yellowknife water treatment plant information session · 2014-12-09 · • niws – no ice, wind...

23
1 Yellowknife Water Treatment Plant Information Session May 10, 2011 Introduction Information Session Presentation Outline Background & History Future Water Treatment Plant Water Sources – Arsenic Arsenic Removal Question Session Informal Discussion May 11, 2011 Yellowknife Water Treatment Plant Information Session Page 2

Upload: others

Post on 13-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

1

Yellowknife Water Treatment Plant Information Session

May 10, 2011

Introduction

• Information Session

• Presentation Outline– Background & History– Future Water Treatment Plant– Water Sources– Arsenic– Arsenic Removal

• Question Session

• Informal Discussion

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 2

Page 2: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

2

Water Supply History

• Piped Water Supply commenced 1948

• Raw Water from Yellowknife Bay

• Concerns raised regarding Arsenic and Sewage

• 1968 onwards Pumphouse 2 and an 8 km Submarine Pipeline utilized

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 3

Existing Water Supply System

• Current Water Supply System consists of – River Pumphouse / Pipeline– Chlorination – Fluoridation – Distribution / fire pumping

• Yellowknife River water is generally good quality

• Turbidity can increase in spring / summer

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 4

Page 3: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

3

Raw Water Quality Concerns

• High Turbidity events– Spring Time– Short durations– Interferes with disinfection – Aesthetic concern (T&O)

• Protection against – Pathogens

(Cryptosporidium & Giardia)– Viruses

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 5

Turbidity Events

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 6

Page 4: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

4

Yellowknife River Water Turbidity

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 7

1999 - Limit

1978 - Limit

Water Supply Regulations

• GNWT “Water Supply System Regulations” make the Guidelines for Canadian Drinking Water Quality the “Standard” for Drinking Water Quality

• For a surface water, the Guidelines for Canadian Drinking Water Quality state– Filtration is required to reduce turbidity as low as possible– Virus inactivation is required for all technologies– Pathogen reduction / inactivation is required to reduce illness based

upon risk (Giardia and Cryptosporidium)

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 8

Page 5: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

5

Actions to meet Regulatory Requirements

• Move to Water Treatment Plant

• Process Piloting Complete

• Preliminary Design Completed

• Membrane Filtration System– 20 Million Liters /day– Fixed Barrier– Low Chemical Use– Highly Automated

• Moving Forward with Detailed Design

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 9

Raw Water Sources

Page 6: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

6

Current Raw Water Source - Yellowknife River

• City’s Raw Water Source since 1968

• Stable Water Quality

• Occasional Turbidity Events

• Pumphouse 2 and Submarine Pipeline used to bring water across the Bay

• In service for 43 years

• Pipeline Replacement Date 2020

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 11

Alternate Raw Water Source - Yellowknife Bay

• Emergency Source

• Used During Repairs

• Stable Water Quality

• Turbidity Events have less impact

• Intake Structure in Place

• Niven Lake Sewage Discharge Discontinue1981

• Mining Stopped

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 12

Page 7: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

7

Orientation of Sources

River Source Water Pumphouse 2Giant Mine

Bay Source Water Pumphouse 1

Submarine Pipeline

Niven Lake Sewage

Discharge

Raw Water Source Comparisons

River Source Water Bay Source Water

Availability of raw water depended upon River flow

Raw Water taken directly from the Bay

Stable Water Quality with TurbidityEvents

Stable Water Quality, Turbidity Events Less Dramatic

Pumphouse 1, 2 and Submarine Pipeline will required replacement / improvements

Pumphouse 1 only will require equipment replacement

Annual Operational & Maintenance must account for Pumphouse 1, 2 and Submarine Pipeline

Annual Operational & Maintenance must account for Pumphouse 1 only

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 14

Page 8: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

8

Arsenic

Sources of Arsenic

• Ore processing at Giant and Con mines released arsenic into air, which settled into water and sediments

• In 1960s Con mine switched to Autoclave process, reducing the release of Arsenic

• Both mines have stopped production recently

• Currently there are high concentrations of Arsenic at the Giant Mine site in terms of surface dust and in water in tailings ponds and below ground.

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 16

Page 9: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

9

Arsenic Background

• Arsenic concentration measured parts per billion (ppb)

• 1 part per billion (ppb) = 1 microgram per Liter (µg/L)

• Guidelines for Canadian Drinking Water Quality– Maximum Allowable Concentration (MAC) of Total Arsenic in

Drinking Water is 10 ppb– Reduced from 25 ppb in 2006 following research by the USEPA– Prior to that the MAC was set at 50 ppb

• CCME Canadian Water Quality Guideline for the Protection of Aquatic Life– Maximum Allowable Concentration 5 ppb

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 17

Arsenic Background II

• Sediment Limitations

• Interim Sediment Quality Guideline (ISQG)– Protection of Aquatic Life– 5,900 ppb (milligrams of Arsenic per kilogram of sediment)

