X ilinx C ustomer M aster Implementation Lessons Learned – Mid Stream. January 17, 2007. Xilinx is a 22 year old high tech company. Operations in U.S., Ireland, Singapore Global sales organization 2005 #5 Great Place To Work. “Fabless” semiconductor manufacturer - PowerPoint PPT PresentationTRANSCRIPT
Xilinx Confidential
Xilinx Customer MasterImplementation Lessons Learned – Mid
Stream
January 17, 2007
Xilinx ConfidentialXCM 2
Xilinx is a 22 year old high tech company
• “Fabless” semiconductor manufacturer• Produce programmable logic devices• 2005 Revenue was $1.7 Billion
A TopA Top--Ranking CompanyRanking Company
Xilinx has been recognized for setting a new standard for managing a high technology business
Xilinx has been recognized for setting a new standard for managing a high technology business
#4 #4 -- XilinxXilinx 20032003
#5#5-- XilinxXilinx 20052005
#6 #6 -- XilinxXilinx 20022002
#10 #10 -- XilinxXilinx 20042004
#14 #14 -- XilinxXilinx 20012001
Forbes Best Managed Semiconductor Company (2004)FORTUNE Best Companies to Work For (2001-2004)
• Highest ranking public company • Highest ranking high-technology company
• Operations in U.S., Ireland, Singapore• Global sales organization• 2005 #5 Great Place To Work
Xilinx ConfidentialXCM 3
Oracle 11i is the core of our application suite
Technology StackTechnology Stack
9iAS9iAS
DB 8.1.74DB 8.1.74
HPUX 11.0HPUX 11.0
E-Business Suite Functionality ImplementedE-Business Suite Functionality Implemented
Planning &SchedulingPlanning &Scheduling•Advanced SC Planning
•Constraint-based Optimization
•Global Order Promising
Discrete MfgDiscrete Mfg•Inventory Mgmt
•Bills of Material
•Cost Management
•Quality
•Project Mfg
FinanceFinance• General Ledger• Receivables• Payables• Cash
Management• Assets• Internet
Expenses
Human Human Resources (11.5.9 Resources (11.5.9
FP G)FP G)•HR Core
•Self-Service HR
•Advanced Benefits
•Training Admin
ServiceService•Service Contracts
•Install Base
•iSupport
PurchasingPurchasing
Order ManagementOrder Management•Order Management
•Shipping
•RMA
Xilinx ConfidentialXCM 4
Business Problem - Enable “One Xilinx”
• Establish a unique customer identity for all interactions across the Xilinx Demand Chain– Consolidated reporting across all the Xilinx Systems– Establish contact information one time – “We already know you”
• Requirement: All systems & process share a common definition of a customer and must be able to link their transactions to the common customer ID.
Xilinx ConfidentialXCM 5
XCM VisionProvide the infrastructure, software, and processes necessary to establish and maintain an integrated
centralized customer master repository. Enable the linking of transactional data to provide improved
customer reporting.
Xilinx ConfidentialXCM 6
We gained approval for the initial scope based on a phased approach
Feb Mar Apr May JulJun Sep Aug NovOct Dec Jan AprFeb Mar May Jun Jul Aug
‘06 ‘07
Duration Ten weeks
Scope• Develop initial
data model• Develop
roadmap and scope phase 1 implementation
• Define phase 1 governance approach
Duration Twenty-six weeks
Scope• Deploy XCM solution and
integrate initial set of applications
• Update data model as needed
• Implement interim governance and cleansing processes
• Prove value of integrated / cleansed data
Duration Twenty-six weeks
Scope• Develop integration for Phase
two applications• Revise data model as needed• Finalize definition of
governance and cleansing processes / organization
• Implement new governance and cleansing processes
Duration TBD
Scope• Align with DCO
activities• Phase
subsequent implementations with DCO
Phase 0Analysis, Strategyand Roadmap
Phase 1 Initial XCM
Solution Rollout
Phase 2 Expanded XCM Solution Rollout
Phase n DCO Alignment
Xilinx ConfidentialXCM 7
Our dates have shifted by 3 months, but we are on track for February
V. Implement1. Develop Implementation Roadmap2. Perform Production Install
VI. AMDOCS Integration1. Design & Development
IV. Build & Test1. Data Warehouse Integration Design, Build & Test2. On-going Data Load Build & Test3. Messaging Build & Test - HUB4. D&B Integration Build & Test5. Integration Testing
III. Design1. Initial data extract, load design & development2. Initial Data load & Validation3. Messaging Design & Functional Design for pub/sub4. TCA Set up/Config Design
14
03/15
16
05/15
15
04/15
I. Concept1. Develop Scope and Vision documents 2. Document business purpose and ROI
02/1501/1512/1511/1510/159/158/157/156/15
