wrm_jmarinelli_leadpracdrillpadmeth_final

47
Leading Practice Drill Pad Methodology Julius Marinelli Consultant Exploration Geologist 1 Leading Practice Drill Pad Methodology

Upload: julius-marinelli

Post on 20-Jul-2015

21 views

Category:

Documents


0 download

TRANSCRIPT

Leading Practice Drill Pad Methodology

Julius Marinelli

Consultant

Exploration Geologist

1

Leading Practice

Drill Pad Methodology

Leading Practice Drill Pad Methodology

Today’s Presentation Outline

History

Preparation

Construction

Safety and Environment

Design Evolution

Rehabilitation

Community

2

Leading Practice Drill Pad Methodology

History

1900

3

Leading Practice Drill Pad Methodology

History

1953

4

Leading Practice Drill Pad Methodology

History

1990

5

Leading Practice Drill Pad Methodology

History

Today

6

Leading Practice Drill Pad Methodology

History

Stats

How

many

drill

pads?

7

Leading Practice Drill Pad Methodology

Preparation Site selection and

layout

Stakeholder

access negotiation

Regulatory

documentation

Contractor and

equipment

selection

8

Leading Practice Drill Pad Methodology

Site selection and layout

Mt Carrington Drake

NSW gold-silver

3000 historical holes

Exploration and

resource targets

9

Number of holes

Angle and azimuth

Ground check, peg

and photograph

WRM – 2011

60 pads,+10000m

Leading Practice Drill Pad Methodology

Site selection and layout

Proactive

management of

impacts

Initial ground

check

10

Leading Practice Drill Pad Methodology

Site selection and layout

11

Potential for harm

• Tree overhang

• Buried assets

Distance from

drainage

Flora and fauna

Slope of site

Water supply

Waste disposal

Site specific

Leading Practice Drill Pad Methodology

Site selection and layout

Flora and fauna

12

Vulnerable bird

species

Habitat trees –

Casuarina seed

cone count

30 on ground is

critical

Leading Practice Drill Pad Methodology

Site selection and layout

Flora and

faunaGlossy Black

Cockatoo

Red Tailed

Cockatoo

13

Leading Practice Drill Pad Methodology

Stakeholder Access &

Negotiation Communication

Regulatory

documentation

14

Landowners

Forests NSW

Requirements• Agreement

• S30

• SDN

• REF

• Mine Ops Plan

Leading Practice Drill Pad Methodology

Stakeholder Access &

Negotiation

15

Administered

by Environment

division in

Resources and

Energy

Liaising with

Forests NSW

establishes

requirements

for FMZ’s

Leading Practice Drill Pad Methodology

Contractors and Equipment

Selection – Drillers and Earthmovers

Smallest footprint possible

Experience and safety record

Reliability and communication

Local knowledge

Drill Management Plan

16

Leading Practice Drill Pad Methodology

Construction

Tree audit for

Forestry

Payments for

larger trees

Earthmoving

contractor shown

pad design

15m x 10m plan

agreed

17

Leading Practice Drill Pad Methodology

Construction

Track making that

minimises excavation

Best chance for flora

regeneration

18

Leading Practice Drill Pad Methodology

Construction

Storage of topsoil

and vegetative

matter

Pad base set for

strata protection

Sediment fencing

minimises

washaways in wet

weather

19

Leading Practice Drill Pad Methodology

Construction Plastic lining fitted

to capture

accidental fluid

spills

Bunding around

perimeter to

contain potential

fluid spills

20

Leading Practice Drill Pad Methodology

Construction

Coconut fibre

matting

provides good

working surface

Minimises

hazards

Absorbs

accidental spills

21

Leading Practice Drill Pad Methodology

Construction

Barrier fencing

for visibility –

day and night

Sign-off for

each pad

Mobilise

equipment onto

site

22

Leading Practice Drill Pad Methodology

Safety & Environment

Review all

aspects of setup

once all

equipment is

set up

Confirm

prestart

checklist

23

Leading Practice Drill Pad Methodology

Safety & Environment

Checklists

sign off

Site Prep

Size etc.

