Page 1: Wp2 presentazione per berlino

BIOEUPARKSExploiting the potentialities of solid

biomasses in EU ParksIEE/12/994/SI2.645924

Work Package 2: AWARENESS RAISING AND DEVELOPMENT OF METHODOLOGIES FOR FACING LOCAL CONFLICTS

Page 2: Wp2 presentazione per berlino

Legambiente is an Italian, non-profit association created in 1980 for the safeguard and the sound management of the environment and for the promotion of sustainable lifestyle, production systems and use of resources.

Legambiente is the most widespread environmental organisation in Italy, with over 115.000 members and over 2million people involved in volunteer activities and campaigns.

The activity of Legambiente is based on the work of 1.500 local groups and co-ordinated through 20 regional committees and a national headquarter in Rome.

WHO IS LEGAMBIENTE?

NATIONAL HEAD OFFICE in Rome20 REGIONAL COMMITTEES LOCAL GROUPS: over 1500 between local groupsMEMBERS: over 115.000VOLUNTEERS: over a million people involved during Legambiente activities and campaigns each yearEDITORIAL GROUP “La Nuova Ecologia” (8 magazines and 3 websites)STAFF: about 150 employees including permanent and temporary staff in the Headquarter and the Regional Committees

NATIONAL HEAD OFFICE in Rome20 REGIONAL COMMITTEES LOCAL GROUPS: over 1500 between local groupsMEMBERS: over 115.000VOLUNTEERS: over a million people involved during Legambiente activities and campaigns each yearEDITORIAL GROUP “La Nuova Ecologia” (8 magazines and 3 websites)STAFF: about 150 employees including permanent and temporary staff in the Headquarter and the Regional Committees

Page 3: Wp2 presentazione per berlino

… gives prior attention to the problems deriving from environment and urban degradation, to energy issues and the development of the renewable sources and to the links between economy and the environment… has a constant interest in educating people on environmental issueshas a strong commitment to the issues of nature conservation and to the policy of protected areas… has a strong involvement in international action and is active in the field of international cooperation… bases their initiatives to safeguard the environment on accurate scientific data (Scientific Environmentalism)

IN ITS WORK LEGAMBIENTE…

Page 4: Wp2 presentazione per berlino

Work Package 2: AWARENESS RAISING AND DEVELOPMENT OF METHODOLOGIES FOR FACING LOCAL CONFLICTS

Why this action? Because the project consider inescapable and indispensable the sharing of objectives and the methodologies to be applied for implement a biomass supply chain in a certain territory with local key actors and citizens. What are the aspects that can affect the realization of the project? lack of transparency in the decision processlow involvement (and information) for localsunderestimation of social effectsenvironmental and health impactpolitical positionsdoubts on private investments on issues directly affecting citizens’ life. What are the strengths that can facilitate the realization of the project? the efficiency and sustainability of the supply biomass chainprovide all the necessary information to all stakeholderstake into account local social, environmental and economic featurescitizens participation during the decision making process and during all key stagesthe definition of guide lines (Memorandum of Understanding) which defines common shared rules and commit all stakeholders to follow these rules.

Page 5: Wp2 presentazione per berlino

WHAT 2 Awareness Event per Nature Park, 10 in total

4 Round Tables per Nature Park, 20 Round Tables in total

45 Specific Meetings for preparation of Memoranda of Understanding

WHERE In each target area, meaning 5 Nature Parks involved.

In each target area, meaning 5 Nature Parks involved.

In each target area, meaning 5 Nature Parks involved.

WHO Events will be organised and managed by Nature Parks representatives

Round Tables will be organised and managed by Nature Parks representatives

Specific meetings will be organised and managed by Nature Parks representatives

WHY To inform and aware locals on the main features of project.

To include in an inclusive approach both the civil society and the supply chain promoters

To develop the Memoranda of Understanding

WHEN Between 2nd and 4th month of project.

Between the 4th to 8th month of project

From 6th to 8th month of project

DURATION half day sessions half day sessions 2/3 hours sessions

TARGET local inhabitants, local interests groups, local economic actors and local public actors.

Local authorities, Public enterprises, CHP Plants and heat plants owners, Investors, Agricultural enterprises and land owners, Enterprises working in forest management and wood treatment, Transport enterprises, Environmental and citizens’ associations, Financial institutions, Experts

Local authorities, Public enterprises, CHP Plants and heat plants owners, Investors, Agricultural enterprises and land owners, Enterprises working in forest management and wood treatment, Transport enterprises, Environmental and citizens’ associations, Financial institutions, Experts

THE TOOLS OF THE PROJECT

Page 6: Wp2 presentazione per berlino

A CASE STUDY: THE BUONCONVENTO MUNICIPALITY

 

Where: Buonconvento is a village in Siena Province (Tuscany), about 3.300 inhabitants

What: Four 999 kW biogas plant

The story: After the project was presented to the municipal administration and evaluated by the Technical Office, the City Council decided that that more detailed projects and more precise documentation for the construction of biogas plants were needed. Furthermore the beginning of a heated debate led the Municipality to engage a participatory process involving local citizens and experts.

Page 7: Wp2 presentazione per berlino

What were the concerns of the Municipality?

The consequences of the plants supply which, coming from outside the territory, would have implications on local viability, already characterized as criticalA possible negative impact on landscape, water resources, soil productiveness and wildlife.

What were the concerns of the citizens?

Healthy problems: toxic fumes, noxious emissions, pathogenic bacteria etc.The inconvenience caused by bad smells and the visual impact of power plants on the territory

A CASE STUDY: THE BUONCONVENTO MUNICIPALITY

Page 8: Wp2 presentazione per berlino

Who attended?

Jury formed by citizens selected at random among all Buonconvento inhabitants (50 citizens of different ages and professions, either not experts nor necessarily interested in the subject)Guarantee Body, chaired by the Mayor of Buonconvento and composed of representatives from the different points of view with respect to biogas. One of the tasks of the Body is checking that all opinions will be expressed.Experts chosen in a balanced way between "pro" and “con“

The participatory methodology Sending a letter and a leaflet to all citizensActivation of a dedicated web site www.biogasparliamone.itTwo workshops with "pro" and “con“ experts A final phase during which the Jury will express its opinionA public presentation of the results

A CASE STUDY: THE BUONCONVENTO MUNICIPALITY

 

Page 9: Wp2 presentazione per berlino

The most controversial issues: What is biological in biogas?How much are the biogas incentives and how much will they cost to citizens?How a biogas plant works? How much is the water and energy consumption?How big, in terms of surface, is a biogas plant?How much "mass" is needed to feed it? How big is the consequence on the agricultural land and what is the potential impact on crops and landscape?What is the impact on roads and traffic?Does the plant make bad smell and noise?What goes in and what comes out from the furnace?The residual from biogas production can be harmful?What controls are made?What does a «well done biogas» mean?What are the most suitable places for a plant?

A CASE STUDY: THE BUONCONVENTO MUNICIPALITY

 

Page 10: Wp2 presentazione per berlino

THANK YOU!