WTP 604MANAGEMENT OF PRE-
CONSTRUCTION ACTIVITIES
COURSE OUTCOMES:
AT THE END OF THE COURSE, THE PARTICIPANTS SHOULD BE ABLE TO:-
1. ADMINISTER CIVIL AND STRUCTURAL WORKS DOCUMENTATION
2. COORDINATE SITE INVESTIGATION3. PREPARE CIVIL AND STRUCTURAL METHOD
STATEMENT4. PREPARE CIVIL AND STRUCTURAL WORK
PROGRAMME5. ORGANISE PRELIMINARY ITEMS6. ORGANISE SETTING OUT7. ORGANISE SITE CLEARANCE
ADMINISTER CIVIL AND STRUCTURAL WORKS
DOCUMENTATION
ALIRAN PROSES KONTRAK KERJA(KAEDAH KONVENSIONAL)
PERINGKATMENENDER
J/K PenilaianTender
PENGANUGERAHAN KONTRAK/MULA
KONRAK
TEMPOH PERLAKSANAAN
KERJA
TARIKH SIAP ASAL / KONTRAK
Gagal
Berjaya
TAK SIAP
EOT DENDA KELEWATA
N
KontrakTamat
TARIKH SIAP SEMASA / SEBENAR
TAK LULUS
LULUS
TEMPOH TANGGUNG KECACATAN
SIJIL SIAP BAIKIKECACATAN
BAIKI KECACATA
N
ADA KECACATAN
TIADA KECACATAN
Surat Setuju Terima
(LA)
Sijil Siap Kerja
(CPC)
GMGD
Peringkat Menender:MEMAHAMI & MELENGKAPKAN BORANG
TENDER
Para 3.
Dan selanjutnya, yang bertandatangan di bawah ini bersetuju menyiapkan Kerja-Kerja itu dalam masa............................... hari/minggu/bulan * dari tarikh pemilikan tapakbina atau dalam apa-apa tempoh lanjutan yang diperuntukkan dalam Syarat-Syarat Kontrak
Para 4.
Jumlah amaun Tender ini ialah jumlah wang pukal sebanyak Ringgit Malaysia …………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………iaitu, RM..………………………………….
(SYARAT WAJIB)
DENGAN PERKATAAN
ANGKA
Peringkat Menender:MEMAHAMI & MELENGKAPKAN BORANG
TENDER
Bertarikh pada................ haribulan......... 20......................................................................Tandatangan Pentender
Nama Penuh : ...........................................
Atas sifat : ...............................................
yang diberikuasa dengan sempurnanyauntuk menandatangani Tender ini untukdan bagi pihak:.................................................................Meterai atau cap Pentender
Saksi : ......................................................
Nama Penuh : ..........................................
Pekerjaan : ................................................
Alamat : ...................................................
....................................................
(SYARAT WAJIB)
Selepas PenganugerahanTender:MENYEMAK & MEMAHAMI SURAT SETUJU TERIMA
(A) TARIKH MILK TAPAK(B) TARIKH SIAP(C) JUMLAH HARGA KONTRAK
Initial Stage-Contractual matter (2 weeks)
Recurring stage- constructional matter
OnCompletion
(A) (B)
Kerja awalan
Kerja FizikalTEMPOH DAN HARGA KONTRAK (RM)
Dokumen kontrak adalah merupakan suatu dokumen yang merekodkan terma-terma kontrak bagi menjelaskan hak dan tanggungjawab pihak-pihak yang berkontrak secara bertulis dan sangat penting dalam pelaksanaan kerja pembinaan. Di antara sebab lain mengapa Dokumen Kontrak diperlukan adalah seperti berikut:
(a)ia boleh menjelaskan skop kerja yang perlu dilakukan;
(b) menetapkan harga dan tempoh siap; dan
(c) menjelaskan tindakan yang boleh diambil jika terdapat sebarang kemungkiran atau pertikaian oleh mana-mana pihak.
DOKUMEN KONTRAK
SYARAT SEBELUM MEMULAKAN KONTRAK:
Para 7.
Yang bertandatangan di bawah ini berniat, jika Tender ini disetujuterima memilih salah satu daripada bentuk Bon Pelaksanaan seperti berikut:
*(i) Jaminan Bank/Bank Islam/Bank Pembangunan & Infrastruktur Malaysia Berhad (BPIMB) atau
*(ii) Jaminan Syarikat Kewangan atau
*(iii) Jaminan Insurans/Takaful atau *(iv) Wang Jaminan Pelaksanaan yang dikenakan potongan sebanyak sepuluh
peratus (10%) daripada setiap bayaran interim sehingga mencapai jumlah lima peratus (5%) daripada Jumlah Harga Kontrak.
