www.zetasoftwares.com project costing zeta erp. flow panel

11
www.zetasoftwares .com PROJECT COSTING ZETA ERP

Upload: leslie-chandler

Post on 12-Jan-2016

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Www.zetasoftwares.com PROJECT COSTING ZETA ERP.  FLOW PANEL

www.zetasoftwares.com

PROJECT COSTING

ZETA ERP

Page 2: Www.zetasoftwares.com PROJECT COSTING ZETA ERP.  FLOW PANEL

www.zetasoftwares.com

FLOW PANEL

Page 3: Www.zetasoftwares.com PROJECT COSTING ZETA ERP.  FLOW PANEL

www.zetasoftwares.com

MAJOR FEATURES

• Project can be created with budget details

• Fully integrated with finance and distribution

module

• Centralized purchase can be done from inventory

and order processing module

• Project wise purchase can be made from project

costing module

Page 4: Www.zetasoftwares.com PROJECT COSTING ZETA ERP.  FLOW PANEL

www.zetasoftwares.com

MAJOR FEATURES

• Time sheet can be recorded

• Target can be assigned to each team member

• Receipts against billing is possible

• Variance reported automatically

• Project can also be managed with out affecting

other modules

Page 5: Www.zetasoftwares.com PROJECT COSTING ZETA ERP.  FLOW PANEL

www.zetasoftwares.com

PROJECT DETAILS

• Project can be saved with budget details

• Project can be divided as any number task and

phase

• Task type can be specified such as material ,

labor and over head.

• Detailed budgeting is possible

Page 6: Www.zetasoftwares.com PROJECT COSTING ZETA ERP.  FLOW PANEL

www.zetasoftwares.com

TRANSACTION

• Centralized purchase can be done from

distribution module.

• For centralized purchase: purchase order ->

purchase receipt -> purchase invoice can be

done.

• Goods issued note can be used for allocating

inventory item against each project

• Stock adjustment is possible

Page 7: Www.zetasoftwares.com PROJECT COSTING ZETA ERP.  FLOW PANEL

www.zetasoftwares.com

• Project wise purchase can be done from project

costing module.

• Purchase order -> purchase receipt -> purchase

invoice is possible against each task and phase of

a project

• Purchase return is possible

• AP Invoice can be generated against each task

and phase of a project

TRANSACTION

Page 8: Www.zetasoftwares.com PROJECT COSTING ZETA ERP.  FLOW PANEL

www.zetasoftwares.com

• Sales invoice (with product details) can be

generated against each task and phase of a

project

• AR invoice (without product details) can be

generated against each task and phase of a

project .

• Journal entry can be posted against each task and

phase of a project .

TRANSACTION

Page 9: Www.zetasoftwares.com PROJECT COSTING ZETA ERP.  FLOW PANEL

www.zetasoftwares.com

• Project cost details such as material, labor,

overhead etc… can be recorded against the task

and phase of a project with out affecting finance

and inventory & order processing module.

• Project credit can be recorded without affecting

finance module

• Billing and Receipt is possible without affecting

finance module

TRANSACTION

Page 10: Www.zetasoftwares.com PROJECT COSTING ZETA ERP.  FLOW PANEL

www.zetasoftwares.com

MIS REPORTS

• Project cost analysis reports

• Project quantity variance

reports

• Project profitability reports

• Project activity reports

• Project time sheet

Page 11: Www.zetasoftwares.com PROJECT COSTING ZETA ERP.  FLOW PANEL

www.zetasoftwares.com

WWW.ZETASOFTWARES.COM

THANK YOU