yate health centre and locality hub development 22 september 2009

45
Yate health centre and locality hub development 22 September 2009

Upload: justice-letcher

Post on 01-Apr-2015

226 views

Category:

Documents


0 download

TRANSCRIPT

Yate health centre and locality hub development

22 September 2009

Looking at the rear of the building

Walking through from Sure Start to main reception – Ground floor

Main reception – Ground floor (entering from rear entrance)

Main reception area – Ground floor

Main reception area – Ground floor

Storage and filing area – 2nd floor Integrated Office

2nd floor Integrated Office

2nd floor – Integrated Office and individual meeting rooms

2nd floor Integrated Office – large meeting room 8690

2nd floor – Integrated Office

Outside S15 – Out Patients Notes Room (2nd floor)

Shower cubicle – 1st floor

G31 – Activity room

Plant room – 2nd floor

Plant room – 2nd floor

Server room – 2nd floor

West Walk Surgery – G.P. Office

Fire Escape Staircase – overlooking Library

View into corridor

Minor procedures room F19

Minor procedures room F19

1st floor waiting area

A G.P. consultation room – 1st floor

1st floor reception for out patients

1st floor reception – out patients

1st floor reception for out patients

F08 bookable room with audio booth

West Walk Surgery – waiting area

West Walk Surgery – Treatment room 1st floor 8710

Fire escape staircase

Corridor on 1st floor

Integrated office – 1st floor

Integrated office – 1st floor

Integrated office – 1st floor

G40 – assessment office – Sure Start Children’s Centre

G48 – Activity room (left) for Sure Start Children’s Centre

Looking back to the Sure Start entry/exit end of corridor

Looking back towards Sure Start entry/exit end of corridor at building rear

G34 – Physiotherapy room

G11 – Main waiting area near reception

Ground floor main reception (main entrance far left, waiting room immediate left)

Main reception desks

Main reception desks

Looking at rear of building