Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
GOVERNMENT OF ANDHRA PRADESHROADS & BUILDINGS DEPARTMENT
ANDHRA PRADESH ROAD SECTOR PROJECTFeasibility Study, Design and Detailed Engineering
DETAILED PROJECT REPORT
UPGRADING OF PEDANA – NUZVID – VISSANNAPETA ROADVOLUME – VIII – ANNEXURES FOR RESETTLEMENT ACTION PLAN
ANDHRA PRADESH ROAD DEVELOPMENT CORPORATION
JUNE – 2012
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 1
RP785 v12
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
CONTENTS
S.No Description Page.No
1 ANNX-1.1, AP R&R POLICY 2005 3
2 ANNX-1.2: MODIFIED R&R POLICY PROVISIONS 26
3ANNX-1.3 : R&R ENTITLEMENT FRAMEWORK
30
4 ANNX-2.1: LIST OF PROJECT AFFECTED FAMILIES AND PROJECT DISPLACED FAMILIES
33
5 ANNX-2.2 PROJECT DISPLACED FAMILIES 57
6 ANNX- 2.3: COMMUNITY PROPERTY RESOURCES OF PEDNA- NUZVID- VISANNAPETA ROAD 72
7 ANNX-2.4: CONSULTATION FINDINGS 79
8 ANNX-3.1: CHAINAGE WISE ENCUMBRANCE DETAILS
80
9 ANNX-5.1 : G.O Rt No. 1615 : PLMC CONSTITUTION 82
10 ANNX-5.2: G O Rt. No. 167 – APPOINTMENT OF PROJECT ADMINISTRATOR
84
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 2
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
ANNEXURE 1.1 – AP R&R POLICY -2005
G.O.Ms.No.68 Rehabilitation and Resettlement (R&R) Policy for Government of Andhra Pradesh - Issued.
Irrigation & CAD (Project Wing-LA-IV-R&R) Department G.O.Ms.No.68 Dated the 8th April, 2005 ORDER:
1.Compulsory acquisition of land for implementation of development and infrastructure projects displaces people from their homes, land and/or their means of livelihood. Apart from depriving them of their land, livelihood and resources base, displacement has other psychological, social and cultural consequences also. The Government recognize the need to minimize large scale displacement to the extent possible and where displacement is inevitable, the need to address the Issue of displacement with utmost care human touch and forethought. Such an approach is especially necessary in respect of Tribal, Small and Marginal farmers.
2. Various policies relating to the Resettlement and the Rehabilitation (R&R) of displaced persons have been in place from time to time, varying 'Tom project to project and district to district. The need has been felt for the evolution of a comprehensive policy on R& R to ensure uniformity of benefits across the State and also to ensure the delivery of benefits in a transparent manner.
3. A Committee was constituted by the Government vide G.O. Ms. No.70, irrigation & CAD (Projects Wing) Department, dated 15-07-2004 for preparation of draft R&R Policy for Government of Andhra Pradesh, The recommendations of the Committee were discussed in a State Level meeting comprising of major stake holders in the policy like the Department of Energy, Industries, Roads & Buildings, Environment, Forest, Science & Technology, Finance, Tribal Welfare, Law and Revenue. The State Level Meeting endorsed the recommendations of the Committee.
4. Government after careful examination of the Committee recommendations as endorsed by State Level meeting hereby approve the Rehabilitation & Resettlement Policy for Government of Andhra Pradesh enclosed to this order for implementation by all the Departments for Government of Andhra Pradesh.
