2006-07 SUMMERY OF MLA FUND RELEASED BY M AC No. Name of MLA Amt. released on Date AC No. 1 Sh. Ashok Ahuja AC No. 2 Smt.Sheila Dikshit AC No. 3 Smt.Taj Dar Babar AC No. 4 Sh.Sushil Choudhary AC No. 5 Sh.T.S. Marwah AC No. 6 Sh. Parvez Hashmi AC No. 7 Sh.Subhash Chopra AC No. 8 Sh Yoganand Shastri AC No. 9 Smt Kiran Walia AC No. 10 Smt Barkha Singh AC No. 11 Sh.Karan Singh Tanwar AC No. 12 Sh.Jagdish Mukhi AC No. 13 Sh.Harcharan Singh Balli AC No. 14 Sh.O.P.Babbar AC No. 15 Sh.Ramesh Lamba AC No. 16 Sh.Mala Ram Gangwal AC No. 17 Sh.Anil Bhardwaj AC No. 18 Sh.S.C. Vats AC No. 19 Sh Ravindra Nath Bansal AC No. 20 Sh.Jai Bhagawan Aggarwal AC No. 21 Sh.Kulwant Rana AC No. 22 Sh.Surendra Kumar AC No. 23 Sh Jai Kishan AC No. 24 Sh Raj Kumar Chouhan AC No. 25 Sh Bejinder Singh AC No. 26 Sh.Dayanand Chandela AC No. 27 Sh.Mukesh Sharma AC No. 28 Sh Ranbir Kharb AC No. 29 Sh. Mahabal Mishra AC No. 30 Sh.Dharam Dev Solanki AC No. 31 Sh Vijay Lochav AC No. 32 Sh. Balram Tanwar AC No. 33 Sh Vijay Jolly AC No. 34 Sh.Prem Singh AC No. 35 Sh.Ramesh Bidhuri AC No. 36 Sh.Ram Vir Singh Bidhuri AC No. 37 Sh.Brahm Pal AC No. 38 Sh.Amrish Singh Gautam AC No. 39 Smt.Meera Bhardawaj AC No. 40 Sh.Ashok Kumar Walia AC No. 41 ShArvindra Singh Lovely AC No. 42 Sh Harshwardhan AC No. 43 Sh. Naseeb Singh AC No. 44 Sh Narendra Nath AC No. 45 Sh.Veer Singh Dhingan AC No. 46 Sh.Baljor Singh AC No. 47 Sh.Ram Babu Sharma AC No. 48 Sh Vinay Sharma AC No. 49 Sh.Mateen Ahmad AC No. 50 Sh.Bhishm Sharma AC No. 51 Sh Sahib Singh Chauhan AC No. 52 Sh Mohan Singh Bisht AC No. 53 Sh Mange Ram Garg AC No. 54 Sh.Charan Singh Kandera AC No. 55 Sh.Jile Singh Chauhan AC No. 56 Sh.Mangat Ram Singhal AC No. 57 Smt..Anjali Rai AC No. 58 Sh.Shoaib Iqbal AC No. 59 Sh.Haroon Yushuf AC No. 60 Sh.Prahlad Singh Sawhney AC No. 61 Sh.Surender Pal Singh Bitoo AC No. 62 Sh.Kunvar Karan Singh AC No. 63 Sh.Shadi Ram AC No. 64 Sh.Rajesh Jain AC No. 65 Sh.Subesh Sachdewa AC No. 66 Sh. Ramakant Gosomi AC No. 67 Sh. P.C. Yogi AC No. 68 Sh S.P. Ratawal AC No. 69 Sh M.L. Sodhi

Upload: doanthu

Post on 26-Apr-2018

246 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

2006-07

SUMMERY OF MLA FUND RELEASED BY MIN. OF UD

AC No. Name of MLA Amt. released on Date

AC No. 1 Sh. Ashok AhujaAC No. 2 Smt.Sheila DikshitAC No. 3 Smt.Taj Dar BabarAC No. 4 Sh.Sushil ChoudharyAC No. 5 Sh.T.S. MarwahAC No. 6 Sh. Parvez HashmiAC No. 7 Sh.Subhash ChopraAC No. 8 Sh Yoganand ShastriAC No. 9 Smt Kiran Walia

AC No. 10 Smt Barkha SinghAC No. 11 Sh.Karan Singh TanwarAC No. 12 Sh.Jagdish MukhiAC No. 13 Sh.Harcharan Singh BalliAC No. 14 Sh.O.P.BabbarAC No. 15 Sh.Ramesh LambaAC No. 16 Sh.Mala Ram GangwalAC No. 17 Sh.Anil BhardwajAC No. 18 Sh.S.C. VatsAC No. 19 Sh Ravindra Nath BansalAC No. 20 Sh.Jai Bhagawan AggarwalAC No. 21 Sh.Kulwant RanaAC No. 22 Sh.Surendra KumarAC No. 23 Sh Jai Kishan AC No. 24 Sh Raj Kumar ChouhanAC No. 25 Sh Bejinder Singh AC No. 26 Sh.Dayanand ChandelaAC No. 27 Sh.Mukesh SharmaAC No. 28 Sh Ranbir KharbAC No. 29 Sh. Mahabal MishraAC No. 30 Sh.Dharam Dev SolankiAC No. 31 Sh Vijay LochavAC No. 32 Sh. Balram TanwarAC No. 33 Sh Vijay JollyAC No. 34 Sh.Prem SinghAC No. 35 Sh.Ramesh BidhuriAC No. 36 Sh.Ram Vir Singh BidhuriAC No. 37 Sh.Brahm PalAC No. 38 Sh.Amrish Singh GautamAC No. 39 Smt.Meera BhardawajAC No. 40 Sh.Ashok Kumar WaliaAC No. 41 ShArvindra Singh LovelyAC No. 42 Sh HarshwardhanAC No. 43 Sh. Naseeb SinghAC No. 44 Sh Narendra NathAC No. 45 Sh.Veer Singh DhinganAC No. 46 Sh.Baljor Singh AC No. 47 Sh.Ram Babu SharmaAC No. 48 Sh Vinay SharmaAC No. 49 Sh.Mateen AhmadAC No. 50 Sh.Bhishm SharmaAC No. 51 Sh Sahib Singh ChauhanAC No. 52 Sh Mohan Singh BishtAC No. 53 Sh Mange Ram GargAC No. 54 Sh.Charan Singh KanderaAC No. 55 Sh.Jile Singh ChauhanAC No. 56 Sh.Mangat Ram SinghalAC No. 57 Smt..Anjali RaiAC No. 58 Sh.Shoaib IqbalAC No. 59 Sh.Haroon YushufAC No. 60 Sh.Prahlad Singh SawhneyAC No. 61 Sh.Surender Pal Singh BitooAC No. 62 Sh.Kunvar Karan SinghAC No. 63 Sh.Shadi RamAC No. 64 Sh.Rajesh JainAC No. 65 Sh.Subesh SachdewaAC No. 66 Sh. Ramakant GosomiAC No. 67 Sh. P.C. YogiAC No. 68 Sh S.P. RatawalAC No. 69 Sh M.L. Sodhi

Page 2: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

AC No. 70 Sh. Rajesh Lilothiatotal 0 0 0 0 0 0 0 0

Page 3: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

SUMMERY OF MLA FUND RELEASED BY MIN. OF UD

000000000000000000000000000000000000000000000000000000000000000000000

Total Amt. Released

Page 4: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

00 0 0

Page 5: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

upto 30.11.13NORTH DELHI MUNICIPAL CORPORATION

STATUS REPORT OF MLA FUND FOR THE YEAR 2006-07 upto 30.11.13Zone Name of MLA Interest AMOUNT BOOKED BILLS VERIFIED Completed

CIVIL ELECT HORT. C.S.E CIVIL ELECT HORT. C.S.E Works Works

Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos.

Amt

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 343 City Smt.Taj Dar Babar 255.67 61.64 8.51 325.82 47 241.46 0 0.00 0 0.00 0 0.00 47 241.46 84.36 45 197.50 0 0.00 0 0.00 0 0.00 45 197.50 4 39.02 45 163.80 12.88

17 Rohini Sh.Anil Bhardwaj 100.00 27.52855 9.76 137.29 23 108.46 0 0.00 0 0.00 0 0.00 23 108.46 28.83 21 81.89 0 0.00 0 0.00 0 0.00 21 81.89 0 0.00 21 81.89 17.82

18 Rohini Sh.S.C. Vats 199.25 111.14 10.92 321.31 66 196.69 0 0.00 0 0.00 0 0.00 66 196.69 124.63 65 166.75 0 0.00 0 0.00 0 0.00 65 166.75 8 18.66 67 178.01 12.0619 Rohini 204.19 39.57 8.77 252.53 45 229.37 0 0.00 0 0.00 0 0.00 45 229.37 23.15 45 207.46 0 0.00 0 0.00 0 0.00 45 207.46 0 0.00 47 210.02 0.00

20 Rohini 156.93 71.64 11.00 239.57 41 119.58 9 29.84 0 0.00 0 0.00 50 149.42 90.14 40 104.84 9 27.10 0 0.00 0 0.00 49 131.94 9 20.55 40 111.38 4.92

21 Rohini Sh.Kulwant Rana 199.02 8.29 9.99 217.30 35 156.02 0 0.00 0 0.00 0 0.00 35 156.02 61.27 31 104.94 0 0.00 0 0.00 0 0.00 31 104.94 9 40.79 29 90.12 41.6322 Narela 189.92 24.03 11.34 225.29 55 202.57 0 0.00 0 0.00 0 0.00 55 202.57 22.72 55 188.49 0 0.00 0 0.00 0 0.00 55 188.49 9 31.80 51 166.48 2.54

53 Rohini 247.77 6.79 11.43 265.99 56 138.92 0 0.00 0 0.00 1 4.52 57 143.44 122.54 56 121.92 0 0.00 0 0.00 1 2.95 57 124.88 7 18.96 67 152.17 3.04

54 Narela 200.00 41.36 13.71 255.07 55 206.83 0 0.00 0 0.00 0 0.00 55 206.83 48.24 53 160.12 0 0.00 0 0.00 0 0.00 53 160.12 10 37.28 44 123.82 23.29

55 200.00 53.96 10.52 264.48 66 231.44 0 0.00 0 0.00 0 0.00 66 231.44 33.04 66 226.11 0 0.00 0 0.00 0 0.00 66 226.11 1 1.04 69 234.12 0.39

56 142.00 41.13 10.62 193.75 11 113.15 5 13.20 0 0.00 0 0.00 16 126.35 67.39 11 101.24 5 11.45 0 0.00 0 0.00 16 112.68 5 40.26 18 81.18 10.74

57 S.P. Smt..Anjali Rai 129.91 73.33 8.92 212.16 59 166.76 0 0.00 0 0.00 0 0.00 59 166.76 45.40 57 153.04 0 0.00 0 0.00 0 0.00 57 153.04 1 5.68 56 147.36 4.3058 City Sh.Shoaib Iqbal 130.73 39.08 11.92 181.73 51 142.77 0 0.00 0 0.00 0 0.00 51 142.77 38.96 48 118.89 0 0.00 0 0.00 0 0.00 48 118.89 1 2.90 47 115.99 16.0959 City 100.00 47.00 10.48 157.48 13 52.94 0 0.00 0 0.00 0 0.00 13 52.94 104.53 13 42.99 0 0.00 0 0.00 0 0.00 13 42.99 1 6.96 12 36.03 0.01

60 City 273.20 156.34 14.51 444.05 20 152.14 0 0.00 0 0.00 0 0.00 20 152.14 291.92 19 113.27 0 0.00 0 0.00 0 0.00 19 113.27 4 48.97 15 64.30 23.50

61200.00 75.12 11.38 286.50 42 151.51 0 0.00 0 0.00 0 0.00 42 151.51 134.99 41 140.62 0 0.00 0 0.00 0 0.00 41 140.62 1 3.60 43 140.84 6.50

62 180.16 126.68 10.11 316.95 40 168.28 0 0.00 0 0.00 0 0.00 40 168.28 148.67 39 146.79 0 0.00 0 0.00 0 0.00 39 146.79 3 4.30 36 142.49 10.92

63 Sh.Shadi Ram 169.54 5.38863 8.54 183.47 20 104.94 0 0.00 0 0.00 0 0.00 20 104.94 78.53 16 58.85 0 0.00 0 0.00 0 0.00 16 58.85 2 8.28 14 50.57 27.74

64 S.P. Sh.Rajesh Jain 198.39 42.94 10.05 251.38 58 143.20 0 0.00 0 0.00 0 0.00 58 143.20 108.18 58 142.39 0 0.00 0 0.00 0 0.00 58 142.39 2 2.83 57 141.09 2.4966 K.Bagh 100.00 102.49901 9.62 212.12 16 72.82 0 0.00 0 0.00 0 0.00 16 72.82 139.30 16 71.63 0 0.00 0 0.00 0 0.00 16 71.63 1 24.16 0 0.00 3.51

67 K.Bagh Sh. P.C. Yogi 198.41 11.90 10.58 220.89 69 144.46 0 0.00 0 0.00 0 0.00 69 144.46 76.43 69 138.25 0 0.00 0 0.00 0 0.00 69 138.25 2 3.99 77 148.51 2.5868 K.Bagh Sh S.P. Ratawal 199.58 111.27 10.61 321.46 68 255.46 0 0.00 0 0.00 0 0.00 68 255.46 66.00 68 245.82 0 0.00 0 0.00 0 0.00 68 245.82 0 0.00 71 255.31 0.0069 S.P. Sh M.L. Sodhi 241.55 48.73 10.42 300.70 84 187.14 0 0.00 0 0.00 0 0.00 84 187.14 113.56 81 174.57 0 0.00 0 0.00 0 0.00 81 174.57 1 1.03 82 176.37 8.60

A/C NO

FUNDS RELEASE

D

Previous unbooked Amt.

TOTAL AMT.

AVAILABLE FOR

BOOKING (4+5)

TOTAL AMOUNT BOOKED

* FUNDS AVAILABLE FOR BOOKIN

G

TOTAL AMT. OF BILLS

VERIFIED

Under Progress

Remarks (Liabilites) Rs. lacs

Expenditure

Expenditure

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Sh Ravindra Nath BansalSh.Jai Bhagawan Aggarwal

Sh.Surendra Kumar Sh Mange Ram Garg Sh.Charan Singh Kandera

Civil Line

Sh.Jile Singh Chauhan

Civil Line

Sh.Mangat Ram Singhal

Sh.Haroon Yushuf Sh.Prahlad Singh Sawhney

Civil Line

Sh.Surender Pal Singh Bitoo

Civil Line

Sh.Kunvar Karan Singh

Civil Line

Sh. Ramakant Gosomi

Page 6: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Zone Name of MLA Interest AMOUNT BOOKED BILLS VERIFIED Completed

CIVIL ELECT HORT. C.S.E CIVIL ELECT HORT. C.S.E Works Works

Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos.

Amt

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

A/C NO

FUNDS RELEASE

D

Previous unbooked Amt.

TOTAL AMT.

AVAILABLE FOR

BOOKING (4+5)

TOTAL AMOUNT BOOKED

* FUNDS AVAILABLE FOR BOOKIN

G

TOTAL AMT. OF BILLS

VERIFIED

Under Progress

Remarks (Liabilites) Rs. lacs

Expenditure

Expenditure

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

Amt (Rs. lacs)

70 K.Bagh 100.00 104.12 11.88 216.00 82 153.14 0 0.00 0 0.00 0 0.00 82 153.14 62.86 79 146.17 0 0.00 0 0.00 0 0.00 79 146.17 0 0.00 81 151.19 5.67

Total 4316.22 1431.49 255.59 6003.30 1122 3840.08 14 43.04 0 0.00 1 4.52 1137 3887.64 2115.66 1092 3354.55 14 38.55 0 0.00 1 2.95 1107 3396.05 81 361.07 1089 3163.03 241.23Remarks:- Balance unbooked amount has already been sent back to UD department, Govt. of NCT of Delhi.

Sh. Rajesh Lilothia

Page 7: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

deptt. deptt. deptt. deptt. Div. Div. Div. Div. Div. Div.

civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)

Status Report of MLA,Smt.Taj Dar Babar, AC No. 3 2006-07

S.No. Name of Work deptt. Div. Name of agency D.O.S D.O.C Expenditure

1 Civil EE-II 05.05.06 04.05.06 363800.00 15.09.06 14.11.06 295754.00 Completed

2 Civil EE-II 05.05.06 04.05.06 359860.00 14.08.06 20.09.06 359859.00 Completed

3 Civil EE-II 05.05.06 04.05.06 213288.00 01.08.06 10.10.06 213288.00 Completed

4 Civil EE-II 05.05.06 04.05.06 288657.00 M/s M.V.S Const. 01.08.06 12.09.06 288657.00 Completed

5 Civil EE-II 05.05.06 04.05.06 357746.00 01.08.06 19.09.06 357653.00 Completed

6 Civil EE-II 05.05.06 04.05.06 418329.00 18.08.06 11.11.06 418156.00 Completed

7 Civil EE-II 15.05.06 04.05.06 516200.00 20.09.06 04.12.06 436723.00 In Prog.

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Present Position

Imp. Of gali no. 21 by pdg. Cc in Darya Ganj in W.no. 2(B) City Zone.

207/12.09.06/EE-II

M/s Puneet Const.Co

Imp. Of back lane by pdg. Inter locking tiles from H.no. 73 to 101 in Block A Jang pura B W.no 2(A)/ City Zone

170/01.08.06/EE-II

M/s Bansal Enterprises

M/p of road from Baoli gate and Galib Academy to Lodhiy road in Basti Nizzamudin in W.no.2(A)/ City Zone

172/01.08.06/EE-II

M/s Ajay Const.Co

Imp. Of back lane by pdg. Inter locking from H.no 71 to 78 in Sunder Nagar in W.no 2(B) in City Zone.

165/24.07.06/EE-II

Imp of back lane from h.no. 69 to 59 in Sunder Nagar W.no 2(B) City Zone

164/24.07.06/EE-II

M/s Kejriwal Builders

Imp of road from Gurudwara to Shiv mandir in Vikram Nagar in Minto road Road W.no 2(A) City Zone.

190/10.08.06/EE-II

M/s Modhar Builders

Stg. Of the road from H.no 75 to 89 in Sunder Nagar by pdg. Mastik in W.no. 2(B) City Zone.

214/12.09.06/EE-II

M/s Sheenu Enterprises

Page 8: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

8 Civil EE-II 15.05.06 04.05.06 618900.00 02.08.06 08.09.06 324912.00 Completed

9 Civil EE-II 15.05.06 04.05.06 553500.00 05.11.06 26.12.06 425008.00 Completed

10 Civil EE-II 15.05.06 04.05.06 207900.00 15.09.06 15.10.06 206882.00 Completed

11 Civil EE-II 15.05.06 04.05.06 262200.00 17.07.06 01.09.06 197331.00 Completed

12 Civil EE-II 22.05.06 24.04.06 150400.00 M/s Kay Const.Co 14.09.06 10.10.06 127657.00 Completed

13 Civil EE-II 23.05.06 03.05.06 322900.00 20.09.06 20.10.06 160646.00 Completed

14 Civil EE-II 23.05.06 03.05.06 328000.00 M/s S.K & Co. 20.09.06 20.10.06 167863.00 Completed

15 Civil EE-II 23.05.06 04.05.06 346400.00 13.09.06 30.10.06 255376.00 Completed

16 Civil EE-II 23.05.06 04.05.06 206400.00 13.09.06 30.10.06 150136.00 Completed

Imp of back lane by pdg. Inter locking tilies behinde Bung low NO. 30,31 in Nizz. East in W.no 2(A) City Zone

171/01.08.06/EE-II

M/s Ajay Const.Co

Imp of lane from h.no A-57 to A-64 in Nizz.East by pdg. Kota Stone, CC and pre mixing in W.no 2(A) City Zone

262/26.10.06/EE-II

M/s Sheenu Enterprises

Imp of road from gate of Kotla Monuments to Gurudwara and from H.no A-6 to B-11 in Vikram Nagar W.no 1/City Zone.

204/07.09.06/EE-II

M/s Ajay Const.Co

Imp of lane by pdg cc adj. H.NO A-45 and from H.no B-11 to E-11 in Vikram Nagar Minto Road Constituency C-1 City Zone.

157/10.07.06/EE-II

M/s Sagar Const.Co.

Imp of Entrace of Dargah Faiz Ilahi at Asaf Ali Road in W.no 1(B) City Zone (BY Const. Flower Bed)

208/12.09.06/EE-II

Imp of Prahalad wali gali in Gali NO. 24 in Darya Ganj W.no 2(B) City Zone (By Pdg interlocking tiles)

213/12.09.06/EE-II

M/s Sheenu Enterprises

Imp of lane at Adj. City Look in Sunder Nagar in W.no 2(B) City Zone (By pdg. Intrlocking tiles)

212/12.09.06/EE-II

Pdg. Grit wash on the boundry wall of park along nala from H.no G-59 to G-8 in Nizz. West W.no 2(A) City zone.

218/13.09.06/EE-II

M/s Manoj Associates

Stg. Of B/Wall of green belt Towards bunglow no. A-30 in Nizz. West w.no 2(A) City zone

217/13.09.06/EE-II

M/s Manoj Associates

Page 9: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

17 Civil EE-II 19.06.06 07.06.06 631500.00 07.06.07 26.06.07 562536.00 Completed

18 Civil EE-II 26.06.06 07.06.06 219300.00 17.11.06 14.12.06 144916.00 Completed

19 Civil EE-II 26.06.06 07.06.06 550900.00 18.05.07 10.07.07 408700.00 Completed

20 Civil EE(Pr.) 12.07.06 03.05.06 5000000.00 30.08.06 30.05.07 5000000.00 Completed

21 Civil EE-II 25.09.06 08.09.06 377500.00 M/s Suman Ass. 11.08.07 10.09.07 340549.00 Completed

22 Civil EE-II 25.09.06 08.08.06 247800.00 M/s Ashok Kumar 20.10.06 17.11.06 175990.00 Completed

23 Civil EE-II 03.10.06 18.07.06 128500.00 16.01.07 15.02.07 128374.00 Completed

24 Civil EE-II 03.10.06 18.07.06 198200.00 20.01.07 15.03.07 198200.00 Completed

25 Elect. E-I 27.10.06 19.10.06 180367.00 29.01.07 03.02.07 174961.00 Completed

26 Elect. E-I 27.10.06 19.10.06 181848.00 22.12.06 02.01.07 175169.00 Completed

Stg. Of T.Point of Mata Sundri Road with Mir Dard Road in W.no1 City Zone (By Bitumen mastik Ashphat Conc.)

31/04.05.07/EE-II

M/s Subhash Bross.

P/L driange line and improvement of Foot Path from Ranjeet Singh Fly Over to Gandhi Mkt. Crossing(LHS) in Minto Road W.no-1/City Zone

286/09.11.06/EE-II

M/s Ajay Const.Co

P/L CC on road berms starting from crossing of Ranjeet Singh Fly Over to Mata Sundri Road Crossing in Minto Road W.NO-1/City Zone

44/10.05.07/EE-II

M/s Priya darsni Const.Co

C/O Barat Ghar at Basti Hazrat Nizzamudding W.NO.2, City Zone.

18/24.08.06/EE(Pr.)City Zone

M/s Ashok Kumar Jain

P/L CC in gali no.1 from H.NO.4240/1 to 4234/1 in Darya Ganj in W.NO.2(B)/City Zone.

196/10.08.07/EE-II

P/F Ceiling in easting Badminton Court at Hindi Park, Darya Ganj W.No.2(B)/City Zone.

256/19.10.06/EE-II

P/L CC in Gali adjoining to Bank of Indir in Darya Ganj inW.NO.2(B) City Zone

393/12.01.07/EE-II

M/s N.K Const.Co.

Dev.of road berms by CC on Brij Mohan marg near DAV School in Darya Ganj in C-2(B) City Zone.

396/12.01.07/EE-II

M/s Shree Madhav Builders

P/O Tube well at park behind M.C School, Sarai Kala Khan in C-2, City Zone.

372/22.12.06/EE(E)Hort.

M/s Priyanka Enterprises

P/O Tube well at park DDA Slum Qtrs, Sarai Kala Khan in C-2, City Zone.

358/18.12.06/EE(E)Hort.

M/s Paras Const.Co

Page 10: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

27 Civil EE-II 30.10.06 19.09.06 206600.00 10.05.07 01.06.07 168116.00 Completed

28 Civil EE-II 30.10.06 19.09.06 350200.00 19.05.07 10.07.07 193810.00 Completed

29 Civil EE-II 30.10.06 19.09.06 458400.00 17.07.07 10.08.07 250935.00 Completed

30 Civil EE-II 30.10.06 19.09.06 302900.00 M/s S.K & Co. 19.03.07 P 141609.00 In Prog.

31 Civil EE-II 30.10.06 19.09.06 653900.00

32 Elect. 13.11.06 09.11.06 148425.00 M/s V.V.Ent. 04.03.07 31.05.07 89904.00 Completed

33 Elect. 13.11.06 09.11.06 148358.00 M/s V.V.Ent. 04.03.07 31.05.07 92341.00 Completed

34 Civil EE-II . 26.10.06 196900.00 15.01.07 16.02.07 196387.00 Completed

35 Civil EE-II 14.11.06 26.10.06 146000.00 13.05.07 26.06.07 99417.00 Completed

Pdy.CC an side berms from Transport Authority to Nizamuddin Rly. Station Bridge in Village Sarai Kala Khan in C-2A/City Zone.

46/10.05.07/EE-II

M/s Bansal Enterprises

Pdy.Interlocking pavers in back of Nizamuddin East Mkt.and Connecting lane in C-66 to C-71 in Nizz.East in C-2A/City Zone.

49/10.05.07/EE-II

M/s Kejriwal Builders

Dev.of back lane by pdy.Interlocking tiles from H.NO.D-1 to D-18 in Nizamuddin East in C-2A/City Zone.

74/18.06.07/EE-II

M/s Bansal Enterprises

Dev.to front of Foot/Path along Mata Sundir College at Minto Road in W.NO.2(B)/ City Zone.

472/22.01.08/EE-II

Stg.of road by pdy.Mastic Asphalt from Sarai Kala Khan Bus Terminal to Nizamuddin pdy.Station near Footover bridge in C-2(A)/ City Zone.

P/O Tube Well at Gandhi Mkt.Park (Near Nehru Hill) in W.NO.-1 City Zone.

399/25.01.07/EE(E)H

P/O Tube well at Green Belt Mata Sundri College Park in W.NO.-1 City Zone.

401/25.01.07/EE(E)H

P/L CC in gali no.7 from house no.7/1 to 7/9 in Darya Ganj in W.NO.2(B)/City Zone.

422/12.01.07/EE-II

M/s N.K Const.Co.

Providing drainage from Bunglow no.29 to Bunglow no.32 in Nizamuddin Basti in C-2(A)/City Zone.

28/04.05.07/EE-II

M/s Kejriwal Builders

Page 11: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

36 Civil EE-II 14.11.06 26.10.06 666300.00 23.07.07 14.08.07 579068.00 Completed

37 Civil EE-II 14.11.06 26.10.06 495400.00 20.03.07 16.05.07 262559.00 Completed

38 Civil EE-II 14.11.06 26.10.06 287600.00 04.05.07 28.06.07 151668.00 Completed

39 Civil EE-II 14.11.06 26.10.06 112100.00 09.04.07 09.05.07 79080.00 Completed

40 Civil EE-II 14.11.06 26.10.06 164000.00 09.04.07 09.05.07 115047.00 Completed

41 Civil EE-II 14.11.06 02.11.06 3500000.00 02.10.08 P 3272103.00 In Prog.

42 Civil EE-II 16.11.06 08.08.06 483800.00 M/s Balaji Asso. 27.08.07 25.08.07 435325.00 Completed

43 Civil EE-II 16.11.06 08.08.06 274000.00 M/s Punit Ent. 10.03.07 10.05.07 205133.00 Completed

Stg.of road by pdy.Mastic Asphalt as rowd about of A,B,C and D-Block of Nizamuddin East in W.NO.2A/City Zone.

80/19.06.07/EE-II

M/s Balaji & Asso.

Pdy.Interlocking tiles from H.NO.137 to house no.137 to house no.33 in Village Sarai Kala Khan in W.No.2A/City Zone.

617/15.03.07/EE-II

M/s Bansal Enterprises

Dev.of side berms by interlocking pavers infront of Community Centre in Nizamuddin (West) in W.NO.2A/City Zone.

27/04.05.07/EE-II

M/s Kejriwal Builders

Raising of B/Wall of park near Community Hall in Nizamuddin (West) and pdy.grit wash in w.no.2A/City Zone.

542/02.03.07/EE-II

M/s Manoj Associates

Stg.of B/Wall by pdy.grit wash from Banglow no.A-1 to A-30 in Nizamuddin (West) in C-2A/City Zone.

541/02.03.07/EE-II

M/s Manoj Associates

C/O Recreation centre on Ranjit Singh Marg in the open space of Nehru Hill Park in Minto Road area w.no.1 City Zone.

06/23.09.08/EECWG)-I

M/s Ashok Kumar Jain

Stg.of T-Point of road at Khalsa School & Shraff Hospital in Darya Ganj w.no.2(B) City Zone.(By pdy.mastic asphalt).

82/19.06.07/EE-II

C/O Foot-path from Bal jain Ashram to Daya Nand Road along Shraff Hospital in Darya Ganj in w.no.2(B)/City Zone.

527/02.03.07/EE-II

Page 12: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

44 Civil EE-II 16.11.06 08.08.06 631500.00 27.08.07 30.07.07 566624.00 Completed

45 Civil EE-II 16.11.06 08.08.06 272100.00 M/s Punit Ent. 10.03.07 10.05.07 202771.00 Completed

46 Civil EE-II 16.11.06 08.08.06 81200.00 06.04.07 27.04.07 50246.00 Completed

47 Civil EE-II 16.11.06 26.10.06 156400.00

48 Civil EE-II 16.11.06 26.10.06 588700.00 07.03.07 14.04.07 456704.00 Completed

49 Civil EE-II 16.11.06 26.10.06 599000.00 07.03.07 17.04.07 464041.00 Completed

50 Civil EE-II 06.12.06 26.10.06 589100.00 07.03.07 17.04.07 462441.00 Completed

51 Civil EE-II 09.01.07 03.01.07 61456.00 21.03.07 10.03.07 51940.00 In Prog.

Stg.of T.point of road infront of Francis School in Darya Ganj w.no.2(B)/City Zone.(By pdy.Mastic asphalt)

81/19.06.07/EE-II

M/s Blalaji & Asso.

C/O Fotpath at 17 Darya Ganj in w.no.2(B)/City Zone.

528/02.03.07/EE-II

C/O Footpath near Shiv Mandir at Subhash Marg in Darya Ganj in C2(B)/City Zone.

676/30.03.07/EE-II

M/s Deen Dayal Ent.

Pdy.wall & Foot path with red sand stone at the entrance of Nizamuddin (west) in w.no.2A/City Zone.

P/L CC in lanes adjoin flat no.64 & 48 in DDA Flat, Mata Sundari in Minto Road Causting w.no.1/City Zone.

545/02.03.07/EE-II

M/s Shree Madhav Builders

P/L CC in back lane from Milap Building to National Hearld Building & adjoin lane in Minto Road causting w.no.2B,/City Zone.

526/02.03.07/EE-II

M/s Shree Madhav Builders

P/L RMC in lanes adjoining H.NO.102 & 88 in Flats of Mata Sundri Road in W.NO.2B, Minto Road Coustely in City Zone.

525/02.03.07/EE-II

M/s Amba Contractors.

P/L CC adjoining H.NO. C-25 in Vikram Nagar in Minto Road Conselting in w.no.2 City Zone.

511/13.02.07/EE-II

M/s Amba Contractors.

Page 13: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 14: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 15: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.79

Liabilities Rs.lacs

Page 16: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 17: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 18: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

1.61

6.54

0.00

0.00

0.00

0.00

Page 19: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

2.28

0.00

0.00

Page 20: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

1.56

0.00

0.00

0.00

0.10

0.000.00

0.000.000.00

Page 21: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 22: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.00

12.88

Page 23: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

deptt. deptt. deptt. deptt. Div. Div. Div. Div. Div. Div.

civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)

Status Report of MLA,Sh.Anil Bhardwaj, AC No. 17 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure

1 Civil EE(R)-I 09.10.06 17.07.06 1182902.00

2 Civil EE(R)-I 02.11.06 18.10.06 199900.00 15.12.06 01.02.07 199684.00 Completed

3 Civil EE(R)-I 14.11.06 07.10.06 361455.00 10.02.07 30.04.07 360630.00 Completed

4 Civil EE(R)-I 20.11.06 18.10.06 497600.00 12.02.07 30.07.07 366136.00 Completed

5 Civil EE(R)-I 07.12.06 27.11.06 199700.00 26.12.06 15.01.07 199108.00 Completed

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Present Position

Construction of hall near Vardhman Vatika infront of Gurudwara in Tri Nagar C-27 Rohini Zone.

Dev.of lane by pdy.and laying C.Con. Infront of H.NO.1013/67 to 1023/67 in Deva Ram Park and 1222/83 to 1232/84 in Shanti Nagar in Tri Nagar C-27/Rohini Zone.

309/15.12.06/EE(RD)-I

M/s Naresh Enterprises

Development works in B-2 pkt. Market at Keshav Puram C-28/RDI.

465/02.02.07/EE(RD)-I

M/s Monu Const.Co

Const.of round about infront of ward C-27 store and development to drainage system along B/Wall of A-2 Pocket of Keshav Puram in Ward no.C-27 Trinagar Rohini Zone.

466/02.02.07/EE(RD)-I

M/s Monu Const.Co

P/L C.Cons.from H.No.178 to 162 and 344 to 330 in Rampura Village in C-27 Rohini Zone.

339/22.12.06/EE(RD)-I

M/s Naresh Enterprises

Page 24: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

6 Civil EE(R)-I 12.01.07 05.01.07 435482.00 4.3.07 20.04.07 435210.00 Completed

7 Civil EE(R)-I 12.01.07 05.01.07 420571.00 26.3.07 26.04.07 419326.00 Completed

8 Civil EE(R)-I 01.02.07 01.02.07 199200.00 14.2.07 12.3.07 198841.00 Completed

9 Civil EE(R)-I 01.02.07 01.02.07 166100.00 14.02.07 13.08.07 164731.00 Completed

10 Civil EE(R)-I 01.02.07 01.02.07 165200.00 10.2.07 30.3.07 164780.00 Completed

11 Civil EE(R)-I 07.02.07 05.01.07 1111500.00 07.10.07 28.01.08 1088884.00 Completed

12 Civil EE(R)-I 13.02.07 10.02.07 172900.00 26.02.07 09.07.04 171019.00 Completed

13 Civil EE(R)-I 13.02.07 06.02.07 394250.00 02.04.07 20.09.07 394212.00 Completed

Construction of Kanihya lal Khari Marg by providing RMC from Ram pura Village Main road to LIG flats Ram Pura at C-28 R.D.I.

566/23.2.07/EE R-I

M/s Rakesh Kumar Goel

Construction of Ram pura Village School road by providing RMC from WZ-61 to M.C Primary School at Ram Pura at C-28/RDI.

628/26.3.07/EE R-I

M/s R.M. Auto Center

P/L C.Cons.from H.No.101/12 to 111/12 in Onkar Nagar B in Tri Nagar C-27/Rohini Zone.

473/9.2.07/ R-I

M/s Subash Singh

P/L C.Conc.from H.NO.3906/15 to 3912/15 in Kanhiya Nagar and infront of H.NO.90/11, 93/11 & 100/11 in Onkar Nagar B in Tri Nagar C-27/Rohini Zone.

475/09.02.07/EE R-I

M/s S. Kumar

P/L C.Conc.from H.NO.2362/176 to 2368/176 and 2368/176 and 2373/177 to 2377/177 in Onkar Nagar Tri Nagar C-27/Rohini Zone.

470/9.2.07/EE-RI

M/s Naresh Enterprises

Construction of main road by pdy. RMC opposite Sr.Sec.School from Janta Flats Market to MIG Flats Ram Pura at C-28/RDI.

136/28.09.07/EE-®-I

M/s Manoj Kumar Gupta

Construction of passage of B-4 Market at Keshav Puram at C-28/RDI.

537/22.02.07/EE(R )-I

M/s Subash Singh

Const.of lane by providing CC from WZ-3348 to 3335 and WZ-3334 to 3275 at Mahendra Park at C-28/RDI.

620/22.03.07/EE(R )-I

M/s Ajit Dabas

Page 25: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

14 Civil EE(R)-I 13.02.07 06.02.07 478365.00 02.04.07 20.09.07 477981.00 Completed

15 Civil EE(R)-I 13.02.07 06.02.07 478306.00 02.04.07 20.09.07 477734.00 Completed

16 Civil EE(R)-I 13.02.07 06.02.07 199900.00 M/s S.Kumar 26.02.07 30.04.07 199139.00 Completed

17 Civil EE(R)-I 13.02.07 05.01.07 598900.00

18 Civil EE(R)-I 23.02.07 07.02.07 599300.00 28.07.08 03.09.08 462178.00 Completed

19 Civil EE(R)-I 23.02.07 07.02.07 598900.00 06.12.07 26.03.08 490727.00 Completed

20 Civil EE(R)-I 23.02.07 07.02.07 598800.00 28.07.08 03.09.08 470254.00 Completed

Construction of lane by providing CC from WZ-3064 to 1723 and WZ-3060 lane and cross adjoining lane at Mahendra Park at C-28/RDI.

622/22.03.07/EE(R )-I

M/s Ajit Dabas

Construction of lane by providing CC from WZ-3120 to 3366 and adjoining lane at Mahendra Park at C-28.

621/22.03.07/EE(R )-I

M/s Ajit Dabas

Const.to lane by CC from WZ-3944 Gali no.1 to WZ-598 Gali no.2 and adjoining lane shree Nagar at C-28/RDI.

535/22.02.07/EE(R )-I

Const.of lane by providing CC & drain from C-4/154 to C-4/161 to C-4/167, C-4/154 to C-4/160, C-4/167 to C-5/7 and adjoining lane of C-4 Pocket at Keshav Puram C-28/RDI.

Const.of lane by providing CC from gali no.2 towards gali no.4 between 316 and 181 and WZ-251 to 260 at Shree Nagar, Keshav Puram at C-28/RDI.

107/17.07.08/EE(M)-I

M/s R.S. Const Co.

Const.of lane by providing CC from WZ-268 Railway road xing to WZ-349 and adjoining cross lane at Shree Nagar, Keshav Puram at C-28/RDI.

165/27.11.07/EE®-I

M/s R.S. Const Co.

Const.of lane by pdy.CC near WZ-673 to 373 and WZ-660 to 377 and WZ-351 to WZ-334 and near by lanes at Shree Nagar at C-28 RDI.

109/17.07.08/EE(M)-I

M/s R.S. Const Co.

Page 26: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

21 Civil EE(R)-I 23.02.07 05.01.07 598100.00 28.11.7 04.04.08 498746.00 Completed

22 Civil EE(R)-I 23.02.07 19.02.07 589300.00 06.09.07 12.12.07 471960.00 Completed

23 Civil EE(R)-II 29.03.07 07.02.07 599600.00 23.07.08 29.10.08 477944.00 Completed

Construction of Walk way and gate at Park near C-7/221 at Keshav Puram at C-28/RDI.

161/27.1.07/EE(R) _I

M/s Ashish Const.Co

Construction of Huts 2 Nos at Tikona Park at Shree Nagar at C-28.

51/17.08.07/EE(R-I)

M/s Ashish Const.Co

C/O lane near WZ-668 gali no.2 to WZ-702, along M.C School WZ-686 from WZ-686 to 687and lane along WZ-349 at Shiv Nagar in C-28/Rohini Zone.

108/17.07.08/EE(M)-II

M/s R.S. Const Co.

Page 27: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 28: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA,Sh.S.C. Vats, AC No. 18 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure

1 Civil EE(R)-I 09.06.06 15.05.06 186468.00 14.09.06 13.11.06 186468.00 Completed

2 Civil EE(R)-I 09.06.06 15.05.06 255400.00 22.11.06 08.12.06 209984.00 Completed

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Present Position

Imp. Of lane by pdg. CC from H.NO.G-507 to G-523 and G-461 to G-482 in G-Block in R/C Shakarpur C-29/RZ

96/05.09.06/EE(RD)-I

M/s Rakesh Kumar Goel

Imp.of lane by pdg. CC from H.NO.K-152 to K-498, K-482 to K-458 and K-432 to K-410 in K-Block in R/C Shakurpur in C-29/RZ

224/22.11.06/EE(RD)-I

M/s Rakesh Kumar Goel

Page 29: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

3 Civil EE(R)-I 09.06.06 15.05.06 216390.00 04.10.06 29.11.06 216327.00 Completed

4 Civil EE(R)-I 09.06.06 15.05.06 190818.00 14.09.06 13.11.06 190782.00 Completed

5 Civil EE(R)-I 09.06.06 15.05.06 212597.00 04.10.06 29.11.06 212597.00 Completed

6 Civil EE(R)-I 09.06.06 15.05.06 188257.00 30.09.06 P 177973.00 In Prog.

7 Civil EE(R)-I 09.06.06 15.05.06 203330.00 20.09.06 19.10.06 203330.00 Completed

8 Civil EE(R)-I 23.06.06 15.05.06 449173.00 13.09.06 11.12.06 448905.00 Completed

9 Elect. EEE-VII 07.07.06 28.06.06 569027.00 23.10.06 31.10.06 435037.00 Completed

10 Elect. EEE-VII 07.07.06 27.06.06 570737.00 23.10.06 31.10.06 436972.00 Completed

11 Elect. EEE-VII 07.07.06 29.06.06 568394.00 12.10.06 16.10.06 429702.00 Completed

Imp. Of lane by pdg. CC from H.NO. H-715 to H-731 and H-689 to H-695 and G-438 to G Block Mkt. In G-Block R/C Shakurpur C-29/RZ

147/25.09.06/EE(RD)-I

M/s Rakesh Kumar Goel

Imp. Of lane by pdg. CC from H.NO. K-126 to Corner of park in K-block in R/C Shakurpur in C-29/RZ

95/05.09.06/EE(RD)-I

M/s Rakesh Kumar Goel

Imp. To lane by pdg. CC from H.NO. G-643 to G-664 and G-688 to G-710 and G-552 to G-574 in G-Block in JJ Shakurpur in C-29/RZ

146/25.09.06/EE(RD)-I

M/s Rakesh Kumar Goel

Imp.to road by pdg. CC between Rejsthali Apptt. and Madhuban Apptt. in Pitampura Village C-29

130/21.09.06/EE-(RD)-I

M/s Sharma Associates

Imp.to berm by pdg. Interlocking tiles from H.No. 55 to 66, H.No. 138 to 160 and 35 to 49 in Engineer Enclave in C-29

110/11.09.06/EE(RD)-I

M/s Rakesh Kumar Goel

Imp.to SW Drain from H.NO. 177, MP Enclave to Road no. 44 in Rajdhani Enclave in C-26

84/04.09.06/EE(R )-I

M/s Lakra Const.Co

P/O 3 NOS semi high Mast poles with lights in Mpl.parks opposite (a) H.NO. D-800 (b) Saraswati Dharmshala E-blcok, Saraswati Vihar and (c ) opposite H.NO.C-172, Pushpanjali Enclave, C.NO.8 under Rohini Zone

86/18.10.06/EE(E)-VII

M/s Seth Consts.

P/O NOS Semi high Mast poles with lights in Mpl. Parks opposite H.NO.A-68, B-230 & C-529, Saraswati Vihar, C.NO.18 under Rohini Zone

87/18.10.06/EE(E)-VII

M/s Seth Consts.

P/O 3 NOS High Mast Poles with lights in Mpl.Parks opposite (a) Jeewan Anand Apartment, West Enclave-2 NOS and (b) opposite H.NO.30, Tarun Enclave-1 NOS, C.no.18 under Rohini Zone.

85/12.10.06/EE(E)-VII

M/s S.K Enterprises

Page 30: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

12 Elect. EEE-VII 07.07.06 26.06.06 566494.00 12.12.06 P 391900.00 In Prog.

13 Elect. EEE-VII 07.07.06 30.06.06 567318.00 12.10.06 16.10.06 428355.00 Completed

14 Civil EE(R)-I 07.07.06 22.06.06 290400.00 04.09.06 26.10.06 200415.00 Completed

15 Civil EE(R)-I 07.07.06 22.06.06 445163.00 08.09.06 11.11.06 445163.00 Completed

16 Civil EE(R)-I 26.07.06 22.06.06 198974.00 M/s S..Kumar 04.08.06 10.11.06 198974.00 Completed

17 Civil EE(R)-I 26.07.06 15.05.06 204200.00 M/s Azad Singh 27.12.06 25.02.07 131538.00 Completed

18 Civil EE(R)-I 26.07.06 15.05.06 411840.00 29.11.06 07.05.07 411553.00 Completed

19 Elect. EEE-VII 18.08.06 02.08.06 185149.00 07.02.07 20.02.07 183742.00 Completed

20 Elect. EEE-VII 18.08.06 03.08.06 199889.00 11.06.07 10.07.07 178026.00 Completed

21 Civil EE(R)-I 08.09.06 04.08.06 191300.00 M/s GP Ravi 31.09.06 P 111042.00 In Prog.

22 Civil EE(R)-I 08.09.06 04.08.06 198907.00 21.09.06 06.11.06 198232.00 Completed

23 Civil EE(R)-I 11.09.06 04.08.06 199761.00 21.09.06 27.11.06 199589.00 Completed

P/O 3 NOS High Mast Poles with lights in Mpl.Parks opposite (a) H.no. 138, Chander Lok (b) Ram Vatika, Sharda Niketan (c ) Opposite DDA market near Community Hall, Sandesh Vihar, C.no.18 under Rohini Zone.

139/07.12.06/EE(E)-VII

M/s Perfect Electric Works

P/O 3 NOS Semi High Mast poles with lights in Mpl.parks opposite H.No.22,100 and 194, Sharda Niketan, C.NO.18 under Rohini Zone

84/12.10.06/EE(E)-VII

M/s Kamal Electricals

Imp.of roads and rd. side berms by P/L cement concrete from opp.H.NO.D-54 to D-59 in Pushpanjali Enclave in C-30

82/04.09.06/EE(RD)-I

M/s Pawan Constn.Co.

Imp.to park B/wall by pdg./Firing M.S.grill and Marble wash opp. H.NO.B-230 in Saraswati Vihar in C-30

105/08.09.06/EE(RD)-I

M/s Sharma Associates

P/L CC of intersection opp.BA-16 in Mangolpuri Industrila Area Phase-II in C-30

65/04.08.06/EE(RD)-I

Dev.to S.W.drain & berms near H.No. 25 & 26 (both side) in Sandesh Vihar in C-29.

319/18.12.06/EE(R )-I

Const.of umbrella in g-block park near Community Centre in J.J.Colony Shakurpur inC-29 Rohini Zone.

202/17.11.06/EE(R )-I

M/s Nishant Const.Co

P/O semi high mast pole with lights in MPL park opp.H.NO.252, Sanik Vihar, C.NO.18 under Rohini Zone.

166/01.02.07/EE(E)-VII

M/s Neeraj Electricals

P/O lighting arrangement in MPL Park opp. H.NO.171, Sanik Vihar, C.NO.18 under Rohini Zone.

08/06.06.07/EE(E)-VII

M/s Saksham Electricals & Electronics

Const.of B/Wall of Tot-lot near H.NO.143 and 230 in Tarun Enclave in C-30

129/21.09.06/EE(M)-I

Const.of B/Wall of Tot-lot near H.NO.26 & 43 in Tarun Enclave in C-30

126/21.09.06/EE(RD)-I

M/s Subhash Singh

Development of open surface drain on Shaheed Bismil Marg from Bannu Apptt.to road no.42 in Zone H-4/5 in C-30

125/21.09.06/EE(RD)-I

M/s Subhash Singh

Page 31: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

24 Civil EE(R)-I 11.09.06 21.08.06 199338.00 128/21.9.06/ R-I M/s G.P.Rani 21.9.06 11.12.06 197380.00 Completed

25 Civil EE(R)-I 15.09.06 15.05.06 143382.00 01.10.06 P 141382.00 In Prog.

26 Civil EE(R)-I 15.09.06 15.05.06 130282.00 1.10.06 29.11.06 130281.00 Completed

27 Civil EE(R)-I 15.09.06 15.05.06 314200.00 04.03.07 22.08.07 217818.00 Completed

28 Civil EE(R)-I 15.09.06 21.08.06 197834.00 M/s S. Kumar 22.09.06 16.11.06 197768.00 Completed

29 Civil EE(R)-I 26.09.06 25.09.06 219681.00 11.01.07 16.03.07 219681.00 Completed

30 Civil EE(R)-I 26.09.06 25.09.06 264051.00 11.01.07 24.03.07 264051.00 Completed

31 Civil EE(R)-I 27.09.06 13.09.06 372900.00 04.03.07 P 280707.00 In Prog.

32 Civil EE(R)-I 27.09.06 13.09.06 423700.00 15.03.07 P 168310.00 In Prog.

33 Elect. EEE-VII 27.09.06 16.09.06 198217.00 24.05.07 14.06.07 168495.00 Completed

34 Elect. EEE-VII 27.09.06 16.09.06 198816.00 24.05.07 14.06.07 169195.00 Completed

35 Elect. EEE-VII 27.09.06 16.09.06 199537.00 12.06.07 28.06.07 170437.00 Completed

36 Civil EE(R)-I 27.09.06 25.09.06 196841.00 M/s S. Kumar 10.10.06 14.12.06 196675.00 Completed

Wideming of road by P/L CC along M.C Pry School to Opp.Chadha Shop on Mahatma Hans Raj Marg in C-30Const.of passage in Ramleela Park in G-Block in Shakurpur JJ Colony in C-29

134/22.09.06/EE(R )-I

M/s Lakra Const.Co

Pdy./Fixing grill on B/Wall of park infront of H.NO.654 in H-Block Shakurpur JJ Colony in C-29

137/22.9.06/EE(R-I)

M/s Subhash Singh

Dev.of Kurbani Wala Park by pdy.B/Wall with grill near Masjid in H-Block in JJ Colony Shakurpur in C-29

567/23.10.07/EE(R-I)

M/s Lakra Const. Co.

Widewing of road by P/L CC from Car Parking gate to opp.Sapra Biscuit Shop on Guru Virja Nang Marg in C-30

136/22.09.06/EE(RD)-I

Devlopment to back lane by CC from H.NO.228 to 229, 228 to 223 and along 315 in Depali in C-30

379/11.01.07/EE(R )-I

M/s Nishant Const.Co

Development of back lane by CC from H.No.207 to 222 and along 405 to 419 in Deepali in C-30

378/11.01.07/EE(R )-I

M/s Mukesh Kumar Bansal

Development of lane by CC from H.NO.381 to 383, 356 to 312, 747 to 751 and 751 to 754 in Rishi Nagar in C-30

531/22.02.07/EE(R )-I

M/s Universal const.

