X. 1 X. Illustrated Examples A Defined Drainage Systems B Poorly Defined Drainage Systems C Collecting Runoff Adjacent to Roadways and Conveying Cross- Drainage Efficiently

Upload: eadoin

Post on 11-Jan-2016

43 views

Category:

Documents


0 download

DESCRIPTION

X. Illustrated Examples. ADefined Drainage Systems BPoorly Defined Drainage Systems CCollecting Runoff Adjacent to Roadways and Conveying Cross-Drainage Efficiently. X. Illustrated Examples. ADefined Drainage Systems Rim Rock Ride in Village of Oak Creek Bell Canyon Wash. - PowerPoint PPT Presentation

TRANSCRIPT

X. 1

X. Illustrated Examples

A Defined Drainage SystemsB Poorly Defined Drainage SystemsC Collecting Runoff Adjacent to

Roadways and Conveying Cross-Drainage Efficiently

X. 2

X. Illustrated Examples

A Defined Drainage Systems Rim Rock Ride in Village of Oak Creek

Bell Canyon Wash

X. 3

A Defined Drainage Systems: Rim Rock Ride

1. Existing Conditionsa) Field Reconnaissance

existing 3 barrel 72-inch CMPs

X. 4

A Defined Drainage Systems: Rim Rock Ride

1. Existing Conditions [CONTINUED]a) Field Reconnaissance

existing 3 barrel 72-inch CMPsn-values

X. 5

X. 6

X. 7

A Defined Drainage Systems: Rim Rock Ride

X. 8

A Defined Drainage Systems: Rim Rock Ride

1. Existing Conditionsa) Field Reconnaissance

existing 3 barrel 72-inch CMPsn-values

b) Surveyaerial field

X. 9

A Defined Drainage Systems: Rim Rock Ride

1. Existing Conditionsc) Hydrologic Data

Watershed Delineation

X. 10

X. 11

A Defined Drainage Systems: Rim Rock Ride

1. Existing Conditionsc) Hydrologic Data

HEC-1 Methodology Split Flow Analysis Model Verification

X. 12

A Defined Drainage Systems: Rim Rock Ride

1. Existing Conditionsc) Hydrologic Data

HEC-1 Methodology

Green and Ampt Clark Unit Hydrograph Modified Puls Routing

X. 13

X. 14

X. 15

X. 16

X. 17

A Defined Drainage Systems: Rim Rock Ride

1. Existing Conditionsc) Hydrologic Data

HEC-1 Split Flow Analysis

Uneven Weir Program

X. 18

X. 19

X. 20

A Defined Drainage Systems: Rim Rock Ride

1. Existing Conditionsc) Hydrologic Data

HEC-1 Hydrologic Model Verification

Regional Data UGGS Data USGS Regional Regression Equations Previous Studies

X. 21

X. 22

A Defined Drainage Systems: Rim Rock Ride

1. Existing Conditionsd) Floodplain Delineation

HEC-RASFloodway

e) Culvert HydraulicsHY-8Uneven Weir Program

X. 23

X. 24

X. 25

X. 26

X. 27

[HANDOUT Floodplain Delineation Map]

X. 28

A Defined Drainage Systems: Rim Rock Ride

2. Alternative Analysisa) Replace existing culvert with new

boxculvert

b) Replace existing culvert with slab bridge

c) Lower roadway profile

X. 29

A Defined Drainage Systems: Rim Rock Ride

2. Alternative Analysisd) Utilities

e) Cost Estimates

X. 30

X. 31

A Defined Drainage Systems: Rim Rock Ride

3. Selected Alternative

X. 32

[HANDOUT Selected Alternative Plan Sheet]

X. 33

A Defined Drainage Systems: Rim Rock Ride

B Poorly Defined Drainage Systems Moson Road

Cochise County

X. 34

X. 35

X. 36

X. 37

B Poorly Defined Drainage Systems: Moson Road

1. Existing Conditionsa) Hydrology

Regression Equations Drainage Area = 4.14 mi2

FEMA Zone A

Study Area 8

X. 38

B Poorly Defined Drainage Systems: Moson Road

1. Existing Conditionsb) Floodplain

FEMA

X. 39

X. 40

X. 41

X. 42

B Poorly Defined Drainage Systems: Moson Road

2. Concept Drainage Improvementsa) Hydraulics

storm frequency erosion protection

X. 43

X. 44

X. 45

X. 46

X. 47

X. 48

X. 49

X. 50

X. 51

X. 52

X. 53

[HANDOUT Concept Drainage Improvements Plan Sheet]

X. 54

B Poorly Defined Drainage Systems: Moson Road

2. Concept Drainage Improvementsa) Hydraulics

storm frequency erosion protection

b) LOMR

X. 55

X. 56

X. 57

X. Illustrated Examples

C Collecting Runoff Adjacent to Roadways and Conveying Cross-Drainage Efficiently Highway 260 – Wagon Wheel Wash

Navajo County

X. 58

X. 59

C Runoff And Cross-Drainage: Wagon Wheel

1. Existing Conditionsa) Reconnaissance

existing flow paths vs. existing flow paths

X. 60

C Runoff And Cross-Drainage: Wagon Wheel

1. Existing Conditionsb) Hydrology

HEC-1

X. 61

X. 62

X. 63

C Runoff And Cross-Drainage: Wagon Wheel

1. Existing Conditionsc) Floodplain

HEC-2 Split Flow Analysis

X. 64

X. 65

X. 66

C Runoff And Cross-Drainage: Wagon Wheel

2. Designa) Storm Frequency

cost estimates

b) Business Access

c) Upstream Detention

X. 67

X. 68

X. 69

X. 70

X. 71

X. 72

X. 73

X. 74

X. 75

X. 76

[HANDOUT Alternative Plan Sheet]