5. It is further ordered that as per Section 8.5 of this Policy the provisions of G.O. Ms. No. 98, Irrigation & CAD (Projects Wing) Department, dated 15-04-1986 and G.O. Ms. No. 64, Social Welfare (T) Department, dated 18-04-1990 and any other Government order/Memo Instructions issued by any other Department of" Government of Andhra Pradesh shall cease to operate as far as those Projects are concerned that are notified under this Policy.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 3
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
(BY ORDER AND IN THE NAME OF GOVERNOR OF ANDHRA PRADESH)
MOHAN KANDA CHIEF SECRETARY TO GOVERNMENT To :
All the Departments of SecretariatAll the District Collectors in the State. All the Special Collectors of Irrigation Projects. The Engineer-in-Chief (AW)/(Irrigation), Errum Manzil, Hyderabad All the Chief Engineers of the Projects.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 4
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
CHAPTER –I
1.0 POLICY PREAMBLE
1.1 Compulsory acquisition of land for public purpose including infrastructure projects displaces people, forcing them to give up their home, assets and means of livelihood, a part from depriving them of their lands, livelihoods and resource-base, displacement has other traumatic psychological and socio-cultural consequences. The Government of Andhra Pradesh recognizes the need to minimize large-scale displacement to the extent possible and, where displacement is inevitable, the need to handle with utmost care, human touch and forethought, issues relating to Resettlement & Rehabilitation of Project Affected Families. Such an approach is especially necessary in respect of tribal, small & marginal farmers and women.
1.2 The system of extending cash compensation does not, by itself, in most cases, enable the affected families to obtain cultivable agricultural land, homestead and other resources, which they have to surrender to the State. The difficulties are more acute for persons who are critically dependent on the acquired assets for their subsistence/ livelihoods, such as landless agricultural workers, forest dwellers, tenants and artisans, as their distress and destitution is more severe, and, yet they are not eligible for compensation. 1.3 The Policy essentially addresses the need to provide succour to the asset less rural poor, support the rehabilitation efforts of the resource poor section, namely, small and marginal farmers, SCs/STs and women who have been displaced, besides, it seeks to provide a broad canvas for an effective dialogue between the Project Affected Families and Project Displaced.Families and the Administration for Resettlement & Rehabilitation. Such a dialogue is expected to enable timely completion of projects with a sense of definiteness as regards costs and adequate attention to the needs of the displaced persons especially the resource poor sections. The intention is to impart greater flexibility for interaction and negotiation so that the resultant Package gains all-round acceptability in the shape of a workable instrument providing satisfaction to all stakeholder/ Requiring bodies. 1.4 The GOAP Policy on the Resettlement & Rehabilitation of Project Affected Families and Project Displaced Families will be applicable to the projects as defined in this policy and upon notification under this policy.
1.5 Administrator for Resettlement & Rehabilitation shall implement this Policy in letter and spirit in order to ensure that the benefits envisaged under the Policy reaches the Project Affected and Displaced Families, especially resource poor sections including SCs/STs.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 5
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
CHAPTER –II:
2.0 OBJECTIVES OF THE POLICY
The objectives of the Policy are as follows:
2.1 To minimize displacement and to identify non- displacing or least- displacing alternatives:
2.2 To Plan the resettlement and rehabilitation of Project Affected and Displaced Families, (PAFs/ PDFs) including special needs Tribals and vulnerable section;
2.3 To provide better Standard of living to PAFs; and
2.4 To facilitate harmonious relationship between the Requiring Body and PAFs through mutual cooperation.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 6
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
CHAPTER –III
3.0 DEFINITIONS:
The definition of various terms used in this Policy Document are as follows:
3.1 “Administrator for Resettlement and Rehabilitation” means an officer not below the rank of Joint Collector of the State Government appointed by it for the purpose of resettlement and rehabilitation of the Project Affected Families of the Project concerned provided that if the appropriate Government in respect of the Project is the Central Government, Such appointment shall be made in consultation with the Central Govt.
3.2“Affected Zone”, in relation to a project, means declaration under Para 5.1 of this policy by the appropriate Government area of Villages or locality under a project for which the Land is being acquired under Land Acquisition Act, 1894 or any other Act in force for the following areas:
a. Area falling under FRL contour
b. Dwelling House (S) falling within 100 meters of surface distance from FRL water line
3.3 “Agricultural family” means a family whose primary mode of livelihood is agriculture and includes family of owners as well as tenants / sub-tenants of agricultural land, agricultural labourers, occupiers of forest lands and of Collectors of minor forest produce; 3.4 “Agricultural labourers” means a person normally resident in the affected zone for a period of not less than three years immediately before the declaration of the affected zone who does not hold any land in the affected zone but who earns his livelihood principally by manual labour on agricultural land therein immediately before such declaration and who has been deprived of his livelihood as ascertained through enquiry in the gram sabha; 3.5 “Agricultural Land” includes lands uses or capable of being used for the purpose of-
a. agriculture or horticulture;
b. diary farming, poultry farming, pisciculture, breeding or livestock and nursery growing medical herbs;
c. raising of crops, grass or garden produce; and
d. Land used by an agriculturist for the grazing of cattle, but does not include land used for the cutting of wood only;
3.6 “Appropriate Government” means:
a. in relation to acquisition of land for the purposes of the Union, the Central Government;
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 7
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
b. in relation to a project which is executed by Central Government agency/ Central Government undertaking or by any other agency of the orders/ directions of Central Government, the Central Government, otherwise the State Government and
c. in relation to acquisition of land for other purposes, the State Government.
