wv school building authority facilities presentationsba.wv.gov/agenda/documents/att-u.pdfoverview of...

21
WV School Building Authority Facilities Presentation Office of School Facilities March 21, 2016 Mike Pickens Scott Raines

Upload: others

Post on 19-Aug-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

WV School Building Authority

Facilities PresentationOffice of School Facilities

March 21, 2016

Mike Pickens

Scott Raines

Page 2: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Presentation Points

• Overview of Maintenance in West Virginia Schools

• Statewide PM program with SBA grant

• Long term objective of statewide preventive maintenance program

Page 3: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Facts

• WV Code 18-9E-3(c) The WVDE OSF shall inspect school facilities funded in part or wholly by WV School Building funds

• WVDE OSF – 3 HVAC technicians inspect and prepare a report > 300 schools

• Report is sent to County Superintendent and the SBA

• Aggregate number on every Facility Review report that is sent to the SBA

Page 4: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Overview of Maintenance in WV

schools• In 2010 survey was conducted from WVDE OSF

a. 82% 85% of WV counties did not have a viable preventive maintenance program

b. Average age of school buildings in WV is 47 years old

c. 720 schools, 1100 buildings, 42,750,000 square feet of school space

• 2015 survey

a. In 2015 $76,275,300 spent on utilities

b. In 2015 $350,067,716 spent on operations & maintenance costs

c. In 2015 $183,474,243 Capital outlay dollars spent

d. SBA $97,932,072

Page 5: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

National Facilities Council

• Nationally, the largest share of state and local governments’ capital spending goes to K–12 and higher education facilities.

• For the 17-year period from 1995 through 2011, the average share of state and local capital spending devoted to K–12 public school in all state’s facilities ranged from a low of 12% to a high of 31%

• During this same period, West Virginia ranked 45th in the nation with 16.70% of its state and local capital outlay devoted to K-12 public school facilities.

Page 6: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%
Page 7: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Facilities challenges

• How do we extend the life of equipment and mechanical systems?

• How do we prevent county school systems from seeking funding from the SBA a second time on HVAC and mechanical systems that are in schools that were built by SBA funds?

• How do we save cost on in school buildings on HVAC and mechanical systems and return those dollars back to the classroom?

• How do we bridge the gap between the neeed and what we can provide?

Page 8: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Preventive Maintenance

• Extends the life of equipment, provides a more efficient energy savings operation

• Provides a more conducive learning environment

• Research shows that test scores can be raised by improving indoor environmental quality

• Change the culture from a re-active to proactive

• Then change the culture from an proactive to predictive

• Continuing the state-wide preventive maintenance program

Page 9: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

WVDE – SBA partnership • SBA statewide PM grant

a. All 55 counties and the WVSDB are using program

b. School Dude is the software provider

c. Approximately 3,500 pieces of equipment are downloaded into the program

d. 3,512 number of schedules are now downloaded into the program

e. 34,101 of PM work orders created to date

f. 28,173 of PM work orders have been closed out as complete 82.6%

Page 10: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Average score by county 1 - 10

3.0

3.5

4.0

4.5

5.0

5.5

6.0

6.5

Ba

rbo

ur

Be

rke

ley

Bo

on

e

Bra

xto

n

Bro

oke

Cab

ell

Calh

ou

n

Cla

y

Dod

dri

dge

Fa

ye

tte

Gilm

er

Gra

nt

Gre

enb

rier

Ham

pshir

e

Han

co

ck

Hard

y

Harr

iso

n

Jackson

Jeff

ers

on

Ka

na

wha

Lew

is

Lin

coln

Log

an

Ma

rio

n

Ma

rsha

ll

Ma

son

McD

ow

ell

Me

rcer

Min

era

l

Min

go

Mo

no

ng

alia

Mo

nro

e

Mo

rga

n

Nic

ho

las

Oh

io

Pe

nd

leto

n

Ple

asan

ts

Po

ca

hon

tas

Pre

sto

n

Pu

tna

m

Rale

igh

Ran

do

lph

Ritch

ie

Roa

ne

Su

mm

ers

Ta

ylo

r

Tu

cker

Tyle

r

Upsh

ur

Wa

yn

e

We

bste

r

We

tze

l

Wirt

Wo

od

Wyo

min

g

County Average Facility Review Score 2014-2015

Page 11: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Work Orders generated from Statewide

PM program

0

50

100

150

200

250

300

350

400

450

Ca

lho

un

Cla

y

Do

ddrid

ge

Gilm

er

Gra

nt

Mo

nro

e

Ple

asa

nts

Pocaho

nta

s

Ritchie

Sum

mers

Tucker

Tyle

r

Webste

r

WV

SD

B

Wirt

Generated PM Wos

Completed PM Wos

Counties <2k Students

Page 12: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

PM work orders completed

0

10

20

30

40

50

60

70

80

90

100

Counties <2K StudentsCompletion Index

Page 13: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Statewide PM program

Work orders

0

100

200

300

400

500

600

700

800

900

1,000

Barb

ou

r

Bra

xto

n

Bro

oke

Ha

mpshir

e

Ha

ncock

Ha

rdy

Jackson

Le

wis

Lin

coln

Ma

rsh

all

Ma

so

n

Mcdo

well

Min

era

l

Min

go

Mo

rgan

Nic

hola

s

Pre

sto

n

Ra

ndo

lph

Ro

ane

Taylo

r

Up

sh

ur

Wetz

el

Wyo

min

g

Generated PM Wos

Completed PM Wos

Counties w/ 2-5k Students

Page 14: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Work orders completed

0

10

20

30

40

50

60

70

80

90

100

Counties w/ 2K-5K StudentsCompletion Index

Page 15: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Statewide PM work orders

0

200

400

600

800

1,000

1,200

1,400

1,600

Berk

ley

Ca

bell

Fayett

e

Gre

en

brie

r

Ha

rris

on

Jeffe

rson

Ma

rion

Me

rce

r

Mo

non

galia

Ohio

Putn

am

Ra

leig

h

Wayne

Generated PM Wos

Completed PM Wos

Counties >5k Students

Page 16: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Work orders completed

0

10

20

30

40

50

60

70

80

90

100

Berkley Cabell Fayette Greenbrier Harrison Jefferson Marion Mercer Monongalia Ohio Putnam Raleigh Wayne

Completion IndexCounties over 5,000 students

Page 17: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

High achieving counties

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

20,000

Kana

wha

Boon

e

Pend

leto

n

Generated PM Wos

Completed PM Wos

Counties w/ 2-5k Students

Page 18: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Enhancing the statewide PM

program through Collaboration

• Implementation of Building Information

Modeling (BIM) on SBA projects.

Equipment Make, Model and Component data

Operations and Maintenance (OEM)

documents

Pictures of equipment and wiring diagrams

Page 19: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Enhancing the statewide PM

program through Collaboration

• Capital Improvement Forecasting

Life Cycle data of building systems and

components

Anticipates most critical needs

Projects replacement times and costs

Real time updates of facility maintenance

Page 20: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Enhancing the statewide PM

program through Collaboration

• Forecasting for the 2020-2030 CEFP

“Living” facility evaluations and costs

Improved transportation data

Incorporate Census and Geographical data

Reduction of annual update efforts

Potential reduction in need of future revision

processes

Page 21: WV School Building Authority Facilities Presentationsba.wv.gov/agenda/Documents/ATT-U.pdfOverview of Maintenance in WV schools • In 2010 survey was conducted from WVDE OSF a. 82%

Questions