Page 1: WPS Construction Worker Transport Strategy rev A€¦ · Name Dean Israel Position Project Manager Address ADCO Constructions Level 2 7/9 West Street North Sydney 2060 Phone 02 8437

.

Construction Workers

Transport Strategy

Waitara Public School

Edgeworth David Road,

Waitara NSW Version 0

PRINCIPLE CONTRACTOR - ADCO CONSTRUCTIONS

LEVEL 2 7/9 WEST STREET

NORTH SYDENY

NSW

Page 2: WPS Construction Worker Transport Strategy rev A€¦ · Name Dean Israel Position Project Manager Address ADCO Constructions Level 2 7/9 West Street North Sydney 2060 Phone 02 8437

Waitara Public School Construction Workers Transport Strategy V0 Page 2 of 10

WAITARA PUBLIC SCHOOL

CONTENTS

GENERAL INFORMATION 3

PURPOSE OF THE DOCUMENT 3

PROJECT SPECIFIC INFORMATION 4

Site access information 4

Work hours 4

Estimated daily workers on site 4

Council requirements 4

Client requirements 5

Traffic Management 5

On site Parking 5

Off site Parking 5

Public Transport 5

SURVEY OF AVAILABLE STREET CARPARKING 6

ATTACHMENTS 10

Page 3: WPS Construction Worker Transport Strategy rev A€¦ · Name Dean Israel Position Project Manager Address ADCO Constructions Level 2 7/9 West Street North Sydney 2060 Phone 02 8437

Waitara Public School Construction Workers Transport Strategy V0 Page 3 of 10

WAITARA PUBLIC SCHOOL

GENERAL INFORMATION

PURPOSE OF THE DOCUMENT

This strategy document has been produced for the following purposes:

� Compliance to SSD consent condition B27

� Establishment site specific restrictions on vehicle parking by Construction Workers

� Detail available options for construction workers travelling to the site

Any queries should be directed to:

Name Dean Israel

Position Project Manager

Address ADCO Constructions

Level 2 7/9 West Street North Sydney 2060

Phone 02 8437 5000 or 0413 777 152

Email [email protected]

The details of this document will be included in the site specific induction presentation for all construction workers. This document will be reviewed quarterly to ensure its compliance adequacy.

Page 4: WPS Construction Worker Transport Strategy rev A€¦ · Name Dean Israel Position Project Manager Address ADCO Constructions Level 2 7/9 West Street North Sydney 2060 Phone 02 8437

Waitara Public School Construction Workers Transport Strategy V0 Page 4 of 10

WAITARA PUBLIC SCHOOL

PROJECT SPECIFIC INFORMATION

Site access information

Construction

Vehicle site

entry location

Gate 2 off Myra Street – Primary Site Access

Construction

Vehicle site

entry location

Gate 3 off Edgeworth David Avenue – Secondary Site Access

School

Pedestrian entry

location

Existing School Gate 5 (50m north of ADCO Gate 2)

Site Personnel

entry location/s

Gate 1 off Myra Street

Delivery

instructions

1. Entry in accordance with Traffic Management Plan

2. No Deliveries between 8:30am – 9:30am and 2::30pm – 3:30pm

Drop-off and Pick-up Times (Times to be confirmed following consultation

with the School)

3. No deliveries via Highlands Avenue during Main Works Stage

Work hours General Monday – Friday

Saturday Sunday Public Holiday

RDO

From 7am 8am

No work

7am

To 6pm 1pm 6pm

Estimated daily workers on site

∇ ADCO estimates the daily number of construction workers on site will average 56 with a peak

number of 80.

Based on an average of 56 workers per day the following distribution of transport modes to

site are assumed:

- Percentage of workers using individual vehicles 70% = 39 Vehicles

- Percentage of workers using carpool arrangements with fellow colleagues 15%

- Percentage of workers using public transport 15%

Council requirements ∇ Compliance with LINK traffic management plan (Annexure A)

∇ Adhere to local street signage and parking restrictions

Page 5: WPS Construction Worker Transport Strategy rev A€¦ · Name Dean Israel Position Project Manager Address ADCO Constructions Level 2 7/9 West Street North Sydney 2060 Phone 02 8437

Waitara Public School Construction Workers Transport Strategy V0 Page 5 of 10

WAITARA PUBLIC SCHOOL

Client requirements ∇ The school has requested no parking by any construction workers in Highlands Ave from the

Schools Gate 6 to Fern Ave – refer below

Traffic Management ∇ Traffic management requirements will be implemented by competent approved personnel.