3.7 “BPL Family”: The Below Poverty Line Families shall be those as defined by the planning Commission of India from time to time. 3.8 “Project” means the project(S) notified under this Policy and displacing:
a. 100 or more families en- mass under this policy and displacing:
b. 25 or more families en- mass in Tribal areas or in areas mentioned in Schedule V of the constitution India from their Lands or houses.
3.9 “Commissioner for Resettlement & Rehabilitation”, means the Commissioner for Resettlement & Rehabilitation appointed by the State Government not below the rank of Commissioner/ Secretary of that Government. 3.10 “a)Family” means Family consisting of such persons as his or her spouse, minor sons, unmarried daughters, minor brothers or unmarried sisters, fathers, mother and other members residing with him and dependent on him for their livelihood 1 “and each major son residing with such person will be treated as a separate family ”1
b)1a“Vulnerable persons” means the disabled, destitute, orphans, widows, major unmarried daughter,abandoned/ divorced women or persons above fifty years of age, who are not provided or can not immediately be provided with alternative livelihood, and who are not otherwise covered as part of a family 1a
3.11 “Holding”: means the total land held by a person as an occupant or tenant or as both; 3.12 “Marginal farmer”: means a cultivator with an un-irrigated land holding up to one hectare or irrigated land holding up to half hectare or combination of both on same principle; 3.13 “Non-agricultural Labourer”: means a person who is not an agricultural labourer but is normally residing in the affected zone for a period of not less than three years immediately before the declaration of the affected zone and who does not hold any land under the affected zone but who earns his livelihood principally by manual labour or as a rural artisan immediately before such declaration and who has been deprived of earning his livelihood principally by manual labour or as such artisan in the affected zone; 3.14 “Notification”: means a notification published in the Official Gazette; 3.15 “Occupiers”: Means members of Scheduled Tribe community in possession of forest land prior to 25th October, 1980.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 8
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
3.16 “Project Affected Family” Means and displacing:
a. a family whose source of livelihood are substantially affected by the process of acquisition of land for the project and who has been residing continuously for a period of not les than three years preceding the date of declaration of the affected zone or practicing any trade, occupation or vocation continuously for a period of not less than three years in the affected zone regardless of the fact whether they owned land or not
b. family whose more than 50% of land is acquired and left over land after acquisition is below Ac.5.0 dry Ac. 2.5 wet or combination of both on above principle
c. a Project Displaced Family
3.17 “Project Displaced family”: means any family, who on account of acquisition of his dwelling house in the village in the affected zone for the purpose of the project, has been displaced from such dwelling house. 3.18 “Resettlement Zone”, in relation to a project, means the declaration of any area under Para 5.12 of this Policy by the appropriate Government acquired or proposed to be acquired for resettlement of Project Displaced Families as a resettlement zone: 3.19 “Requiring Body” ” shall mean any company, a body corporate, an institution, or any other Organization for whom land is to be acquired by the appropriate Government, and includes the appropriate Government if the acquisition of land is for such Government either for its own use or for subsequent allotment of such land in public interest to a body corporate, institution, or any other organization or to any company under lease, license or through any other system of transfer of land to such company, as the case may be;
3.20 “Small farmer”: means a cultivator with an un-irrigated land holding of more than one hectare and up to two hectares or with an irrigated land holding of more than half hectare and up to one hectare or combination of both on same principle 3.21 “Substantially affected”: ” means where average annual income of PAF is likely to be more than 50% and is likely to become BPL family due to acquisition of his land or other’s land for the project, as compared to his average annual income in last three years preceding the date of notification, from land and or other sources of incomes 3.22 “Tribal Areas”: means areas declared so by the Tribal Welfare Government of Andhra Pradesh from time to time. 1. Added by vide G.O.Ms.No.76, I & CAD(PW-LA-IV, R&R.I) Dept., dt:13-4-2006. 1a. Added to para 3.10 as 3.10( b)vide G.O.Ms.No.46 I & CAD(PW:LA- IV-R&R)Dept., dt:28-2-2009,G.O.MS.No 77 I & CAD(PW-LA-IV, R&R.I) Dept., dt:10-7-2009.& Para 3.10 shall be treated as Para 3.10(a).
