28
NAME OF SECTION TYPE OF MACHINE Formaseal 1 (21111111)

Upload: hosambi

Post on 22-Dec-2015

228 views

Category:

Documents


0 download

DESCRIPTION

http://memberfiles.freewebs.com/31/18/60431831/documents/Pumps.ppthttp://memberfiles.freewebs.com/31/18/60431831/documents/Pumps.ppthttp://memberfiles.freewebs.com/31/18/60431831/documents/Pumps.ppt

TRANSCRIPT

PA

CK

ING

AN

D F

ILL

ING

AR

EA

Quarterly

Halfyearly

Yearly

YOGURT MACHINES

NAME OF SECTION TYPE OF MACHINE PERIOD

Fo

rmas

eal 1

(21

1111

11)

Weekly

Monthly

PA

CK

ING

AN

D F

ILL

ING

AR

EA

Yearly

Quarterly

Halfyearly

Fo

rmas

eal 1

(21

1111

11)

Roller Conveyors (21111112)

Weekly

Halfyearly

Belt Conveyors (21111113)

Weekly

Halfyearly

TYPE OF MACHINE PERIOD

Fo

rmas

eal 2

(21

1121

11)

Weekly

Monthly

PA

CK

ING

AN

D F

ILL

ING

AR

EA

Fo

rmas

eal 2

(21

1121

11)

Yearly

Roller Conveyors (21112112)

Weekly

Halfyearly

Belt Conveyors (21112113)

Weekly

Halfyearly

PA

CK

ING

AN

D F

ILL

ING

AR

EA

Weekly

Monthly

Quarterly

Half Yearly

Yearly

Has

sia

(21

1131

11)

Roller Conveyors (21113112)

Weekly

Halfyearly

Belt Conveyors (21113113)

Weekly

Halfyearly

PA

CK

ING

AN

D F

ILL

ING

AR

EA

Tre

pko

1 (

Lin

ear)

(21

1141

11)

Weekly

Yearly

Plastic Chain conveyors(21114112)

Ink Jet Printer(21114113) Weekly

TYPE OF MACHINE PERIOD

Monthly

Quarterly

Weekly

Monthly

Halfyearly

Roller Conveyors (21114114)

Weekly

Halfyearly

Belt Conveyors (21114115)

Weekly

Halfyearly

TYPE OF MACHINE PERIOD

PA

CK

ING

AN

D F

ILL

ING

AR

EA

Tre

pko

2 (

Ro

tary

) (2

1115

111)

Weekly

Yearly

Ink Jet Printer(21115112) Weekly

Plastic Chain conveyors(21115113)

Gru

nd

wal

d (

2111

6111

)

Weekly

Monthly

Quarterly

Weekly

Monthly

Halfyearly

Roller Conveyors (21115114)

Weekly

Halfyearly

Belt Conveyors (21115115

Weekly

Halfyearly

TYPE OF MACHINE PERIOD

PA

CK

ING

AN

D F

ILL

ING

AR

EA

Gru

nd

wal

d (

2111

6111

)

Weekly

Yearly

Ink Jet Printer 1 (21116112) Weekly

Ink Jet Printer 2 (21116113) Weekly

Monthly

Quarterly

Roller Conveyors (21116114)

Weekly

Halfyearly

Belt Conveyors (21116115)

Weekly

Halfyearly

INCUBATION AREA Heaters(21211111) Weekly

1.1. Check the sterile air filter1.2. Check leakage at connections hoses, gasket and unions.1.3. Check all lubrication points and oil level.1.4. Check the Ic water line and clean .1.5. Check the compressed air filter.1.6. Check all sensors and proximity Switches for normal operation.1.7. Check all motor circuit (contactors,overload ).2.1. Check the oil level in gear box2.2. Check all bearing and change worn out.2.3. Check Joint bearing for clearance Inspect gaskets. 2.4. Clean the electrical panel.2.5. Check and tighten all connection points in panels and motors.

Quarterly3.1. Check and change membranes for filling station.

3.2. Check all items in Form Seal main Panels.

Halfyearly 4.1. change cable legs

Yearly

YOGURT MACHINES

PERIOD JOB DESCRIBTION

Weekly

Monthly

5.1. make seasonal overhauling as following:1. change all distributors .2. change heater of sealing.3. change heater of preheating unit.4. change temp sensor of sealing and preheating.5. check all cables and change old.6. check connection box of all motors.7. check all connection in panels.