Develoment of lane by CC from H.NO.1014 to 1053 and 985 to 1055 in Rani Bagh in C-30

582/06.03.07/EE(R )-I

M/s Naresh Kumar Gupta

P/O street light arrangement in JJ colony Shakurpur in W.NO.29 under R.Z

04/24.05.07/EE(E)-VII

M/s Dev.Engineers

P/O street light arrangement in Rani Baghand Rishi Nagar in W.NO.30 under RZ

02/24.05.07/EE(E)-VII

M/s Super Shine Associates

P/O street light arrangement in Rajdhani Enclave Harsh vihar, Samrat Enclave and Sainik Vihar in AC no.18 under RZ

07/06.06.07/EE(E)-VII

M/s Aman Electricals

Development of lane by CC from H.No.1395 to along M.C Pry.School in Rani Bagh in C-30

162/10.10.06/EE(RD)-I

Page 32: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

37 Civil EE(R)-I 29.09.06 29.09.06 279526.00 11.01.07 30.04.07 279526.00 Completed

38 Civil EE(R)-I 29.09.06 28.09.06 404700.00 12.02.07 P 290205.00 In Prog.

39 Civil EE(R)-I 29.09.06 15.05.06 216000.00 27.12.06 21.03.07 186414.00 Completed

40 Civil EE(R)-I 06.10.06 26.09.06 539602.00 27.12.06 19.06.07 537101.00 Completed

41 Civil EE(R)-I 31.10.06 29.09.06 338600.00 M/s R.K Const. 02.02.07 21.03.07 259397.00 Completed

42 Civil EE(R)-I 31.10.06 28.09.06 598100.00 04.03.07 24.07.07 445080.00 Completed

43 Civil EE(R)-I 01.11.06 28.09.06 526900.00 12.02.07 19.04.07 401766.00 Completed

44 Civil EE(R)-I 01.11.06 28.09.06 328200.00 22.02.07 18.05.07 250090.00 Completed

45 Civil EE(R)-I 01.11.06 28.09.06 495200.00 22.02.07 18.07.07 377981.00 Completed

46 Civil EE(R)-I 15.11.06 07.10.06 567700.00 19.02.07 18.02.07 493553.00 Completed

47 Civil EE(R)-I 15.11.06 10.09.06 293500.00 21.01.07 16.04.07 218241.00 Completed

Development of S.W drain from H.No.E-899 to along E-864 in Saraswati Vihar in C-30

385/11.01.07/EE(R )-I

M/s Ashish Const.Co

Development of S.W drain from H.No.E-876 to along E-865 in Saraswati Vihar in C-30

464/02.02.07/EE(R )-I

M/s Shri Balaji Const.Co.

Const.of Umbrella in park infront of H.NO.1 in I-Block in Shakurpur J.J Colony in C-29.

313/18.12.06/EE(R )-I

M/s A & T Const.

Const.of B/Wall of park in between Vidya Vihar & C.N.G filling station in Zone H-4/5 in Saraswati Vihar in C-30

341/27.12.06/EE(R )-I

M/s Vijay Builders

Development of park by Construction of B/wall opp.H.NO. C-1/18 in West Enclave Saraswati Vihar in C-30.

461/02.02.07/EE(R )-I

Development of back lane by P/L Cement Concrete from H.NO.C-2/63 to C-2/88, C-2/1 to C-2/18, C-1/61 to C-1/68 and C-1/40 to C-1/52 in West Enclave Saraswati Vihar in C-30.

521/02.02.07/EE(R )-I

M/s Mukesh Kumar Bansal

Development of back lane by CC from H.No.443 to 438, 419 to DDA mkt.and 431 to 437 in Deepali in Saraswati Vihar Ward in C-30 Rohini Zone.

496/12.02.07/EE(R )-I

M/s Mukesh Kumar Bansal

Development of back lane by CC from H.NO.180 to 168 in Tarun Enclave Saraswati Vihar in C-30.

497/12.02.07/EE(R )-I

M/s Mukesh Kumar Bansal

Dev.of back lane by CC from H.No.C-2/113 to C-2/136, C-2/138 to C-2/161, C-2/51 to C-2/123 (along park) in West Enclave in Saraswati Vihar Ward C-30 Rohini Zone.

498/12.02.07/EE(R )-I

M/s Mukesh Kumar Bansal

Construction of designer gate in Vidya Vihar park and West Enclave Park Between Market and Jeevan Anand Society Saraswati vihar in C-30/RDI

476/09.02.07/EE®-I

M/s Dua Const.Co

Dev.of road of pdy.CC from H.NO.249 to 241 in Lok Vihar 'B' Block in C-29.

412/12.01.07/EE(R )-I

M/s Ashish Const.Co

Page 33: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

48 Civil EE(R)-I 15.11.06 10.09.06 286400.00 21.01.07 26.03.07 211313.00 Completed

49 Civil EE(R)-I 15.11.06 10.09.06 349500.00 28.02.07 23.05.07 248244.00 Completed

50 Civil EE(R)-I 15.11.06 10.09.06 452700.00 15.03.07 25.05.07 318748.00 Completed

51 Civil EE(R)-I 15.11.06 10.09.06 262500.00 08.04.07 27.06.07 187109.00 Completed

52 Civil EE(R)-I 15.11.06 10.09.06 524400.00 22.02.07 30.05.07 375260.00 Completed

53 Civil EE(R)-I 07.02.07 06.02.07 193009.00 22.02.07 19.03.07 186862.00 Completed

54 Civil EE(R)-I 07.02.07 06.02.07 132551.00 M/s S.Kumar 15.03.07 15.06.07 131608.00 Completed

55 Civil EE(R)-I 07.02.07 23.01.07 132237.00 03.03.07 28.05.07 131914.00 Completed

56 Civil EE(R)-I 07.02.07 23.01.07 592100.00 24.03.07 01.06.07 475497.00 Completed

57 Civil EE(R)-I 07.02.07 06.02.07 190701.00 03.03.07 01.06.07 190662.00 Completed

58 Civil EE(R)-I 07.02.07 06.02.07 180635.00 03.03.07 18.12.07 180339.00 Completed

59 Civil EE(R)-I 07.02.07 06.02.07 198924.00 03.03.07 02.05.07 198924.00 Completed

60 Civil EE(R)-I 07.02.07 06.02.07 196534.00 03.03.07 17.04.07 196534.00 Completed

61 Civil EE(R)-I 01.03.07 08.11.06 228500.00 18.08.07 06.10.07 146173.00 Completed

62 Civil EE(R)-I 01.03.07 08.11.06 475506.00 27.09.07 23.01.08 475248.00 Completed

Dev.of 45-'O' R.O.W road by pdy.CC pavement from market to road no.43 in Rajdhani Enclave in C-29.

411/12.01.07/EE(R )-I

M/s Suresh Kumar & Co.

Dev.of service lane by pdy.CC from H.NO.74 to 90 in Sandesh Vihar in C-29.

512/19.02.07/EE(R )-I

M/s Satish Gupta & Co.

Dev.of service lane by pdy.CC from H.NO.7 to 17 in Samrat Enclave in C-29.

585/06.03.07/EE(R )-I

M/s Mukesh Kumar Bansal

Dev.of berm opp.H.NO.G-102 in Shakurpur J.J Colony in C-29.

638/29.03.07/EE(R )-I

M/s Anil Kumar

Dev.of service lane by pdy.CC from H.NO.28 to 51 in Rohit Kunj in C-29.

508/13.02.07/EE(R )-I

M/s Mukesh Kumar Bansal

Const.of B/wall of Tot-Lot near H.No.12 in Tarun Enclave in C-30 in Saraswati Vihar ward Rohini Zone.

536/22.02.07/EE(R )-I

M/s Subhash Singh

Dev.of central verge by constructing flower pots from sant nagar chowk to fountain chowk on Guru Virja Nand Marg C-30.

534/22.02.07/EE®-I

Constns.of culverts opp.H.NO.46, 55, 180 in Anand Vihar in C-30.

548/22.02.07/EE(R )-I

M/s Ajay Const.Co

Development of S.W drain on Mahatma Hans Raj Marg from Rashmi Appartment Gate to Jheelwala park in Saraswati Vihar in C-30 Rohini Zone.

619/22.03.07/EE(R )-I

M/s Dua Const.Co

Const.of Culvert and drain near H.NO.263 in Rajdhani Enclave in C-29.

545/22.02.07/EE(R )-I

M/s Lakra Const.Co

Dev./Const.of Toilet block in E-Block Shakarpur J.J Colony C-29.

540/22.02.07/EE-R-I

M/s Prakash Khanna

Dev./Const.of Umbrella in G-Block Park Opp. H.NO.285 in Shakarpur J.J Colony C-29.

546/22.02.07/EE(R )-I

M/s Jasvinder Gulati

Dev./Const.of culverts in H & I block in Shakarpur JJ Colony C-29.

542/22.02.07/EE(R )-I

M/s Amit Const.

Dev.of S.W drain from H.NO.21 to 42 in M.P Enclave in C-29.

38/09.08.07/EE(R )-I

M/s Nandni Enterprises

Dev.of S.W drain & berm from H.NO.28 to 48 & 49 to 71 in Rohit Kunj in C-29.

125/18.09.07/EE®-I

M/s Naresh Kumar Gupta Co.

Page 34: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

63 Civil EE(R)-I 01.03.07 08.11.06 520461.00 18.08.07 P 304975.00 In Prog.

64 Civil EE(R)-I 01.03.07 09.11.06 295400.00 18.08.07 09.11.07 229175.00 Completed

65 Civil EE(R)-I 01.03.07 08.11.06 320200.00 26.08.07 25.10.07 218865.00 Completed

66 Civil EE(R)-I 12.03.07 12.02.07 260800.00

67 Civil EE(R)-I 12.03.07 12.02.07 163928.00 26.07.07 20.09.07 163632.00 Completed

68 Civil EE(R)-I 12.03.07 12.02.07 236648.00 30.11.07 04.02.08 231956.00 Completed

69 Civil EE(R)-I 12.03.07 12.02.07 231421.00 24.10.07 26.12.07 230860.00 Completed

70 Civil EE(R)-I 12.03.07 12.02.07 231516.00 161/17.10.07®-I 22.10.07 22.12.07 231309.00 Completed

71 Civil EE(R)-I 12.03.07 12.02.07 346700.00 28.09.07 24.11.07 346113.00 Completed

72 Civil EE(R)-I 12.03.07 12.02.07 359084.00 28.09.07 12.12.07 357089.00 Completed

73 Civil EE(R)-I 12.03.07 12.02.07 220701.00 17.11.07 16.01.08 219934.00 Completed

74 Civil EE(R)-I 12.03.07 12.02.07 424362.00 28.09.07 29.11.07 423036.00 Completed

75 Civil EE(R)-I 12.03.07 12.02.07 218648.00 17.11.07 16.01.08 218251.00 Completed

76 Civil EE(R)-I 12.03.07 12.02.07 349385.00 28.09.07 23.12.07 349385.00 Completed

Const.of B/wall of park back of H.NO.300 (L Type) in Rajdhani Enclave in C-29.

39/09.08.07/EE(M)-I

M/s Navitesh Consts

Dev.of drainage system & berm near "B" Block Lok Vihar Market in C-29.

40/09.08.07/EE®=I

M/s Navitesh Const

Dev.of S.W drain Gate no.1(both side) in M.P Enclave in C-29.

49/17.08.07/EE(R )-I

M/s Navtosh Consts.

Dev.of S.W drain from Comm.Centre to Parwana Road in Pushpanjali Enclave in C-30.C/O Walkway in Park Opp.H.NO.27 in Tarun Enclave in C-30.

27/16.07.07/EE(R )-I

M/s Subhash Singh

C/O Hut/Umbrella in Phool Ram Park Rishi Nagar in C-30.

211/13.11.07/EE(M)-I

M/s Sandeep Const

C/O Hut in Park Opp. H.NO.71, Sainik Vihar in C-30.

162/17.10.07/EE®_I

M/s Arun Builders

C/O Hut/Umbrella in Sant Nagar Park in C-30.

M/s Arun Builders

Dev.of park by Improvement of Walkway by P/L red sand stone Sharda Appartment side in Zone H-4/5 in ward Saraswati Vihar in C-30.

116/18.09.07/EE-R-I

M/s Nishant Const.Co

Development of park by Improvement of walk way by P/L red sand stone Vidya Vihar Appartment side in ward Saraswati Vihar in C-30.

117/18.09.07/EE-R-I

M/s Nishant Const.Co

Const.of Hut in Park Opp.H.NO.C-140 in Pushpanjali Enclave in Saraswati Vihar ward C-30.

247/15.11.07/EE®-I

M/s Arun Builders

Development of Park near Jeevan Jyoti App.by Improvement of Walkway by P/L Red Send Stone in Saraswati Vihar in C-30.

128/08.09.07/EE®-I

M/s Vijay Builders

Construction of Hut near Vidya Vihar Park in Ward Saraswati Vihar C-30.

246/15.11.07/EE®-I

M/s Arun Builders

Development of park opp.H.NO.C-2/62, West Enclave by Constructing B/Wall & Firing of M.S Grill in Saraswati Vihar C-30.

127/18.09.7/EE®-I

M/s Vijay builders

Page 35: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA,Sh Ravindra Nath Bansal, AC No. 19 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure

1 Civil EE(R)-I 01.06.06 27.05.06 422695.00 09.09.06 10.10.06 422695.00 Completed

2 Civil EE(R)-I 01.06.06 27.05.06 295168.00 27.09.06 30.12.06 295157.00 Completed

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Present Position

Remodelling to drainage system and lane from H.NO. 53A to 76A, 61A to Power house road crossing 78A to 102A to 104A in 'PA' block, Pitampura C-32

99/08.09.06/EE(R)-I

M/s Rakesh Kumar Goel

Construction of walk way in the park opp. house no. 117 A and Construction of boundary wall from 103A to 105A in 'PA' block Pitampura C-32

144/25.09.6/EE(RD)-I

M/s Surendra Constructions

Page 36: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

3 Civil EE(R)-I 01.06.06 27.05.06 293400.00 11.09.06 14.12.06 293316.00 Completed

4 Civil EE(R)-I 23.06.06 20.06.06 326528.00 29.09.06 30.12.06 319004.00 Completed

5 Civil EE(R)-I 23.06.06 20.06.06 350302.00 29.09.06 03.05.07 350128.00 Completed

6 Civil EE(R)-I 23.06.06 20.06.06 320500.00 08.09.06 30.11.06 270248.00 Completed

7 Civil EE(R)-I 23.06.06 20.06.06 171458.00 06.09.06 17.08.07 171458.00 Completed

8 Civil EE(R)-I 20.07.06 04.07.06 244000.00 12.09.06 15.12.06 186018.00 Completed

9 Civil EE(R)-I 08.08.06 25.07.06 543600.00 19.01.07 03.07.07 401589.00 Completed

10 Civil EE(R)-I 08.08.06 25.07.06 259800.00 21.01.07 05.03.07 203153.00 Completed

11 Civil EE(R)-I 08.08.06 25.07.06 222700.00 18.12.06 15.02.07 159919.00 Completed

12 Civil EE(R)-I 08.08.06 25.07.06 463900.00 29.01.07 23.04.07 345731.00 Completed

Construction walk way in the park opp. house no. 44A in 'YP' block and Construction of walkway in the park opp. house no. RP-71 in 'RP' block Pitampura C-32

101/08.09.6/EE(RD)-I

M/s Surendra Constructions

Imp.to side lane by pdg.RMC and drainage from H.NO. 61 to 187 in BM(West) Block in Shalimar Bagh C-31/RDI

132/22.09.06/EE(RD)-I

M/s Pee Kay Const.

Imp.of lane by PDg.RMC from H.NO. 15 to 26 in BG (Poorvi) Block in Shalimar Bagh C-31/RDI

131/22.09.06/EE(R )-I

M/s Manoj Kumar Gupta

Imp.of lane from House No. 490 to 506 by pdg.drainage and RMC in 'AG' Block in Shalimar Bagh in C-31/RD-I

90/05.09.06/EE(RD)-I

M/s Chauhan Const.co

Construction of umbrella in the Shiv Park Sitnated opposite 'BE' block in Shlimar Bagh in C-31/RD-I

75/30.08.06/EE(R )-I

M/s Sharma & Co.

Construction of Tol Wall opposite H.NO. 584 to 595 in 'AG' Block, in Shalimar Bagh in C-31

98/05.09.06/EE(RD)-I

M/s Manoj Kumar Gupta

Remodelling to drain and pdy. Cement concrete in the lane from H.NO.ND-1 to ND-69 and ND-69 to ND-61 in 'ND' block in Pitampura, C-32, Delhi

388/11.01.07/EE(R )-I

M/s A.R Contractors & Suppliers

Remodelling Cement concrete in the lane from H.NO.HU-1 to HU-84 in 'HU' block in Pitampura, C-32, Delhi

345/27.12.06/EE(RD)-I

M/s Manoj Kumar Gupta

Remodelling to drainage system and pdy.Cement concrete on side berms from H.NO.KU-73 to KU-79 in 'KU' block Pitampura, C-32, Delhi

304/15.12.06/EE(RD)-I

M/s V.K Consts.Co

Remodelling to drainage system and pdy.Cement concrete in the lane from H.NO.31A to 36A, 37A to 44A in 'CA' block Shalimar Bagh, C-33, Delhi

409/12.01.07/EE(R )-I

M/s Raj Enterprises

Page 37: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

13 Civil EE(R)-I 08.08.06 24.07.06 427092.00 02.03.07 31.05.07 426913.00 Completed

14 Civil EE(R)-I 08.08.06 26.07.06 599300.00 19.01.07 19.06.07 485414.00 Completed

15 Civil EE(R)-I 08.08.06 26.07.06 462830.00 22.01.07 12.06.07 462352.00 Completed

16 Civil EE(R)-I 08.08.06 01.08.06 147700.00 22.12.06 26.02.07 114326.00 Completed

17 Civil EE(R)-I 08.08.06 01.08.06 236300.00 23.12.06 25.06.07 154312.00 Completed

18 Civil EE(R)-I 30.08.06 19.08.06 288075.00 29.12.06 28.06.07 288021.00 Completed

19 Civil EE(R)-I 30.08.06 19.08.06 380100.00 20.01.07 12.09.07 269902.00 Completed

20 Civil EE(R)-I 30.08.06 19.08.06 213700.00 26.12.06 12.3.07 157763.00 Completed

21 Civil EE(R)-I 30.08.06 19.08.06 408302.00 02.03.07 02.07.07 403151.00 Completed

Remodelling to drainage system and pdy.Cement concrete in the lane from H.NO.45A to 52A, 53A to 63A in 'CA' block Shalimar Bagh, C-33, Delhi

261/29.11.06/EE(R )-I

M/s Ashish const.Co

Pdy.Cement concrete in the lane from H.NO.4A to 5A, 58A to 68A, 50A to 63A, 99A to 86A, 133A to 152A, 83A to 69A, 15A to 4A, 17A to 32A, 48A to 33A, 110A to 123A, 108A to 96A in 'WP' block Pitampura, C-32, Delhi

401/12.01.07/EE(R )-I

M/s A.R Contractors & Suppliers

Pdy.Cement concrete in the lane from H.NO.222A to 240A, 171A to 153A, 179A to 166A, 227A to 213A, 212A to 197A, 166A to 182A, 131A to 120A, and 201A to 190A in 'WP' block Pitampura, C-32, Delhi

342/27.12.06/EE(R )-I

M/s K.K Const.Co.

Construction of back lane by pdy.cement concrete of FIU block from H.NO.155 to 138, 125 to 124 in Pitampura, C-32, Delhi

317/18.12.06/EE(RD)-I

M/s Manoj Kumar Gupta

Remodelling to drainage system from H.NO.63 to 86, 136 to 115, 115 to 125, 85 to 75, 64 to 74, 97 to 105, 86 to 96, 55 to 124, 28 to 54, 27 to 1 in QP block Pitampura, C-32, Delhi

318/18.12.06/EE(RD)-I

M/s Manoj Kumar Gupta

Raising of B/Wall of 'CA' Block Shlaimar Bagh from H.NO.1A to 74A in Pitampura C-32

344/22.12.06/EE(RD)-I

M/s Ashish const.Co

Remodelling to drainage system from H.NO.74A to 56A, 55A to 54A, 54A to 51A in G & JU block and 56A to 25A in JU block in Pitampura C-32

400/12.01.07/EE(RD)-I

M/s A.R Contractors & Suppliers

Providing marbel wash plaster on the B/Wall of G & JU Block in Pitam Pura C-32

322/18.12.06/EE R-I

M/s Pankaj Cust. Co.

Remodelling to drainage system from house no.47A to 90A, 23A to 8A, 2A to 1A, 4A to park, 7A to parking, 5A to 1A G & JU Block in Pitampura C-32

553/22.02.07/EE(R )-I

M/s Manoj Kumar Gupta

Page 38: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

22 Civil EE(R)-I 30.08.06 19.08.06 141800.00 21.12.06 21.02.07 95188.00 Completed

23 Civil EE(R)-I 30.08.06 19.08.06 423111.00 06.12.06 07.02.07 423097.00 Completed

24 Civil EE(R)-I 30.08.06 19.08.06 157200.00 27.12.06 24.02.07 103325.00 Completed

25 Elect. EEE-VII 04.09.06 18.08.06 121526.00 12.06.07 11.07.07 98092.00 Completed

26 Elect. EEE-VII 04.09.06 17.08.06 158315.00 5.2.07 20.2.07 157740.00 Completed

27 Civil EE(R)-I 11.09.06 07.08.06 543000.00 12.1.07 17.04.07 406245.00 Completed

28 Civil EE(R)-I 11.09.06 24.07.06 667057.00 5.2.07 06.06.07 667027.00 Completed

29 Civil EE(R)-I 06.10.06 04.07.06 747300.00 11.01.07 20.02.07 583456.00 Completed

30 Civil EE(R)-I 06.10.06 04.07.06 615700.00 21.02.07 31.08.07 474501.00 Completed

Providing steel fencing on the B/Wall of the parks Opp.H.NO.KP-6, KP-125 and Construction of lane by pdy.CC from H.NO.17 to 35 in KP Block Pitampura C-32

316/18.12.06/EE(RD)-I

M/s Har Shri Nath Consts.

Providing and fixing grills on the Islands & intersection of G & JU Block, Fountain Chowk and Construction of Walkway in the park opp.H.NO.18A in WP Block in Pitampura C-32

278/04.12.06/EE(RD)-I

M/s Rakesh Kumar Goel

Construction of Walkway and providing grills on the B/Wall of Park Opp.H.No.56 in GP Block in Pitampura C-32

315/18.12.06/EE(R )-I

M/s Virender Const.

Provision of lighting arrangement in Mpl.Park behind BH(East.) Block Market, Shalimar Bagh, C.No.19 under R.Zone.

09/06.06.07/EE(E)-VII

M/s Bindra Motors & Electricals

P/O semi high mast pole with lights in central park situated between H.NO.58 to 67 and from 68 to 75 in Bk-II Block Shalimar Bagh, C.no.19 under R.Zone.

167/1.2.07/EE(E) VII

M/s Kirshana Electricals

Development of lane by providing darinage and RMC from h.no.13 to 25 and 35 to 38 in AL block in Shalimar Bagh in C-31/R.Zone.

371/11.1.07/EE-R-I

M/s Suresh kumar Co.

Remodelling to drainage system and providing RMC on side berms from NP-98 to NP-85 and Construction of drain and lane from NP-40 to NP-31, NP-120 to 113and providing RMC opp.H.NO.NP-20, NP-21, NP-85, NP-85 to NP-140 in NP-Block Pitampura C-32

445/31.1.07/EE-R-I

M/s Suresh kumar Co.

Development of lane by pdg.RMC and drainage system from H.NO.49 to 59 in BA block in Shalimar Bagh in C-31/RD-I

377/11.01.07/EE(RD)-I

M/s Rakesh Kumar Goel

Development of lane by providing RMC and drainage from falt no.80A to 77 and near 69 in AC block in Shalimar Bagh C-31

510/13.02.07/EE(RD)-I

M/s Satish Gupta & Co.

Page 39: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

31 Civil EE(R)-I 06.10.06 03.10.06 665600.00 21.02.07 31.08.07 498614.00 Completed

32 Civil EE(R)-I 26.10.06 10.10.06 378900.00 19.02.07 03.08.07 264100.00 Completed

33 Civil EE(R)-I 08.11.06 24.07.06 785000.00 M/s Friends Const 01.03.07 18.02.08 629408.00 Completed

34 Civil EE(R)-I 20.11.06 13.11.06 3447600.00 05.10.07 11.10.07 3438900.00 Completed

35 Civil EE(R)-I 20.11.06 15.11.06 4381900.00 01.08.07 12.10.07 4381900.00 Completed

36 Civil EE(R)-I 12.01.07 13.12.06 26500.00 21.03.07 29.03.07 16422.00 Completed

Development of lane by pdy.RMC and drainage from flat no.54A to 49 and 55A to 60 in AC block in Shalimar Bagh in C-31/RDI.

501/13.02.07/EE(RD)-I

M/s Satish Gupta & Co.

Constrcution of back lane by pdy.RMC from h.no.1 to 33 in DU Block and construction of drainand side berms by providing RMC from Durga tempal to H.NO.33 in DU block and constrcution of side berms by providing RMC from EU-43A to EU-31A in EU Block Pitampura, C-32.

507/13.02.07/EE(RD)-I

M/s Tokas & Co.

Development of lane by pdy.RMC and drainage from flat no.81A to 87 and 13A to 18 in AC block in Shalimar Bagh in C-31/RDI.

Advance to M/s Sri Ram Institate for Industrial Researce for Testing cheque as approved by Addl. Comm.Engg.dated 18.06.07 and w.no.572 dated 01.03.07, EE®-I

Strengthening of internal roads of LP Block, NP Block, PP Block, QP Block, WP Block, KD Block and ZP Block from 1 to40 and 41 to 80 in Pitampura C-32 (dense carpetting)

20/05.06.07/EE(Br.)-III

M/s Sona Consultant & Cont.

Strengthening of internal roads of BU (SFS), CU Block, KU Block, LU Block, MU (Flats), UU Block from 202 to Power house road crossing CA block Shalimar bagh, CC Block shalimar bagh, in Pitampura C-32 (dense carpetting)

19/05.06.07/EE(BR )-III

M/s Sona Consultant & Cont.

Providing and laying chequered tiles on the front side of 'MP' block Market in Pitampura C-32.

610/20.03.07/EE(R )-I

M/s Rakesh Kumar Goel

Page 40: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

37 Civil EE(R)-I 12.01.07 28.12.06 128300.00 22.03.07 27.04.07 77827.00 Completed

38 Civil EE(R)-I 12.01.07 28.12.06 374600.00 30.03.07 23.10.07 373115.00 Completed

39 Civil EE(R)-I 12.01.07 28.12.06 345156.00 05.04.07 20.07.07 344662.00 Completed

40 Civil EE(R)-I 16.01.07 28.11.06 99600.00 26.03.07 22.09.07 70075.00 Completed

41 Civil EE(R)-I 16.01.07 15.11.06 242100.00 22.03.07 18.06.07 170189.00 Completed

42 Civil EE(R)-I 16.01.07 15.11.06 149600.00 19.03.07 24.05.07 115756.00 Completed

43 Civil EE(R)-I 16.01.07 15.11.06 112300.00 22.03.07 18.06.07 84200.00 Completed

44 Civil EE(R)-I 24.01.07 07.08.06 665500.00 29.03.07 04.12.07 586079.00 Completed

45 Civil EE(R)-I 01.02.07 20.01.07 199800.00 09.02.07 16.04.07 199776.00 Completed

Remodelling to drainage system from House no.11 to 26, 130 to 27 and 11A to 148 in HP block Pitampura C-32.

611/20.03.07/EE(R )-I

M/s Rakesh Kumar Goel

Construction of drain from House no.PD-1A to 69A, 29A to 58A in PD block Pitampura C-32.

639/29.03.07/EE(R )-I

M/s Pee Kay Const.

Construction of drain from House no.17A to 97A, 16A to 101A, 96A to 77A, 47A to 68A in PD block Pitampura C-32.

637/29.03.07/EE(R )-I

M/s Sonu Const.Co.

Covering of existing drain by pdy.RCC and pyd.cement conceret on side berms from Gella Ram Hospital to DU-144 in Pitampura C-32.

613/20.03.07/EE(R )-I

M/s Virender Const.

Construction of Walkway in the Park Opposite House no.57 in MP block in Pitampura C-32.

601/16.03.07/EE(R )-I

M/s Virender Const.

Covering of existing drain by providing RCC opposite H.NO.107 to H.NO.117 in MP block in Pitampura C-32.

600/16.03.07/EE(R )-I

M/s V.K Consts.Co

Providing Red Sand stone and M.S Grills on the Planter of MD block market and providing M.S grills on the Island near DDA office at R.P Chowk in Pitampura C-32.

612/20.03.07/EE(R )-I

M/s Virender Const.

Development of lane by providing RMC from House no.39 to 66 and 43 to 50 in BK(West) block in Shalimar Bagh in C-31/RZ.

Advance to M/s Sri Ram Institate for Industrial Researce for Testing cheque as approved by Addl. Comm.Engg.dated 16.06.07 and w.no.623 dated 22.03.07, EE®-I

M/s A Contractor & Suppliers

Development of lane by providing RMC near H.NO.27 along DDA Bagh, near H.NO.40 in BG(Poorvi) block in Shalimar Bagh in C-31/R.D.I.

474/09.02.07/EE(R )-I

M/s Lakra Const.CO

Page 41: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

46 Civil EE(R)-I 12.02.07 28.12.06 331740.00 02.04.07 04.07.07 331352.00 Completed

47 Civil EE(R)-I 12.02.07 28.12.06 230530.00 04.04.07 06.07.07 230308.00 Completed

Constrcution of drain and providing interlocking files on side berms and lanes from H.NO.89A to 96A, park to 39A, 211A to 207A in QU block (LIG) in Pitampura C-32.

643/09.03.07/EE(R )-I

M/s Rakesh Kumar Goel

Construction of drain and providing interlocking tiles in the lanes, side berms from 117A to 16A, 52A to 49A, 85A to 88A in QU block (LIG) in Pitampura C-32.

644/29.03.07/EE(R )-I

M/s Rakesh Kumar Goel

Page 42: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA,Sh.Jai Bhagawan Aggarwal, AC No. 20 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure

1 Civil EE(Br)-IV 25.05.06 23.05.06 426448 26.08.06 02.11.06 425805.00 Completed

2 Civil EE(Br)-IV 25.05.06 23.05.06 424301 26.08.06 02.11.06 421960.00 Completed

3 Civil EE(Br)-IV 05.06.06 23.05.06 417402 11.10.06 05.12.06 417339.00 Completed

4 Elect EEE-VII 14.06.06 26.05.06 368160 26.09.06 13.10.06 368054.00 Completed

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Present Position

Imp.of 9.00 m road by pdg.CC & drainage system from H.NO.-9 to 16 & 29 to 36 in Block B-1 Sec-11 Rohini

23/25.08.06/EE(Br.-IV)

M/s Sushil Const.Co

Imp.of 9.00 m road by pdg.CC & drainage system from H.NO.-22 to park & 23 to Park in Block B-2 Sec-11 Rohini

22/25.08.06/EE(Br.-IV)

M/s Sushil Const.Co

Imp.of 9.00 m road by pdg.CC & drainage system from H.NO.-75 to 116 in pocket B-6 Sec-11 Rohini

27/10.10.06/EE(Br.)-IV

M/s Sh. N.K Engineering Corp.

P/O NOS HPSV street light arrangement in sector-11, Rohini and Prashant Vihar, C.NO. 20 undre Rohini Zone

60/25.09.06/EE(E)-VII

M/s Bansal Electric Store

Page 43: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

5 Elect EEE-VII 14.06.06 26.05.06 378820 26.09.06 13.10.06 378444.00 Completed

6 Elect EEE-VII 14.06.06 26.05.06 543607 24.11.06 21.12.06 397590.00 Completed

7 Civil EE(Br)-IV 15.06.06 09.06.06 481300 13.12.06 12.04.07 357200.00 Completed

8 Civil EE(Br)-IV 15.06.06 09.06.06 314900 25.09.06 16.11.06 234262.00 Completed

9 Civil EE(Br)-IV 15.06.06 09.06.06 327874 06.10.06 15.11.06 326581.00 Completed

10 Civil EE(Br)-IV 15.06.06 09.06.06 342504 18.09.06 P 339764.00 In Prog.

11 Civil EE(Br)-IV 15.06.06 09.06.06 318764 06.10.06 P 311884.00 In Prog.

12 Civil EE(Br)-IV 19.06.06 15.06.06 523522 08.12.06 P 414591.00 In Prog.

13 Civil EE(Br)-IV 19.06.06 15.06.06 354900 14.10.06 25.12.06 265835.00 Completed

14 Civil EE(Br)-IV 07.08.06 31.05.06 236931 30.01.07 13.03.07 236864.00 Completed

15 Civil EE(Br)-IV 07.08.06 31.05.06 259867 23.02.07 20.04.07 259338.00 Completed

P/O 100 NOS HPSV street light arrangement in Sec-5 and Sec-6, Rohini, C.No-20 under Rohini Zone

61/25.09.06/EE(E)-VIII

M/s Bansal Electric Store

P/O street light arrangement with 100 NOS 150 watts HPSV fittings in Suraj park, Raja Vihar and Ambedkar Nagar in A.C.no.20 under Rohini Zone

109/22.11.06/EE(E)-VII

M/s Bansal Electric Store

C/O B/wall of park with M.S.Grill and grit wash plaster near H.No.73 in F7A Block Sector-16 C-33II,R-II

314/12.12.06/EE(R )-I

M/s Konark Const.Co

Const.of B/wall & Pdg.M.S.Grill with grit wash of park near H.NO. G-1/163 in Sector-16/C33-II, R-II

190/25.09.06/EE(R )-II

M/s Satbir Const.Co

Pdg. & Laying perforated type interlocking tiles from PWD road to Supdtt.Engg.office of flood deptt.infront of Arya R.H.S in H-Block Sect-15 Rohini in C34-II,R-II

219/06.10.06/EE( R)-II

M/s Satbir Const.Co

Pdg. & laying perforated type interlocking tiles infront opp.from Dream Palace restaurent near P.W.D road to SE office L.H.S in front of Arya Apptt.H-Block Sector-15 Rohini in C-34II, R-II

184/18.09.06/EE( R)-II

M/s Shri Bhagwan Const.Co.

Const.of road by Pdg. CC pavement from G6/76 to G2/16 in Sector 15 in C-34III, R-II

211/06.10.06/EE(R )-II

M/s Nirvan Const.Co

C/O B/Wall with M.S grill and grit wash of park near H.No. F-3/86, F-3/50, F-5/11 in sector 15 in C-34II, R-II

284/28.11.06/EE(R )-II

M/s Sharma & Co.

Const.of B/Wall and pdg.M.S.Grill with grit wash plaster of park in Block A, Near H.No.13 in Sector 16 Rohini in C-33II, R-II

222/06.10.06/EE( R)-II

M/s Satbir Const.Co

Const.of Ahatas by Pdy.I/L prefab pavers from H.NO.419/ to 437 Pkt.E-16 Sec.8, H.NO.219 to 232 Pkt.E-15 Sec.8 Rohini in C-33I,R-II

404/22.01.07/EE( R)-II

M/s Mange Ram Gupta

Const.of Ahatas by Pdy.I/L prefab pavers from H.NO.121 to 134, H.NO.161 to 177, H.NO.9 to 24, H.NO.49 to 64 in Pkt.B9 Sec.5 Rohini in C-33I,R-II

469/22.02.07/EE(R )-I

M/s Vijay Bansal

Page 44: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

16 Civil EE(Br)-IV 07.08.06 31.05.06 272942 27.02.07 29.03.07 272337.00 Completed

17 Civil EE(Br)-IV 07.08.06 31.05.06 569000 31.01.07 23.04.07 451874.00 Completed

18 Civil EE(Br)-IV 07.08.06 31.05.06 374090 22.01.07 28.05.07 368850.00 Completed

19 Civil EE(Br)-IV 07.08.06 31.05.06 259326 22.02.07 09.03.07 259052.00 Completed

20 Civil EE(Br)-IV 13.10.06 30.09.06 588900 01.05.07 15.06.07 425272.00 Completed

21 Elect EE(Br)-IV 19.10.06 07.10.06 199216 20.10.06 25.10.06 193810.00 Completed

22 Elect EE(Br)-IV 19.10.06 07.10.06 199186 20.10.06 25.10.06 194324.00 Completed

23 Elect EE(Br)-IV 19.10.06 07.10.06 198961 20.10.06 25.10.06 196731.00 Completed

24 Elect EE(Br)-IV 19.10.06 07.10.06 198510 20.10.06 25.10.06 193841.00 Completed

25 Civil EE(Br)-IV 30.11.06 27.11.06 199904 07.12.06 P 187320.00 In Prog.

26 Civil EE(Br)-IV 30.11.06 27.11.06 199947 07.12.06 P 185716.00 In Prog.

Const.of Ahatas by pdy.I/L prefab pavers from H.NO.102 to 107, H.NO.206 to 225, H.NO.79 to 89 Pkt.B4 Sec7 Rohini in C-33I, R-II

399/22.01.07/EE( R)-II

M/s Vijay Bansal

Const.of lane by RMC Surroundings of Nandan Vatika near CSC 8 Pkt.B-4 Sec7 Rohini in C-33I,R-II

433/24.01.07/EE(R )-II

M/s Rajeev Const.Co

Remodelling of drain & imp.of surrounding berms by I/L prefab pavers from Green View Aptt.to Pargati Sheel Aptt.in Sec-9 Rohini C-33I,R-II

405/22.01.07/EE(R )-II

M/s Mange Ram Gupta

Const,of Ahatas by pdy.I/L prefab pavers from H.NO.197 to 208, H.NO.289 to 300 & 445 to 456 in Pkt.A-2 Sec.8 Rohini in C-33I, R-II

468/22.02.07/EE( R)-II

M/s Mange Ram Gupta

Dev.of 9.00 M road by pyd.CC and drainage system from H.NO.74 to 43 in Pocket B-6 Sec-11 Rohini.

71/07.03.07/EE(BR.)-IV

M/s Hanuman Builders India

P/O street light arrangement with 150W HPSV fitings in Suraj park Rohini in AC no.20 under Rohini Zone.

233/20.10.06/EE(E)-VII

M/s Master Elect.Store

P/O street light arrangement with 150W HPSV fitting in sector-19, Rohini in AC no.under Roihini Zone.

234/20.10.06/EE(E)-VII

M/s Master Elect.Store

P/O street light arrangement with 150W HPSV fittings in sec-7, Naharpur, Rohini in ACNo.20 under Rohini Zone.

232/20.10.06/EE(E)-VIII

M/s Master Elect.Store

P/O street light arrangement with 150W HPSV fitting in Raja Vihar in AC no.20 under Rohini Zone.

231/20.10.06/EE(E)-VII

M/s Master Elect.Store

Providing premixing on road from B-5/1 to B-2/40 & B-7/34 to B-8/8 to B-2/14 & B-5/14 to B-6/1 in Sector 15 ward-34-II Rohini-II Rohini Zone.

308/07.12.06/EE(R )-II

M/s Lakra Const.Co.

Providing premixing on road from H.NO. A-7/81 to A-5/84 & A-4/62 to A-4/26 & A-3/26 to A-3/26 & A-3/62 & A-4/15 to A-4/32 & A-3/64 to A-3/41 & A-3/47 to A-3/18 & A-4/8 to A-4/47 & B-5/8 to B-4/25 & B-2/8 to B-2/25 in Rohini-II ward-34(II) Rohini Zone Sector-15.

307/07.12.06/EE(R )-II

M/s Naresh Enterprises

Page 45: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

27 Civil EE(Br)-IV 11.12.06 04.12.06 192000 12.01.07 12.03.07 191394.00 Completed

28 Civil EE(Br)-IV 01.02.07 10.01.07 199150 18.04.07 30.06.07 197420.00 Completed

29 Civil EE(Br)-IV 01.02.07 10.01.07 159050 M/s G.P.Ravi 25.07.07 P 153992.00 In Prog.

30 Civil EE(Br)-IV 01.02.07 10.01.07 177250 18.04.07 30.06.07 177213.00 Completed

31 Civil EE(Br)-IV 01.02.07 10.01.07 191050 17.04.07 30.06.07 152063.00 Completed

32 Civil EE(Br)-IV 01.02.07 10.01.07 199350 17.04.07 18.06.07 198899.00 Completed

33 Civil EE(Br)-IV 06.02.07 09.01.07 236812 09.01.08 21.03.08 236260.00 Completed

34 Civil EE(Br)-IV 06.02.07 09.01.07 210801 27.04.07 P 177470.00 In Prog.

35 Civil EE(Br)-IV 06.02.07 09.01.07 298000 22.04.07 21.07.07 219237.00 In Prog.

36 Civil EE(Br)-IV 06.02.07 15.06.06 95100 20.04.07 P 65198.00 In Prog.

37 Civil EE(Br)-IV 08.02.07 19.12.06 232950 27.04.07 25.05.07 179579.00 Completed

Const.of walkway by chequered files at central park near H.NO.393 Pkt.G-6, Sec-16 Rohini in C-33II, Rohini Zone-II

386/10.01.07/EE(R )-II

M/s Sujit Kumar

Const.of lane by CC pavement from H.NO.A43 to New Modern Tailor & lane near H.NO.B-12 in Mandir Mohalla Samaipur in C-34I,R-II

496/02.03.07/EE(R )-II

M/s Ajay Const.Co

Const.of lane by pdy.CC pavement Raj Pal wali gali from H.No.D-199 to D-191 in Saroop Nagar U/R Colony in C-34I (R )II.

493/02.03.07/EE(M)-II

Const.of lane by pdy.CC pavement from H.No.B1 to B-7 and from Sarbir House to opp.STD in Mandir Mohalla Samaipur in C-34I (R )II.

497/02.03.07/EE(R )-II

M/s Ajay Const.Co

Const.of lane by pdy.CC pavement from Sunil House to B23 and B22 to B13 in Mandir Mohalla Samaipur in C-34I (R )II.

495/02.03.07/EE(R )-II

M/s Ajay Const.Co

Const.of lane by pdy.CC pavement from H.NO.28 to Kanshi Ram and From H.NO.64 to 85 in Khera Garhi Colony in C-34I(R )-II.

494/02.03.07/EE(R )-II

M/s Ajay Const.Co

Const.of B/wall of park near H.No.D1/26, D1/9, D5/33 in Sector-15, Rohini in C-34II, R-II.

520/17.12.07/EE(M)-II

M/s D & G Const. Co.

Const.of B/wall of park near H.No.D10/2, D6/2, D5/58, D4/33 in Sector-15, Rohini in C-34II, R-II.

39/17.04.07/EE(R )-II

M/s Konark Const.Co

Const.of B/wall of park near H.NO.E1/11/10, D3/2, D2/9 in Sector-15, Rohini in C-34-II, Rohini-II.

31/12.04.07/EE(R )-II

M/s Konark Const.Co

Pdy.CC pavement of road from H.NO.B6/7 to B6/34 in Sector-15, Rohini in C-34II, Rohini Zone-II.

45/18.04.07/EE(R )-II

M/s Konark Const.Co

Const.of road berm near Rang Rasayan Society by interlocking tiles in sector-13, Rohini in ward C-33I, Rohini-II.

29/12.04.07/EE(R )-I

M/s Konark Const.Co

Page 46: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

38 Civil EE(Br)-IV 08.02.07 19.12.06 583000 18.04.07 06.02.09 440148.00 Completed

39 Civil EE(Br)-IV 08.02.07 19.12.06 199850

40 Civil EE(Br)-IV 08.02.07 19.12.06 426200 08.05.07 30.07.07 304682.00 Completed

41 Civil EE(Br)-IV 08.02.07 19.12.06 196600 12.03.07 07.06.07 196328.00 Completed

42 Civil EE(Br)-IV 08.02.07 19.12.06 116908 12.03.07 27.06.07 113908.00 Completed

43 Civil EE(Br)-IV 08.02.07 19.12.06 176375 27.07.07 31.07.07 174626.00 Completed

44 Civil EE(Br)-IV 08.02.07 19.12.06 372500 M/s M.K Gupta 27.04.07 17.08.07 344597.00 Completed

45 Civil EE(Br)-IV 08.02.07 19.12.06 190000 28.03.07 29.03.07 190000.00 Completed

46 Civil EE(Br)-IV 08.02.07 19.12.06 191812 28.03.07 29.03.07 191670.00 Completed

47 Civil EE(Br)-IV 08.02.07 19.12.06 195828 28.03.07 29.03.07 195671.00 Completed

48 Civil EE(Br)-IV 08.02.07 19.12.06 224691 M/s M.K Gupta 19.05.07 16.08.07 221689.00 Completed

Dev.of opp. Colony in C-22 Rohini-II, SH: Const.of lane by RMC from H.NO.61 to 80 in Pkt.F-18, Sector-8 Rohini in C-33-I, Rohini-II.

46/18.04.07/EE(R )-II

M/s Katyal Bros.

Const.of road by pdy.RMC from H.NO.E-4/7 to E-4/69 Sector-7, Rohini in ward no.33-I Rohini-II.Construction of B/wall of park opposite H.no.E-4/63 Sector-7, Rohini in ward no.33-I(Rohini)-II.

69/09.05.07/EE(R )-II

M/s Mange Ram Gupta

Const.of road bny providing RMC from H.NO.E-4/122 to E-4/134 Sector-7 Rohini in ward no. 33I(Rohini)-II.

484/02.03.07/EE(R )-II

M/s Subash Singh

Const.of road by pdy.RMC from H.NO.E-4/41 to E-4/47 Sector-7, Rohini in ward no.33-I Rohini-II.

483/02.03.07/EE(R )-II

M/s Vashista Const.Co.

Const.of road by pdy.M/P from H.NO.25 to 43, 32 to 38 and 12 to 48 in Pocket E-3 Sector-7 Rohini in ward 33I®-II.

486/02.03.07/EE®-II

M/s Naresh Enterprises

Const.of road by pdy.M/P from H.NO.16 to 30, 15 to 82, 71 to 76, 66 to 69, 58 to 62 and 42 to 48 in Pocket E-1, Sector-7 Rohini in ward 33I®-II.

36/17.04.07/EE(R )-II

P/L dense carpet from H.NO.300 to 364 in pkt.A-2 Sec-8, Rohini in C-33, R-II.

477/02.03.07/EE(R )-II

M/s Sona Consultant & Contractor

P/L dense carpet from H.NO.143 to 209 in pkt.A-2 Sec-8, Rohini in C-33-I, R-II.

479/02.03.07/EE(R )-II

M/s Sona Consultant & Contractor

P/L dense carpet from H.NO.19 to 116 in Pocket A-2 Sector-8 Rohini in C-33-I, R-II.

478/02.03.07/EE(R )-II

M/s Sona Consultant & Contractor

Const.of Ahatas by pdy.Interlocking prefab pavers form H.NO.186 to 205 in Pocket B-4 and H.No.124 to 132, 169 to 177 in Pocket C-7, Sector-8 Rohini in Ward C-33-I(Rohini)-II.

71/09.05.07/EE(R )-II

Page 47: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

49 Elect EEE-VII 20.02.07 18.12.06 460368 22.11.07 29.11.07 447490.00 Completed

50 Elect EEE-VII 20.02.07 18.12.06 437437 26.03.07 08.08.07 339480.00 Completed

0.00

P/O Street light arrangement with 150W HPSV fitting in Shalimar Village, Ambedkar Nagar, Haiderpur, Yadav Nagar, Samaipur in A.C no.20 under Rohini Zone.

128/16.11.07/EE(E)-VII

M/s Pragati Engg.

P/O Street light arrangement with 150W HPSV fittings in Sec-5 to Sec-19, Rohini in AC. No.20 under Rohini Zone.

221/26.03.7/EE(E)-VII

M/s S.G Enterprises

Page 48: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 49: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

11.83

0.00

0.00

0.00

0.00

Liabilities Rs.lacs

Page 50: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 51: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

5.99

0.00

0.00

0.00

Page 52: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.000.000.000.000.000.000.000.000.000.00

0.000.000.000.000.000.000.000.000.000.00

Page 53: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 54: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

17.82

0.00

0.00

Liabilities Rs.lacs

Page 55: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.10

0.00

0.00

0.00

0.00

0.00

Page 56: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

1.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.80

0.00

0.00

Page 57: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.02

0.00

0.00

0.00

0.00

0.00

0.92

2.55

0.00

0.00

0.00

0.00

Page 58: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

1.14

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 59: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 60: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

2.15

0.00

0.00

2.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 61: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.00

12.06

0.00

0.00

Liabilities Rs.lacs

Page 62: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 63: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 64: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 65: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

Page 66: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 67: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 68: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.00

0.00

0.00

0.00

0.00

Liabilities Rs.lacs

Page 69: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.03

0.07

1.09

0.00

0.00

0.00

Page 70: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.13

0.14

Page 71: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.05

0.00

0.00

0.00

0.00

0.33

0.79

0.30

0.00

Page 72: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 73: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 74: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.004.92

Page 75: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

deptt. deptt. deptt. deptt. Div. Div. Div. Div. Div. Div.

civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)

Status Report of MLA,Sh.Kulwant Rana, AC No. 21 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure

1 Civil EE(R)-II 10.07.06 07.07.06 985000.00 15.12.06 18.04.07 984221.00 Completed

2 Civil EE(R)-II 12.07.06 07.07.06 1627200.00 22.04.07 P 810002.00 In Prog.

3 Civil EE(R)-II 12.07.06 07.07.06 1449000.00 22.04.07 P 715442.00 In Prog.

4 Civil EE(R)-II 12.07.06 07.07.06 1161668.00 02.02.07 P 1150887.00 In Prog.

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Present Position

Imp.of road by pdg.RMC from Kabza Factory to H.NO.153 in Village Shahbad Dau;atpur in C-36, Rohini-II

290/05.12.06/EE(R )-II

M/s Kamal Builders

Raising of road by providing Metalling and premiring from Uday Chand plot to interlocking tile factory in village Shahbad Daulatpur in C-36, Rohini-II

22/12.04.07/EE®_II

M/s Dee Tee Enterprises

Raising of road by providing Metalling and premiring from Rao Electronics to Mange Ram house in village Begumpur C-36, Rohini-II

21/12.04.07/EE®_II

M/s Dee Tee Enterprises

Raising of road by providing Metalling and premiring from Atar Singh House to road no.3 in village Pooth Kalan in C-36, Rohini-II

413/23.01.07/EE®-II

M/s Shiv Shakti Const.

Page 76: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

5 Civil EE(R)-II 12.07.06 07.07.06 1447700.00 13.02.07 P 371206.00 In Prog.

6 Civil EE(R)-II 12.07.06 07.07.06 288987.00 28.11.06 06.02.07 288531.00 Completed

7 Civil EE(R)-II 12.07.06 07.07.06 458818.00 20.11.06 10.04.07 457760.00 Completed

8 Civil EE(R)-II 12.07.06 07.07.06 98400.00

9 Civil EE(R)-II 12.07.06 07.07.06 42550.00

10 Civil EE(R)-II 12.07.06 07.07.06 201683.00 27.1.07 8.3.07 201004.00 Completed

11 Elect. EEE-VII 17.07.06 10.07.06 382571.00 28.11.07 08.08.07 301918.00 Completed

12 Elect. EEE-VII 17.07.06 06.07.06 181944.00 20.09.06 26.09.06 135644.00 Completed

Const.of drain & Raising of road by providing Metalling and premiring from jira Lal Chowk to Shiv Kumar House in village Pooth Kalan in C-36, Rohini-II

350/04.01.07/EE(M)-IV

M/s J.B Enterprises

P/L Ready mined cement concrete from Himalaya Aptt. Corner to H.No.-307 in "A" Block Sector-II, Rohini in C-35, Rohini-II

247/02.11.06/EE( R)-II

M/s J.B Enterprises

C/O of gate in Park "A" block sector-1 & behind Community Centre, Mangol Pur Kalan Village in Rohini-II in C-35

244/02.11.06/EE(R )-II

M/s Konark Constn.Co.