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 9
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
CHAPTER-IV
4.0 Appointment of Administrator And Commissioner For Resettlement And Rehabilitation And Their Powers & Functions
4.1 Where the appropriate Government is satisfied that acquisition of land for any project involves displacement of families from their lands and or houses as a result of acquisition of land, it shall, by notification, appoint in respect of that project an officer not below the rank of Joint Collector of the state Government to be the Administrator for R&R in respect of that project.
Provided that if the appropriate Government in respect of the project is the Central Government, such appointment shall be made in consultation with the Central Government. 4.2 The Administrator for Resettlement & Rehabilitation shall be assisted by such officers and employees as the appropriate Government may provide 4.3 Subject to the superintendence, directions and control of the appropriate Government and Commissioner for R&R, the Administrator for Resettlement & Rehabilitation shall take all measures for the Rehabilitation and Resettlement of all Project Affected Families (PAF) in respect of that project. 4.4 The overall control and superintendence of the formulation of resettlement & rehabilitation plan and execution of the same shall vest in the Administrator, Resettlement & Rehabilitation.
4.5 Subject to any general or special order of the appropriate
a. Minimize displacement of persons and identify non- displacing or least displacing alternatives in consultation with the requiring body.
b. Hold consultation with the Project Affected Families while preparing a resettlement and rehabilitation Scheme /plan;
c. Ensure that interest of the adversely Project Affected Families of Scheduled Tribes and weaker sections are protected.
d. Prepare a draft Plan/Scheme of resettlement and rehabilitations as required under Chapter V and VI of this Policy. Wherever tribal PAPs are involved, the draft plan/ scheme shall be prepared in consultation with respective area Project officer ITDA/DTWO. .
e. Prepare a budget including estimated expenditure of various components of acquisition of Land, Resettlement and Rehabilitation activities or programmes in consultation with representatives of the Project Affected Families and requiring body for whom the land is acquired;
f. Acquired adequate land for the Project and also for Resettlement and Rehabilitation of the Project Affected Families;
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 10
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
g. Allot Land and sanction benefits to Project Affected Families;
h. Perform such other function as the appropriate Government may, form time to time, by order in writing, assign.
4.6 Administrator for Resettlement & rehabilitation may, by order in writing, delegates such of the administrative powers conferred and duties imposed on him by or under this policy to any officer not below the rank of RDO/ Sub Collector or equivalent who will be called as R&R officer for the said project 4.7 All officers and staff appointed by the appropriate Government under this policy shall be subordinate to the Administrator for Resettlement & Rehabilitation.
4.8 The State Government shall appoint an officer of the rank of Commissioner/ Secretary of that Government for Resettlement and Rehabilitation in respect of such projects to which this Policy applies to be called the Commissioner for Resettlement & Rehabilitation 4.9 For the purposes of this Policy, the Administrator the Resettlement & Rehabilitation and other officers and employees appointed for the purposes of Resettlement and Rehabilitation of PAF shall be subordinate to the Commissioner for Resettlement and Rehabilitation
4.10 The Commissioner shall be responsible for supervising the formulation of resettlement and rehabilitation plans/ schemes, proper implementation of such plans/ schemes and redressal of grievances as mentioned in Chapter VII of this Policy. Wherever tribal PAPs are involved, commissioner, TW shall also be involved in above responsibilities and functions.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 11
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
CHAPTER-V
5.0 Schemes/PlansFor Resettlement And Rehabilitation;
The procedure mentioned in this Chapter shall be followed for declaration of Affected Zone, carrying out survey & census of Project Affected Families, Assessment of Government Land available and land to be acquired for the purpose of Resettlement and Rehabilitation, preparation of draft scheme/plan for R&R and its final publication.