5.2.Check all spare parts and change as necessary as mentioned in list. 1.solenoid valve 2.plug assist motor 3.video card 4. cylinder sensor 5.hydraulic solenoid valve 6.cable legs 7.resistor sensor 8.resistor sensor 9.FCV Board

Yearly Yearly

1.1.check roller rotation 1.2. check Drive band .1.3. check the shaft for conveyor ,and sprockts , bearings, chains , and coupling and change If necessary.1.4. check oil level for motor and refill it If necessary 1.5. grease motion transfer chains.

2.1. check chains cover , main swith for motor conveyor.

1.1. ckeck the belt conveyor .1.2. check rollers ,pulleys ,sprockets , guides, bearings , and replace worn out part.1.3. check oil level for conveyor motor and refill it If necessaury .1.6. check tention of conveyors belts .1.5. Grease the chains for motor. 1.4. check chain covers. And main switch ,2,1. Change gear box oil.

1.1. Check the sterile air filter1.2. Check leakage at connections hoses, gasket and unions.1.3. Check all lubrication points and oil level.1.4. Check the Ic water line and clean .1.5. Check the compressed air filter.1.6. Check all sensors and proximity Switches for normal operation.1.7. Check all motor circuit (contactors,overload ).2.1. Check the oil level in gear box2.2. Check all bearing and change worn out.2.3. Check Joint bearing for clearance Inspect gaskets. 2.4. Clean the electrical panel.2.5. Check and tighten all connection points in panels and motors.

Quarterly3.1. Check and change membranes for filling station.

3.2. Check all items in Form Seal main Panels.

Halfyearly 4.1. change cable legs

5.3.Check all spare parts and change as necessary as mentioned in list. 1.DEEP GROOVE BALL BEARING S/RO 2 2.ONE WAY RASTICTOR 2 3.O-RING 4 4.CYL ROL BRG XXX 2 5.ROD STANCE 2 6.UNIBALL BEARING 2 7.HOOK 4 8.SEALING FORM 1 9.SEAL RING 1

Weekly

Halfyearly

Weekly

Halfyearly

PERIOD JOB DESCRIBTION

Weekly

Monthly

1.1.check roller rotation 1.2. check Drive band .1.3. check the shaft for conveyor ,and sprockts , bearings, chains , and coupling and change If necessary.1.4. check oil level for motor and refill it If necessary 1.5. grease motion transfer chains. 2.1. check chains cover , main swith for motor conveyor. 1.1. ckeck the belt conveyor .1.2. check rollers ,pulleys ,sprockets , guides, bearings , and replace worn out part.1.3. check oil level for conveyor motor and refill it If necessaury .1.6. check tention of conveyors belts .1.5. Grease the chains for motor. 1.4. check chain covers. And main switch ,2,1. Change gear box oil.

Yearly

5.1. make seasonal overhauling as following:1. change all distributors .2. change heater of sealing.3. change heater of preheating unit.4. change temp sensor of sealing and preheating.5. check all cables and change old.6. check connection box of all motors.7. check all connection in panels.

5.2.Check all spare parts and change as necessary as mentioned in list. 1.solenoid valve 2.plug assist motor 3.video card 4. cylinder sensor 5.hydraulic solenoid valve 6.cable legs 7.resistor sensor 8.resistor sensor 9.FCV Board

5.3.Check all spare parts and change as necessary as mentioned in list. 1.DEEP GROOVE BALL BEARING S/RO 2 2.ONE WAY RASTICTOR 2 3.O-RING 4 4.CYL ROL BRG XXX 2 5.ROD STANCE 2 6.UNIBALL BEARING 2 7.HOOK 4 8.SEALING FORM 1 9.SEAL RING 1

Weekly

Halfyearly

Weekly

Halfyearly

Weekly

1.1.Check the grease in the container and refill .1.2. Check and clean Ic water line.1.3. Check all Sensors and proximity switches for normal operation .1.4.Check all motor circuits (Contactors, Overloads).

Monthly2.1. Clean the compressed air filters2.2. Check the pointer on the filter

Quarterly 3.1. Check all items in HASSIA main panel .