• Probable Effects Limit (PEL)– defines the level above which adverse effects are expected to

occur frequently IN AQUATIC LIFE– 17,000 ppb (milligrams of Arsenic per kilograms of sediment)

• Natural levels of Arsenic in soil– Yellowknife Average 150,000 ppb

(Federal Contaminated Site Risk Assessment in Canada, Part I, 2004)

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 18

Page 10: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

10

Arsenic Distribution

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 19

Arsenic Concentrations Bay Water (ppb) - 1988

Stratum 1 (Upper Bay - ppb)

Stratum 2 (Back Bay - ppb)

Stratum 3 (East of Latham

Island - ppb)

Stratum 4 (Lower Bay -ppb)

Summer Max 22 24 12 4

Mean 2.65 4.65 2.91 1.25

Fall Max 9 6 5 1

Mean 3.03 4.81 2.7 1

Winter Max 25 26 27 1

Mean 2.12 4.86 2.57 1

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 20

Ref: Water Quality Study of Yellowknife Bay: 1987-1988. DRAFT Report, HydroQual Consultants Inc

• Giant Mine Operating

• Arsenic Concentration falls away

Page 11: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

11

Arsenic Concentrations Sediments (ppb) - 1988

Stratum 1(upper bay)

Stratum 2(Back Bay)

Stratum 3(east and south Latham Island)

Stratum 4(lower bay)

Pre-1980 254,000 388,000 173,000 -

Post-1980 257,000 595,000 137,000 36,000

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 21

Ref: Water Quality Study of Yellowknife Bay: 1987-1988. DRAFT Report, HydroQual Consultants Inc

• Natural Background– 150,000 ppb

Subsequent Studies

• Jackson 1996– Giant Mine Operating– Station #8 (Pumphouse 1)– 6 Samples Water Samples Taken between Sept ‘92 and Mar ’94– All water samples less than 5 ppb (Aquatic Requirement)

• City of Yellowknife– Sampling Total Arsenic at Pumphouse 1 since 2005– All water samples less than 3 ppb, one exception at 6.5 ppb – Drinking Water Limit 10 ppb

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 22

Page 12: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

12

Arsenic Concentrations

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 23

0

1

2

3

4

5

6

7

8

9

10

11

Jun-05 Dec-05 Jun-06 Nov-06 May-07 Nov-07 May-08 Oct-08 Apr-09 Oct-09 Apr-10 Sep-10

Con

cent

ratio

n (p

pb)

Bay Water River Water

Maximum Allowable Concentration - 10 ppb

Conclusion of Information Review

• Information on Arsenic within the Bay is limited.

• Last study noted Arsenic concentrations in the Bay Water were below limits

• Yellowknife River and Currents influence the movement of Arsenic within the Bay

• Currents could re-suspend fine particulates and pore water

• Next actions– Determine if there is a connection between fluctuating Arsenic

Concentration and the local conditions– Develop Field study to obtain sediment data closer to the Intake

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 24

Page 13: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

13

Arsenic Correlation

• Indication of Weather Influence

• Using – City Arsenic Data – Weather Records for Airport

• Date reviewed and analyzed

• Filtered for day’s where Temperature < -3 ºC

• NIWS – No Ice, Wind Speed

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 25

Dissolved Arsenic and Wind Action

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 26

Page 14: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

14

Potential of Future Arsenic Event

• Event Basis– Arsenic greater than 10 ppb in Bay Raw Water

• Statistical Analysis Completed

• Cause: Release of pore water

• Conclusions – Short Term Event of less than 10 days in duration: Unlikely– Long Term Event exceeds 0.4 (1.0 is a definite occurrence)

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 27

Arsenic Concentrations

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 28

0

1

2

3

4

5

6

7

8

9

10

11

Jun-05 Dec-05 Jun-06 Nov-06 May-07 Nov-07 May-08 Oct-08 Apr-09 Oct-09 Apr-10 Sep-10

Con

cent

ratio

n (p

pb)

Bay Water River Water

Maximum Allowable Concentration - 10 ppb

Page 15: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

15

2010 Sediment Sampling

Sample Location Water Total Arsenic Concentration (ppb)

Water Dissolved Arsenic Concentration

(ppb)

Sediment Total Arsenic Concentration (ppb)

YB-01 1.0 0.93 -

YB-02 0.96 1 102,000

YB-03 0.96 0.89 47,000

YB-04 1.4 1.1 140,000

YB-05 1.1 1.1 81,000

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 29

• Update sediment concentration around the intake

• 1988 Samples: 173,000 / 137,000 ppb

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 30

47,000 ppb

140,000 ppb

102,000 ppb

81,000 ppb

Yellow Text –Sediment Total Arsenic Concentration

Natural Background Ave – 150,000 ppb

No Sample

Page 16: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

16

Arsenic “Remobilization”

• Andrade et al (2010)

• Sediment Core Analysis charts mining activity

• Cores showed mobility following deposition

• Analysis of pore water showed Arsenic movement towards the sediments / water body interface

