13THE WORLD BANK GREEN BOND IMPACT REPORT 2018
The World Bank is committed to transparent reporting of its green and climate-related financing, including the projects that are part of its Green Bond program. Detailed information for all World Bank financed projects is available on the World Bank website http://projects.worldbank.org. Project summaries and impact indicators for Green Bond eligible projects are summarized on the investor website at: http://treasury.worldbank.org/en/about/unit/treasury/ibrd/ibrd-green-bonds.
The following section lists the 91 World Bank eligible projects supported by the financing of World Bank Green Bonds as of June 30, 2018. The projects are organized by sector. Selected results indicators, World Bank loan amount, share of loan amount to total project costs, and the amount of Green Bond proceeds that have been allocated to support disbursements to each project are disclosed. Annex 1 describes the reporting approach and should be read in conjunction with this report.
Interpreting Reported ResultsThe intention of impact reporting is to help investors develop a more detailed understanding of the climate and environmental impacts that can be expected or projected to result from Green Bond eligible projects. Several key results indicators have been selected and where possible quantified, but it is important to appreciate the inherent limitations of data reported. The main considerations to adequately interpret results are:
• Scope of results: Reporting is based on “ex-ante” estimates of climate and environmental impacts at the time of project appraisal and mostly for direct project effects, except as indicated where the results have been updated for actual results at the time of project completion.
• Uncertainty: An important consideration in estimating impact indicators and projecting results is that they are based on assumptions. While technical experts aim to make sound and conservative assumptions that are reasonable based on the information available at the time, the actual environmental impact of the projects generally diverge from initial projections. In general, behavioral changes or shifts in baseline conditions can cause deviations from projections.
• Comparability: Caution should be taken in comparing projects, sectors, or whole portfolios because baselines (and base years) and calculation methods may vary significantly. In addition, the cost structures between countries will also vary, so that developing cost-efficiency calculations (such as results per dollar invested) could, for example, place smaller countries with limited economies of scale at a disadvantage and will not take into consideration country-specific context.
• Omissions and qualitative results: Because the selected projects aim to provide social and developmental benefits as well as climate and environmental ones, they will have impacts across a much wider range of indicators than captured in the next section. Therefore, exclusively focusing on the reported indicators will leave out other important development impacts. Where quantitative data is unavailable, qualitative indicators have been included to illustrate other beneficial impacts.
To better understand the developmental impacts of projects and the broader country context, please view the full project documentation available on the World Bank website at http://projects.worldbank.org/.
IMPACT REPORTING
14THE WORLD BANK GREEN BOND IMPACT REPORT 2018 14THE WORLD BANK GREEN BOND IMPACT REPORT 2018
15THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Target Results and Committed and Allocated Amounts
Results should be read in conjunction with Annex 1, which describes the reporting approach.
ELIGIBLE PROJECTS BY SECTOR
RENEWABLE ENERGY AND ENERGY EFFICIENCY
WATER AND WASTEWATER
SOLID WASTE MANAGEMENT
AGRICULTURE, LAND USE, FORESTS, AND ECOLOGICAL RESOURCES
RESILIENT INFRASTRUCTURE, BUILT ENVIRONMENT, AND OTHER
CLEAN TRANSPORTATION
16THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Targ
et R
esul
ts
#Li
nk to
Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M
Project Life
Ann
ual
Ener
gy
Savi
ngs
M
Wh
Ann
ual
Ener
gy
Prod
uced
M
Wh
Ren
ewab
le
Cap
acity
A
dded
MW
Ann
ual G
HG
Em
issi
ons
Avoi
ded
Tons
of
CO
2 Eq.
Oth
er R
esul
ts
CommittedUS$ mil
IBRD share
Allocated US$ mil
1Be
laru
s - B
iom
ass
Dis
trict
Hea
ting
(P14
6194
| FY
14):
incr
ease
en
ergy
effi
cien
cy in
dis
trict
hea
ting
syst
ems
and
repl
ace
natu
ral g
as
with
woo
d bi
omas
s as
a re
new
able
en
ergy
sou
rce.
M20
236,
000
1,66
0,00
010
642
0,00
0C
umul
ativ
e ov
er 5
yea
rs:
● 1,
180,
000
MW
h en
ergy
sav
ings
from
effi
cien
cy in
vest
men
ts.
● 2,
100,
000
tons
of C
O2 e
q.
emis
sion
s re
duce
d.
90.0
100%
46.2
2C
hina
- Be
ijing
Roo
ftop
Sola
r Ph
otov
olta
ic S
cale
- Up
(Sun
shin
e Sc
hool
s) P
roje
ct (P
1250
22 |
FY13
): pr
omot
e re
new
able
ene
rgy
in 1
000
scho
ols
and
othe
r edu
catio
nal
inst
itutio
ns.
M20
na10
0,00
010
089
,590
● 10
to 1
5% o
f the
sch
ools
’ an
nual
pow
er u
se p
rovi
ded
by re
new
able
sou
rces
. ●
650,
000
stud
ents
in 1
,000
sc
hool
s be
nefit
.
105.
050
%24
.9
3C
hina
- Ec
o-Fa
rmin
g Pr
ojec
t (P
0965
56 |
FY09
): pr
omot
e su
stai
nabl
e fa
rmin
g sy
stem
s an
d re
duce
gre
enho
use
gas
emis
sion
s (fr
om m
etha
ne a
nd b
urni
ng c
oal
and
firew
ood)
ben
efitin
g ru
ral
com
mun
ities
with
bio
gas
syst
ems.
M20
na~
~90
0,00
0●
400,
000
- 500
,000
rura
l ho
useh
olds
ben
efit w
ith
clea
ner b
ioga
s-ba
sed
cook
ing
and
heat
ing
syst
ems.
U
pdat
ed fo
r act
ual r
esul
ts a
t pr
ojec
t com
plet
ion.
119.
827
%11
9.8
4C
hina
- En
ergy
Effi
cien
cy
Fina
ncin
g (P
0848
74 |
FY08
, FY1
2):
prom
ote
ener
gy c
onse
rvat
ion
in
Chi
na’s
indu
stria
l sec
tor s
uppo
rting
in
term
edia
ry lo
ans
for e
nerg
y effi
cien
cy p
roje
cts
in m
ediu
m
and
larg
e-si
zed
man
ufac
turin
g co
mpa
nies
.
M20
21,8
07,9
00na
na6,
490,
000
● 2,
666,
000
tons
of c
oal e
q.
(tce)
ann
ual e
nerg
y sa
ving
s (a
ssum
ing
150
subp
roje
cts)
. U
pdat
ed fo
r act
ual r
esul
ts a
t pr
ojec
t com
plet
ion.
300.
045
%30
0.0
5C
hina
– F
inan
cing
for A
ir Po
llutio
n C
ontro
l (P1
5466
9 | F
Y16)
: re
duce
air
pollu
tant
s an
d ca
rbon
em
issi
ons
thro
ugh
lend
ing
for
ener
gy e
ffici
ency
and
cle
an e
nerg
y,
with
a fo
cus
on th
e Ji
ng-J
in-J
i and
ne
ighb
orin
g re
gion
s.
M20
3,12
5,00
02,
460,
000
● 3,
600
tons
of p
artic
ulat
e em
issi
ons
(loca
l air
pollu
tant
) re
duce
d by
EE
and
RE
subp
roje
cts
finan
ced.
567.
010
0%10
7.4
6C
hina
- En
ergy
Effi
cien
cy
Fina
ncin
g II
Proj
ect (
P113
766
| FY1
0): p
rom
ote
ener
gy
cons
erva
tion
in C
hina
’s in
dust
rial
sect
or th
roug
h in
term
edia
ry lo
ans
to e
nerg
y effi
cien
cy p
roje
cts.
M20
20,2
00,0
00na
na4,
930,
000
Upd
ated
for a
ctua
l res
ults
at
proj
ect c
ompl
etio
n.45
.566
%45
.5
7C
hina
- G
reen
Ene
rgy
Sche
mes
fo
r Low
-car
bon
City
in S
hang
hai
(P12
7035
| FY
13):
prom
ote
gree
ner c
ity d
evel
opm
ent w
ith
ener
gy e
ffici
ency
and
rene
wab
le
ener
gy in
stal
latio
ns in
com
mer
cial
an
d go
vern
men
t bui
ldin
gs.
M20
621,
700
~~
165,
000
100.
041
%75
.6
RENEWABLE ENERGY AND ENERGY EFFICIENCY
17THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Targ
et R
esul
ts
#Li
nk to
Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M
Project Life
Ann
ual
Ener
gy
Savi
ngs
M
Wh
Ann
ual
Ener
gy
Prod
uced
M
Wh
Ren
ewab
le
Cap
acity
A
dded
MW
Ann
ual G
HG
Em
issi
ons
Avoi
ded
Tons
of
CO
2 Eq.
Oth
er R
esul
ts
CommittedUS$ mil
IBRD share
Allocated US$ mil
8C
hina
- Ji
angx
i Shi
huta
ng
Nav
igat
ion
& H
ydro
pow
er
(P10
1988
| FY
09):
max
imiz
e in
land
wat
erw
ay tr
ansp
ort c
apac
ity
as a
low
-car
bon
alte
rnat
ive
to
land
tran
spor
t and
gen
erat
e hy
drop
ower
.
Both
20na
472,
000
120
450,
000
● 4,
400
hect
ares
of c
rop
land
pro
tect
ed fr
om fl
oodi
ng.
● R
MB
26.6
milli
on re
duct
ion
in a
nnua
l floo
d lo
sses
. U
pdat
ed fo
r act
ual r
esul
ts a
t pr
ojec
t com
plet
ion.
100.
031
%10
0.0
9C
hina
- Li
aoni
ng T
hird
Med
ium
C
ities
Infra
stru
ctur
e (P
0992
24
| FY0
8): i
mpr
ove
the
ener
gy
effici
ency
and
env
ironm
enta
l pe
rform
ance
of h
eatin
g an
d ga
s se
rvic
es.
M20
2,75
7,20
0na
na~
● 8,
935
tons
of s
ulph
ur
diox
ide
avoi
ded
per a
nnum
. ●
11,6
59 to
ns o
f tot
al
susp
ende
d pa
rticl
es (l
ocal
po
lluta
nt) a
void
ed p
er
annu
m.