MENDAPATKAN BON PERLAKSANAAN:
Bank Gerenti
Wang JaminanPerlaksanaan
BON PERLAKSANAAN5% x Contract Sum)
JaminanInsuran
Ciri-ciri: 1 : 1Wang dibekukan oleh bank selama tempoh kontrak + Tempoh Tanggungan Kecacatan(12 bln) + 3 bulan 14 hari
Tuntutan untuk melepaskan wang tahanan boleh dibuat dengan syarat: mengemukakan “Sijil Membaiki Kecacatan” dan surat dari klien kepada bank yang membenarkan pelepasan wang tahanan
Bayaran yang dikenakan:•Premium•Stamp duty•Colletural
Wang Jaminan Perlaksanaan akan ditolak sebanyak 10% daripada setiap bayaran interim (mulai interim pertama) sehingga ianya mencapai 5% dari jumlah harga kontrak.
Kelebihan: “No Losses” dan dapat faedah (interest) dari bank
Keburukan : Kekurangan Aliran Tunai
Kelebihan: Jumlah wang tahanan adalah rendah (cash colletural)
Keburukan: Kontraktor akan “kerugian” premium + part of colletura (± 40%)
Kelebihan: Tiada perbelanjaan untuk bon
Keburukan: Bayaran interim akan berkurangan (dalam tempoh tertentu)
Initial Stage-Contractual matter (2 weeks)
Recurring stage- constructional matter
OnCompletion
(A) (B)
INSURAN TANGGUNGAN AWAM PUBLIC (LIABILITY INSURANCE)INSURAN KERJA (INSURANCE OF WORK)INSURANCE PAMPASAN PEKERJA (WORKMEN COMPENSATION INSURANCE - WCI)
ATAU
C.A.R POLISI (Kesemua risiko kontraktor)Merangkumi insuran tanggungan
awam dan insuran kerja sahaja
Initial Stage-Contractual matter (2 weeks)
Recurring stage- constructional matter
OnCompletion
(A) (B)
Syarat-syaratnya:
Kontraktor mesti mendaftar (buka akaun) pekerja di bawah skim socso khusus untuk projok berkenaan sahaja
Kontrajtor harus membuka fail dengan pihak socso untuk mendapatkan no fail majikan dan penyenaraikan nama pekerja yang di khususkan untuk kerja berkenaan.
Kelonggaran diberikan kepada kontraktor dimana kontraktor boleh membuka fail memadai dengan menyeranaikan sekurang-kurangnya seorang pekerja. Senarai ini perlu dikemaskini dari masa ke semasa mengikut pertambahan bilangan pekerja yang terlibat.
Initial Stage-Contractual matter (2 weeks)
Recurring stage- constructional matter
OnCompletion
(A) (B)Bernilai 0.25% x Nilai Kontrak
No fail CIDB perlu dicetakkan pada ‘singboard’ projek. Jika kontraktor gagal berbuat demikian denda akan dikenakan.
COORDINATE SITE INVESTIGATION
SITE INVESTIGATION
Site Investigation is the gathering of the information about the
proposed location of a project, e.g. highway or buildings.
The Importance of SIi. To study the general suitability of the
site for an engineering project.ii. To enable a safe, practical and economic
design to be prepared.iii. To determine the possible difficulties
that may be encountered by a specific construction method for any particular civil project.
iv. To study the suitability of construction material (soil or rock).
Obviously, it is a part of geotechnical processes in preliminary stage.
Lack of geotechnical processes will lead to a:i. Failures where many case histories are
available.ii. Significant delay and increase in construction
costs when the design has to be revised or amended.
Generally the elimination of the site investigation will not safe the cost of the project thus it only comprises from only 0.1% to 5% of the project cost.
The Purpose of Site Investigation
1. The site investigation is aimed at providing sufficient reliable subsurface information for most economical, satisfactorily safe foundation for the proposed structure.
2. The site investigation should reveal sufficient subsurface information for the design and construction of a stable foundation safe from both collapse and detrimental movements.
The Scope of Site Investigation
• Topography• Soil profile• Ground-water condition
The Stages of Site Investigation
In general, a site investigation program should comprise four stages, i.e. :
• Desk study and site reconnaissance,• Preliminary ground investigation,• Detailed ground investigation,• Monitoring
Desk study and site reconnaissance
• The desk study is the first stage of the site investigation process which involves researching the site to gain as much information as possible, both geological and historical.
• A good starting point is to use Ordinance survey maps which allow the selection of the site by obtaining accurate grid reference through the maps.
• In addition to present maps, old maps are used to gain historical information such as former uses of the site; concealed mine workings; in filled ponds; old pits; disused quarries; changes in potential landslide areas, etc.