Half Yearly4.1. Change the hydraulic oil (every 2000hrs) of the hydraulic system.

4.2. check the cable &legs of sealing heater and change the burn cable

Yearly

1.1.check roller rotation 1.2. check Drive band .1.3. check the shaft for conveyor ,and sprockts , bearings, chains , and coupling and change If necessary.1.4. check oil level for motor and refill it If necessary 1.5. grease motion transfer chains.

2.1. check chains cover , main swith for motor conveyor.

1.1. ckeck the belt conveyor .1.2. check rollers ,pulleys ,sprockets , guides, bearings , and replace worn out part.1.3. check oil level for conveyor motor and refill it If necessaury .1.6. check tention of conveyors belts .1.5. Grease the chains for motor. 1.4. check chain covers. And main switch ,

2,1. Change gear box oil.

5.1. change spare parts as following: 1. solenoid valve 2. Check all motor circuits (Contactors, Overloads) 3..cylinder sensor 4..hydrolic solenoid valve 5.cable legs 6.resistor sensor

5.2.Check all spare parts and change as necessary as mentioned in list. 1.DEEP GROOVE BALL BEARING S/RO 2 2.ONE WAY RASTICTOR 2 3.O-RING 4 4.CYL ROL BRG XXX 2 5.ROD STANCE 2 6.UNIBALL BEARING 2 7.HOOK 4 8.SEALING FORM 1 9.SEAL RING 1

Weekly

Halfyearly

Weekly

Halfyearly

Weekly

1.1. Check pneumatic equipment for leaks at connections,hoses, gaskets and unions.1.2. Check that all lubrication points are sufficiently oiled .1.3. Check oil- level in lubrication pump.1.4. Check suction heads for scratches, - add talc powder or silicone.1.5. Check all Sensors and proximity switches for normal operation . 1.6. Check all motor circuits (Contactors, Overloads)2.1. Check mechanical parts joints and bearings for clearance .2.2. Inspect filling piece gaskets.2.3. check all connection in panels2.4. change all air pipes.3.1. Check all the items in the electric panel.3.2. Clean all solenoid valves.2

Yearly

1.1. check and clean .

1.2. check oil level of Conveyor motor and fill it If necessary.

2.1. Open the conveyor, and check ,clean conveyor and guide ; and checks prockets , bearings and replace worn out part.

3.1. change the oil.

Weekly

1.1. Head - check and clean 1.2. Cabinet Filter - clean 1.3. Pipe connections- check1.4. Photocell- clean 1.1.check roller rotation 1.2. check Drive band .1.3. check the shaft for conveyor ,and sprockts , bearings, chains , and coupling and change If necessary.1.4. check oil level for motor and refill it If necessary 1.5. grease motion transfer chains.

2.1. check chains cover , main swith for motor conveyor.

1.1. ckeck the belt conveyor .1.2. check rollers ,pulleys ,sprockets , guides, bearings , and replace worn out part.1.3. check oil level for conveyor motor and refill it If necessaury .1.6. check tention of conveyors belts .1.5. Grease the chains for motor. 1.4. check chain covers. And main switch ,

2,1. Change gear box oil.

PERIOD JOB DESCRIBTION

Monthly

Quarterly

4.1. make seasonal overhauling as following: 1.change all solenoids valves . 2.change all heaters of sealing. 3..check all cables and change old. 4.check connection box of all motors.

Weekly

Monthly

Halfyearly

Weekly

Halfyearly

Weekly

Halfyearly

PERIOD JOB DESCRIBTION

Weekly

1.1. Check pneumatic equipment for leaks at connections,hoses, gaskets and unions.1.2. Check that all lubrication points are sufficiently oiled .1.3. Check oil- level in lubrication pump.1.4. Check suction heads for scratches, - add talc powder or silicone.1.5. Check all Sensors and proximity switches for normal operation . 1.6. Check all motor circuits (Contactors, Overloads)2.1. Check mechanical parts joints and bearings for clearance .2.2. Inspect filling piece gaskets.2.3. check all connection in panels2.4. change all air pipes.3.1. Check all the items in the electric panel.3.2. Clean all solenoid valves.2

Yearly

Weekly

1.1. Head - check and clean 1.2. Cabinet Filter - clean 1.3. Pipe connections- check1.4. Photocell- clean 1.1. check and clean .