Upd
ated
for a
ctua
l res
ults
at
proj
ect c
ompl
etio
n.
165.
051
%16
5.0
10C
hina
- Sh
ando
ng E
nerg
y Effi
cien
cy (P
1140
69 |
FY11
): im
prov
e th
e en
ergy
effi
cien
cy a
nd
envi
ronm
enta
l per
form
ance
of
the
indu
stria
l sec
tor a
nd fi
nanc
e re
new
able
ene
rgy
prod
uctio
n fro
m
biom
ass
(cor
n an
d w
heat
sta
lk).
M15
3,24
7,50
016
5,00
030
~●
318,
000
TCE
ener
gy
savi
ngs.
144.
747
%11
6.6
11C
hina
- U
rum
qi D
istri
ct H
eatin
g Pr
ojec
t (P1
2066
4 | F
Y11)
: pro
mot
e en
ergy
effi
cien
cy in
dis
trict
hea
ting
by re
plac
ing
disp
erse
d bo
ilers
in
urba
n ar
eas
with
an
inte
grat
ed
dist
rict h
eatin
g ne
twor
k.
M20
1,22
9,40
0na
na41
5,50
0●
1,62
6 M
W o
f ine
ffici
ent
coal
-fire
d bo
ilers
repl
aced
by
com
bine
d he
at a
nd p
ower
di
stric
t hea
ting
netw
ork.
U
pdat
ed fo
r act
ual r
esul
ts a
t pr
ojec
t com
plet
ion.
99.1
29%
99.1
12In
dia
- Grid
-Con
nect
ed R
oofto
p So
lar P
rogr
am (P
1550
07 |
FY15
): in
crea
se s
olar
roof
top
capa
city
to
the
pow
er g
rid a
nd in
cent
iviz
e th
e m
arke
t for
roof
top
sola
r pow
er b
y w
ay o
f low
cos
t fina
ncin
g.
M25
647,
200
250
1,20
0,00
0●
The
250
MW
of c
apac
ity o
f ro
ofto
p so
lar p
hoto
volta
ics
expe
cted
to b
e gr
id-
conn
ecte
d by
5 y
ears
n w
ith
at le
ast a
noth
er 1
50 M
W to
be
con
nect
ed in
sub
sequ
ent
year
s.
● 13
milli
on to
ns C
O2 e
q. in
cu
mul
ativ
e sa
ving
s ov
er th
e pr
ojec
t's 2
5 ye
ar li
fe.
● M
arke
t dev
elop
men
t for
ro
ofto
p ph
otov
olta
ic s
yste
ms
in d
iffer
ent b
usin
ess
mod
els.
500.
055
%43
.0
RENEWABLE ENERGY AND ENERGY EFFICIENCY
18THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Targ
et R
esul
ts
#Li
nk to
Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M
Project Life
Ann
ual
Ener
gy
Savi
ngs
M
Wh
Ann
ual
Ener
gy
Prod
uced
M
Wh
Ren
ewab
le
Cap
acity
A
dded
MW
Ann
ual G
HG
Em
issi
ons
Avoi
ded
Tons
of
CO
2 Eq.
Oth
er R
esul
ts
CommittedUS$ mil
IBRD share
Allocated US$ mil
13In
dia
- Pow
er S
yste
m D
evel
opm
ent
Proj
ectIV
(P10
1653
| FY
09):
expa
nd tr
ansm
issi
on in
frast
ruct
ure
resu
lting
in d
ecre
ased
CO
2 em
issi
ons
thro
ugh
effici
ency
gai
ns
and
trans
ferri
ng s
urpl
us h
ydro
en
ergy
to p
ower
defi
cit r
egio
ns.
M20
8,69
9,00
0na
na~
● R
educ
ed tr
ansm
issi
on
loss
es e
quiv
alen
t to
betw
een
526-
993M
W.
● 10
7,00
0 ci
rcui
t km
of
incr
ease
d ca
paci
ty.
● 68
,000
GW
h po
wer
ex
chan
ge g
row
th b
etw
een
regi
ons.
U
pdat
ed fo
r act
ual r
esul
ts a
t pr
ojec
t com
plet
ion.
400.
016
%40
0.0
14In
dia
- Ram
pur H
ydro
pow
er P
roje
ct
(P09
5114
| FY
08):
scal
e-up
acc
ess
to re
new
able
ene
rgy
thro
ugh
cons
truct
ion
of a
run-
of-th
e-riv
er
hydr
oele
ctric
sch
eme.
M30
na1,
770,
000
412
1,40
7,70
0U
pdat
ed fo
r act
ual r
esul
ts a
t pr
ojec
t com
plet
ion.
400.
060
%40
0.0
15In
done
sia
- Ind
ones
ia G
eoth
erm
al
Ener
gy (P
1130
78 |
FY12
): in
crea
se
pow
er g
ener
atio
n fro
m re
new
able
ge
othe
rmal
reso
urce
s.
M30
na1,
210,
000
150
1,10
0,00
0●
33,0
00,0
00 to
ns o
f CO
2 eq
. cum
ulat
ive
emis
sion
re
duct
ions
of o
ver 3
0 ye
ars.
175.
030
%12
9.0
16Ja
mai
ca -
Ener
gy S
ecur
ity a
nd
Effici
ency
Enh
ance
men
t Pro
ject
(P
1127
80 |
FY11
): in
crea
se
ener
gy e
ffici
ency
and
sec
urity
by
prom
otin
g gr
eate
r par
ticip
atio
n of
re
new
able
ene
rgy
and
gas-
base
d ge
nera
tion
in th
e en
ergy
mix
.
MN
/Ana
~~
~●
623
MW
of n
ew e
lect
ricity
ge
nera
ting
cap
acity
in
clud
ing
thre
e w
ind
farm
s,
two
sola
r far
ms,
and
one
hy
dro
plan
t.
● 60
0 G
Wh
from
rene
wab
le
reso
urce
s an
nual
ly.U
pdat
ed fo
r act
ual r
esul
ts a
t pr
ojec
t com
plet
ion.
14.5
100%
14.5
17M
exic
o - E
ffici
ent L
ight
ing
and
Appl
ianc
es P
roje
ct (P
1064
24 |
FY11
): pr
omot
e th
e effi
cien
t use
of
ene
rgy
and
to m
itiga
te c
limat
e ch
ange
by
incr
easi
ng th
e us
e of
en
ergy
effi
cien
t tec
hnol
ogie
s in
the
resi
dent
ial s
ecto
r.
M5
2,00
0,00
0na
na66
4,00
0C
umul
ativ
e ov
er 5
yea
rs:
● Ex
chan
ge 4
5.8
milli
on
light
bul
bs a
nd 1
.9 m
illion
re
frige
rato
rs a
nd a
ir co
nditi
oner
s.
● 3.
32 m
illion
tons
of C
O2
eq. e
mis
sion
s re
duce
d.
● 50
-60%
ele
ctric
ity s
aved
in
resi
dent
ial h
ouse
hold
s.
● 10
,000
,000
MW
h in
cu
mul
ativ
e en
ergy
sav
ings
. U
pdat
ed fo
r act
ual r
esul
ts a
t pr
ojec
t com
plet
ion.
250.
635
%25
0.6
RENEWABLE ENERGY AND ENERGY EFFICIENCY
19THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Targ
et R
esul
ts
#Li
nk to
Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M
Project Life
Ann
ual
Ener
gy
Savi
ngs
M
Wh
Ann
ual
Ener
gy
Prod
uced
M
Wh
Ren
ewab
le
Cap
acity
A
dded
MW
Ann
ual G
HG
Em
issi
ons
Avoi
ded
Tons
of
CO
2 Eq.
Oth
er R
esul
ts
CommittedUS$ mil
IBRD share
Allocated US$ mil
18M
exic
o - I
nteg
rate
d En
ergy
Se
rvic
es (P
0889
96 |
FY08
): in
crea
se e
nerg
y ac
cess
for p
oor
com
mun
ities
usi
ng re
new
able
en
ergy
(mai
nly
sola
r and
som
e w
ind
gene
rato
rs) a
nd to
dev
elop
a
sust
aina
ble
mar
ket f
or p
rovi
ding
en
ergy
ser
vice
s in
rem
ote
rura
l ar
eas.
M20
na5,
800
624
1,00
0●
4,40
0 ru
ral h
ouse
hold
s re
ceiv
e el
ectri
city
from
re
new
able
sou
rces
. ●
Larg
er lo
ng-te
rm n
atio
nal
impa
ct w
ith re
plic
atio
n th
roug
hout
rura
l are
as.
Upd
ate
for a
ctua
l res
ults
at
proj
ect c
ompl
etio
n.
12.0
18%
12.0
19M
exic
o –
Mun
icip
al E
nerg
y Effi
cien
cy P
roje
ct (P
1498
72 |
FY16
): pr
omot
e en
ergy
effi
cien
cy
in s
treet
ligh
ting,
wat
er u
se a
nd
build
ings
in 2
3 m
unic
ipal
ities
.
M8
127,
590
5,80
06
57,9
26●
463,
405
tons
CO
2 em
issi
ons
redu
ctio
ns
annu
ally.
●
1,02
0,71
4 M
Wh
proj
ecte
d lif
etim
e sa
ving
s.
● 28
sub
-pro
ject
s de
sign
ed.
100.
064
%0.
3
20M
exic
o - S
usta
inab
le R
ural
D
evel
opm
ent (
and
Add
Fina
ncin
g)
(P10
6261
| FY
09, F
Y13)
: in
crea
se th
e us
e of
ene
rgy
effici
ent,
was
te m
anag
emen
t and
re
new
able
ene
rgy
tech
nolo
gies
in
agrib
usin
ess.
M10
20,4
9332
,130
~28
3,90
0C
umul
ativ
e ov
er 7
yea
rs:
● 14
3,45
0 M
Wh
save
d fro
m e
nerg
y effi
cien
cy
inve
stm
ents
. ●
224
,908
MW
h pr
oduc
ed
by re
new
able
(bio
mas
s)
ener
gy.
● 1,
987,
500
tons
of C
O2 e
q.
emis
sion
avo
ided
.