Const.of drainage system infront of Bagga link in Village Rithala in C-35, Rohini-II

Const.of Ahatas infront of H.No.D-16/320 in Sector-III, in C-35,Rohini-IIConst.of drain from Himalaya Aptt.corner to H.NO.307 in 'A' Block Sector-II, Rohini,C-35,R-II

315/12.12.06/ EE (R)II

M/s R.P. Associentes

P/O lighting arrangement in cremation grounds, Mangol Pur kalan, Mangol Pur Khurd Barawala Village, Begum Pur and Avantika, C-NO.21 under Rohini Zone

115/22.11.06/EE(E) VII

M/s S.T. Electric

P/O 1 no. Semi High Mast pole with lights opposite Kali Mata Mandir, Sector-3, Rohini, C.NO.21 under Rohini Zone

54/19.09.06/EE(E)-VII

M/s Saksham Elect.& Electronics

Page 77: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

13 Elect. EEE-VII 17.07.06 11.07.06 565167.00 28.11.06 21.12.06 395464.00 Completed

14 Elect. EEE-VII 17.07.06 07.07.06 546538.00 24.11.06 07.12.06 400408.00 Completed

15 Elect. EEE-VII 17.07.06 08.07.06 546059.00 12.12.06 22.12.06 404840.00 Completed

16 Elect. EEE-VII 17.07.06 03.07.06 564843.00 24.11.06 22.12.06 560441.00 Completed

17 Elect. EEE-VII 17.07.06 01.07.06 548160.00 12.12.06 27.12.06 398000.00 Completed

18 Civil EE(BR)-IV 14.09.06 21.08.06 263500.00 05.02.07 17.03.07 260048.00 In Prog.

19 Civil EE(BR)-IV 14.09.06 21.08.06 505600.00 01.02.07 30.04.07 328219.00 Completed

20 Civil EE(BR)-IV 14.09.06 21.08.06 278900.00 09.03.07 28.04.07 243568.00 Completed

21 Civil EE(BR)-IV 14.09.06 21.08.06 358000.00 02.04.07 23.04.07 336057.00 Completed

22 Civil EE(BR)-IV 22.09.06 28.08.06 307481.00 01.02.07 20.04.07 300067.00 Completed

P/O 100 Nos. HPSV Street light arrangement in Shahbad Daulat Pur, Prahlad Pur and Barawala village C.NO. 21 under Rohini Zone

104/22.11.06/EE(E)-VII

M/s Khanna Sales Corpr.

P/O 100 Nos. HPSV street light arrangement in Vijay Vihar, Phase-II, C.NO.21 under Rohini Zone.

114/22.11.06/EE(E)-VII

M/s Eeminent Traders (India)

P/O 100 Nos. HPSV street light arrangement in Vijay Vihar, Phase-II, C.NO.21 under Rohini Zone.

142/07.12.06/EE(E)-VII

M/s Perfect Electric Works

P/O 100 Nos. HPSV street light arrangement in Budh Vihar Phase-II, C.NO.21 under Rohini Zone.

119/22.11.06/EE(E)-VII

M/s Shala Electric Works

P/O 100 Nos HPSV street light arrangement in Budh vihar Ph-I, C.NO.21 under Rohini Zone.

141/07.12.06/EE(E)-VII

M/s Perfect Electric Works

C/O Hut in park on main Bawana Auchandi Road in Shahbad Daulatpur Village in Rohini Zone.

43/22.12.06/EE(Br.)-IV

M/s Vinay Coust. Co.

C/O Wlakway in Chhoru Ram park in Prahlad pur Village in W.No.C-36, Rohini Zone.

50/27.12.06/EE(Br.)-IV

M/s Vijay kumar Coust.

C/O gate in park of Prahladpur Village W.NO.36 in Rohini Zone.

57/12.01.07/EE(BR.)-IV

M/s Vikas Bansal

C/O gate in park on main Bawana Auchandi road in Barwala Village in W.No.C-36 Rohini Zone.

52/29.12.06/EERR-IV

M/s Vinay Coust. Co.

Const.of lane by pdy.CC Pavement from H.NO.189 to Mahender house in Village Pooth Kalan in C-36 Rohini-II

397/22.01.07/EE(R )-II

M/s Jarial Const.CO

Page 78: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

23 Civil EE(BR)-IV 22.09.06 28.08.06 461411.00 01.02.07 20.04.06 460870.00 Completed

24 Civil EE(BR)-IV 22.09.06 28.08.06 250100.00 14.02.07 13.04.07 193180.00 Completed

25 Civil EE(BR)-IV 27.09.06 21.08.06 278900.00 30.04.07 08.06.07 275202.00 Completed

26 Civil EE(BR)-IV 27.09.06 26.09.06 278900.00 08.03.07 28.06.07 270740.00 Completed

27 Civil EE(BR)-IV 27.09.06 26.09.06 388900.00 23.02.07 09.05.07 343558.00 Completed

28 Civil EE(BR)-IV 04.10.06 21.08.06 596300.00 15.05.07 25.06.07 392015.00 Completed

29 Civil EE(BR)-IV 04.10.06 21.08.06 263500.00 17.2.07 14.3.07 208315.00 Completed

30 Civil EE(BR)-IV 04.10.06 21.08.06 278900.00 14.2.07 14.3.07 220164.00 Completed

31 Civil EE(R)-II 10.10.06 04.09.06 584200.00 12.03.07 P 262900.00 In Prog.

32 Civil EE(R)-II 10.10.06 04.09.06 455970.00 01.03.07 P 205188.00 In Prog.

33 Civil EE(R)-II 10.10.06 25.09.06 199800.00 29.11.06 P 193132.00 In Prog.

Const.of lane by pdy.CC Pavement from H.NO.590 to Electric Pole no.46 in Village Pooth Kalan in C-36 Rohini-II

396/22.01.07/EE(R )-II

M/s Jarial Const.CO

Const.of lane by pdy.CC pavement from Jagbir Plot to NDPL Pole no.3 and Adjacent lane in C-36/Rohini-II

364/05.01.07/EE(B )-II

M/s R.B Builders & Contrators

C/O gate in Chhotu Ram Park in Prahlad pur Village in ward C-36, Rohini Zone.

01/20.04.07/EE(BR.)-IV

M/s Shiv Shanker Gupta

C/O gate in Hanumaan park in Shahbad Daulat pur Village in Rohini Zone, Wrad C-36

67/26.02.07/EE BR-IV

M/s Vinay Coust. Co.

Construction of Wlakway in Hanumaan Park in Shahbad Daulatpur village in ward C-36 Rohini Zone.

61/13.02.07/EE(Br.)-IV

M/s Vinay Coust. Co.

C/O walkway in Park of E-Block Sec-1 Avantika Rohini in Ward 35 Rohini Zone.

05/23.04.07/EE(Br.)-IV

M/s Competant Const.Co

C/O hut in Park of E-Block Sec-1, Avantika Rohini in Ward C-35, Rohini Zone.

59/13.2.07/EE(Br.)-IV

M/s Vinay Coust. Co.

C/O gate in park of E-Block Sec-1, Avantika Rohini in Ward C-35, Rohini Zone.

60/13.2.07/EE(Br.)-IV

M/s Vinay Coust. Co.

C/O two gate in A-Block Parks in sector-I Avantika W.NO.35 Rohini-II

432/24.01.07/EE(R )-II

M/s Sumit Const.Co.

C/O gate at near cremation ground park and corner park of stone market Mangol pur Kalan W.NO.35, Rohini-II.

467/22.02.07/EE(R )-II

M/s D.D Builders

Constn.of lane by pdy.CC pavement from Hans Raj House to Omparkash house in Village Prahladpur inC-36, Rohini-II.

268/16.11.06/EE(R )-II

M/s Ujeet Kumar

Page 79: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

34 Civil EE(R)-II 10.10.06 25.09.06 89600.00 29.11.06 20.01.07 89600.00 Completed

35 Civil EE(R)-II 02.02.07 25.09.07 194300.00 M/s S.Kumar 17.04.07 07.06.07 193859.00 Completed

36 Civil M-IV 27.02.07 10.02.07 295900.00 04.05.07 P 110212.00 In Prog.

37 Civil M-IV 27.02.07 10.02.07 216600.00 26.12.07 05.03.07 155512.00 Completed

38 Civil M-IV 27.02.07 10.02.07 284600.00 26.12.07 10.03.07 204727.00 Completed

39 Civil M-IV 27.02.07 30.01.07 424100.00

40 Civil M-IV 27.02.07 30.01.07 192000.00

41 Civil M-IV 27.02.07 30.01.07 195100.00 M/s Dua Bros. 03.05.07 30.10.08 134071.00 Completed

Construction of lane by pdy.CC pavement from Satyender Kaushik house to Narendar kaushik house in Village Prahladpur in C-36, Rohini-II

264/16.11.06/EE(R )-II

M/s Vasista Const.CO

Const.of lane by pdy.CC pavement from H.NO.418 to EP no.178 in Village Pooth Kalan in C-36, R-II

490/02.03.07/EE(R )-II

Const.of lane by pdy.CC pavement from Satyawan House to Prakash, House in Shahbad Daulatpur Village in C-36 R.D-II.

44/17.04.07/EE(M)-IV

M/s Navitesh Const.

Const.of lane by pdy.CC pavement form Daljeet Plot to Pradeep plot in Shahbad Daulatpur Village in C-36 Rohini Div.-II

540/17.12.07/EE(M)-4/RZ

M/s Jarial Const.CO

Constn.of lane by pdy.CC pavement from Kuldeep House to Satbir plot and Surounding area in Shahbad Daulatpur Village in C-36, Rohini-II.

539/17.12.07/EE(M)-4/RZ

M/s Jarial Const.CO

Constn.of lane by pdy.CC pavement from Jai Prakash house to Shiv Shakti Kiryana Stote in Village Shahbad Daulatpur in C-36 Rohini-II.

Const.of lane by pdy.CC pavement from Azad house to Suresh House in Shahbad Daulatpur Village in C-36 Rohini Div-II

Const.of darin from Satbeer House to Uday Singh Plot along Phirni road in Shahbad Daultpur Village in C-36, Rohini-II.

47/20.04.07/EE®-II

Page 80: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

42 Civil M-IV 27.02.07 30.01.07 198700.00 M/s Dua Bros. 06.06.07 30.10.08 134189.00 CompletedConst.of drain from Samadhi outfall drain in Village Shahbad Daultpur in C-36, R.D-II.

52/27.04.07/EE®-I

Page 81: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA,Sh.Surendra Kumar, AC No. 22 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C ExpenditureDate of

BookingDate of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Present Position

Page 82: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

1 Civil EE-Narela 14.06.06 29.05.06 352550.00 24.02.07 18.05.07 352550.00 Completed

2 Civil EE-Narela 14.06.06 29.05.06 318600.00 M/s Prem Bros. 20.12.06 15.03.07 305129.00 Completed

3 Civil EE-Narela 14.06.06 29.05.06 281350.00 02.03.07 05.06.07 281350.00 Completed

4 Civil EE-Narela 14.06.06 29.05.06 311082.00 12.02.07 15.05.07 310709.00 Completed

5 Civil EE-Narela 14.06.06 29.05.06 319979.00 02.11.06 05.03.07 313172.00 In Prog.

6 Civil EE-Narela 14.06.06 29.05.06 385400.00 M/s Tara Chand 03.02.07 15.03.07 375692.00 Completed

7 Civil EE-Narela 14.06.06 29.05.06 355916.00 05.11.06 10.03.07 351086.00 Completed

8 Civil EE-Narela 14.06.06 29.05.06 416200.00 04.11.06 26.02.07 413268.00 Completed

9 Civil EE-Narela 14.06.06 29.05.06 261164.00 22.11.06 07.03.07 258088.00 Completed

Pdy. Cc Pav. And drain from Dada Mal Dev (Pond) to Satish Kumar House in Village Bajit pur C-37-I/Narela

141/27.10.06/EE-Narela

M/s D.G.Const. Co.

Pdy. R.M.C and drain from Mahender Singh to Balbir Singh House in Village Bajit pur in C-37-I/Narela

273/15.12.06/EE-Narela

Imp to lane by Pdy. Cc Pav. From Pratap Singh Balmiki Randhir and Bhore to Hukam Singh and Jeet Ram wali gali in Village Bawana in C-37-I/Narela

183/10.11.06/EE-Narela

M/s D & G Const.Co

Pdy. Cc Pav. And drain from old syndicate Bank (Kehri) to Dalip Singh Yadav and Delhi road to Ishwar Mkt. And link gali in village Bawana C-37-I/Narela

140/27.10.06/EE-Narela

M/s D & G Const.Co

Pdy. Cc Pav. And drain from Jasbir House to Rampath House and Parmanand to Rajinder and Parmanand to Rajinder House in Village Sultanpuri C-37-I/Narela

144/27.10.06/EE(Narela)

M/s Shyam Lal Gupta

Pdy. R.M.C and drain fromCommiuty Centre to Chnader Bhan (B.D.O) House in Village Buddan pur Majra in C-37-I/Narela

347/22.01.07/EE-Narela

Imp to lane by Pdy. CC Pav. Of drain from Bhoop Singh House to Delhi State Bank and Adj. Lanes in village Qutab Garh in C-37-II/Narela

124/27.10.06/EE-Narela

M/s Raj Associates

Imp to lane by pdy. Cc Pav. From Om Prakash to Raghubir House in Village Darya Pur in C-37-II/Narela

124/27.10.06/EE-Narela

M/s Raj Associates

Imp. To lane by pdy. Cc pav. Of drain from Pt. Rohtash to Pt. Shish Ram House in Village Harewali in C-37-II/Narela

203/16.11.06/EE-Narela

M/s Raj Associates

Page 83: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

10 Civil EE(Pr.)Rural 14.06.06 29.05.06 255300.00 11.01.07 10.03.07 207797.00 Completed

11 Civil EE(Pr.)Rural 14.06.06 29.05.06 504612.00 08.01.07 25.05.07 493812.00 Completed

12 Civil EE(Pr.)Rural 14.06.06 29.05.06 496058.00 M/s Jai Kumar 19.09.06 08.11.06 495185.00 Completed

13 Civil EE(Pr.)Rural 14.06.06 29.05.06 286035.00 28.08.06 30.10.06 285969.00 Completed

14 Civil EE(Pr.)Rural 14.06.06 29.05.06 460929.00 28.08.06 P 455589.00 In Prog.

15 Civil EE(Pr.)Rural 14.06.06 29.05.06 227101.00 22.08.06 18.09.06 226432.00 Completed

16 Civil EE(Pr.)Rural 14.06.06 29.05.06 290304.00 28.08.06 17.10.06 289292.00 Completed

17 Civil EE(Pr.)Rural 14.06.06 29.05.06 564800.00 M/s Jai Kumar 13.12.06 P 478914.00 In Prog.

18 Civil EE(Pr.)Rural 14.06.06 29.05.06 638000.00 M/s Dev.Const. 29.12.06 09.02.07 549386.00 Completed

19 Civil EE-Narela 21.06.06 20.06.06 464071.00 16.11.06 P 429623.00 In Prog.

Imp to lane by from pdy. Ram Kumar House to Roshtas House and Rajinder House to Prem House by drain and R.M.C in Villge Awhandi in C-37/Narela

76/02.01.07/EE(Pr.)Rural

M/s Parvesh Const.Co.

Imp to lane from Dada Bhaya to Panchayat-Ghar to side lane by pdy. M/P in Village Daraya Pur in C-37/Narela

36/21.08.06/EE(Pr.)Rural

M/s Mathur Const.Co

C/O Central verge and pdy. Grills from Aditiya College upto Mukhtiyar singh Marg in Villge Bawana C-37 Narela

42/12.09.06/EE(Pr.)R

C/O Foot path from Aditiya College to M.C Pry. Scholl (Boys) in Village Bawana in C-37/Narela

33/21.08.6/EE(Pr.)R

M/s Naresh Kumar Garg.

Imp to phirini road by pdy. Brick flooring from Ram Kumar House to Panchyat Ghar in Village Harewali in C-37/Narela

32/21.08.06/EE(Pr.)R

M/s Naresh Kumar Garg.

Imp to lane by Pdy. Brick Flooring from Kartare House to Kehar Singh House in Village Auchandi in C-37/Narela

34/21.08.06/EE(Pr.)R

M/s Naresh Kumar Garg.

Dev. Of B/wall of park by pdy. Red sand stone and imp. To side lane around park by drain and R.M.C in Villaeg Harewali in C-37/Narela

35/21.08.06/EE(Pr.)R

M/s Dev Const.Co

Imp. To road berms portion between road and drain from MC Pry. School(Girls) to dairy by RMC in Village Bawana in C-37/Narela

65/04.12.06/EE(Pr.)R

Imp. To lanes from Mahaveer House to Dada Bhaya and Raju House to Ram Kishan House by drain and RMC in Village Qutab Garh in C-37/Narela

73/20.12.06/EE(Pr.)R

C/O O/s drian from Delhi Jal Board Pump House to Jhingoli Mor in Village Harewali in C-37-II/Narela

139/27.10.06/EE-Narela

M/s Deg Const.Co.

Page 84: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

20 Civil EE(Pr.)Rural 18.07.06 29.05.06 684000.00 11.01.07 12.02.07 532667.00 Completed

21 Civil EE-Narela 08.08.06 29.05.06 1049466.00 09.02.07 26.03.07 1049239.00 Completed

22 Civil EE(Pr.)Rural 29.08.06 21.08.06 184000.00 19.09.06 20.12.06 183363.00 Completed

23 Civil EE-Narela 04.09.06 23.07.06 671700.00 30.12.06 02.07.07 481236.00 Completed

24 Civil EE-Narela 04.09.06 23.07.06 790200.00 30.01.07 12.05.07 685643.00 In Prog.

25 Civil EE-Narela 04.09.06 23.07.06 383400.00 25.01.07 20.04.07 332964.00 Completed

26 Civil EE(Pr.)Rural 04.09.06 23.07.06 410200.00 11.01.07 07.04.07 318746.00 Completed

27 Civil EE-Narela 04.09.06 23.07.06 195200.00 19.11.06 04.01.07 194502.00 Completed

28 Civil EE-Narela 04.09.06 23.07.06 198300.00 06.11.06 08.01.07 197940.00 Completed

29 Civil EE-Narela 04.09.06 23.07.06 288003.00 04.12.06 21.02.07 287587.00 Completed

Imp.to lane by RMC & drain from Sultan House to Choupal in Village Bajit Pur in W.NO.37/Narela

79/02.01.07/EE(Pr.)R

M/s S.G Const.CO

Pdy.RMC and C/O open Surface drain from Road No.3 to Rajbir house in Punjab Khore inC-37II/Narela Zone.

373/07.02.07/EE-Narela

M/s Bhupander Dabas

Imp.of lane by CC from Dhani Ram House to Master Mohan Mohan House in Village Bawana C-37/ Narela Zone.

43/12.09.06/EE(Pr)R

M/s Rakesh Kumar

C/O lane by pdy.B/P and drain from Tyre Sole Factory and Azad Singh House to Phirni Road in Village Karawal in C-38-II/ Narela Zone.

206/16.11.06/EE-Narela

M/s Sh.Arpti Associates

Pdy.RMC from Suresh Kumar S/O Sh. Gugan House to Bhatt pura Chopal in Village Karawal in C-38-II/ Narela Zone.

345/22.01.07/EE-Narela

M/s Sh.Arpti Associates

C/O lane by pdy. RMC from Rattan Singh House to Rishal Singh House and Kamlesh Gesural Stone to Ram Singh House in Village Karawal in C-38-II/Narela Zone

341/17.01.07/EE-Narela

M/s Sh.Arpti Associates

Dev.of lanes by pdy.CC and drain from Sultan pur Road to Chander Bhan and Krishna House Balraj House to Hoshair Singh House and Yash pal House to Balraj House in Village Karawal C-38/Narela Zone.

78/02.01.07/EE(Pr.)R

M/s Parvesh Const.Co.

C/O Culvert near Manu House in Village Nangal Thakran in C-37-I/Narela Zone.

159/03.11.06/EE-Narela

M/s Nitin Kumar Traders

Dev.of lane by pdy.B/P and drain from Balram Singh to Raghbir Balkishan and Krishan Rohilla wali Gali in Village Sultan pur Dabas inC-37-I/ Narela Zone.

165/03.11.06/EE-Narela

M/s Tri Murti Trading Co.

Dev.of lane by pdy.CC pav.and drain from Banwari Khatu to Dharano Singh and H.P Gass Agency to PT.Desan House in Village Bagwana in C-37-I/Narela Zone.

242/27.11.06/EE-Narela

M/s Ankit Associates

Page 85: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

30 Civil EE-Narela 04.09.06 23.07.06 186700.00 26.10.06 15.02.07 183458.00 In Prog.

31 Civil EE-Narela 04.09.06 23.07.06 354156.00 05.12.06 17.02.07 353735.00 Completed

32 Civil EE-Narela 04.09.06 23.07.06 344876.00 04.12.06 22.02.07 344646.00 Completed

33 Elect. EE(E)II 18.09.06 30.08.06 200000.00 M/s Dev Engineer 10.11.06 30.11.06 198919.00 Completed

34 Elect. EE(E)II 18.09.06 30.08.06 199090.00 12.11.06 06.12.06 193544.00 Completed

35 Elect. EE(E)II 18.09.06 30.08.06 199483.00 12.11.06 06.12.06 195419.00 Completed

36 Elect. EE(E)II 18.09.06 30.08.06 198970.00 10.11.06 07.12.06 194974.00 Completed

37 Elect. EE(E)II 18.09.06 30.08.06 199209.00 M/s G.S Electricals 25.11.06 20.12.06 195062.00 Completed

38 Civil EE-Narela 20.09.06 25.07.06 245100.00 M/s A.R Enterprises 22.12.06 13.02.07 208403.00 Completed

39 Civil EE(Pr.)Rural 23.10.06 28.08.06 1531300.00 26.07.07 10.10.07 1250346.00 Completed

40 Civil EE-Narela 01.11.06 23.07.06 297100.00 10.02.07 20.07.07 228559.00 Completed

Dev.of lane by pdy.CC pav.from Dilbag to Gulab Singh House and link gali in Village Pooth Khurd in C-37-I/Narela Zone.

111/19.10.06/EE-Narela

M/s Jagdamba Trading Co.

Dev.of lane by pdy.CC pav.from Rishal Singh Saini to Mange Ram house in Village Salah pur Majra in C-37-I/Narela Zone.

244/27.11.06/EE-Narela

M/s Surender Kumar Verma

Dev.of lane by pdy.CC Pav. On drain from Bodh Raj to Tika Ram Via Nand Ram, Dr. Rajeev to Jai Prakash, Kanwal to Deepchand and Bala Lohar to Pt.Dayanand Village Bawana inC-37-I/ Narela Zone.

241/27.11.06/EE-Narela

M/s Ankit Associates

P/O street light Arrangement in Village Darya Pur, Mangal Thakran and Bajit pur in W.NO.37/Narela Zone.

138/08.11.06/EE(E)II

P/O street light arrangement in Village Mangesh pur, Katawara, Qutab Garh in W.NO.37/Narela Zone.

137/08.11.06/EE(E)II

M/s Sri Balaji Electricals

P/O Street light arrangement in Village Pooth Kherel, Sultan pur Dabas in W.NO.37/Narela Zone.

140/08.11.06/EE(E)II

M/s Sant Gian Corp.

P/O Street light arrangement in Village Auchan di Harevely in W.NO.37/Narela Zone.

136/08.11.06/EE(E)II

M/s Chauhan Electricals

P/O street light arrangment in Village Bawana in W.NO.37/Narela Zone.

165/23.11.06/EE(E)-II

C/O culvert near park and Community centre in Village Qutab Garh in C-37-II/Narela

272/15.12.06/EE-Narela

Pdy.RMC on Phirni Road form Hari Pahlwan House to Dr. Dalip House in Village Darya Pur in C-37/Narela Zone.

16/17.07.07/EE(Pr.)R

M/s Chhikara Const. Co.

C/O culvert near povd.in Village Nizampur in W.NO.38/ Narela Zoe.

90/07.02.07/EE-Narela

M/s Bhardwaj Const.Co

Page 86: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

41 Civil EE(Pr.)Rural 01.11.06 23.07.06 178000.00 M/s Rakesh Kumar 20.12.06 P 175839.00 In Prog.

42 Civil EE(Pr.)Rural 01.11.06 23.07.06 280300.00 M/s A.K Const.Co. 10.02.07 13.04.07 316673.00 Completed

43 Civil EE(Pr.)Rural 01.11.06 23.07.06 365200.00 04.01.07 08.03.07 289529.00 Completed

44 Civil EE-Narela 07.11.06 25.07.06 398672.00 22.01.07 03.05.07 396567.00 Completed

45 Civil EE-Narela 07.11.06 25.07.06 271096.00 M/s Amit Const.Co 01.03.07 P 259285.00 In Prog.

46 Civil EE-Narela 07.11.06 25.07.06 259200.00 M/s Amit Const.Co 18.02.07 26.03.07 258617.00 Completed

47 Civil EE-Narela 07.11.06 25.07.06 268828.00 M/s Amit Const.Co 18.02.07 27.02.08 268743.00 Completed

48 Civil EE-Narela 07.11.06 25.07.06 510728.00 18.01.07 24.02.07 509983.00 Completed

C/O lane by pdy.B/P and darin from Chandro House to Atro house in Village Ladpur in C-38/ Narela Zone.

70/12.12.06/EE(Pr.)R

C/O Lane by pdy.brick pav.from Jagdish S/O Gopi Ram House to Ram Basti S/O Ram Saroop Plot in Village LadpUr in C-38/ Narela Zone.

91/07.02.07/EE(Pr.)R

C/O Lane by pdy.brick pav.from Ram Kishan House to Karan Singh House in Village Ladpur Narela Zone in C-38/ Narela Zone.

77/02.01.07/EE(Pr.)R

M/s Competent Const.Co

C/O lane by pdy.CC Pavment and O/S drain of lane from Chandgi Ram House to Munshi Ram House in Village Nizam Pur in C-38I/Narela Zone.

337/17.01.07/EE-Narela

M/s D & G Const.Co

C/O lane by pdy.CC pav.& O/S drain from Dattar House to Rohtas House and gali infront of Anil House in Village Jaunti in C-38-I/Narela Zone.

355/25.01.07/EE-Narela

C/O lane by pdy.CC pav.& O/S drain of lanes from Balwan House to Ram Kishan House, Balbir to Chander and Ram Kumar to Deepchand house in Village Jaunti in C-38-I/Narela Zone.

354/25.01.07/EE-Narela

C/O lane by pdy.CC pav. & remodelling of drain from Prahlad House to Chandgi House, Kishan to Laxman, Satey to Surje and Khem Chand House to Mahavir House in Village Jaunti in C-38-I/Narela House.

353/25.01.07/EE-Narela

C/O lane by pdy.CC pav.& O/S drain from Rajinder to Ram Kumar, Om Prakash to Baljeet, Mahavir to Surender and Jagbir to Madanparsad in Village Kanjhawla in C-38-I/Narela Zone.

338/17.01.07/EE-Narela

M/s D & G Const.Co

Page 87: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

49 Civil EE-Narela 10.11.06 03.11.06 198500.00 02.12.06 20.12.06 197747.00 Completed

50 Civil EE-Narela 10.11.06 07.11.06 198805.00 02.12.06 22.12.06 198518.00 Completed

51 Civil EE(Pr.)Rural 15.12.06 23.07.06 734890.00 18.05.07 24.09.07 714566.00 Completed

52 Civil EE-Narela 26.12.06 20.12.06 198104.00 02.02.07 P 198050.00 In Prog.

53 Civil EE-Narela 26.12.06 20.12.06 198041.00 M/s Raj Associates 06.01.07 20.02.07 197268.00 Completed

54 Civil EE-Narela 26.12.06 20.12.06 196744.00 15.01.07 10.03.07 196520.00 Completed

55 Civil EE-Narela 26.12.06 20.12.06 199700.00 M/s Rakesh Kumar 22.01.07 02.03.07 193679.00 Completed

56 Civil EE-Narela 26.12.06 21.12.06 199300.00 M/s Rakesh Kumar 18.01.07 07.03.07 193268.00 Completed

57 Civil EE-Narela 29.12.06 28.12.06 99286.00 M/s Govind Gupta 22.01.07 22.02.07 99091.00 Completed

58 Civil EE-Narela 29.12.06 28.12.06 99440.00 18.01.07 19.02.07 99219.00 Completed

59 Civil EE-Narela 13.02.07 07.02.07 199700.00 M/s Sh.Govind Ent. 23.07.07 17.08.07 189708.00 Completed

60 Civil EE-Narela 13.02.07 07.02.07 199600.00 12.07.07 05.08.07 190287.00 Completed

6162

Pdy.RMC from Mahender to Karan Singh House in Village Bajit Pur in C-37-I/Narela Zone.

248/01.12.06/EE-Narela

M/s Nitin Kumar Traders

Pdy.RMC from main stand to Joginder House in Village Bajit Pur in C-37-I/Narela Zone.

247/01.12.06/EE-Narela

M/s Ankit Associates

Pdy.RMC & C/O drain from Gopichand House to Balmiki Chopal in village Majri in C-38/Narela Zone.

5/17.05.07/EE(Pr.)R

M/s Krishna Kumar Vashit

Dev.of road by RMC near Society and Phool Kumar House in Village Nangal Thakran in C-37-I/Narela Zone.

312/03.01.07/EE-Narela

M/s Tri Murti Trading Co.

Dev.of drainage system from pond to well in Village Bajit Pur in C-37-I/Narela Zone.

307/03.01.07/EE-Narela

Dev.of drainage system from Kawal Singh to Hari singh House in Village Nangal Thakran in C-37-I/Narela.

302/03.01.07/EE-Narela

M/s Gobinda Enterprises

Providing permixing on Bajit Pur Ketwara road from Culvert towards Canal in C-37-II/Narela.

327/16.01.07/EE-Narela

Providing permixing on Bajit Pur Ketwara road from Culvert towards Canal in C-37-II/Narela.

310/03.01.07/EE-Narela

Dev.of road by M/P (both side) near Culvert in Village Daryapur in C-37-II/Narela.

319/15.01.07/EE-Narela

Dev.of road by M/P from Village Daryapur to village Nargal Thakran in C-37-II/Narela.

320/15.01.07/EE-Narela

M/s Gobinda Enterprises

C/O O/s drian from H.NO.522 to Out Fall drain at Phirni road in Village Jounti in C-37-I/Narela

5/05.07.07/EE-Narela

Pdy. CC pav.at main chowk adjoining Phirni road in Village Jounti in C-38-I/Narela

12/05.07.07/EE-Narela

M/s Tri Murti Trading Co.

Page 88: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

6364656667

Page 89: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

8.17

7.34

0.11

Liabilities Rs.lacs

Page 90: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

10.76

0.00

0.00

0.98

0.43

0.00

0.00

0.00

Page 91: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.03

0.00

0.00

0.00

0.00

Page 92: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.21

2.51

0.07

Page 93: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

1.86

0.00

0.00

4.24

1.92

0.00

Page 94: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 95: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

41.63

Liabilities Rs.lacs

Page 96: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.07

0.00

0.00

0.00

0.00

Page 97: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.05

0.00

0.00

0.86

0.00

0.34

Page 98: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

1.05

0.00

0.00

0.00

0.00

0.00

Page 99: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 100: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.02

0.00

0.00

0.00

0.12

0.00

0.00

0.00

Page 101: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000.00

Page 102: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.002.54

Page 103: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

deptt. deptt. deptt. deptt. Div. Div. Div. Div. Div. Div.

civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)

Status Report of MLA, Sh Mange Ram Garg, AC No. 53 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure

1 Civil EE(Br)-III 08.06.06 24.05.06 155378.00 03.01.07 20.02.07 155311.00 Completed

2 Civil EE(Br)-III 08.06.06 24.05.06 156708.00 06.12.06 18.01.07 156669.00 Completed

3 Civil EE(Br)-III 08.06.06 24.05.06 194198.00 28.11.06 27.12.06 194057.00 Completed

4 Civil EE(Br)-III 08.06.06 24.05.06 201139.00 28.12.06 25.1.07 201030.00 Completed

5 Civil EE(Br)-III 08.06.06 24.05.06 248662.00 02.11.06 12.01.07 248246.00 Completed

6 Civil EE(M)-II 08.06.06 24.05.06 196800.00 28.03.08 P 121144.00 In Prog.

7 Civil EE(Br)-III 08.06.06 24.05.06 103704.00 12.09.06 24.11.06 103462.00 Completed

PresIn Prog.

Date o

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Present Position

Pdg.interlocking tiles in back lane from C-60 to C-68 in Shakti Nagar Ext. in C-99

134/27.12.06/EE(Br)-III

M/s Vijay Kumar

Pdg.interlocking tiles in back lane from C-69 to C-77 in Shakti Nagar Ext. in C-99

118/06.12.06/EE(Br)-III

M/s Gupta Associates

Pdg.interlocking tiles in back lane from A-1 to A-12 in Satyawati Colony C-99

110/27.11.06/EE(Br)-III

M/s Rakesh Kumar Goel

Pdg.interlocking tiles in back lane from C-21 to C-24 (adj. Park) in Satyawati Colony C-99

132/22.12.06/EE(Rr.)III

M/s Lakra const.Co

Imp.to lane by RMC from C-31 to C-25 in Satyawati Colony C-99

98/01.11.06/EE(BR.)-III

M/s Rajan Builder

Imp.to drainage system near H.No. 367 Kothi wala Bagh Bharat Nagar C-99/RZ

363/25.03.08/EE(M)-II/RZ

M/s Vijay Kumar -II

Imp.to drainage system near Jain Temple to Nimri Shopping complex C-99/RZ

71/11.09.06/EE9Br.)-III

M/s Sh.Balaji Const.Co

Page 104: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

8 Elect. EEE-VII 22.06.06 29.05.06 237621.00 30.05.07 27.06.07 229657.00 Completed

9 Elect. EEE-VII 22.06.06 26.05.06 224345.00 06.11.06 28.11.06 160500.00 Completed

10 Elect. EEE-VII 22.06.06 26.05.06 232905.00 1.12.06 22.12.06 141653.00 Completed

11 Elect. EEE-VII 22.06.06 26.05.06 239743.00 21.02.07 19.07.07 232354.00 Completed

12 Elect. EEE-VII 22.06.06 26.05.06 98591.00 26.09.06 10.10.06 94210.00 Completed

13 Civil EE(Br)-III 03.07.06 07.06.06 112104.00 6.1.07 28.2.07 111733.00 Completed

14 Civil EE(Br)-III 04.07.06 27.06.06 348982.00 07.12.06 13.03.07 348288.00 Completed

15 Elect. EEE-VII 07.07.06 26.05.06 140000.00 19.02.07 10.12.07 124272.00 Completed

16 Elect. EEE-VII 07.07.06 26.05.06 234254.00 14.2.07 26.2.07 231000.00 Completed

17 Elect. EEE-VII 07.07.06 29.05.06 102752.00 1.2.07 20.2.07 102424.00 Completed

18 Elect. EEE-VII 07.07.06 29.05.06 171893.00 15.01.07 10.12.07 154050.00 Completed

P/O semi high mast light with poll in the park infront of D-200, Ashok Vihar Ph-I, in W.NO.100 under R.Z

01/24.05.07/EE(E)-VII

M/s G.S Electricals

P/O street light arrangement in Ashok Vihar Ph-I, Ph-II, Ph-III and Ph-IV under R.Z

96/01.11.06/EE(E)-VII

M/s Master Electric Store

P/O street light arrangement in Shakti Nagar Extn., Bharatnagar, Nimri Colony under R.Z

122/28.11.06/EE(E)-VII

M/s M.J. Electricals

P/O Semi high mast light with poll in the park infront of B-1/25, Ashok Vihar Ph-II, in W.NO.100 under R.Z

187/19.02.07/EE(E)-VII

M/s Krishna Electric Works

Provision of Juno light arrangement near C-15, LIG flats, Ashok Vihar Ph-IV in W.NO. 100 under R.Z

59/25.09.06/EE(E)-VII

M/s Kamal Electricals

Imp.to side berms by interlocking tiles near H.No.444 Nimri Colony and A-27 and B-8 in Satyawati Colony C-99/RZ

141/5.1.07/EE(Br.)III

M/s Jasvivla Gulati

Imp.to lane by & side berms near H.No. 130, H.No.89, H.NO. 146, drainage & park near H.No.98, drainage & side berms near H.NO.34 Ph-II Nimri Colony C-99 RZ by pdg.interlocking tiles, CC & precast R.C.C slab.

117/06.12.06/EE(BR.)-III

M/s Rajan Builder

P/O Juno type lighting arrangement in the park in front of B-1/130, Ashok Vihar Ph-II in W.NO.100 under Rohini Zone.

184/19.02.07/EE-VII

M/s Ankur Enterprises

P/O street light arrangement in A,B,C and D blocks of JJ Colony, Wazirpur under Rohini Zone

179/8.2.07/EE(E)-VII

M/s Himacla Electric

P/O lighting arrangement in the Central Market in Ashok Vihar Ph-II under Rohini Zone

168/1.2.07/EE(E)-VII

M/s Balaji Electricals

P/O lighting arrangement in the park in F-block, Ashok Vihar Ph-I under Rohini Zone

163/08.01.07/EE(E)-VII

M/s Shivam Electricals

Page 105: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

19 Elect. EEE-VII 07.07.06 29.05.06 444317.00 19.02.07 27.03.07 444129.00 Completed

20 Elect. EEE-VII 07.07.06 29.05.06 174550.00 M/s Seth Const 09.01.07 12.02.07 163288.00 Completed

21 Civil EE(Br)-III 17.07.06 24.05.06 198188.00 M/s G.P. Rav 1.9.06 P 197950.00 In Prog.

22 Civil EE(Br)-III 17.07.06 07.07.06 198625.00 02.09.06 28.10.06 198600.00 Completed

23 Civil EE(Br)-III 17.07.06 12.07.06 198700.00 2.11.06 28.12.06 198425.00 Completed

24 Civil EE(Br)-III 17.07.06 12.07.06 199106.00 6.1.07 24.2.07 199035.00 Completed

25 Civil EE(Br)-III 21.07.06 21.06.06 599900.00 12.09.07 06.10.07 328325.00 Completed

26 Civil EE(Br)-III 21.07.06 21.06.06 326900.00 14.08.07 26.09.07 181100.00 Completed

27 Civil EE(Br)-III 21.07.06 21.06.06 288831.00 14.02.07 20.04.07 288387.00 Completed

28 Civil EE(Br)-III 21.07.06 21.06.06 134246.00 M/s H.P. Cost. 6.1.07 24.03.07 134246.00 Completed

P/O lighting arrangement in the park of CD block Ashok Vihar Ph-I in Ward No.100 under Rohini Zone

188/19.02.07/EE(E)-VII

M/s Sachdewa Electricals

P/O lighting arrangement in the park in H-block Ashok Vihar Ph-I under Rohini Zone

155/04.01.07/EE(E)-VII

Imp.to lane by CC flooring from F-259 to 279,F-173 to 193 in JJ Colony Wazirpur C-99 Rohini Zone.

62/31.8.06/EE(Br.)III

C/O S.W drain & providing cement concrete slabs near H.NO.297 Bharat Nagar C-99 Rohini Zone.

66/01.09.06/EE(Br.)-III

M/s Lakra const.Co

imp.to lane by precast cement cocrete tiles near H.NO.23A, 7A along park & C/O Walkway in park near H.NO.23A in C pocket Ashok Vihar Ph-III in C-99 Rohini Zone

89/1.11.06/EE(Br.)III

M/s Vashist Cost.Co

Imp.to lane by precast cement concrete tiles near H.NO. 47A & Along park & C/O walkway near H.NO.47A in C pocket Ashok Vihar Ph-III, C-99 Rohini Zone.

138/5.1.07/EE(Br.)III

M/s Surjit kumar

Pdg.interlocking tile from H.NO.A-35 to A-88 and H.NO.89 to park H.NO.A-114 to park, H.No.A-115 to H.NO.A-123 and H.No. 123 to park in Ashok vihar C-100, Rohini Zone Phase-I.

91/12.09.07/EE(Br.)-III

M/s Mange Ram Gupta

Pdg.interlocking tile along B/wall of Maharaja Agarsain Model School main road to J.J.Colony in Ashok Vihar Phase-IV, C-100, Rohini Zone

69/07.08.07/EE(Br.)-III

M/s Mange Ram Gupta

Const.of back lane by pdg.RMC from H.NO.F-104 to F-136 in Ashok Vihar Phase-I in C-100, Rohini Zone.

163/18.01.07/EE(BR.)-III

M/s Vijay Kumar

Pdg.interlocking tile adjoining to B/wall near gate no.8 of opposite Community Center in Phase-IV, Ashok Vihar in C-100, Rohini Zone.

145/5.1.07/EE(Br.)III

Page 106: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

29 Civil EE(Br)-III 21.07.06 21.06.06 452953.00 25.1.07 p 449953.00 In Prog.

30 Civil EE(Br)-III 26.07.06 21.07.06 192258.00 M/s S. Kumar 01.09.06 27.11.06 191191.00 Completed

31 Civil EE(Br)-III 26.07.06 21.07.06 199498.00 02.09.06 04.10.06 199453.00 Completed

32 Civil EE(Br)-III 26.07.06 21.07.06 199658.00 02.09.06 04.10.06 199327.00 Completed

33 Civil EE(Br)-III 31.07.06 29.07.06 194262.00 06.10.06 21.11.06 193904.00 Completed

34 Civil EE(Br)-III 03.08.06 07.06.06 194500.00 M/s S.Kumar 05.03.07 23.04.07 194416.00 Completed

35 Civil EE(Br)-III 03.08.06 07.06.06 198300.00 7.9.06 15.10.06 198234.00 Completed

36 Civil EE(Br)-III 12.10.06 03.10.06 56062.00 6.1.07 9.2.07 55991.00 Completed

37 Civil EE(Br)-III 12.10.06 27.06.06 198259.00 08.01.07 12.03.07 197708.00 Completed

38 Civil EE(Br)-III 12.10.06 24.05.06 88699.00 6.1.07 28.2.07 87348.00 Completed

39 Civil EE(Br)-III 19.10.06 16.10.06 82715.00 12.1.07 20.2.07 82368.00 Completed

40 Civil EE(Br)-III 08.11.06 28.08.06 200000.00 7.1.07 14.02.07 199916.00 Completed

41 Civil EE(Br)-III 08.11.06 28.08.06 200000.00 22.01.07 30.03.07 199857.00 Completed

Const.of road by pdg.M/P from DAV School to Delhi Administrative flats in phase-IV in Ashok Vihar C-100 Rohini Zone

165/18.1.07/EE(Br.)III

M/s Marge Ram Cvpte

P/L CC flooring in back lane from H.NO.A-13 to A-26 in Satyawati Colony C-99 Rohini Zone.

63/31.08.06/EE(Br.)-III

Providing Cheq.cement concrete tiles on drain opp. H.NO.A-15 in Satyawati Colony C-99 Rohini Zone.

64/01.09.06/EE(Br.)-III

M/s Amit Const.

Providing CC flooring on road side berm infront of H.NO.A-26 to A-13 and upto corner in Satyawati Colony C-99 Rohini Zone.

65/01.09.06/EE(Br.)-III

M/s Amit Const.

Pdy.CC flooring in back lane from C-36 to C-23 in Shakti Nagar Extn.in C-99 Rohini Zone.

78/06.10.06/EE(Br.)-III

M/s Lakra const.Co

Pdy.CC arround park in MIG Flats phase-IV, Ashok Vihar, C-100 Rohini Zone.

112/29.11.06/EE(BR.)-III

Const.of lane by pdg.CC in Gulabi MKT Phase-II Ashok Vihar C-100,Rohini Zone.

77/6.10.06/EE(Br.)III

M/s Lakra const.Co

Making addl.water arrangement in Nimri Colony Ph-II in C-99 Rohini Zone.

153/5.1.07/EE(Br.)III

M/s Vashist Const.Co

C/O drain near Masjid and Arya Samaj Mandir in Wazirpur JJ Colony C-99.

159/05.01.07/EE(Br.)-III

M/s Amit Const.

P/L Cement Concrete flooring from L-135 to L-155 in J.J Colony Wazirpur C-99 Rohini Zone.

137/5.1.07/EE(Br.)III

M/s Sujit kumar

Providing cement concrete flooring in lane near H.NO.365 Bharat Nagar C-99 Rohini Zone.

140/5.1.07/EE(Br.)III

M/s Lakra const.Co

Dev.of road berm near H.NO.C-113 in Ashok Vihar Phase-I in C-100, Br-III, Rohini Zone.

152/5.1.07/EE(Br.)-III

M/s Amit Const.

Dev.of road by M/P in LIG flats 'J' Block Ashok Vihar Phase-I in C-100, BR-III, Rohini Zone.

154/05.01.07/EE(Br.)-III

M/s Sujeet Kumar

Page 107: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

42 Civil EE(Br)-III 08.11.06 28.08.06 200000.00 15.01.07 01.03.07 199984.00 Completed

43 Civil EE(Br)-III 08.11.06 31.07.06 197000.00 09.01.07 20.03.07 196979.00 Completed

44 Civil EE(Br)-III 08.11.06 31.07.06 100000.00 6.1.07 27.02.07 99977.00 Completed

45 Civil EE(Br)-III 08.11.06 31.07.06 200000.00 16.01.07 30.03.07 199958.00 Completed

46 Civil EE(Br)-III 08.11.06 28.08.06 216071.00 10.2.07 p 212121.00 In Prog.

47 Civil EE(Br)-III 08.11.06 28.08.06 352029.00 12.2.07 p 341173.00 In Prog.

48 Civil EE(Br)-III 08.11.06 28.08.06 275000.00 25.04.07 24.07.07 149505.00 Completed

49 Civil EE(Br)-III 08.11.06 28.08.06 250000.00 23.04.07 20.07.07 163263.00 Completed

50 Civil EE(Br)-III 08.11.06 28.08.06 475000.00 M/s M.K Gupta 18.02.07 21.04.07 313812.00 Completed

51 Civil EE(Br)-III 08.11.06 31.07.06 425000.00 08.02.07 18.03.07 272649.00 Completed

52 Civil EE(Br)-III 08.11.06 31.07.06 589000.00 M/s M.K Gupta 17.02.09 P 381113.00 In Prog.

53 Civil EE(Br)-III 08.11.06 31.07.06 325000.00 22.02.07 11.05.07 212916.00 Completed

Const.of B/wall with M.S grill in Ashok market, Ashok Vihar phase-II, C-100, Br-III, Rohini Zone.

151/05.01.07/EE(BR.)-III

M/s Lakra const.Co

Const.of footpath in park infront of H.NO.C-2/23 in Ashok Vihar Phase-II in C-100, Br-III, Rohini Zone.

146/05.01.07/EE(Br.)-III

M/s Sujeet Kumar

Const.of Culvert near H.NO.-140, 'A' Block Ashok Vihar, Phase-II in C-100, Br-III, Rohini Zone.

149/5.1.07/EE(Br.)III

M/s Amit Const.

Raising & stg.of B/wall near SFS flats gate no.6 in Ashok Vihar phase-IV in C-100, Br-III, Rohini Zone.

147/05.01.07/EE(Br.)-III

M/s Sujeet Kumar

Dev.of lane by CC behind B2/44 in Block B2 Ashok Vihar Phase-II, in C-100, Br-III Rohini Zone.

189/7.2.07/EE(Br.)III

M/s Seeper Builders

Const.of drain from H.NO.B-1/108 to B1/95 in Ashok Vihar Phase-II in C-100, Br-III, Rohini Zone.

185/7.2.07/EE(Br.)III

M/s M.K. Gupta

Dev.of road berm by interlocking tiles near H.NO.C-3/77 and around the park in Ashok Vihar Phase-II in C-100, Br-III, Rohini Zone.

02/16.04.07/EE(BR.)-III

M/s Lakra const.Co

Cosnt.of drain in B-2 Block along Lakshmi Narian temple in Ashok Vihar Phase-II in C-100, Br-III, Rohini Zone.

01/16.04.07/EE(BR.)-III

M/s Lakra const.Co

Const.of drain from Phase-4 to Water tank on Gulab Singh Marg in Ashok Vihar C-100, Br-III, Rohini Zone.

191/07.02.07/EE(BR.)-III

Const.of drain from Delhi Administration falt phase-IV to gate no.8, Ashok Vihar in C-100, Br-III, Rohini Zone.

190/07.02.07/EE(BR.)-III

M/s Supar Builders

Const.of drain from Araya Samaj tample to F-149 in Ashok Vihar Phase-I, C-100, Br-III, Rohini Zone.

188/07.02.07/EE(BR)-III

Const.of drain along 'D' Block School in Ashok Vihar Phase-I, C-100, Br-III, Rohini Zone.

192/07.02.07/EE(Br.)-III

M/s Rakesh Kumar Goel

Page 108: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

54 Civil EE(Br)-III 08.11.06 31.07.06 325000.00 20.02.07 11.05.07 235430.00 Completed

55 Civil EE(Br)-III 08.11.06 31.07.06 319178.00 10.02.07 09.04.07 319178.00 Completed

56 Civil EE(Br)-III 08.11.06 31.07.06 194633.00 10.2.07 p 192100.00 In Prog.

57 Civil EE(Br)-III 08.11.06 31.07.06 383662.00 25.02.07 01.06.07 383662.00 Completed

58 Civil EE(Br)-III 08.11.06 31.07.06 558300.00 28.02.07 02.04.07 376960.00 Completed

59 Civil EE(Br)-III 30.11.06 18.09.06 196999.00 6.1.07 13.03.07 196697.00 Completed

60 Civil EE(Br)-III 30.11.06 18.09.06 195856.00 6.1.07 13.03.07 195579.00 Completed

61 Civil EE(Br)-III 30.11.06 18.09.06 784000.00 16.1.08 28.02.08 725089.00 Completed

62 Civil EE(Br)-III 30.11.06 18.09.06 186507.00 6.1.07 12.03.07 185521.00 Completed

63 Civil EE(Br)-III 10.01.07 13.12.06 170371.00 M/s S.Kumar 30.01.07 19.04.07 170100.00 Completed

64 Civil EE(Br)-III 10.01.07 01.11.06 176239.00 30.1.07 05.04.07 175697.00 Completed

Const.of lane by pdg.CC from H.NO.B-4/2 to B-4/10 in B-4 Block, Ashok Vihar Phase-II in C-100, Br-III, Rohini Zone.

183/07.02.07/EE(Br.)_II

M/s Rakesh Kumar Goel

Const.of road by pdy.RMC from Village Wazirpur Deep Cinema road to Choupal in Wazirpur Village in C-100, Br-III, Rohini Zone.

184/07.02.07/EE(Br.)-III

M/s Mukesh Kumar Bansal

Dev.of road berms by pdy.indterlocking tiles from Ashok mkt.to Chandi Wala Bagh in Ashok Vihar Phase-II, C-100, Br-III, Rohini Zone.

193/7.2.07/EE(Br.)III

M/s Mavse Ram covster

Const.of drain in 'A' Block from H.NO.-35 to 88, 88 to 80 and 89 to park in Ashok Vihar Phase-I, C-100, Br-III, Rohini Zone.

195/07.02.07/EE(Br.)-III

M/s Rakesh Kumar Goel

Const.of Walkway in the park of CD Block park in Ashok Vihar phase-I, C-100, Rohini Zone.

201/20.02.07/EE(Br.)-III

M/s Supar Builders

Providing cement concrete pavement on road side berm opp. H.NO.5 to 15 in D-Block in Satyawati Colony C-99 Rohini Zone.

139/5.1.07/EE(Br.)III

M/s Lakra const.Co

Providing and laying CC flooring on road side berm opp.H.NO.D-4 to E-Block in Satyawati Colony C-99 Rohini Zone.

136/5.1.07/EE(Br.)III

M/s Amit Const.

Dev.of road by pdy.RMC from corner of Teacher's park to Najafgarh drain in Wazirpur J.J Colony in Ward no.C-99 Rohini Zone.

22/11.06.07/EE(Br)_III

M/s Pankaj Cust. Co.

Const.of Boundary Wall of Teacher's park in Wazirpur J.J Colony C-99 Rohini Zone.

150/5.1.07/EE(Br.)III

M/s Lakra const.Co

P/L CC flooring in back lane of H.NO.C-18 and lane near park in Satyawati Colony C-99 Rohini Zone.

180/29.01.07/EE(BR.)-III

Providing and laying CC flooring from B66 to B86 & along park in B-Block J.J Colony Wazirpur C-99 Rohini Zone.

179/29.1.07/EE(Br.)III

M/s Amit Const.