The source of information that useful in desk study:
1. Geological map
Geological maps are probably most important source of information as these give and excellent indication of the sort of ground conditions like to be encountered.
2. Aerial photography
Aerial photography is another extremely useful source of information on topography and ground conditions.
3. Records of previous investigation
Records of previous investigation reports also helpful in a desk study. The many sources of site investigation data include previous company and Public Works Departement.
The reconnaissance phase of a site investigation
• This site investigation is done through a site visit or walk-over survey.
• Important evidences to look for are site lay out, surface condition, climate and hazards water levels, etc.
• Generally the desk study and reconnaissance is aimed at the feasibility study of the being planned.
• If the desk study shows that the site is feasible for the structure, then preliminary investigation should follows.
Preliminary Investigation• Preliminary Investigation is aimed at predicting the
geological structures, soil profiles and the position of ground water table by geophysical method or by making a few boreholes.
• The investigation should give information on the existence on ground structures that may need closer examination: for example,
1. The extent of disturbed strata,2. The location and extend of natural cavities and mine workings.3. Fractures and river crossings or alluvial areas that may have
buried soft material or pet, their liability to cause subsidence, surface movements or instability
4. Information on suitability of soil for fills work, ground water condition and the possibility of flooding should be provided at this stage.
Detailed Investigation
• At this stage, the extent of the test, number and depth of boreholes, selection of appropriate equipment for field testing and the choice of laboratory testing are made.
• Soil exploration consists of three steps:1. Boring and in-situ testing,2. Sampling,3. Laboratory testing.
Monitoring
• Monitoring during construction and maintenance period is required whether the expectations of the proceeding investigation have been realize.
• No one can ensure that the soil parameters used for design is the most representative of the soil conditions at the site unless the response is observed.
• Field observation can help for early diagnosis and redemption of any problem that might be encountered during construction.
• Among the measurement made during the monitoring stage are the settlement, displacement, deformation, inclination, and pore water pressure.
Steps of Soil Exploration
A.BORINGSoil borings are the most common method of subsurface exploration in the field. A bore hole is used to determine the nature of the ground in a qualitative manner and then recover disturbed and undisturbed samples for quantitative examination.Some types of borings are hand/mechanical auger borings, wash borings, percussion drilling, rotary drilling, and core borings. An auger is a screw-like tool used to bore a hole.Some augers are operated by hand: others are power operated
BORE HOLES
34
Boring Logs
Hand/Mechanical Auger
• Hand augers may be used for boring to a depth of about 6 m.
• Power augers may be used for boring to a depth of about 10 to 30 m.
• As the hole is bored a short distance, the auger may be lifted to removed soil. The removed soil can be used for field classification and laboratory testing, but it must not be considered as an undisturbed soil sample.
• Power auger set with a drill rig can be used to obtain samples from deeper strata. Some rigs can be used to drill a hole to 100 m depth.
Wash Boring
• Wash borings consists of simultaneous drilling and jetting action. A hole is bored through a casing by using a drilling bit.
• Jetting action is accomplished by pumping water downward through the drilling bit to soften the soil. Samples taken using the wash boring methods are disturbed sample.
Percussion Drilling
• Percussion Drilling is the process of making boreholes by striking the soil then removing it.
• The tools are repeatedly dropped down the borehole while suspended by wire from the power winch.
• Water is circulated to bring the soil cuttings to the ground surface.
• A casing and a pump are required to circulate the water.
Rotary Drilling
• Rotary Drilling uses rotation of the drill bit with the simultaneous application of pressure to advance the hole.
• This method is the most rapid method of advancing a hole in soil and rock.
• Drilling mud may be needed to prevent soil cave-in.
• Sample obtained from drilling by this method is relatively less disturbed as compared to samples obtained by the preceding methods.
41
Boring tools
Auger boring Power drills
42
SOIL BORING
1.2 Confirmatory Bearing Capacity Of Soil
The Contractor shall conduct a Probe Test as stated in the Drawings to confirm the required design bearing capacity. The Contractor shall submit the Probe Test result to the S.O. for approval.
STANDARD SPECIFICATION FOR BUILDING WORKS 2014SECTION C : FOUNDATION WORKS AND WORKS BELOW
LOWEST FLOOR LEVEL
HAMMER 4.5KG
28 cm
ROD 16mm Ø; 1.2M Long
GAMBAR UJIAN MAKINTOSH DIJALANKANBAGI MENDAPATKAN NILAI KEUPAYAAN GALAS TANAH.
JKR PROBE
Rod 16mm Ø, 1.2 meter long
Starter kun 300 & 600
Hammer 4.5kg
Couplin
JKR Probe/Makintosh Probe
PREPARE CIVIL AND STRUCTURAL METHOD
STATEMENT
What is a Work Method Statements ?
