Present Supply Scenario Infrastructure growth remains the overriding priority for India Power Sector has a pivotal role to play Present Power ScenarioInstalled Capacity Peak Power Demand Peak availability : : : 159,400 MW 118,000 MW 103,000 MW
Generation MixThermal 102450 MW(64%) Hydro Nuclear RES 36860 MW(23%)
Central State Private
50992 MW 79394 MW 29014 MW
(32%) (50%) (18%)
4560 MW(3%) 15530 MW(10%)
TOTAL 159400 MW
159400 MW
Transmission Network - PresentThe Electrical RegionsNORTHER N REGION
Transmission network spread geographically over 3.3 million sq kms 765kV/400kV lines: 1,00,916 ckms 220kV lines: 1,28,000 ckms HVDC Bipole (500kV) : 7,500 ckms National Grid Inter-regional capacity: 20,800MW
1EASTER N REGION
NORTHEASTER N REGION
WESTER NREGIO N
SOUTHE RN REGION
2
POWER MAP OF INDIA
POWERGRID Transmission Network - Present 400kV Backbone Trans. Network - about 60,500 ckm (220kV: 10,000 ckm) Overlaying 765kV AC and 500kV HVDC system - about 7,000 ckm Substations 400kV & above 131 nos. with 89,000 MVA 2 nos. HVDC Bipole (4000 MW) and 4 nos HVDC Back to Back System (3000 MW)
Worlds 3rd largest Transmission Network
National Grid - PresentInter-regional capacity : 20,800MWNRGORAKHPUR AURAIYA KANKAROLI AGRA KOTA SAHU PURI 500 MW PATNA BALIA MUZAFFARPUR BIRPARA
NERSALAKATI BONGAIGAON
BIHARSHARIFF MALDA
MALANPUR ZERDA GWALIOR UJJAIN
SASARAM
VINDHYACHAL KORBA SIPAT RAIPUR CHANDRAPUR BALIMELA
DEHRI BUDHIPADAR RANCHI ROURKELA TALCHER
ER
WRKOLHAPUR
1000 MW PONDA U.SILERU BELGAUM NAGJHARI
1000 MW GAZUW AKA
SR
National Grid By 2012Inter-regional capacity : >32,000 MW
National Grid A Continuing Process
Change in Generation Profile60000 50000 40000 30000 20000 10000 0 Central SectorXI XII
XI Plan36874 28600
57000
XII Plan26783 14400 15043
State Sector26783(34%) 14400(15%)
Private Sector Total15043(19%) 57000 (57%) 78700 100000
36874 (47%) 28600 (28%)
Energy Resource MapUnevenly dispersed energy resources Hydro in NER & NR Coal in ERPipavav Jammu
Ludhiana
NRRAPP Jaipur
Delhi
NEPALPartabpur Lucknow Patna Vindhyachal
SIKKIM
BHUTANGuwahatiCHICKEN NECK
NERBANGLA DESHMY AN MM AR
ERKolkata
Gandhinagar Indore Bhopal Korba
Integration of energy resources through high capacity National Grid - a must
WRTarapur Mumbai
Talcher/Ib Valley Raipur Bhubaneswar
Hyderabad
Vizag Simhadri
LEGENDGeneration Coal Load-Centre
SRKaiga Kozhikode Mangalore Bangalore Krishnapatnam Ennore South Madras Chennai Cuddalore Kayamkulam Thiruvananthapuram
Hydro
Lignite Coastal
KudankulamCOLOMBO
Nuclear
SRI LANKA
Generation Profile of IPPsNER 5000 MW Jharkhand 6500 MW Orissa 23,000 MW
Chhattisgarh. 58,000 MW AP24,000 MW T.N.10,000 MW
New Regime of Power SectorOpen Access in Transmission Generation de-license Power purchase through Tariff-based competitive bidding Destination of power transfer not firmed-up when generation project is envisaged
Need of New Initiatives in TransmissionChange in generation profileQuantity Location of the generation project