96.8
48%
77.9
21M
oldo
va -
Dis
trict
Hea
ting
Effici
ency
Impr
ovem
ent (
P132
443
| FY1
5): i
mpr
ove
qual
ity a
nd
relia
bilit
y of
hea
ting
serv
ices
by
impr
ovin
g th
e op
erat
iona
l effi
cien
cy
and
viab
ility
of a
new
dis
trict
he
atin
g co
mpa
ny.
M30
96,7
00na
na22
,800
● 34
% re
duct
ion
in h
eatin
g sy
stem
bre
akdo
wns
by
year
5.
●
109,
000
peop
le w
ith
acce
ss to
mor
e en
ergy
effi
cien
t coo
king
and
hea
ting.
40.5
66%
22.1
22M
onte
negr
o - E
nerg
y Effi
cien
cy
(and
Add
ition
al F
inan
cing
) (P
1079
92 |
FY09
, FY1
4):
impr
ove
ener
gy e
ffici
ency
and
en
viro
nmen
tal q
ualit
y in
27
build
ings
use
d fo
r hea
lth a
nd
educ
atio
n se
rvic
es.
M25
30,0
00na
na12
,200
Cum
ulat
ive
over
5 y
ears
and
ta
rget
ing
27 b
uild
ings
: ●
150,
000
MW
h in
life
time
ener
gy s
avin
gs.
● 60
,750
met
ric to
ns o
f C
O2 e
q. li
fetim
e em
issi
ons
redu
ced.
U
pdat
ed fo
r act
ual r
esul
ts a
t pr
ojec
t com
plet
ion.
13.7
100%
13.1
23M
oroc
co -
Cle
an a
nd E
ffici
ent
Ener
gy P
roje
ct (P
1436
89 |
FY15
): de
velo
p th
e fir
st u
tility
siz
ed
phot
ovol
taic
pla
nt to
mor
e re
liabl
y su
pply
sol
ar p
ower
to re
mot
e re
gion
s.
M25
na~
7578
,000
● 41
2,00
0 pe
ople
ben
efit
from
ele
ctric
ity a
nd
asso
ciat
ed e
cono
mic
op
portu
nitie
s of
whi
ch 5
0%
are
expe
cted
to b
e fe
mal
e.
125.
079
%34
.2
RENEWABLE ENERGY AND ENERGY EFFICIENCY
20THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Targ
et R
esul
ts
#Li
nk to
Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M
Project Life
Ann
ual
Ener
gy
Savi
ngs
M
Wh
Ann
ual
Ener
gy
Prod
uced
M
Wh
Ren
ewab
le
Cap
acity
A
dded
MW
Ann
ual G
HG
Em
issi
ons
Avoi
ded
Tons
of
CO
2 Eq.
Oth
er R
esul
ts
CommittedUS$ mil
IBRD share
Allocated US$ mil
24M
oroc
co –
Noo
r Oua
rzaz
ate
Con
cent
rate
d So
lar P
ower
(P
1312
56 |
FY12
, FY1
5): r
epla
ce
foss
il fu
el- b
ased
ele
ctric
ity
with
rene
wab
le e
nerg
y us
ing
conc
entra
ted
sola
r pow
er
tech
nolo
gy.
M30
na1,
638,
000
410
522,
000
369.
515
%57
.2
25
Peru
- Se
cond
Rur
al E
lect
rifica
tion
(P11
7864
| FY
11):
prov
ide
elec
trici
ty to
rem
ote
com
mun
ities
by
ext
endi
ng th
e co
nven
tiona
l el
ectri
city
grid
and
fina
ncin
g so
lar
phot
ovol
taic
sys
tem
s.
M20
na~
~~
● 42
,500
rura
l hou
seho
lds
elec
trifie
d, o
f whi
ch
20,0
00 a
re s
erve
d by
so
lar p
hoto
volta
ic s
yste
ms
from
regu
late
d el
ectri
city
di
strib
utio
n co
mpa
nies
. ●
174,
000
peop
le b
enefi
ted.
U
pdat
ed fo
r act
ual r
esul
ts
at p
roje
ct c
ompl
etio
n.
43.8
60%
43.8
26Tu
nisi
a - E
nerg
y Effi
cien
cy
(P10
4266
| FY
09):
supp
ort
indu
stria
l ene
rgy
effici
ency
and
co
-gen
erat
ion
inve
stm
ents
by
prov
idin
g fin
anci
ng th
roug
h in
term
edia
ries.
M20
580,
000
nana
126,
000
Upd
ated
for a
ctua
l res
ults
at
pro
ject
com
plet
ion.
34.5
91%
34.5
27Tu
rkey
- Pr
ivat
e Se
ctor
Ren
ewab
le
Ener
gy a
nd E
nerg
y Effi
cien
cy
Proj
ect (
P112
578
| FY0
9, F
Y12)
: en
hanc
e re
new
able
ene
rgy
acce
ss (s
mal
l hyd
roel
ectri
c an
d ge
othe
rmal
) and
ene
rgy
effici
ency
in
indu
strie
s (ir
on a
nd s
teel
, ce
men
t, ce
ram
ics,
che
mic
als
and
text
iles)
.
M20
3,02
3,80
03,
728,
000
933
3,21
4,00
0●
Rea
ch 3
1% o
f cou
ntry
’s
tota
l gen
erat
ion
to b
e fro
m
rene
wab
le e
nerg
y.
Proj
ect c
ompl
eted
and
ac
tual
resu
lts m
et e
xpec
ted
targ
ets.
934.
561
%93
4.5
28Tu
rkey
- R
enew
able
Ene
rgy
Inte
grat
ion
(P14
4534
| FY
14):
assi
st in
mee
ting
incr
ease
d po
wer
de
man
d by
stre
ngth
enin
g th
e tra
nsm
issi
on s
yste
m a
nd fa
cilit
atin
g la
rge-
scal
e re
new
able
ene
rgy
gene
ratio
n.
M20
nana
na69
0,00
0●
1,73
4,00
0 M
Wh
per y
ear
of w
ind
ener
gy h
andl
ed
by th
e su
bsta
tions
fund
ed
unde
r pro
ject
.
268.
263
%55
.5
29Tu
rkey
- SM
E En
ergy
Effi
cien
cy
(P12
2178
| FY
13):
impr
ove
ener
gy e
ffici
ency
in s
mal
l and
m
ediu
m e
nter
pris
es in
ene
rgy-
inte
nsiv
e in
dust
ries
by s
calin
g-up
com
mer
cial
ban
k le
ndin
g fo
r en
ergy
effi
cien
cy in
vest
men
ts.
M20
1,50
0,00
0na
na44
,000
Cum
ulat
ive
over
5 y
ears
: ●
154,
500
tons
of C
O2 e
q.
emis
sion
s re
duce
d fo
r all
SME
loan
s.
● 30
0,00
0 M
Wh
in
elec
trici
ty s
avin
gs
by th
e en
d of
pro
ject
im
plem
enta
tion.
67.0
22%
67.0
RENEWABLE ENERGY AND ENERGY EFFICIENCY
21THE WORLD BANK GREEN BOND IMPACT REPORT 2018
RENEWABLE ENERGY AND ENERGY EFFICIENCYTa
rget
Res
ults
#Li
nk to
Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M
Project Life
Ann
ual
Ener
gy
Savi
ngs
M
Wh
Ann
ual
Ener
gy
Prod
uced
M
Wh
Ren
ewab
le
Cap
acity
A
dded
MW
Ann
ual G
HG
Em
issi
ons
Avoi
ded
Tons
of
CO
2 Eq.
Oth
er R
esul
ts
CommittedUS$ mil
IBRD share
Allocated US$ mil
30U
krai
ne -
Dis
trict
Hea
ting
Ener
gy
Effici
ency
(P13
2741
| FY
14):
impr
ove
ener
gy e
ffici
ency
and
qu
ality
of s
ervi
ce o
f Dis
trict
Hea
ting
com
pani
es.
M20
524,
000
nana
261,
800
● 72
1,40
0 co
nsum
ers
serv
ed b
y th
e pa
rtici
patin
g co
mpa
nies
.
222.
184
%11
.5
31U
krai
ne -
Ener
gy E
ffici
ency
(P
0965
86 |
FY11
): im
prov
e en
ergy
effi
cien
cy in
ord
er to
mee
t en
ergy
inte
nsity
redu
ctio
n ta
rget
s,
decr
ease
dep
ende
nce
on im
porte
d ga
s, a
nd d
ecre
ase
the
cost
of
ener
gy s
uppl
y.
M15
7,72
1,15
7na
na1,
000,
000
● C
reat
e jo
bs d
irect
ly a
nd
indi
rect
ly th
roug
h in
crea
sed
cost
com
petit
iven
ess
as
a re
sult
of lo
wer
ene
rgy
inte
nsity
. Pr
ojec
t com
plet
ed a
nd
actu
al re
sults
met
exp
ecte
d ta
rget
s.
200.
010
0%20
0.0
32U
zbek
ista
n - A
dvan
ced
Elec
trici
ty
Met
erin
g Pr
ojec
t (P1
2277
3 |
FY12
): im
prov
e en
ergy
effi
cien
cy
by m
easu
ring
ener
gy c
onsu
mpt
ion
and
was
te th
roug
h ad
vanc
ed
met
erin
g an
d bi
lling
syst
ems.
Mna
nana
na~
● 1.
2 m
illion
adv
ance
d m
eter
s in
stal
led.
●
Impr
ove
billin
g an
d co
llect
ion
rate
s by
8%
and
10
%, r
espe
ctiv
ely.
1.2
73%
1.2
Subt
otal
for R
enew
able
Ene
rgy
and
Ener
gy E
ffici
enc
6,10
5.0
4,00
2.1
Cum
ulat
ive
Loan
Rep
aym
ents
(283
.3)
Tota
l Allo
cate
d an
d O
utst
andi
ng fo
r Ren
ewab
le E
nerg
y an
d En
ergy
Effi
cien
cy3,
718.
8
22THE WORLD BANK GREEN BOND IMPACT REPORT 2018
CLEAN TRANSPORTATIONTa
rget
Res
ults
#Li
nk to
Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M /a
Project Life
Pass
/km
and
/or
pass
enge
rsTo
n/K
m a
nd/o
r to
ns
GH
G
emis
sion
s re
duce
d/av
oide
d
Oth
er re
sults
CommittedUS$ mil
IBRD share
Allocated US$ mil
33Br
azil
- Gre
enin
g R
io d
e Ja
neiro
U
rban
Rai
l Tra
nsit
– Ad
ditio
nal
Fina
ncin
g (P
1119
96 |
FY12
): pr
ovid
e a
mor
e effi
cien
t and
cl
eane
r sub
urba
n ra
il sy
stem
.