1.2. check oil level of Conveyor motor and fill it If necessary.

2.1. Open the conveyor, and check ,clean conveyor and guide ; and checks prockets , bearings and replace worn out part.

3.1. change the oil.

1.1.check roller rotation 1.2. check Drive band .1.3. check the shaft for conveyor ,and sprockts , bearings, chains , and coupling and change If necessary.1.4. check oil level for motor and refill it If necessary 1.5. grease motion transfer chains.

2.1. check chains cover , main swith for motor conveyor.

1.1. ckeck the belt conveyor .1.2. check rollers ,pulleys ,sprockets , guides, bearings , and replace worn out part.1.3. check oil level for conveyor motor and refill it If necessaury .1.6. check tention of conveyors belts .1.5. Grease the chains for motor. 1.4. check chain covers. And main switch ,

2,1. Change gear box oil.

Weekly

1.1. Check pneumatic equipment for leaks at connections,hoses, gaskets and unions.1.2. Check that all lubrication points are sufficiently oiled .

Monthly

Quarterly

4.1. make seasonal overhauling as following: 1.change all solenoids valves . 2.change all heaters of sealing. 3..check all cables and change old. 4.check connection box of all motors.

Weekly

Monthly

Halfyearly

Weekly

Halfyearly

Weekly

Halfyearly

PERIOD JOB DESCRIBTION

Weekly Weekly1.3. Check oil- level in lubrication pump.1.4. Check suction heads for scratches, - add talc powder or silicone.1.5. Check all Sensors and proximity switches for normal operation . 1.6. Check all motor circuits (Contactors, Overloads)2.1. Check mechanical parts joints and bearings for clearance .2.2. Inspect filling piece gaskets.2.3. check and tight all Terminal in the panels2.4. change all air pipes.3.1. Check all for normal operation items in the electric panel.3.2. Clean all solenoid valves.

Yearly

Weekly

1.1. Head - check and clean 1.2. Cabinet Filter - clean 1.3. Pipe connections- check1.4. Photocell- clean

Weekly

1.1. Head - check and clean 1.2. Cabinet Filter - clean 1.3. Pipe connections- check1.4. Photocell- clean 1.1.check roller rotation 1.2. check Drive band .1.3. check the shaft for conveyor ,and sprockts , bearings, chains , and coupling and change If necessary.1.4. check oil level for motor and refill it If necessary 1.5. grease motion transfer chains.

2.1. check chains cover , main swith for motor conveyor.

1.1. ckeck the belt conveyor .1.2. check rollers ,pulleys ,sprockets , guides, bearings , and replace worn out part.1.3. check oil level for conveyor motor and refill it If necessaury .1.6. check tention of conveyors belts .1.5. Grease the chains for motor. 1.4. check chain covers. And main switch ,

2,1. Change gear box oil.

1.1. Tight all Terminal .1.2. Check Fan working .1.3. Check If the outlet air is hot.

Monthly

Quarterly

4.1. make seasonal overhauling as following: 1.change all solenoids valves . 2.change all heaters of sealing. 3..check all cables and change the bad ones. 4.Tihght all Terminal connection in boxes .

Weekly

Halfyearly

Weekly

Halfyearly

Weekly

1.1. Check the sterile air filter1.2. Check leakage at connections hoses, gasket and unions.1.3. Check all lubrication points and oil level.1.4. Check the Ic water line and clean .1.5. Check the compressed air filter.1.6. Check all sensors and proximity Switches for normal operation.1.7. Check all motor circuit (contactors,overload ).2.1. Check the oil level in gear box2.2. Check all bearing and change worn out.2.3. Check Joint bearing for clearance Inspect gaskets. 2.4. Clean the electrical panel.2.5. Check and tighten all connection points in panels and motors.

3.1. Check and change membranes for filling station.

3.2. Check all items in Form Seal main Panels.

4.1. change cable legs

YOGURT MACHINES

JOB DESCRIBTION

5.1. make seasonal overhauling as following:1. change all distributors .2. change heater of sealing.3. change heater of preheating unit.4. change temp sensor of sealing and preheating.5. check all cables and change old.6. check connection box of all motors.7. check all connection in panels.