A Work Method Statements is a document detailing how a
particular task or activity will be carried out
14.1.2 Method statements
14.1.2.1 The Contractor shall also furnish in writing to
the S.O. or S.O’s Representatives particulars of the
Contractor’s method statements for carrying out such
works and of the construction plant and temporary
works, if any, which the Contractor intends to supply,
use or construct as the case may be. The submission
to and approval by the S.O. or the S.O.’s
Representatives of such programme or the furnishing
of such particulars shall not relieve the Contractor of
any of his duties or responsibilities under the
Contract.
STANDARD SPECIFICATION FOR BUILDING WORKS 2014
SECTION A: PRELIMINARIES AND GENERAL CONDITIONS
What is the purpose of a Work Method Statements ?
To outline a correct, systematic and safe method
of work for the particular task or activity
To provide an induction document that workers
must read/understand before starting a task to
meet legal compliance, hazard identification and
control
To help plan for the task ahead of time
To provide the Supervisor with a procedure for
completing the work
Where does a Work Method Statements sit in the hierarchy of the construction site?
A Work Method Statements is part of your Quality
Plan
Your Quality Plan will include a list of required
Work Method Statements for the Project
The Work Method Statements will be produced as
site specific to cover the required task
PREPARE CIVIL AND STRUCTURAL WORK
PROGRAMME
BORANG JKR203/203A:MENJELASKAN BERKAITAN PROGRAM
KERJA
PERANCANGAN“PERANCANGAN IALAH PROSES PEMBUATAN KEPUTUSAN TERDAHULU TERHADAP APA YANG PERLU DIBUAT DAN BAGAIMANA”
K&R 478
IA MELIBATKAN MISSI KESELURUHAN, KENALPASTI PENYELESAIAN UTAMA, TENTUKAN OBJEKTIF, KEMBANGKAN POLISI, PROGRAM, PROSEDUR UNTUK MEMCAPAINYA.
CIRI-CIRI:MASA DEPANTINDAKANPLAN TINDAKAN/PENCAPAIAN
The plan is
What needs to be done
How to do it
Who will do it
How long will it take?
How much will it costs?
Starting the Project Plan: The Work Breakdown Structure (WBS)
What is to be done When it is to be started and finished Who is going to do it Some activities must be done
sequentially Some activities may be done
simultaneously Many things must happen when and how
they are supposed to happen Each detail is uncertain and subjected to
risk
a) Lukisan senibina (Architectural drawings)• lukisan utama yang dijadikan rujukan kepada jurutera awam, struktur,
mekanikal dan elektrikal.• Menunjukkan maklumat projek : lokasi, dimensi, dan bahan yang digunakan.• Sebarang percanggahan di dalam dimensi perlu dimaklumkan kepada
pegawai berkenaan.
b) Lukisan Kejuruteraan Mekanikal & Elektrikal (Mechanical & Electrical Drawings)
• Menunjukkan aturcara dan aturan terhadap aspek mekanikal dan elektrikal.• Termasuk pemasangan penghawa dingin, peralatan pencegah kebakaran,
sistem di makmal komputer sekolah, sistem hidraulik di makmal kejuruteraan di universiti dan lain-lain.
JENIS-JENIS LUKISAN RUJUKAN
C) Lukisan Kejuruteraan Awam dan Struktur untuk pembinaan (Civil & Structural Drawings)
• Digunakan dalam pembinaan jalanraya, perparitan, pembentungan serta paip sumber air.
• Struktur merupakan lukisan yang menunjukkan saiz kekuda bumbung, rasuk, ketebalan papak lantai dan tebal papak.
SPESIFIKASI• amat penting di dalam merancang perolehan alatan dan bahan.• memberikan keterangan yang jelas mengenai mutu atau gred alatan dan bahan
yang diperlukan.• perolehan yang menepati kehendak kerja dapat menganggar kos dengan tepat
secara tidak langsung.• Spesifikasi mempunyai 2 fungsi: alat komunikasi kepada pembekal mengenai kehendak bahan dan khidmat yang
perlu dibekalkan. Kriteria terhadap bahan dan khidmat yang sebenar diberikan oleh pembekal
dibandingkan. Rujuk rajah 4
PROGRAMMING AND SCHEDULING TECHNIQUES:o BAR CHARTo ARROW NETWORKINGo CRITICAL PATH METHODo PERT - Program Evaluation and
Review Techniqueo PRECEDENCE DIAGRAMo RESOURCE AGGREGATION &
LEVELLINGo LINE OF BALANCE
o PERT was developed for the Polaris missile/submarine project in 1958
o CPM developed by DuPont during the same time
o Initially, CPM and PERT were two different approachesCPM used deterministic time
estimates and allowed project crunching
PERT used probabilistic time estimates
o Microsoft Project (and others) have blended CPM and PERT into one approach
Terminologyo Activity - A specific task or set of tasks that
are required by the project, use up resources, and take time to complete
o Event - The result of completing one or more activities
o Network - The combination of all activities and events that define a project
Drawn left-to-right Connections represent predecessors
Terminology….o Path - A series of connected activitieso Critical - An activity, event, or path which, if
delayed, will delay the completion ofo the projecto Critical Path - The path through the project
where, if any activity is delayed, the project is delayed
There is always a critical path There can be more than one critical
patho Sequential Activities - One activity must be
completed before the next one can begin-Parallel
Probability Considerations on Activity Duration Estimates
Optimistic time: time to complete
an activity if everything goes
perfectly well.