Scarce Right of Way Complex dynamism due to high technologyReactive Power Management Control of power flow
Implementation in time Shortage of skilled manpower
High Capacity Corridors
Cluster of Demand areas
Cluster of Generation pockets
Need to be developed in Phases depending upon progress of generation projects
Challenges in Transmission DevelopmentCreation of high Capacity Transmission Corridor Minimum cost per MW transfer Optimal Transmission losses Minimization of Right of Way Protection of flora & fauna Strengthening of National Grid
Technology
Technology being AdoptedHigh Voltage line EHVAC : 400kV HVDC : 500kV 765kV 800kV 1200kV
Increase the capacity of trans. corridor through HSIL/re-conductoring with HTLS /Upgradation Utilisation of transmission lines upto full thermal capacity Series capacitors, SVC, FACTS Optimization of Tower design tall tower, multi-ckt. tower GIS substation
Voltage Upgradation Increase in Transmission voltage1200kV
Voltage (kV)
765kV
800kV HVDC
500kV HVDC 400kV 220kV
1977
1990
2000
2012 Year
2016
Complexities with high voltage AC system Reactive Power Management Availability of switchgear Corona Loss Sustainability of grid during contingencies
Development Plan
High Capacity Transmission CorridorKISHENGANGA ALISTONG AMARGARH URI-II WAGOORA PAMPORE DULHASTI WAMPOH KISHENPUR CHAMERA SIUL PARBATI II -II III -III HAMIRPUR PONG KOLDAM N.JHAKRI BASPARAMPUR
URI SALALI&II
JAMMU SARNA DASUYA AMRITSAR JALANDHAR LUDHIANA MALERKOTLA MOGA KAITHAL PANIPAT FATEHBAD HISSAR
NALLAGARH PATIALA ROORKEE
K'WANGTOO
TEHRI
KURUKSHETRAPANCHKULA
SONIPATBAWANA
DELHI BHIWANI JATTI KALAN BAHDURGARH MAHRANIBAGH RATANGARH MANESAR DADRI BALLABGARH GURGAON SIKAR GNOIDA
POOLING STN DHAULIGANGA SAHARANPUR DEHRADUN BAGPAT ROORKEE KASHIPUR MEERUT MANDAULA(UP)
BAREILLY MURADNAGAR LUCKNOW MAINPURI LUCKNOW(UP)
B'SAHAR (PG)
BAREILLY
ZIRO FROM SIKKIM BHUTAN MELLI KAMENG TEESTA-V TALA PUNATSANGCHU-I RANGANADIRANGIT GANGTOK RAMMAM MELLI
LOWER SUBANSIRI
NEEMRANA
JODHPUR
MERTA BHIWADI JAIPUR BASSI (RSEB) DAUSABHILWARA
JAIPUR AGRAAURAIYA
GORAKHPUR(PG) MUZAFARPUR SILIGURI MAU BALIA PURNEA BARH
CHUKHA BALIPARATEZPUR
ITANAGAR GOHPUR
KATHALGUR DEOMALI
UNNAO KANPUR PANKI FATEHPUR
BIRPARA BONGAIGAON
SAMAGURI
MARIANI BISHWANATH DOYANG CHARIALI MISA DIMAPUR
GWALIORANTA RAPP-C&D RAPP-B
ORAI
KANKROLI BHINMAL ZERDA RANCHODPURA BACHCHAU MUNDRA
KOTA
CHITTORGARH
BINAUDAIPUR
NAGDA DEHGAM KARAMSAD ASOJ SSAROVARBHARUCH
SHUJALPUR
PIRANALIMBDIRAJKOT AMRELI
BHOPALITARSI SATPURA
RAJGARH
INDOREKHANDWA
JETPUR
KAWAS
GANDHAR VADODRA VALTHANKAKRAPAR KHADOLI KHARADPADA BOISARMUMBAI LOC
LOKTAK JIRIBAM KOLASIB NKSTPP AGARTALA AIZWAL BOKARO DURGAPUR RIHAND POOL AGARTALA GPP ZEMABAWK VINDHYACHAL MEJIA B'SPUR JEERAT PALLATANA JABALPUR KORBA(W) KORBA GBPP SUBHASGRAM JAMSHEDPUR WR POOL STPS KOLAGHAT BUDHIPADAR SEONI SIPAT JDAMOH
ALLAHABAD OBRA ANPARA SASARAM SASAN NABINAGAR SINGRAULI GAYA SATNA
VARANASI PATNA GAON BIHARSHARIFMAITHON RB
BYRNIHAT ALIPURDUAR DALKHOLA KISHANGANJ KHLIEHRIAT KAHALMALDA FARAKKA BADARPUR KUMARGHAT
KOPILI KHANDONG
