zachary tess d7 project manager. us 14 – new ulm to north mankato adt & serious crashes 2009...
TRANSCRIPT
Zachary TessD7 Project Manager
Highway 14 New Ulm to North Mankato ADT and Crashes
RSA High Crash Intersections Fatalities (8 total) Serious Injury (5 total)
2009 ADT– 12.6% Heavy Vehicle Traffic (2007-2011 K+A Crashes)
New Ulm Pop. 13,500
Courtland Pop. 600
Nicollet Pop. 1100
North Mankato / Mankato Pop. 52,700
US 14 – New Ulm to North MankatoADT & Serious Crashes
2009 AADT (HCAADT: 12.6%); 2007-2011 K+A Crashes
Constrained
Corridor Typical - (WB Construction Shown)
Constrained Corridor TypicalConstruction - 2018 $16.4M - $24.6M $14.1M - $21.2M
R/W $0.3M $1.0MHigh TensionCable Barrier
$1.7M *$1.2M
*Future Consideration
Additional Pavement & Aggregate needs◦ 14’ inside median vs. 4’ shoulder ◦ Loonheads – U-turns for truck/agg equipment◦ Crown correction–cheaper than drainage structures
Still need R/W (south side utility poles)
Construction Difference
Pavement andaggregates
$1.5M
Loonheads $0.5MCrown
Correction$0.3M
Current R/W Costs - $12K/acre
• Provided by District Real Estate Rep
When Construction + R/W becomes equal between alternatives
• $46K/acre – Assumes HTCB in both alternatives
• $66K/acre – HTCB only in constrained
R/W Cost per acre $12,000
ConstrainedCorridorTypical
Construction - 2018 $16,407,934 $14,106,085High Tension Cable Barrier
$1,700,000 $1,200,000
R/W $241,612 $966,446
Total $18,349,546 $16,272,531
R/W Cost per acre $46,386
ConstrainedCorridorTypical
$16,407,934 $14,106,085
$1,700,000 $1,200,000
$933,950 $3,735,799
$19,041,884 $19,041,884
• 8’ SHOULDERS (DIMINISHING RETURNS FOR WIDER SHOULDERS)• KEEP 12’ LANES FOR HIGH SPEED RURAL• MINIMIZE MEDIAN WIDTH (ALLOW 3’ DEFLECTION IN THRU LANES)• RUMBLE STRIPS BOTH SIDES (CRASH HISTORY OF
DROWSY/INATTENTIVE DRIVERS)• STICK WITH TUBE DELINEATORS & CONSIDER CABLE IF FUTURE
NEED
SAVES 10’ OF WIDTH AND UNWARRANTED CABLE BARRIER~$1.5M+$1.7M
• 53’ MEDIAN WIDTH WITH 1:4 INSLOPES AND 10’ DITCH BOTTOM (SAVES 13’ AND ALLOWS SPACE FOR RCI)
• 12’ RIGHT LANE AND 8’ SHLD ON WB TH 14 (SAVES ADDITIONAL 2’) DELAY INSTALL OF CABLE BARRIER UNTIL WARRANTS ARE MET
SAVES 25’ OF R/W FOR ENTIRE PROJECT~$230,000 r/w +MATERIAL COSTS+$1.2M CABLE
RAISED MEDIAN BARRIER•USE OF 2’ SHLD REDUCES MEDIAN WIDTH BY 8’ •REDUCED MAINTENANCE AND SNOW MELT PROBLEMS•SIMILAR COST TO HIGH TENSION CABLE BARRIER•USE OF 8’ SHLD LIKE OPTION 1 YIELDS 10’ WIDTH REDUCTION
WIDTH REDUCTION SAVES ~$1.5M
Tech Memo
Constrained◦ Pros
Less impacts to farmland/wetlands
Evaluation for other corridors statewide
◦ Cons Higher Construction Cost Higher Maintenance Cost
Corridor Typical◦ Pros
Lower Construction Cost Introduction of alternative
intersection treatment types – RCUTs
Lower Maintenance Cost
◦ Cons Additional
farmland/wetland impacts
Construction◦ $10M - $15M
4-lanes only No Interchange
R/W◦ $4M
4-lanes Relocations Interchange
*Currently Unfunded
Why to west?◦ RSA – Critical Crash rate intersections
TH 14/TH 111 in Nicollet TH 14/TH 99 in Nicollet
◦ Local and Political Momentum Local Infrastructure planning/needs
Wastewater treatment planning – North Mankato City expanding
2000 population – 890 2010 population – 1100 23.5% increase
TH 14/TH 15 Intersection Discussion◦ Alternatives◦ Discussion of inclusion with MN River Bridge in
New Ulm in 2018
Contact Information◦ Zachary Tess – D7 Project Manager◦ [email protected]◦ 507-304-6199
Corridor Website◦ http://www.dot.state.mn.us/d7/projects/14newulm
tonmankato/