• Reducing Environment in winter promotes creation of Dissolve Arsenic

• Supports the inference between Wind speed and Arsenic concentrations in Bay Water

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 31

Giant Mine Factor

• Significant Source of Arsenic

• Development of Remediation Plan Ongoing

• Tailings Ponds Water Arsenic Concentration: 20,000 ppb

• Tailing Ponds Concept – Discharge Treated Tailings Water to North End of the Bay– Application of Diffuser– Dilution Design of 80:1– Dispersion Analysis demonstrates 5 ppb limit for the protection of

aquatic life is achievable (Giant Mine Remediation Project - Developer’s Assessment Report , 2010)

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 32

Page 17: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

17

Giant Mine – What if……..

• Tailings Pond Breach

• Water Discharged into Baker Creek / Back Bay

• Initial Giant Mine work applied a dilution ratio of 200:1 from Baker Creek to South Yellowknife Bay (SWK Consulting, 2009)

• Arsenic Concentration Drops – 20,000 ppb to 100 ppb at the Intake

• In the event of a release there would likely NOT be enough time to – Procure, install and commission arsenic removal equipment, – Commission previously installed equipment

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 33

Arsenic Removal

Page 18: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

18

Arsenic Treatment Options

• Coagulation

• Sorption Process

• Ion Exchange

• High Pressure Membrane Filtration

• Assessment Factors– Local Situation– Chemical Involvement– Complexity– Waste Generation – Cost

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 35

Adsorption Filters

• Iron Based Media

• Adheres to the Surface

• Potential Pre-oxidation

• Packaged System

• Arsenic Locked into Media

• Backwash Waste contains no Arsenic

• Once “Full” media can be regenerate or disposed of.

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 36

Page 19: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

19

Adsorption Filters II

• Media meets US EPA’s Toxicity Characteristic Leaching Procedure (TCLP)

• Passive System.

• Also removes other components– Phosphates– Silica– Vanadium

• Performance – Initial Outlet Concentration below detection limit– Break through as Media “used”

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 37

Estimate Media Life

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 38

0

2

4

6

8

10

12

14

0 100 200 300 400 500 600 700 800 900 1000

Arse

nic

Rem

oval

Med

ia L

ife (m

onth

s)

Incoming Arsenic Concentration (ppb)

Anticipated maximum at intake in a tailings pond release

GCDWQ limit = 10 ppb

Page 20: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

20

Low Probability Scenario – Tailings Pond Failure

• Tailings Ponds Dam Failure

• 20,000 ppb water release into Baker Creek / Back Bay

• Concentration at Bay Intake 100 ppb

• Passive Arsenic Removal System in Place

• Reduces Arsenic Concentration to below 10 ppb

• Arsenic Removal System provides 3 to 4 months of treatment

• Pre-arranged Media Replacement Program Activated

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 39

Conclusions and Recommendations

Page 21: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

21

Conclusions

• Yellowknife is moving towards a Water Treatment Plant

• Existing Submarine Pipeline is undersized for the future capacity

• Circumstances for moving to the River have changed

• Opportunity to address any lingering issued with Bay Water within the Water Treatment Process.

• Since 2005, the Arsenic Concentrations in the Bay Water are less than Drink Water Maximum Allowable Concentrations (10 ppb)

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 41

Conclusion II

• The concentration of Arsenic in the Bay varies through out the year, influenced by– Arsenic Remobilization– Pore Water– Wind Speed / Ice Cover– Currents

• Long Term Elevation of Arsenic above 10 ppb is possible

• Low Probability Events at Giant Mine could significantly increase Arsenic Concentration in the Bay Water

• Technology is available to address these issues

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 42

Page 22: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

22

Economic Influence

• Yellowknife River Option– Upgrades to Pumphouse 1 & 2– Replacement of 8 km submarine pipeline– $10 million Capital Cost (+ 100% / - 20%)– Additional costs for fish habitat compensation, assessments etc.

Total additional costs not defined at this time– $250,000 Annual Operation and Maintenance Costs

• Yellowknife Bay Option – Upgrades to Pumphouse 1 – $3.0 million Capital Cost (+50% / - 20%)– $80,000 Annual Operation and Maintenance Costs

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 43

Recommendation

• Based upon the information to date and an engineering basis

• AECOM has recommended that the City of Yellowknife moves ahead with the design of a Water Treatment Plant that:– Utilizes Yellowknife Bay as the Raw Water Source, and– Includes an Arsenic Treatment Stage to address the annual

variations in Arsenic Concentrations and presence of Giant Mine.

May 11, 2011Yellowknife Water Treatment Plant Information Session

Page 44

Page 23: Yellowknife Water Treatment Plant Information Session · 2014-12-09 · • NIWS – No Ice, Wind Speed Yellowknife Water Treatment Plant May 11 ... aquatic life is achievable (Giant

23

Thank You

Any Questions?