HAFLONG SILCHAR IMPHAL
JABALPUR POOL
JHARKHAND
TILAIYYA
KODERMA MAITHON
CHAMPABHILAI
RANCHI DHARAMJAYGARH
NAVSARI MAGARWADA VAPI TARAPUR
KORADI
DHULE WARDHA AKOLAA'BADBHADRAWATI CHANDRAPUR
RAIPURBHATAPARA
RAIGARH BARIPADA JHARSUGUDA RENGALITALCHER STPS MERAMUNDALI CHANDAKA
AURANGABAD PADGHE PARLI(N) RAMAGUNDAM PUNE PARLI GAJWEL WARANGAL LONIKHAND SOLAPUR(PG) KARADNAVI MUMBAI PUNE KALWASOLAPUR
ANGUL
INDRAVATI BEHRAMPUR JEYPORE
EAST COASTGAZUWAKA VEMAGIRI
KHAMMAM
KOLHAPUR
HYDERABAD N'SAGAR
RAICHURMUNIRABAD MAPUSA NARENDRA
VIJAYAWADA
MAHBOOB NAGAR
KURNOOL GOOTYCUDDAPAH KRISHNAPATANAM UMPP NELLORE HIRIYUR
KAIGA DAVANGERE TALGUPPA
KRISHNAPATANAM IPPLEGENDTransmission Corridor for Orissa IPP's (Corridor - I) Transmission Corridor for Jharkhand IPP's (Corridor - II) Transmission Corridor for Sikkim IPP's (Corridor - III) Transmission Corridor for Chhattisgarh & MP IPP's (Corridor - IV Transmission Corridor for Chhattisgarh IPP's (Corridor - V) Transmission Corridor for Krishnapatnam IPP's (Corridor - VI) Transmission Corridor for Tuticorin IPP's (Corridor - VII) Transmission Corridor for Srikakulam IPP's (Corridor - VIII) Transmission Corridor for Southern Region IPP's (Corridor - IX)
BANGALORE
KOLAR ALAMANTHI TIRUVALAM NORTH CHENNAI JV HASSAN BANGALORE MADRAS HOSUR MALEKOTTAYUR MYSORE CHEYYUR UMPP PONDICHERRY BAHOOR CUDDALORE KOZIKODE ARASUR NEYVELI PUGALUR NORTH TRICHUR TRICHY UDUMALPET KARAIKUDI MUVATTAPUZHA MADURAI PALLOM
BANG_NEW
SALEM
KAYAMKULAM EDAMON TRIVANDRUM
TUTICORIN JV TIRUNELVELI KUDANKULAM
Strengthening National GridPlanned to enhance progressively to about the National Grid capacity
7500080000 60000 40000 20000 0 Present By 2011-12 By 2016-17
20800
32000
National Grid A Continuing Process
Road Map Map for Transmission Road for Indian Power System 400kV Transmission System Present Backbone 765kV Transmission system 2700 ckm under operation, about 7000 ckm under different stages of execution 765kV transmission lines are mostly double circuit HVDC system - 800kV 6000MW NER- Agra under execution 1200kV AC Transmission System development : expected operation by 2016-17 under
Plan Target
POWERGRID 11th Plan TargetItem 11th Plan Target Achieved So far(Mar10) Balance
Transmission line 400kV & above (Ckm) No.of EHV substations(400kV & above) MVA capacity Investment (USD billion)(*) Achieved in 2009-10
35500 45
18400 (5515) 27 (7) 30080 (10290) 5.6 (2.3)
17100 18
56000 12
25920 6.4
POWERGRID Transmission Augmentation Plan (Next 7-8 years)Item Estimated Addition Programme in 12th Plan (2102-16)
Transmission line 400kV/765kV & above (Ckm) No.of EHV substations (400kV & above) MVA capacity
80,000 90,000
90-100 150,000 170,000
Estimated
Investment : About USD 22 billion
POWERGRID Physical Target (Next 7-8years)Transmission Lines : 80,000 90,000 Ckt.kms + 500kV/800kV HVDC: 5,000 6,000 ckt km 765 kV AC 400kV AC : 30,000 35,000 ckt km : 45000 50,000 ckt. km
New Substations 90 - 100 Nos. 765/400kV 400/220/132kV 1200/765/400kV : 35 40 Nos. : 55 - 60 Nos. : 1 2 Nos.