M30
● 70
0,00
0 pa
ssen
gers
per
da
y (4
0% in
crea
se
sinc
e 20
09)
● 34
,000
to
ns o
f CO
2 eq
. red
uced
an
nual
ly
● 10
0 ne
w tr
ains
de
liver
ed a
nd in
ope
ratio
n ●
Upg
rade
d in
frast
ruct
ure
● Sh
orte
r tra
vel a
nd
wai
ting
times
. ●
Bicy
cle
park
ing
faci
litie
s in
sel
ect s
tatio
ns.
600.
073
%39
2.1
34Br
azil
- Sao
Pau
lo S
tate
Su
stai
nabl
e Tr
ansp
ort (
P127
723
| FY1
3): i
mpr
ove
trans
port
effici
ency
and
saf
ety,
incr
ease
sh
are
of w
ater
way
tran
spor
t, an
d im
prov
e re
silie
nce
to
clim
ate
chan
ge a
nd n
atur
al
disa
ster
s.
Both
30●
50%
redu
ctio
n of
road
fata
litie
s in
the
100
mos
t cr
itica
l spo
ts.
● 30
% in
crea
se
of e
xpor
ted
biof
uel
trans
porte
d by
w
ater
way
●
6 m
illion
to
ns/y
ear
freig
ht in
the
Tiet
e-Pa
rana
w
ater
way
(4
00%
incr
ease
)
● 75
0 km
of r
oads
re
habi
litat
ed.
● 40
new
aut
omat
i st
atio
ns to
mon
itor c
limat
e ris
k.
● 39
add
ition
al
mun
icip
aliti
es w
ith
disa
ster
risk
map
ping
.
300.
070
%20
0.5
35C
hina
- C
hang
zhi U
rban
Tr
ansp
ort (
P124
978
| FY1
2):
impr
ove
trans
port
mob
ility
and
acce
ssib
ility
whi
le re
duci
ng
emis
sion
s.
M25
● 10
% re
duct
ion
in
fuel
con
sum
ptio
n pe
r pa
ssen
ger-k
m o
n pr
ojec
t co
rrido
rs.
● 56
% re
duct
ion
in tr
affic
fata
litie
s.
● R
educ
ed tr
avel
tim
es
durin
g pe
akho
urs.
●
50 n
ew e
lect
ric b
uses
in
use
.
100.
050
%66
.0
36C
hina
- H
aJia
Rai
lway
(P11
7341
| F
Y14)
: pro
vide
add
ition
al
railw
ay c
apac
ity a
nd re
duce
tra
nspo
rt tim
e fo
r pas
seng
ers
and
freig
ht.
M30
● 3
milli
on
addi
tiona
l pa
ssen
gers
per
ye
ar.
● 7
milli
on
addi
tiona
l fre
ight
vol
ume
per y
ear.
● R
educ
ed p
asse
nger
an
d fre
ight
trav
el ti
me.
●
15 m
illion
peo
ple
bene
fit
incl
udin
g ru
ral p
oor.
● R
educ
ed p
ollu
tion
from
shi
ft to
ele
ctric
ra
ilway
s fro
m ro
ad a
nd a
ir tra
nspo
rt.
300.
05%
54.3
37C
hina
- H
eilo
ngjia
ng C
old
Wea
ther
Sm
art P
ublic
Tr
ansp
orta
tion
Syst
em
(P13
3114
| FY
14):
upgr
ade
the
qual
ity, s
afet
y an
d effi
cien
cy o
f pu
blic
tran
spor
t ser
vice
.
M25
● 38
.8 m
illion
mor
e bu
s rid
es a
nnua
lly
due
to in
crea
sed
effici
ency
of b
us
serv
ice.
● 20
-30%
redu
ctio
n in
fu
el u
se.
● 22
-25
km o
f im
prov
ed
trans
port
corri
dors
de
velo
ped.
●
320
new
cle
aner
-fuel
ve
hicl
es p
rocu
red.
200.
046
%23
.5
23THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Targ
et R
esul
ts
#Li
nk to
Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M /a
Project Life
Pass
/km
and
/or
pass
enge
rsTo
n/K
m a
nd/o
r to
ns
GH
G
emis
sion
s re
duce
d/av
oide
d
Oth
er re
sults
CommittedUS$ mil
IBRD share
Allocated US$ mil
38C
hina
- H
ubei
Xia
ngya
ng
Urb
an T
rans
port
(P11
9071
| F
Y12)
: im
prov
e m
obilit
y,
safe
ty, a
nd e
ffici
ency
in u
rban
tra
nspo
rtatio
n.
M25
● 46
0,00
0 be
nefic
iarie
s of
re
duce
d tra
vel
times
and
gre
ater
ac
cess
to th
e ci
ty
cent
er.
● 40
new
and
hig
her
qual
ity b
uses
in o
pera
tion
● 30
% re
duct
ion
in
fata
litie
s an
d se
vere
ac
cide
nts.
100.
047
%65
.9
39C
hina
- Ji
aozu
o G
reen
Tr
ansp
ort a
nd S
afet
y Im
prov
emen
t (P1
3227
7 | F
Y14)
: im
prov
e tra
nspo
rt sa
fety
and
effi
cien
cy a
long
the
sele
cted
tra
nspo
rt co
rrido
rs a
nd p
rom
ote
non-
mot
oriz
ed tr
ips
with
in th
e pi
lot g
reen
cor
ridor
.
M30
● 24
1,50
0 no
n-m
otor
ized
trip
s pe
r ye
ar in
the
gree
n co
rrido
r.
● 32
,400
add
ition
al
bus
pass
enge
rs
per y
ear.
● 49
0,00
0 be
nefic
iarie
s.
● R
educ
ed tr
affic
fata
litie
s.
● 17
km
in g
reen
cor
ridor
s ex
clus
ivel
y de
dica
ted
to
pede
stria
ns a
nd c
yclis
ts.
100.
050
%20
.2
40C
hina
- N
anch
ang
Urb
an R
ail
(P13
2154
| FY
13):
prov
ide
an e
ffect
ive
urba
n m
ass
rapi
d tra
nsit
syst
em fo
r a ra
pidl
y ex
pand
ing
city
to re
duce
po
llutio
n, tr
affic
cong
estio
n, a
nd
com
mut
ing
times
.
M30
● 20
0,00
0 pa
ssen
ger-t
rips
per d
ay.
● R
educ
ed tr
avel
tim
e on
pub
lic tr
ansp
ort b
y 25
m
inut
es o
r mor
e.
● 10
0% o
f sta
tions
to
beco
me
whe
el-c
hair
and
sigh
t im
paire
d ac
cess
ible
. ●
90%
inte
grat
ion
of
faci
litie
s fo
r bus
/rail/
bike
tra
nsfe
r
250.
010
%11
7.0
41C
hina
- Q
ingh
ai X
inin
g U
rban
Tr
ansp
ort P
roje
ct (P
1278
67 |
FY14
): pr
ovid
e m
ore
effici
ent,
safe
r and
cle
aner
tran
spor
tatio
n.
M30
● 26
4,00
0 ad
ditio
nal
pass
enge
rs p
er
day.
● 20
% d
ecre
ase
in tr
avel
tim
e.
● Im
prov
ed a
cces
sibi
lity
to 1
89,4
00 jo
bs.
● R
educ
ed v
ehic
le
pollu
tion.
120.
048
%5.
1
42C
hina
- Ti
anjin
Urb
an T
rans
port
Impr
ovem
ent P
roje
ct (P
1481
29
| FY1
6): l
ever
age
the
exis
ting
met
ro s
yste
m a
nd p
rom
ote
wal
king
and
bik
ing
in th
e ur
ban
core
to m
ake
trans
port
gree
ner
and
safe
r.
M20
● 85
,000
new
m
etro
use
rs p
er
day.
●
135,
000
new
no
n-m
otor
ized
trip
s pe
r day
."
● 6,
500
tons
of
CO
2 em
issi
ons
redu
ced
annu
ally.
● 2.
8 m
illion
trip
s be
nefit
fro
m im
prov
emen
ts e
ach
day.
●
50 k
m o
f roa
ds
reha
bilit
ated
, 111
met
ro
stat
ions
impr
oved
and
5
new
bus
term
inal
s co
mpl
eted
.
100.
045
%11
.1
43C
hina
- U
rum
qi U
rban
Tra
nspo
rt Pr
ojec
t II (
P148
527
| FY1
6):
impr
ove
mob
ility
in s
elec
ted
trans
port
corri
dors
and
redu
ce
pollu
tion
from
car
s w
ith a
bus
ra
pid
trans
it (B
RT)
sys
tem
.
M30
● 64
5,00
0 pe
ople
be
nefit
from
dire
ct
acce
ss to
BR
T co
rrido
rs a
nd
gree
ner/m
ore
effici
ent t
rans
port.
● 51
.7 k
m o
f BR
T ro
utes
op
erat
ed.
● 45
% o
f com
mut
ers
usin
g sm
art c
ards
. ●
450%
incr
ease
in
aver
age
pass
enge
r bo
ardi
ngs
per b
us/k
m
durin
g pe
ak h
ours
140.
026
%25
.5
CLEAN TRANSPORTATION
24THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Targ
et R
esul
ts
#Li
nk to
Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M /a
Project Life
Pass
/km
and
/or
pass
enge
rsTo
n/K
m a
nd/o
r to
ns
GH
G
emis
sion
s re
duce
d/av
oide
d
Oth
er re
sults
CommittedUS$ mil
IBRD share
Allocated US$ mil
44C
hina
- W
uhan
Sec
ond
Urb
an
Tran
spor
t (P1
1283
8 | F
Y10)
: im
prov
e effi
cien
cy, c
over
age
and
safe
ty o
f pub
lic tr
ansp
ort
syst
ems
in a
n en
viro
nmen
tally
su
stai
nabl
e, in
tegr
ated
and
saf
e w
ay.
M20
● 45
9,00
0 to
ns o
f CO
2 eq
. em
issi
ons
redu
ced
annu
ally.