Page 109: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

65 Civil EE(Br)-III 16.10.07 03.01.07 198700.00 M/s G.B. Ravi 8.2.07 30.03.07 197946.00 Completed

66 Civil EE(Br)-III 16.10.07 03.01.07 80000.00 M/s G.B. Ravi 09.03.07 16.04.07 79617.00 Completed

67 Elect. EEE-VII 18.01.07 01.07.06 441930.00 06.09.07 01.07.08 410211.00 Completed

68 Elect. EEE-VII 18.01.07 01.07.06 352869.00 16.08.07 30.08.07 337620.00 Completed

69 Elect. EEE-VII 18.01.07 01.07.06 355197.00 22.03.07 30.08.07 344626.00 Completed

70 Elect. EEE-VII 18.01.07 01.07.06 498688.00 26.03.07 18.04.07 467169.00 Completed

71 Elect. EEE-VII 18.01.07 01.07.06 519051.00 26.03.07 18.04.07 483410.00 Completed

72 Elect. EEE-VII 18.01.07 01.07.06 519165.00 18.07.07 03.08.07 503874.00 Completed

73 Civil EE(Br)-III 23.02.07 20.02.07 199600.00 M/s S.Kumar 09.03.07 30.05.07 199487.00 Completed

74 CSE Dems/RZ 23.02.07 27.11.06 452000.00 16.05.07 23.05.07 295440.00 Completed

Providing/Laying cement conceret on road side berms from E-27 to E19 in Satywati Colony C-99/Rohini Zone.

194/7.2.07/EE(Br.)III

Providing/Laying cement conceret on road side berms near E-15 in Satywati Colony C-99/Rohini Zone.

210/08.03.07/EE(Br.)-III

P/O Juno and flood type ltg.arrangements in the parks of SFS flats, Ashok Vihar Ph-IV in W.NO.100 under Rohini Zone.

34/31.08.07/EE(E.)-VII

M/s S.T Electricals.Co.

P/O Semi high mast lights with pole in the park of Invitation market and in the park in block A-48, Ashok Vihar Ph-II, under Rohini Zone.

14/10.08.07/EE(E.)-VII

M/s Eminet Traders India

P/O SHM lights with pole in the park in L-Block, J.J Colony, Wazirpur and Shakti Nagar extn.in w.no.99 under Rohini Zone.

214/19.03.07/EE(E)-VII

M/s Kamal Electricals

P/O ltg.arrangement in the parks of Ashok Vihar Ph-III and Ashok Vihar Ph-IV in w.no.100 under Rohini Zone.

219/26.03.07/EE(E)-VII

M/s Hi-Tec Electricals

P/O ltg.arrangement in the parks of Ashok Vihar Ph-I and Ashok Vihar Ph-II in w.no.100 under Rohini Zone.

218/26.03.07/EE(E)-VII

M/s Hi-Tec Electricals

P/O ltg. Arrangement in the parks of J.J Colony Wazirpur and Satyawati Colony in W.NO.99 under Rohini Zone.

12/12.07.07/EE(E)-VII

M/s Perfect Electric Works

Const.of drainage system from H.NO.425 to 444 & 464 to 445 in Nimri Colony C-99/Rohini Zone.

219/08.03.07/EE(Br.)-III

C/O Urival Block at Gulab Singh Marg near Mountfort School on Soprt Complex Nalla in w.no.100/Rohini Zone.

148/19.03.07/EE(DEMS)RZ

M/s J.B Enterprises

Page 110: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA, Sh.Charan Singh Kandera, AC No. 54 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure

1 Elect. EE(E)-II 15.05.06 08.04.06 125681.00 02.08.06 14.08.06 97581.00 Completed

2 Civil EE-Narela 05.06.06 20.04.06 596500.00 27.11.06 23.01.07 419975.00 Completed

3 Civil EE-Narela 05.06.06 20.04.06 398700.00 27.11.06 12.02.08 281063.00 Completed

Date of

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Present Position

P/O 12 Mtr High Semi High mast light at Jhagola village Chowk in C-102/ Narela Zone

69/24.07.06/EE(E)-II

M/s A.K Electricals

Pdy. Cc pav. In lanes and drain from Ghashi Ram to Hari Singh House in Village Taj pure C-102-II/Narela

127/27.10.06/EE-Narela

M/s Raj Associates

Pdy. Cc pav. In lanes and drain from Sh. Dalel Singh House-2 Ishwar house in Village Taj pure C-102-II/Narela

126/27.10.08/EE-Narela

M/s Raj Associates

Page 111: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

4 Civil EE-Narela 05.06.06 20.04.06 435387.00 27.10.06 02.02.07 417493.00 Completed

5 Civil EE-Narela 05.06.06 20.04.06 593800.00 15.01.07 P 393272.00 In Prog.

6 Civil EE-Narela 05.06.06 20.04.06 594800.00 04.01.07 P 214445.00 In Prog.

7 Civil EE-Narela 05.06.06 20.04.06 589400.00 27.10.06 P 423470.00 In Prog.

8 Civil EE-Narela 05.06.06 20.04.06 398000.00 27.10.06 04.12.06 291038.00 Completed

9 Civil EE-Narela 05.06.06 20.04.06 599200.00 06.09.06 15.11.06 441730.00 Completed

10 Civil EE-Narela 05.06.06 20.04.06 599400.00 10.11.06 12.02.07 436589.00 Completed

11 Civil EE-Narela 05.06.06 20.04.06 399400.00 04.01.07 P 159697.00 In Prog.

12 Civil EE-Narela 05.06.06 20.04.06 396200.00 27.10.06 25.01.07 283365.00 Completed

13 Civil EE-Narela 05.06.06 20.04.06 599300.00 04.01.07 P 369384.00 In Prog.

14 Civil EE-Narela 05.06.06 20.04.06 595400.00 04.01.07 P 386546.00 In Prog.

Pdy. Cc pav. In lanes and drain from Parkash to Ram Singh House in Village Khera Khurd in C-102-II/Narela

145/27.10.06/EE-Narela

M/s Shyam Lal Gupta

Pdy. Cc pav. In lanes from Joda Singh to Dalip Singh and Darshan Singh to Gurunam Singh House in Village Jhingola C-102-II/Narela

204/16.1.06/EE-Narela

M/s Mahboob Const.Co.

Pdy. Cc pav. In lanes from Chopal to Shushil Chohan and side lane of Kirtap Singh, Ravindre, vaid Ram and Sat prakash House in Village Bakhatawar Pur C-102-II/Narela

143/27.10.06/EE-Narela

M/s D & G Const.Co.

Pdy. Cc pav. In lanes from Shri Bhagwan to Billo House and Masjid Chwok in Village Bakhatawar Pur C-102-II/Narela

153/27.10.06/EE-Narela

M/s Shivam Builders

Pdy. Cc pav. In lanes from Krishan to Hem Chander, Hukmi to Jay Bhagwan and Side lanes of Daram Singh House and ADJ lanes in Village Khera Khurd C-102-II/Narela

149/27.10.06/EE-Narela

M/s Shankar Const.Co

Pdy. Cc pav. In lanes from Saroj to Ishware and Inde lane of Omprakash, Darambir House and AdJ. lanes in Village Khera Kalan C-102-II/Narela

98/06.09.06/EE-Narela

M/s Shankar Const.Co

Pdy. Cc pav. In lanes from Karambir to Chander House Jay Pal House and AdJ. lanes in Village Khera Kalan C-102-II/Narela

189/12.11.06/EE-Narela

M/s Shivam Builders

Pdy. B/p In lanes and drain from Pala Ram to Lachman and Jai Chand to Balbir House in Village Sunger Pur C-102-II/Narela

186/10.11.06/EE-Narela

M/s Naresh Kumar

Pdy. Cc in lanes from Bharam to M.C.School in village Sunger Pur in c-102-II.Narela

128/27.10.06/EE-Narela

M/s Raj Associates

Pdy. B/P in lanes drain from Ranbir to Balbir and lanes from Kala Ram and Ved Ram house in Village Sunger Pur in C-102-II/Narela.

134/27.10.06/EE-Narela

M/s Naresh Kumar

Pdy. B/P in lanes from Jagdish to Ajeet, Hawa Singh to Ram Kishan house in village Singhu in C-102-II/Narela.

129/27.10.06/EE-Narela

M/s Raj Associates

Page 112: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

15 Civil EE-Narela 05.06.06 01.06.06 492000.00 15.09.06 10.11.06 358272.00 Completed

16 Civil EE-Narela 05.06.06 01.06.06 347900.00 14.09.06 06.10.06 252020.00 Completed

17 Civil EE-Narela 05.06.06 01.06.06 309300.00 07.09.06 03.10.06 224144.00 Completed

18 Civil EE-Narela 05.06.06 01.06.06 231200.00 M/s Atul Gupta 13.07.06 30.08.06 166314.00 Completed

19 Civil EE-Narela 05.06.06 01.06.06 540000.00 14.09.06 06.10.06 390792.00 Completed

20 Civil EE-Narela 05.06.06 01.06.06 617600.00 08.11.06 03.02.07 456188.00 Completed

21 Civil EE-Narela 05.06.06 01.06.06 708000.00 01.12.06 03.02.07 485500.00 In Prog.

22 Civil EE-Narela 17.07.0.6 20.04.06 600000.00 16.01.07 P 366485.00 In Prog.

23 Civil EE-Narela 17.07.0.6 20.04.06 600000.00 19.11.06 20.12.06 443484.00 Completed

24 Civil EE-Narela 20.09.06 20.04.06 799800.00 23.01.07 18.04.07 582159.00 Completed

25 Civil EE-Narela 20.09.06 20.04.06 500000.00 07.02.08 P 448358.00 In Prog.

Pdy. B/P in lanes and C/O ,O/S drain from Radhe Shyam to Mangla House and Hari House to Ranvir Singh House and its Parallel lanes in Village Kureni in C-101-II/Narela.

86/06.09.06/EE-Narela

M/s Shivam Associates

Pdy. Cc in lanes and C/O ,O/S drain from Phirni Road to Rahish House via Munsi Ram Chohan and House And its Adj. Lanes VillageKureni in C-101-II/Narela.

85/06.09.06/EE-Narela

M/s Shivam Associates

Pdy. Cc in lanes and C/O ,O/S drain from Umed Singh House to Muni Ram upto Balbir House and its Adj. lanes in Village Tikri in C-101-II/Narela.

87/06.09.06/EE-Narela

M/s Shivam Associates

Pdy. cc in lanes and C/O ,O/S drain from Dr. Rajpal to Tara Chand House and Roop Chnad House to Bhim Singh to Raghbir House in Balmik Mohalla in Village Tikri in C-101-II/Narela.

49/05.07.06/EE-Narela

Pdy. cc in lanes and C/O ,O/S drain from Bhiku Ram House to Shri Ram Dalmill and its Adj. Lanes in Village Kureni in C-101-II/Narela.

88/06.09.06/EE-Narela

M/s Shivam Associates

Pdy. Cc in lanes and C/O ,O/S drain from Mukherji House to TubeWell in Village Bakner in C-101-II/Narela.

151/27.10.06/EE-Narela

M/s Ravinder Kumar

Pdy. Cc in lanes and C/O ,O/S drain from Ram Karan to Ashok House and Prince clinic to Post office and its adj. Lanes in vilage Bakner in C-101-II/Narela.

142/27.10.06/EE-Narela

M/s D & G Const.Co.

Pdy.CC and drain from Sukh bir singh to Zile Singh upto Ram Singh House and Adj.lanes in Village Bakoli in C-102-II/Narela

222/12.10.07/EE-Narela

M/s Vikas Builders

Pdy.CC and drain from Dayananad to Leeley Kumar House in Village Tajpur in C-102-II/Narela

190/10.11.06/EE-Narela

M/s Om Const.Co

Pdy.CC pavement from Dharampal house to Krishan Kumar House in Village Palla in C-102-II/Narela

340/17.01.07/EE-Narela

M/s Ankit Associates

Pdy.CC Pav.from Jagdish to kalu Ram Via Bhagwat & Side lane of Randhir House in Village Palla in C-102-II/Narela

205/16.11.06/EE-Narela

M/s Ankit Associates

Page 113: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

26 Civil EE-Narela 31.10.06 25.10.06 196131.00 08.11.06 28.03.07 195444.00 Completed

27 Civil EE-Narela 31.10.06 25.10.06 193353.00 08.11.06 04.12.06 192596.00 Completed

28 Civil EE-Narela 10.11.06 06.11.06 192500.00 01.12.06 07.02.07 191880.00 Completed

29 Civil EE-Narela 10.11.06 06.11.06 190399.00 04.12.06 08.02.07 189728.00 Completed

30 Civil EE-Narela 10.11.06 06.11.06 195000.00 04.12.06 08.02.07 194576.00 Completed

31 Civil EE-Narela 10.11.06 06.11.06 194500.00 01.12.06 08.01.07 194456.00 Completed

32 Civil EE-Narela 10.11.06 06.11.06 91200.00 04.12.06 01.02.07 90338.00 Completed

33 Civil EE-Narela 10.11.06 06.11.06 195700.00 04.12.06 10.02.07 194767.00 Completed

34 Civil EE(Pr.)R 30.10.06 25.01.07 944744.00 03.08.07 24.12.07 943220.00 Completed

35 Civil EE(Pr.)R 30.10.06 25.01.07 481962.00 105/23.02.07 02.03.07 11.06.07 480388.00 In Prog.

36 Civil EE-Narela 25.01.07 17.01.07 195438.00 08.02.07 04.04.07 195138.00 Completed

37 Civil EE-Narela 25.01.07 17.01.07 198745.00 08.02.07 29.03.07 198489.00 Completed

38 Civil EE-Narela 25.01.07 17.01.07 198407.00 08.02.07 24.03.07 196484.00 Completed

39 Civil EE-Narela 25.01.07 17.01.07 198768.00 08.02.07 29.03.07 198416.00 Completed

C/O drain from Community Centre to Calender Factory in Village Boodhpur in C-102-I/Narela Zone.

177/03.11.06/EE-Narela

M/s Titen Kumar Traders

Dev.of road by WBM from PWD office to Pawan Plot in Village Ali Pur in C-102-I/Narela Zone.

170/08.11.06/EE-Narela

M/s Jagdamba Trading Co.

Pdy.B/P and drain from Naresh Kumar to Kaptan House in Village Budhpur in C-102-I/Narela.

249/01.12.06/EE-Narela

M/s Tri Murti Trading Co.

Pdy.B/P and drain from Nafe Singh to Dharampal House in Village Budhpur in C-102-I/Narela.

254/04.12.06/EE-Narela

M/s Raj Associates

Pdy.B/P and drain from Balbir to Rajinder House and Side lane of Sumer Khate in Village Budhpur in C-102-I/Narela.

260/04.12.06/EE-Narela

M/s Ankit Associates

C/O Culvert near Surat Singh House and Kali Ram Samadhi in Village Jinpur in C-102-I/Narela.

250/01.12.06/EE-Narela

M/s Rakesh Kumar

C/O Culvert near Ram Kumar House and Mandir in Village Khampur in C-102-I/Narela.

258/04.12.06/EE-Narela

M/s Govind Gupta

Pdy.M/P from Gond Factory to Mukesh House in Village Budh Pur in C-102-I/Narela.

259/04.12.06/EE-Narela

M/s Govind Enterprises

C/O boundary wall of Cremation Ground at Pana Paposian in C-101/Narela Zone.

20/02.08.07/EE(Pr.)R

M/s Puneet Const. Co.

Development of ground in Cremation ground at Pana Paposian at w.no.101/Narela Zone.

M/s Jai Kumar Mpl Const.

Pdy.CC & drain lane from Jeet Ram to Chand Roop House in Village Khera Klurd in C-102-I/Narela Zone.

375/08.02.07/EE-Narela

M/s Ankit Associates

Pdy.CC & drain lane from Jagbir to Jai Pal House in Village Khera Klurd in C-102-I/Narela Zone.

377/08.02.07/EE-Narela

M/s Raj Associates

Pdy.CC & drain in lane from Amar Singh to Surender House in Village Alipur in C-102-I/Narela Zone.

374/08.02.07/EE-Narela

M/s Ankit Associates

Pdy.CC & drain in lane from Hari Prakash to Om Prakash House in Village Naya Bans in C-102-I/Narela Zone.

376/08.02.07/EE-Narela

M/s Vidya Const.CO

Page 114: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

40 Civil EE-Narela 25.01.07 17.01.07 89270.00 02.03.07 10.04.07 89270.00 Completed

41 Civil EE-Narela 02.02.07 31.01.07 198341.00 19.02.07 02.03.07 192564.00 Completed

42 Civil EE-Narela 02.02.07 31.01.07 345800.00 01.04.07 25.04.07 244175.00 Completed

43 Civil EE-Narela 02.02.07 31.01.07 160858.00 18.04.07 26.05.07 160858.00 Completed

44 Civil EE-Narela 02.02.07 31.01.07 380000.00 02.04.07 12.06.07 263557.00 Completed

45 Civil EE-Narela 02.02.07 31.01.07 197344.00 20.02.07 04.04.07 197344.00 Completed

46 Civil EE-Narela 02.02.07 11.01.07 196331.00 20.02.07 29.03.07 196305.00 Completed

47 Civil EE-Narela 02.02.07 11.01.07 198226.00 17.02.07 21.05.07 196305.00 Completed

48 Civil EE-Narela 02.02.07 11.01.07 197183.00 17.02.07 22.05.07 196226.00 Completed

49 Civil EE-Narela 02.02.07 11.01.07 198831.00 27.02.07 28.05.07 197183.00 Completed

50 Civil EE-Narela 06.02.07 11.01.07 199441.00

C/O Retaing wall near Maan Public School play ground in Village Holambi Klurd in C-102-I/Narela Zone.

371/20.02.07/EE-Narela

M/s Jagdamba Trading Co.

Dev.of lane from Kalu Ram House to Jasram house in Village Palla in C-102-I/Narela Zone.

380/14.02.07/EE-Narela

M/s Ankit Associates

Remodelling of drain from Bakner Village to Drain (Munir pur) in Village Bakner in C-101-I/Narela Zone.

436/30.03.07/EE-Narela

M/s Jagdeep Associates

Pdy.CC pav.and drain from Chander House Via Sisodia Chopal to Bhim Singh House and Bijender House to Dharambir House in Village Bakhte war pur in C-102-II/Narela Zone.

433/30.03.07/EE-Narela

M/s A.R Enterprises

C/O drain and laying CC pav.from Anoop Singh House to Dharamvir House and Pram house to Tiggipur road and Remodelling of drain from Anil Mehra House to Karan Singh Chauhan House in Village Bakhtewar pur in C-102-II/Narela Zone.

438/30.03.07/EE-Narela

M/s Shankar Const.Co

Pdy.CC and drain from Rajinder to Om Prakash House in Village Boodh Pur in C-102-I/Narela Zone.

385/20.02.07/EE-Narela

M/s Rakesh Kumar

C/O drain from Shiv Parkash house to Ranjeet Jogi House in Village Holambi Khurd in C-102-I/Narela Zone.

386/20.02.07/EE-Narela

M/s Tri Murti Trading Co.

Dev.of lane by pdy.CC pav.and drain from Vinod S/O Ramesh to Dharambir Singh Rana House in Village Khera Kalan in C-102-I/Narela Zone.

381/14.02.07/EE-Narela

M/s Sh. Govind Ent.

Pdy.CC pavement and drain near Panchyat Ghar in Village Khera Kalan in C-102-I/Narela

382/14.02.07/EE-Narela

M/s Sh. Govind Const.

Dev.of lane by pdy.CC pav.and drain from Partap Singh to Phool Singh House in Village Khera Kalan in C-102-I/Narela Zone.

384/20.02.07/EE-Narela

M/s Sh. Surender Singh

Pdy.CC & drain from Vikram to Hari Ram House in Village Boodh pur in C-102-I/Narela.

Page 115: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

51 Civil EE-Narela 06.02.07 11.01.07 194747.00

52 Civil EE-Narela 12.02.07 06.02.07 599800.00 02.04.07 04.05.07 512679.00 Completed

53 Civil EE-Narela 12.02.07 06.02.07 597600.00 28.07.07 12.10.07 496536.00 Completed

54 Civil EE-Narela 12.02.07 06.02.07 98601.00 30.03.07 12.04.07 98439.00 Completed

55 Civil EE(Pr.)R 14.02.07 06.02.07 92324.00 M/s IIT Delhi 92324.00 Completed

56 Civil EE-Narela 22.03.07 17.01.07 530444.00 02.04.07 23.01.07 530444.00 Completed

Dev.of lane by pdy.CC pav.& drain from Brahm Prakash to Jaipal House in Village Khera Kalan in C-102-I/Narela.

Pdy.M/P on Bakoli Village Road from Cremation Ground to (LHS) Turing Towards Palla Road in Village Prokoli in C-102-II/Nareal Zone.

437/30.03.07/EE-Narela

M/s Shankar Const.Co

Pdy.M/P on Bakoli approach road from Uma Dharam Kanta to Beeru Godown in Village Bakoli in C-102-II/Nareal Zone.

30/26.07.07/EE-Narela

M/s Sh. Shanker Const. Co.

Dev.of lane adjoining to M.C Pry.School (Girls) in Village Palla in C-102-II/Narela Zone.

420/26.03.07/EE-Narela

M/s Govind Gupta

C/O drain on main road Swatantar Nagar from Narela Bawana road to Narela Lampur road in C-101-I (From RD-1260 to 1500) Sh: Theird Party Payment to I.T.I Delhi.

Advance to IIT Delhi vide Commissioner orders dated 04.07.05

Advance to IIT Delhi vide Commissioner orders dated 04.07.05

C/O drain in 20 point had less colony in Village Bakner in C-101-I (Narela Zone) from Glass Factory to Dharam Pal House and its adjoining lanes.

439/30.03.07/EE-Narela

M/s Sh. Raj Asso.

Page 116: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA, Sh.Jile Singh Chauhan, AC No. 55 2006-07

Page 117: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure

1 Civil EE-XII 10.05.06 01.05.06 574992.00 01.06.06 24.07.06 574896.00 Completed

2 Civil EE-XII 17.05.06 01.05.06 957834.00 28.10.06 05.02.07 945535.00 Completed

3 Civil EE-XII 24.05.06 28.04.06 820590.00 19.11.06 09.04.07 820563.00 Completed

4 Civil EE-XII 27.06.06 27.06.06 198300.00 26.07.06 25.09.06 197615.00 Completed

5 Civil EE-XII 27.06.06 23.06.06 142600.00 28.10.06 P 103676.00 In Prog.

6 Civil EE-XII 27.06.06 26.05.06 157845.00 19.11.06 31.01.07 157840.00 Completed

7 Civil EE-XII 27.06.06 27.06.06 271653.00 09.09.06 16.11.06 271432.00 Completed

Date o

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Present Position

Imp of lane (By B/P ) and drain from Chaten Bihari Mandir to Laxmi Chand in village Burari in C-104/CLZ

84/31.05.06/EE-XII

M/s J.B Enterprises

Imp to lane main road from Pappu Sharma House to S.D Dwedi House, Darshan vihar Villag Burari in C-104/CLZ

378/27.10.06/EE-XII

M/s Oborio Const.Co

C/O drain from H.No B-225 to B-288 and up to MC Primary School up to Chowk in Bhalsway Dairy Colony in C-103/CLZ

400/09.11.06/EE-XII

M/s Sorout Const.Co

C/o glai no.2 from RD-0 to RD-100 in Kamal pur, Village Burari in C-104/CLZ

145/17.07.06/EE-XII

M/s Surya Kant sharma

Imp.to gali no.29 by pdy. Brick flooring from chanderpal house to Omprakash house in Sant nagar, Village Burari in C-104/CLZ

342/17.10.06/EE-XII

M/s Baba & Co

Imp.to lane by CC from Saroop House to Sri Nivas house and Vinod House to Ganshyam House in Village Burari in C-104/CLZ

412/10.11.06/EE-XII

M/s Sorout Const.Co

Imp.to lane by Pdy.brick flooring from gali no.22 to end of lane in Shankar Pura, Village Burari in C-104/CLZ

205/31.08.06/EE-XII

M/s Abhay Const.CO

Page 118: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

8 Civil EE-XII 11.07.06 06.06.06 802827.00 20.12.06 23.03.07 802545.00 Completed

9 Civil EE-XII 17.07.06 01.05.06 206979.00 03.08.06 24.08.06 206806.00 Completed

10 Civil EE-XII 01.08.06 01.05.06 647495.00 29.02.07 26.06.07 629108.00 Completed

11 Elect. EEE-II 17.08.06 27.07.06 129901.00 20.10.06 27.11.06 93717.00 Completed

12 Elect. EEE-II 17.08.06 22.07.06 298098.00 13.11.06 20.11.06 283550.00 Completed

13 Elect. EEE-II 17.08.06 26.07.06 267254.00 13.11.06 20.12.06 255452.00 Completed

14 Elect. EEE-II 17.08.06 25.07.06 282977.00 13.11.06 12.12.06 272360.00 Completed

C/O drain frm A-57 to H.No. A-07 and upto Gujjar Chowk in Bhalswa Dairy Colony Along Park in C-103/CLZ

527/20.12.06/EE-XII

M/s Gupta Engg.Co.

Imp.to lane and drain from Mukul House to N.P.Singh House in Sant Nagar, Village Burari in C-104/CLZ(By CC)

166/02.08.06/EE-XII

M/s J.B Enterprises

Imp.to gali no.3, Gali no.4, Ravi House to Mandir, Gali NO-3 to Saroj House and Gali no.3 to Harinder House in Shastri Park Villaeg Burari C-104.CLZ(By Pdy.B/P)

651/19.02.07/EE-XII

M/s Mahesh Chand & Co.

P/O 12m long Sheet Legal opp.Masjid, Busari Garhi W.NO.104/CLZ

122/20.10.06/EE(E)-II

M/s Saksham Electricals & Electronics

P/O street lighting arrangment at W.NO.104 under C.L Zone (Jagat Pur Jharoda Bholswa, Mulund Pav.Mangole Pura and Nathu Pura)

157/13.11.06/EE(E)-II

M/s A.K Electricals

P/O street lighting arrangment at W.NO.104/C.L.Zone (Kushak Ibrahim pur Mukhmale pur Kadi Vihar, Amrit Vihar and Inder Prastha Colony)

150/13.11.06/EE(E)-II

M/s Bharat Electricals & Electronics

P/O sheet lighting arrangment at w.no.104/C.L.Zone (Rajiv Nagar Kamal Vihar, Tomar Colony, Chandan Vihar, Burari and Condue tor Colony)

151/13.11.06/EE(E)-II

M/s Bharat Electricals & Electronics

Page 119: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

15 Civil EE-XII 29.08.06 01.08.065 649487.00 05.10.06 30.03.07 649399.00 Completed

16 Civil EE-XII 20.09.06 12.09.06 196000.00 27.10.06 17.11.06 187793.00 Completed

17 Civil EE-XII 26.09.06 23.08.06 410138.00 11.11.06 07.02.07 410137.00 Completed

18 Civil EE-XII 26.09.06 23.08.06 438103.00 20.11.06 22.03.07 437615.00 Completed

19 Civil EE-XII 26.09.06 23.08.06 423113.00 10.11.06 26.02.07 421321.00 Completed

20 Civil EE-XII 26.09.06 23.08.06 409681.00 10.11.06 11.02.07 409681.00 Completed

21 Civil EE-XII 26.09.06 23.08.06 426638.00 11.11.06 06.01.07 426511.00 Completed

22 Civil EE-XII 26.09.06 23.08.06 425352.00 12.11.06 07.02.07 425338.00 Completed

Imp.to Budh Bazar lane from Puran to Ajay S.T.D Booth in Village Nathu Pura in C-104/C.L.Zone.( C/O drain & CC)

278/26.09.06/EE-XII

M/s S.S Enterprises

C/I of lane along Kabristan in Bhalswa village in C-103/CLZ (By Brick Flooring)

384/27.10.06/EE-XII

M/s Dinesh Const.Co

Dev.of lane by pdy.B/F from H.NO.A-545 to A-712 and along Park in Bhalswa dairy Colony in C-103/CLZ

419/10.11.06/EE-XII

M/s Balkar Singh & Bros.

Dev.of lane by pdy.B/F from H.NO.A-193 to A-377 and along open land in Bhalswa Dairy Colony in C-103/CLZ

458/20.11.06/EE-XII

M/s Lamba Bros.

Dev.of lane by pdy.B/F from H.NO.-88 to C-169 in Bhalswa Dairy Colony in C-103/CLZ

416/10.11.06/EE-XII

M/s Balkar Singh & Bros.

Dev.of by pdy.B/F from H.NO.A-289 to A-384 and A-200 to A-281 in Bhalswa Dairy Colony inC-103/CLZ

415/10.11.06/EE-XII

M/s Balkar Singh & Bros.

Dev.of lane by pdy.B/F from C-57 to B-232 along Masjid and Masjid Madarsa in Bhalswa Dairy Colony in C-103/CLZ

414/10.11.06/EE-XII

M/s Balkar Singh & Bros.

Dev.of lane by pdy.B/F from H.No.A-737 to A-785 and A-544 to A-496 in Bhalswa Dairy Colony in C-103/CLZ

418/10.11.06/EE-XII

M/s Balkar Singh & Bros.

Page 120: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

23 Civil EE-XII 26.09.06 23.08.06 416397.00 10.11.06 05.01.07 412981.00 Completed

24 Civil EE-XII 26.09.06 23.08.06 429083.00 10.11.06 08.01.07 428589.00 Completed

25 Civil EE-XII 04.10.06 07.07.06 180534.00 19.11.06 13.01.07 180384.00 Completed

26 Civil EE-XII 04.10.06 07.07.06 472644.00 14.01.07 23.03.07 472138.00 Completed

27 Civil EE-XII 04.10.06 01.09.06 217954.00 23.12.06 22.04.07 217876.00 Completed

28 Civil EE-XII 04.10.06 01.07.06 403818.00 11.01.07 17.04.07 403224.00 Completed

29 Civil EE-XII 04.10.06 01.07.06 469054.00 21.12.06 22.04.07 469054.00 Completed

30 Civil EE-XII 04.10.06 01.05.06 183740.00 19.11.06 15.01.07 183569.00 Completed

31 Civil EE-XII 04.10.06 11.08.06 164888.00 19.11.06 13.01.07 160359.00 Completed

Dev.of lane by pdy.B/F from H.NO.A-633 to A-600 & A-641 to Mandir in Bhalswa Dairy Colony in C-103/CLZ

420/10.11.06/EE-XII

M/s Balkar Singh & Bros.

Dev.of lane by pdy.B/F from H.NO.A-1 to A-64 in Bhalswa Dairy Colony inC-103/CLZ

417/10.11.06/EE-XII

M/s Balkar Singh & Bros.

C/O lane from Verma house to Toni house in Village Jharodha in C-104/CLZ

411/10.11.06/EE-XII

M/s Sorout Const.Co

Dev.of gali no.10,11 and gali no.19 by B/pavent & CC Lalit to Subhash, Ram Narayan to Bhola & Chitra to Sat narayan in B-Block Village Jharodha in C-104/CLZ

539/02.01.07/EE-XII

M/s Shri Parkash

C/O lane from Krishan House to Parmanand house & Ranbir house to Mana Public Schools in Village Burai C-104/CLZ

497/14.12.06/EE-XII

M/s Mahesh Chand & Co.

C/O lane from Bikaner Sweets to Shri Sudesh, Urmila to Suraj and Ram khiladi to Ajit House in Sant Nagar, Village Burai in C-104/CLZ.

555/10.01.07/EE-XII

M/s Shri Parkash

C/O lane from R.K Builders to Flood Nallah in Village Mukund pur in C-104/CLZ

498/14.12.06/EE-XII

M/s Mahesh Chand & Co.

Imp.to lane from Manohar house to Nathini House in Village Jharoda in C-104/CLZ (By CC)

409/10.11.06/EE-XII

M/s Sorout Const.Co

Imp.to lane & drain in gali no.16 from Bhisham House to Ram Avaad house in Village Mukand Pur in C-104/CLZ (By CC)

410/10.11.06/EE-XXII

M/s Sorout Const.Co

Page 121: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

32 Civil EE-XII 05.10.06 13.09.06 198000.00 28.10.06 25.11.06 197355.00 Completed

33 Civil EE-XII 09.10.06 01.07.06 266918.00 06.11.06 02.03.07 258115.00 Completed

34 Civil EE-XII 24.11.06 25.10.06 196900.00 19.12.06 19.02.07 196499.00 Completed

35 Civil EE-XII 24.11.06 25.10.06 196900.00 18.12.06 19.02.07 195693.00 Completed

36 Civil EE-XII 24.11.06 25.10.06 191500.00 23.12.06 20.02.07 191229.00 Completed

37 Civil EE-XII 24.11.06 25.10.06 195800.00 15.12.06 15.02.07 195784.00 Completed

38 Civil EE-XII 24.11.06 25.10.06 194700.00 14.12.06 16.02.07 193736.00 Completed

C/O drain from Police Post to Supplementary drain for making conection in Village Mukund pur in C-104/CLZ

338/17.10.06/EE-XII

M/s Sorout Const.Co

C/O drain from Vijender House to Amichand House in Amrit Vihar Village Nathu Pura in C-104/CLZ

389/27.10.06/EE-XII

M/s Ram Doot Builders

Dev.of lane along A-401 (Kishan Kumar) to A-465 (Basant Chauhan House) by pdy.brick flooring in Bhalswa Dairy Colony in C-103/CLZ.

515/18.12.06/EE-XII

M/s A.N Const

Dev.of lane from A-312 (Goel electric works) to A-344 (Jugdamba Pr.) by pdy.brick flooring in Bhalswa Dairy Colony in C-103/CLZ.

516/18.12.06/ EE-XII

M/s Harshit Builders

Dev.of lane from H.NO.A-210 (Uma Shankar house) to A-362 (Ram Karan) by pdy.brick flooring in Bhalswa Dairy Colony in C-103/CLZ.

505/14.12.06 EE-XII

M/s Globe Const.Co.

Dev.of lane from B-161 (RMA Bandh) to B-193 (Ram Avtar) by pdy.brick flooring in Bhalswa Dairy Colony in C-103/CLZ.

493/14.12.06 EE-XII

M/s Prem Brros.

Dev.of lane along A-55 (Neeraj Builder) to A-63 (Kali Charan Store) by pdy.brick flooring in Bhalswa Dairy Colony in C-103/CLZ.

506/14.12.06 EE-XII

M/s Unique Enterprises

Page 122: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

39 Civil EE-XII 24.11.06 25.10.06 197400.00 16.12.06 22.02.07 194422.00 Completed

40 Civil EE-XII 24.11.06 25.10.06 195500.00 23.02.07 27.03.07 194496.00 Completed

41 Civil EE-XII 24.11.06 01.07.06 599800.00 15.02.07 20.06.07 598701.00 Completed

42 Civil EE-XII 29.12.06 28.12.06 197200.00 19.01.07 17.05.07 197072.00 Completed

43 Civil EE-XII 29.12.06 28.12.06 197200.00 15.01.07 19.03.07 196778.00 Completed

44 Civil EE-XII 29.12.06 28.12.06 191000.00 15.01.07 15.02.07 190914.00 Completed

45 Civil EE-XII 29.12.06 28.12.06 186600.00 13.01.07 12.03.07 186374.00 Completed

46 Civil EE-XII 29.12.06 28.12.06 197900.00 16.01.07 23.03.07 197431.00 Completed

47 Civil EE-XII 29.12.06 28.12.06 198600.00 12.01.07 22.03.07 198477.00 Completed

Dev.of lane from A-242 (G.R.P Public School to A-330 Kanwar Pal) by pdy.brick flooring in Bhalswa Dairy Colony in C-103/CLZ.

500/14.12.06 EE-XII

M/s Aman deep Const.Co

Dev.and raising of road by M/P infront of H.NO.951 in C-Block Jahangir Puri Colony in C-103/CLZ.

714/23.02.07/EE-XII

M/s Sona Consultant & Contractors

Dev.of lane by B/Pavent from Mahalaxmi Builder to Onkar House and Main Road to R.S Chaudel House in Amrit Vihar Village Nathupura in C-104/CLZ

643/13.02.07/EE-XII

M/s Shiv Skakti Const.I

C/O lane from Rajinder to Jitender House in Village Nathee Pura in C-104/CLZ.

563/10.01.07/EE-XII

M/s Mohan lal & Co.

C/O lane from Ravi Kumar to Rajinder House in Village Nathee Pura in C-104/CLZ.

576/12.01.07/EE-XII

M/s N.K Const.Co.

C/O lane from Bhardwaj to Yogesh and Ashok to Hari Chand House in Sant Nagar in Village Burari in C-104/CLZ.

587/15.01.07/EE-XII

M/s Sorout Const.Co

C/O lane from Satish to Sarvan Kumar House in Village Burari in C-104/CLZ.

570/12.01.07/EE-XII

M/s Prem Bros.

C/O lane from Satish to Sobhan Singh House in Village Burari in C-104/CLZ.

582/15.01.07/EE-XII

M/s Aman deep Const.Co

C/O lane from Bindra Devi to H.No.58 to Umesh House in Village Nathee Pura in C-104/CLZ.

584/15.01.07/EE-XII

M/s Aman deep Const.Co

Page 123: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

48 Civil EE-XII 29.12.06 28.12.06 193900.00 17.01.07 22.03.07 193667.00 Completed

49 Civil EE-XII 29.12.06 28.12.06 198500.00 24.01.07 21.03.07 197437.00 Completed

50 Civil EE-XII 29.12.06 28.12.06 165200.00 13.01.07 10.03.07 164912.00 Completed

51 Civil EE-XII 29.12.06 28.12.06 178800.00 15.01.07 20.03.07 178500.00 Completed

52 Civil EE-XII 29.12.06 28.12.06 197800.00 24.01.07 20.03.07 197718.00 Completed

53 Civil EE-XII 29.12.06 28.12.06 188700.00 17.01.07 21.03.07 188436.00 Completed

54 Civil EE-XII 29.12.06 28.12.06 189300.00 16.01.07 22.03.07 188939.00 Completed

55 Civil EE-XII 29.12.06 28.12.06 199300.00 15.01.07 15.02.07 198583.00 Completed

56 Civil EE-XII 29.12.06 13.12.06 432772.00 26.02.07 03.07.07 432742.00 Completed

C/O lane from Girver Singh to Doodh Nath House in Village Burari in C-104/CLZ.

580/15.01.07/EE-XII

M/s Rana Const.Co

C/O lane from Anish Khan to Attar Singh House in Sant Nagar Village Burari in C-104/CLZ.

579/15.01.07/EE-XII

M/s Urique Enterprises

C/O lane & drain from Manpal to Yogender and Tyagi to Naresh House in Village Burari in C-104/CLZ.

571/12.01.07/EE-XII

M/s Prem Bros.

C/O lane & drain from Subedar to Raghu Raj House in Sant Nagar, Village Burari in C-104/CLZ.

588/15.01.07/EE-XII

M/s Sorout Const.Co

C/O lane and drain from Raghu Raj to Paradise School in Sant Nagar in Village Burari in C-104/CLZ.

578/15.01.07/EE-XII

M/s Unique Enterprises

C/O lane and drain from Hemant to Ranachal & Upender to Vijay House in Village Burari in C-104/CLZ.

583/15.01.07/EE-XII

M/s Aman deep Const.Co

C/O lane and drain from S.P Gupta to Munna Building Material to Ravi Kumar House in Village Natthi Pura in C-104/CLZ.

581/15.01.07/EE-XII

M/s Rana Const.Co

C/O lane from Babu Ram to Bhu mia Matta & Shyam Lal to Virendar house in Village Burari C-104/CLZ.

589/15.01.07/EE-XII

M/s Sorout Const.Co

C/O lane and drain from Amrit Property to Khushal and Ram Chander to Basant House in Sant Nagar, Village Burari in C-104/CLZ.

681/23.02.07/EE-XII

M/s Global Enterprises

Page 124: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

57 Civil EE-XII 29.12.06 13.12.06 413253.00 04.03.07 14.05.07 397427.00 Completed

58 Civil EE-XII 29.12.06 13.12.06 581000.00 02.03.07 30.06.07 421103.00 Completed

59 Civil EE-XII 29.12.06 13.12.06 303229.00 26.02.07 03.07.07 303216.00 Completed

60 Civil EE-XII 29.12.06 13.12.06 385018.00 02.03.07 30.06.07 383436.00 Completed

61 Civil EE-XII 29.12.06 13.12.06 324099.00 02.03.07 30.06.07 323864.00 Completed

62 Civil EE-XII 29.12.06 13.12.06 574200.00 02.03.07 30.06.07 531852.00 Completed

63 Civil EE-XII 29.12.06 13.12.06 593300.00 24.02.07 10.01.08 588260.00 Completed

64 Civil EE-XII 29.12.06 13.12.06 437900.00 25.07.07 17.09.07 437071.00 Completed

C/O lane and drain from Jagdish to Satyender House in Sant Nagar, Village Burari in C-104/CLZ.

734/23.02.07/EE-XII

M/s J.B Enterprises

C/O lane & drain from Amit to Sevaram & Sanjay to Attar Singh House in Village Burari in C-104/CLZ.

668/23.02.07/EE-XII

M/s Sorout Const.Co

C/O drain from Kailash Chand to Triveni Devi House in Sant Nagar, Village Burari in C-104/CLZ.

682/23.02.07/EE-XII

M/s Global Enterprises

C/O lane & drain from Vijay to Chander Bhan, Titu to Chandra Kiran House and adjoining lanes in Village Burari C-104/CLZ.

680/23.02.07/EE-XII

M/s Global Enterprises

C/O lane and drain from Durga Parshad to Baljit and Raj Singh to Jitender House in Village Mukund Pur in C-104/CLZ.

666/23.02.07/EE-XII

M/s Sorout Const.Co

C/O lane and drain form Govind Acharya Ashram to Nem Singh & Tapan to Seth Soap in Sant Nagar, Village Burari in C-104/CLZ.

732/23.02.07/EE-XII

M/s kanhaya Lal

C/O lane nad drain from Pawan to Abhishek & Negi Travels to Raja Ram House in Sant Nagar, Village Burari in C-104/CLZ.

733/23.02.07/EE-XII

M/s Pankaj Const Co.

C/O lane and drain from Ashok to Ranjeet and Kedar Nath to Amar Jeet House in Sant Nagar Village Burari in C-104/CLZ.

44/23.07.07/EE-XII

M/s Sorout Const.Co

Page 125: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

65 Civil EE-XII 29.12.06 13.12.06 407400.00 24.07.07 28.11.07 407400.00 Completed

66 Civil EE-XII 29.12.06 13.12.06 447700.00 02.03.07 30.06.07 310623.00 Completed

67 Civil EE-XII 14.02.07 25.10.06 470911.00 28.11.07 11.02.08 415631.00 Completed

68 Civil EE-XII 15.02.07 01.07.06 1176640.00 28.04.07 17.09.07 1176483.00 Completed

69 Civil EE-XII 20.02.07 13.02.07 191000.00 03.03.07 30.03.07 190847.00 Completed

70 Civil EE-XII 20.02.07 13.02.07 194202.00 23.02.07 27.03.07 193735.00 Completed

C/O lane and drain from main road to Munna Masjid to Surash to Shyam Lal House in Village Mukund pur in C-104/CLZ.

43/23.07.07/EE-XII

M/s Ankit Const Co.

C/O lane from R.K Pathak to Om Prakash House in Sant Nagar, Village Burari in C-104/CLZ.

667/23.02.07/EE-XII

M/s Sorout Const.Co

C/O lane from Vinod to Flood Nallah, Krishanpal to Patwari, Murli to Jugdish, Parveen to Patwari Mandir to Raj Kumar, Patwari to Rawat, Patwari to Satish & Naresh to Flood Nallah in Sant Nagar, Village Burari C-104/CLZ.

415/19.11.07/EE-XII

M/s Sorout Const.Co

C/O lane & drain in gali no.114 from Amang Dass House to Ajay Rana House in Sant Nagar, Village Burari in C-104/CLZ.

13/27.04.07/EE-XII

M/s J.B Enterprises

C/O remaning partain of lane from Guru Nanak store to flood Nallah in Sant Nagar in Village Burari in C-104/CLZ.

670/23.02.07/EE-XII

M/s Sorout Const.Co

Imp.to road from Sulabh Souchalya to Sr.Sec.School B-Block Jahangir puri C-103/CLZ.

707/23.02.07/EE-XII

M/s Sona Consultant & Contractors

Page 126: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA, Sh.Mangat Ram Singhal, AC No. 56 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure

1 Hort. EEE-Hort. 17.05.06 03.04.06 151813.00 26.05.06 16.06.06 147342.00 Completed

2 Hort. EEE-Hort. 17.05.06 03.04.06 137392.00 26.05.06 16.06.06 127931.00 Completed

Date o

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Present Position

P/o Tube Well at Park Opp. H.no E-235-236, Gandhi Vihar in C-106/CLZ

22/18.05.06/EE(E)Hort.

M/s A.K Electricals

P/o Tube Well at Dispensary Wala Park, Indra Nagar in C-105/CLZ

21/18.05.06/EE(E) Hort.

M/s Sri Balaji Electricals

Page 127: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

3 Hort. EEE-Hort. 17.05.06 03.04.06 137392.00 26.05.06 15.06.06 119332.00 Completed

4 Hort. EEE-Hort. 17.05.06 03.04.06 140739.00 26.05.06 15.06.06 130641.00 Completed

5 Hort. EEE-Hort. 25.05.06 24.05.06 140739.00 01.06.06 16.06.06 133428.00 Completed

6 Hort. EEE-Hort. 19.06.06 14.06.06 137034.00 12.10.06 26.10.06 96682.00 Completed

7 Hort. EEE-Hort. 19.06.06 14.06.06 173849.00 11.10.06 06.11.06 119502.00 Completed

8 Civil EE-XVI 26.06.06 21.06.06 426553.00 30.08.06 10.11.06 426390.00 Completed

9 Elect EEE-II 17.08.06 04.07.06 130177.00 20.10.06 27.11.06 93448.00 Completed

10 Elect EEE-II 17.08.06 02.05.06 131666.00 20.10.06 27.11.06 95546.00 Completed

11 Elect EEE-II 17.08.06 02.06.06 504353.00 08.12.06 12.12.06 480444.00 Completed

12 Elect EEE-II 17.08.06 22.07.06 181042.00 29.10.06 27.11.06 122256.00 Completed

P/o Tube Well at Green Belt Opp. H.no. A-242-243, Gandhi Vihar in C-106/CLZ

19/18.05.06/EE(E) Hort.

M/s Sri Balaji Electricals

P/o Tube Well at Park Opp. H.no H-3/1345, Jahangir puri in C-106/CLZ

20/18.05.06/EE(E) Hort.

M/s Balaji Electricals

P/o Tube Well in Park of Safai Karamchari Colony Jahangir puri in C-106/CLZ

23/25.05.06/EE(E) Hort.

M/s Sri Balaji Electricals

P/o Tube Well at Dhobi Wala Park in Jhangir puri in C-106/CLZ

117/04.10.06/EE(E)-Hort.

M/s Saksham Electricals & Electronics

P/o Tube Well at main Park of Adarsh Nagar in C-105/CLZ

118/04.10.06/EE(E)-Hort.

M/s Balaji Electricals

Imp. To lane by pdy. RMC and drainge system in Block-H from House No. H-551 to H-600 in Jahangir puri C-106/CLZ

200/24.08.06/EE-XVI

M/s Balkar Singh & Bros.

P/O 12m Long street light opp.qtrs.of Block no-14, Jahangir Puri in C-106/CLZ

121/20.10.06/EE(E)-II

M/s Sri Balaji Electricals

P/O 12m Long street light at MPL Park Green Belt, A-1890, Jahangir Puri in W.NO.106/CLZ

120/20.10.06/EE(E)-II

M/s Sri Balaji Electricals

P/O 12m Long street light at MPL Park Opp. H.NO.2/662-663, Jahangir Puri in C-106/CLZ

175/06.12.06/EE(E)-II

M/s Kamal Eelctricals

P/O Garden light at MPL Park, Jahangir Puri behind NDPL Office, A-Block, W.NO.106/CLZ

123/20.10.06/EE(E)-II

M/s A.K Electricals

Page 128: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

13 Civil EE(Br,-II 21.08.06 22.06.06 2823238.00 23.02.07 27.07.07 2820570.00 Completed

14 Civil EE-XVI 21.08.06 08.08.06 162400.00 04.10.06 P 157721.00 In Prog.

15 Civil EE-XVI 01.09.06 20.06.06 1490546.00 23.02.07 30.07.07 1487767.00 Completed

16 Civil EE-XVI 04.09.06 08.08.06 499000.00 20.12.06 22.05.07 388353.00 Completed

17 Civil EE-XVI 13.09.06 13.09.06 198981.00 15.01.07 P 181980.00 In Prog.

18 Civil EE-XVI 26.09.06 08.08.06 1115509.00 28.02.07 27.10.07 1105405.00 In Prog.

19 Elect EEE-II 12.10.06 13.09.06 372517.00 28.12.06 05.01.07 353179.00 Completed

20 Civil EE-XVI 01.12.06 23.09.06 1989600.00 19.11.07 P 1513333.00 In Prog.

21 Civil EE-XVI 01.12.06 23.09.06 1632800.00 10.07.07 P 1067219.00 In Prog.

22 Civil EE-XVI 13.12.06 11.11.06 479536.00 28.02.07 29.11.07 478592.00 Completed

Imp.of Shah Alam Bandh Road by pdy.WBM from Dobhi Ghat Road to GT Road in C-106/CLZ Sh:- C/O embank ment for road at Encroached portion of road by Jhuggi Dwellors at Shah Alam Bandh Road

119/23.02.07/EE(Br.).II

M/s Jindal Enterprises

Dev.of drain system infront of Food Supply office in Sarai Pipal Thala in C-106/C.L.Zone.

243/28.09.06/EE-XVI

M/s Mohan Lal & Co.

C/O B/Wall of Ram Leela Ground Park between A & C Block in Gandhi Vihar in C-106/C.L. Zone.

462/20.02.07/EE-XVI

M/s Satbir Const.Co

C/O B/wall of S.F.S Quarters along pump house road in Jahangir Puri Colony in C-106/CLZ

333/14.12.06/EE-XVI

M/s Prem Bros.

Dev.of Compond by pdy.Kota Stone near Shiv Mandir in Village Dheer pur in C-106/CLZ

364/08.01.07/EE-XVI

M/s Unique Enterprises

C/O B/Wall along JJ Cluster behind G-Block Pump House in Jhahangir Puri Colony in C-106/CLZ

451/19.02.07/EE-XVI

M/s Praveen Kumar Aggarwal

P/O Garden light at MPL Park, Subhash Park-II at Adarsh Nagar, C-105/CLZ

198/28.12.06/EE(E)-II

M/s Eminort Traders

Dev.of lane by pdy.RMC and drainaje system in H-Blcok along Shah Alam Bandh road from H.NO.501 to H.NO.550 in Jahangir puri colony in C-106/CLZ.

6/13.04.07/EE-XVI

M/s Garg Const.Co.

Dev.of lane by pdy.RMC and drainaje system from H.NO.H-1000 to H-951 in H-Block Jahangir Puri Colony in C-106/CLZ.

04/13.04.07/EE-XIV

M/s Shree Builders

Dev.of Court Yard by pdy.Kota Stone flooring of Barodari in H-2 Block Jhanir Puri Colony in C-106/CLZ.

465/20.02.07/EE-XVI

M/s Mudit Const.

Page 129: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

23 Civil EE-XVI 13.12.06 23.09.06 497296.00 07.03.07 21.11.07 496207.00 CompletedProviding M/P of road from H.NO.58 to 69 in Rajasthani Udyog Nagar in C-106/CLZ.

493/02.03.07/EE-XVI

M/s Shiva Const. Co.