Transformation Capacity (MVA)- 1,50,000 1,70,000 MVA 765/400kV 400/220/132kV : 80,000 90,000 MVA : 70,000 80,000 MVA
Series Compensation : 22 nos. on 400kV lines
Interconnection with Neighbouring Countries
INTERCONNECTION OF INDIA WITH BANGLADESH
India & Bangladesh Interconnection
Asynchronous Interconnection between the two countries agreed in a meeting between Indian Delegation and BPDB & PGCB officials, Bangladesh on November 24, 2009 at Dhaka. Scope of Interconnection : Establishment of 400kV Sw. Stn. at Baharampur(India) by LILO of Farakka-Jeerat 400kV S/c line Baharampur(India) Ishurdi/Bheramara(Bangladesh) 400kV D/c line. Installation of HVDC back-to-back station (400/230 kV) at Ishurdi/ Bheramara(Bangladesh).
The target date of commissioning is July, 2012.
POWER MAP OF BANGLADESH AND INDIATEESTA-V RANJITGANGTOK TENGA MELLI
TALALHAO
KHUPI
KAMENG
Interconnection between India & Bangladesh GridsGOHPUR
CHUKHANECHIPHU
RAMMAM
LEBONG NBU BIRPARA(WB) SILIGURI BIRPARA SALAKATI MOINAGURI TEESTA LD ALIPURDUAR GOSAIGAON AZARA AMINGAON DHALIGAON SAMAGURI PANCHAGARH BORNAGAR RANGIA BONGAIGAON ROWTA TEJPUR MARIANI SINGIGAON BALIPARA
Purpose : Exchange of Power between India and Bangladesh
PURNEA DALKHOLADALKHOLA (WBSEB) THAKURGAON (2x41+1x20) MVA LALMONIRHAT 40 MVA SAIDPUR 82 MVA RANGPUR 82 MVA
AGIA
GUWAHATI CHANDRAPUR JAGIROAD
ASSAMLONGPI UMTRU
PURNEA(BSEB) KATIHAR
DALKHOLA(WBSEB)PURBASADIPUR 33.4 MVA RAIGANJ
BOROPUKURIA
UMIAM UMIAM-4 KYRDEMKULAI
BYRNIHAT NEHU
UMRANGSO KOPILI KHLIEHRIAT KHANDONG
SAMSI PALASHBARI 40 MVA
TURA BALURGHAT
NANGAL BIBRA
MEGHALAYA
SHILLONG
Interconnection : Baharampur(India)Bheramara(Bangladesh) 400kV D/c line
KAHALGAON MALDA
GANGARAMPUR
CHERRAPUNJI CHATTAK 40 MVA
KHLIEHRIAT HAFLONG
JOYPURHAT JAMALPUR 82 MVA
BOGRAKHEJURIA NIAMATPUR 82 MVA NAOGAON 82 MVA BOGRA SOUTH
NETROKONA 40 MVA SYLHET
SYLHET 40 MVA PANCHGRAM
FARRAKACH. NAWABGANJ 40 MVA
MYMENSINGH 82 MVA
FENCHUGANJ 33 MVA SILCHAR DULLABCHERA
PILAPOOL BADARPUR JIRIBAM
DHULIAN
RAGHUNATHGANJ SAGARDIGHI
RAJSHAHI 53 MVA
SRIPUR(MODHUPUR) NATORE 40MVA SIRAJGANJ 40 MVA PABNA 82 MVA SHAHJAD PUR 40 MVA BAGHABARI TANGAIL 82 MVA KABIRPUR 82 MVA JOYDEVPUR 68 MVA
KISHORGANJ 40 MVA SHAHJIBAZAR 20 MVA
SREEMONGAL 40 MVA DHARMNAGAR KAILASHAHAR
RAMPURHAT
BEHRAMPUR GOKARNA SAITHIA
ISHURDI
B. BARIA
ASHUGANJ50 MVA B BARIA 100 MVA
BAKRESHWARDEBAGRAM KATWA BOLPUR
BEHRAMPUR
BHERAMARA 16.6 MVA
KUMARGHAT KAMALPUR EAST KANCHANBARI KHOWAI AMBASSA AGARTALA GPP SURYAMANINAGAR KOLASIB JIRIBAM
MANIKGANJ 41 MVA BOTTAIL 82 MVA CHUADANGA
TONGIMIRPUR BASUNDHARA KALYANPUR ULLON