● Es
tabl
ish
faci
litie
s fo
r pe
dest
rians
and
cyc
lists
. ●
35%
mod
al s
hare
of
publ
ic tr
ansp
orta
tion
on
targ
et c
orrid
ors.
100.
016
%99
.0
45C
hina
- Xi
'an
Sust
aina
ble
Urb
an
Tran
spor
t (P0
9263
1 | F
Y08)
: im
prov
e tra
nspo
rt ac
cess
ibilit
y an
d m
obilit
y an
d en
hanc
e ai
r-qu
ality
mon
itorin
g of
the
urba
n tra
nspo
rt sy
stem
M25
● 52
,000
pub
lic
bicy
cles
with
70
milli
on u
sers
.
● D
oubl
ed a
rea
of b
us
term
inal
s.
● 27
5% in
crea
se in
av
erag
e sp
eed
of p
ublic
tra
nspo
rtatio
n fro
m 1
2 to
45
km
/ hr.
●
Air q
ualit
y m
onito
ring
syst
em/fa
cilit
y im
plem
ente
d.
● 31
,000
veh
icle
s w
ith
emis
sion
s te
sted
. U
pdat
ed fo
r act
ual r
esul
ts
at p
roje
ct c
ompl
etio
n.
150.
036
%15
0.0
46C
hina
- Xi
njia
ng Y
inin
g U
rban
Tr
ansp
ort I
mpr
ovem
ent
Proj
ect (
P126
454
| FY1
2):
prov
ide
impr
oved
acc
ess,
sa
fety
, and
effi
cien
cy in
pu
blic
tran
spor
tatio
n in
an
envi
ronm
enta
lly s
usta
inab
le
man
ner.
M30
● 10
5.5
milli
on
pass
enge
r-trip
pe
r yea
r (40
%
incr
ease
). ●
60,0
00 a
dditi
onal
pe
ople
with
acc
ess
to q
ualit
y ur
ban
trasn
port
serv
ices
.
● R
educ
ed p
eak-
hour
tra
vel t
imes
in tw
o in
tegr
ated
cor
ridor
s.
● R
educ
ed tr
affic
acci
dent
fa
talit
ies.
U
pdat
ed fo
r act
ual r
esul
ts
at p
roje
ct c
ompl
etio
n.
100.
048
%94
.0
47C
hina
- Yu
nnan
Hon
ghe
Pref
ectu
re D
iann
an C
ente
r U
rban
Tra
nspo
rt (P
1015
25
| FY1
4): i
mpr
ove
the
safe
ty,
acce
ssib
ility,
and
effi
cien
cy
of tr
ansp
orta
tion
in c
ore
urba
n ar
eas
by b
uild
ing
new
in
frast
ruct
ure,
sta
ff tra
inin
g an
d ed
ucat
ion
cam
paig
ns.
M25
● 74
2,00
0 pe
ople
ga
inin
g ac
cess
to
urba
n tra
nspo
rt se
rvic
e.
● 38
milli
on
addi
tiona
l pa
ssen
ger t
rips
annu
ally.
● R
educ
ed a
vera
ge tr
avel
tim
e fo
r pub
lic tr
ansp
ort
user
s.
● R
educ
ed th
e nu
mbe
r of
trans
port
rela
ted
fata
litie
s.
150.
043
%9.
0
48C
olom
bia
- Nat
iona
l Urb
an
Tran
sit P
rogr
am (P
1179
47 |
FY10
, FY1
2): r
educ
e ca
rbon
em
issi
ons
and
impr
ove
publ
ic
trans
porta
tion
effici
ency
and
sa
fety
.
M15
● 10
%
redu
ctio
n of
PM
10
conc
entra
tion
leve
l.
● R
educ
ed a
vera
ge
trave
l tim
e fo
r low
inco
me
rider
s.
● R
educ
ed a
ccid
ents
an
d po
llutio
n (in
clud
ing
gree
nhou
se g
ases
) as
soci
ated
with
bus
tra
nspo
rt se
rvic
es.
● 50
km
of r
ehab
ilitat
ed
pede
stria
n pu
blic
spa
ce.
493.
925
%38
3.8
CLEAN TRANSPORTATION
25THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Targ
et R
esul
ts
#Li
nk to
Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M /a
Project Life
Pass
/km
and
/or
pass
enge
rsTo
n/K
m a
nd/o
r to
ns
GH
G
emis
sion
s re
duce
d/av
oide
d
Oth
er re
sults
CommittedUS$ mil
IBRD share
Allocated US$ mil
49Ec
uado
r - M
anta
Pub
lic
Serv
ices
Impr
ovem
ent P
roje
ct
(P14
3996
| FY
14):
impr
ove
trans
port
serv
ices
and
the
qual
ity a
nd s
usta
inab
ility
of
wat
er a
nd s
anita
tion.
M30
● 50
5 av
erag
e da
ily c
yclis
t tra
ffic
(20%
incr
ease
). ●
3,15
0 av
erag
e da
ily p
edes
trian
tra
ffic
(25%
in
crea
se).
● 71
,000
resi
dent
s be
nefit
fro
m w
ater
con
nect
ion
inve
stm
ents
. ●
Impr
oved
mob
ility
and
acce
ssib
ility
of
stre
et n
etw
ork
incl
udin
g pe
dest
rian
faci
litie
s an
d cy
clin
g pa
ths.
100.
087
%32
.2
50Ec
uado
r - Q
uito
Met
ro L
ine
One
(P14
4489
| FY
15):
impr
ove
urba
n m
obilit
y an
d se
rve
the
grow
ing
dem
and
for p
ublic
tra
nspo
rt.
M30
● 29
6,00
0 pa
ssen
gers
per
da
y.
● 58
,170
tons
of
CO
2 em
issi
ons
redu
ced
per
year
.
● U
S$14
milli
on in
ann
ual
fuel
sav
ings
. ●
40%
redu
ctio
n in
av
erag
e tra
vel t
ime.
●
1,80
0 jo
bs c
reat
ed.
205.
012
%14
6.9
51In
dia
- Eas
tern
Ded
icat
ed
Frei
ght C
orrid
or -
II (P
1317
65
| FY1
4): i
ncre
ase
the
capa
city
an
d qu
ality
of f
reig
ht ra
il se
rvic
e.
M22
● 22
tons
of
freig
ht tr
affic
annu
ally.
● 40
0,00
0 to
ns o
f CO
2 eq
. red
uced
an
nual
ly.
● 1,
133
kms
of n
ew
freig
ht-o
nly
rail.
●
Axle
-load
lim
it ra
ised
fro
m 2
3 to
25
tons
in
crea
sing
spe
eds.
910.
067
%12
3.0
52In
dia
- Sus
tain
able
Urb
an
Tran
spor
t (P1
1037
1 | F
Y10)
: im
prov
e go
vern
men
t cap
acity
to
man
age
clim
ate
frien
dly
urba
n tra
nspo
rt so
lutio
ns fo
cusi
ng
on p
ublic
and
non
-mot
oriz
ed
trans
port.
M30
● 12
8,00
0 to
ns o
f CO
2 eq
. em
issi
ons
redu
ced
annu
ally
ove
r 10
yea
rs.
● 68
new
saf
e si
dew
alks
an
d cy
cle
track
s.
● 40
% p
ublic
tran
spor
t tri
p m
ode
shar
e.
105.
232
%81
.8
53M
exic
o - U
rban
Tra
nspo
rt Tr
ansf
orm
atio
n (P
1071
59
| FY1
0): r
educ
e ca
rbon
em
issi
ons
and
trans
form
pub
lic
trans
porta
tion
effici
ency
.
M13
● 34
0,00
0
tons
of C
O2
eq. e
mis
sion
s re
duce
d an
nual
ly w
hen
city
sub
proj
ects
ar
e fu
lly
oper
atio
nal.
● 9.
3 in
tegr
ated
mas
s tra
nsit
corri
dors
of 1
5km
ea
ch.
● 12
new
ligh
t tra
ins.
150.
06%
52.0
54Pe
ru –
Lim
a M
etro
Lin
e 2
Proj
ect (
P145
610
| FY1
5):
Con
stru
ctio
n of
a 3
5 km
sub
way
lin
e an
d re
late
d in
frast
ruct
ure
impr
ovin
g tra
nspo
rtatio
n in
the
east
-wes
t axi
s of
the
Lim
a-C
alla
o M
etro
polit
an a
rea.
M17
● 36
0,00
0 pa
ssen
gers
per
da
y.
● 10
0,00
0 ad
ditio
nal j
obs
reac
habl
e by
pub
lic
trans
porta
tion
with
in 6
0 m
inut
es.
● 34
% re
duct
ion
in tr
avel
tim
e pe
r trip
. ●
Bene
fits
1.6
milli
on
peop
le fo
r im
prov
ed
acce
ss to
jobs
.
300.
05%
40.0
CLEAN TRANSPORTATION
26THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Targ
et R
esul
ts
#Li
nk to
Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M /a
Project Life
Pass
/km
and
/or
pass
enge
rsTo
n/K
m a
nd/o
r to
ns
GH
G
emis
sion
s re
duce
d/av
oide
d
Oth
er re
sults
CommittedUS$ mil
IBRD share
Allocated US$ mil
55Ph
ilippi
nes
- Ceb
u Bu
s R
apid
Tr
ansi
t (BR
T) P
roje
ct (P
1193
43
| FY1
5): i
mpr
ove
the
qual
ity,
safe
ty, a
nd e
nviro
nmen
tal
perfo
rman
ce o
f urb
an p
ublic
tra
nspo
rtatio
n.
M25
● 27
5,00
0 ad
ditio
nal
pass
enge
rs
usin
g pu
blic
tra
nspo
rtatio
n.
● 50
%
redu
ctio
n in
C
O2 e
mis
sion
s pe
r per
son-
km in
pro
ject
co
rrido
r.
● 25
% re
duct
ion
of
annu
al a
ccid
ents
in c
ity.
116.
051
%12
.3
Subt
otal
for T
rans
port
5,19
0.1
2,20
5.1
Cum
ulat
ive
Loan
Rep
aym
ents
(53.
2)To
tal A
lloca
ted
and
Out
stan
ding
for T
rans
port
2,15
1.9
Amou
nts
may
not
add
up
due
to ro
undi
ng.