Most likely time: time to complete
an activity under normal conditions.
Pessimistic time: time to complete
an activity under adverse
circumstances.
PROGRAMMING AND SCHEDULING TECHNIQUES:
COMPUTER SOFTWARES:
MICROSOFT PROJECT PRIMAVERA
No Item Block A Block B Block C Consumer Sub Station Rumah Sampah Kafeteria Pondok Pengawal Sewerage
Treatment Plant OVERALL 0% A Site Preparation 100% 100% 100% 100% 100% 100% 100% 100%B Surveying Works 60% 75% 75% 50% 50% 50% 50% 50% C Structure Works 1 Earthwork 100% 100% 100% 100% 100% 100% 100% 25%2 Piling Works 47% 100% 100% 0% 0% 7% 0% 0%3 Pile Cap 0% 0% 90% 0% 0% 0% 0% 0%4 Stump 0% 0% 90% 0% 0% 0% 0% 0%5 Ground Beam & Slab 0% 0% 60% 0% 0% 0% 0% 0%6 Ground Wall & Column 0% 0% 0% 0% 0% 0% 0% 0%7 1st Floor Beam & Slab 0% 0% 0% 0% 0% 0% 0% 0%8 1st Floor Wall & Column 0% 0% 0% 0% 0% 0% 0% 0%9 2nd Floor Beam & Slab 0% 0% 0% 0% 0% 0% 0% 0%10 2nd Floor Wall & Column 0% 0% 0% 0% 0% 0% 0% 0% D Architecture Works 1 Brickwork 0% 0% 0% 0% 0% 0% 0% 0%
WORK PROGRESS SUMMARY
NADI CERGAS SDN BHD
PROGRESS S-CURVE
23
DATE TARGET ACTUAL
March-14 0.00 0.00
April-14 2.00 0.00
May-14 3.00 0.00
June-14 4.00 1.00
July-14 5.00 1.80
August-14 6.00 2.80
September-14 7.00 5.00
October-14 7.50 6.00
November-14 9.00 8.00
December-14 11.00
January-15 13.00
February-15 16.00
March-15 21.00
April-15 26.00
May-15 33.00
June-15 40.00
July-15 48.00
August-15 55.00
September-15 61.00
October-15 67.00
November-15 72.00
December-15 77.00
January-16 82.00
February-16 86.00
March-16 89.00
April-16 93.00
May-16 95.00
June-16 97.00
July-16 99.00
August-16 99.50
September-16 100.00
October-16 100.00
Ma
r-1
4
Ap
r-1
4
Ma
y-1
4
Ju
n-1
4
Ju
l-1
4
Au
g-1
4
Se
p-1
4
Oc
t-1
4
No
v-1
4
De
c-1
4
Ja
n-1
5
Fe
b-1
5
Ma
r-1
5
Ap
r-1
5
Ma
y-1
5
Ju
n-1
5
Ju
l-1
5
Au
g-1
5
Se
p-1
5
Oc
t-1
5
No
v-1
5
De
c-1
5
Ja
n-1
6
Fe
b-1
6
Ma
r-1
6
Ap
r-1
6
Ma
y-1
6
Ju
n-1
6
Ju
l-1
6
Au
g-1
6
Se
p-1
6
Oc
t-1
6
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.02.0 3.0 4.0 5.0 6.0 7.0 7.5
9.011.0
13.016.0
21.0
26.0
33.0
40.0
48.0
55.0
61.0
67.0
72.0
77.0
82.0
86.089.0
93.095.0
97.099.099.5100.0100.0
0.000.000.001.001.802.805.006.00
8.00
TARGETACTUAL
DURATION (TOTAL 30 MONTHS)
% W
OR
K D
ON
E
NADI CERGAS SDN BHD
MONETARY S-CURVE
25
Marc
h-1
4
May-1
4
June-1
4
July
-14
August
-14
Septe
mber-
14
Oct
ober-
14
Novem
ber-
14
Dece
mber-
14
January
-15
Febru
ary
-15
Marc
h-1
5
Apri
l-15
May-1
5
June-1
5
July
-15
August
-15
Septe
mber-
15
Oct
ober-
15
Novem
ber-
15
Dece
mber-
15
January
-16
Febru
ary
-16
Marc
h-1
6
Apri
l-16
May-1
6
June-1
6
July
-16
August
-16
Septe
mber-
16
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
0.02.0
4.05.06.07.09.010.0
14.017.0
21.025.0
30.034.0
38.042.0
46.049.0
53.056.0
59.063.0
67.071.0
75.0
85.0
92.095.0
98.099.0100.0
0.0
4.84.84.84.88.1
10.8