GHORASALRAMPURA SIDDHIRGANJ HARIPUR
AMINBAZAR
AIZWAL
DURGAPURBIDHAN NAGAR MANKAR KRNAGAR
500MW HVDC B/b stn at Bheramara(Bangladesh)
AGARTALACOMILLA NORTH 40 MVA
JHENAIDA 40 MVA FARIDPUR 40 MVA MAGURA
HASNABAD
PALLATANAMEGHNAGHAT COMILLA SOUTH 82 MVA
V 400k
2kV at 13
MIZORAMAIZWAL (ZEMABAWK)
DPL ARAMBAGBURDWAN
SATGACHIA
RANAGHAT
TRIPURA
W.PHAILENG
BTPSKHANYAN BELMURI DHRMPR KALYANI BONGAON JESSORE 80 MVA NOAPARA 40 MVA
GOPALGANJ
CHANDPUR 40 MVA
MADARIPUR 26.6 MVA FENI 40 MVA CHOWMOHANI 82 MVA
KHAGRACHARI
SERCHIP
Type of connection : Asynchronous(HVDC)
RISHRA
JEERATKHULNA CENTRAL 192 MVA BARASAT ASHOKNAGAR KHULNA SOUTH
MARPARA
ARAMBAG
DOMJUR HM
TITAGARH
GOALPARA33.2 MVA
RANGAMATILUNGLEI
BARISAL82 MVA KAWKHALI BAGERHAT 26.6 MVA BHANDARIA 13.3 MVA PATUAKHALI 40 MVA
ULUBERIA KOLAGHAT(D) HWH(D)
LILUAH HOWRAH(WB) KASBA SATKHIRA GALLAMARI MANGLA 13.3 MVA
RAUJAN BHOLA63 MVA HATHAZARI LUNGSEN
SONARPUR KRG'PUR(D) JOKA SOUTHERN
BASIRHAT
KAPTAICHANDROGHONA 26.6 MVA MADANHAT 82 MVA
SUBHASGRAM
BURHANUDDIN
BAROAULIA 82 MVA KULSI 126 MVA HALISHAHAR 167 MVA JULDAH
KOLAGHAT BARIPADATAMLUK HALDIA
SIKALBAHA41 MVA DOHAZARI 80 MVA
LAKSHMIKANTOPUR BUDGE BUDGE
SHAHMIRPUR
Transfer Capacity : 500MW (upgradable to 1000MW)
FALTA
Bay of BengalLEGENDEXISTING FUTURE
230/220kV 132kVCOX'S BAZAR 20 MVA
BANDARBAN
INTERCONNECTION BETWEEN INDIA AND BANGLADESH GRIDSMALDA KHEJURIA KAHALGAON FARRAKA NIAMATPUR NAOGAON BOGRA SOUTH JAYPURHAT BARAPUKURIA BOGRA
CH. NAWABGANJ DHULIAN RAGHUNATHGANJ SAGARDIGHI
BANGLADESHMADHOPUR RAJSHAHI NATORE SIRAJGANJ BAHARAMPUR ISHURDI PABNA SHAHJAD PUR
DURGAPUR
GOKARNA
BAHARAMPUR (400 KV)400kV D/c
BAGHABARI GHORASAL
INDIAKATWA BAKRESHWAR
BHERAMARA
BOTTAIL
FARIDPUR LEGEND THE PROJECT 400 kV 230 kV 132 kV Existing Under Constr. / Future
KOLAGHAT SUBHASGRAM JEERAT
KHULNA (SOUTH)
INTERCONNECTION OF INDIA WITH SRI LANKA
Sri Lanka : Present Power ScenarioSri Lanka Transmission System220kV Line
Installed Capacity : 2411 MWCHUNNAKAM
(Hydro 50%, Thermal-46% )KOTUGODA
132kV : Underground Cable 132kV Line 132kV Line (not in operation) 220/132 kV Sub Station 132kV GS Hydro Power Station Thermal Power StationKILINOCHCHI
Maximum Demand : 1922MWKELANIYA BARGE PS KHD KELANITISSA LAKDANAWI FORT KOLONNAWA BIYAGAMA S'KANDA ANURADHAPURA
VAVUNIA
TRINCOMALEE
NEW ANURADHAPURA
PUTTALAM
Demand Growth : 8 % Hydro potential : 2000 MW, out of which 1000 MW already harnessed
HABARANA
KOLLUPITIYA VALACHCHANAI POLONNARUWA ORUWALA
PANNIPITIYA
BOWATENNA
MADAMPE RATMALANA
KURUNEGALA UKUWELA AMPARA