Page 130: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 131: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA, Smt..Anjali Rai, AC No. 57 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure

1 Civil EE-III 19.05.06 18.05.06 214886.00 M/s Islamuddin 22.08.06 11.10.06 214707.00 Completed

2 Civil EE-III 19.05.06 18.05.06 302400.00 M/s Islamuddin 05.02.07 30.03.07 221098.00 Completed

3 Civil EE-III 19.05.06 18.05.06 233303.00 M/s Sajid Khan 11.08.06 30.10.06 233238.00 Completed

4 Civil EE-III 19.05.06 18.05.06 291700.00 06.07.06 04.10.06 215293.00 Completed

Date o

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Present Position

Imp of lane by pdg. Cc from 9232 to 9205 in Multani Dhanda in C-108/SPZ Pahar Ghanj

217/21.08.06/EE-III

Imp of lane by pdg. Cc from Gali no-5 to M.C .Pry School in Pahar Ganj C-108/SPZ

673/09.02.07/EE-III

Imp to lane by pdg.cc from Chandans Ply Wood 59 to Delhi Empire at adj. Lanes in Pahar Ganj C-108/SPZ

183/25.07.06/EE-III

Imp to lane by pdg. Cc from 3839 to Chwok Tail Mill at pahar ganj in C-108/SPZ

143/27.06.6/EE-III

M/s Sonu Builders

Page 132: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

5 Civil EE-III 19.05.06 18.05.06 291400.00 M/s Sajid Khan 12.02.07 21.03.07 212862.00 Completed

6 Civil EE-III 19.05.06 18.05.06 226590.00 M/s Sajid Khan 23.08.06 27.08.06 226469.00 Completed

7 Civil EE-III 22.05.06 20.05.06 237727.00 27.07.06 04.09.06 237211.00 Completed

8 Civil EE-III 22.05.06 20.05.06 289800.00 21.08.06 03.10.06 212071.00 Completed

9 Civil EE-III 22.05.06 20.05.06 302461.00 M/s Neel Traders 18.09.06 12.06.07 301290.00 Completed

10 Civil EE-III 22.05.06 20.05.06 298700.00 10.07.06 20.09.06 218468.00 Completed

11 Civil EE-III 22.05.06 20.05.06 226860.00 27.07.06 04.09.06 226710.00 Completed

12 Civil EE-III 22.05.06 20.05.06 296200.00 28.07.06 08.09.06 217113.00 Completed

13 Civil EE-III 22.05.06 20.05.06 315100.00 27.06.06 17.07.06 229838.00 Completed

Imp to lane by pdg. Cc from 40 X to 33 x and adj. Lanes at Pahar Ganj C-108/SPZ

666/09.02.07/EE-III

Imp to lane by pdg. Cc from 9200 to 9183 in Multani Dhanda Pahar Ganj C-108/SPZ

216/21.08.06/EE-III

Imp to lane by pdg. cc from 8866 to D.B.Gupta Road in Pahar Ganj C-108/SPZ

174/14.07.06/EE-III

M/s Jag Mohan Kapoor

Imp to lane by pdg. CC from 31x to 22x and adj. Lanes in Pahar Ganj 108/S.P.Zone

222/21.08.06/EE-III

M/s Naveen Const.

Imp to lane by pdg. Premixing from 2318 to 1757 and adj. Lanes in Pahar Ganj C-108 SPZ

200/11.08.06/EE-III

Imp to lane by pdg. Cc in gali no-10 in fromt of Gurudwara in Pahar Ganj C-108/SPZ

147/07.07.06/EE-III

M/s Surender Kumar Jain

Imp to lane by pdg. Cc from A.Raod to H.no 8338 in Pahar Ganj C-108/SPZ

149/07.07.06/EE-III

M/s Sanjeev Builders

Impto lane by pdg.cc fr om Hotel Rachna to 8580 in pahar Ganj C-108/SPZ

148/07.07.06/EE-III

M/s Sanjeev Builders

Imp to lane by pdg.cc from 9030 to 9058 in Multani Dhanda c-108/SPZ

145/27.06.06/EE-III

M/s Sehgal Contractors

Page 133: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

14 Civil EE-III 01.08.06 22.06.06 598000.00 01.04.07 25.05.07 582398.00 Completed

15 Civil EE-III 01.08.06 22.06.06 599400.00 28.02.07 11.04.07 567413.00 Completed

16 Civil EE-III 01.08.06 22.06.06 590300.00 M/s K.K Const. 07.02.07 19.04.07 558740.00 Completed

17 Civil EE-III 01.08.06 22.06.06 599200.00 M/s K.K Const. 28.12.07 01.03.07 569152.00 Completed

18 Civil EE-III 01.08.06 22.06.06 599300.00 M/s K.K. Const 26.12.06 P 567609.00 In Prog.

19 Civil EE-III 01.08.06 22.06.06 599600.00 M/s K.K Const. 19.03.07 15.05.07 558122.00 Completed

20 Civil EE-III 01.08.06 22.06.06 597900.00 M/s K.K Const. 19.03.07 01.05.07 563604.00 Completed

21 Civil EE-III 01.08.06 22.06.06 596000.00 M/s Islamuddin 19.02.07 29.03.07 467875.00 Completed

I/S to Turkman Road from Turkman Gate towards Chitli Kabar by pdy.mastic in C-107/SPZ

813/15.03.07/EE-III

M/s Naveen Const.

I/S to Fasil Road from Ajmeri Gate Chwok to Shop no. 46 by pdy.mastic in C-107/SPZ

647/05.02.07/EE-III

M/s Star Enterprises

I/S of road of Bazar Sitaram from Transformer to Kali Masjid by pdy.mastic in C-107/SPZ

446/11.12.06/EE-III

I/S of Fasil Road from Gali Khati Khan to Balmiki Manidr by pdy.mastic at Asaf Ali Road in C-107/SPZ

449/11.12.06/EE-III

I/S of Salak Prem Narayan by pdy.mastic at Churiwalan in C-107/SPZ

455/11.12.06/EE-III

I/S of lane by pdy.mastic in Churiwalan from Masjid towards Anjuman Chowk in C-107/SPZ

712/09.02.07/EE-III

I/S of lane by pdy.mastic in Churiwalan from Chawari Bazar towards Metro Guest House in C-107/SPZ

710/09.02.07/EE-III

Pdy.CC slabs to Footpath along Anglo Arabic School at G.B.Road, Ajmeri Gate in C-107/SPZ

724/15.02.07/EE-III

Page 134: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

22 Civil EE-III 01.08.06 22.06.06 595800.00 22.03.07 23.04.07 561304.00 Completed

23 Civil EE-III 01.08.06 22.06.06 597550.00 29.02.07 11.04.07 567224.00 Completed

24 Civil EE-III 28.11.06 23.10.06 199573.00

25 Civil EE-III 21.12.06 18.12.06 199476.00 31.01.07 28.03.07 199413.00 Completed

26 Civil EE-III 21.12.06 18.12.06 199798.00 09.02.07 29.03.07 199673.00 Completed

27 Civil EE-III 21.12.06 18.12.06 199511.00 M/s Islamuddin 19.01.07 21.03.07 199406.00 Completed

28 Civil EE-III 21.12.06 18.12.06 198439.00 22.01.07 23.04.07 198289.00 Completed

I/S of road along Anglo Arabic School at Ajmeri Gate by pdy.mastic in C-107/SPZ

715/09.02.07/EE-III

M/s Star Enterprises

I/S of Fasil Road from Mohalla Niharan to G.B.Road School by pdy.mastic in C-107/SPZ

648/05.02.07/EE-III

M/s Star Enterprises

Dev.of road surface by premix from Chitra Gupta Road to 6 Malik Building in w.no.108/SPZ.(Laxmi narain street)

Dev.of lane by pdy. CC from 9148 to 9134 gate no.4 in Multani Dhanda in w.no.108/SPZ.

600/22.01.07/EE-III

M/s Shree Mohan Builders

Dev.of lane by pdy.P/L CC from XYZ-1 to XYZ-11 at Chuna Mandi in C-108/SPZ.

662/05.02.07/EE-III

M/s Bansal Const.

Dev.of lane by pdy.CC from Mantola to M.C Pry.School in Chandi walan in C-108/SPZ.

579/17.01.07/EE-III

Dev.of lane by pdy.CC fromSai Mandir to Jain Dharam Shala and adjoining lanes in Pahar Ganj in C-108/SPZ.

565/17.01.07/EE-III

M/s Kushal Bharat

L432
R.P.S:
Page 135: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

29 Civil EE-III 21.12.06 18.12.06 199511.00 27.01.07 23.03.07 199415.00 Completed

30 Civil EE-III 21.12.06 18.12.06 199662.00 18.01.07 26.03.07 199584.00 Completed

31 Civil EE-III 21.12.06 18.12.06 199511.00 09.01.07 14.05.07 199412.00 Completed

32 Civil EE-III 21.12.06 18.12.06 199646.00 18.04.07 17.05.07 199518.00 Completed

33 Civil EE-III 21.12.06 18.12.06 199722.00 M/s Jain Const. 19.02.07 14.05.07 199701.00 Completed

34 Civil EE-III 21.12.06 18.12.06 198867.00 27.02.07 23.05.07 198806.00 Completed

35 Civil EE-III 21.12.06 18.12.06 198625.00 06.02.07 29.03.07 198235.00 Completed

36 Civil EE-III 21.12.06 18.12.06 199722.00 571/17.01.07/ 22.01.07 18.04.07 199667.00 Completed

Dev.of road by P/L CC from plot no.1 to gali Hari Mandir at D.B Gupta Road in C-108/SPZ.

619/23.01.07/EE-III

M/s Bhatia Const.CO

Dev.of lane by pdy.CC from 748 to 1126 Gali Doorwali at Pahar Ganj in C-108/SPZ.

559/16.01.07/EE-III

M/s Deepak Kumar

Dev.of gali by pdy.CC from 6 Tooti to Ram Gali in Pahar Ganj in C-108/SPZ.

576/17.01.07/EE-III

M/s Surender Kumar Jain

Dev.of road by P/L CC from Chowk Sang Trashan to gali Ket Wati in Pahar Ganj in W.NO.-108/SPZ.

808/15.03.07/EE-III

M/s Sanjeev Builders

Dev.of lane by pdy.CC from 25XYZ to Sauatan Dharam Shalla in Chuuna Mandi in C-108/SPZ.

572/17.01.07/EE-III

Dev.of lane by pdy.CC from 1983 to 2102 gali no.8 in Chuuna Mandi in C-108/SPZ.

589/19.01.07/EE-III

M/s S.K const.Co.

Dev.of road by P/L CC from XYZ-17 to XYZ-22 at C.G Road in C-108/SPZ.

660/05.02.07/EE-III

M/s Rakesh Bansal

Dev.of lane by pdy.CC from34X to gali Laxmi Narain Street cornar in w.no.108/SPZ.

M/s Goldey Const.Co

Page 136: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

37 Civil EE-III 21.12.06 18.12.06 199203.00 18.04.07 20.04.07% 199113 Completed

38 Civil EE-III 21.12.06 18.12.06 199476.00 22.01.07 21.03.07 199410.00 Completed

39 Civil EE-III 21.12.06 18.12.06 199661.00 27.04.07 16.05.07 199600.00 Completed

40 Civil EE-III 21.12.06 18.12.06 199476.00 22.01.07 21.03.07 199427.00 Completed

41 Civil EE-III 21.12.06 18.12.06 198255.00 M/s Mohd.Rashid 20.01.07 30.03.07 198201.00 Completed

42 Civil EE-III 21.12.06 18.12.06 199543.00 21.02.07 23.04.07 199458.00 Completed

43 Civil EE-III 21.12.06 18.12.06 199319.00 07.03.07 23.04.07 199020.00 Completed

44 Civil EE-III 21.12.06 18.12.06 199534.00 M/s J.P Const.Co 20.02.07 04.05.07% 199456.00 Completed

45 Civil EE-III 24.01.07 18.12.06 198867.00 M/s J.P Const.Co 24.02.07 30.03.07 198761.00 Completed

Dev.of lane by pdy.CC from 3400 to 3410, 3366 to 3369 Mathh gali Hari Mandir in Pahar Ganj in C-108/SPZ.

584/17.01.07/EE-III

M/s United Const Co.

Dev.of lane by pdy.CC from D.B Gupta Road to Corner of St.Anthony School in Pahar Ganj in C-108/SPZ.

561/11.01.07/EE-III

M/s Arora Const.Co

Dev.of road by P/L CC from Imperila Cinema to Gali Natwa at Chuuna Mandi in Pahar Ganj in C-108/SPZ.

588/19.01.07/EE-III

M/s Madhu Const.Co.

Dev.of lane from Main Bazar to Katra Raiji by P/L CC in Pahar Ganj in C-108/SPZ.

562/17.01.07/EE-III

M/s Vardan Builders

Dev.of lane by pdy.CC from Arakasha road to AK-30 in Pahar Ganj in C-108/SPZ.

582/17.01.07/EE-III

Dev.of private Katra no.3554 by pdy.CC in Dariba Pahar Ganj in C-108/SPZ.

730/22.02.07/EE-III

M/s Chaudhary Associates

Dev.of Katra (Private) 3895 Dariba pan in Pahar Ganj in C-108/SPZ.(By P/L CC)

568/17.01.07/EE-III

M/s Sethi Enterprises

Dev.of Katra (Private) 3360 and pdy.CC in lane at Gali Mathh Wali in C-108/SPZ.

628/01.02.07/EE-III

Dev.of lane by pdy.CC from 9202 to 9194 in Multani Dhanda in C-108/SPZ.

775/22.02.07/EE-III

Page 137: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

46 Civil EE-III 01.02.07 18.12.06 199722.00 07.02.07 28.03.07 199691.00 Completed

47 Civil EE-III 01.02.07 18.12.06 198867.00 09.02.07 28.03.07 198767.00 Completed

48 Civil EE-III 07.02.07 18.12.06 199662.00 24.02.07 30.03.07 199584.00 Completed

49 Civil EE-III 07.02.07 18.12.06 199775.00 12.02.07 30.03.07 199647.00 Completed

50 Civil EE-III 07.02.07 18.12.06 198687.00 12.02.07 30.03.07 198522.00 Completed

51 Civil EE-III 14.02.07 18.12.06 198625.00 27.04.07 13.06.07% 198561 Completed

52 Civil EE-III 14.02.07 18.12.06 199425.00 M/s Balaji Const. 19.02.07 27.03.07 199314.00 Completed

53 Civil EE-III 15.02.07 18.12.06 199830.00 03.03.07 28.03.07 199786.00 Completed

54 Civil EE-III 15.02.07 18.12.06 199203.00 M/s Amba Const. 03.03.07 28.03.07 199183.00 Completed

Dev.of road by P/L CC from Gali no.3 to Gali no.7 at Raj Guru Road in w.no.108/SPZ.

644/05.02.07/EE-III

M/s Rajesh Kumar

Dev.of road by P/L CC from gali Hari Mandir to Dariba pan at Pahar Ganj in w.no.108/SPZ.

643/05.02.07/EE-III

M/s Bajaj Const.Co

Dev.of road by P/L CC from Canara Bank to Raj Guru Road at D.B Gupta Road in C-108/S.P Zone.

736/22.02.07/EE-III

M/s Malhotra Const.Co

Dev.of lane by pdy.CC at Dal Mandi Chowk in Pahar Ganj in C-108/S.P.Zone.

685/09.02.07/EE-III

M/s Kapoor Const.Co

Dev.of Katra (Pvt.) 5419 Laddu Ghati Pahar Ganj in C-108/S.P Zone.

684/09.02.07/EE-III

M/s Jag Mohan Kapoor

Dev.of lane by pdy.CC from Bharat Nagar Chowk to Basant Road in W.NO.108/S.P Zone.

792/05.03.07/EE-III

M/s United Const Co.

Dev.of road by P/L CC from Dariban Pan to Chowk Ram Nath Patwa in C-108/SPZ.

721/15.02.07/EE-III

Dev.of lane from Mata Mandir to Tel Mandi Chowk in Kessru Walan in Pahar Ganj C-108/SPZ.

744/22.02.07/EE-III

M/s Jatinder Builders

Dev.of lane by pdy.CC from 566 to 802 Mantola in Pahar Ganj in C-108/SPZ.

746/22.02.07/EE-III

M461
R.P.S:
Page 138: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

55 Civil EE-III 15.02.07 18.12.06 199425.00 18.04.07 08.06.07% 199319 Completed

56 Civil EE-III 15.02.07 18.12.06 199175.00 M/s Aditi Const. 18.04.07 29.06.07 199000.00 Completed

57 Civil EE-III 15.02.07 18.12.06 199830.00 03.03.07 28.03.07 199781.00 Completed

58 Civil EE-III 15.02.07 18.12.06 199203.00

59 Civil EE-III 15.02.07 18.12.06 199203.00 18.04.07 29.06.07 199028.00 Completed

Dev.of lane by pdy.CC from 1730 to Sanatan Dharam Sala Chunna Mandi Pahar Ganj in C-108/SPZ.

834/28.03.07/EE-III

M/s Rajesh Kumar Khatri

Dev.of road from R.K Mission to Urival Block Mahavir Park (Rattan Mkt.) in Pahar Ganj in C-108/SPZ.

824/28.03.07/EE-III

Dev.of lane by pdy. CC from 522 to 490 Mantola in Pahar Ganj in C-108/SPZ.

745/22.02.07/EE-III

M/s Sehgal Contractors

Dev.of lane by pdy.CC from 3336 to Dariba Pan in Pahar Ganj in C-108/SPZ.

Dev.of lane from 571 to Chowk 492 Mantola in Pahar Ganj in C-108/SPZ.

823/28.03.07/EE-III

M/s Bansal Const.

Page 139: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA, Sh.Shoaib Iqbal, AC No. 58 2006-07

Page 140: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure

1 Civil EE-II 05.09.06 26.06.06 569200.00 172/EE(M)-II 06.02.08 15.12.09 384990.00 Completed

2 Civil EE-II 05.09.06 26.06.06 390053.00 09.02.07 02.09.07 390053.00 Completed

3 Civil EE-II 05.09.06 26.06.06 561886.00 21.11.06 18.04.07 561886.00 Completed

4 Civil EE-II 05.09.06 26.06.06 420685.00 04.01.07 03.04.07 420409.00 Completed

5 Civil EE-II 05.09.06 26.06.06 496517.00 04.01.07 03.04.07 496517.00 Completed

6 Civil EE-II 21.09.06 04.09.06 317200.00 26.02.07 30.08.07 236218.00 Completed

Date of

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Present Position

Dev.of drainage system & CC flooring of Private katras of Madarsa Hussain Bux. Chandni Mahal, Ganj Mir Khan in W.NO.109/CZ

M/s Sagar Const. Co.

Dev.of drainage system & CC flooring of Private katras of Chitli Qabar, Chatta lal Main Delhi Ghate Bazar in C-109, City Zone.

496/09.02.07/EE-II

M/s Dinesh Kumar

Imp./Stg.of side portion of road by pdy.CC (LHS) from Delhi Gate Telephone Exchange to Delite Cinema on Faseel Road in W.No.109, City Zone.

298/21.11.06/EE-II

M/s N.K Const.Co

C/O Footpath of Faseel Road from N.S Marg to M.C.D Dhalao Rauab Ganj in C-109/City Zone.

369/26.12.06/EE-II

M/s N.K Const.Co

C/O Footpath of Channel side portion from Mother Dairy Delhi Gate to Delite Cinema on Faseel Road in W.NO.109/City Zone (Delhi gate Exchange Side).

370/26.12.06/EE-II

M/s N.K Const.Co

Dev.of Katra Gokul Shah by pdy.CC in area C-110 City Zone.

470/22.01.07/EE-II

M/s Adbeena Engineers & Cotrector

Page 141: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

7 Civil EE-II 21.09.06 04.09.06 280000.00 14.05.07 18.07.07 279577.00 Completed

8 Civil EE-II 21.09.06 04.09.06 342000.00 07.03.08 18.04.07 337930.00 Completed

9 Civil EE-II 21.09.06 04.09.06 394200.00 17.09.07 P 289592.00 In Prog.

10 Civil EE-II 08.11.06 04.09.06 571900.00 18.02.07 25.04.07 564755.00 Completed

11 Civil EE-II 08.11.06 15.09.06 213900.00 28.02.07 18.04.07 174125.00 Completed

12 Civil EE-II 13.11.06 10.11.06 698200.00 07.12.07 28.02.08 600515.00 Completed

13 Civil EE-II 13.11.06 10.11.06 176000.00 20.01.07 09.02.07 175778.00 Completed

Dev.of service lane of Netaji Subhash Marg from Police Post to Akhara gate in C-110/ City Zone. (By Pdy.RMC M-15 Graduce)

34/04.05.07/EE-II

M/s Pooja Ent.

Pdy.CC Channel from Jama Masjid Gate no.1 to Dujana House Shop No.1400, Shop No.3754 to Chitli Qabar Road Shop NO.810 to 1333, Post office Daraya Ganj to Tiraha Behram Khan in C-110/City Zone.

556/02.03.07/EE-II

M/s Adbeena Engineers & Cotrector

Dev.of Kucha Nahar Khan y pdy.CC from H.NO.2085 to Kucha Challan Road in C-110/City Zone.

252/17.09.07/EE-II

M/s Naveen Const.

Dev.of Kucha Neel Kanth by pdy.CC flooring from 3084 Qazi wara 2969 Kucha Neel Kanth, 2969 to 2964, 2969 to 3007 Qazi Wara 2969 to 3018, S.S Road in Kucha Neel Kanth in aur C-110/City Zone.

503/09.02.07/EE-II

M/s Adbeena Engineers & Cotrector

Dev.of side berms by pdy.CC of Urdu Bazar road from behind Jagat Cinema to ward Jama Masjid in c-110/City Zone.

519/13.02.07/EE-II

M/s Puneet Const.Co

Dev.of road pertian from Delhi Gate Bazar Chowk to Tiraha Bairam Khan in Delhi Gate Bazar by Bitumen Mastic in W.NO.109/City Zone.

397/23.11.07/EE-II

M/s Bansal Const.Co.

Dev.of Gali Muftiwalan wale from Shop no.1018 to H.NO.1028 by pdy.CC in Delhi Gate Bazar in W.NO.C-109/City Zone.

430/12.01.07/EE-II

M/s K.K Const.Co

Page 142: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

14 Civil EE-II 13.11.06 10.11.06 140100.00 12.02.07 14.03.07 140100.00 Completed

15 Civil EE-II 16.11.06 15.11.06 72500.00 28.02.07 20.03.07 45903.00 Completed

16 Civil EE-II 04.01.07 04.12.06 168700.00 08.03.07 26.03.07 168700.00 Completed

17 Civil EE-II 04.01.07 04.12.06 194000.00 06.03.07 28.04.07 194000.00 Completed

18 Civil EE-II 17.01.07 04.12.06 182583.00 15.03.07 30.03.07 182580.00 Completed

19 Civil EE-II 17.01.07 04.12.06 189300.00 09.03.07 10.04.07 189300.00 Completed

20 Civil EE-II 17.01.07 20.12.06 189400.00 15.03.07 30.03.07 189400.00 Completed

21 Civil EE-II 17.01.07 20.12.06 191900.00 09.03.07 11.04.07 191900.00 Completed

Dev.of Gali Shakti Mandir from Shop no.1017 to H.NO.1049 by pdy.CC in w.no.109/City Zone.

564/06.03.07/EE-II

M/s K.K Const.Co

P/L Storm water drainage system at Urdu Bazar Road, Matia Mahal, Chitli Qabar road, latadi House C-110/City Zone.

502/09.02.07/EE-II

M/s Puneet Const.Co

Dev.of gali Amrood wali & H.NO.683 in Police Station Chandeni Mahal Street in Chandeni Mahal Area in C-109/City Zone.

562/06.03.07/EE-II

M/s Khushal Bharti

Dev.of gali by pdy.CC from H.NO.791 to H.NO.1879 in Sui Walan area in C-109/City Zone.

563/06.03.07/EE-II

M/s Khushal Bharti

Dev.of road lanes by pdy.CC pavemement from Shahashani Masjid, Pataudi House to 2192 gali Mehar Pawar in area C-110/City Zone.

569/06.03.07/EE-II

M/s Amba Contractors

Development of Davide Street from aover Head Bridge to opp. Govt. School, Bela Road by pdy.CC in area C-110/City Zone.

567/06.03.07/EE-II

M/s Sehgal Contractors

Dev.of Chowk Balak mata Cauhie from H.NO.465 to 480 no. adjoining lanes in gali Matir Mahal in area C-110/Coty Zone.

565/06.03.07/EE-II

M/s Shree Madhav Builders

Dev.of gali Matir Mahal from Shop no. 391/B, Matir Mahal to 464A, Matir Mahal by pdy.CC pav.in area C-110/City Zone.

566/06.03.07/EE-II

M/s Sehgal Contractors

Page 143: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

22 Civil EE-II 17.01.07 20.12.06 192200.00 16.04.07 15.05.08 192200.00 Completed

23 Civil EE-II 17.01.07 20.12.06 166796.00 15.03.07 28.03.07 166796.00 Completed

24 Civil EE-II 24.01.07 04.12.06 462700.00 08.10.07 20.02.08 325107.00 Completed

25 Civil EE-II 24.01.07 04.12.06 453200.00

26 Civil EE-II 24.01.07 04.12.06 459200.00 21.11.07 31.12.07 351279.00 Completed

27 Civil EE-II 24.01.07 20.12.06 490500.00 14.02.08 26.03.08 404608.00 Completed

28 Civil EE-II 24.01.07 20.12.06 182400.00 14.03.07 18.04.07 181900.00 Completed

29 Civil EE-II 24.01.07 20.12.06 195900.00 17.04.07 07.06.07 195803.00 Completed

30 Civil EE-II 01.02.07 27.01.07 191761.00 15.03.07 30.03.07 191523.00 Completed

Dev.of gali Fatak Ramkishan Dass and adjoining lanes of Matir Mahal Road in area C-110/City Zone.

561/06.03.07/EE-II

N.K.Const.Co.

Dev.of Urdu Bazar road by pdy.CC pav.from gali Khan Khana Towards Jama Masjid in area C-110/City Zone.

568/06.03.07/EE-II

M/s Amba Contractors

Dev.of Foot path of Urdu Bazar road from Crossing of Patudi House road to Fish mkt.by pdy.CC tiles in area C-110/City Zone.

279/04.10.07/EE-II

M/s Sudhir Const.

Dev.of Foot path by pdy.CC tiles from crossing of N.S Marg to Jagat Cinema in area C-110/City Zone.

Dev.of Foot path of Patudi House road both side by pdy.CC tiles, Dalao to Masjid Patudi House in area C-110/City Zone.

272/03.10.07/EE-II

M/s Rajiv Kumar

Dev.of Urdu Bazar road by pdy. Mastic Asphalt from Tanga Stand Towards Jagat Cinema in area C-110/City Zone.

194/05.02.08/EE-(M)-II

M/s Ashok Kumar Gupta

Dev.of Gali from H.NO.1808 to H.NO.1822 by pdy.CC in Suiwalan Area W.no.109/City Zone.

588/13.03.07/EE-II

M/s K.K Const.Co

Dev.of Gali from H.NO.1708 to 1744 by pdy.CC in Hauz Suiwalan Area W.no.109/City Zone.

610/13.03.07/EE-II

M/s N.K Const.Co

Dev.of lanes and by lanes of gali Ghodiya and Gali behind Moti Mahal by pdy.CC pav.in area C-110/City Zone.

598/13.03.07/EE-II

M/s Shree Madhav Builders

Page 144: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

31 Civil EE-II 01.02.07 27.01.07 196110.00 19.03.07 16.04.07 195263.00 Completed

32 Civil EE-II 01.02.07 27.01.07 195210.00 15.03.07 30.03.07 195006.00 Completed

33 Civil EE-II 01.02.07 27.01.07 198500.00 13.03.07 01.05.07 198495.00 Completed

34 Civil EE-II 01.02.07 27.01.07 193220.00 14.03.07 24.04.07 193220.00 Completed

35 Civil EE-II 05.02.07 27.01.07 198164.00 14.03.07 28.04.07 198164.00 Completed

36 Civil EE-II 05.02.07 27.01.07 197964.00 13.03.07 12.06.07 194898.00 Completed

37 Civil EE-II 05.02.07 27.01.07 199252.00 14.03.07 21.05.07 199252.00 Completed

38 Civil EE-II 05.02.07 27.01.07 197024.00 16.03.07 18.06.07 197024.00 Completed

Dev.of gali Hospital wali Gali Neem wali, Gali opp. Urdu Bazar in area C-110/City Zone.(By pdy.CC pav.)

602/13.03.07/EE-II

M/s Sehgal Contractors

Dev.of Katras of Hareli Azam Khan, Gali School wali 808, 815,845 Kucha Dakhni Rai to Kucha Challan Road in area C-110/City Zone.

605/13.03.07/EE-II

M/s Sehgal Contractors

Dev.of Gali Darziyan and Gali Sydeen & gali Adeen wali by pdy.CC in C-109/City Zone.

607/13.03.07/EE-II

M/s N.K Const.Co

Dev.of Gali from H.No.1724 to 1795 by pdy.CC in Hauz Sui Walan in C-109/City Zone.

586/13.03.07/EE-II

M/s K.K Const.Co

Dev.of Drainage system and CC flooring in Katras (Pvt.)H.no.696, 692, 700 and 673, 699, 711 near Chandni Mahal Police Station in area C-109/City Zone.

590/13.03.07/EE-II

M/s Khushal Bhart

Dev.of drainage system & CC flooring in Katras (Pvt.) Nos.1594, 1595, Gali Tajran, Katra 748 & 758 in Suiwalan in area C-109/City Zone.

591/13.03.07/EE-II

M/s Khushal Bhart

Dev.of Drainage system and CC flooring in Katras (P.)H.no.1778, 1737, 1742, 1760 & 1762 in Hauz Sui Walan in area C-109/City Zone.

596/13.03.07/EE-II

M/s Amba Contractors

Dev.of drainage system and CC flooring in Katra (P.) no. 703, 697, 676, 693, 689 & 686 near Chandni Mahal Police Station in area C-109/City Zone.

608/13.03.07/EE-II

M/s N.K Const.Co

Page 145: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

39 Civil EE-II 05.02.07 27.01.07 199833.00 14.03.07 12.06.07 199833.00 Completed

40 Civil EE-II 09.02.07 27.01.07 196800.00 15.03.07 30.03.07 196218.00 Completed

41 Civil EE-II 09.02.07 27.01.07 191500.00 21.03.07 18.04.07 191500.00 Completed

42 Civil EE-II 09.02.07 27.01.07 188800.00 15.03.07 30.03.07 188800.00 Completed

43 Civil EE-II 09.02.07 27.01.07 152150.00 20.03.07 20.04.07 152150.00 Completed

44 Civil EE-II 09.02.07 27.01.07 190800.00 22.03.07 18.04.07 190474.00 Completed

45 Civil EE-II 09.02.07 27.01.07 194640.00 15.03.07 30.03.07 194600.00 Completed

46 Civil EE-II 09.02.07 27.01.07 189300.00 15.03.07 30.03.07 188967.00 Completed

47 Civil EE-II 09.02.07 27.01.07 193000.00 20.03.07 16.04.07 192932.00 Completed

48 Civil EE-II 12.02.07 06.02.07 463800.00

Dev.of drainage Syatem & CC flooring in Katra Dhobian & Katra Rang Mahal in area C-109/City Zone.

585/13.03.07/EE-II

M/s K.K Const.Co

Dev.of (Private) Katra no.226351, 377 332-329 in Gali Ghodiya in area C-110/City Zone.

604/13.03.07/EE-II

M/s Sehgal Contractors

Dev.of (Private) Katra no.468-69, 524-425 and 494 in Gali Matia Mahal in area C-110/City Zone.

589/13.03.07/EE-II

M/s Kushal Bharat

Dev.of (Private) Katra no.1428, 1424, 1412 and 1415 in Gali Gondni Wali in area C-110/City Zone.

594/13.03.07/EE-II

M/s Amba Contractors

Dev.of open space opp.Subhash Park Gate adjoining police post at Urdu Bazar Road Xing in area C-110/City Zone.

603/13.03.07/EE-II

M/s Sehgal Contractors

Dev.of Katra at Gali Hospital Wali no.3867, 1457 Katra Chokehal Kala Mahal Road in C-110/City Zone.

595/13.03.07/EE-II

M/s Amba Contractors

Dev.of Katra Mallah 1464, 1485, Kalan Mahal Road in area C-110/City Zone.

600/13.03.07/EE-II

M/s Shree Madhav Builders

Dev.of Katras (P.) Phatak Ram Kishan Dass 1049, Dhobian 1120, Katra Phaulad Khan in area C-110/city Zone.

599/13.03.07/EE-II

M/s Shree Madhav Builders

Dev.of Katra (P.)Gali Khan Khana, Gali Neem Wali no. 3888 in area C-110/City Zone.

597/13.03.07/EE-II

M/s Shree Madhav Builders

Dev.of road by pdy.CC from Shop no.1598 to Shop no.790 in Suiwalan Area in w.no.109/City Zone.

Page 146: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

49 Civil EE-II 12.02.07 06.02.07 587800.00

50 Civil EE-II 22.02.07 22.02.07 199900.00 14.03.07 18.04.07 199900.00 Completed

51 Civil EE-II 22.02.07 22.02.07 198700.00 606/13.03.07/EM/s N.K Const 22.03.06 21.06.06 198700.00 Completed

Dev.of road by pdy.bitumeen Mastic Surface Shop no. 1958 to Shop no.790 in Suiwalan Area in w.no. 109/City Zone.

Dev.of road by Pdy.CC from Sheesh Mahal Chowk Naugara to H.No.1284 in Gali Jali Basti (Rakab Ganj) in C-109/City Zone.

592/13.03.07/EE-II

M/s Khushal Bharat

Dev.of Gali Kucha Lalman, (Darya Ganj) in w.no.109/City Zone.(By pdy.CC)

Page 147: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA, Sh.Haroon Yushuf, AC No. 59 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure

1 Civil EE-II 08.09.06 06.07.06 179900.0000 23.11.07 24.12.07 135798.00 Completed

Date o

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Present Position

Development of side lanes of Gali Chah Shiri at Farash Khana by pdy.CC pav.in C-111-A City Zone.

511/14.11.07/EE-II

M/s Sagar Const. Co.

Page 148: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

2 Civil EE-II 09.10.06 20.09.06 295700.0000 08.05.07 16.08.07 243158.00 Completed

3 Civil EE-II 09.10.06 20.09.06 365000.0000 08.05.07 03.10.07 270796.00 Completed

4 Civil EE-II 09.10.06 20.09.06 378000.0000 20.07.07 14.08.07 308794.00 Completed

5 Civil EE-II 09.10.06 20.09.06 460900.0000 09.12.06 20.01.07 367498.00 Completed

6 Civil EE-II 09.10.06 20.09.06 439800.0000 11.12.06 20.01.07 356095.00 Completed

7 Civil EE-II 13.02.07 12.02.07 286700.0000 19.10.07 12.09.07 220803.00 Completed

8 Civil EE-II 23.02.07 12.02.07 367900.00 16.10.07 14.01.08 338844.00 Completed

9 Civil EE-II 23.02.07 12.02.07 215100.00 10.09.07 18.10.07 176549.00 Completed

Stg.of main lane of Nai Basti from H.NO.7807 to 7855 by pdy.RMC in area C-112-A / City Zone.

629/20.03.07/EE-II

M/s Amba Contrector

Pdy.CC in lanes and bye lanes of gali Darjian in area C-112-A/City Zone.

33/04.05.07/EE-II

M/s Sagar Const. Co.

Stg.of approach road to Mosque Nai Basti and its by lanes by Providing RMC in area C-112-A/City Zone.

631/20.03.07/EE-II

M/s Amba Contrector

P/L RMC at Sadar Nallah road from Ghante wali Masjid to Sadar Thana Road in area in C-112-A/City Zone.

338/08.12.06/EE-II

M/s Deen Dayal Enterprises

P/L RMC in Sadar Nallah road from Tahu Shah Mandir upto Sadar Nallah Road in C-112-B/City Zone.

339/08.12.06/EE-II

M/s Deen Dayal Enterprises

Dev.of Gali Kalyan and Gali Kucha Shiv Mandir by pdy.CC pav.in Katra Bariyan Road in C-111-A/City Zone.

103/11.07.07/EE-II

M/s Sagar Const. Co.

Stg.of roads/lanes of Basti Harphool Singh from H.NO.5694 to 5700 5658 and lanes of Arya Samaj Mandir to H.NO.5831 and H.NO.5726 to 5836 by pdy.RMC in area C-112A, City Zone.

180/07.09.07/EE-III

M/s Jitender Builders

P/L CC pavement of Gali Tyre wali and its side lanes in Bara Hindo Rao in area C-112-A/City Zone.

179/07.09.07/EE-III

M/s D.K. Builders

Page 149: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

10 Civil EE-II 23.02.07 12.02.07 265400.00 08.10.07 06.11.07 191355.00 Completed

11 Civil EE-II 23.02.07 12.02.07 696600.00 01.10.07 23.11.07 499717.00 Completed

12 Civil EE-II 23.02.07 12.02.07 645800.00 19.09.07 19.11.07 493411.00 Completed

13 Civil EE-II 23.02.07 12.02.07 697430.00 1071/28.03.08 28.03.08 P 696081.00 In prog.

C/O Toilet in Big Hall and Imp.of road at II-nd Floor at Katra Gauri Shankar in area C-112-A/City Zone.

42/02.08.07/EE-II

M/s D.K. Builders

C/O Addl.room at II nd floor of Big Hall and its remainiing works at Katra Gauri Shankar in area C-112-A/City Zone.

178/07.09.07/EE-II

M/s D.K. Builders

P/L CC pav.and drainage system of Gali Munshi Abdul Reheem H.NO.7642 to 7613, Gali Choti Masjid H.NO.7435 to 7442 & 7418 and Gali Lallan wali H.NO.7408 to 7400 and adj.lanes in area C-112A/City Zone.

293/12.09.07/EE-III

M/s D.K. Builders

I/Stg.of Idgah road from Sadar Thana road to Qutab road by pdy.dense carpeting in area C-112-B/City Zone.

M/s Vinod Kumar

Page 150: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 151: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 152: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA, Sh.Prahlad Singh Sawhney, AC No. 60 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure

1 Civil EE-II 14.06.06 30.05.06 322900.00 M/s Monu Ent. 15.01.07 15.02.07 240823.00 Completed

2 Civil EE-II 14.06.06 30.05.06 359900.00 M/s Monu Ent. 18.01.07 19.04.07 266660.00 Completed

3 Civil EE-XVI 11.07.06 01.06.06 1254150.00 31.12.06 14.02.07 855462.00 Completed

4 Civil EE-XVI 11.07.06 01.06.06 1104000.00 31.01.07 15.04.07 857343.00 Completed

5 Civil EE-XVI 11.07.06 01.06.06 1521629.00 487/27.02.07 M/s R.C.C. 31.01.07 P 1382690.00 In Prog.

6 Civil EE-II 20.07.06 08.06.06 422700.00 01.02.07 10.05.07 329825.00 Completed

7 Civil EE-II 20.07.06 20.07.06 587800.00 M/s Monu Ent. 20.09.07 10.10.07 466992.00 Completed

Date o

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Present Position

Imp of gali Katra Khushal Rai In Kinari Bazar by Pdy. Cc in W.NO-113(B) City Zone

420/12.01.07/EE-II

Imp to main gali of Dharam Pura By pdy. Cc from H.NO. 2274 to 2346 in W.no.113(B) City Zone

413/12.01.07/EE-II

Providing RMC from H.NO. 1 to 3/IA in court lane in C-114/CLZ

359/22.12.06/EE-XVI

M/s Sanjeev Aggarwal

Pdy.RMC from back side of Telephone exchange to G.T.Road along Phool Mandi in Rajindra Mkt. In C-114/CLZ

361/22.12.06/EE-XVI

M/s Raj Kumar Kesar

Imp.to lane common passage of Pvt.Katra at 19 no.Raj Niwas Marg by providing RMC and drainage system in C-114/CLZ

Imp.of Chowk Ramaiya and by lane by providing RMC at Mori gate ward no.113A/City Zone

406/12.01.07/EE-II

M/s Amba Contractor

Imp.of gali Chah Indira by providing RMC in Chandni Chowk, ward no.113(B)/City Zone

417/12.01.07/EE-II

Page 153: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

8 Civil EE-II 31.07.06 08.06.06 795800.00 08.05.07 29.08.07 627767.00 Completed

9 Civil EE-XVI 28.09.06 28.07.06 864000.00 07.04.07 03.07.07 862441.00 Completed

10 Civil EE-XVI 04.10.06 09.09.06 2427600.00 16.03.07 P 1826849.00 In Prog.

11 Civil EE-II 23.10.06 26.09.06 134800.00 M/s Puneet Ent. 30.06.07 18.07.07 57628.00 Completed

12 Civil EE-II 23.10.06 26.09.06 191100.00 30.6.07 20.2.09 122490.00 Completed

13 Civil EE(Br.)-II 26.01.06 07.09.06 501300.00 05.03.07 22.05.07 434509.00 Completed

14 Civil EE(Br.)-II 26.01.06 07.09.06 510000.00 20.02.07 24.05.07 459009.00 Completed

15 Civil EE(Br.)-II 26.01.06 07.09.06 229900.00 20.02.07 16.04.07 203091.00 Completed

16 Civil EE(Br.)-II 26.01.06 07.09.06 521300.00 09.05.07 27.05.07 496325.00 Completed

17 Civil EE(Br.)-II 26.01.06 07.09.06 167100.00 19.2.07 27.4.07 149422.00 Completed

18 Civil EE-XVI 22.12.06 27.11.06 370100.00

Imp.to open portion infront of Shani Mandir at Foutain Chowk in Chandni Chowk by Pdy.RMC in C-113A/City Zone.

654/26.03.07/EE-II

M/s Sudhir Const.

Pdy.RMC in Pvt.katra no.6 Rajpur road in C-114/CLZone(Near Victoria School)

518/29.03.07/EE-XVI

M/s Mayank Associates

Pdy.RMC on Ram Kishore Marg from Shankaracharya Marg to Bela Road in C-114/CLZ

488/28.02.08/EE-XVI

M/s Satbir Const. Co.

Dev.of lane by pdy.CC and drainaje along H.NO.1418 and 1407 in Kucha Ustad Hira in C-113(B)/City Zone.

48/10.05.07/EE-II

Dev.of lane by pdy.CC and drainaje system at 2730/1 Chowk Raiji in C-113(B) in City Zone.

102/11.7.07/EE-II

M/s Sagar Const Co

Pdy.Kota stone flooring drainage & stg.the services of Lav. Block in Pvt.Katra no.3854 in Sarai Phoose in C-114/CLZ.

120/23.02.07/EE(Br.)-II

M/s Jindal Entps.

Pyd.Kota Stone flooring drainage and stg.the services of Lav.Block in Pvt.Katra no.3840 in Sarai Phoose in C-114/CLZ.

111/19.02.07/ EE-Br-II

M/s Shree Builders

Pdy.Kota stone flooring drainage & stg.the services of Lav. Block in Pvt.Katra no.9139, 9082 in Nawab Ganj in C-114/CLZ.

103/07.02.07/EE(Br.)-II

M/s Shree Builders

Pdy.Kota stone flooring drainage & stg.the services of Lav. Block in Pvt.Katra no.3807 in Sarai Phoose in C-114/CLZ.

114/19.02.07/EE(BR.)-II

M/s Jindal Entps.

Pdy.Kota stone flooring drainage & stg.the services of Lav. Block in Pvt.Katra no.3862-61 in Sarai Phoose in C-114/CLZ.

101/7.2.07/EE(Br.)-II

M/s Ashok kumar Gupta

Pdy.RMC in Chwok infront of Butler School, Boulverd Road in C-114/CLZ.

Page 154: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

19 Civil EE-XVI 15.01.07 27.11.06 1603850.00 M/s R.C.C 07.09.07 P 811761.00 In Prog.

20 Civil EE-XVI 15.01.07 27.11.06 1323600.00 M/s R.C.C 26.11.07 P 875874.00 In Prog.

Pdy.RMC and imp.to demage system in gali Jaonun wali from 1488 to 1540 via H.NO.1492 near Ritz Cinema, Kashmeri gate in C-114/CLZ.

69/27.06.07/EE-XVI

Dev.of side berms by RMC on Library Road from Azad Mkt.Chowk to Sanatan Dharam Madnir in Nawed Ganj in C-114/CLZ.

70/27.06.07/EE-XVI

Page 155: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 156: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 157: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.76

0.00

Liabilities Rs.lacs

Page 158: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 159: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 160: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 161: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.04

0.11

0.00

0.00

0.00

0.00

2.08

0.00

Page 162: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 163: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000.000.00

Page 164: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.003.04

0.00

0.00

0.00

Liabilities Rs.lacs

Page 165: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

2.01

3.80

1.66

0.00

0.00

0.00

2.40

0.00

2.30

2.09

Page 166: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

2.23

2.34

0.00

0.00

0.52

Page 167: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.02

0.00

0.00

0.00

0.00

Page 168: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.99

Page 169: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

1.95

0.00

0.00

0.00

0.00

0.00

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 170: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

23.29

Page 171: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.39

0.00

0.00

Liabilities Rs.lacs

Page 172: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 173: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 174: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 175: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 176: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 177: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 178: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 179: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.000.000.000.000.000.000.00

Page 180: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.39

0.00

0.00

Liabilities Rs.lacs

Page 181: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 182: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.05

0.00

0.00

0.17

0.10

0.00

4.76

5.66

0.00

Page 183: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 184: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 185: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.00

10.74

0.00

0.00

0.00

0.00

Liabilities Rs.lacs

Page 186: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 187: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.32

0.00

0.00

0.00

Page 188: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

2.00

0.00

0.00

0.00

0.00

Page 189: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 190: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 191: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 192: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

1.99

0.00

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 193: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.00

0.004.30

Page 194: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

Liabilities Rs.lacs

Page 195: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

1.05

0.00

0.00

0.00

0.00

Page 196: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 197: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

4.53

0.00

0.00

0.00

0.00

0.00

Page 198: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 199: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.64

Page 200: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

5.88

0.00

0.00

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 201: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

16.09

0.00

Liabilities Rs.lacs

Page 202: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 203: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.01

0.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 204: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 205: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 206: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.01

0.00

0.00

0.00

0.00

1.39

0.00

0.00

Liabilities Rs.lacs

Page 207: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

6.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.70

Page 208: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

7.92

4.48

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 209: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 210: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

23.50

Page 211: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

deptt. deptt. deptt. deptt. Div. Div. Div. Div. Div. Div.

civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)

Status Report of MLA, Sh.Surender Pal Singh Bitoo, AC No. 61 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C

1 Civil EE-XII 24.04.06 13.04.06 385084.00 219/06.09.06/EE-XII 08.09.06 10.11.06 384911.00 Completed

2 Civil EE-XII 24.04.06 13.04.06 388168.00 220/06.09.06/EE-XII 10.09.06 10.11.06 388009.00 Completed

3 Civil EE-XII 24.04.06 13.04.06 498800.00 422/10.11.06/EE-XII 02.01.07 31.05.07 391369.00 Completed

4 Civil EE-XII 24.04.06 13.04.06 275622.00 196/14.08.06/EE-XII 25.08.06 23.10.06 275520.00 Completed

5 Civil EE-XII 24.04.06 13.04.06 238896.00 195/14.08.06/EE-XII 22.08.06 20.10.06 238815.00 Completed

6 Civil EE-XII 24.04.06 13.04.06 358275.00 239/07.09.06/EE-XII 28.09.06 24.11.06 358256.00 Completed

7 Civil EE-XII 17.05.06 16.05.06 484671.00 118/23.06.06/EE-XII 30.06.06 25.08.06 484550.00 Completed

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Expenditure

Present Position

Imp to lane by pdg. CC from H.No. N-42 to N-52 and H.NO N-30 in Mukherjee Nagar in C-116/CLZ

M/s Tyagi Const.Co

Imp to lane by pdg. CC from N.D.P.L office to H.NO 1137 in Mukherjee Nagar in C-116/CLZ

M/s Tyagi Const.Co

Imp to lane by pdg. CC from H.No. 1315 to H.no 1343 in Mukherjee

Nagar in C-116/CLZ

M/s Gaurav Mehta

Imp to lane by pdg. CC from H.No. 1443 to 1435 and infront of DDA

park in Autram Line in C-116/CLZ

M/s Lamba Brothers

Imp to lane by pdg. CC from H.No. 1487 to 1498 in Autram Line in C-

116/CLZ

M/s Lamba Brothers

Imp to lane by pdg. CC from H.No. 7 to 83, 141 to 150, 150 to 153, 77

to 79, 133 to 131 in Malik pure Village in C-116/CLZ

M/s Dinesh Const.Co

Imp to B/Wall from H.NO 1932 to H.No. 1879 in Autram Line in C-

116/CLZ

M/s Mayank Associates

Page 212: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

8 Civil EE-XII 13.06.06 02.06.06 438334.00 170/02.08.06/EE-XII 02.08.06 12.09.06 438112.00 Completed

9 Civil EE-XII 13.06.06 02.06.06 438345.00 167/02.08.06/EE-XII 03.08.06 18.09.06 438186.00 Completed

10 Civil EE-XII 13.06.06 02.06.06 267573.00 189/11.08.06/EE-XII 25.08.06 16.10.06 267327.00 Completed

11 Civil EE-XII 13.06.06 02.06.06 343516.00 188/11.08.06/EE-XII 25.08.06 16.10.06 343358.00 Completed

12 Civil EE-XII 13.06.06 02.06.06 291149.00 298/06.10.06/EE-XII 10.10.06 13.02.07 291116.00 Completed

13 Civil EE-XII 13.06.06 02.06.06 384061.00 187/11.08.06/EE-XII 11.08.06 12.09.06 384024.00 Completed

14 Civil EE-XII 29.06.06 13.06.06 437835.00 489/14.12.06/EE-XII 14.12.06 19.03.07 437388.00 Completed

15 Civil EE-XII 29.06.06 13.06.06 430394.00 349/17.10.06/EE-XII 17.10.06 20.02.07 429952.00 Completed

16 Civil EE-XII 29.06.06 13.06.06 453541.00 254/19.09.06/EE-XII 19.09.06 25.01.07 453329.00 Completed

P/L RMC in lane from main road to Community Centre in Vijay Nagar(D/S) in C-116/CLZ

M/s Balkar Singh & Bros.

P/L RMC in lane from main road to H.NO. 2/26 in Vijay Nagar(D/S) in

C-116/CLZ

M/s Balkar Singh & Bros.

P/L interlocking tiles in open space in block-2 in Vijay Nagar(D/S) in

C-116/CLZ

M/s Triveni Const. & Govt.

Supplior

P/L interlocking tiles on side berms from H.NO. 1665 to 1675 in Autram line in C-116/CLZ

M/s Triveni Const. & Govt.

Supplior

P/L CC in lane from H.NO. A41 to B65 in Vijay Nagar(S/S) in C-

116/CLZ

M/s Gaurav Malita

Raising of open space by pdy. Interlocking tiles in front of

MOtherDairy in Vijay Nagar(D/S) in C-116/CLZ

M/s Triveni Const. & Govt.

Supplior

Imp.to gali no.9 from main road wazirabad village to Noor-

Proparties by pdy. CC in Village Wazirabad in /C-115/CLZ

M/s Balkar Singh & Bros.

Imp.to branch lanes of gali no.6 by pdy. Brick flooring in village

Wazirabad in /C-115/CLZ

M/s Gaurav Malita

Imp. To branch lanes of gali no.8 by pdy. CC from Khadag Bhadur

House to Purshotam House and along Trilok House in village

Wazirabad in C-115/CLZ

M/s Lamba Brothers

Page 213: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

17 Civil EE-XII 29.06.06 13.06.06 599800.00 403/10.11.06/EE-XII 19.11.06 16.03.07 442590.00 Completed

18 Civil EE-XII 29.06.06 20.06.06 451783.00 610/24.01.07/EE-XII 31.01.07 15.03.07 451550.00 Completed

19 Civil EE-XII 29.06.06 20.06.06 598900.00

20 Civil EE-XII 29.06.06 21.06.06 271006.00 221/06.09.06/EE-XII 10.09.06 23.10.06 270941.00 Completed

21 Elect. EEE-II 28.07.06 21.07.06 171901.00 107/04.10.06/EE(E)-II 18.12.06 28.12.06 125095.00 Completed

22 Elect. EEE-II 07.08.06 21.07.06 172451.00 106/04.10.06/EE(E)-II 05.10.06 12.10.06 129660.00 Completed

23 Elect. EEE-II 07.08.06 21.07.06 172451.00 105/04.10.06/EE(E)-II 05.10.06 27.10.06 127633.00 Completed

24 Civil EE-XII 23.10.06 19.10.06 499900.00 06/10.04.07/EE-XII 19.04.07 22.06.07 342224.00 Completed

25 Civil EE-XII 23.10.06 19.10.06 368982.00 565/10.01.07/EE-XII 10.01.07 22.03.07 368851.00 Completed

Imp.to main entrance of Wazirabad Village main road by pdy. RMC

starting from Suplimentry drain in village Wazirabad in C-115/CLZ

M/s Baba & Co.