CLEAN TRANSPORTATION
27THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Targ
et R
esul
ts
#Li
nk to
Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M /a
Project Life
Ann
ual w
ater
sa
ving
s
Ann
ual
amou
nt o
f w
aste
wat
er
trea
ted/
reus
ed/
avoi
ded
Ann
ual
amou
nt o
f ra
w/u
ntre
ated
se
wag
e sl
udge
trea
ted
& d
ispo
sed
of
Ann
ual
amou
nt
of
slud
ge
that
is
reus
ed
Oth
er re
sults
CommittedUS$ mil
IBRD share
Allocated US$ mil
56Br
azil
- Fed
eral
Inte
grat
ed
Wat
er S
ecto
r (P1
1207
3 | F
Y12)
: im
prov
e w
ater
re
sour
ce m
anag
emen
t in
clud
ing
asse
ssin
g ho
w
clim
ate
chan
ge im
pact
s w
ater
ava
ilabi
lity,
and
im
prov
e co
ordi
natio
n an
d ca
paci
ty o
f key
fede
ral
inst
itutio
ns in
the
wat
er
sect
or.
A30
~~
~~
● 14
wat
er re
sour
ces
man
agem
ent i
nstit
utio
ns
supp
orte
d by
the
proj
ect.
●
Incr
ease
d w
ater
use
effi
cien
cy a
nd p
rope
r m
anag
emen
t of s
olid
was
te.
● Im
prov
ed q
ualit
y of
wat
er
serv
ice
in b
oth
urba
n an
d ru
ral a
reas
.
63.8
75%
16.3
57Br
azil
- Esp
irito
San
to
Inte
grat
ed S
usta
inab
le
Wat
er M
anag
emen
t Pr
ojec
t (P1
3068
2 | F
Y14)
: im
prov
e su
stai
nabl
e w
ater
re
sour
ces
man
agem
ent
and
incr
ease
acc
ess
to
sani
tatio
n.
Both
25~
~●
1,59
0 to
ns o
f BO
D
(Bio
chem
ical
O
xyge
n D
eman
d)
rem
oved
a
year
.
~●
2.6
milli
on p
eopl
e be
nefit
. ●
70%
of S
tate
with
dis
aste
r w
arni
ng s
yste
m.
● 32
,897
new
hou
seho
ld
sew
er c
onne
ctio
ns.
● 16
4,00
0 pe
ople
with
im
prov
ed s
anita
tion.
●
2,00
0 he
ctar
es re
fore
sted
.
81.1
70%
2.4
58C
hina
- Be
ngbu
In
tegr
ated
Env
ironm
ent
Impr
ovem
ent (
P096
925
| FY0
8): i
mpr
ove
effec
tiven
ess
and
resi
lienc
e of
urb
an w
ater
su
pply,
trea
tmen
t ser
vice
s an
d flo
od p
reve
ntio
n an
d co
ntro
l sys
tem
s th
roug
h im
prov
ed in
frast
ruct
ure
and
wat
ersh
ed
man
agem
ent.
A25
~●
60 k
m o
f w
aste
wat
er
netw
orks
co
mpl
eted
.
~~
● 85
.5%
floo
d pr
otec
tion
of B
engb
u’s
city
land
ar
ea (1
31.8
4 km
of s
torm
dr
aina
ge n
etw
orks
). ●
Pollu
tion
redu
ctio
n re
ache
d 13
%
● 3
mon
ths
of w
ater
sup
ply
rese
rves
. U
pdat
ed fo
r act
ual r
esul
ts a
t pr
ojec
t com
plet
ion.
99.9
45%
99.9
59C
hina
- W
ater
C
onse
rvat
ion
II (P
1141
38 |
FY12
): im
prov
e ag
ricul
ture
w
ater
man
agem
ent a
nd
incr
ease
agr
icul
ture
wat
er
prod
uctiv
ity.
A30
● 22
.67
milli
on
cubi
c m
eter
s re
duct
ion
in
wat
er w
ithdr
awal
. ●
16.5
2 m
illion
cu
bic
met
ers
redu
ctio
n in
gr
ound
wat
er
over
draf
t. ●
5.80
milli
on
cubi
c m
eter
s re
duct
ion
in
grou
ndw
ater
w
ithdr
awal
.
nana
na●
15%
incr
ease
in m
ain
crop
yie
lds.
●
RM
B 20
0 in
crea
se in
per
ca
pita
ann
ual a
gric
ultu
ral
inco
me.
●
Rev
erse
the
trend
of
decl
inin
g w
ater
tabl
e in
gr
ound
wat
er ir
rigat
ed a
reas
. U
pdat
ed fo
r act
ual r
esul
ts a
t pr
ojec
t com
plet
ion.
76.7
50%
76.7
WATER AND WASTEWATER
28THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Targ
et R
esul
ts
#Li
nk to
Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M /a
Project Life
Ann
ual w
ater
sa
ving
s
Ann
ual
amou
nt o
f w
aste
wat
er
trea
ted/
reus
ed/
avoi
ded
Ann
ual
amou
nt o
f ra
w/u
ntre
ated
se
wag
e sl
udge
trea
ted
& d
ispo
sed
of
Ann
ual
amou
nt
of
slud
ge
that
is
reus
ed
Oth
er re
sults
CommittedUS$ mil
IBRD share
Allocated US$ mil
60C
hina
- Xi
ning
Flo
od
and
Wat
ersh
ed M
gmt
(P10
1829
| FY
09):
impr
ove
sust
aina
ble
utiliz
atio
n of
land
an
d w
ater
reso
urce
s by
impr
oved
floo
d co
ntro
l man
agem
ent,
was
tew
ater
col
lect
ion
and
treat
men
t, an
d w
ater
shed
m
anag
emen
t.
A30
~●
4,80
0,00
0 to
ns o
f un
treat
ed
was
tew
ater
flo
win
g in
to
river
s av
oide
d an
nual
ly.
nana
● 1,
100,
000
tons
of s
oil l
oss
avoi
ded
annu
ally.
●
434,
440
peop
le b
enefi
t fro
m re
duce
d vu
lner
abilit
y to
flo
od e
vent
s.
Upd
ated
for a
ctua
l res
ults
at
proj
ect c
ompl
etio
n.
100.
053
%10
0.0
61D
omin
ican
Rep
ublic
- Em
erge
ncy
Rec
over
y an
d D
isas
ter R
isk
Man
agem
ent (
P109
932
| FY0
8, F
Y12)
: pro
vide
in
frast
ruct
ure
reco
very
an
d st
reng
then
risk
m
anag
emen
t cap
acity
in
tropi
cal s
torm
affe
cted
ar
eas.
A30
~~
nana
● 37
,218
hec
tare
s of
da
mag
ed ir
rigat
ion
rebu
ilt.
● 15
2 km
tran
smis
sion
lin
es re
stor
ed to
“dis
aste
r-re
sist
ant”
stan
dard
s.
● Sa
ntia
go w
aste
wat
er
oper
atio
n re
stor
ed.
● 25
2 M
W o
f dam
aged
hy
drop
ower
faci
litie
s re
stor
ed a
nd d
am s
afet
y st
anda
rds
impr
oved
. U
pdat
ed fo
r act
ual r
esul
ts a
t pr
ojec
t com
plet
ion.
99.9
100%
99.9
62In
dia
- And
hra
Prad
esh
Wat
er S
ecto
r Im
prov
emen
t (P1
0095
4 |
FY10
): im
prov
e irr
igat
ion
serv
ices
on
a su
stai
nabl
e ba
sis
and
stre
ngth
en
the
Stat
e’s
inst
itutio
nal
capa
city
for m
ultis
ecto
ral
deve
lopm
ent a
nd o
f its
w
ater
reso
urce
s.
A30
~~
~~
● Im
prov
ed ir
rigat
ion
serv
ice
deliv
ery
on a
sus
tain
able
ba
sis.
●
Incr
ease
d cr
oppi
ng
inte
nsity
, cro
p di
vers
ity,
and
prod
uctiv
ity o
f cro
ps,
lives
tock
, and
fish
. ●
895,
455
hect
ares
pr
ovid
ed w
ith n
ew ir
rigat
ion
or d
rain
age
serv
ices
.
450.
646
%35
3.2
63In
done
sia
- Wat
er
Res
ourc
es a
nd Ir
rigat
ion
Man
agem
ent P
rogr
am
2 (P
1143
48 |
FY11
): im
prov
e in
frast
ruct
ure
and
gove
rnm
ent c
apac
ity
for r
iver
bas
in w
ater
re
sour
ce a
nd ir
rigat
ion
man
agem
ent.
A25
nana
nana
● In
crea
sed
crop
pr
oduc
tivity
by
prov
idin
g m
ore
effici
ent a
nd re
liabl
e irr
igat
ion
wat
er.
● 50
0,00
0 fa
rmer
ho
useh
olds
from
pro
vinc
es
invo
lvin
g 12
rive
r bas
ins
bene
fited
. ●
381,
000
hect
ares
pr
ovid
ed w
ith n
ew ir
rigat
ion
or d
rain
age
serv
ices
. Pr
ojec
t com
plet
ed.
150.
074
%12
4.7
WATER AND WASTEWATER
29THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Targ
et R
esul
ts
#Li
nk to
Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M /a
Project Life
Ann
ual w
ater
sa
ving
s
Ann
ual
amou
nt o
f w
aste
wat
er
trea
ted/
reus
ed/
avoi
ded
Ann
ual
amou
nt o
f ra
w/u
ntre
ated
se
wag
e sl
udge
trea
ted
& d
ispo
sed
of
Ann
ual
amou
nt
of
slud
ge
that
is
reus
ed
Oth
er re
sults
CommittedUS$ mil
IBRD share
Allocated US$ mil
64Le
bano
n - L
ake
Qar
aoun
Po
llutio
n Pr
even
tion
(P14
7854
| FY
16):
redu
ce
the
quan
tity
of u
ntre
ated
m
unic
ipal
sew
age
disc
harg
ed in
to th
e Li
tani
Riv
er a
nd a
ddre
ss
pollu
tion
arou
nd Q
arao
un
Lake
.
A14
~●
30,0
00
cubi
c m
eter
s of
mun
icip
al
was
tew
ater
co
llect
ed a
nd
treat
ed d
aily.
● 1,
250
cubi
c m
eter
s of
tras
h re
mov
ed fr
om
river
ban
ks.