0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0
Target
% % RM RMDATE TARGET ACTUAL TARGET ACTUAL
Mar-14 0.0 0.0 0 0.00Apr-14 2.0 4.8 948 2,297,584.31May-14 4.0 4.8 1,895 2,297,584.31Jun-14 5.0 4.8 2,369 2,297,584.31Jul-14 6.0 4.8 2,843 2,297,584.31Aug-14 7.0 8.1 3,317 3,856,552.46Sep-14 9.0 10.8 4,265 5,133,647.85Oct-14 10.0 4,739Nov-14 14.0 6,634Dec-14 17.0 8,056Jan-15 21.0 9,951Feb-15 25.0 11,847Mar-15 30.0 14,216Apr-15 34.0 16,112May-15 38.0 18,007Jun-15 42.0 19,903Jul-15 46.0 21,798Aug-15 49.0 23,220Sep-15 53.0 25,115Oct-15 56.0 26,537Nov-15 59.0 27,958Dec-15 63.0 29,854Jan-16 67.0 31,749Feb-16 71.0 33,645Mar-16 75.0 35,540Apr-16 85.0 40,279May-16 92.0 43,596Jun-16 95.0 45,018Jul-16 98.0 46,439Aug-16 99.0 46,913Sep-16 100.0 47,387
ORGANISE PRELIMINARY ITEMS
04/21/2023 81
PRELIMINARIES merupakan senarai arahan kerja yang perlu dilaksanakan oleh pihak Kontraktor bagi tujuan penyediaan atau persiapan tapak bina.
04/21/2023 82
Keterangan :• Preliminaries adalah merupakan
salah satu daripada kandungan Dokumen Tender atau Dokumen Kontrak,
• ianya merupakan arahan yang perlu dipatuhi oleh pihak Kontraktor dalam melaksanakan kerja pembinaan.
04/21/2023 83
Dalam penyediaan Preliminaries , Juru Ukur Bahan akan mengenal pasti
terlebih dahulu tentang perkara yang perlu dinyatakan.
Ia bergantung kepada o kepentingan, o keperluan projek dan o kehendak Majikan.
Penyediaannya adalah berbeza di antara satu projek dengan projek yang lain.
PELAKSANAAN IBS
SKOR IBS ≥ 70%
04/21/2023 85
Senarai yang terkandung dalam Preliminaries dipecahkan kepada dua :-
i. Perlu dihargakan ii. Tidak perlu
dihargakan.
04/21/2023 86
i. Perlu dihargakan
Ianya bermaksud arahan atau maklumat yang dinyatakan merupakan kerja atau keperluan yang perlu dilaksanakan oleh pihak Kontraktor, di mana kerja perlaksanaan ini melibatkan kos.
04/21/2023 87
Dalam pecahan pertama – Perlu Dihargakan –
terbahagi kepada tiga (3) iaitu :-
04/21/2023 88
I. Keperluan yang menjadi syarat untuk Kontraktor masuk ke tapak projek.
Kontraktor dikehendaki mematuhi arahan dengan menyediakan keperluan sebelum dibenarkan memulakan kerja di tapak dan kepatuhan terhadap arahan ini merupakan syarat bagi pihak majikan untuk membenarkan Kontraktor memasuki tapak bina.
04/21/2023 89
I. Keperluan yang menjadi syarat untuk Kontraktor masuk ke tapak projek.
- Contohnya seperti menyediakan polisi-polisi insuran ( Contractor’s All Risks, Worker’s Compensation Insurance Policy etc. )
04/21/2023 90
II. Keperluan yang dilaksanakan semasa projek sedang berjalan. Arahan terhadap kerja yang perlu disedia dan dilaksanakan oleh pihak Kontraktor semasa projek sedang berjalan.
Membantu kerja pembinaan sebenar
dari segi penyediaan kemudahan, pengurusan dan pentadbiran, keselamatan dan sebagainya.
Melicinkan lagi perlaksanaan projek
tersebut secara keseluruhan.