P/L CC in lanes from H.NO. 77 to 85, 3 to 14, 167 to 210, 133 to 120

and in front of H.No. 336 in Parmanand Colony C-116/CLZ

M/s Gaurav Malita

P/L CC in lanes from H.NO. C-1A to Opp. H.NO. B-41 and from B-41 to Main road Vijay Nagar (S/S) in

C-116/CLZ

Pdy. Grit wash Plaster and Grill to B/Wall of park near H.NO. 799 in

Mukharji Nagar C-116//CLZ

M/s Kalra Const.CO

P/O semi high mast light in the park opp.house no. 1544 at Outram line

ward no. 116/CLZ

M/s M.J Electrcals & Electronics

P/O semi high mast light in the park at Brothers Ram Lila Ground in

Parmanand Colony in W.NO.116/CLZ

M/s Sri Balaji Electricals

P/O semi high mast light in the park Opp. New Mkt. Timarpur in

W.NO.115/CLZ

M/s Saksham electrical & electronics

Pdy.RMC on main approach road of Gopal pur Village in C-115/CLZ

M/s Balkar Singh & Bros.

Dev.of gali no.7,8,8A,9,10,11 and Gali no.12 by pdy.CC and tiles in Gopal Pur Village in C-115/CLZ

M/s Deepak Aggarwal

Page 214: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

26 Civil EE-XII 23.10.06 19.10.06 416260.00 544/02.01.07/EE-XII 02.01.07 30.03.07 415761.00 Completed

27 Civil EE-XII 23.10.06 19.10.06 400568.00 552/03.01.07/EE-XII 03.01.07 21.02.07 400301.00 Completed

28 Civil EE-XII 23.10.06 19.10.06 411644.00 572/12.01.07/EE-XII 12.01.07 P 360498.00 In Prog.

29 Civil EE-XII 23.10.06 19.10.06 408383.00 545/02.01.07/EE-XII 02.01.07 15.02.07 408235.00 Completed

30 Civil EE-XII 23.10.06 19.10.06 408503.00 543/02.01.07/EE-XII 22.01.07 30.03.07 407936.00 Completed

31 Civil EE-XII 06.11.06 28.10.06 382853.00 550/02.01.07/EE-XII 10.01.07 27.02.07 382841.00 Completed

32 Civil EE-XII 06.11.06 28.10.06 311776.00 548/02.01.07/EE-XII 11.01.07 26.02.07 311732.00 Completed

33 Civil EE-XII 06.11.06 28.10.06 329465.00 549/02.01.07/EE-XII 10.01.07 26.02.07 321879.00 Completed

34 Civil EE-XII 06.11.06 28.10.06 402835.00 540/02.01.07/EE-XII 22.01.07 20.03.07 402621.00 Completed

Dev.of lane by pdy.RMC and drainaje system from Nagar

Chemist to Seema STD in gali no.1, Gopal Pur Village in C-115//CLZ

M/s Balkar Singh & Bros.

Dev.of road from D-1 to D-244 in Nehru Village by pdy.Batch mix

conc.in C-115/CLZ

M/s Sanjeev Aggarwal

Dev.of lane by pdy.CC from H.NO.C-321 to C-350 and in front of Mother Dairy Booth in C-Block

Nehru Village in C-115/CLZ

M/s Bhanu Const.Co

Dev.of road from H.NO.E-1 to E-224 in Nehru Village by pdy.Batch

mix conc.in C-115/CLZ

M/s Balkar Singh & Bros.

Pdy.RMC on main approach road of Nehru Vihar from Ring road

Towards Nehru Vihar in C-115/CLZ

M/s Balkar Singh & Bros.

P/L CC and drainage system in lane from H.NO.1022 to 1041 in

Mukherjee Nagar in C-116/CLZ.

M/s Manish Const.Co

P/L CC and drainage system in lane from H.NO.730 to 743 in

Mukherjee Nagar in C-116/CLZ.

M/s Manish Const.Co

P/L CC and drainage system in lane from H.NO.72 towards Akhara in Parmanad colony in C-116/CLZ.

M/s Manish Const.Co

P/L CC in lanes from H.NO.902 to 915 and H.No.901 to 888 in

Mukherjee Nagar in C-116/CLZ.

M/s Balkar Singh & Bros.

Page 215: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

35 Civil EE-XII 06.11.06 28.10.06 327390.00 546/02.01.07/EE-XII 05.01.07 26.02.07 326907.00 Completed

36 Civil EE-XII 06.11.06 28.10.06 409630.00 542/02.01.07/EE-XII 02.01.07 27.02.07 408896.00 Completed

37 Civil EE-XII 06.11.06 28.10.06 292022.00 559/10.01.07/EE-XII 12.01.07 26.03.07 291649.00 Completed

38 Civil EE-XII 06.11.06 28.10.06 222046.00 600/19.01.07/EE-XII 19.01.07 22.03.07 220524.00 Completed

39 Civil EE-XII 06.11.06 28.10.06 304524.00 560/10.01.07/EE-XII 22.01.07 26.02.07 303360.00 Completed

40 Civil EE-XII 13.12.06 27.11.06 119625.00 622/05.02.07/EE-XII 05.02.07 28.02.07 119403.00 Completed

41 Civil EE-XII 13.12.06 27.11.06 161350.00 115/21.08.07/EE--XII 21.08.07 27.10.07 161350.00 Completed

42 Civil EE-XII 13.12.06 27.11.06 162850.00 128/22.08.07/EE-XII 22.08.07 29.10.07 162850.00 Completed

43 Civil EE-XII 13.12.06 27.11.06 127985.00 621/05.02.07/EE-XII 05.02.07 28.02.07 127816.00 Completed

P/L CC and drainage system in lanes from H.NO.716 to 729 in

Mukherjee Nagar in C-116/CLZ.

M/s Balkar Singh & Bros.

P/L CC in lanes from H.NO.36 to 272 and H.No.87 to 92 in Tagor

Park in C-116/CLZ.

M/s Balkar Singh & Bros.

C/O B/Wall and pdy.gate/grills in Park near H.NO.121 in Indira Vihar

in C-116/CLZ.

M/s Manish Const.Co

C/O B/Wall and pdy.gate in Park near H.NO.190 in Mukherjee Nagar

in C-116/CLZ.

M/s Manish Const.Co

C/O B/Wall and pdy.laying CC in Dushera Ground in Mukherjee

Nagar in C-116/CLZ.

M/s Manish Const.Co

Dev.of lane by pdy.CC from H.NO.686 to Barat Ghar in Akhare

Wali Gali in Malka Ganj in C-115/CLZ

M/s Shree Parkash

Dev.of lane by pdy.CC from H.NO.D-10 to D-162 and 249 in

Akhare Wali Gali in Malka Ganj in C-115/CLZ.

M/s Sanjeev Aggarwal

Dev.of lane by pdy.CC back lane of C-2 from Prem Prakash Dham to Gurudwara in Malka Ganj in C-

115/CLZ.

M/s Sanjeev Aggarwal

Dev.of lane by pdy.CC from Gurudwara to Laxmi Narayan

Temple in Malka Ganj in C-115/CLZ.

M/s Shree Parkash

Page 216: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

44 Civil EE-XII 19.12.06 27.11.06 340773.00 640/13.02.07/EE-XII 22.02.07 16.06.07 340774.00 Completed

45 Civil EE-XII 19.12.06 27.11.06 306032.00 639/13.02.07/EE-XII 22.02.07 16.06.07 306032.00 Completed

Dev.of lane by pdy.CC in B-Block from Gandhi Square road to Laxmi

Narain Temple H.NO.B-1/20 to H.NO.6 in Malkaganj in

C-115/CLZ.

M/s Satbir Singh

Development of road by CC from H.NO.A-262 to B-409 in Nehru

Vihar in C-115/CLZ.

M/s Satbir Singh

Page 217: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA, Sh.Kunvar Karan Singh, AC No. 62 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C

1 Civil EE-XII 01.06.06 30.05.06 199800.00 98/09.06.06/EE-XII 12.06.06 12.07.06 199766.00 Completed

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Expenditure

Present Position

Pdg. Mix Seal on road Surface in front of Guru Nanak Pio Guru dwara on G.T Road in C-117/CLZ

M/s Sona Consultant & Contractor

Page 218: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

2 Civil EE-XII 01.06.06 30.05.06 199015.00 102/09.06.06/EE-XII 12.06.06 12.07.06 198970.00 Completed

3 Civil EE-XII 01.06.06 30.05.06 199200.00 107/09.06.06/EE-XII 12.06.06 12.07.06 199195.00 Completed

4 Civil EE-III 05.06.06 02.06.06 292937.00 573/12.01.07/EE(M)-III 19.01.07 16.01.10 292718.00 Completed

5 Civil EE-XII 05.06.06 02.06.06 342852.00 413/10.11.06/EE-XII 15.11.06 30.11.06 342852.00 Completed

6 Civil EE-XII 05.06.06 02.06.06 250000.00 262/19.09.06/EE-XII 28.09.06 02.11.06 172927.00 Completed

7 Civil EE-XII 05.06.06 02.06.06 365555.00 249/18.09.06/EE-XII 27.09.06 30.12.06 365495.00 Completed

8 Civil EE-XII 05.06.06 02.06.06 365181.00 252/18.09.06/EE-XII 30.09.06 03.11.06 356335.00 Completed

9 Civil EE-XII 05.06.06 02.06.06 365593.00 251/18.09.06/EE-XII 18.09.06 03.11.06 361368.00 Completed

10 Civil EE-XII 05.06.06 02.06.06 391848.00 210/31.08.06/EE-XII 09.09.06 29.12.06 391420.00 Completed

Pdg. Mix Seal on road Surface in front of Invitation Banquat Hall on G.T Road in C-117/CLZ

M/s Sona Consultant & Contractor

Pdg. Mix Seal on road Surface in front of Saya Automobiles at G.T Karnal Road in C-117/CLZ

M/s Sona Consultant & Contractor

C/o walk way in Park Opp. H.NO.47 in Gunjra Wala Town part-II IN w.no.118/CLZ

M/s Bhanu Const.Co

Imp to lane by Inter Locking tiles and S.W.Drain from D-14/1 to D-14/18 and F-14/41 to F-12/10 in Model Town in C-118/CLZ

M/s Shri Prakash

C/o walk way in park in front of H.No. 242 and 256 in Kalyan Vihar C-118/CLZ

M/s Abhay Const.Co

Imp.to back lane by Pdg. RMC and inter locking tiles from H.NO. D-1 to D-21 in Azad Pur Colony in C-118/CLZ

M/s Sanjeev Aggarwal

Imp.to back lane by Pdg. RMC and inter locking tiles from H.NO. E-310 to E-330/A in Azad Pur Colony in C-118/CLZ

M/s Deepak Aggarwal

Imp.to back lane by Pdg. RMC and inter locking tiles from H.NO. E-139 to E-162 and E-297 to E-286 in Azad Pur Colony in C-118/CLZ

M/s Sanjeev Aggarwal

Imp.to back lane by Pdg. RMC and inter locking tiles from H.NO. D-24 to D-44 in Azad Pur Colony in C-118/CLZ

M/s Sanjeev Aggarwal

Page 219: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

11 Civil EE-XII 05.06.06 02.06.06 392633.00 253/18.09.06/EE-XII 29.09.06 03.11.06 355618.00 Completed

12 Civil EE-XII 05.06.06 02.06.06 380964.00 209/31.08.06/EE-XII 09.09.06 29.12.06 380955.00 Completed

13 Civil EE-XII 05.06.06 02.06.06 338953.00 436/13.11.06/EE-XII 13.11.06 05.12.06 338917.00 Completed

14 Civil EE-XII 05.06.06 02.06.06 598600.00 291/27.09.06/EE-XII 06.10.06 29.12.06 352176.00 Completed

15 Civil EE-XII 05.06.06 02.06.06 798600.00

16 Civil EE-XII 05.06.06 02.06.06 167746.00 554/10.01.07/EE-XII 10.01.07 30.01.07 167735.00 Completed

17 Civil EE-XII 05.06.06 02.06.06 329598.00 434/13.11.07/EE-XII 13.11.06 P 85235.00 In Prog.

18 Civil EE-XII 15.06.06 14.06.06 130200.00 151/21.07.06/EE-XII 31.07.06 21.08.06 130006.00 Completed

Imp.to back lane by Pdg. RMC and inter locking tiles from H.NO. E-121 to E-138 and E-268 to E-285 in Azad Pur Colony in C-118/CLZ

M/s Sanjeev Aggarwal

Imp.to back lane by Pdg. RMC and inter locking tiles from H.NO. D-45 to D-60 in Azad Pur Colony in C-118/CLZ

M/s Deepak Aggarwal

Imp to lane by pdy. Inter locking tiles and S.W Drain from C-1/15 to C-4/1 and C-3/1 to C-3/10 and C-7/1 to C-7/10 in Modal Town C-118/CLZ

M/s Abhay Const.Co

Imp to lane by pdy. Inter locking tiles and S.W Drain from K-3/1 to Arya Smaj Mandir, k-12 to K-31/11 and K-31/27 to K-31/11 in Modal Town C-118/CLZ

M/s A.R Const.Co

Imp to lane by RMC and inter locking tiles from H.no 156/ to 169 in Kalyan Vihar C-118/CLZ

Const. Of walk way from diff. Places to wards Hut in D-Park in Model Town-III in C-118/CLZ

M/s Malhotra Const.

Imp to walk way by pdy. Cc tiles in Meera Bai Park and C/o Channel in Krishna Gali in Old Gupta Colony in C-118/CLZ

M/s Deepak Aggarwal

Imp to S.W.drain from H.NO. C-5/5 to C-5/22 in Model Town in C-118/CLZ

M/s Vipin Kumar gupta

Page 220: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

19 Civil EE-XII 27.07.06 19.07.06 198700.00 281/27.09.06/EE-XII 05.10.06 03.12.06 198700.00 Completed

20 Civil EE-XII 27.07.06 19.07.06 198300.00 217/06.09.6/EE-XII 14.09.06 30.12.06 197629.00 Completed

21 Civil EE-XII 27.07.06 19.07.06 198600.00 326/16.10.06/EE-XII 24.10.06 24.12.06 198559.00 Completed

22 Civil EE-XII 27.07.06 19.07.06 192412.00 218/06.09.06/EE-XII 06.09.06 14.11.06 177911.00 Completed

23 Civil EE-XII 27.07.06 19.07.06 194396.00 381/27.10.06/EE-XII 27.10.06 19.05.07 173732.00 Completed

24 Civil EE-XII 02.08.06 02.08.06 1315913.00 510/18.12.06/EE-XII 18.12.06 10.04.07 1315772.00 Completed

25 Civil EE-XII 04.09.06 07.07.06 2450000.00 33/05.07.07/EE-XII 12.07.07 20.07.07 2149660.00 Completed

26 Civil EE-XII 04.09.06 02.06.06 337800.00 448/20.11.06/EE-XII 20.11.06 20.12.06 337725.00 Completed

27 Civil EE-XII 13.02.07 02.06.06 147119.00 273/19.09.06/EE-XII 19.09.06 18.10.06 147080.00 Completed

Imp.to lane by Pdy.RMC from A-244 to A-249 in Dera Wal Nagar in C-118/CLZ

M/s Mohan Lal & Co.

Imp.to lane by Pdy.RMC from A-250 to A-255 in A-Block in Dera Wal Nagar in C-118/CLZ

M/s Prem Bros.

Const.of S.W.Drain from H.NO.A-244 to A-255 in Dera Wal Nagar in C-118/CLZ

M/s Mohan Lal & Co.

Imp.to lane by Pdy.RMC from H.NO. B-80 to B-82 in CC Colony in C-118/CLZ

M/s Prem Bros.

Imp.to lane by Pdy.RMC in front of H.NO. B-65 in CC Colony in C-118/CLZ

M/s Amandeep Const.CO

P/L CC in lanes from H.NO. 1 to 70 (1 to 8, 9 to 16, 17 to 24, 25 to 32, 33 to 44, 45 to 52, along park, 53 to 60, 61 to 68, 69 to 72, along School and main lane from park to H.No. 68) in DTC Colony C-118/CLZ

M/s Yogander Const.

Stg.of road by pdy.bitumeen mastic from G.T.K road to C-3/19 and A-8/18 to A-8/45 in R.P Bagh in C-117/CLZ

M/s Surender & Co.

Dev.of lane & S.W drain in Road M-block in Model Town in C-118/CLZ

M/s Satbir Singh

Imp.to D-Block Park in Model Town-III in w.no.118/CLZ.

M/s Malhotra Contractors

Page 221: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

28 Civil EE-XII 21.02.07 05.02.07 502200.00 03/10.04.07/EE-XII 13.06.07 16.08.07 323191.00 Completed

29 Civil EE-XII 21.02.07 05.02.07 196230.00 729/23.02.07/EE-XII 04.03.07 27.07.07 191218.00 In Prog.

30 Civil EE-XII 21.02.07 05.02.07 199800.00 715/23.02.07/EE-XII 02.03.07 23.06.07 199744.00 Completed

31 Civil EE-XII 21.02.07 05.02.07 198128.00 721/23.02.07/EE-XII 23.02.07 P 153951.00 In Prog.

32 Civil EE-XII 21.02.07 05.02.07 337193.00 37/13.07.07/EE-XII 21.07.07 19.05.07 337134.00 Completed

33 Civil EE-XII 21.02.07 05.02.07 471400.00 02/10.04.07/EE-XII 10.04.07 12.05.07 306331.00 Completed

34 Civil EE-XII 21.02.07 05.02.07 568961.00 127/22.08.07/EE(M)-III 29.08.07 22.06.08 568528.00 Completed

35 Civil EE-XII 21.02.07 05.02.07 112339.00 116/21.08.07/EE-XII 28.08.07 25.10.07 112163.00 Completed

36 Civil EE-XII 21.02.07 05.02.07 353791.00 34/13.07.07/EE-XII 22.07.07 21.09.07 353637.00 Completed

37 Civil EE-XII 21.02.07 05.02.07 416202.00 677/23.02.07/EE-(M)-III 02.03.07 16.01.10 416201.00 Completed

C/O walkway in Park near H.NO.A-45, Derawal Nagar in C-118/CLZ.

M/s Vikram Malhotra

Dev.of lane from H.NO.A-71 to A-76 in Derawal Nagar in C-118/CLZ (By RMC)

M/s N.K Const.Co

C/O brick pavement lane near M.C Pry.School in Model Town-II in C-118/CLZ.

M/s Globe Const.Co

C/O lane from Tarkeshwar Dham to Gurdwara in Kalyan Vihar in C-118/CLZ.

M/s Rana Const.Co

Providing/Fixing S.F.R.C Covers on drain from H.NO.B-4 to B-63 and from H.NO.1 to 42 in Priya Danshi Vihar in C-118/CLZ.

M/s Balkar Singh Bros.

C/O Service lane back side of H.NO.135 to 170 in State Bank Colony in C-118/CLZ.

M/s Amit Contractors

C/O Walkway and Hut in Park of Gujra Wala Town in Part-III in C-118/CLZ.

M/s Shivani Const Co.

P/F S.F.R.C Covers and Interlocking tiles lane from H.NO.224 to 270 in A-Block Derawal Nagar in C-118/CLZ.

M/s Sanjeev Aggarwal

Covering of S.W Drain in Derawal Nagar in C-118/CLZ. (P/F SFRC Slabs & Open drain)

M/s Raj enterprises

Dev.of lane from H.NO.278 to 288 in Gujrawala Town Part-III in w.no.118/CLZ.(By Pdy.RMC)

M/s Gaurav Mrhta

Page 222: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

38 Civil EE-XII 21.02.07 05.02.07 122089.00 727/23.02.07/EE-XII 23.02.07 28.03.07 122081.00 Completed

39 Civil EE-XII 21.02.07 05.02.07 84536.00 753/08.03.07/EE-XII 08.03.07 16.04.07 84482.00 Completed

40 Civil EE-XII 21.02.07 22.07.06 1922558.00 01/10.04.07/EE-XII 18.04.07 17.10.07 1922311.00 Completed

Pdy./Fixing gate of Nani Wala Bagh Park in C-118/CLZ.

M/s Krishna Traders

Dev.of lane and Chowk infront of H.No.E-5 & B-26 in C.C.Colony in C-118/CLZ.

M/s Amandeep Const.CO

C/O S.W drain from end of A-Block Sangam park to A-7/10 in Rana Partap Bagh in C-117/CLZ.

M/s Surender & Co.

Page 223: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 224: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA, Sh.Shadi Ram, AC No. 63 2006-07

S.No. Name of Work deptt. Div. D.O.S D.O.C

Civil EE-XVI 05.10.06 21.09.06 448500.00 330/14.12.06/EE-XVI M/s Prem Bros. 18.12.06 19.05.07 323765.00 Completed

Civil EE-XVI 05.10.06 21.09.06 559400.00 332/14.12.06/EE-XVI M/s Prem Bros. 24.01.07 21.05.07 403304.00 Completed

Civil EE-XVI 05.10.06 21.09.06 539600.00 331/14.12.06/EE-XVI M/s Prem Bros. 26.12.06 11.05.07 406830.00 Completed

Civil EE-XVI 05.10.06 21.09.06 581000.00 399/23.01.07/EE-XVI 26.05.07 20.07.07 433393.00 Completed

Civil EE-XVI 30.10.06 27.09.06 698200.00 464/20.02.07/EE-XVI 13.03.07 20.05.07 492818.00 Completed

Civil EE-XVI 30.10.06 16.10.06 608300.00

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Expenditure

Present Position

1 Dev.of lane by pdy.CC pavement and dranaje system from H.NO.B-1709 to B-1714 and B-1693 to K-1698 in Shastri Nagar C-120/CLZ

2 Dev.of lane by pdy.CC pavement and dranaje from B-1700 to B-1730 and B-1741 to B-1757 in Shastri Nagar inC-120/CLZ

3 Dve.of lane by RMC pav.and dranaje system from B-1734 to B-1714 and b-1447 to B-1428 in Shastri Nagar in C-120/CLZ

4 Dev.of lane by pdy.RMC pav.and dranaje system from H.NO.A-695 to A-707 in Shastri Nagar in C-120/CLZ.

M/s V.K Const.Co.

5 Dev.of lane by pdy.CC pav.and drainage system from A-598 to A-668 and B-983 to B-978 in Shastri Nagar in C-120/CLZ.

M/s Vikas Builders

6 Dev.of lane by pdy.CC pav.and drainage system from A-16/121 to A-19/152, A-21/161 to A-22/176 and A-22/176 to A-20/160 in Inder Lok in C-120/CLZ.

Page 225: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Civil EE-XVI 30.10.06 16.10.06 376800.00 353/21.12.06/EE-XVI M/s Rakesh 08.03.07 09.05.07 274834.00 Completed

Civil EE-XVI 30.10.06 16.10.06 493050.00 346/21.12.06/EE-XVI 07.07.07 20.10.07 353340 Completed

Civil EE-XVI 30.10.06 16.10.06 494650.00 350/21.12.06/EE-XVI 10.01.07 05.07.07 363496.00 Completed

Civil EE-XVI 30.10.06 16.10.06 486500.00

Civil EE-XVI 30.10.06 16.10.06 541800.00 351/21.12.06/EE-XVI 01.03.07 04.05.07 402227.00 Completed

Civil EE-XVI 30.10.06 16.10.06 473300.00 352/21.12.06/EE-XVI 22.02.07 09.05.07 345029.00 Completed

Civil EE-XVI 30.10.06 27.09.06 376500.00 452/20.02.07/EE-XVI 22.05.07 08.06.07 357329.00 Completed

7 Dev.of lane by pdy.CC Pav.and drainage system from H.NO.172 to 195 and 214 to Park in Sahazada Bagh in Ph-I in C-120/CLZ.

8 Dev.of lane by pdy.CC pav.and drainage system from L-2/99 to L-2/12 and L-135 to L-126 in Shastri Nagar in C-120/CLZ.

M/s V.K.Const Co.

9 Dev.of lane by pdy.CC pav.and drainage system from H.NO.L-136 to L-147 (back lane) in Shastri Nagar in C-120/CLZ.

M/s Rakesh Bansal

10 Dev.of lane by pdy.CC pav.and drainage system from 464 to 474 in Shazada Bagh Ph-I and A-19/145 to A-20/160 in Inder Lok in C-120/CLZ.

11 Dev.of lane by pdy.RMC pav.and drainage system from H.NO.329 to Park and 484 to park in Shazada Bagh Ph-I in C-120/CLZ.

M/s Rakesh Bansal

12 Dev.of lane by pdy.CC pav.and drainage system from A-22/176 to A-20/160 and A-13/97 to A-14/112 in Inder Lok in C-120/CLZ.

M/s Rakesh Bansal

13 Dev.of road by premix carpet in A-Block and B-Block L-2 Block and Subadhra Colony in C-120/CLZ

M/s Surander Kumar Jain

Page 226: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Civil EE-XVI 30.10.06 21.09.06 821900.00 76/29.06.07/EE-XVI 05.07.07 P 622581.00 In Prog.

Civil EE-XVI 30.10.06 21.09.06 780400.00

Civil EE-XVI 30.10.06 21.09.06 593500.00 455/22.02.07/EE-XVI 16.03.07 23.04.07 421666.00 Completed

Civil EE-XVI 03.11.06 24.10.06 313100.00 480/20.02.07/EE-XVI 26.02.07 P 205249.00 In Prog.

Civil EE-XVI 03.11.06 24.10.06 384400.00 387/24.01.07/EE-XVI 24.01.07 28.02.07 259502.00 Completed

Civil EE-XVI 03.11.06 24.10.06 330900.00 386/24.01.07/EE-XVI 24.01.07 28.02.07 219536.00 Completed

Civil EE-XVI 03.11.06 27.09.06 591750.00

14 Dev.of lane by pdy.CC pav.and adjoining system from H.NO.B-1546 to B-1554 and B-1447 to B-1438 in Shastri Nagar in C-120/CLZ.

M/s Shree Builders

15 Dev.of lane by pdy.RMC pav.and drainage system from H.NO.A-827 to A-891 in Shastri Nagar in C-120/CLZ.

16 Dev.of lane by pdy.CC pav.and drainage system from H.NO.B-1247 to B-1232 and A-388 to A-400/9 in Shastri Nagar in C-120/CLZ.

M/s Vikas Builders

17 Dev.of lane by pdy.RMC pav.and drainage system from 69-D to 73-D in D-Block, Kamla Nagar in C-119/CLZ.

M/s Vikas Builders

18 Dev.of lane by pdy.RMC pav.and drainage system from 11D to 21D in D-Block, Kamla Nagar inC-119/CLZ.

M/s Barahi Const.

19 Dev.of lane by pdy.RMC Pav.& drainage system from 26D to 28D in D-Block, Kamla Nagar in C-119/CLZ.

M/s Barahi Const.

20 Dev.of roads by pdy.crapet in Anand nagar and Inder Lok intrenal roads in C-120/CLZ.

Page 227: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 228: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 229: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA, Sh.Rajesh Jain, AC No. 64 2006-07

S.No. Name of Work deptt. Div. D.O.S D.O.C

1 Elect. EEE-I 19.05.06 18.05.06 347163.00 175/19.10.06/EE(E)-I 28.10.06 P 153600.00 In Prog.

2 Civil EE-III 07.06.06 01.04.06 202948.00 599/22.01.07/EE-III 24.01.07 24.03.07 201841.00 Completed

3 Civil EE-III 07.06.06 01.04.06 202311.00 595/22.01.07/EE-III 24.01.07 24.03.07 202073.00 Completed

4 Civil EE-III 04.07.06 08.04.06 206935.00 295/21.09.06/EE-III 29.09.06 04.12.06 206596.00 Completed

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Expenditure

Present Position

P/O lighting arrangment and other necessary arrangment for newly Constructed Fountain at Round

about Roshanara Road W.no-121/SPZ

M/s Repair Shop

P/L CC Pav. In gali from H.NO. 1459 to 1484 and H.NO. 878 to 973 in Punjabi Mohalla C-121/A/SPZ

M/s R.P Enterprises

P/L CC Pav. In gali Chanda wali, Tulsi Ram and gali Ladhan basti

and other adj lanes in C-121/A/SPZ

M/s R.P Enterprises

Imp.to lane by pdy.CC flooring from Balmiki Bara to Kh.NO.4968

in Arya Pura C-121/SPZ

M/s J.P Const.Co.

Page 230: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

5 Civil EE-III 04.07.06 08.04.06 204327.00 298/21.09.06/EE-III 29.09.06 04.12.06 204146.00 Completed

6 Civil EE-III 04.07.06 08.04.06 204944.00 353/13.10.06/EE-III 13.10.06 27.11.06 204803.00 Completed

7 Civil EE-III 04.07.06 08.04.06 206408.00 296/21.09.06/EE-III 21.09.06 27.10.06 206030.00 Completed

8 Civil EE-III 04.07.06 08.04.06 209186.00 591/22.01.07/EE-III 24.01.07 18.03.07 208789.00 Completed

9 Civil EE-III 04.07.06 08.04.06 198520.00 294/21.09.06/EE-III 29.09.06 04.12.06 198334.00 Completed

10 Civil EE-III 04.07.06 08.04.06 205946.00 346/10.10.06/EE-III 12.10.06 27.11.06 205445.00 Completed

11 Civil EE-III 04.07.06 08.04.06 182712.00 293/21.09.06/EE-III 21.09.06 24.10.06 182186.00 Completed

12 Civil EE-III 04.07.06 08.04.06 279020.00 463/11.12.06/EE-III 20.12.06 05.03.07 277706.00 Completed

Imp.to lane by pdy.CC pavement from Jaipur Golden Transport R.A Road to Chpoal at gali Mitra and

gali from H.no. 2974 to H.NO.2981 in Arya Pura C-121/SPZ

M/s J.P Const.Co.

Imp.to lane by pdy.CC pavement from H.NO.7821 to 7823 and

Adj.lane gali Maula Bux R.A Road in Arya Pura C-121/SPZ

M/s D.K Const.Co

Imp.to lane by pdy.CC pavement in gali Bheem H.NO. 613 to 629 and main gali Mangla Kumar at G.T

road in C-121/SPZ

M/s D.K Builders-I

Imp.to lane by pdy.CC pavement from T-1 to T-55 croosing and

Adj.lane in Kala Rait, Malka Ganj in C-121/SPZ

M/s Pawan Const.Co

Imp.to lane by pdy.CC pavement from T-56 to T-1689 and T-1769 in

Kala Rait, Malka Ganj in C-121/SPZ

M/s J.P Const.Co.

Imp.to lane by pdy.CC pavement from T-1700 to Shin Mandir and

Adj.lane in Kala Rait, Malka Ganj in C-121/SPZ

M/s Nareder Singh Dhankar

Imp.to lane by pdy.CC pavement from T-1697 and 98 to shiv Mandir and Adj.lane in Kala Rait, Malka

Ganj in C-121/SPZ

M/s V.K Associates

P/L CC Pav.from Shop No. 690 to 2096 and Adj.lanes in Mukim Pura

in C-121A/SPZ

M/s Sonu Builders

Page 231: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

13 Civil EE-III 04.07.06 27.06.06 530502.00 378/01.11.06/EE-III 13.11.06 10.02.07 530156.00 Completed

14 Civil EE-III 04.07.06 27.06.06 521382.00 379/01.11.06/EE-III 10.11.06 10.02.07 520055.00 Completed

15 Civil EE-III 04.07.06 08.04.06 285436.00 632/01.02.07/EE-III 26.02.07 20.03.07 284941.00 Completed

16 Civil EE-III 04.07.06 08.04.06 292447.00 631/01.02.07/EE-III 12.02.07 09.04.07 292272.00 Completed

17 Civil EE-III 04.07.06 08.04.06 352535.00 432/30.11.06/EE-III 30.11.06 23.02.07 352050.00 Completed

18 Civil EE-III 04.07.06 08.04.06 300482.00 292/21.09.06/EE-III 21.09.06 10.11.06 300102.00 Completed

19 Civil EE-III 04.07.06 08.04.06 306548.00 297/21.09.06/EE-III 12.10.06 04.12.06 305927.00 Completed

20 Civil EE-III 04.07.06 08.04.06 414156.00 610/23.01.07/EE-III 26.02.07 28.03.07 413887.00 Completed

21 Civil EE-III 04.07.06 08.04.06 315185.00 291/21.09.06/EE-III 20.10.06 04.12.06 314832.00 Completed

P/L mastic from Gurudwara to road no.40 and Adj.lnaes in gali no.1 & 2

Partap Nagar in C-121/SPZ

M/s D.K Const.Co

P/L mastic from H.No.67 to 95 (Gali no.10), of Samaj kalyan

Kandra to H.NO.201 in Vasudev Nagar in C-121/SPZ

M/s D.K Const.Co

P/L CC pav.from Shop No. 3295 to 3311 and 3311 to gali Pardhan in

Arya Pura in C-121A/SPZ

M/s D.K Const.Co

P/L CC pav.from Shop No. 4174 to Arya Smaj Mandir in Arya Pura in

C-121A/SPZ

M/s D.K Const.Co

P/L CC pav.from H.No. 4116 to Gali Tulsi Ram and H.NO.4369 to

Lodhan Rajput Chopal in C-121A/SPZ

M/s Bajaj Const.Co

P/L CC pav.from Shop No. 4643 to 3593 in Arya Pura in C-121A/SPZ

M/s R.P Enterprises

P/L CC pav.from gali Gai wali to Shop No. 3134 in Arya Pura in C-

121A/SPZ

M/s J.P Const.Co.

P/L CC pav.from Shop No. 2051 to 1956 and Adj.lanes in Mukim Pura

in C-121A/SPZ

M/s Jag Mohan kapoor

P/L CC pav.from H.No. 4586 to park and H.NO. 4558 to 4406 in

gali Sunder Singh in Arya Pura in C-121A/SPZ

M/s Kalra Const.

Page 232: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

22 Civil EE-III 04.07.06 08.04.06 273158.00 299/21.09.06/EE-III 21.09.06 24.10.06 272604.00 Completed

23 Civil EE-III 04.07.06 08.04.06 295707.00 593/22.01.07/EE-III 22.01.07 22.02.07 295242.00 Completed

24 Civil EE-III 24.07.06 20.06.06 262248.00 554/11.01.07/EE-III 10.01.07 05.03.07 261821.00 Completed

25 Civil EE-III 24.07.06 20.06.06 339819.00 403/20.11.06/EE-III 22.11.06 28.12.06 339157.00 Completed

26 Civil EE-III 14.08.06 28.06.06 199250.00 264/19.09.06/EE-III 06.10.06 18.11.06 198965.00 Completed

27 Civil EE-III 14.08.06 28.06.06 198200.00 271/19.09.06/EE-III 25.09.06 19.12.06 197652.00 Completed

28 Civil EE-III 14.08.06 28.06.06 197600.00 265/19.09.06/EE-III 10.10.06 24.11.06 197327.00 Completed

29 Civil EE-III 29.08.06 28.06.06 197400.00 266/19.09.06/EE-III 22.09.06 16.11.06 197039.00 Completed

30 Civil EE-III 29.08.06 18.08.06 195550.00 272/19.09.06/EE-III 29.09.06 09.11.06 195442.00 Completed

31 Civil EE-III 29.08.06 28.06.06 197450.00 262/15.09.06/EE-III 15.09.06 06.10.06 196660.00 Completed

P/L CC pav.from J-156 to Roshan Ara Road and Adj.lanes in C-

121A/SPZ

M/s V.K Associates

P/L CC pav.from H.No. 576 to 570 and 2123 to 2127 and 2042 to 706

in Mukim Pura in C-121A/SPZ

M/s V.K Associates

Imp.to gali no.2,3 and 5 and its link by pdy.CC pavment in kothi Mem

in ward no.122/SPZ

M/s Ganesh Builders

Imp.to road berms by pdy.CC of PD Road (Maharaja Aggersen

Marg.)from Rani Jhansi Road to Bara Toti Chowk in C-122/SPZ

M/s Sonu Builders

P/L CC from Shop.NO.4250 to 4272 at Bhadur Garh Road in C-

122/SPZ

M/s Amba Const.Co

P/L CC from Shop.NO.2297 to 5111 at G.T. Road in C-121A/SPZ

M/s Som Dutt Dwivedi

P/L CC from H.NO.2557 to 2540 and H.NO.2550 at Punjabi Basti at

C-121A/SPZ

M/s Jatinder Builders

P/L CC from Rawal Pindi Jewellers to Basti Harpool Singh gate at G.T

Road C-121, A/S.P.Zone.

M/s Rajesh Kumar

P/L CC from Jeevan Ghee wala to Bara Hindu Rao Chowk at B.G

Road in C-122-B/S.P.Zone.

M/s Goldy Const.Co

P/L CC in gali no.3 in Faiz Ganj in W.NO.122/ S.P.Zone

M/s Bajaj Const.Co

Page 233: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

32 Civil EE-III 29.08.06 15.05.06 338542.00 532/02.01.07/EE-III 02.01.07 17.02.07 338303.00 Completed

33 Civil EE-III 29.08.06 15.05.06 338070.00 531/02.01.07/EE-III 02.01.07 14.02.07 337634.00 Completed

34 Civil EE-III 04.09.06 15.05.06 336824.00 541/02.01.07/EE-III 03.01.07 20.03.07 336804.00 Completed

35 Civil EE-III 04.09.06 01.08.06 201218.00 261/15.09.06/EE-III 18.09.06 20.12.06 200797.00 Completed

36 Civil EE-III 04.09.06 01.08.06 234506.00 259/07.09.06/EE-III 08.09.06 25.09.06 234448.00 Completed

37 Civil EE-III 04.09.06 28.06.06 199850.00 270/19.09.06/EE-III M/s Jain Const. 21.09.06 02.11.06 199431.00 Completed

38 Civil EE-III 04.09.06 28.06.06 199100.00 268/19.09.06/EE-III 31.10.06 06.12.06 198877.00 Completed

39 Civil EE-III 04.09.06 28.06.06 198300.00 267/19.09.06/EE-III 23.10.06 11.12.06 197967.00 Completed

40 Civil EE-III 04.09.06 28.06.06 199500.00 269/19.09.06/EE-III 27.09.06 04.12.06 199289.00 Completed

Dev.of side berms by pdy.interlocking tiles from Mother Dairy to DTC stand in Gulabi Bagh

in W.NO.121/S.P.Zone.

M/s D.K Builders-I

Dev.of side berms by pdy.interlocking tiles from Barat

Ghar to Super Bazar (LHS) in Gulabi Bagh in C-121/ S.P Zone.

M/s D.K Builders-I

Dev.of side berms by pdy.interlocking tiles from CPWD park to Barat Ghar gali (LHS) in Gulabi Bagh in W.NO.121/ S.P

Zone.

M/s Nareder Singh Dhankar

Imp.of road infront of Sanatan Dharam Mandir in W.NO.122/ S.P

Zone.(By Pdy.CC)

M/s D.K Const.Co

Imp.of Azad Mkt.road & B.G road by premixing in W.NO.122/S.P

Zone.

M/s V.K Associates

P/L CC in lane from H.NO.2521 to 2557 at Punjabi Basti in

C-121A/S.P Zone.

P/L CC in lane from Shop no.5111 to 5130 and adjoing lanes at G.T

Road in C-121-A/S.P.Zone.

M/s Bansal Const.

P/L CC in lane from Shop no. 4272 to 4287 at Bhadur Garh Road in C-

122/S.P Zone.

M/s Malhotra Const.Co

P/L CC in lane from Shop NO.4216 to 4250 at Bhadur Garh Road in C-

122/ S.P Zone.

M/s Surender Kumar Jain

Page 234: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

41 Civil EE-III 04.09.06 28.06.06 199126.00 273/19.09.06/EE-III 29.09.06 07.11.06 198853.00 Completed

42 Civil EE-III 05.09.06 28.08.06 492243.00 526/02.01.07/EE-III 02.02.07 20.03.07 491372.00 Completed

43 Civil EE-III 05.09.06 28.08.06 326709.00 479/14.12.06/EE-III 19.12.06 06.03.07 326391.00 Completed

44 Civil EE-III 20.09.06 02.09.06 198873.00 553/11.01.07/EE-III 05.02.07 31.03.07 197466.00 Completed

45 Civil EE-III 25.09.06 23.09.06 199357.00 402/20.11.06/EE-III 23.11.06 28.12.06 198691.00 Completed

46 Civil EE-III 25.09.06 23.09.06 199760.00 367/31.10.06/EE-III 02.11.06 25.11.06 199304.00 Completed

47 Civil EE-III 29.11.06 29.11.06 130038.00 502/20.12.06/EE-III 19.12.06 20.03.07 129834.00 Completed

48 Civil EE-III 29.11.06 29.11.06 138714.00 478/14.12.06/EE-III 14.12.06 06.03.07 138105.00 Completed

49 Civil EE-III 29.11.06 29.11.06 185554.00 535/02/01/2007/EE-III 14/02/2007 P 129845.00 In Prog.

Dev.of lane from H.NO.9A to Rani Jhansi Road by Pdy.CC in

W.NO.122/S.P Zone.

M/s Naveen Const.

Dev.of Maharaja Agairsen Marg from Masjid to Lady Reading

School by mastic in W.NO.122/S.P Zone.

M/s Ravi Builders

Dev.of Pucci gali (6264 to 6243) by pdy.CC pavement in Bara Hindu

Rao in W.NO.122/S.P Zone.

M/s Kushal Bharat

P/L CC pavement from H.No.3329 to 3343 in Gali Pardhan Wali at Arya Pura in C-121/S.P.Zone.

M/s J.P Const.Co.

P/L CC in gali Ahiran from Jain Mandir to Shop No.4046 and Shop No.4008 to 3095 in Pt.Pahari Dluraj

in C-122/S.P.Zone.

M/s S.K Const.Co

P/L CC in Shish Mahal from B.G Road to 1266 and adjoing lane in C-

122/S.P.Zone.

M/s Chaudhary Const.

P/L CC from H.NO.2048 to main road (B.G.Road) at Pahari Dhiraj in

C-122/S.P.Zone.

M/s Balaji Const.

P/L CC from H.NO.2048 to 2057 in Mahavir gali in Teli wara in C-

122/S.P.Zone.

M/s Jag Mohan kapoor

Dev.of road berms of main Sadar Bazar by cc from Bara Tuti Chowk

to Rue Mandi in Telewara in C-122/S.P.Zone.

Page 235: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

50 Civil EE-III 04.12.06 15.11.06 196998.00 441/06.12.06/EE-III 29.12.06 20.01.07 196766.00 Completed

51 Civil EE-III 04.12.06 15.11.06 199747.00 552/11.01.07/EE-III 14.02.07 28.03.07 199264.00 Completed

52 Civil EE-III 18.12.06 13.12.06 199370.00 692/09.02.07/EE-III 12.02.07 30.03.07 198799.00 Completed

53 Civil EE-III 20.02.07 08.11.06 212826.00 30/27.07.07/EE-III 04.10.07 29.10.07 212307.00 Completed

54 Civil EE-III 20.02.07 07.02.07 199587.00 893/30.03.07/EE-III 10.05.07 09.08.07 199444.00 Completed

55 Civil EE-III 20.02.07 29.11.06 291598.00 909/30.03.07/EE-III M/s Walid 05.04.07 17.07.07 291456.00 Completed

56 Civil EE-III 20.02.07 07.02.07 142882.00 29/12.07.07/EE-III 18.07.07 10.08.07 141798.00 Completed

57 Civil EE-III 20.02.07 29.11.06 190613.00 911/30.03.07/EE-III 03.04.07 28.03.07 190032.00 Completed

58 Civil EE-III 20.02.07 29.11.06 194146.00 912/30.03.07/EE-III 04.04.07 28.06.07 193819.00 Completed

P/L CC on main road, Hathi Khana from Chowk to T-Junction on Rani

Jhansi Road in C-122/SPZ

M/s J.P Const.Co.

P/L CC in lane from H.NO.564 to 6497 in Bara Hindu Rao in

C-122/SPZ

M/s Aditi Const.

P/L CC from Shop no.4643 to 4177 and Ram Saroop Hall to Shop

no.4133 in Arya Pura in C-121/SPZ.

M/s Shree Madhav Builders

P/L CC from H.NO.2637 to 2633 in gali Ram and 4347 to Fountain,

3941 to 4023 in gali Ahiram in C-122/SPZ.

M/s J.P Const.Co.

P/L CC in gali Paheya wali and from Kishan Ganj Chowk to Matawali Gali in C-122/SPZ.

M/s Jag Mohan kapoor

P/L CC from H.no.J-202 to T-236 and gali Satya Ghar and T-37 to T-159 and adj.lanes in Arya Pura in

C-121/SPZ.

P/L CC and making gate in Telewara from H.No.322 to 326 in

C-122/SPZ.

M/s Sonu Builders

Dev.of Pvt.Katra from H.NO.3550 to 3568 in gali Hanuman wali at

G.T road in C-121/SPZ.

M/s V.K Associates

Dev.of Pvt.Katra from H.NO.4160 and 4149 in Arya Pura in C-121-

A/SPZ.

M/s D.K Const.Co

Page 236: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

59 Civil EE-III 22.02.07 13.02.07 198040.00 899/30.03.07/EE-III 27.04.07 29.05.07 197878.00 CompletedP/L CC pav.from H.No.8328 to 8333 at R.A road and H.NO.4532 to

4536 in Arya Pura in C-121/SPZ.

M/s J.P Const.Co.

Page 237: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA,Sh. Ramakant Gosomi, AC No. 66 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C

1 Civil EE-I 26.05.06 08.04.06 597916.00 93/12.09.06/EE-I 17.01.06 19.12.06 597916.00 Completed

2 Civil EE-I 20.07.06 03.07.06 336626.00 218/30.11.06/EE-I 22.12.06 9.3.07 335432.00 Completed

3 Civil EE-I 20.07.06 03.07.06 482200.00 202/29.11.06/ EE-I 18.12.06 6.3.07 476386.00 Completed

4 Civil EE-I 20.07.06 03.07.06 291800.00 217/30.11.06/ EE-I 15.12.06 23.1.07 286515.00 Completed

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Expenditure

Present Position

Construction of a modern canopy in the park in M.I.G Flats Prashad Nagar in C-126/KBZ

M/s Fren Const.Co

Imp.to road by pdg.CC pavement from Patel road to M.C.Pry.School in Chopal wali gali in Shadipur Village in W-126/KBZ

M/s Shah Builders

Imp.to road by pdg.CC pavement from Z-56 to Madarsa in Z-Block Ranjeet Nagar in W-126/KBZ

M/s Shah Builders

Imp.to road by pdg.CC pavement from M.C.Pry.School to y-38 and Masjid in Y-Block Ranjeet Nagar in W-126/KBZ

M/s Kuldeep Singh

Page 238: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

5 Civil EE-I 20.07.06 03.07.06 217844.00 198/29.11.06/EE-I 23.02.07 13.03.07 217262.00 Completed

6 Civil EE-I 20.07.06 03.07.06 198000.00 91/12.9.06/ EE-I 29.9.06 18.12.06 198000.00 Completed

7 Civil EE-I 20.07.06 03.07.06 429500.00 215/30.11.06/EE-I 15.12.06 20.01.07 422523.00 Completed

8 Civil EE-I 20.07.06 03.07.06 198800.00 113/19.09.06/EE-I 22.09.06 18.12.06 198092.00 Completed

9 Civil EE-I 22.08.06 03.07.06 665100.00 453/23.02.07/EE-I 07.05.07 20.08.07 638186.00 Completed

10 Hort. ADH/KBZ 08.09.06 11.07.06 140648.00 90/18.12.06/ADH/KBZ 18.12.06 31.01.07 80600.00 Completed

11 Hort. ADH/KBZ 08.09.06 11.07.06 111634.00 87/15.12.06/ADH/KBZ 15.12.06 25.01.07 56000.00 Completed

12 Hort. ADH/KBZ 08.09.06 11.07.06 118879.00 89/18.12.06/ADH/KBZ 18.12.06 31.01.07 67000.00 Completed

13 Hort. ADH/KBZ 08.09.06 11.07.06 133404.00 92/18.12.06/ADH/KBZ 18.12.06 25.01.06 69000.00 Completed

Imp.to road by pdg.CC pavement from H.NO.3251 to H.NO.3221/1 in Ranjeet Nagar in W-126/KBZ

M/s Naresh Kumar

Imp.to B/wall of Akhara Park in F-Block in Ranjeet Nagar in W-126/KBZ

M/s sanjay kumar jain

Imp.to road by pdg.CC pavement from 2178/1 to 2185/8A in Guru Arjun Nagar in W-126/KBZ

M/s Kuldeep Singh

Imp.to road by Pdg.CC & S.W drainage from Balmiki Mandir to X-17 in Ranjeet Nagar in W-126/KBZ

M/s Tajinder Const.Co

Pdy.CC pavement on road from H.NO.2633 to WZ-59 in main Bazar Wali Gali in Shadi Pur Village in W-126/KBZ

M/s Fren Const.Co

Providing & Fixing of Children play apparatment in parks West Patel Nagar area W.NO.125/Karol Bagh Zone.

M/s K.P Enterprises

Providing & Fixing of CPA in Gaushala park Prem Nagar W.NO.125/KBZ

M/s K.P Enterprises

P/F of CPA for parks in X,Y,Z blocks Ranjeet Nagar, Pandav Nagar W.NO.126/KBZ

M/s K.P Enterprises

P/F of CPA for parks Patel Nagar park and Parshad Nagar park of W.NO.126/KBZ

M/s K.P Enterprises

Page 239: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

14 Civil EE-I 07.12.06 03.07.06 186627.00 417/21.2.07/ EE-I 23.2.07 13.3.07 186626.00 Completed

15 Civil EE-I 07.12.06 03.07.06 344960.00 461/23.02.07/EE-I M/s Vikas Const05.03.07 28.05.07 344346 Completed

16 Civil EE-I 07.12.06 03.07.06 191231.00 465/13.03.07/EE-I M/s Sanjay Buil 19.03.07 19.06.07 190543 Completed

17 Civil EE-I 27.12.06 14.12.06 196147.00 340/9.01.07/EE-I 07.02.07 16.03.07 194926.00 Completed

18 Civil EE-I 27.12.06 14.12.06 198469.00 344/9.01.07/EE-I M/s Jai Kumar 04.04.07 17.05.07 198469.00 Completed

19 Civil EE-I 27.12.06 14.12.06 262427.00 35/12.06.07/EE-I 09.07.07 29.08.07 261699 Completed

20 Civil EE-I 07.02.07 13.07.06 2484300.00 25.09.07 P 2416188 In Prog.

0

Const.of Walkway in the Guru Arjun Dev Park of Guru Arjjun Nagar in Ranjeet Nagar in W-126 KBZ.

M/s ivlar Indara puram

Pdy.two new red stone gates in C-Block Park Ranjeet Nagar in W-126 KBZ.

Stg.of B/wall and pdy.red stone gates in Guru Arjun Dev.park in A-Block, Ranjeet Nagar in W-126 KBZ.

Pdy.CC pavement on road from H.NO.43 to 54 and 54 to 58 in DDA flats in Pandav Nagar in C-126/KBZ

M/s Kritika Consts.

Pdy.CC pavement on road from H.No. 44 to 48 and along park in DDA flats in Pandav Nagar in C-126/KBZ.

Const.of walkway in DDA flats park in Pandav Nagar in W-126/KBZ.

M/s Som Dutt Dwevedi

Pdy.dense carpetting on Road no.11 from Patel road upto Farid puri Crossing in C-125B/KBZ.

15/07.09.07/EE(Pr)KBZ

M/s Sanjeev Kumar Bros.