∇ All workers are all required to comply with the set conditions as defined in the TMP.

∇ A copy of the TMP will be available from the Site Manager and posted on the Site Notice

Board. Conditions will be communicated to workers prior to project commencement, during

the site induction at with other consultative forums.

∇ Only certified personnel are permitted to undertake traffic control duties in accordance with

relevant legislative requirements.

∇ Subcontractors are responsible for providing all traffic control in the delivery of any materials,

plant of equipment they are responsible for under their respective subcontract

On site Parking ∇ There is no designated space for construction workers to park their vehicles on site for an

extended period. When required, workers will be allowed to drive onto site to off-load

materials, tools and equipment required to complete their works for a maximum period of

20min.

Off site Parking ∇ Construction workers are to adhere to all local parking restrictions

∇ Construction workers are to refrain from loud talking, foul language, littering, loud car noises

e.g. excessive revving, and slamming car doors in and around residential streets.

∇ Construction workers are to obey traffic and carpark restrictions during School drop off and

pick up times

∇ Construction workers are to ensure that their parked vehicle does not obstruction private

driveways or pedestrian paths

Public Transport ∇ Construction workers will be encouraged to utilise the available public transport options

∇ Waitara Train Station: 750m walk via Park Lane

WAITARA PUBLIC

SCHOOL

WAITARA TRAIN STATION

Page 6: WPS Construction Worker Transport Strategy rev A€¦ · Name Dean Israel Position Project Manager Address ADCO Constructions Level 2 7/9 West Street North Sydney 2060 Phone 02 8437

Waitara Public School Construction Workers Transport Strategy V0 Page 6 of 10

WAITARA PUBLIC SCHOOL

SURVEY OF AVAILABLE STREET CARPARKING

A survey of the surrounding streets to the site was undertaken 12:40pm Thursday 7 March 2019 and confirmed the following:

- Parking restrictions

- All day parking available

- Number of private vehicles that park on a typical day and the number of spaces available

LEGEND:

Unrestricted No Parking During School Drop off and Pickup No Parking No Parking As per School Request

Photo 03

Photo 02 Photo 04

Photo 01

Photo 05

Photo 08

Photo 11

Photo 06

Photo 09

Photo 07

Photo 10

Photo 01

Page 7: WPS Construction Worker Transport Strategy rev A€¦ · Name Dean Israel Position Project Manager Address ADCO Constructions Level 2 7/9 West Street North Sydney 2060 Phone 02 8437

Waitara Public School Construction Workers Transport Strategy V0 Page 7 of 10

WAITARA PUBLIC SCHOOL

PHOTOGRAPHIC RECORD

Photo No. Location Photo

01

Myra Street northbound No Parking

02 Edgeworth David Avenue westbound

No Parking

03 Edgeworth David eastbound

unrestricted

04 Edgeworth David Ave westbound

school drop off / pickup restrictions

Page 8: WPS Construction Worker Transport Strategy rev A€¦ · Name Dean Israel Position Project Manager Address ADCO Constructions Level 2 7/9 West Street North Sydney 2060 Phone 02 8437

Waitara Public School Construction Workers Transport Strategy V0 Page 8 of 10

WAITARA PUBLIC SCHOOL

05 Ingalara Ave looking north from Fern

Ave unrestricted

06 Fern Ave looking east from Highlands

Ave

07 Highlands Avenue south of Fern Ave

unrestricted

08 Oleander Road looking east from

Myra Avenue unrestricted

Page 9: WPS Construction Worker Transport Strategy rev A€¦ · Name Dean Israel Position Project Manager Address ADCO Constructions Level 2 7/9 West Street North Sydney 2060 Phone 02 8437

Waitara Public School Construction Workers Transport Strategy V0 Page 9 of 10

WAITARA PUBLIC SCHOOL

09 Myra Street looking north from

Oleander Road unrestricted

10 Myra Street northbound unrestricted

11 Myra Street southbound unrestricted

and school drop off and pick up

restrictions (marked yellow arrow)

12 Myra Street southbound unrestricted

south of site entry

Page 10: WPS Construction Worker Transport Strategy rev A€¦ · Name Dean Israel Position Project Manager Address ADCO Constructions Level 2 7/9 West Street North Sydney 2060 Phone 02 8437

Waitara Public School Construction Workers Transport Strategy V0 Page 10 of 10

WAITARA PUBLIC SCHOOL

ATTACHMENTS

A- Traffic Management Plan prepared by LINK