04/21/2023 91
II. Keperluan yang dilaksanakan semasa projek sedang berjalan.
Contohnya adalah seperti penyediaan pejabat tapak, telefon, fax, kenderaan Pegawai Penguasa, Pegawai Keselamatan, setor, rumah kongsi, foto dan laporan kemajuan dan sebagainya.
04/21/2023 92
Menyediakan dan melaksanakan langkah-langkah keselamatan/ kesihatan (health & safety) di tapak yang perlu dan mencukupi, sepertimana keperluan OSHA serta akta berkaitan dan langkah-langkah lain yang perlu sebagaimana Arahan Pegawai Inden seperti berikut:-
i) Pakaian, topi dan but keselamatan (Peralatan Perlindungan Diri yang lengkap)ii) Tali keselamatan dan papan tanda keselamatan untuk mengasingkan kawasan kerja dan kawasan laluaniii) Lain-lain peralatan keselamatan yang diperlukan untuk kerja ini. iv) Orang yang berlesen/kompeten untuk melaksanakan kerja-kerja seperti berikut :-
a) Kerja-kerja memasang perancahb) Kerja ruang terkurungc) Kerja-kerja kimpaland) Pengendali jentera/mesin
CONTOH: Keperluan yang dilaksanakan semasa projek sedang berjalan
04/21/2023 93
16. Progress Photographs 16.1 The Contractor shall take progress photographs at monthly intervals or more frequent as directed by the S.O. The photographs to be taken from different angles as approved by the S.O. and the average number of photographs shall be sufficient enough to show the progress of the Works. For building works, the average number per month shall not be less than six (6) per block of building. 16.2 The Contractor shall supply six (6) sets of bound printed copies of the approved photographs, all properly titled and dated. The photographs shall also be provided in jpeg or other approved format with each image set at minimum size of 1280 x 960 pixels and at resolution of 72 pixels per inch and submitted to the S.O. monthly, in compact discs or removable storage.
04/21/2023 94
III. Keperluan yang dilaksanakan selepas projek siap.
Keperluan yang perlu dilakukan oleh pihak Kontraktor
selepas kerja pembinaan siap sebagaimana kehendak kontrak.
Sebelum Kontraktor dibenarkan menyerah tapak, Kontraktor perlulah memastikan kehendak Preliminaries ini tercapai.
04/21/2023 95
III. Keperluan yang dilaksanakan selepas projek siap.
Contohnya adalah seperti pembukaan terhadap kerja tertutup, pengalihan atau pembuangan sampah / sisa bahan, pembersihan tapak bina dan sebagainya.
04/21/2023 96
04/21/2023 97
04/21/2023 98
04/21/2023 99
Dihargakan :
1. Permits and licenses required in connection with the works.
The contractor shall allow for and obtain all necessary permits, licenses, etc., required from the relevant Authorities in connection with the carrying out of the works and pay all fees, royalties in connection therewith.
04/21/2023 100
Dihargakan :
2. Testing of materials
Allow here or in the rates for the cost of carrying out all tests described herein including providing all necessary labor, materials and appliances and paying all fees and charges for tests carried out by others.
04/21/2023 101
Dihargakan :
3. Removal of rubbish
The contractor shall ensure all surplus materials of building, cutting trees and the like will be removed from the site to contractor’s own dump. All transportation and costs to remove this rubbish shall be responsible by the contractor.
04/21/2023 102
Dihargakan :
04/21/2023 103
LALUAN SEMENTARA – DENGAN KOSNYA SENDIRI, KONTRAKTOR PERLU MENYEDIAKAN LALUAN SEMENTARA KE TAPAK BINA
SEHINGGA SIAP.
Dihargakan :
04/21/2023 104
04/21/2023 105
04/21/2023 106
ii. Tidak Perlu Dihargakan.
Ianya berbentuk maklumat atau kenyataan semata.
Dapat memberi penjelasan yang terperinci kepada Kontraktor mengenai perjalanan sesuatu projek.
04/21/2023 107
Maklumat yang dinyatakan adalah :-
•takrifan terhadap mana-mana istilah, •huraian terhadap kontrak dan sebagainya,
maklumat yang dinyatakan ini akan membantu pihak Kontraktor memahami kehendak sebenar kontrak.
04/21/2023 108
Tidak Dihargakan :
1. Location
The site is situated as shown on the site and location Plan No. KN 669/479/1 which also indicated the confines of the building.
04/21/2023 109
Tidak Dihargakan :
2. Days and hours of working
No part of the work shall be done in other than the normal working hours during the nights of during any days of the weeks set apart for the rest or for authorized public holidays without the knowledge and written permission so given. The contractor shall not be entitled to any additional payment neither shall it release him from any of his liabilities under the contract.
