wrm_jmarinelli_leadpracdrillpadmeth_final
TRANSCRIPT
Leading Practice Drill Pad Methodology
Julius Marinelli
Consultant
Exploration Geologist
1
Leading Practice
Drill Pad Methodology
Leading Practice Drill Pad Methodology
Today’s Presentation Outline
History
Preparation
Construction
Safety and Environment
Design Evolution
Rehabilitation
Community
2
Leading Practice Drill Pad Methodology
Preparation Site selection and
layout
Stakeholder
access negotiation
Regulatory
documentation
Contractor and
equipment
selection
8
Leading Practice Drill Pad Methodology
Site selection and layout
Mt Carrington Drake
NSW gold-silver
3000 historical holes
Exploration and
resource targets
9
Number of holes
Angle and azimuth
Ground check, peg
and photograph
WRM – 2011
60 pads,+10000m
Leading Practice Drill Pad Methodology
Site selection and layout
Proactive
management of
impacts
Initial ground
check
10
Leading Practice Drill Pad Methodology
Site selection and layout
11
Potential for harm
• Tree overhang
• Buried assets
Distance from
drainage
Flora and fauna
Slope of site
Water supply
Waste disposal
Site specific
Leading Practice Drill Pad Methodology
Site selection and layout
Flora and fauna
12
Vulnerable bird
species
Habitat trees –
Casuarina seed
cone count
30 on ground is
critical
Leading Practice Drill Pad Methodology
Site selection and layout
Flora and
faunaGlossy Black
Cockatoo
Red Tailed
Cockatoo
13
Leading Practice Drill Pad Methodology
Stakeholder Access &
Negotiation Communication
Regulatory
documentation
14
Landowners
Forests NSW
Requirements• Agreement
• S30
• SDN
• REF
• Mine Ops Plan
Leading Practice Drill Pad Methodology
Stakeholder Access &
Negotiation
15
Administered
by Environment
division in
Resources and
Energy
Liaising with
Forests NSW
establishes
requirements
for FMZ’s
Leading Practice Drill Pad Methodology
Contractors and Equipment
Selection – Drillers and Earthmovers
Smallest footprint possible
Experience and safety record
Reliability and communication
Local knowledge
Drill Management Plan
16
Leading Practice Drill Pad Methodology
Construction
Tree audit for
Forestry
Payments for
larger trees
Earthmoving
contractor shown
pad design
15m x 10m plan
agreed
17
Leading Practice Drill Pad Methodology
Construction
Track making that
minimises excavation
Best chance for flora
regeneration
18
Leading Practice Drill Pad Methodology
Construction
Storage of topsoil
and vegetative
matter
Pad base set for
strata protection
Sediment fencing
minimises
washaways in wet
weather
19
Leading Practice Drill Pad Methodology
Construction Plastic lining fitted
to capture
accidental fluid
spills
Bunding around
perimeter to
contain potential
fluid spills
20
Leading Practice Drill Pad Methodology
Construction
Coconut fibre
matting
provides good
working surface
Minimises
hazards
Absorbs
accidental spills
21
Leading Practice Drill Pad Methodology
Construction
Barrier fencing
for visibility –
day and night
Sign-off for
each pad
Mobilise
equipment onto
site
22
Leading Practice Drill Pad Methodology
Safety & Environment
Review all
aspects of setup
once all
equipment is
set up
Confirm
prestart
checklist
23
Leading Practice Drill Pad Methodology
Safety & Environment
Checklists
sign off
Site Prep
Size etc.
Access
Water
24
Leading Practice Drill Pad Methodology
Safety & Environment
Site Prep
Bunds
Turnaround
Sed fence
Sketch
25
Leading Practice Drill Pad Methodology
Safety & Environment
Rig setup
PPE
First aid
Guards
Documentation
26
Leading Practice Drill Pad Methodology
Safety & Environment
Rig setup
Comms.
Fire ext.
Containment
27
Leading Practice Drill Pad Methodology
Safety & Environment
Rig Pack-up
Removal
Cap hole
Pad and
access rehab
28
Leading Practice Drill Pad Methodology
Evolution of Drill Pad Methodology
REX Minerals
2008 – Hillside SA
Wheat paddock
Plastic and sand
Adaptability of
method
Tableland and
range forests
Replace sand with
Coconut fibre
mats
29
Leading Practice Drill Pad Methodology
Evolution of Drill Pad Methodology
REX Minerals
REX Minerals
2008
South Australia
Hillside copper
Wheat paddocks
Flat terrain
Cropping –
grazing land
30
Leading Practice Drill Pad Methodology
Evolution of Drill Pad Methodology
REX Minerals Wheat paddock
No surface
scrape
Plastic cover
sheeting
Sand on
plastic
31
Leading Practice Drill Pad Methodology
Evolution of Drill Pad Methodology
REX Minerals
Wheat paddock
Bunding
Barrier
fencing
32
Leading Practice Drill Pad Methodology
Evolution of Drill Pad Methodology
REX Minerals
Wheat paddock
Whole set up
Hay bales as
light and noise
barriers
33
Leading Practice Drill Pad Methodology
Evolution of Drill Pad Methodology
REX / White Rock Minerals NE NSW 2009
(State) Forest
and/or
undulating
terrain
Excavation
Plastic lining
Sand on plastic
Bunding
Barrier fencing
Sediment fencing
34
Leading Practice Drill Pad Methodology
Evolution of Drill Pad Methodology
White Rock Minerals
2010 program
issues
Problems emerged
Wet weather
Sand washes away
in heavy rain
Sand gets in
equipment
Construction and
clean-up costs
escalated
35
Leading Practice Drill Pad Methodology
Evolution of Drill Pad Methodology
White Rock Minerals 2010-11 Solutions
discussed
Needed to lessen
impact
Smaller rig – smaller
pad
Smaller excavator or
backhoe
Replace sand with
coconut fibre matting
Make Mats recyclable
36
Leading Practice Drill Pad Methodology
Evolution of Drill Pad Methodology
White Rock Minerals 2011 - Solutions
implemented
Cost savings
Use of mats up to 3
times
No need to collect
sand and dispose
Backhoe costs lower
per hour vs. excavator
Speedier rehab
37
Leading Practice Drill Pad Methodology
Evolution of Drill Pad Methodology
WRM / REX Minerals
Solutions
successfully
implemented at
WRM
Now used by
REX Minerals in
wheat
paddocks
38
Leading Practice Drill Pad Methodology
Evolution of Drill Pad Methodology
REX Minerals
Solutions
implemented
Easy and
speedy rehab
on pastures
and crop land
39
Leading Practice Drill Pad Methodology
Rehabilitation
Discussions with
Forests NSW
Landholders
Re-use
disturbed
topsoil and
vegetative
matter
Documentation
signoff
40
Leading Practice Drill Pad Methodology
Community Showcase
methods to
mines
inspectorate
Community site
visit days
44
Leading Practice Drill Pad Methodology
In Summary
46
Preparation
Construction
Safety and Environment
Designcontinualevolution
Rehabilitation
Community