5.2.Check all spare parts and change as necessary as mentioned in list. 1.solenoid valve 2.plug assist motor 3.video card 4. cylinder sensor 5.hydraulic solenoid valve 6.cable legs 7.resistor sensor 8.resistor sensor 9.FCV Board

1.1.check roller rotation 1.2. check Drive band .1.3. check the shaft for conveyor ,and sprockts , bearings, chains , and coupling and change If necessary.1.4. check oil level for motor and refill it If necessary 1.5. grease motion transfer chains.

2.1. check chains cover , main swith for motor conveyor.

1.1. ckeck the belt conveyor .1.2. check rollers ,pulleys ,sprockets , guides, bearings , and replace worn out part.1.3. check oil level for conveyor motor and refill it If necessaury .1.6. check tention of conveyors belts .1.5. Grease the chains for motor. 1.4. check chain covers. And main switch ,2,1. Change gear box oil.

1.1. Check the sterile air filter1.2. Check leakage at connections hoses, gasket and unions.1.3. Check all lubrication points and oil level.1.4. Check the Ic water line and clean .1.5. Check the compressed air filter.1.6. Check all sensors and proximity Switches for normal operation.1.7. Check all motor circuit (contactors,overload ).2.1. Check the oil level in gear box2.2. Check all bearing and change worn out.2.3. Check Joint bearing for clearance Inspect gaskets. 2.4. Clean the electrical panel.2.5. Check and tighten all connection points in panels and motors.

3.1. Check and change membranes for filling station.

3.2. Check all items in Form Seal main Panels.

4.1. change cable legs

5.3.Check all spare parts and change as necessary as mentioned in list. 1.DEEP GROOVE BALL BEARING S/RO 2 2.ONE WAY RASTICTOR 2 3.O-RING 4 4.CYL ROL BRG XXX 2 5.ROD STANCE 2 6.UNIBALL BEARING 2 7.HOOK 4 8.SEALING FORM 1 9.SEAL RING 1

JOB DESCRIBTION

1.1.check roller rotation 1.2. check Drive band .1.3. check the shaft for conveyor ,and sprockts , bearings, chains , and coupling and change If necessary.1.4. check oil level for motor and refill it If necessary 1.5. grease motion transfer chains. 2.1. check chains cover , main swith for motor conveyor. 1.1. ckeck the belt conveyor .1.2. check rollers ,pulleys ,sprockets , guides, bearings , and replace worn out part.1.3. check oil level for conveyor motor and refill it If necessaury .1.6. check tention of conveyors belts .1.5. Grease the chains for motor. 1.4. check chain covers. And main switch ,2,1. Change gear box oil.

5.1. make seasonal overhauling as following:1. change all distributors .2. change heater of sealing.3. change heater of preheating unit.4. change temp sensor of sealing and preheating.5. check all cables and change old.6. check connection box of all motors.7. check all connection in panels.

5.2.Check all spare parts and change as necessary as mentioned in list. 1.solenoid valve 2.plug assist motor 3.video card 4. cylinder sensor 5.hydraulic solenoid valve 6.cable legs 7.resistor sensor 8.resistor sensor 9.FCV Board

5.3.Check all spare parts and change as necessary as mentioned in list. 1.DEEP GROOVE BALL BEARING S/RO 2 2.ONE WAY RASTICTOR 2 3.O-RING 4 4.CYL ROL BRG XXX 2 5.ROD STANCE 2 6.UNIBALL BEARING 2 7.HOOK 4 8.SEALING FORM 1 9.SEAL RING 1

1.1.Check the grease in the container and refill .1.2. Check and clean Ic water line.1.3. Check all Sensors and proximity switches for normal operation .1.4.Check all motor circuits (Contactors, Overloads).2.1. Clean the compressed air filters2.2. Check the pointer on the filter

3.1. Check all items in HASSIA main panel .

4.1. Change the hydraulic oil (every 2000hrs) of the hydraulic system.

4.2. check the cable &legs of sealing heater and change the burn cable

1.1.check roller rotation 1.2. check Drive band .1.3. check the shaft for conveyor ,and sprockts , bearings, chains , and coupling and change If necessary.1.4. check oil level for motor and refill it If necessary 1.5. grease motion transfer chains.

2.1. check chains cover , main swith for motor conveyor.

