wp4 - e-infrastructure services - & wp5 - network services - achievements
DESCRIPTION
WP4 - e-Infrastructure Services - & WP5 - Network Services - achievements. Ramon Diacov o – WP4 Manager (UFRJ) Gilberto Diaz – WP5 Manager (ULA) Final Project Review, 11.10.2012 Brussels (Belgium). Reminder WP4 + WP5 Objectives Achievements & Perspectives WP4 Infrastructure Services - PowerPoint PPT PresentationTRANSCRIPT
www.gisela-grid.eu
Grid Initiatives for e-Science virtual communities in Europe and Latin America
WP4 - e-Infrastructure Services - &
WP5 - Network Services - achievements
Ramon Diacovo – WP4 Manager (UFRJ)
Gilberto Diaz – WP5 Manager (ULA)
Final Project Review, 11.10.2012
Brussels (Belgium)
www.gisela-grid.eu 2
Reminder• WP4 + WP5 Objectives
Achievements & Perspectives• WP4 Infrastructure Services• WP5 Network Services• Sustained e-Infrastructure & Network operation• Handover Status
Conclusions
Outline
2GISELA – Final Project Review - Brussels – 11/10/2012
www.gisela-grid.eu
“Ensure the sustainability of the EU-LA e-Infrastructure”
“Establish a powerful e-Infrastructure facility built on the EELA-2 legacy”
• WP4
– Implement the catchall Grid Support Centre (GSC)
– Implement a Grid Operations Centre (GOC)
– Setup and operate the e-Infrastructure following the best practices
recommended by EGI
• WP5
– Implement the Network Support Centre (NSC)
– Deploy Network monitoring tools
– Deploy a ticket system to manage network issues
3
WP4 & WP5 Objectives
GISELA – Final Project Review - Brussels – 11/10/2012
www.gisela-grid.eu
• The catchall Grid Support Centre (GSC) has been deployed
• 2 Grid Operation Centres (GOC) are operational (UNAM, Uniandes)
• The e-Infrastructure operation is fully EGI compliant through the adoption of common services and practices, of Operational Level Agreements (OLA) with RCs, etc.
• Experienced Operation Teams (core & RCs) are in place (EELAs + GISELA legacy)
• Baseline Operation tasks ensured routinely– Site integration support
– Prod.vo.eu-eela.eu VO operation
– Resource Centres oversight (monitoring, ticket handling)
– Software deployment as requested by WP3
4
WP4: Achievements
GISELA – Final Project Review - Brussels – 11/10/2012
www.gisela-grid.eu
WP4: CPU Cores integration
Number of Cores, basically as committed in the DoW
5
+ 3000 Cores, from Friend Institutions, open to Prod-VO
GISELA – Final Project Review - Brussels – 11/10/2012
www.gisela-grid.eu
WP4: RC / Resources situation
CPU, Storage resources by the end of GISELA
•Less RCs than foreseen:– Expectations included former EELA-2 partners that are neither GISELA partners nor third parties– Grouping for cost-effective support
6
WIP
✔
✔
6GISELA – Final Project Review - Brussels – 11/10/2012
www.gisela-grid.eu 7
WP4: e-Infrastructure load per RC
Steady usage over the entire reporting period
GISELA – Final Project Review - Brussels – 11/10/2012
Cumulative load per Resource Center (wall-time hours)
www.gisela-grid.eu
• Percentage of consumed resources– Considers only the available resources– Depicts fair e-Infrastructure usage
8
Con
su
med
%
WP4: e-Infrastructure Occupancy
GISELA – Final Project Review - Brussels – 11/10/2012
www.gisela-grid.eu
Average above the DoW target
9
WP4: e-Infrastructure availability
GISELA – Final Project Review - Brussels – 11/10/2012
www.gisela-grid.eu
– 142 total tickets during the 2nd project year– More than 66% solved in 7 days or less
10
WP4: Ticket resolution time
Days to solve
Nu
mb
er of
tickets
GISELA – Final Project Review - Brussels – 11/10/2012
www.gisela-grid.eu
• The Network Support Centre (NSC) has been deployed as Partition of the RedCLARA NSC
• A perfSONAR Network platform is operational allowing to monitor inter-RCs network activity. It consists of:
– 5 Measurements Points currently scattered over the region
– A Web-based monitoring tool (MonGISELA) further adopted by the
CLARA Work Group (GT-Mediciones)
• A Ticket System has been installed to handle the network issues
11
WP5: Achievements
11GISELA – Final Project Review - Brussels – 11/10/2012
www.gisela-grid.eu 12
perfSONAR Measurements Points
MonGISELA Home Page
Monitoring of network activity between RCs
WP5: Monitoring Infrastructure
12GISELA – Final Project Review - Brussels – 11/10/2012
www.gisela-grid.eu 13
• Average delay of 120 milliseconds
• Less than 1% average packet loss
• Average delay of 80 milliseconds
• 3% average packet loss
WP5: Inter-RCs network monitoring
13GISELA – Final Project Review - Brussels – 11/10/2012
Performance assessment of the GISELA’s Network Infrastructure
• Packets delay and packet loss rate (UFRJ - CEDIA)
• Packets delay and packet loss rate (ULA - UFRJ)
www.gisela-grid.eu
• Sustainability scheme: Mexico Declaration agreement
– UNAM taking over the prod.vo.eu-eela.eu VO Operation
VOMS, MyProxy, LFC, LB, UI, WMS, AMGA already deployed
The only catch-all VO available for small research groups in LA (thanks to GISELA)
• Handover Status (end of September 2012)
– ROC Operations
Resource Centres handed over to ROC-LA (HEP LA ROC)
IGALC sites that are still active have been/are being handed over
Continuity of RC operation supported by each local Institution
Support still being given by the GSC to ensure the smoothest transition
14GISELA – Final Project Review - Brussels – 11/10/2012
WP4: Sustainability scheme / Handover Status
www.gisela-grid.eu
•Sustainability scheme
– Future NSC as a Partition of RedCLARA NSC
– perfSONAR: standard support by RedCLARA
– MonGISELA cared of by RedCLARA & GT-Mediciones
15
WP5: Sustainability scheme
15GISELA – Final Project Review - Brussels – 11/10/2012
www.gisela-grid.eu 161616
WP4WP5
WP4 & WP5: e.o. 2012 planning
16GISELA – Final Project Review - Brussels – 11/10/2012
www.gisela-grid.eu
• WP4 & WP5 have successfully established Advanced Computing & Network resources for e-Science in Latin America, in legacy of EELA and EELA-2
• The Distributed Computing Infrastructure is constructed from the most natural “building blocks”– Resource Centres in Local Institutions providing computing & storage
resources and their support– One distributed Operation Centre for the Core operations: ROC-LA
merging the GSC and GOC functions– NRENs ensuring all Network services under the federative coordination
of CLARA
• The long-term of the DCI operation and support is granted by– A cost-effective agreement involving UNAM, Uniandes, CEDIA, etc.
– Full EGI compliance
17
Conclusions
17GISELA – Final Project Review - Brussels – 11/10/2012