Page 240: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 241: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 242: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA,Sh. P.C. Yogi, AC No. 67S.No. Name of Work deptt. Div. D.O.S D.O.C

1 Elect. EEE-VII 30.05.06 12.04.06 117120.00 09.11.06 13.11.06 116990.00 Completed

2 Elect. EEE-VII 30.05.06 12.04.06 106591.00 97/1.11.06/EE(E)-VII 06.11.06 13.11.06 106280.00 Completed

3 Elect. EEE-VII 30.05.06 12.04.06 107535.00 22.11.06 05.12.06 102587.00 Completed

4 Elect. EEE-VII 30.05.06 12.04.06 117190.00 44/29.08.06/EE(E)-VII 29.08.06 05.09.06 114108.00 Completed

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Expenditure

Present Position

P/O lighting arrangement in the park near E-26 Naraina Vihar in Ward 128 under KBZ

101/09.11.06/EE(E)-VII

M/s M.K Enterprises

P/O lighting arrangement main gate E-Block opp. Union Bank Naraina Vihar in Ward 128 under KBZ site change to opp.near Tani Stand Naraina MKT. Under KBZ. Site change to opp.near Taxi Stand Naraina Mkt.under KBZ.

M/s Forward Enginerrs

P/O lighting arrangement opp. Guru Dawara Naraina Vihar in Ward 128 under KBZ site change to behind Bus Stand E-Block Naraina Vihar under KBZ.

102/22.11.06/EE(E)-VII

M/s Khanna Sales Corpn.

P/O lighting arrangement opp. Sanatan Dharm Mandir Naraina Vihar in Ward 128 under KBZ

M/s M.K Enterprises

Page 243: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

5 Elect. EEE-VII 30.05.06 12.04.06 110541.00 43/29.08.06/EE(E)-VII 29.08.06 04.09.06 110493.00 Completed

6 Elect. EEE-VII 30.05.06 12.04.06 113794.00 47/18.09.06/EE(E)-VII 20.09.06 03.10.06 112781.00 Completed

7 Civil EE-I 23.06.06 22.06.06 138287.00 174/27.11.06/ EE-I 6.12.06 3.3.07 137942.00 Completed

8 Civil EE-I 23.06.06 22.06.06 129042.00 96/19.09.06/EE-I 23.11.06 28.12.06 128815.00 Completed

9 Civil EE-I 23.06.06 22.06.06 185247.00 161/15.11.06/EE-I 05.01.07 12.02.07 184735.00 Completed

10 Civil EE-I 23.06.06 22.06.06 179252.00 462/23.02.07/EE-I 09.03.07 19.04.07 164019.00 Completed

11 Civil EE-I 23.06.06 22.06.06 152810.00 117/19.09.06/EE-I 10.10.06 25.11.06 152810.00 Completed

12 Civil EE-I 23.06.06 22.06.06 218008.00 131/26.09.06/EE-I 18.11.06 15.02.07 217739.00 Completed

P/O lighting arrangement opp. Mother Dairy H-Block Naraina Vihar in Ward 128 under KBZ

M/s Raj Electricals

P/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ

M/s Gyan Enterprises

Imp.to lane by CC and drainage from H.no.21/65 to 21/72 in 21-Block old Rajinder Nagar in C-127A/KBZ

M/s Deepak Associates

Imp.to lane by CC and drainage from H.no.30/1 to 30/5 in 30-Block old Rajinder Nagar in C-127A/KBZ

M/s Sandeep Kapoor

Imp.to lane by Pdg.CC and drainage from H.no.1/5 to 1/10 and adjoining lanes in 1-Block old Rajinder Nagar in C-127A/KBZ

M/s Kritika Consts.

Imp.to lane by Pdg.CC and drainage from H.no.27/17 to 27/32 in 27-Block old Rajinder Nagar in C-127A/KBZ

M/s Raj Builders

Imp.to lane by Kota Stone and drainage from H.no.27/64 in 27-Block old Rajinder Nagar in C-127A/KBZ

M/s Rakesh Enterprises

Imp.to lane by CC and drainage from H.no.6/17 to 6/92 in 6-Block old Rajinder Nagar in C-127A/KBZ

M/s Raj Builders

Page 244: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

13 Civil EE-I 23.06.06 22.06.06 165722.00 159/15.11.06/EE-I 10.12.06 15.01.07 165406.00 Completed

14 Civil EE-I 23.06.06 22.06.06 141200.00 194/29.11.06/EE-I 08.12.06 28.12.06 119190.00 Completed

15 Civil EE-I 23.06.06 22.06.06 109405.00 101/19.09.06/EE-I 19.09.06 08.11.06 100620.00 Completed

16 Civil EE-I 23.06.06 22.06.06 109524.00 104/19.09.06/EE-I 23.11.06 28.12.06 109524.00 Completed

17 Civil EE-I 23.06.06 22.06.06 132802.00 100/19.09.06/EE-I 19.09.06 16.10.06 132802.00 Completed

18 Civil EE-I 23.06.06 22.06.06 184400.00 99/19.09.06/EE-I 01.12.06 12.12.06 180277.00 Completed

19 Civil EE-I 23.06.06 22.06.06 182332.00 75/07.07.06/EE-I 19.07.06 30.09.06 181884.00 Completed

Imp.to lane by CC and drainage from H.no.33/42 to 33/12 in 33-Block old Rajinder Nagar in C-127A/KBZ

M/s Kritika Consts.

Imp.to back lane by CC and drainage from H.no.29/1 to 29/5 in 29-Block old Rajinder Nagar in C-127A/KBZ

M/s Sandeep Kapoor

Imp.to lane by Pdg.CC and drainage from H.no.27/17 to 27/32 in 27-Block old Rajinder Nagar in C-127A/KBZ

M/s Sandeep Kapoor

Imp.to lane by Pdg.CC and drainage from H.no.30/41 to 30/45 in 30-Block old Rajinder Nagar in C-127A/KBZ

M/s Sandeep Kapoor

Imp.to lane by Pdg.CC and drainage from H.no. J-364 to J-370 in J-Blcok New Rajinder Nagar in C-127A/KBZ

M/s Inder Enterprises

Imp.to road by premix from R-812 to R-806 along Nehru Park in New Rajinder Nagar in C-127/KBZ

M/s Rakesh Enterprises

Imp.to drainage system by open surface drain from E-66 to E-70, E-76 to E-81 and around H.NO. E-120 in E-Block Naraina Vihar in C-128/KBZ

M/s Tyagi Associates

Page 245: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

20 Civil EE-I 03.07.06 22.06.06 199825.00 164/15.11.06/EE-I 24.11.06 23.02.07 199666.00 Completed

21 Civil EE-I 03.07.06 22.06.06 96555.00 139/11.10.06/EE-I 16.10.06 01.11.06 96428.00 Completed

22 Civil EE-I 12.07.06 11.07.06 62492.00 119/19.09.06/EE-I 26.10.06 09.11.06 62423.00 Completed

23 Civil EE-I 11.08.06 08.07.06 264804.00 28.11.06 08.12.06 241692.00 Completed

24 Elect. EEE-VII 11.08.06 08.07.06 260000.00 20.11.06 01.12.06 253231.00 Completed

25 Elect. EEE-VII 11.08.06 08.07.06 199402.00 13.11.06 30.11.06 190116.00 Completed

26 Elect. EEE-VII 11.09.06 07.09.06 38600.00 314/05.01.07/EE-I 05.01.07 23.01.07 36731.00 Completed

27 Civil EE-I 11.09.06 29.08.06 230447.00 375/24.01.07/EE-I 05.02.07 30.04.07 230447.00 Completed

28 Civil EE-I 11.09.06 29.08.06 271805.00 360/22.01.07/EE-I 08.02.07 25.04.07 271805.00 Completed

Imp.to Square by pdg.CC infront of H-477 to H-473 in H-Block New Rajinder Nagar in C-127/KBZ

M/s Kritika Consts.

Imp.to road berm by CC from R-801 to R-806 front side in R-Block, New Rajinder Nagar in C-127/KBZ

M/s Inder Enterprises

Imp.to drainage system by open surface drain near WZ-96 in Dusghara village in C-127B/KBZ

M/s Bagga Builders

Provision of Tubewell at Raj Guru Park Old Rajinder Nagar, W.NO.127 under KBZ

306/23.11.06/EE(E)Hort.

M/s Illuminator & Circuteers

Provision of Tubewell at 'C' block Park Inderpuri W.NO.128 under KBZ

265/20.11.06/EE(E)-Hort.

M/s Maya Eelctricals

Provision of Tubewell at 'F' block Park Naraiana Vihar W.NO.128 under KBZ

245/09.11.06/EE(Elect)/Hort.

M/s Perfect Eelctric Works

Making conection of drainage System from EG-15 to EA-156 in Inder Puri C-128/KBZ

M/s Raj Builders

Pdy.CC and drainage on road from H-475 to park and H-423 to H-475 in H-Block New Rajinder Nagar in C-127A/KBZ

M/s Rakesh Enterprises

Pdy.RMC and drainage to Square from D/S 358 to 388 in D/S in New Rajinder Nagar in C-127A/KBZ

M/s Akriti Decors

Page 246: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

29 Civil EE-I 11.09.06 29.08.06 276600.00 376/24.01.07/EE-I 29.01.07 19.04.07 280011.00 Completed

30 Civil EE-I 11.09.06 29.08.06 212615.00 286/27.12.06/EE-I 10.01.07 14.05.07 209342.00 Completed

31 Civil EE-I 11.09.06 29.08.06 216843.00 288/27.12.06/EE-I 27.12.06 25.01.07 216563.00 Completed

32 Civil EE-I 11.09.06 29.08.06 169726.00 283/27.12.06/EE-I 27.12.06 01.02.07 169685.00 Completed

33 Civil EE-I 11.09.06 29.08.06 233400.00 369/24.01.07/EE-I 27.01.07 28.02.07 233400.00 Completed

34 Civil EE-I 11.09.06 29.08.06 264160.00 275/18.12.06/EE-I 18.12.06 19.01.07 263340.00 Completed

35 Civil EE-I 11.09.06 29.08.06 114600.00 380/24.01.07/EE-I 05.02.07 28.03.07 105474.00 Completed

36 Civil EE-I 11.09.06 29.08.06 341171.00 284/27.12.06/EE-I 07.01.07 01.03.07 340682.00 Completed

Pdy.CC and drainage to Square from D-128 to D-136 in D-Block New Rajinder Nagar in C-127A/KBZ

M/s Raj Builders

Const.of B/wall and fixing of grills of park near D-156 in D-block New Rajinder Nagar in C-127A/KBZ

M/s Pankaj Contractor

Pdy./laying the F/Path and drainage from H-348 to R-812 in New Rajinder Nagar in C-127A/KBZ

M/s Sunil Enterprises

Pdy./laying the F/Path and drainage by Kota Stone from R-520 to Manav Sthali School in New Rajinder Nagar in C-127A/KBZ

M/s Inder Enterprises

Pdy.CC in lane and by lanes from H-322 to H-325 and H-325 to H-318 in H-Block New Rajinder Nagar in C-127A/KBZ

M/s Rakesh Enterprises

Pdy.RMC and drainage in lane and by lanes from D/S -561 to 576 in Double Storey in C-127A/KBZ

M/s Sunil Enterprises

Pdy. CC and drainage in lane and by lanes form 19/1 to 19/8 in 19-Block Old Rajinder Nagar in C-127A/KBZ

M/s Shah Builders

Pdy.RMC and drainage in lane from A-125 to SBI in A-Block Inderpuri in C-127B/KBZ

M/s Tyagi Associates

Page 247: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

37 Civil EE-I 11.09.06 29.08.06 160000.00 382/24.01.07/EE-I 28.01.07 28.03.07 158432.00 Completed

38 Civil EE-I 11.10.06 26.09.06 321926.00 298/05.01.07/EE-I 26.02.07 07.05.07 321618.00 Completed

39 Civil EE-I 11.10.06 26.09.06 198376.00 306/05.01.07/EE-I 05.01.07 30.03.07 198294.00 Completed

40 Civil EE-I 11.10.06 26.09.06 277900.00 370/24.01.07/EE-I 07.02.07 16.03.07 273901.00 Completed

41 Civil EE-I 11.10.06 26.09.06 147708.00 316/05.01.07/EE-I 12.01.07 13.02.07 147683.00 Completed

42 Civil EE-I 11.10.06 26.09.06 407408.00 311/05.01.07/EE-I 19.01.07 14.04.07 276457.00 Completed

43 Civil EE-I 11.10.06 26.09.06 69408.00 320/05.01.07/EE-I 05.01.07 23.01.07 69404.00 Completed

44 Civil EE-I 11.10.06 26.09.06 215300.00 425/21.02.07/EE-I 30.03.07 07.05.07 209243.00 Completed

Pdy.CC and drainage in back lane from H.NO.A-116 to A-108 in A-block Inder Puri in C-127B/KBZ

M/s Shah Builders

Pdy.RMC and drainage to back lane from C-143 to C-136 in C-Block NIA Ph-I in C-128/KBZ.

M/s Akriti Decors

Pdy.RMC and drainage to lane and Chowk from I-304 to I-308 in I-Block, Naraina Vihar in C-128/KBZ.

M/s Rakesh Enterprises

Pdy.RMC and drainage to lane and Chowk from I-248 to I-219 and I-214 to I-218, in I-Block, Naraina Vihar in C-128/KBZ.

M/s Shah Builders

Const.of open Surface drain from E-172 to E-150 in E-Block Naraina Vihar in C-128/KBZ.

M/s Raj Builders

Const.of F/path and berm by Polish Kota, CC and drainage from E-192 to E-197 and E-198 to E-202 in E-Block Naraina Vihar in C-128/KBZ.

M/s Rajeev Gupta

Pdy.drainage and interlocking tiles on side berms from E-251 to E-256 in E-Block, Naraina Vihar in C-128/KBZ.

M/s Raj Builders

Const.of gate and B/Wall of Tash Park near E-151 in E-Block, Naraina Vihar in C-128/KBZ.

M/s Raj Builders

Page 248: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

45 Civil EE-I 11.10.06 26.09.06 160825.00 403/19.02.07/EE-I 22.02.07 11.07.07 160509.00 Completed

46 Civil EE-I 11.10.06 26.09.06 543027.00 308/05.01.07/EE-I 17.01.07 14.04.07 543027.00 Completed

47 Civil EE-I 11.10.06 05.10.06 239081.00 357/22.01.07/EE-I 23.01.07 20.02.07 238359.00 Completed

48 Civil EE-I 11.10.06 05.10.06 163400.00 282/27.12.06/EE-I 27.12.06 01.03.07 157239.00 Completed

49 Civil EE-I 16.10.06 06.09.06 144044.00 152/15.11.06/EE-I 11.01.07 06.03.07 143067.00 Completed

50 Civil EE-I 16.10.06 26.09.06 125998.00 430/21.02.07/EE-I 06.03.07 30.05.07 125915.00 Completed

51 Civil EE-I 16.10.06 26.09.06 156208.00 429/21.02.07/EE-I 26.02.07 02.06.07 156162.00 Completed

52 Civil EE-I 16.10.06 26.09.06 270090.00 312/05.01.07/EE-I 09.01.07 20.03.07 269634.00 Completed

53 Civil EE-I 08.11.06 06.11.06 97981.00 170/17.11.06/EE-I 22.11.06 28.12.06 97758.00 Completed

Const.of gate and B/Wall of Ornamental park in G-Block, Naraina Vihar in C-128/KBZ.

M/s Ma Bhumika Enterprises

Pdy.RMC and drainage to road from A-1 to A-12 in A-Block, Naraina Vihar in C-128/KBZ.

M/s Akriti Decors

Pdy.CC and drainage system of lanes and by lanes from WZ-159A to WZ-166 in Dusghara Village in C-127B/KBZ.

M/s R.P Aggarwal

Pdy.drainage system and CC from B-33/1 to B-37 in B-Block Inderpuri C-127B/KBZ.

M/s Sanjeev Const.

Const.of B/Wall of park along Dustbin in C-Block, Naraina Vihar in C-128/KBZ.

M/s Deepak Const.Co

Pdy.grit wash and Red Sand stone to B/Wall and F/Path of park near E-255 and E-27 in E-Block Naraina Vihar in C-128/KBZ.

M/s Raj Builders

Const.of gate and B/Wall of park near B-21 in B-Block, Naraina Vihar in C-128/KBZ.

M/s Maa Bhumika Enterprises

Pdy.RMC and drainage to road from E-180 to E-184 Opp. Gyan Mandir School in C-128/KBZ.

M/s Raj Builders

Pdy.CC and drainage of lanes and by lanes from H.NO.B-860 to B-746 in JJR Inderpuri C-128/KBZ.

M/s Kritika Consts.

Page 249: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

54 Civil EE-I 08.11.06 06.11.06 169656.00 225/30.11.06/EE-I 07.12.06 13.02.07 169656.00 Completed

55 Civil EE-I 10.01.07 22.11.06 84674.00 493/19.03.07/EE-I 16.03.07 30.03.07 84674.00 Completed

56 Civil EE-I 10.01.07 22.11.06 221593.00 516/23.03.07/EE-I 23.03.07 25.05.07 216767.00 Completed

57 Civil EE-I 10.01.07 22.11.06 106108.00 486/19.03.07/EE-I 19.04.07 03.10.07 105620.00 Completed

58 Civil EE-I 10.01.07 22.11.06 173536.00 464/13.03.07/EE-I 20.03.07 20.06.07 155930.00 Completed

59 Civil EE-I 10.01.07 22.11.06 171409.00 484/19.03.07/EE-I 03.05.07 18.06.07 169646.00 Completed

60 Civil EE-I 10.01.07 22.11.06 401850.00 33/11.06.07/EE-I 07.08.07 P 273240.00 In Prog.

Const.of drain from G-201 to G-164 in G-Block Naraina Vihar in C-128/KBZ.

M/s Bagga Builders

Pdy.and laying drainage and CC from H.NO.F-437-B to F-440 in New Rajender Nagar in C-127A/KBZ.

M/s Sunil Enterprises

Const.of Boundary Wall and grill in Park near 28 Double Storey, New Rajender Nagar in C-127A/KBZ.

M/s Sanjeev Const.

Pdy.drainage system from H.NO.561 upto Geeta Mandir in Double Storey in New Rajender Nagar in C-127A/KBZ.

M/s Romie Const Co.

Const.of lane by pdy.CC pavement with drainage from H.NO.H/452 to H/461 in New Rajender Nagar in C-127/KBZ.

M/s Bunty Builders

Const.of foot-path by pdy.precast CC slabs from H.NO.R/665 to R/739 in R-Block, New Rajender Nagar in C-127/KBZ.

M/s Sandeep Kapoor

Const.of lanes by pdy.CC pavement with drainage from H.NO.H/361 to H/346 in H-Block in New Rajender Nagar in C-127/KBZ.

M/s K.S. Builders

Page 250: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

61 Civil EE-I 10.01.07 22.11.06 255719.00 32/11.06.07/EE-I 16.07.07 P 126208.00 In Prog.

62 Civil EE-I 10.01.07 22.11.06 545966.00 518/29.03.07/EE-I 10.04.07 18.06.07 536568.00 Completed

63 Civil EE-I 10.01.07 13.10.06 243243.00 507/23.03.07/EE-I 01.04.07 25.05.07 243243.00 Completed

64 Civil EE-I 10.01.07 13.10.06 195773.00 481/19.03.07/EE-I 15.03.07 30.03.07 194396.00 Completed

65 Civil EE-I 10.01.07 22.11.06 174215.00 488/19.03.07/EE-I 01.05.07 18.06.07 171256.00 Completed

66 Civil EE-I 10.01.07 22.11.06 218283.00 459/23.02.07/EE-I 02.03.07 26.03.07 218201.00 Completed

Const.of square & lanes by pdy.CC pavement with drainage from H.No.D/128 to C/100 in New Rajender Nagar in C-127/KBZ.

M/s Bunty Builders

Const.of lane by pdy.ready ruined concrete with drainage from H.NO.R/739 to R/754 in R-Block, New Rajender Nagar in C-127/KBZ.

M/s Deepak Associates

Const.of partition wall and walkway in Subhash Park in New Rajender Nagar in C-127A/KBZ.

M/s Sanjeev Const.

Pdy.and laying chequrred tiles and gates in Saraswati Park in New Rajender Nagar in C-127A/KBZ.

M/s Sunil Enterprises

Const.of foot-path by pdy.precast CC slabs from H.NO.R/621 to R/700 in R-Block, New Rajender Nagar in C-127/KBZ.

M/s Sandeep Kapoor

Const.of road by pdy.premix carpet from H.NO.R/680 to R/667 & R/780 to R/790, R/832 to R/820 in R-Block, New Rajender Nagar in C-127/KBZ.

M/s Inder Enterprises

Page 251: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

67 Civil EE-I 19.01.07 04.11.06 166247.00 04.04.07 17.04.07 163420.00 Completed

68 Elect. EE-I 26.02.07 15.02.07 282125.00 524/29.03.07/EE-I 07.04.07 08.10.07 282098.00 Completed

69 Civil EE-I 26.02.07 15.02.07 369300.00 52/29.03.07/EE(M)-I 03.04.07 30.05.08 289074.00 Completed

70 Civil EE-I 26.02.07 15.02.07 356420.00 522/19.03.07/EE-I 13.07.07 27.07.07 355341.00 Completed

71 Civil EE-I 26.02.07 15.02.07 171083.00 475/19.03.07/EE-I 07.04.07 25.06.07 171083.00 Completed

72 Civil EE-I 26.02.07 15.02.07 199396.00 476/19.03.07/EE-I 04.04.07 12.05.07 199370.00 Completed

73 Civil EE-I 26.02.07 15.02.07 192190.00 517/29.03.07/EE-I 29.03.07 17.04.07 192170.00 Completed

74 Civil EE-I 26.02.07 15.02.07 200226.00 526/29.03.07/EE-I 08.04.07 04.05.07 200073.00 Completed

Provision of street lighting arrangement in Rajender Nagar Constituency (Old Rajender Nagar, New Rajender Nagar, Inderpuri, Dashgara, Naraina Vihar under KBZ.)

238/26.03.07/EE(E)-VII

M/s Paras Const.Co

Const.of shed in 5 no.Park near SBI in E-Block Naraina Vihar C-128/KBZ.

M/s Tanya Const.

Const.of shed in Apna Park near E-276 in E-Block Naraina Vihar C-128/KBZ.

M/s Raj Builders

Pdy.mastic carpet on road from E-260 to E-276 in E-Block Naraina Vihar C-128/KBZ.

M/s kapoor Bros.

Const.of open Surface drain from E-283 to E-290 and E-119 to E-113 in E-Block Naraina Vihar in C-128/KBZ.

M/s Tajinder Const.Co

Pdy.M/P on road from B-86 to PWD road in N/A PH-II C-128/KBZ.

M/s Som Dutt Dwevedi

Pdy.drainage and interlocking tiles on road berms from flat no.1 to 128 and I-325 to Water Tank in I-Block, Naraina Vihar in C-128/KBZ.

M/s Raj Builders

Pdy.drainage interlocking tiles on road berms from galt no.I-137 to gate no.1 both side in I-Block Naraina Vihar C-128/KBZ.

M/s Kishore & Co.

Page 252: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

75 Civil EE-I 26.02.07 15.02.07 237993.00 310/29.11.07/EE-I M/s Jai Kumar 03.12.07 11.02.08 237059.00 Completed

76 Civil EE-I 26.02.07 15.02.07 199917.00 477/19.03.07/EE-I M/s Jai Kumar 29.03.07 05.05.07 199828.00 Completed

77 Civil EE-I 26.02.07 15.02.07 172757.00 474/19.03.07/EE-I 29.03.07 25.04.07 172520.00 Completed

78 Civil EE-I 26.02.07 15.02.07 220010.00 307/29.11.07/EE-I M/s Jai Kumar 08.12.07 29.02.08 219357.00 Completed

79 Civil EE-I 26.02.07 15.02.07 316865.00 523/29.03.07/EE-I 29.03.07 18.04.07 316699.00 Completed

Pdy.drainage and CC on square front of I-83 and I-47 in I-Block Naraina Vihar C-128/KBZ.

Const.of drain from back lane of G-136 to G-119 in G-Block Naraina Vihar C-128/KBZ.

Pdy.CC on road berms from I-Block gate to G-153 Naraina Vihar C-128/KBZ.

M/s Narender Singh Dhanku

Pdy.CC and drainage from lane and by lanes from WZ-429C to Mata Mandir road in Naraina Village C-128/KBZ.

Pdy.CC and drainage from lane and by lanes from WZ-410 to WZ-308 in Naraina Village C-128/KBZ.

M/s Raj Builders

Page 253: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA,Sh S.P. Ratawal, AC No. 68 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C

1 Civil EE-XXIX 05.05.06 01.05.06 400848.00 28.11.06 15.02.07 400703.00 Completed

2 Civil EE-XXIX 05.05.06 01.05.06 393106.00 200/6.11.06/EE-XXIX 7.11.06 14.02.07 392608.00 Completed

3 Civil EE-XXIX 05.05.06 01.05.06 395690.00 199/6.11.06/EE-XXIX 24.11.06 16.3.07 395454.00 Completed

4 Civil EE-XXIX 05.05.06 01.05.06 399621.00 250/28.11.06/EE-XXIX 28.11.06 15.2.07 396489.00 Completed

5 Civil EE-XXIX 05.05.06 01.05.06 156950.00 58/11.08.06/EE-XXIX 11.08.06 15.11.06 156047.00 Completed

6 Civil EE-XXIX 05.05.06 01.05.06 328374.00 206/6.11.06/EE-XXIX 12.09.07 15.02.08 323485.00 Completed

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Expenditure

Present Position

Imp. To Foot-Path by pdg. Cc pavement from round about (R.H.S) up to New Rohtak Road Xing on Ramjas road in

202/6.11.06/ EE-XXIX

M/s Bansal Enterprises

Imp. To Foot-Path by pdg. Cc pavement from Xing D.B Gupta road up to round about (LHS) on Ramjas road in C-129A/KBZ

M/s Kejri Builders

Imp. To Foot-Path by pdg. Cc pavement from round about (LHS) Up to New Rohtak road on Ramjas road in C-129A/KBZ

M/s Kejriwal Builders

Imp. To Foot-Path by pdg. Cc pavement from Xing D.B Gupta road (RHS) block 53 Up to round about on Ramjas road in C-129/KBZ

M/s Bansal Enterprises

Imp. To Foot-Path by pdg. Red sand stone flooring along the park from Ganga mandir marg Up to New Pusa road on road no. 31 in WEA in C-129/KBZ

M/s Harish Kumar

Imp. To Foot-Path by pdg. Red sand stone flooring along with Tikona Park on New Pusa road in C-130A/KBZ

M/s Amit Const.

Page 254: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

7 Civil EE-XXIX 05.05.06 01.05.06 154000.00 05/12.05.06/EE-XXIX 15.06.06 19.06.06 153492.00 Completed

8 Civil EE-XXIX 05.05.06 01.05.06 154000.00 06/12.05.06/EE-XXIX 19.06.06 26.06.06 153739.00 Completed

9 Civil EE-XXIX 05.05.06 01.05.06 477999.00 272/13.12.06/EE-XXIX 21.12.06 27.12.06 477943.00 Completed

10 Civil EE-XXIX 05.05.06 01.05.06 480684.00 218/24.11.06/EE-XXIX 06.12.06 12.12.06 480209.00 Completed

11 Civil EE-XXIX 05.05.06 01.05.06 479283.00 246/28.11.06/EE-XXIX 10.12.06 15.12.06 479124.00 Completed

12 Civil EE-XXIX 05.05.06 01.05.06 455061.00 273/13.12.06/EE-XXIX 05.12.06 19.12.06 455041.00 Completed

13 Civil EE-XXIX 05.05.06 01.05.06 244440.00 177/06.11.06/EE-XXIX 06.11.06 15.12.06 244276.00 Completed

14 Civil EE-XXIX 05.05.06 01.05.06 296996.00 201/06.11.06/EE-XXIX 17.11.06 22.02.07 296988.00 Completed

Imp.to D.B Gupta road by providing 2cm premix carpet from Faiz road xing to sraswati marg Xing in C-129/KBZ

M/s Sarthak Const.Co

Imp.to Saraswati marg by providing 2cm premix carpet in C-129/KBZ

M/s Sarthak Const.Co

Imp.to Prabhat road by pdg. Mastic wearing course in C-129/KBZ

M/s Balaji & Associates

Imp.to road from Round about 9A-block to Ganga mandir marg in W.E.A by Pdg. Mastic in C-129A/KBZ

M/s Balaji & Associates

Imp.to roads by providing mastic wearing course from Channa Market round about to round about 9A blcok & from Channa market R/A to 11A/10 in W.E.A in C-129A/KBZ

M/s Y.K Builders

Imp.to B.C Marg. By pdg. Mastic from round about Mandir to 12A-block WEA in C-129A/KBZ

M/s Balaji & Associates

Imp.to lanes by providing CC pavement in 7A-block near Dalao & 11A-block, W/.E.A in C-129A/KBZ

M/s Harish Kumar

Imp.to lanes by providing cc pavement in 7A-block opp. park & Dhobi Ghat in W.E.A in C-129A/KBZ

M/s Kejriwal Builders

Page 255: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

15 Civil EE-XXIX 05.05.06 01.05.06 461245.00 243/28.11.06/EE-XXIX 01.12.06 04.12.06 461232.00 Completed

16 Civil EE-XXIX 05.05.06 01.05.06 344395.00 242/28.11.06/EE-XXIX 29.11.06 05.12.06 344240.00 Completed

17 Civil EE-XXIX 05.05.06 01.05.06 571082.00 215/24.11.06/EE-XXIX 04.12.06 08.12.06 570816.00 Completed

18 Civil EE-XXIX 05.05.06 01.05.06 570713.00 244/28.11.06/EE-XXIX 04.12.06 08.12.06 566896.00 Completed

19 Civil EE-XXIX 05.05.06 01.05.06 498000.00 213/24.11.06/EE-XXIX 28.11.06 04.12.06 476532.00 Completed

20 Civil EE-XXIX 05.05.06 01.05.06 477611.00 214/24.11.06/EE-XXIX 30.11.06 05.12.06 477479.00 Completed

21 Civil EE-XXIX 05.05.06 01.05.06 573952.00 217/24.11.06/EE-XXIX 11.12.06 19.12.06 573607.00 Completed

22 Civil EE-XXIX 05.05.06 01.05.06 197775.00 56/11.08.06/EE-XXIX 18.08.06 25.09.06 197574.00 Completed

Providing mastic asphaltic from Ganga Mandir Marg to Vishnu Mandir Marg on Pyara lal road in Regar Pura in C-130A/KBZ

M/s Y.K Builders

Pdg. Mastic asphaltic from Vihsnu Mandir marg to Nalla on Pyara Lal road in Regar Pura in C-130A/KBZ

M/s Y.K Builders

Providing mastic asphaltic near Tikona Park on New Pusa Road to Ganga Mandir Marg in C-130A/KBZ

M/s Balaji & Associates

Providing mastic asphaltic from New Pusa road to Ganga Mandir Marg on Tank Road in Regar Pura in C-130A/KBZ

M/s Y.K Builders

Imp.to Ramjas road by providing mastic wearing course from D.B.Gupta road upto near round about C-129/KBZ

M/s Balaji & Associates

Imp. To lane Ramjas road by pdg. Mastic wearing course from round about upto near new Rohtak road in C-129A/KBZ

M/s Balaji & Associates

Imp.to Sujan Singh Gurudwara road by providing mastic from xing Ajmal Khan road to Gurudwara in C-129/KBZ

M/s Balaji & Associates

Pdg. Premix carpet on roads & lanes in C-130A/KBZ(ON Vishnu Mandir Marg Ganga Mandir Marg & Arya Samaj Road)

M/s Harish Kumar

Page 256: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

23 Civil EE-XXIX 05.05.06 01.05.06 189566.00 165/31.10.06/EE-XXIX 31.10.06 22.12.06 187762.00 Completed

24 Civil EE-XXIX 25.05.06 18.05.06 449830.00 290/12.01.07/EE-XXIX 15.01.07 P 449586.00 Completed

25 Civil EE-XXIX 25.05.06 18.05.06 256000.00 142/25.10.06/EE-XXIX 28.11.06 5.12.06 255510.00 Completed

26 Civil EE-XXIX 25.05.06 18.05.06 199288.00 59/11.08.06/EE-XXIX 11.08.06 15.11.06 198827.00 Completed

27 Civil EE-XXIX 25.05.06 18.05.06 327997.00 105/05.09.06/EE-XXIX M/s Jai Kumar 05.09.06 08.12.06 327826.00 Completed

28 Civil EE-XXIX 25.05.06 18.05.06 575600.00 285/26.12.06/EE-XXIX 03.01.07 16.02.07 553370.00 Completed

29 Civil EE-XXIX 25.05.06 18.05.06 430580.00 190/06.11.06/EE-XXIX 17.11.06 P 402986.00 Completed

30 Civil EE-XXIX 25.05.06 18.05.06 309000.00 208/06.11.06/EE-XXIX 21.11.06 13.02.07 302731.00 Completed

31 Civil EE-XXIX 25.05.06 18.05.06 477848.00 247/28.11.06/EE-XXIX 02.12.06 07.12.06 477635.00 Completed

Pdg./Fixing New gates of park behind cremation ground, Sat Nagar opp. 7A-block, WEA in C-129A/KBZ

M/s Rajeev Gupta

Const. Of main gate on Gangeshwar Dham road in Ajmal Khan Park C-129A/KBZ

M/s Mulhotra Const.CO

Pdg. Mastic asphalt on Master Prithvi Nath road infront of Golden Movement in C-129/KBZ

M/s S.K Aggerwal

C/O Foot/path by pdg. CC slab opp. 67-block from xing New Rohtak road upto and (L.H.S) Rattan Nagar in C-129/KBZ

M/s Harish Kumar

Pdg. Cement concrete pavement from H.NO. 3A/39 to H.no. 3A/60 in 3A-block, WEA in C-129A/KBZ

Pdg. Mastic asphaltic from Nalla to saraswati Marg on Pyare lal road in C-130A/KBZ

M/s Y.K Builders

Const. Of main gate on Master Prithivi Nath Marg in Ajmal Khan Park in C-129/KBZ

M/s Malhotra Const.Co

Const. Of Fountain in Hathiwala Chowk at Arya Samaj road Xing Ganga Mandir Marg C-130/KBZ

M/s Sehgal Bros.

Pdg. Mastic asphalt from 11A/10 up to Ganga Mandir Marg 6A Block WEA C-129/KBZ

M/s Y.K Builders

Page 257: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

32 Civil EE-XXIX 25.05.06 18.05.06 520245.00 216/24.11.06/EE-XXIX 22.11.06 30.11.06 519709.00 Completed

33 Civil EE-XXIX 25.05.06 18.05.06 476315.00 74/05.09.06/EE-XXIX 05.09.06 08.11.06 462865.00 Completed

34 Civil EE-XXIX 25.05.06 18.05.06 153769.00 168/31.10.06/EE-XXIX 31.10.06 08.12.06 153430.00 Completed

35 Civil EE-XXIX 25.05.06 18.05.06 227100.00 169/31.10.06/EE-XXIX 31.10.06 14.12.06 177408.00 Completed

36 Civil EE-XXIX 25.05.06 18.05.06 239069.00 170/31.10.06/EE-XXIX 31.10.06 05.12.06 238932.00 Completed

37 Civil EE-XXIX 25.05.06 18.05.06 238438.00 171/31.10.06/EE-XXIX 31.10.06 30.11.06 238293.00 Completed

38 Civil EE-XXIX 25.05.06 18.05.06 244700.00 73/28.08.06/EE-XXIX 18.09.06 21.09.06 244684.00 Completed

39 Civil EE-XXIX 25.05.06 18.05.06 243000.00 141/19.10.06/EE-XXIX 03.11.06 11.11.06 242695.00 Completed

40 Civil EE-XXIX 25.05.06 18.05.06 203248.00 104/5.9.06/EE-XXIX 6.10.06 12.12.06 202844.00 Completed

41 Civil EE-XXIX 25.05.06 18.05.06 179861.00 138/19.10.06/EE-XXIX 20.10.06 15.12.06 179403.00 Completed

Pdg. Mastic asphaltic from Guru Nanak Market to round about Channa Market in C-129/KBZ(Near Temple)

M/s Balaji & Associates

Pdg. CC pavement in lanes from H.NO. 13A/119 to H.NO. 13A/1, 13A/91, 13A/81 13A/47 & 13A/63 to 13A/41, 13A/63 to 13A/57 in 13A-block WEA (Slum Qtrs.) in C-129.KBZ

M/s Amit Builders

Pdg. CC pavement in gali No.13 Regar pura in C-130A/KBZ

M/s Amit Builders

Pdg. CC pavement in gali no. 30 Regar pura in C-130A/KBZ

M/s Pawan Kumar

Pdg. CC pavement in gali no.31 Regar pura in C-130A/KBZ

M/s Malhotra Const.Co

Pdg. CC pavement in gali no.37 Regar pura in C-130A/KBZ

M/s Malhotra Const.Co

Pdg. CC pavement in gali no. 37 Rrgar pura in C-130A/KBZ

M/s Dee Kay Enterprises

Imp. To crossing of Ajmal Khan road Xing Padam Singh road by pdg. Mastic in C-129/KBZ

M/s Bhavuk Const.Co

Imp.to back lane by pdg. Cement Concrete pavemnet from B.C marg H.No. 12/14 upto end in 12-block, W.E.A in C-129A/KBZ

M/s Bharar Const. Co.

Imp to side berm (RHS) by providing Cement Concrete pavement from Liberry Cinema upto round about on road no.6 in C-129/KBZ

M/s Malhotra Const.Co

Page 258: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

42 Civil EE-XXIX 25.05.06 18.05.06 325361.00 183/06.11.06/EE-XXIX 06.11.06 27.01.07 324885.00 Completed

43 Civil EE-XXIX 25.05.06 18.05.06 369575.00 182/06.11.06/EE-XXIX 06.11.06 27.01.07 369575.00 Completed

44 Civil EE-XXIX 25.05.06 18.05.06 498143.00 286/26.12.06/EE-XXIX 09.01.07 22.02.07 497512.00 Completed

45 Civil EE-XXIX 25.05.06 18.05.06 344344.00 274/13.12.06/EE-XXIX 27.12.06 31.12.06 344110.00 Completed

46 Civil EE-XXIX 25.05.06 18.05.06 387446.00 248/28.11.06/EE-XXIX 22.12.06 26.02.07 387301.00 Completed

47 Civil EE-XXIX 09.06.06 07.06.06 552095.00 83/05.09.06/EE-XXIX 05.09.06 14.11.06 551529.00 Completed

48 Civil EE-XXIX 09.06.06 07.06.06 579592.00 109/06.09.06/EE-XXIX 06.09.06 18.04.07 578920.00 Completed

49 Civil EE-XXIX 09.06.06 07.06.06 184959.00 53/10.8.06/EE-XXIX 12.8.06 11.9.06 184959.00 Completed

C/O Service lanes from H.NO. 60/11 to 60/14, 60/21 to 60/26 & 60/31 to 60/36 in block No.60 on Ramjas road in C-129A/KBZ(By pdg. CC pavement)

M/s Kuldeep Singh

C/O service lanes from h.NO. 52/26 to 52/35, 52/46 to 52/59 & 52/74 to 52/87 in 52-block on Ramjas road in C-129A/KBZ(by pdg. Cement Concrete pavement)

M/s Kuldeep Singh

Pdg.mastic asphaltic from New Pusa road to Guru Nanak road on Pyare lal road in Regar pura in C-130A/KBZ

M/s Y.K Builders

Pdg. Mastic asphaltic from New Pusa road and Padam Singh road Xing in Regar pura in C-130A/KBZ

M/s Balaji & Associates

Providing mastic asphalt from Ganga Mandir Marg on Hardhyan Singh road in Regar Pura in C-130A/KBZ

M/s Dee Kay Enterprises

Pdg. Drainage system from block 12A-block up to Crossing Arya Samaj road on B.C Marg (road no.10) in C-129/KBZ

M/s M.G Const.Co

P/L R.M.C in lanes in Bapa Nagar from Military road to Market (by R.M.C) in C-130/KBZ

M/s S.K Verma

Pdg. CC pavement in gali no. 4 Block No. 6 Dev Nagar in C-130B/KBZ

M/s Amit Builders

Page 259: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

50 Elect. EEE-VII 15.12.06 10.08.06 402115.00 202/5.3.07/ EE(E)-VII 5.3.07 28.3.07 396848.00 Completed

51 Elect. EEE-VII 15.12.06 10.08.06 170505.00 40/14.09.07/ EE(E)-VII 23.09.07 07.10.07 155138.00 Completed

52 Elect. EEE-VII 15.12.06 10.08.06 406564.00 203/5.3.07/EE(E)-VII 5.3.07 28.3.07 396700.00 Completed

53 Civil EE-XXIX 28.12.06 27.12.06 699900.00 18/18.04.07/EE-XXIX 30.04.07 27.05.07 699341.00 Completed

54 Civil EE-XXIX 28.12.06 27.12.06 364412.00 410/23.02.07/EE-XXIX 03.04.07 22.05.07 363503.00 Completed

55 Civil EE-XXIX 28.12.06 27.12.06 272200.00 155/24.07.07/EE-XXIX 05.10.07 10.10.08 192862.00 Completed

56 Civil EE-XXIX 28.12.06 27.12.06 699050.00 02/18.04.07/EE-XXIX 23.04.07 30.05.07 529275.00 Completed

57 Civil EE-XXIX 28.12.06 27.12.06 360600.00 9/18.04.07/EE-XXIX 19.04.07 28.06.07 234190.00 Completed

58 Civil EE-XXIX 28.12.06 27.12.06 264000.00 405/23.02.07/EE-XXIX 04.04.07 25.05.07 254815.00 Completed

P/o semi high mast light poles near Mandir Dev.Nagar & Near Ganeshwar gate Ajmal Khan Park in Ward 129 under KBZ.

M/s Sachdeva Electrieals

P/O lighting arrangement in the park near Dhobi Ghat WEA under KBZ.

M/s Maya Electricals

P/o semi high mast light poles in the park opp. Janki College under KBZ.

M/s Kamal Electrieals

Construction of road by providing RMC on Guru Nanak Market from Pusa Road to Saraswati Marg in C-129/KBZ.

M/s Kuldeep Singh

Const.of foot-path by providing polish kota stone flooring from Pyare Lal Road upto H.S road on Ajmal Khan road in C-129A/KBZ.

M/s Bagga Builders

Const.of Brick files Arches of ladies park side in Ajmal Khan Park in C-129/KBZ.

M/s Fren Const Co.

Const.of internal road/ lanes by providing CC pavement in 4-Block WEA in C-129A/ KBZ.

M/s Som Dutt Duevedi

Const.of foot-path by providing polish kota stone flooring from D.B Gupta Road upto Pyare Lal Road on Ajmal Khan road in C-129A/KBZ.

M/s Bagga Builders

Const.of road by providing mastic Ashphaltic from xing of Guru Nanak Road and Pyare Lal Road in C-130/KBZ.

M/s Subash Bros.

Page 260: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

59 Civil EE-XXIX 28.12.06 27.12.06 552300.00 412/23.2.07/EE-XXIX 23.2.07 29.3.07 421873.00 Completed

60 Civil EE-XXIX 28.12.06 27.12.06 298700.00 468/29.03.07/EE-XXIX 09.05.07 07.06.07 186313.00 Completed

61 Civil EE-XXIX 28.12.06 27.12.06 589500.00 25/28.06.07/EE-XXIX 03.07.07 10.07.07 586561.00 Completed

62 Civil EE-XXIX 28.12.06 27.12.06 301317.00 459/23.03.07/EE-XXIX 10.04.07 24.05.07 300885.00 Completed

63 Civil EE-XXIX 28.12.06 27.12.06 300333.00 411/23.02.07/EE-XXIX 23.02.07 07.04.07 300243.00 Completed

64 Civil EE-XXIX 28.12.06 27.12.06 274300.00 159/24.09.07/EE-XXIX 25.09.07 05.11.07 223590.00 Completed

65 Civil EE-XXIX 28.12.06 27.12.06 391700.00 414/23.02.07 23.02.07 16.04.07 390267.00 Completed

66 Civil EE-XXIX 28.12.06 27.12.06 306981.00 455/23.03.07/EE-XXIX 25.03.07 25.05.07 306512.00 Completed

Const.of road by providing CC pavement from Pusa Road to B.C Marg (RHS) along 16-Block Dispensary (Guru Nanak Market) in C-129A/KBZ

M/s Sanjeet Cousts

Const.of foot-path providing Polish kota Stone flooring from Arya Samaj road upto Padam Singh Road on Ajmal Khan Road in C-129A/KBZ.

M/s Bagga Builders

Const.of road by providing mastic from New Rohtak road xing upto Nav-Hind Public School between 5C & 4C block New Rohtak road in C-129B/KBZ.

M/s A & N Bros.

Const.of gali no.6 by providing CC pavement in Sat Nagar iin C-129A/KBZ.

M/s Ksihor & Co.

Const.of gali no.3 by providing CC pavement in Sat Nagar in C-129A/KBZ.

M/s Sunil Enterprises

Const.of block lanes by pdy.CC pavement in 1C, 2C block on New Rohtak road in C-129B/KBZ.

M/s Pawan Kumar

Const.of gali no.1 by providing CC pavement in Sat Nagar in C-129A/KBZ.

M/s Bharat Const.co

Const.of lane by pdy.CC pavement from H.NO.K/1 to 1C/9 in Ahata Thakur Dass in C-129B/KBZ.

M/s Bagga Builders

Page 261: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

67 Civil EE-XXIX 28.12.06 27.12.06 248700.00 177/27.09.07/EE-XXIX 28.09.07 31.10.07 195645.00 Completed

68 Civil EE-XXIX 28.12.06 27.12.06 699300.00 50/02.08.07/EE-XXIX 03.08.07 30.09.07 699023.00 Completed

69 Civil EE-XXIX 28.12.06 27.12.06 388700.00 457/23.03.07/EE-XXIX 03.04.07 29.06.07 388498.00 Completed

70 Civil EE-XXIX 28.12.06 27.12.06 521500.00 19/18.04.07/EE-XXIX 18.05.07 29.05.07 462215.00 Completed

71 Civil EE-XXIX 28.12.06 27.12.06 317584.00 458/23.03.07/EE-XXIX 29.03.07 30.11.07 317397.00 Completed

Const.of lanes by providing CC pavement in 65-block, New Rohtak Road in C-129B/KBZ.

M/s Pawan Kumar

Const.of lanes in block no.4 by providing CC pavement in W.E.A in C-129A/KBZ.

M/s Malhotra Const.Co

Const.of lane by providing CC pavement from H.NO.14B/26 to 14B/40 Dev Nagar in C-130B/KBZ.

M/s Bagga Builders

Const.of road by providing mastic from 5C/22 upto H.NO. 5C/26 between 4C & 5C block, New Rohtak road in C-129B/KBZ.

M/s Bhavuk Const.Co

Const.of roads by providing RMC (Remaining portion) between Ajmal Khan Road and Gurudwara road in C-129/KBZ.

M/s Bagga Builders

Page 262: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA,Sh M.L. Sodhi, AC No. 69 2006-07S.No. Name of Work deptt. Div. D.O.S D.O.C

1 Elect. EEE-I 10.05.06 28.04.06 188460.00 86/EE(E)I/15.09.06 24.09.06 10.10.06 138657.00 Completed

2 Elect. EEE-I 10.05.06 03.05.06 160888.00 76/15.09.06/EE(E)I 24.09.06 10.10.06 144614.00 Completed

3 Civil EE-III 17.05.06 16.04.06 187900.00 120/01.06.06/EE-III 02.06.06 30.06.06 187436.00 Completed

4 Civil EE-III 22.05.06 19.05.06 192550.00 204/11.08.06/EE-III 02.10.06 P 103365.00 In Prog.

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Expenditure

Present Position

P/o Semi high mast lighting arrangment at Aram Bagh Park between Block NO. 54 and 97 in W.no 132 SPZ

M/s M.J Electricals & Electronics

P/o semi high mast lighting arrangment near gate of Varunalya (D.J.B office) in W.no 132/SPZ

M/s Sechdeva Electricals

P/L Cc in Tail Mill road Amar puri from H.NO AB-221 to H.NO L-312 and in Adj. Lanes in C-131/SPZ

M/s Choudhary Associates

P/L cc in Amar puri from H.NO AB-399 to .No.AB-340 and in Adj. Lanes in C-131/SPZ

M/s Essco traders

Page 263: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

5 Civil EE-III 22.05.06 19.05.06 195300.00 124/05.06.06/EE-III M/s Arya & Co. 08.06.06 19.10.06 195186.00 Completed

6 Civil EE-III 22.05.06 19.05.06 199020.00 179/14.07.06/EE-III 25.07.06 04.09.06 198994.00 Completed

7 Civil EE-III 22.05.06 19.05.06 188040.00 118/01.06.06/EE-III 12.06.06 25.08.06 187186.00 Completed

8 Civil EE-III 22.05.06 19.05.06 189820.00 254/07.09.06/EE-III M/s Nitin Gupta 09.12.06 24.05.07 189085.00 Completed

9 Civil EE-III 22.05.06 19.05.06 193630.00 189/26.07.06/EE-III 25.08.06 29.09.06 192884.00 Completed

10 Civil EE-III 22.05.06 19.05.06 198600.00 186/25.07.06/EE-III 08.11.06 08.06.07 198022.00 Completed

11 Civil EE-III 22.05.06 19.05.06 196500.00 319/26.09.6/EE-III M/s Amit Gupta 09.11.06 02.01.07 196353.00 Completed

12 Civil EE-III 22.05.06 19.05.06 198800.00 121/01.06.06\EE-III 02.06.06 04.07.06 198359.00 Completed

13 Civil EE-III 31.05.06 30.05.06 272000.00

P/L cc in Amar puri from H.NO AB-400 to H.no AB-113 and in Adj. Lanes in C-131/SPZ

P/L CC on Tail mill road from H.NO 7408 to H.NO 7477 and in Adj laned in C-131/SPZ

M/s Sumit Const.Co.

P/L CC on Tail mill road from H.NO 7477 to AB-221 and in Adj laned in C-131/SPZ

M/s Rajesh Const.Co

P/L cc in Amar puri from H.NO AB-01 to H.NO AB-113 and in Adj. C-131 SPZ

P/L cc in Amar puri from H.NO AB-137 to H.NO AB-87 and in Adj. C-131 SPZ

M/s Bansal Const.

P/L cc in gali Subzi wali Nabi Karim from H.NO 6320 to H.No 6350 and in Adj. Lanes in C-131 SPZ

M/s S.K Const.Co

P/L cc in gali Subzi wali Nabi Karim from H.NO 6679 to H.No 6312 and in Adj. Lanes in C-131 SPZ

P/L cc in Laxmanpuri from H.NO L-106 to H.NO L-110 and in Adj. Lanes in C-131/SPZ

M/s J.P.Const.Co

I/S of Multani Dhanada road by pdg. Bitumen Mastic from gali no-6 to Hanuman Mnadir in C-131/SPZ

Page 264: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

14 Civil EE-III 31.05.06 30.05.06 273800.00

15 Civil EE-III 19.06.06 06.06.06 278000.00 437/30.11.06/EE-III 30.11.06 08.01.07 204652.00 Completed

16 Civil EE-III 19.06.06 06.06.06 201744.00 597/22.01.07/EE-III 01.02.07 28.02.07 201659.00 Completed

17 Civil EE-III 19.06.06 06.06.06 281200.00 616/23.01.07/EE-III 03.02.07 28.02.07 207640.00 Completed

18 Civil EE-III 19.06.06 06.06.06 204277.00 241/07.09.06/EE-III 07.09.06 26.10.06 203747.00 Completed

19 Civil EE-III 19.06.06 20.04.06 193536.00 182/25.07.06/EE-III M/s Islamuddin 28.07.06 06.10.06 193504.00 Completed

20 Civil EE-III 26.06.06 20.06.06 199428.00 573/17.01.07/EE-III 31.01.07 26.03.07 199417.00 Completed

21 Civil EE-III 26.06.06 20.06.06 202751.00 523/27.12.06/EE-III 28.12.06 20.02.07 202708.00 Completed

I/S of Multani Dhanada road by pdg. Bitumen Mastic from Hanuman Mnadir to Shiv Mandir in C-131/SPZ

Imp. Of side berms by pdy. Cc from H.No. 11207 to Dori walan gali in C-132 A/SPZ

M/s V.K Associates

Imp to lane by pdy. Cc from H.no. 9419 to 9679 and 9682 to 9411 in Bagh Raoji (Pacca chowk) Basti Lal Singh in C-132 A/SPZ

M/s Kapoor Const.

