x prize cup update
DESCRIPTION
This Briefing is UNCLASSIFIED. X Prize Cup Update. Lt Col Robin Athey AF Liaison to FAA/AST 17 May 2007. Overview. Perspective on X Prize Cup Safety Overview Inspection Team Lessons Learned Holloman AFB NM and X Prize Joint Effort. - PowerPoint PPT PresentationTRANSCRIPT
1
Headquarters 14th Air Force
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
X Prize Cup UpdateX Prize Cup Update
This Briefing is UNCLASSIFIED
Lt Col Robin Athey AF Liaison to FAA/AST
17 May 2007
2I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED
UNCLASSIFIED
Overview
• Perspective on X Prize Cup
• Safety Overview
• Inspection Team
• Lessons Learned
• Holloman AFB NM and X Prize Joint Effort
3I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED
UNCLASSIFIED
X Prize Cup Perspective
4I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED
UNCLASSIFIED
Safety Overview
• AST’s Role:
• Approve and inspect permitted activities -• Armadillo Permit
• Advise Flight Standards and Air Traffic on non-permitted rocket activities – • Tethered flights - Microspace• Amateur rockets – 8 large and 2-
4 small• Static Fires• Rocket Belt
• Coordinate X Prize Cup activities within FAA
5I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED
UNCLASSIFIED
Inspection• Lead Safety Randy Repcheck
(Jim Malecha – AFS)
• Armadillo Aerospace Karen Shelton-MurDan Murray
• Microspace Yvonne Tran
• High Power Rockets Brad WarnerDave Gerlach
• Mishap Response Dave Gerlach(Dan Diggins – AAI)
(Bob Benson – NTSB)
• Weather Karen Shelton-Mur
• Static Fires, Rocket Belt, Fuel Depot Dave Gerlach
• Noise Monitoring Stacey ZeeDavid Coate - ICF
Adam Teepe – ICF
• Technical Advisor Mark Wright
• Duty Officer Lyndon BonaparteGlen Rizner
6I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED
UNCLASSIFIED
Lessons Learned• Applicants need more assistance in developing application
• AST developed an experimental permit sample application
• Because timelines are tight for the experimental permit, need:• To focus greatly on pre-application consultation• To encourage draft applications• Review documents in a timely manner
• AST’s one-stop-shop role was critical to the success of the X Prize Cup
• AST had a great deal of responsibility for the safe operation of the amateur rockets
7I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED
UNCLASSIFIED
Holloman AFB and X Prize Cup
• HAFB Considered Joint X Prize & Base Air Show--Oct 07• Early they were determining the logistically/legally implications
• AST passed on to AF POCs Lessons Learned--Challenges
8I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED
UNCLASSIFIED
Holloman AFB and X Prize Cup
• 49th Fighter Wing Commander, Gen Goldfein, attended the 2006 X-Prize Cup at Las Cruces
• Considered hosting X Prize Cup at Holloman AFB in Alamogordo NM
• Initial contact made in October but asked to wait by AF• Holloman needed Air Combat Command approval
• Working group suggested to go over FAA lessons learned
• Met with Holloman AFB POCs and X Prize in March
• During team summit in April pad construction and access may cause change to Lunar Lander challenge
9I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED
UNCLASSIFIED
Holloman AFB and X Prize Cup
• FAA Nominal Permit Schedule• 30 March 07 Data submitted in support of Environmental review
• March April 07 draft applications submitted
• 28 May 07 Complete Enough applications must be at FAA to begin 120 day review period for permit issuance
• 25 September 07 Permit Issuance
• 25 October 07 Dress Rehearsal day at Holloman
• 26-27 October 07 X Prize Cup
• Ten teams have pre-registered to compete in the Lunar Lander Challenge• Seven in Pre-application consultations with FAA
10I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED
UNCLASSIFIED
Holloman AFB and X Prize Cup
• Latest Issues• Funding sources for XPF
• Storage
11I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED
UNCLASSIFIED
Summary
• FAA / AF and XPF ready for first ever Air and Space show• Working toward October show
• Ten teams pre-registered for Lunar Lander Challenge• FAA working with teams on Permits
• Combined Space and Air Show scheduled for 26-27 Oct 07