1.1. ckeck the belt conveyor .1.2. check rollers ,pulleys ,sprockets , guides, bearings , and replace worn out part.1.3. check oil level for conveyor motor and refill it If necessaury .1.6. check tention of conveyors belts .1.5. Grease the chains for motor. 1.4. check chain covers. And main switch ,

2,1. Change gear box oil.

5.1. change spare parts as following: 1. solenoid valve 2. Check all motor circuits (Contactors, Overloads) 3..cylinder sensor 4..hydrolic solenoid valve 5.cable legs 6.resistor sensor

5.2.Check all spare parts and change as necessary as mentioned in list. 1.DEEP GROOVE BALL BEARING S/RO 2 2.ONE WAY RASTICTOR 2 3.O-RING 4 4.CYL ROL BRG XXX 2 5.ROD STANCE 2 6.UNIBALL BEARING 2 7.HOOK 4 8.SEALING FORM 1 9.SEAL RING 1

1.1. Check pneumatic equipment for leaks at connections,hoses, gaskets and unions.1.2. Check that all lubrication points are sufficiently oiled .1.3. Check oil- level in lubrication pump.1.4. Check suction heads for scratches, - add talc powder or silicone.1.5. Check all Sensors and proximity switches for normal operation . 1.6. Check all motor circuits (Contactors, Overloads)2.1. Check mechanical parts joints and bearings for clearance .2.2. Inspect filling piece gaskets.2.3. check all connection in panels2.4. change all air pipes.3.1. Check all the items in the electric panel.3.2. Clean all solenoid valves.2

1.1. check and clean .

1.2. check oil level of Conveyor motor and fill it If necessary.

2.1. Open the conveyor, and check ,clean conveyor and guide ; and checks prockets , bearings and replace worn out part.

3.1. change the oil.

1.1. Head - check and clean 1.2. Cabinet Filter - clean 1.3. Pipe connections- check1.4. Photocell- clean 1.1.check roller rotation 1.2. check Drive band .1.3. check the shaft for conveyor ,and sprockts , bearings, chains , and coupling and change If necessary.1.4. check oil level for motor and refill it If necessary 1.5. grease motion transfer chains.

2.1. check chains cover , main swith for motor conveyor.

1.1. ckeck the belt conveyor .1.2. check rollers ,pulleys ,sprockets , guides, bearings , and replace worn out part.1.3. check oil level for conveyor motor and refill it If necessaury .1.6. check tention of conveyors belts .1.5. Grease the chains for motor. 1.4. check chain covers. And main switch ,

2,1. Change gear box oil.

JOB DESCRIBTION

4.1. make seasonal overhauling as following: 1.change all solenoids valves . 2.change all heaters of sealing. 3..check all cables and change old. 4.check connection box of all motors.

JOB DESCRIBTION

1.1. Check pneumatic equipment for leaks at connections,hoses, gaskets and unions.1.2. Check that all lubrication points are sufficiently oiled .1.3. Check oil- level in lubrication pump.1.4. Check suction heads for scratches, - add talc powder or silicone.1.5. Check all Sensors and proximity switches for normal operation . 1.6. Check all motor circuits (Contactors, Overloads)2.1. Check mechanical parts joints and bearings for clearance .2.2. Inspect filling piece gaskets.2.3. check all connection in panels2.4. change all air pipes.3.1. Check all the items in the electric panel.3.2. Clean all solenoid valves.2

1.1. Head - check and clean 1.2. Cabinet Filter - clean 1.3. Pipe connections- check1.4. Photocell- clean 1.1. check and clean .

1.2. check oil level of Conveyor motor and fill it If necessary.

2.1. Open the conveyor, and check ,clean conveyor and guide ; and checks prockets , bearings and replace worn out part.

3.1. change the oil.

1.1.check roller rotation 1.2. check Drive band .1.3. check the shaft for conveyor ,and sprockts , bearings, chains , and coupling and change If necessary.1.4. check oil level for motor and refill it If necessary 1.5. grease motion transfer chains.

2.1. check chains cover , main swith for motor conveyor.

1.1. ckeck the belt conveyor .1.2. check rollers ,pulleys ,sprockets , guides, bearings , and replace worn out part.1.3. check oil level for conveyor motor and refill it If necessaury .1.6. check tention of conveyors belts .1.5. Grease the chains for motor. 1.4. check chain covers. And main switch ,

2,1. Change gear box oil.