~●
50%
redu
ctio
n in
po
lluta
nt lo
ad (n
itrog
en) t
o w
ater
way
s.
● 34
4,00
0 of
dire
ct
bene
ficia
ries.
●
7,30
0 ne
w h
ouse
hold
se
wer
con
nect
ions
.
55.0
92%
2.2
65Tu
nisi
a - S
econ
d W
ater
Se
ctor
Inve
stm
ent
(P09
5847
| FY
09):
prom
ote
bette
r wat
er
man
agem
ent t
hrou
gh
effici
ency
impr
ovem
ents
in
irrig
atio
n an
d in
crea
sed
capa
city
for w
ater
shed
m
anag
emen
t.
A30
~~
nana
● 24
,436
hec
tare
s re
habi
litat
ed w
ith ir
rigat
ion
and
drai
nage
sys
tem
s.
● 21
,128
hou
seho
lds
supp
lied
with
new
drin
king
w
ater
. U
pdat
ed fo
r act
ual r
esul
ts a
t pr
ojec
t com
plet
ion.
17.0
30%
17.0
66Vi
etna
m –
Can
Tho
Urb
an
Dev
elop
men
t and
R
esilie
nce
(P15
2851
| FY
16):
redu
ce fl
ood
risk
in th
e ur
ban
core
are
a,
impr
ove
its c
onne
ctiv
ity
to n
ew u
rban
gro
wth
ar
eas,
and
impr
ove
the
city
’s c
apac
ity to
man
age
disa
ster
risk
.
A29
nana
nana
● 2,
675
hect
ares
in u
rban
co
re la
nd a
rea
prot
ecte
d fro
m fl
oods
.
● 25
-30%
redu
ctio
n in
trav
el
time
betw
een
urba
n co
re
and
Cai
Ran
g ce
nter
. ●
420,
000
peop
le a
s di
rect
be
nefic
iarie
s.
125.
039
%5.
3
Subt
otal
for W
ater
, Was
tew
ater
, and
Was
te M
anag
emen
t1,
319.
189
7.6
Cum
ulat
ive
Loan
Rep
aym
ents
(64.
8)To
tal A
lloca
ted
and
Out
stan
ding
for W
ater
, Was
tew
ater
, and
Was
te M
anag
emen
t83
2.8
Amou
nts
may
not
add
up
due
to ro
undi
ng.
WATER AND WASTEWATER
30THE WORLD BANK GREEN BOND IMPACT REPORT 2018
SOLID WASTE MANAGEMENTTa
rget
Res
ults
#Li
nk fo
r Mor
e In
form
atio
n
Proj
ect N
ame
(Num
ber |
Yea
r/s L
oans
A
ppro
ved)
an
d D
escr
iptio
n
A/M
Project Life
Was
te p
reve
nted
, m
inim
ized
, reu
sed
or
recy
cled
Ann
ual G
HG
em
issi
ons
redu
ced
Oth
er re
sults
CommittedUS$ mil
IBRD share
Allocated US$ mil
67Br
azil
- Int
egra
ted
Solid
Was
te
& C
arbo
n Fi
nanc
e (P
1067
02 |
FY11
): im
prov
e tre
atm
ent a
nd
final
dis
posa
l of m
unic
ipal
sol
id
was
te a
nd re
duce
met
hane
em
issi
ons.
M19
● 9,
000
tons
per
day
of
was
te d
ispo
sed
in e
nviro
nmen
tally
su
stai
nabl
e sa
nita
ry
land
fills
.
● 50
milli
on to
ns o
f m
etha
ne re
gene
rate
d an
nual
ly.
● 3
dum
ps c
lose
d.
● 7
mun
icip
aliti
es m
ade
inve
stm
ents
to im
prov
e re
cycl
ing
and
com
post
ing
activ
ities
. U
pdat
ed fo
r act
ual
resu
lts a
t pro
ject
co
mpl
etio
n.
16.7
14%
16.7
68M
oroc
co -
Solid
Was
te S
ecto
r D
PL (P
1049
37 |
FY09
): en
hanc
e th
e go
vern
ance
of t
he
solid
was
te s
ecto
r.
M26
nana
● 24
,436
hec
tare
s re
habi
litat
ed w
ith
irrig
atio
n an
d dr
aina
ge
syst
ems.
●
21,1
28 h
ouse
hold
s su
pplie
d w
ith n
ew
drin
king
wat
er.
Upd
ated
for a
ctua
l re
sults
at p
roje
ct
com
plet
ion.
117.
110
0%11
7.1
Subt
otal
for S
olid
Was
te M
anag
emen
t5,
190.
12,
205.
1C
umul
ativ
e Lo
an R
epay
men
ts(5
3.2)
Tota
l Allo
cate
d an
d O
utst
andi
ng fo
r Sol
id W
aste
Man
agem
ent
2,15
1.9
Amou
nts
may
not
add
up
due
to ro
undi
ng.
31THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Target Results
# Link for More Information
Project Name (Number | Year/s Loans Approved)
and Description
A/M
Project Life
ResultsC
omm
ittedU
S$ mil
IBR
D share
Allocated
US$ m
il
69 Armenia - Second Community Agriculture Resource Management and Competitiveness Project (P133705 | FY14): improve pasture-based livestock management in targeted alpine grasslands areas.
A 25 ● At least 10,000 pasture users benefit through their membership in Pasture Users’ Cooperatives. ● 110,000 hectares of land managed with sustainable practices.
23.0 54% 5.0
70 China - Guangdong Agricultural Pollution Control (P127775 | FY14): promote waste management in livestock and crop production (including methane capture and use) and improve soil nutrient, fertilizer, and pesticide use.
M 25 ● 45,000 tons of annual pollution load to waterways reduced. ● 5,000 tons of annual nutrient load to waterways reduced. ● 28,000 hectares with improved soil nutrient, fertilizer and pesticide use.
100.0 48% 44.5
71 China - Hebei Rural Renewable Energy Development Project (P132873 | FY15): demonstrate sustainable biogas production and utilization to reduce environmental pollution and supply clean energy.
M 25 By 2020: ● 42,000,000 m3 of biogas used annually. ● 58,780 tons of CO2 emissions reduced annually. ● 96,100 rural resident households with access to biogas supply. ● Additional biogas used as fuel for public transportation.
71.5 47% 7.6
72 China - Hunan Forest Restoration and Development (P125021 | FY13): increase resilience of forests.
Both 26 ● 58,900 hectares of ecological forest plantation areas reforested and rehabilitated. ● 26,130 households benefited.
80.0 69% 80.0
73 China - Integrated Forestry Development (P105872 | FY11): increase forest cover to create wind breaks, farmland shelter belts, and conservation schemes, and to train farmers in forest and environmental management.
Both 25 ● 132,600 hectares of forests restored or re/afforested. ● 20% increase in vegetative cover plus improved species diversity in degraded forests rehabilitated. ● 324,000 farmers trained in forest management. Updated for actual results at project completion.
99.1 50% 99.1
74 China - Integrated Modern Agriculture Development (P125496 | FY14): develop sustainable and climate resilient agricultural production systems by investing in improved irrigation and drainage systems and practices that address climate risk.
A 25 ● Reduced water use per ton of rice, wheat and maize produced in target regions. ● 94,000 hectares of farmland served with improved irrigation and drainage services. ● 38,500 hectares of leveled land and improved soil conditions.
200.0 64% 129.4
75 China - Ningxia Desertification Control and Ecological Protection (P121289 | FY12): control desertification and land degradation by stabilizing moving sands, re-vegetating degraded steppe lands and planting shelter belts.
Both 30 ● 30,000 hectares restored or re/ afforested.
80.0 70% 35.3
76 Indonesia - Coral Reef Rehabilitation and Management Program- Coral Triangle Initiative (P127813 | FY14): protect and sustainably manage unique coral ecosystems in selected districts and provinces.
A 20 ● Reduce destructive fishing in selected areas. ● 1,140 direct beneficiaries in fishing communities. ● 1.4 million hectares of marine areas brought under biodiversity protection.
3.8 89% 1.3
AGRICULTURE, LAND USE, FORESTS, AND ECOLOGICAL RESOURCES
32THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Target Results
# Link to More Information
Project Name (Number | Year/s Loans Approved)
and Description
A/M
Project Life
ResultsC
omm
ittedU
S$ mil
IBR
D share
Allocated
US$ m
il
77 Mexico - Forests and Climate Change (P123760 | FY12): support rural communities' sustainable management of forests, and generate additional income from forest products and services and to reduce emissions from deforestation and forest degradation.
Both 13 ● 10% increase in areas under improved forest management (equivalent to 1,630,000 additional hectares). ● Support 2 pilot areas to reduce carbon emissions from deforestation and forest degradation. ● 4,000 forest communities benefited. (3,202 by end of 2016 – value is yearly results)
350.0 45% 286.4
78 Morocco - Large Scale Irrigation Modernization (P150930 | FY16): expand agriculture through the adoption of irrigation techniques that make more efficient use of water resources, while building better ties between farmers and markets.
A 25 ● 9,274 farmers benefit. ● 100% of area with access to water on demand in peak period. ● 20,700 hectares with improved irrigation technologies.
150.0 80% 5.9
79 Peru - Peru National Agriculture Innovation Program (P131013 | FY14): strengthen the national agricultural innovation system and integrate climate change criteria into project such as adaptive research, seed improvements and skills development, among others.
A 10 ● 20,000 small and medium farmers adopting new technologies. ● 61 new technologies demonstrated on farms.
13.0 31% 2.6
80 Philippines - Rural Development (P132317 | FY15): improve the resilience of small-scale farmers and fishermen to climate change by helping them recover and increase income-generating activities and strengthening the conservation of coastal and marine resources.
A 30 ● Increase incomes of about 1.9 million farmers and fishermen and the value of their products.
501.3 75% 148.2
81 Russian Federation - Forest Fire Response (P123923 | FY13): improve forest fire prevention and management and to enhance sustainable forest management.
Both 18 ● Improve forest fire detection and suppression systems. ● Improve capabilities of fire brigades. ● Avoid 75,500,000 tons of CO2 eq. emissions over 25 years. ● Raise public awareness and education standards in forestry issues in general.
40.0 33% 16.2
82 Tunisia - Fourth Northwest Mountainous and Forested Areas Development (P119140 | FY11): better protect and manage natural resources through conservation of soil and water resulting from improved agriculture and pasture practices and to improve access to potable water for rural communities.