II. Requirements1. Clear Support Requirements2. Data Load Requirements3. Messaging Requirements4. TCA Set up/Config Requirements
3. Infrastructure Planning1. Analyze requirements and set up infrastructure
2. Data Governance1. Create Data Stewardship operating model2. Create Data Stewardship execution model3. Create Customer Admin Group framework
1. Project Management1. Project Mobilize2. Engage Stakeholders3. Ongoing Project Management
Activities Months 1312111094321- X
V. Implement1. Develop Implementation Roadmap2. Perform Production Install
VI. AMDOCS Integration1. Design & Development
IV. Build & Test1. Data Warehouse Integration Design, Build & Test2. On-going Data Load Build & Test3. Messaging Build & Test - HUB4. D&B Integration Build & Test5. Integration Testing
III. Design1. Initial data extract, load design & development2. Initial Data load & Validation3. Messaging Design & Functional Design for pub/sub4. TCA Set up/Config Design
14
03/15
16
05/15
15
04/15
I. Concept1. Develop Scope and Vision documents 2. Document business purpose and ROI
02/1501/1512/1511/1510/159/158/157/156/15
II. Requirements1. Clear Support Requirements2. Data Load Requirements3. Messaging Requirements4. TCA Set up/Config Requirements
3. Infrastructure Planning1. Analyze requirements and set up infrastructure
2. Data Governance1. Create Data Stewardship operating model2. Create Data Stewardship execution model3. Create Customer Admin Group framework
1. Project Management1. Project Mobilize2. Engage Stakeholders3. Ongoing Project Management
Activities Months 1312111094321- X
MilestonesMilestones
Project Plan
Requirements Complete
Design Complete
Build CompleteIntegration test Complete
Phase I Go-Live
Data Stewardship Council formed
DW Reports
Xilinx ConfidentialXCM 8
What have we learned so far?
Xilinx ConfidentialXCM 9
Governance is keyLesson 1
Xilinx ConfidentialXCM 10
Customer Administration
System 1System 1
Customer
Data HUB
Customer Data
Librarian
Primary Systems Other “Customer” Systems
System 2System 2
System nSystem n
System 3System 3
System 1System 1
System 2System 2
System nSystem n
System 3System 3
DataGovernance
Governance is critical and must be established early (Primacy issues can be significant)
Other User OrgsOther User OrgsStewardship Counsel
SalesFox/Saba/IB
FinanceGD/AR
Svc Clarify
OpsOM
MktgeComm /
Performark
ITDW/B2B
BizOpsPriceBook
Stewardship Counsel
SalesFox/Saba/IB
FinanceGD/AR
Svc Clarify
OpsOM
MktgeComm /
Performark
ITDW/B2B
BizOpsPriceBook
Lesson 1
Xilinx ConfidentialXCM 11
If you think your data is bad…..Lesson 2
Xilinx ConfidentialXCM 12
Assume it is much worseLesson 2
Xilinx ConfidentialXCM 13
Select your partner(s) carefullyLesson 3
Xilinx ConfidentialXCM 14
IT can start it, but the business has to come along
Lesson 4
Xilinx ConfidentialXCM 15
You have to sell up the food chainLesson 5
Xilinx ConfidentialXCM 16
Examples of Potential Capabilities
• Integration with cost & revenue applications provides real-time Customer & Segment P&L
• Integration of all customer transaction systems enables powerful improvement to customer experience
• Use of data model in production environment(s)
• Cleansed and standardized data in production – limited reporting
• Integration between sales tools and customer data enables new forms of account management and more effective sales activities.
• Real-time notification of most customer activity enables closer management of disti inventory pipeline.
• Integration of opportunity tracking & order entry systems enables accurate win-loss tracking
• Initial integration with data warehouse enables selected reporting, e.g. Sales history by customer and segments
• Improved timeliness and accuracy of transactional data• Adoption of vetted, unique identifiers for customer and
transactions across selected systems
Year 1
Year 2
Year 3+
Master
Data
Strategic
Foundational
Functional
• Design initial data model
• Enable model in production environment
• Establish integration with 1-2 systems
• Establish interim data governance model / process
• Integrate 3-7 systems in six month delivery cycles
• Implement corporate governance structure and processes
• Design corporate governance model
• Expand shared nature of key data
• Significant completion of data and metadata models
• Integration with top 20+ systems
• Initial Alignment with DCO initiatives
• Full integration with DCO Initiatives
Transactional
Enabled by Hub
Deliver
Deliver / Enable
Enable
XCM Value