1.1. Check pneumatic equipment for leaks at connections,hoses, gaskets and unions.1.2. Check that all lubrication points are sufficiently oiled .

4.1. make seasonal overhauling as following: 1.change all solenoids valves . 2.change all heaters of sealing. 3..check all cables and change old. 4.check connection box of all motors.

JOB DESCRIBTION

1.3. Check oil- level in lubrication pump.1.4. Check suction heads for scratches, - add talc powder or silicone.1.5. Check all Sensors and proximity switches for normal operation . 1.6. Check all motor circuits (Contactors, Overloads)2.1. Check mechanical parts joints and bearings for clearance .2.2. Inspect filling piece gaskets.2.3. check and tight all Terminal in the panels2.4. change all air pipes.3.1. Check all for normal operation items in the electric panel.3.2. Clean all solenoid valves.

1.1. Head - check and clean 1.2. Cabinet Filter - clean 1.3. Pipe connections- check1.4. Photocell- clean 1.1. Head - check and clean 1.2. Cabinet Filter - clean 1.3. Pipe connections- check1.4. Photocell- clean 1.1.check roller rotation 1.2. check Drive band .1.3. check the shaft for conveyor ,and sprockts , bearings, chains , and coupling and change If necessary.1.4. check oil level for motor and refill it If necessary 1.5. grease motion transfer chains.

2.1. check chains cover , main swith for motor conveyor.

1.1. ckeck the belt conveyor .1.2. check rollers ,pulleys ,sprockets , guides, bearings , and replace worn out part.1.3. check oil level for conveyor motor and refill it If necessaury .1.6. check tention of conveyors belts .1.5. Grease the chains for motor. 1.4. check chain covers. And main switch ,

2,1. Change gear box oil.

1.1. Tight all Terminal .1.2. Check Fan working .1.3. Check If the outlet air is hot.

4.1. make seasonal overhauling as following: 1.change all solenoids valves . 2.change all heaters of sealing. 3..check all cables and change the bad ones. 4.Tihght all Terminal connection in boxes .

TYPE OF MAINTENANCE

MECHANICAL

ELECTRICAL

MECHANICAL

ELECTRICAL

MECHANICAL ELECTRICAL ELECTRICAL

ELECTRICAL

ELECTRICAL

MECHANICAL + ELECTRICAL

MECHANICAL

MECHANICAL

MECHANICAL

ELECTRICAL MECHANICAL

TYPE OF MAINTENANCE

MECHANICAL

ELECTRICAL

MECHANICAL

ELECTRICAL

MECHANICAL

ELECTRICAL

ELECTRICAL

MECHANICAL + ELECTRICAL

ELECTRICAL

ELECTRICAL

MECHANICAL

MECHANICAL

MECHANICAL

ELECTRICAL MECHANICAL

MECHANICAL + ELECTRICAL

MECHANICAL

ELECTRICAL

MECHANICAL

ELECTRICAL MECHANICAL ELECTRICAL

ELECTRICAL

MECHANICAL

MECHANICAL

MECHANICAL

ELECTRICAL

MECHANICAL

MECHANICAL + ELECTRICAL

TYPE OF MAINTENANCE

MECHANICAL

ELECTRICAL

MECHANICAL

ELECTRICAL

ELECTRICAL

ELECTRICAL

MECHANICAL

ELECTRICAL

MECHANICAL

MECHANICAL

ELECTRICAL

MECHANICAL

TYPE OF MAINTENANCE

MECHANICAL + ELECTRICAL

MECHANICAL

ELECTRICAL

MECHANICAL

ELECTRICAL

ELECTRICAL

ELECTRICAL

ELECTRICAL

MECHANICAL

MECHANICAL

MECHANICAL

ELECTRICAL

MECHANICAL

TYPE OF MAINTENANCE

MECHANICAL

MECHANICAL + ELECTRICAL

MECHANICAL

ELECTRICAL

MECHANICAL

ELECTRICAL

ELECTRICAL

ELECTRICAL

ELECTRICAL

ELECTRICAL

MECHANICAL

MECHANICAL

ELECTRICAL

MECHANICAL

ELECTRICAL