BOLAWATTA VEYANGODA KOTUGODA THULHIRIYA VICTORIA BIYAGAMA KOTMALE RANTEMBE KIRIBATHKUMBURA RANDENIGALA INGINIYAGALA
KELANITISSAKOLONNAWA SAPUGASKANDA POLPITIYA SITHAWAKA RATMALANA PANADURA ORUWALA PANNIPITIYA KOSGAMA
LAXAPANA WIMALASURENDRA BADULLA NEW LAXAPANA N'ELIYA
CANYON BALANGODA SAMANALAWEWA MATUGAMA
DENIYAYA
EMBILIPITIYA
GALLE
HAMBANTOTA
MATARA
India Sri Lanka interconnectionQuantum of Power Exchange : 1000 MW Proposed Interconnection
POWER MAP OF INDIA & SRILANKANARENDRA A'WADI RAICHUR HUBLI MUNIRABAD HAVERI KADRA KODASALLI KARWAR KAIGA SIRSI DAVANGERE TALAGUPPA HONALI SHARAVATHI TAIL RACE VARAHI KEMAR MANGALORE KUDRE MUKH HASSAN KOLAR SHIMOGA TIPTUR KA2 AP4 KA3 CHITTOOR TN1 C.DURGA HIRIYUR SULURPET HINDUPUR RENIGUNTA RAICHUR GOOTY MUDDANUR AP1 AP3 KRISHNAPATANAM NELLORE KURNOOL RAICHUR N'SAGAR N'SAGAR FROM TALCHER VIJAYAWADA
TO PONDA
KALINADI
ANANTAPUR
ALAMANTHI N MADRAS
BANGALOREH HALLI TK HALLI
TN3
KASARAKODE
TN4
KANNUR
KE2 PYKARA KUNDAH
MYSORE METTUR TN12 ARASUR INGUR TIRUPPUR
ENNORE SRIPERUMBUDUR KADAPERI MALEKOTTAIYUR ARANI TN2 SP KOIL KALPAKKAM ACHARAPAKKAM TN7 TN5 VILLUPURAM PONDICHERRY VILLIANNOR BAHOUR CUDDALORE
Madurai Anuradhapura HVDC Bipole Line with :1x500MW HVDC Terminal (Stage-I) 2x500 MW HVDC Terminal (Stage-II)
SALEM ATHUR TCGODU
KOZHIKODE KE1 NORTH TRICHUR AP1. MYDUKUR L PERIYAR AP2. NANDYAL KALAMASSERI AP3. YERRAGUNTLA BRAHMAPURAM AP4. KALIKIRIKA1. HIRIYUR KA2. GOWRIBIDANOOR KA3. DB PUR KE1. PALAKKAD KE2. KANIYAMPETAH TN1. THIRUVALEM TN2. VINNAMANGALAM TN3. HOSUR TN4. KRISHNAGIRI TN5. TV MALAI TN6. VILLUPURAM TN7. SINGARAPET TN8. PERAMBULUR TN9. SAMAYAPURAM TN10. KADAMPARAI TN11. SEMPATTY TN12. GC PALAYAM
THUDIYALUR PUGALUR TN9 TN10 UDUMELPET TRICHY
NEYVELI NEYVELI EXTN. P P NALLUR TN8 MYLADUTHURAI THIRUVARUR THANJAVUR PUDUKOTTAI
IDUKKI PALLOM
TN11 MUV'ZHA THENI MADURAI SATHUR SABARGIRI
KARAIKUDI CHUNNAKAM PARAMAKUDI
KAYAMKULAM EDAMON TIRUNELVELI TUTICORIN TRIVANDRUM ZIRCONUM
UNDER GROUND CABLE
KILINOCHCHI
VAVUNIA TRINCOMALEE
NAGARCOIL
KUDANKULAM
ANURADHAPURA NEW ANURADHAPURA PUTTALAM HABARANA VALACHCHANAI POLONNARUWA MADAMPEBOLAWATTA
BOWATENNA KURUNEGALA UKUWELAKIR IBAT HKUMBU RA VEYAN GODA THU LH IR IYA BIYAGAMAS APU GAS-KANDA
AMPARAIN GIN IYAGALA
KOTUGODA
RANDENIGALA RANTEMBEBAD ULLA WIMALASUR EN DRA
LEGEND HVDC BIPOLE 400kV lines 220kV lines 132kV lines
KELAN ITISSA KOLON NAWA R ATMALANA
VIC TORIA KOTMALE POLPIT IYA LAXAPANA N 'ELIYA N EW LAX AP ANA
K OS GA MA
PANADURA
ORU WALA SITH AWAKA C ANYON PAN N IPITIYA
BALANGODA SAMANALAWEWA
MATUGAMA
DENIYAYA EMBILIPITIYA
GALLE MATARA HAMBANTOTA