5.1 The appropriate Government may, if it is of the opinion that acquisition of land for a project is likely to displace families from their lands and or houses, declare, by notification in the Official Gazette, area of villages or localities as an affected zone of the project and thereupon the contents of this Policy shall apply to the project involved. 5.2 Every declaration made under Para 5.1 of the Policy shall be published in at least two daily newspapers one of them should be in the local vernacular having circulation in villages or areas which are likely to be affected and also by affixing a copy of the notification on the Notice Board of the concerned Gram Panchayats and other prominent place or places in the affected zone.
5.3 Once the declaration is made under para 5.1 of the Policy, the Administrator for Resettlement and Rehabilitation shall undertake a socio- Economic survey for identification of the persons and their families likely to be affected by the project 5.4 Every survey shall contain the following village-wise information of the project Affected Families:-
a. Members of families who are permanently residing, practicing any trade, occupation or vocation in the Project Affected Area;
b. Project Affected Families ho are likely to lose their house, agricultural land, employment a or are alienated wholly or substantially from the main source of their trade/ occupation or vocation
c. Agricultural labourers and non- agriculture laborers
d. Project Affected Families who are having possession of forestlands prior to 25th October, 1980, that are prior to the commencement of the Forest (Conservation) Act, 1980.
5.5 Every survey undertaken under Para 5.4 shall be completed within a maximum period of ninety days from the date of declaration made under para 5.1. 5.6 On the expiry of the period of ninety days as aforesaid or as earlier as possible, the Gram Panchayat concerned the details of the findings of the survey conducted by him for inviting objections and suggestions form all persons likely to be affected thereby.
5.7 2 “On the expiry of thirty days from the date of publication of the draft of the details of survey and after considering the objections and suggestions received by him on this behalf, the
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 12
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
Administrator for Resettlement & Rehabilitation shall submit the final details of survey with his recommendations to the District Collector for approval. After approval by the District Collector necessary funds may be obtained from the relevant Head of Accounts for allotment from the Chief Engineer of concerned Irrigatio n Project.” 2 5.8 3 “Within forty-five days from the date of receipt of recommendations of the Administrator for Resettlement & Rehabilitation, the District Administration shall publish the final details of survey in the District Gazette. A copy of such publication shall also be published in the Gram Panchayat concerned.” 3
5.9 The Administrator for Resettlement & Rehabilitation shall ensure that the Project Displaced Families may be settled preferably in group or groups and such sites should form a part of existing Gram Panchayat as far as possible. However it has to ensured that the PDFs may be Resettlement with the host community on the basis of equality and mutual understanding, Consistent with the desire of each group to preserve its own identify and culture. 5.10 For the purposes of para 5.9 above, the Administrator for Resettlement & Rehabilitation shall draw up a list of lands, which may be available in any existing Gram Panchayat or neighbouring Gram Panchayat for Resettlement of Project displaced families. 5.11 The Lands drawn up under para 5.10 shall consist of:-
a. Government wastelands or any other land vesting in the Government available for Resettlement or project displaced families.
b. If sufficient Government land is not available there, then land to be acquired for the purposes of Resettlement (R&R centre) Scheme/Plan. However, the Administrator for R&R should ensue that such acquisition of land should not lead to another list of affected families.
5.12 The appropriate Government shall, by notification, declare any area acquired or proposed to be acquired for Resettlement of Project-displaced families, as a resettlement zone.