04/21/2023 110
Keseluruhannya Preliminaries ini terbahagi kepada :-
Huraian mengenai projek
Definisi terhadap istilah,unit dan Pengukuran Ringkasan spesifikasi
Keselamatan dan kesihatan Kemudahan dan keperluan projek
Arahan terhadap kerja dan sebagainya
04/21/2023 111
RUMUSAN
Memastikan proses pembinaan berjalan dengan lancar dan licin tanpa
mengalami apa-apa masalah yang mengakibatkan projek tersebut terlewat
atau pun terbengkalai.
ORGANISE SETTING OUT
Surveying equipment, such as levels and theodolites, are used for accurate measurement of angular deviation, horizontal, vertical and slope distances. With computerisation, electronic distance measurement (EDM), total stations, GPS surveying and laser scanning have supplemented (and to a large extent supplanted) the traditional optical instruments.
Construction surveying or building surveying (otherwise known as "lay-out" or "setting-out") is to stake out reference points and markers that will guide the construction of new structures such as roads or buildings. These markers are usually staked out according to a suitable coordinate system selected for the project.
The aims of setting outThere are two main aims when
undertaking setting out operations:
i. The various elements of the scheme must be correct in all three dimensions both relatively and absolutely, that is each must be its correct size, in its correct plan position and correct reduced level
ii. Once setting out begins it must proceed quickly with little or no delay in order that the works can proceed smoothly and the cost can be minimised. It must always be remembered that the contractors main commercial purpose is to make a profit – therefore setting out needs to be done efficiently.
The services of a licenced land surveyor are generally required for boundary surveys (to establish the boundaries of a parcel using its legal description) and subdivision plans (a plot or map based on a survey of a parcel of land, with boundary lines drawn inside the larger parcel to indicated the creation of new boundary lines and roads).
Sight Rails
These consist of a horizontal timber cross piece nailed to a single upright or a pair of uprights driven into the ground (see below)
The upper edge of the cross piece is set to a convenient height above the required plane of the structure, usually to the nearest 100mm, and should be a height above ground to ensure convenient alignment by eye with the upper edge.
Sight rails are usually offset 2 or 3 metres at right angles to construction lines to avoid them being damaged as excavations proceed.
2. Site Clearing, Grubbing And Stripping Topsoil 2.1 This work shall consist of clearing, grubbing and tripping topsoil in the areas within the limits of Works designated hereunder and/or shown on the Drawings and/or directed by the S.O., and of clearing only in other areas designated hereunder and/or shown on the Drawings and/or directed by the S.O., all as specified herein and as required by the S.O. The work shall also include the demolition and disposal of structures in the said areas, except where otherwise provided for in the Contract, as specified herein and as required by the S.O.
STANDARD SPECIFICATION FOR BUILDING WORKS 2014
SECTION B : EXCAVATION AND EARTHWORKS
STANDARD SPECIFICATION FOR BUILDING WORKS 2014
SECTION B : EXCAVATION AND EARTHWORKS 2.1.1 Site clearing
Clearing shall consist of cutting and/or taking down, removal and disposal of everything above ground level, including objects such as walls, fences, drains and other obstructions, except such trees, vegetation, structures or parts of structures and other things which are designated in the Contract to remain, to be protect as satisfied under SECTION R : LANDSCAPING AND TURFING WORKS. The material to be cleared shall include but not necessarily be limited to trees, stumps (parts above ground), logs,brushwood, undergrowth, long grasses, crops, loose vegetable matter and structures (except those structures whose removal or clearance is otherwise provided for in the Contract). Clearing shall also include levelling of obsolete dikes, terraces, ditches, et cetera, unless otherwise directed by the S.O.
2.1.2 Grubbing Grubbing shall consist of removal and disposal of surface vegetation, basesof stumps, roots, underground parts of structures, and other obstructions to a depth of at least 0.50 m below ground level, with the agreement of the S.O. 2.1.3 Stripping topsoil
Stripping topsoil shall consist of the removal of topsoil to an average depthof at least 100 mm below ground level, and its stockpiling for use in theWorks, and/or its disposal, as directed by the S.O. 2.1.4 Disposal
All materials resulting from site clearing, grubbing and stripping topsoil shall be removed and disposed of as approved by the S.O. in accordance with Environmental Quality Act 1974(Act 127) and Solid Waste and PublicCleansing Management Act 2007 (Act 672).
Clearing the Site
Construction equipment operations are usually the most rapid and efficient means of clearing a site. Use of the equipment is limited only by unusually large trees and stumps–terrain which hinders their maneuverability and maintenance requirements. The construction equipment used include bulldozers, winches, power saws, rippers, motor graders, and scrapers. In addition, hand tools are used in certain clearing operations.