A 21 ● Reduce erosion and forest degradation. ● Build climate change awareness and disseminate climate-appropriate practices to reinforce livelihood and agro-system resilience. ● 318,000 people benefit
33.5 73% 32.4
AGRICULTURE, LAND USE, FORESTS, AND ECOLOGICAL RESOURCES
33THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Target Results
# Link to More Information
Project Name (Number | Year/s Loans Approved)
and Description
A/M
Project Life
ResultsC
omm
ittedU
S$ mil
IBR
D share
Allocated
US$ m
il
83 Uruguay - Sustainable Management of Natural Resources and Climate Change (P124181 | FY12): improve farm environmental management and reduce greenhouse gas emissions by promoting improved agriculture and livestock management.
Both 21 ● 2,700 (actual has been higher at 3,029) hectares of agricultural land with reduced methane emissions. ● Improve water use in irrigation and livestock production systems. ● Improve pasture management and other productivity measures.
49.0 89% 42.6
Subtotal for Agriculture, Land Use, Forests, and Ecological Resources 1,794.1 936.5Cumulative Loan Repayments (4.1)
Total Allocated and Outstanding for Agriculture, Land Use, Forests, and Ecological Resources 932.4
Amounts may not add up due to rounding.
AGRICULTURE, LAND USE, FORESTS, AND ECOLOGICAL RESOURCES
34THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Target Results
#
Project Name (Number | Year/s Loans
Approved) and Description
A/M
Project Life Results
Com
mitted
US$ m
il
IBR
D
share
Allocated
US$ m
il
84 Belize - Climate Resilient Infrastructure (P127338 | FY15): enhance the resilience of road infrastructure against flood risks and the impacts of climate change.
A 25 ● 30 km of roads rehabilitated and 12 bridges and culverts improved. ● 50% reduction in road interruption due to flooding. ● 170,000 people living near the road networks directly benefit.
30.0 100% 1.6
85 China - Fujian Fishing Ports Project (P129791 | FY14): reduce the vulnerability of fishing communities to extreme weather events.
A 27 ● 11,000 fishermen and their families (total 64,000 people) benefit. ● 3,000 fishing vessels protected in ports. ● Improved effectiveness of early warning and emergency systems.
60.0 58% 4.2
86 China - Huai River Basin Flood Management and Drainage Improvement (P098078 | FY11): increase resilience of communities to the impacts of climate change, particularly flooding.
A 25 ● 9,500 km2 of flood protection (in rural and urban areas). ● 6,600,000 people benefited. Updated for actual results at project completion.
200.0 33% 200.0
87 Jamaica - Disaster Vulnerability Reduction (P146965 | FY16): enhance the country’s resilience to disaster and climate risk.
A 29 ● Protection of infrastructure (e.g., bridges, storm drains, roads) from floods directly benefitting about 247,000 people. ● Increase the government’s capacity to better prepare for and respond to natural disasters.
30.0 100% 1.2
88 Macedonia & Serbia - South East Europe and Caucasus Catastrophe Risk Insurance Facility (P110910 | FY11): increase access to catastrophe risk insurance through facilitating the growth of insurance markets.
A 22 ● Increased catastrophe insurance coverage from 2% to 15% for homeowners, farmers, enterprises, and government entities holding catastrophe insurance policies. Updated for actual results at project completion.
10.0 100% 10.0
89 Mexico - Climate Change Development Policy Loan (P110849 | FY08): mainstream climate change considerations into public policy.
Both 10 Climate-informed public policies, including: ● 642,000 hectares reforested. ● 6,000,000 tons of CO2 eq. emissions reduced annually due to reforestation. ● Domestic carbon pricing strategy developed. ● City and state climate action plans developed. Updated for actual results at project completion.
501.3 100% 501.3
90 Russian Federation - Hydrometeorological Services Modernization (P127676 | FY14): enhance capacity to deliver reliable and timely weather, hydrological and climate information.
A 18 ● >70% accuracy of forecasts for the main administrative centers of Russia. ● > 85-90% accuracy of seasonal river flow forecasts in Volga river basin reservoirs. ● Increased number of sectoral data users data.
60.0 43% 16.1
91 Timor-Leste - Road Climate Resilience Project (P125032 | FY14): rehabilitate and improve the climate resilience of a road corridor.
A 28 ● Improved drainage conditions along 110 km road corridor. ● 30% reduction in major road damage events.
15.0 16% 0.0
Subtotal for Resilient Infrastructure, Built Environment, and Other 906.3 734.3Cumulative Loan Repayments (0.3)
Total Allocated and Outstanding for Resilient Infrastructure, Built Environment, and Other 734.0
Amounts may not add up due to rounding.
RESILIENT INFRASTRUCTURE, BUILT ENVIRONMENT, AND OTHER
37THE WORLD BANK GREEN BOND IMPACT REPORT 2018
Key Assumptions and ApproachThe following key assumptions and approach were used in preparing this report.
• Ex-ante projections: Quantitative estimates for target results represent ex-ante projections developed during project design mostly for direct project impacts once projects are at normal operating capacity. The target results include expected results for projects still in the preparation, construction and/or implementation phase. The impact report thus serves as an illustration of expected results made possible through Green Bond eligible projects, but it is not intended to and does not provide actual results achieved in a specific year or reporting period. Target results have been updated with actual results at project completion when the final project commitment is materially different to the original authorized amount. Where the amounts are based on actual results this is noted in the preceding tables.
• Length of time projects are on report: Impact reporting will be provided for projects for so long as they are part of the World Bank Green Bond program. This means that projects are added to the impact report once Green Bond proceeds have been allocated to support the financing of disbursements to the project, and removed once the client has repaid the respective loan. Projects may also be removed from future reports if the World Bank decides to remove a project from its Green Bond program.1 If a project is removed from the Green Bond program, any Green Bond proceeds previously allocated to support the financing of disbursements to that project will be credited back to the Special Account for Green Bond proceeds and allocated to support the financing of disbursements to other Green Bond eligible projects as part of the routine allocation process.
1 As part of the World Bank’s due diligence in monitoring projects included in its Green Bond program, it may elect to remove a project. Possible reasons for removing a project from a Green Bond program include, but are not limited to, cancellation of the project or significant implementation delays.
• Reporting for co-financed projects: The World Bank often co-finances projects with the client country and/or other lenders. The results for the individual project are based on the total project including all financiers. The World Bank’s share of the total financing is included for each project.
• Partial project eligibility: In cases where a project is only partially Green Bond eligible, the committed amount reported reflects only that portion that is Green Bond eligible. Allocations to support disbursements to such projects are made on a pro rata basis.
• No aggregation of GHG estimates: When reported in the “Project Appraisal”, “Implementation Status and Results”, and/or “Implementation Completion and Results” reports, the GHG emission reductions for projects are reported in tons of CO2 equivalent. The World Bank is undertaking an effort in conjunction with other International Finance Institutions to harmonize the approaches for GHG accounting.2 At the same time, the World Bank is working to develop internally consistent GHG accounting methodologies for investment projects across relevant sectors. Given these on-going developments in GHG accounting, the basis for estimating CO2 equivalent emission reductions may vary between World Bank projects. Therefore, the World Bank does not recommend aggregating the results of different projects in its Green Bond portfolio.
• All reported results are from publicly available sources: Reporting is based on publicly available impacts for the projects disclosed in “Project Appraisal”, “Implementation Status and Results”, and “Implementation Completion and Results” reports. To facilitate comparability of the reported results, the reporting units have been converted where such conversion is based on a standard conversion factor.
2 For more information on the harmoniza-tion framework, see http://pubdocs.worldbank.org/en/540921538149778203/2017-joint-report-on-mdbs-climate-finance.pdf.
38THE WORLD BANK GREEN BOND IMPACT REPORT 2018
The World Bank project cycle (see diagram 1) consists of six stages: Identification, Preparation, Appraisal, Negotiation/Approval, Implementation/Support, and Completion/Evaluation (see below for the detailed descriptions).
Projects that are reviewed for eligibility under the World Bank Green Bond program are selected from among all projects approved by the World Bank Board of Directors (see diagram 2). They therefore represent a subset of the World Bank’s lending portfolio. As of June 30, 2018, there were 91 projects in the Green Bond program.
Project IdentificationThe World Bank works with a borrowing country’s government on a Country Partnership Framework that identifies the country’s priorities for reducing poverty and improving living standards. Within those priorities, the World Bank and the government agree on a project concept, which is outlined in a Project Concept Note. The Project Information Document outlines the project’s scope, and the Integrated Safeguards Data Sheet identifies potential environmental and social issues.
Project PreparationThe borrower leads project preparation, with the World Bank generally taking an advisory role. If necessary, the borrower prepares an Environmental Assessment Report that describes the project’s likely environmental impact and steps to mitigate possible harm. If there are major issues, the borrower prepares an Environmental Action Plan. An analysis of a project’s potentially adverse effects on indigenous peoples may also be undertaken, and any issues are addressed in the Indigenous Peoples Plan.
Project AppraisalThe government and the World Bank review the identification and preparation documents and confirm the expected project outcomes, intended beneficiaries and evaluation tools, as well as the project’s readiness for implementation. The Project Information Document is updated and released when the project is approved for funding.
Project ApprovalThe project team prepares the Project Appraisal Document (for investment project financing) or the Program Document (for development policy financing), along with other financial and legal documents, for submission to the World Bank’s Board of Executive Directors for approval. When approval is obtained and the legal documents are signed, the implementation phase begins.
Project ImplementationThe borrower implements the project with technical assistance and support from the World Bank as needed. Twice a year, the government and the World Bank prepare a review of project progress, the Implementation Status and Results Report.
Project Completion and EvaluationWhen a project is completed and closed, a World Bank operations team prepares an Implementation Completion and Results Report. The final outcomes are compared to expected results. The team also assesses how well the project complied with the Bank’s operations policies, and accounts for the use of Bank resources.
The World Bank’s Independent Evaluation Group (IEG) assesses the performance of roughly one project out of four projects a year, measuring outcomes against the original objectives, sustainability of results and institutional development impact. IEG may produce Impact Evaluation Reports to assess the economic worth of projects and the long-term effects on people and the environment.
ANNEX 2:WORLD BANK PROJECT CYCLE