5.13 The Administrator for R&R or any other officer empowered by Government, on behalf of the appropriate Government, may compulsorily acquire lands required for re-settlement and rehabilitation of PAFs under the Provisions of Land Acquisition Act, 1894. 5.14 After completion of base line survey and census of Project Affected Families and project Displaced Families and assessment of requirement of land for resettlement of land for resettlement and rehabilitation, the Administrator for R&R shall prepare a draft scheme/ plan for the Resettlement & Rehabilitation of the Project Affected Families and project Displaced Families in consultation with representatives of Project Affected Families and Project Displaced Families including women, Chairpersons of elected Panchayati Raj Institutions within which the project area is situated.
5.15 While preparing a draft scheme/ Plan, the Administrator for R&R shall ensure that the cost of R&R scheme/ plan should be an integral part of the cost of the Project for which the land is
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 13
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
being acquired and the entire expenditure for resettlement and rehabilitation of PAFs are to be borne by the requiring body for which the area is being acquired 5.16 It shall be the responsibility of the requiring body to provide sufficient funds to the administrator for R&R for proper implementation of resettlement & Rehabilitation scheme/ plan of Project Affected Families. 5.17 The Administrator for R&R shall keep proper books of accounts and records of the funds placed at his disposal and submit periodical returns to the Appropriate Government in this behalf. 5.18 Every drafts Scheme/ Plan of resettlement and rehabilitation prepared shall contain the following particulars, namely: -
a. the extent of area to be acquired for the project and the name(S) of the corresponding village (S)
b. a Village - Wise list of Project Affected Families and likely number of displaced persons, family- wise and the extent and nature of land and immovable property in their possession indicating the survey numbers thereof held by such person in the affected Zone prior to acquisition of lands for the project and after acquisition of lands for the project;
c. a list of persons who have lost or are likely to lose their employment or livelihood or who have been alienated wholly and substantially from their main sources o occupation or vocation consequent to the acquisition of land for the project;
d. a list of occupiers, if any,
e. a list of public utilities and Government buildings which are likely to be affected;
f. a comprehensive list of benefits and packages which are to be provided to project affected families;
g. details of the extent of land available which may be acquired in settlement area for resettling of the project displaced families;
h. Details of the extent of Government land available which may be allotted to PAFs in lieu of land acquired for the project.
i. Details of the extent of patta land available in project benefited area that can be acquired for allotment of PAFs in lieu of land acquired for the project.
j. detailed of the basic amenities and infrastructure facilities which are to be provided for resettlement;
k. the time schedule for shifting and resettling the displaced families in resettlement zones;
l. Such other particular as the Administrator for Resettlement & Rehabilitation ma think fit to include.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 14
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
5.19 4 “The Administrator for Resettlement & Rehabilitation shall submit the draft scheme/ plan for R&R to the District Administration for its approval. The draft scheme/ plan shall be published in the village/locality concerned. The draft scheme/plan may also be published in the District Gazette to give wide publicity to the same in the affected zone.” 4 5.20 Upon notification of such scheme/ plan, the same shall come into force
3. Substituted for para 5.8 vide G.O.Ms.No.120, I & CAD (PW- LA.IV, R&R-II) Dept., DT: 26.6.2006. 4. Substituted for Para 5.19 vide G.O.Ms.No.120 I & CAD (PW- LA.IV, R&R-II) Dept., DT: 26.6.2006.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 15
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
CHAPTER –VI
6.0 R&R benefits for Project Affected Families
6.1 The Resettlement and Rehabilitation (R&R) benefits shall be extended to all the Project Affected Families and Project Displaced Families (PDF) whether belonging to below poverty line (BPL) or non- BPL except to the extent where specifically restrictions mentioned in the policy. 6.2 5"Allotment of house site/ payment of exgratia
a. Any Project Displaced Family (PDF) holding upto an area of 5 Cents of village site and whose site has been acquired shall be allotted house site of an extent of 202 square meters (5 Cents) of land in rural areas or 75 square meters of land in Urban areas in the Resettlement zone besides payment of compensation for the structures if any therein;