Imp to lane by Pdy. Cc from H.no. T-1085 t o T-1080 Bhagat singh nagar, Manak pura inC-132 A/SPZ

M/s Kapoor Const.

Imp to lane by Pdy. Cc from H.no. T-1090 t o T-1101 Bhagat singh nagar, Manak pura inC-132 A/SPZ

M/s Bajaj Const.Co

P/L cc near Atul Gas Agency Shop No.1 to 49 and Adj. Lanes Janta Mkt. Rani Jhansi Road in C-132 B/SPZ

P/L CC and imp.to drainage system at pvt. Katra Multani no. 8680 in Shidi Pura in W.NO. 132A/SPZ

M/s Guru Kirpa Enterprises

P/L CC and imp.to drainage system at pvt. Katra no. 8800/5 and 8808 in Shidi Pura in W.NO. 132A/SPZ

M/s Guru Kirpa Enterprises

Page 265: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

22 Civil EE-III 26.06.06 20.06.06 198087.00 545/02.01.07/EE-III 03.01.07 22.02.07 197577.00 Completed

23 Civil EE-III 26.06.06 20.06.06 199657.00 547/02.01.07/EE-III 05.01.07 26.02.07 199432.00 Completed

24 Civil EE-III 26.06.06 20.06.06 197436.00 522/27.12.06/EE-III 27.12.06 20.02.07 196944.00 Completed

25 Civil EE-III 26.06.06 20.06.06 197783.00 546/02.01.07/EE-III 02.01.07 20.02.07 197339.00 Completed

26 Civil EE-III 26.06.06 20.06.06 192930.00 569/17.01.07/EE-III 17.01.07 26.02.07 192678.00 Completed

27 Civil EE-III 26.06.06 20.06.06 196674.00 521/27.12.06/EE-III 28.12.06 10.03.07 196633.00 Completed

28 Civil EE-III 26.06.06 20.06.06 195875.00 563/17.01.07/EE-III 17.01.07 26.02.07 195274.00 Completed

29 Civil EE-III 26.06.06 20.06.06 197238.00 373/01.11.06/EE-III 08.11.06 25.01.07 196823.00 Completed

P/L CC and imp. to drainage system at pvt. Katra no. 10334, 10338 in gali piple wali and 10746 in gali phool wali in Manak Pura in W.NO. 132A/SPZ

M/s Guru Kirpa Enterprises

Imp. drainage system and P/L CC in pvt. Katra no. 9725(Nanak Chand) at Gaushala road in W.NO. 132A/SPZ`

M/s Guru Kirpa Enterprises

Imp. drainage system and P/L CC in pvt. Katra no. 9731(Lala Jhoari Mal) at Gaushala road in W.NO. 132A/SPZ

M/s Choudhary Associates

Imp. drainage system and P/L CC in pvt. Katra no. 9383(Sher Sing Katra) at Bagh Raoji in W.NO. 132A/SPZ

M/s Guru Kirpa Enterprises

Imp. drainage system and P/L CC in pvt. Katra no. 9721(Bakhtavar Lal) at Gaushala road in W.NO. 132A/SPZ

M/s Guru Kirpa Enterprises

Imp. drainage system and P/L CC in pvt. Katra no. 9385 in gali Kumhar wali in Bagh Raoji in W.NO. 132A/SPZ

M/s Guru Kirpa Enterprises

Imp. drainage system and P/L CC in pvt. Katra no. 10229(Lilu Wala) in gali Gayasa in Bhagat Singh Nagar in W.NO. 132A/SPZ

M/s Guru Kirpa Enterprises

Imp. drainage system and P/L CC in pvt. Katra no. 8755 and 8748/14B in Shidi Pura in W.NO. 132A/SPZ

M/s J.P.Const.Co

Page 266: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

30 Civil EE-III 10.07.06 07.07.06 192100.00 317/26.09.06/EE-III M/s K.K Const. 29.10.06 04.12.06 191775.00 Completed

31 Civil EE-III 10.07.06 07.07.06 198400.00 318/26.09.06/EE-III 10.10.06 24.11.06 197592.00 Completed

32 Civil EE-III 10.07.06 07.07.06 197800.00 304/25.09.06/EE-III 06.10.06 26.11.06 197651.00 Completed

33 Civil EE-III 10.07.06 07.07.06 195000.00 586/19.01.07/EE-III 12.01.07 30.03.07 194155.00 Completed

34 Civil EE-III 10.07.06 07.07.06 195700.00 311/26.9.06/EE-III 26.09.06 09.11.06 195030.00 Completed

35 Civil EE-III 10.07.06 07.07.06 194600.00 278/19.09.06/EE-III 20.09.06 08.11.06 194209.00 Completed

36 Civil EE-III 10.07.06 07.07.06 196852.00 560/17.01.07/EE-III 18.01.07 26.02.07 196765.00 Completed

37 Civil EE-III 10.07.06 07.07.06 189159.00 590/19.01.07/EE-III 31.01.07 26.03.07 189007.00 Completed

38 Civil EE-III 10.07.06 07.07.06 202759.00 548/02.01.07/EE-III 03.01.07 22.02.07 202378.00 Completed

39 Civil EE-III 10.07.06 07.07.06 203107.00 524/27.12.06/EE-III 28.12.06 02.03.07 203107.00 Completed

P/L CC from H.NO.10578 to Shiv Mandir & in Manak Pura adj. Lanes in W.No.132A/SPZ

P/L CC from Rawal Pindi School to 11233, Doriwalan in gali no.4 in C-132A/SPZ

M/s Shree Madhor Builders

P/L CC from 9038/1413 to 9014 Shidi Pura in W.NO.132A/SPZ

M/s Kapoor Const.

P/L CC from H.NO. 8949 to 8952 in Shidi Pura in C-132/A/SPZ

M/s S.K Const.Co

P/L CC from H.NO. 8987 to 8815/14 in Shidi pura and adj.lanes in C-132A/SPZ

M/s Choudhary Associates

Pdy.M/P at Rani Jhansi Road from Idgah round about to Filmstan Cinema in W.NO.132A/SPZ

M/s Raj Kumar Khatri

Imp.to drainage system and P/L CC in Pvt. Katra no. 10525 to 10540 in Manak Pura in C-132A/SPZ

M/s Choudhary Associates

Imp.to drainage system and P/L CC in Pvt. Katra no. 8734-37 in Shidi Pura in C-132A/SPZ

M/s Guru Kirpa Enterprises

P/L CC and Imp.to drainage system in Pvt.Katra No. 9372 in Gali Malkhan Singh Bagh Raoji in W.NO.132A/SPZ

M/s Choudhary Associates

Imp.to drainage system and P/L CC in Pvt.Katra No.10500 in Manak Pura (Hari Chand Chowk) in W.no.132A/SPZ

M/s Choudhary Associates

Page 267: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

40 Civil EE-III 10.07.06 07.07.06 195314.00 566/17.01.07/EE-III 29.01.07 28.03.07 195126.00 Completed

41 Civil EE-III 10.07.06 07.07.06 195769.00 887/30.03.07/EE-III 16.05.07 25.06.07 194941.00 Completed

42 Civil EE-III 14.08.06 12.08.06 524400.00 433/30.11.06/EE-III 12.12.06 14.02.07 460609.00 Completed

43 Civil EE-III 14.08.06 12.08.06 513400.00 435/30.11.06/EE-III 12.12.06 12.02.07 450164.00 Completed

44 Civil EE-III 21.08.06 07.08.06 216038.00 594/22.01.07/EE-III 22.01.07 21.02.07 215574.00 Completed

45 Civil EE-III 21.08.06 07.08.06 296400.00 434/30.11.06/EE-III 11.12.06 23.02.07 217912.00 Completed

46 Civil EE-III 19.10.06 10.06.06 509718.00 372/01.11.06/EE-III 20.11.06 09.02.07 509713.00 Completed

47 Civil EE-III 19.10.06 03.10.06 199751.00 394/14.11.06/EE-III 18.10.06 23.12.06 199694.00 Completed

48 Civil EE-III 13.12.06 25.10.06 198657.00 544/02.01.07/EE-III 08.01.07 30.03.07 198548.00 Completed

49 Civil EE-III 13.12.06 25.10.06 199820.00 543/02.01.07/EE-III M/s Jain Const. 07.01.07 30.03.07 199743.00 Completed

Imp.to drainage system and P/L CC in Pvt.Katra No.8822 in Shidi Pura in C-132A/SPZ

M/s Choudhary Associates

Imp.to drainage system and P/L CC in Pvt.Katra No.10522 in Manak Pura C-132A/SPZ

M/s D.K Builders-I

P/L M/P on road near Tagore Public School at Motir Khan in C-132(B)/ S.P Zone.

M/s Bajaj Const.Co

Imp.of road surface by pdy.M/P opp.Vardh man Complex in C-132B/S.P Zone.

M/s Bajaj Const.Co

P/L CC on Desh Raj Bhatia Marg from Gali No.4 to Jain Public School in adj.lanes in C-131/ S.P Zone.

M/s D.K Builders-I

P/L cc in Laxmanpuri from H.NO L-96 to H.NO L-124 and in Adj. Lanes in C-131/SPZ

M/s Bajaj Const.Co

P/L CC on Jhanda Walan Road from Shop NO.10640 to Shop no.10604 in C-131/SPZ.

M/s Kapoor Const.

Imp.of road berms by providing CC from C.G Road to School in Aram Bagh in C-132(B)/SPZ.

M/s Mohd.Rashid

Dev.of road berm by pdy.CC opp.Kendrya Bhandar in Aram Bagh in w.no.132(B)/SPZ.

M/s Surander Kumar Jain

Dev.to road berm by pdy.CC from NDPL office to Udasin Ashram in w.no.132(B)/SPZ.

Page 268: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

50 Civil EE-III 13.12.06 25.10.06 198506.00 516/26.12.06/EE-III 03.01.07 05.03.07 198498.00 Completed

51 Civil EE-III 15.12.06 10.07.06 220945.00 52/10.06.08/EE-III 05.07.08 11.11.08 220829.00 Completed

52 Civil EE-III 15.12.06 10.07.06 218637.00 452/23.10.07/EE-III 03.09.07 26.11.07 217012.00 Completed

53 Civil EE-III 15.12.06 10.07.06 222965.00 49/10.06.08/EE-III 17.06.08 05.11.08 222655.00 Completed

54 Civil EE-III 15.12.06 10.07.06 225389.00

55 Civil EE-III 15.12.06 10.07.06 221819.00 168/07.09.07/EE-III 26.11.07 29.03.08 221819.00 Completed

56 Civil EE-III 15.12.06 10.07.06 227497.00 51/10.06.08/EE(M)-III 10.06.08 06.08.08 221473.00 Completed

57 Civil EE-III 19.12.06 16.12.06 198550.00 910/30.03.07/EE-III 11.04.07 28.08.07 198489.00 Completed

Dev.of footpath and side berms by pdy. CC of Jhandewalan, Rani Jhansi (R.J) Road in w.no.132(B)/SPZ.

M/s Kapoor Const.

P/L CC in Amar puri from H.NO.A-21 to H.NO.A-68 (Gali Choley wali) and adjoining lanes in C-131/SPZ.

M/s United Const. Co.

P/L CC in Amar Puri Gali Ansari wali from H.No.AB-431 to H.NO.AB-480 and in adjoining lanes in C-131/SPZ.

M/s Malhotra Const. Co.

P/L CC in Aram Nagar from H.NO.7300 to H.NO.7311 in gali no.2 and in adjoining lanes in w.no.131/SPZ.

M/s United Const. Co.

P/L CC in Aram Nagar from H.NO.7271 to H.No.A-283 in gali no.2 and in adjoining lanes in w.no.131/SPZ.

P/L CC in Aram Nagar from H.No 7338 to H.NO.A-130 in gali no.1 and in adjoining lanes in w.no.131/SPZ.

M/s United Const. Co.

P/L CC in Aram Nagar from H.NO.7353 to H.NO.7338 in gali no.1 and adjoining lanes in C-131/SPZ.

M/s United Const. Co.

Dev.to road surface by m/p at Rani Jhansi Road to LIG Main gate in C-132 (B)/SPZ.

M/s Bajaj Const.Co

Page 269: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

58 Civil EE-III 09.01.07 29.11.07 243522.00 900/30.03.07/EE-III M/s Wahid 23.06.07 30.07.07 243172.00 Completed

59 Civil EE-III 09.01.07 29.11.06 244067.00 901/30.03.07/EE-III M/s Wahid 16.06.07 30.07.07 243602.00 Completed

60 Civil EE-III 09.01.07 25.10.06 96453.00 835/28.03.07/EE-III 18.04.07 22.06.07 96412.00 Completed

61 Civil EE-III 09.01.07 25.09.06 194958.00 726/15.02.07/EE-III 17.02.07 21.02.07 194908.00 Completed

62 Civil EE-III 15.01.07 01.12.06 199766.00 649/05.02.07/EE-III 08.02.07 23.04.07 199565.00 Completed

63 Civil EE-III 15.01.07 01.12.06 199511.00 663/09.02.07/EE-III 15.02.07 14.05.07 199430.00 Completed

64 Civil EE-III 15.01.07 01.12.06 198772.00 696/09.02.07/EE-III 17.02.07 14.05.07 198200.00 Completed

65 Civil EE-III 15.01.07 01.12.06 199798.00 661/05.02.07/EE-III 10.02.07 30.03.07 198802.00 Completed

66 Civil EE-III 15.01.07 01.12.06 199646.00 655/05.02.07/EE-III 22.02.07 08.05.07 199624.00 Completed

67 Civil EE-III 15.01.07 01.12.06 199830.00 780/05.03.07/EE-III M/s K.K Const. 08.03.07 13.06.07 199481.00 Completed

P/L CC in Aram Nagar from H.NO.7312 to 7294 and from H.NO.7266 to H.NO.7263 and in adjoining lanes in C-131/SPZ.

P/L CC in Aram Nagar Qutab Road from H.NO.7250 to H.NO.7230 and from H.No.7231 to H.NO.7237 and in adjoining lanes in C-131/SPZ.

Dev.of lane of P/L CC infront of M.C School in Aram Bagh area in w.no.132B/S.P.Zon.

M/s Raj Kumar Khatri

Dev.of B/Wall & M.S grills Surounding of Jhande walan Mandir in area C-132B/SPZ.

M/s Amba Contractor

Dev.of road by pdy.CC from A-41 to Mother Dairy, Motir Khan, in w.no.132-B/SPZ.

M/s Kushal Bharat

Dev.of road by pdy.CC from A-55 to A-64 LIG Flats Motir Khan, in w.no.132-B/SPZ.

M/s Mohd.Rashid

Dev.of lane of by pdy.CC from A-140 to A-163, in LIG Flats, Motir Khan, w.no.132-B/SPZ.

M/s Ved pal Bhatia

Dev.of lane by pdy.CC from A-239 to A-242 in Motir Khan in w.no.132-B/SPZ.

M/s Rakesh Bansal

Dev.of lane by pdy.CC from A-228 to A-234 to LIG Flats in Motir Khan in w.no.132-B/SPZ.

M/s Rajesh Const.Co

Dev.of lane by pdy.CC from A-60 to A-65, MIG Flats in Motir Khan in w.no.132-B/SPZ.

Page 270: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

68 Civil EE-III 15.01.07 01.12.06 199662.00 642/05.02.07/ 08.02.07 12.05.07 199155.00 Completed

69 Civil EE-III 15.01.07 01.12.06 199583.00 777/22.02.07/EE-III 06.03.07 22.05.07 199438.00 Completed

70 Civil EE-III 15.01.07 01.12.06 199662.00 758/22.02.07/EE(M)-I 22.02.07 18.09.08 199304.00 Completed

71 Civil EE-III 15.01.07 01.12.06 199052.00 788/05.03.07/EE-III 12.03.07 31.05.07 198487.00 Completed

72 Civil EE-III 15.01.07 01.12.06 199052.00 624/18.01.07/EE-III 22.01.07 26.04.07 198657.00 Completed

73 Civil EE-III 15.01.07 01.12.06 199798.00 765/22.02.07/EE-III M/s R.P Builder 22.02.07 18.04.07 199700.00 Completed

74 Civil EE-III 15.01.07 01.12.06 199888.00 678/09.02.07/EE-III 14.02.07 18.04.07 199807.00 Completed

75 Civil EE-III 15.01.07 01.12.06 199418.00 809/15.03.07/EE-III 18.04.07 17.05.07 199313.00 Completed

76 Civil EE-III 15.01.07 01.12.06 199555.00 691/09.02.07/EE-III 07.03.07 P 198865.00 Completed

77 Civil EE-III 15.01.07 05.12.06 440591.00 130/28.08.07/EE-III 31.08.07 17.09.07 440348.00 Completed

Dev.of lane by pdy.CC from 51 to 53, MIG Flats in Motir Khan in w.no.132-B/SPZ.

M/s Vardaan Builders

Dev.of road by pdy.CC from A-42 to A-48 MIG Flats in Motir Khan w.no.132-B/SPZ.

M/s Deepak Kumar

Dev.of road by pdy.CC from A-36 to A-39, MIG at Motir Khan in w.no.132-B/SPZ.

M/s Puneet Nayyar

Dev.of road by pdy.CC from 40 to 44 MIG Flats in Motir Khan in w.no.132-B/SPZ.

M/s Naveen Const

Dev.of road by pdy.CC from B-89 to 95 near Kalyani Mandir in D/S Motir Khan in w.no.132-B/SPZ.

M/s Sethi Enterprises

Dev.of road by pdy.CC from 98 to 109 at Kalyani Mandir in D/S Motir Khan in w.no.132-B/SPZ.

Dev.of lane by pdy.CC from 9A to Park Gate MIG Flats in Motir Khan, w.no.132-B/SPZ.

M/s Som dult dverdi

Dev.of road/lane by pdy.CC from 10-A to 14-A, MIG Falts Motir Khan in w.no.132-B/SPZ.

M/s Sanjeev Builders

Dev.of road by premix from Main Gate to DESU Booth & parking, 14A at Motir Khan in w.no.132-B/SPZ.

M/s Shree Madhav Builders

Dev.of road berms by pdy.CC from main gate MIF Flats to Ladies Park in Motir Khan, in w.no.132-B/SPZ.

M/s Manoj Const

Page 271: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

78 Civil EE-III 15.01.07 05.12.06 418070.00 432/23.10.07/EE-III 29.10.07 04.12.07 417889.00 Completed

79 Civil EE-III 15.01.07 05.12.06 198821.00 739/22.02.07/EE-III 27.02.07 30.04.07 198721.00 Completed

80 Civil EE-III 15.01.07 05.12.06 231960.00 898/30.03.07/EE-III 22.05.07 10.08.07 231428.00 Completed

81 Civil EE-III 15.01.07 05.12.06 245369.00 902/30.03.07/EE-III 27.06.07 25.07.07 245077.00 Completed

82 Civil EE-III 15.01.07 10.01.07 199370.00 656/05.02.07/EE-III 02.03.07 10.05.07 199300.00 Completed

83 Civil EE-III 01.02.07 31.01.07 198364.00 638/05.02.07/EE-III 06.02.07 19.03.07 183020.00 Completed

84 Civil EE-III 07.02.07 30.01.07 243177.00 914/30.03.07/EE-III M/s Wahid 18.07.07 31.07.07 243035.00 Completed

85 Civil EE-III 12.02.07 12.02.07 197112.00 725/15.02.07/EE-III 18.04.07 23.05.07 197112.00 Completed

86 Civil EE-III 12.02.07 12.02.07 197807.00 831/28.03.07/EE-III M/s Jain Const. 08.03.07 18.05.07 197707.00 Completed

Dev.of road berms by pdy.CC from LIG Flats no. 3 to Flat B/Wall in w.no.132-B/SPZ.

M/s Jag Mohan Kapoor

Dev.of road surface by premix from Punchuyan Road to Corner Dalao (Munni Akhara)at Aram bagh in w.no.132(B)/SPZ.

M/s Narender Singh Dhanker

Dev.of lane by pdy/laying CC and imp.of Eutrace gate in gali Gurudwara in Motir Khan in W.NO.132/-B/SPZ.

M/s J.P Const.CO.

Development to B/Wall and entrance of MIG/LIG Flats from Rani Jhansi (R.J) Road in Motir Khan in w.no.132-B/SPZ.

M/s Pawan Const.

Dev.of road surface by M/Premixing at D.B Gupta road from Round About to Chitra Gupta Road in C-132(B)/SPZ.

M/s Goldy Const.Co

Dev.to CC pavement from H.NO.10187/IA to Urival in Shaheed Bhagat Singh Nagar in C-132A/SPZ.

M/s Choudhary Associates

P/L CC in Aram Nagar from H.NO.7271 to H.No.A-283 in gali no.2 and in adjoining lanes in w.no.131/SPZ.

Dev.of gali no.8 by CC in Motee Khan in W.NO.132-B/SPZ.

M/s Arora const.

Dev.of road by pdy.CC from Ambed kar Bhawan to Munni Vayam shala at R.J Road in W.NO.132(B)/SPZ.

Page 272: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

Status Report of MLA,Sh. Rajesh Lilothia, AC No. 70S.No. Name of Work deptt. Div. D.O.S D.O.C

1 Civil EE-XXIX 12.07.06 08.07.06 194971.00 89/05.09.06/EE-XXIX 14.09.06 28.11.06 194767.00 Completed

2 Civil EE-XXIX 12.07.06 08.07.06 174973.00 95/05.09.06/EE-XXIX 11.09.06 12.12.06 174367.00 Completed

3 Civil EE-XXIX 12.07.06 08.07.06 193967.00 90/05.09.06/EE-XXIX 12.09.06 30.01.07 193902.00 Completed

4 Civil EE-XXIX 12.07.06 08.07.06 197181.00 96/05.09.06/EE-XXIX 13.09.06 12.12.06 197116.00 Completed

Date of Booking

Date of Consent

Amount booked

Work order no. with date i/c division

Name of agency

Expenditure

Present Position

Providing & Laying of drainage system near Gurudwara Nanak Tila and BNB 1174 and adjoining in Baljeet Nagar in C-134, KBZ

M/s Markanda Consts.

Providing & Laying of CC flooring near Gurudwara Nanak Tila and T-650/M-1/AC and adjoining in Baljeet Nagar in C-134, KBZ

M/s Sanjay Kumar Jain

Providing & Laying of CC flooring near H.NO. BNB 1174 and T-650B and adjoining in Baljeet Nagar in C-134, KBZ

M/s Markanda Consts.

Providing & Laying of drainage system near H.NO. T-139/A-1 and T-142 and adjoining in Baljeet Nagar in C-134, KBZ

M/s Sanjay Kumar Jain

Page 273: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

5 Civil EE-XXIX 12.07.06 08.07.06 193665.00 88/05.09.06/EE-XXIX 06.09.06 22.10.06 193528.00 Completed

6 Civil EE-XXIX 12.07.06 08.07.06 196906.00 M/s Jai Kumar 06.09.06 29.11.06 196030.00 Completed

7 Civil EE-XXIX 12.07.06 08.07.06 196700.00 91/05.09.06/EE-XXIX 06.09.06 06.11.06 196700.00 Completed

8 Civil EE-XXIX 12.07.06 08.07.06 198680.00 M/s Jai Kumar 06.09.06 25.11.06 198664.00 Completed

9 Civil EE-XXIX 12.07.06 08.07.06 197580.00 99/05.09.06/EE-XXIX 12.09.06 22.11.06 197445.00 Completed

10 Civil EE-XXIX 12.07.06 08.07.06 198630.00 25.09.06 05.12.06 198279.00 Completed

11 Civil EE-XXIX 22.08.06 01.08.06 198506.00 86/05.09.06/EE-XXIX 08.09.06 29.11.06 197579.00 Completed

Providing & Laying of CC flooring near Gurudwara Nanak Tila and BNB 1174 and adjoining in Baljeet Nagar in C-134, KBZ

M/s Markanda Consts.

Providing & Laying of CC flooring near H.NO.BNC-1759 and BNC 2238 and adj.in Baljeet Nagar in C-134B, KBZ

102/05.09.06/EE-XXIX

Providing & Laying of drainage system near H.NO.BNC-1759 and BNC 2238 and adj.in Baljeet Nagar in C-134B, KBZ

M/s Tajinder Const.Co

Providing & Laying of drainage system & CC flooring near H.NO.B-168 to B-64 and adj.in Baljeet Nagar in C-134B, KBZ

101/05.09.06/EE-XXIX

Providing & Laying of drainage system near H.NO.T-2564 and H.NO.E-100A and adj.in Baljeet Nagar in C-134B, KBZ

M/s Deepak Const.Co

Providing & Laying of CC flooring near H.NO.T-2564 and E-100-A and adj.in Baljeet Nagar in C-134B, KBZ

116/25.09.06/EE-XXIX

M/s Bagga Builders

Providing & Laying drainage system near H.NO.T-29/N-10B and BNB 2121 and adjoining in Baljeet Nagar in C-134-B, KBZ

M/s P.R Const.Co

Page 274: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

12 Civil EE-XXIX 22.08.06 01.08.06 198780.00 92/05.9.06/EE-XXIX 06.09.06 03.10.06 198759.00 Completed

13 Civil EE-XXIX 22.08.06 01.08.06 196276.00 M/s Jai Kumar 06.09.06 10.02.07 196050.00 Completed

14 Civil EE-XXIX 22.08.06 01.08.06 191338.00 87/05.09.06/EE-XXIX 06.09.06 13.10.06 191261.00 Completed

15 Civil EE-XXIX 22.08.06 01.08.06 105701.00 25.09.06 08.11.06 105696.00 Completed

16 Civil EE-XXIX 22.08.06 01.08.06 198362.00 93/05.09.06/EE-XXIX 06.09.06 13.10.06 198066.00 Completed

17 Civil EE-XXIX 22.08.06 01.08.06 150959.00 08.09.06 31.10.06 149676.00 Completed

18 Civil EE-XXIX 22.08.06 01.08.06 197951.00 M/s J.S Consts 02.04.07 21.05.07 196531.00 Completed

Providing & Laying drainage system & CC flooring near H.NO.BNB-1356 and BNB 2168 and adjoining in Baljeet Nagar in C-134-B, KBZ

M/s Tajinder Const.Co

Providing & Laying CC flooring near H.NO.T-29/N-10B and BNB 2121 and adjoining in Baljeet Nagar in C-134B/KBZ

103/05.09.06/EE-XXIX

Providing & Laying CC flooring near H.NO.T-572/C-1 and T-510/C-3/BA and adjoining in Baljeet Nagar inC-134B/KBZ

M/s Markanda Consts.

Providing & Laying CC flooring near H.NO.T-563/G-1 and T-515/8B-2 and adjoining in Baljeet Nagar in C-134B/KBZ

117/25.09.06/EE-XXIX

M/s Bagga Builders

Providing & Laying CC flooring near H.NO.T-583/2 and T-572/C-1 and adjoining in Baljeet Nagar in C-134B/KBZ

M/s Tajinder Const.Co

Providing & Laying drainage System & CC flooring near H.NO.T-356/1B and T-348/B-1 and adjoining in Baljeet Nagar in C-134B/KBZ

100/05.09.06/EE-XXIX

M/s Deepak Const.Co

Providing & Laying CC flooring near H.NO.T-487 and T-587/A and adjoining in Baljeet Nagar C-134B/KBZ

118/25.09.06/EE-XXIX

Page 275: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

19 Civil EE-XXIX 22.08.06 01.08.06 194792.00 94/05.09.06/EE-XXIX 12.09.06 12.12.06 194729.00 Completed

20 Civil EE-XXIX 22.08.06 01.08.06 115403.00 98/05.09.06/EE-XXIX 08.09.06 30.10.06 115160.00 Completed

21 Civil EE-XXIX 22.08.06 01.08.06 178281.00 84/05.09.06/EE-XXIX 05.09.06 02.11.06 178231.00 Completed

22 Elect. EEE-VII 12.09.06 08.08.06 165969.00 12.03.07 28.03.07 149297.00 Completed

23 Civil EE-XXIX 19.09.06 25.08.06 197935.00 08.11.06 07.02.07 195210.00 Completed

24 Civil EE-XXIX 19.09.06 25.08.06 196897.00 08.11.06 15.01.07 196393.00 Completed

25 Civil EE-XXIX 19.09.06 25.08.06 197069.00 M/s Jai Kumar 01.11.06 12.12.06 197069.00 Completed

26 Civil EE-XXIX 19.09.06 25.08.06 198123.00 08.11.06 07.02.07 195133.00 Completed

Providing & Laying drainage system and CC flooring near H.NO.T-29/A-1 and T-29/B-9A and adjoining in Baljeet Nagar C-134B/KBZ

M/s Sanjay Kumar Jain

Providing & laying drainage system near H.NO.T-487 and T-587/A and adjoining in Baljeet Nagar in C-134B/KBZ

M/s Deepak Const.Co

Providing & Laying drainage system near H.NO.T-563/G-1 and T-515/8B-2 and adjoining in Baljeet Nagar in C-134B/KBZ

M/s P.R Const.Co

P/O lighting arrangement in Rajiv Vatika Park, Gadodia Road, Anand Parbat under KBZ

200/05.03.07/EE(E)-VII

M/s Maya Electricals

Development of road sides from Dalao to Ramjas Pry.School by pdy.CC pavement in Anand Prabat in C-133 KBZ

158/30.10.06/EE-XXIX

M/s Kritika Consts

Development of road sides from Ramjas Pry.School forwards Farid Puri by pdy.CC Pavement in Anand Parbat in C-133/KBZ

155/30.10.06/EE-XXIX

M/s Tajinder Const.Co

P/L cement concrete road sides from sant Kabir Marg to Ramjas Senior Public School in C-133, KBZ

153/30.10.06/EE-XXIX

P/L cement concrete pavement from gali no.6 A.P.I.A to Shiv Shakti Mandir in Anand Parbat in C-133, KBZ

157/30.10.06/EE-XXIX

M/s Kritika Consts

Page 276: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

27 Civil EE-XXIX 19.09.06 25.08.06 190754.00 01.11.06 19.12.06 189743.00 Completed

28 Civil EE-XXIX 19.09.06 25.08.06 199508.00 09.11.06 26.12.06 199436.00 Completed

29 Civil EE-XXIX 19.09.06 25.08.06 199281.00 09.11.06 08.01.07 199281.00 Completed

30 Civil EE-XXIX 19.09.06 25.08.06 197668.00 21.10.06 11.01.07 197605.00 Completed

31 Civil EE-XXIX 19.09.06 25.08.06 197266.00 M/s J.S Consts 08.11.06 16.04.07 193642.00 Completed

32 Civil EE-XXIX 19.09.06 25.08.06 195650.00 M/s Jai Kumar 01.11.06 12.12.06 195474.00 Completed

33 Civil EE-XXIX 19.09.06 25.08.06 186351.00 31.10.06 04.12.06 186285.00 Completed

34 Civil EE-XXIX 11.10.06 07.09.06 199241.00

P/L cement concrete pavement along factory no.5/12 gali no.12 A.P.I.A in C-133 KBZ

150/30.10.06/EE-XXIX

M/s Deepak Const.Co

P/L cement concrete pavement along factory no.5/8 in gali no.12 A.I.P.A in C-133 KBZ

161/30.10.06/EE-XXIX

M/s Bagga Builders

P/L cement concrete pavement along factory no.R/11A A.P.I.A in C-133 KBZ

164/31.10.06/EE-XXIX

M/s Sanjay Kumar Jain

Development of road sides from post office to Dalao by pdy.CC pavement in Anad Parbat in C-133 KBZ

135/19.10.06/EE-XXIX

M/s Markanda Consts.

P/L CC on road sides on Sant Kabir Marg from Post office to Ghati road L.H.S in Anand Parbat in C-133 KBZ

160/30.10.06/EE-XXIX

P/L cement concrete pavement along factory no.R/12-23 to 78 in Gali no.11 Anand Parbat Industry Area in C-133 KBZ

154/30.10.06/EE-XXIX

Pdy.BRC fabric & M.S grill on Sarai Rohilla flyover in C-133, KBZ

156/30.10.06/EE-XXIX

M/s Tajinder Const.Co

P/L CC flooring & D/system in internal lanes between gali no.1 & 2 starting from H.NO.407/T-2 to 407 E in Than Singh Nagar Anand Parvat in C-134A/KBZ.

Page 277: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

35 Civil EE-XXIX 11.10.06 07.09.06 199895.00 21.12.06 28.02.07 199621.00 Completed

36 Civil EE-XXIX 11.10.06 07.09.06 194903.00 15.12.06 22.01.07 193988.00 Completed

37 Civil EE-XXIX 11.10.06 07.09.06 194667.00 30.11.06 20.02.07 193906.00 Completed

38 Civil EE-XXIX 11.10.06 07.09.06 199466.00 236/28.11.06/EE-XXIXM/s P.R Const. 07.12.06 02.02.07 199055.00 Completed

39 Civil EE-XXIX 11.10.06 07.09.06 139544.00 01.12.06 08.03.07 138972.00 Completed

40 Civil EE-XXIX 11.10.06 07.09.06 91308.00 04.12.06 18.12.06 91280.00 Completed

P/L CC flooring & D/system in Baluji wali gali & Akhara wali gali in Than Singh Nagar Anand Parvat in C-134A/KBZ.

212/22.11.06/EE-XXIX

M/s Deepak Const.Co

P/L CC flooring & D/system in Kuan Wali gali and its links from H.NO.69/1A to 98/2 in Than Singh Nagar Anand Parvat in C-134A/KBZ.

222/27.11.06/EE-XXIX

M/s Bagga Builders

Pdy.D/system and laying CC flooring in gali no.11A and adjoining lanes & Xing in Than Singh Nagar Anand Parvat in C-134A/KBZ.

227/28.11.06/EE-XXIX

M/s Kritika Consts

P/L CC & D/system in Internal lanes between gali no.9 & 10 starting from H.NO.106/7, 207/I to H.NO.217/A in Than Singh Nagar Anand Parvat in C-134A/KBZ.

P/L D/system and CC flooring in gali no.1 (near Kamal Hotel) from H.NO.17/62 to 17/69 and its link from H.NO.17/79 in Than Singh Nagar Anand Parvat in C-134A/KBZ.

228/28.11.06/EE-XXIX

M/s Kritika Consts

P/L CC & D/system in Internal lanes in gali no.5, Punjabi Basti, Anand Parvat in C-134A/KBZ.

223/27.11.06/EE-XXIX

M/s Tajinder Const.Co

Page 278: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

41 Civil EE-XXIX 11.10.06 07.09.06 154010.00 08.12.06 02.02.07 153474.00 Completed

42 Civil EE-XXIX 11.10.06 07.09.06 199806.00 07.12.06 03.03.07 198964.00 Completed

43 Civil EE-XXIX 31.10.06 16.10.06 198383.00 13.12.06 18.01.07 197996.00 Completed

44 Civil EE-XXIX 31.10.06 16.10.06 194132.00 M/s J.S Consts 12.12.06 17.04.07 193451.00 Completed

45 Civil EE-XXIX 31.10.06 16.10.06 198898.00 08.12.06 13.03.07 198898.00 Completed

46 Civil EE-XXIX 31.10.06 16.10.06 197547.00 235/28.11.06/EE-XXIXM/s Sanjay Kum01.12.06 25.02.07 197420.00 Completed

47 Civil EE-XXIX 31.10.06 16.10.06 196917.00 255/06.12.07 /EE-XXIVM/s Tajinder C 07.12.07 10.03.07 196145.00 Completed

Pdy. D/system and laying CC flooring internal lanes between Kuan Wali gali and gali no.5 Starting from H.NO.101 in Than Singh Nagar Anand Parvat in C-134A/KBZ.

253/06.12.06/EE-XXIX

M/s Markanda Consts.

Pdy. D/system and CC flooring from H.NO.257/2 in gali no.7 along H.No.262 in Nehru Nagar C-134A/KBZ.

232/28.11.06/EE-XXIX

M/s Sanjay Kumar Jain

Pdy. & Laying CC flooring near H.NO.BNB 1324 and BNB 1313 and adjoining in Bajeet Nagar in C-134-B/KBZ.

221/27.11.06/EE-XXIX

M/s Bagga Builders

Pdy.& Laying CC flooring near H.NO.BNB 1720 and BNB 1693 and adjoining in Baljeet Nagar in C-134-B/KBZ.

229/28.11.06/EE-XXIX

Pdy.& Laying CC flooring near H.NO.PB-176, PB-208 and F-724 and adjoining in Baljeet Nagar in C-134-B/KBZ.

252/06.12.06/EE-XXIX

M/s Markanda Consts.

Pdy.& Laying CC flooring near H.NO.PB-96, D-181 and PB-175 and adjoining in Baljeet Nagar in C-134-B/KBZ.

Pdy.& Laying Drainage system near H.NO.BNB-1720 and BNB-1693 and adjoining in Baljeet Nagar in C-134-B/KBZ.

Page 279: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

48 Civil EE-XXIX 31.10.06 16.10.06 198373.00 30.11.06 19.02.07 197967.00 Completed

49 Civil EE-XXIX 31.10.06 16.10.06 184071.00 234/28.11.06/EE-XXIXM/s Sanjay Kum29.11.06 26.02.07 183955.00 Completed

50 Civil EE-XXIX 31.10.06 16.10.06 184235.00 16.12.06 26.03.07 183238.00 Completed

51 Elect. EE-XXIX 06.11.06 25.08.06 366265.00 03/24.05.07/EE(E)-VII 01.06.07 16.06.07 352006.00 Completed

52 Civil EE-XXIX 14.12.06 04.12.06 199200.00 12.02.07 17.03.07 198005.00 Completed

53 Civil EE-XXIX 14.12.06 04.12.06 119479.00 292/12.01.07/EE-XXIXM/s Bhatia Cons13.01.07 24.03.07 119479.00 Completed

54 Civil EE-XXIX 14.12.06 04.12.06 193706.00 293/12.01.07/EE-XXIXM/s Kritika Con22.02.07 26.11.07 193429.00 Completed

Pdy.& Laying Drainage system near H.NO.PB-176, PB-208 and F-724 and adjoining in Baljeet Nagar in C-134-B/KBZ.

226/28.11.06/EE-XXIX

M/s Kritika Consts

Pdy.& Laying Drainage system near H.NO.PB-96, D-181 and PB-175 and adjoining in Baljeet Nagar in C-134-B/KBZ.

Pdy.& Laying Drainage system & CC flooring near H.NO.CN-2138, PB-125 and PB-173 and adjoining in Baljeet Nagar in C-134-B/KBZ.

254/06.12.06/EE-XXIX

M/s Murkarad Const.

Pdy.two semi high mast lights infront of two gates infront of at upper Anand Parvet under KBZ

M/s Sachdeva electrical

P/L CC pavement on Ghati Road from Juice Corner towards H.NO.382/1 and adjoining cross lanes in Than Singh Nagar, Anand Parvat in C-134A, KBZ

291/12.01.07/EE-XXIX

M/s Deepak Const.Co

P/L CC pavement and alying drainage system in Internal lanes between gali no.1 & 2 Punjabi Basti, Anand Parvat in C-134A, KBZ.

Covering of S.W drain near gali no.11 & P/L C.C Flooring and drainage system in gali no.11 from H.NO.462 in Nehru Nagar C-134A, KBZ.

Page 280: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

55 Civil EE-XXIX 14.12.06 04.12.06 199832.00 294/12.01.07/EE-XXIXM/s Manoj Kuma22.01.07 20.04.07 199093.00 Completed

56 Civil EE-XXIX 14.12.06 04.12.06 199122.00 20.01.07 16.03.07 198206.00 Completed

57 Civil EE-XXIX 14.12.06 04.12.06 198437.00 296/12.01.07/EE-XXIXM/s Ved Pal Bha22.01.07 20.04.07 198131.00 Completed

58 Civil EE-XXIX 14.12.06 04.12.06 95649.00 05.01.07 01.02.07 95101.00 Completed

59 Civil EE-XXIX 25.01.07 12.01.07 199155.00 03.03.07 30.04.07 195364.00 Completed

60 Civil EE-XXIX 25.01.07 12.01.07 199183.00 23.02.07 12.04.07 195009.00 Completed

61 Civil EE-XXIX 25.01.07 12.01.07 199183.00 24.02.07 30.03.07 198346.00 Completed

P/L CC pavement & Laying D/System in Internal lanes between gali no.1 & 2 from Sudharsan diagnostic to H.NO.302/5 in Than Singh Nagar, Anand Parvat in C-134A, KBZ

P/L CC pavement & Laying D/System in Internal lanes between gali no.1 & 2 Starting from H.NO.397, Ghati road upto H.NO.314/3A, Laxmi Store in Than Singh Nagar, in C-134A, KBZ

295/12.01.07/EE-XXIX

M/s Som Dutt Duevedi

P/L CC pavement & Laying D/System in Gali no. 12 from H.NO.279-A to H.NO.244 in Than Singh Nagar, Anand Parvat in C-134A, KBZ

Const.of culvert near round about in chara mandi in C-134A, KBZ

287/04.01.07/EE-XXIX

M/s Tajinder Const.Co

P/L CC pavement infront of Ramjas Public School Senior Secondary Anand Parbat in C-133/KBZ.

383/22.02.07/EE-XXIX

M/s Ved Pal Bhatia

P/L CC pavement along Ramjas Pry.School Anand Parbat in C-133/KBZ.

392/22.02.07/EE-XXIX

M/s Bagga Builders

P/L CC pavement on H.R road from A-90 to 17/80 Anand Parbat in C-133/KBZ.

390/22.02.07/EE-XXIX

M/s Bajaj Const.Co

Page 281: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

62 Civil EE-XXIX 25.01.07 12.01.07 198239.00 23.02.07 23.04.07 197691.00 Completed

63 Civil EE-XXIX 25.01.07 12.01.07 199102.00 23.02.07 17.04.07 190010.00 Completed

64 Civil EE-XXIX 25.01.07 12.01.07 199921.00 24.02.07 30.03.07 199788.00 Completed

65 Civil EE-XXIX 25.01.07 12.01.07 199569.00 03.03.07 30.04.07 195543.00 Completed

66 Civil EE-XXIX 25.01.07 12.01.07 199239.00 23.02.07 19.04.07 198793.00 Completed

67 Civil EE-XXIX 25.01.07 12.01.07 197249.00 03.03.07 02.06.07 197249.00 Completed

68 Civil EE-XXIX 25.01.07 12.01.07 199665.00 23.02.07 23.04.07 199665.00 Completed

69 Civil EE-XXIX 07.02.07 02.02.07 172233.00 06.03.07 25.05.07 172168.00 Completed

P/L cement concrete pavements on road sides from Railway Accounts office to Daryai Nalla on Old Rohtak road in C-133/KBZ.

396/22.02.07/EE-XXIX

M/s Markanda Consts.

P/L CC pavement from Daryai Nalla to Local Shopping Comlex C.S.A Colony L.H.S on Azad Road in C-133/KBZ.

398/22.02.07/EE-XXIX

M/s Narendra Singh Dhankar

P/L CC pavement on Old Rohtak Road from T.T Post to T-Point RHS in C-133/KBZ.

393/22.02.07/EE-XXIX

M/s Kritika Consts

P/L CC pavement on Old Rohtak Road from Dalao (Subzi Mandi) to T.T Post L.H.S in C-133/KBZ.

399/22.02.07/EE-XXIX

M/s Sanjay Kumar Jain

P/L CC pavement from Daryai Nalla to Local Shopping Comlex C.S.A Colony R.H.S on Azad Road in C-133/KBZ.

389/22.02.07/EE-XXIX

M/s Balaji const.

P/L CC pavement from Road no.10 to Capital Steel Corporation in Anand Parbat in C-133/KBZ.

387/22.02.07/EE-XXIX

M/s Manoj Kumar Bhatia

P/L CC pavement in bye lane of gali no.11 along factory no.R/11A, APIA (Remaining Portion) in C-133/KBZ.

388/22.02.07/EE-XXIX

M/s Som Dutt Duevedi

Providing & Laying by CC flooring near H.NO.PB-1 and PB-139 and adjoining in Baljeet Nagar in C-134B/KBZ.

394/22.02.07/EE-XXIX

M/s Kritika Consts

Page 282: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

70 Civil EE-XXIX 07.02.07 02.02.07 180571.00 01.03.07 08.04.07 178202.00 Completed

71 Civil EE-XXIX 07.02.07 02.02.07 128003.00 403/22.02.07/EE-XXIXM/s RP Const C03.03.07 15.10.07 127878.00 Completed

72 Civil EE-XXIX 07.02.07 02.02.07 146719.00 384/22.02.07/EE-XXIXM/s Ved Pal Bha03.03.07 28.04.07 145579.00 Completed

73 Civil EE-XXIX 07.02.07 02.02.07 184069.00 400/22.02.07/EE-XXIXM/s Sanjay Kum03.03.07 28.04.07 184041.00 Completed

74 Civil EE-XXIX 12.02.07 07.02.07 198123.00 391/22.02.07/EE-XXIXM/s Bagga Buil03.03.07 01.06.07 195937.00 Completed

75 Civil EE-XXIX 12.02.07 07.02.07 169100.00

76 Civil EE-XXIX 12.02.07 07.02.07 198491.00

Providing & Laying by CC flooring near H.NO.PB-516 and H.NO. F-125 and adjoining in Baljeet Nagar in C-134B/KBZ.

395/22.02.07/EE-XXIX

M/s Markanda Consts.

Providing & Laying by CC flooring near H.NO.BNB-1775 and H.NO. BNB-1783 and adjoining in Baljeet Nagar in C-134B/KBZ.

Providing & Laying by drainage system & C.C. flooring near H.NO.BNB-808 and H.NO. BNB-814 and adjoining in Baljeet Nagar in C-134B/KBZ.

Providing & Laying by drainage system & C.C. flooring near H.NO.BNB-789 and H.NO. BNB-818 and adjoining in Baljeet Nagar in C-134B/KBZ.

Const.of Umbrella (Chhatri) in Vijay Park in Baljeet Nagar in C-134-B,KBZ.

Const.of footpath in Mohan Krantkari Veer Vinayak Damodhar Sawarkar Park in Baljeet Nagar in C-134B/KBZ.

Const.of Umbrella (Chhatri) in Mohan Krantikari Veer Vinayak Damodhar Sawarkar Park in Baljeet Nagar in C-134-B,KBZ.

Page 283: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

77 Civil EE-XXIX 12.02.07 07.02.07 198610.00 428/23.02.07/EE-XXIXM/s Jai Kumar 06.03.07 02.03.09 198297.00 Completed

78 Civil EE-XXIX 12.02.07 07.02.07 152603.00 429/23.02.07/EE-XXIXM/S Sahil Const04.03.07 28.06.07 152603.00 Completed

79 Civil EE-XXIX 12.02.07 07.02.07 195491.00 27.02.07 30.05.07 195460.00 Completed

80 Civil EE-XXIX 22.02.07 04.12.06 294600.00 173/24.09.07/EE-XXIXM/s Frem Const03.10.07 23.05.08 228000 Completed

81 Civil EE-XXIX 22.02.07 04.12.06 179382.00 24.02.07 30.03.07 177021.00 Completed

82 Civil EE-XXIX 22.02.07 04.12.06 199449.00 05.03.07 30.04.07 198069.00 Completed

83 Civil EE-XXIX 22.02.07 04.12.06 170011.00 24.02.07 20.06.07 169574.00 Completed

Providing & Laying by drainage system & C.C. flooring near H.NO.PB-1640, PB-1645 and PB-1458 and adjoining in Baljeet Nagar in C-134B/KBZ.

Providing & Laying by drainage system & C.C. flooring near H.NO.BNB-1883 and H.NO. BNB-1872 and adjoining in Baljeet Nagar in C-134B/KBZ.

Providing & Laying by drainage system & C.C. flooring near H.NO.649/B-1, H.NO.T650/D-3 and H.NO.T-235/E-2A/L-5 and adjoining in Baljeet Nagar in C-134B/KBZ.

385/22.02.07/EE-XXIX

M/s Ved Pal Bhatia

C/O Ornamental Gate in Rajeeve Gandhi Vatika (Ambedkar Park) in Than Singh Nagar, Anand Parvat C-134A/KBZ.

Pdy.approach to loop of Zakhira Flyover near Zero Anand Parbat Side in C-133/KBZ.

424/23.02.07/EE-XXIX

M/s Bajaj Const.Co

Const.of silt chamber & drain along Zero (Zakhira flyover) near Gali no.11 in C-133, KBZ.

427/23.02.07/EE-XXIX

M/s Sanjay Kumar Jain

Providing & Laying by drainage system & C.C. flooring near H.NO.BNA-218 and BNA-315 and adjoining in Baljeet Nagar in C-134B/KBZ.

425/23.02.07/EE-XXIX

M/s Bhatia Const.Co.

Page 284: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

84 Civil EE-XXIX 22.02.07 04.12.06 199546.00 02.04.07 17.05.07 199445.00 CompletedConst.of builtup section drain infront of Buster pump road no.89 Baljeet Nagar in C-134B/KBZ.

426/23.02.07/EE-XXIX

M/s Markanda Consts.

Page 285: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Liabilities Rs.lacs

Page 286: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 287: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

5.99

0.00

0.00

0.00

0.00

0.00

0.00

Page 288: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.51

0.00

0.00

0.00

0.00

0.00

0.00

Page 289: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 290: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

Page 291: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.006.50

0.00

Liabilities Rs.lacs

Page 292: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 293: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

7.99

0.00

2.44

0.00

Page 294: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 295: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.05

0.00

0.44

0.00

0.00

0.00

0.00

0.00

0.00

Page 296: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 297: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 298: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.0010.92

Status Report of MLA, Sh.Shadi Ram, AC No. 63 2006-07

0.00

0.00

0.00

0.00

0.00

6.08

Liabilities Rs.lacs

Page 299: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

4.87

0.00

0.00

0.00

Page 300: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

1.99

7.80

0.00

1.08

0.00

0.00

5.92

0.000.000.000.00

Page 301: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 302: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 303: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.00

27.74

1.94

0.00

0.00

0.00

Liabilities Rs.lacs

Page 304: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 305: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 306: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 307: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 308: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.56

Page 309: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 310: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 311: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.002.49

0.00

0.01

0.06

0.05

Liabilities Rs.lacs

Page 312: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.01

0.00

0.07

0.01

0.27

0.60

0.56

0.52

0.64

Page 313: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.01

0.01

0.01

0.00

0.01

0.68

0.000.00

0.000.000.00

Page 314: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 315: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 316: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.003.51

0.00

0.00

0.00

0.00

Liabilities Rs.lacs

Page 317: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 318: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 319: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 320: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 321: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 322: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 323: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

1.29

Page 324: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

1.30

0.00

0.00

0.00

0.00

0.00

Page 325: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 326: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

Page 327: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.002.58

Liabilities Rs.lacs

Page 328: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 329: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by
Page 330: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0

0

0

Page 331: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0

0

0

0

0

0

0

0

0

0

Page 332: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0

0

0

0

0

0

0

0

Page 333: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0

0

0

0

0

0

0

0

0

Page 334: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0

0

0

0

0

0

0

0

Page 335: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0

0

0

0

0

00000000000000

Page 336: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0000000000000

0.00

0.00

0.00

0.89

Liabilities Rs.lacs

Page 337: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.72

Page 338: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

2.74

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 339: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 340: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 341: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 342: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

2.25

0.00

0.00

0.00

Page 343: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 344: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 345: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 346: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.000.000.000.000.000.000.000.000.000.000.008.60

0.00

0.00

0.00

0.00

Liabilities Rs.lacs

Page 347: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 348: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 349: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 350: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.99

Page 351: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

Page 352: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 353: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 354: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 355: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 356: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

1.69

1.98

Page 357: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 358: [XLS] 06-07... · Web viewP/o lighting arrangement at main gate ward E-51 Naraina Vihar in Ward 128 under KBZ Sixchange to opp. Gurudwara D-Block Naraina Vihar KBZ Imp.to lane by

0.00

0.000.000.000.000.000.000.00

5.67