Access

Water

24

Leading Practice Drill Pad Methodology

Safety & Environment

Site Prep

Bunds

Turnaround

Sed fence

Sketch

25

Leading Practice Drill Pad Methodology

Safety & Environment

Rig setup

PPE

First aid

Guards

Documentation

26

Leading Practice Drill Pad Methodology

Safety & Environment

Rig setup

Comms.

Fire ext.

Containment

27

Leading Practice Drill Pad Methodology

Safety & Environment

Rig Pack-up

Removal

Cap hole

Pad and

access rehab

28

Leading Practice Drill Pad Methodology

Evolution of Drill Pad Methodology

REX Minerals

2008 – Hillside SA

Wheat paddock

Plastic and sand

Adaptability of

method

Tableland and

range forests

Replace sand with

Coconut fibre

mats

29

Leading Practice Drill Pad Methodology

Evolution of Drill Pad Methodology

REX Minerals

REX Minerals

2008

South Australia

Hillside copper

Wheat paddocks

Flat terrain

Cropping –

grazing land

30

Leading Practice Drill Pad Methodology

Evolution of Drill Pad Methodology

REX Minerals Wheat paddock

No surface

scrape

Plastic cover

sheeting

Sand on

plastic

31

Leading Practice Drill Pad Methodology

Evolution of Drill Pad Methodology

REX Minerals

Wheat paddock

Bunding

Barrier

fencing

32

Leading Practice Drill Pad Methodology

Evolution of Drill Pad Methodology

REX Minerals

Wheat paddock

Whole set up

Hay bales as

light and noise

barriers

33

Leading Practice Drill Pad Methodology

Evolution of Drill Pad Methodology

REX / White Rock Minerals NE NSW 2009

(State) Forest

and/or

undulating

terrain

Excavation

Plastic lining

Sand on plastic

Bunding

Barrier fencing

Sediment fencing

34

Leading Practice Drill Pad Methodology

Evolution of Drill Pad Methodology

White Rock Minerals

2010 program

issues

Problems emerged

Wet weather

Sand washes away

in heavy rain

Sand gets in

equipment

Construction and

clean-up costs

escalated

35

Leading Practice Drill Pad Methodology

Evolution of Drill Pad Methodology

White Rock Minerals 2010-11 Solutions

discussed

Needed to lessen

impact

Smaller rig – smaller

pad

Smaller excavator or

backhoe

Replace sand with

coconut fibre matting

Make Mats recyclable

36

Leading Practice Drill Pad Methodology

Evolution of Drill Pad Methodology

White Rock Minerals 2011 - Solutions

implemented

Cost savings

Use of mats up to 3

times

No need to collect

sand and dispose

Backhoe costs lower

per hour vs. excavator

Speedier rehab

37

Leading Practice Drill Pad Methodology

Evolution of Drill Pad Methodology

WRM / REX Minerals

Solutions

successfully

implemented at

WRM

Now used by

REX Minerals in

wheat

paddocks

38

Leading Practice Drill Pad Methodology

Evolution of Drill Pad Methodology

REX Minerals

Solutions

implemented

Easy and

speedy rehab

on pastures

and crop land

39

Leading Practice Drill Pad Methodology

Rehabilitation

Discussions with

Forests NSW

Landholders

Re-use

disturbed

topsoil and

vegetative

matter

Documentation

signoff

40

Leading Practice Drill Pad Methodology

Rehabilitation

Example –

immediately

after

41

Leading Practice Drill Pad Methodology

Rehabilitation

Example –

after 9

months

42

Leading Practice Drill Pad Methodology

Rehabilitation

Example –

after 2

years

43

Leading Practice Drill Pad Methodology

Community Showcase

methods to

mines

inspectorate

Community site

visit days

44

Leading Practice Drill Pad Methodology

Community

Primary school

site visits

45

Leading Practice Drill Pad Methodology

In Summary

46

Preparation

Construction

Safety and Environment

Designcontinualevolution

Rehabilitation

Community

Leading Practice Drill Pad Methodology

Thank You

47