India : Interconnection with Sri LankaMadurai
185 KmsRameshwaram
50 Kms
Talaimannar
150 Kms Proposed Route for InterconnectionAnuradhapura
Proposed HVDC Interconnection Initial StageSM REACTOR
FILTER CABLE OVERHEAD VALVES
TRANSFORMER
OVERHEAD
FILTER METALIC RETURN CABLE
Proposed HVDC InterconnectionSM REACTORFILTER
TRANSFORMER
OVERHEAD
CABLE
OVERHEADVALVES
FILTER
METALIC RETURN CABLEFILTER
FILTER
OVERHEAD CABLE
OVERHEAD
INTERCONNECTION OF INDIA WITH BHUTAN
India - Bhutan : Existing Interconnections For import of power from Chukha HEP (4x84 MW) Chukha Birpara 220kV 3 ckts For import of power from Kurichu HEP (4x15 MW) Kuruchu - Geylegphug(Bhutan) Salakati(NER) 132 kV S/c For import of power from Tala HEP (6x170 MW = 1020 MW) Tala Siliguri 400kV 2x D/c line
Hydro Potential in Bhutan
India - Bhutan : Future Potential: About 21000 MW
About 11,000MW identified to be implemented in futurePunatsangchu I : 1200 MW Punatsangchu II : 1000 MW Mangdechu : 720 MW Sankosh : 4000 MW Chamkhar Chu -I : 670 MW Kurigongre : 1800 MW Amochu : 620 MW Kholongchu : 486 MW Wangchu : 900 MW Bunakha : 180 MW
Major portion of power from the future generation projects in Bhutan is envisaged to be imported into Indian grid. The 1st of the future projects to be commissioned in Bhutan is Punatsangchu-I (1200 MW) in 2014-15.
India Bhutan Interconnection
INTERCONNECTION OF INDIA WITH NEPAL
India - Nepal : Present InterconnectionPower Scenario in Nepal Installed Capacity : 607MW (Hydro 91%) Demand : 600 MW Over 16 links at 132/33/11 kV About 50 MW of power being exchanged Net export to Nepal (about 10% of demand of Nepal met from India) Supply of 70MU/annum from Tanakpur (India) to Nepal
India Nepal : Future A 400 kV inter-connection (initially op. at 220kV level) between Muzaffarpur(India) and Dhalkebar(Nepal) planned The scheme is to be developed by a private developer (IL&FS) in participation with POWERGRID For its implementation, two separate JV companies, one for Indian portion (ILFS, PTC, POWERGRID) and other for Nepalese portion (ILFS, PTC, NEA) are proposed Two separate DPRs for Indian and Nepalese portion have been prepared by POWERGRID and submitted to IL&FS in Feb-09 & March-09 respectively Formation of Joint Venture is under progress
India Nepal : Future Hydro Potential of Nepal : about 80,000 MW Large potential projects being considered for development and export of power to India Karnali Pancheshwar HEP Sapta Koshi Arun HEP West Seti HEP Arun HEP U. Marsyangdi 2 - 10,800 MW - 6,500 MW - 3,300 MW - 1,000 MW 750 MW 685 MW 600 MW