b. In case if any Project Displaced Family (PDF) holds village site of more than 5 Cents, such holder shall be allotted village house site of an extent of 202 Square Meters (5 cents) of land in rural areas or 75 Square Meters of land in Urban areas in the Resettlement zone and also be paid exgratia for the site in excess of 5 Cents ( for example if a family holds village site of 20 Cents in Project Affected Zone and have two major sons, residing with such person in case, they take 3 house sites of 5 Cents each in Resettlement zone, they will get exgratia for the balance of 5 Cents (20 Cents – 3x5 cents = 15 cents); and
c. The exgratia payable as above shall be on par with the package deal payable in case of acquisition of private / patta lands” 5
6.3 Grant for House construction:
6“One time financial assistance of Rs.40,000/-(Rupees Forty thousand only) shall be increased to Rs.50,000/- (Rupees Fifty thousand only). This increase will have prospective effect. A sum of Rs.5,000/- (Rupees Five thousand only) is granted to those who have already shifted houses from 8-4-2005 to 10-12-2007. Apart from the above, a sum of Rs.3,000/- (Rupees Three thousand only) would be allowed in addition to the housing grant as per G.O.Ms.No.68, dt:8-4-2005. The above increase shall come into force with retrospective effect i.e., the date of issue of G.O.Ms.No.68, dt:8-4-2005.” 6
6.4 Allotment of Government land to PAFs, who become Small, or Marginal farmers or Landless after acquisition in lieu of Acquired land: in case of allotment of waste/ degraded or agricultural Government land, if available with in the District, in lieu of acquired land and if agreed by PAF for allotment of such land, each such PAF shall also get financial assistance of Rs.10,000 per hectare or as fixed by Government from time to time for land development and in case of allotment of agricultural land, Rs.5,000 per PAF or as fixed by Government from time to time for agricultural production shall be given.
However such allotment of Government land will be restricted to an extent of land acquired from PAF or 2.5 Ha of dry or 1.25Ha wet land which ever is lesser.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 16
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
Provided further that in such cases,
a. no compensation will be payable for the lands acquired from the PAF for the Project, to the extent of Government land is allotted.
b. No exgratia will be payable for the lands resumed from PAF for the project, to the extent of Government land is allotted
Land Acquisition officer shall pass the award for the lands acquire or resumed from PAF accordingly
6.5 Allotment of land acquired by Government from the project benefited area to Schedule Tribe PAFs, who become Small, or Marginal farmers or landlsess after acquisition, in lieu of Acquired land from them: 7“Government shall acquire land with in the project benefited area, as per guidelines issued by the Government from time to time such that no person should become small or marginal farmer or land less due such acquisition, for allotment of such land to ST PAFs(who become small or marginal farmers or landless due to acquisition of their land for the project),
if such PAFs so desire, in lieu of lands acquired from them.
However such allotment will be restricted to the extent of land acquired from such PAFs or 2.5 Ha dry land or 1.25Ha wet land which ever is lower. Further provided that in such cases,
a. no compensation will be payable for the lands acquired from the PAF for the project, to the extent of such land is allotted
b. No exgratia will be payable for the lands resumed from PAF for the project, to the extent of such land is allotted
Land Acquisition officer shall pass the award for the lands acquired or resumed from PAF accordingly.”7
6.6 The land allotted under Para 6.2, 6.4 and 6.5 shall be free from all encumbrances. The land allotted may be in the joint names of wife and husband of PAP. 6.7 Grant for cattle shed: Each PAF having cattle, at the time of acquiring his house, shall get financial assistance of Rs.15000/- or as fixed by Government from time to time for construction of cattle shed in new settlement.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 17
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
6.8 Grant for Transporting materials: Each PAF shall get lump sum one time financial assistance of Rs.5000/- or as fixed by Government from time to time for transportation / shifting of his building materials, belongings and cattle etc. from the affected zone to the resettlement zone. 6.9
6.9 Income Generating Scheme Grant: Each PAF comprising of rural artisan/ small trader and self employed person shall get one – time lump sum financial assistance of Rs.25,000 or as fixed by Government from time to time for construction of working shed / shop.
6.10 Wages if after acquisition land owner becomes land less: Each PAF owning agricultural land in the affected zone and whose entire land has been acquired shall get one – time financial assistance equivalent to 750 days minimum agricultural wages for “loss of livelihood” if no land is allotted in lieu of acquired land. 6.11 Wages if after acquisition land owner becomes marginal farmer 8“or continues to be a marginal farmer even after acquisition”8 : Each PAF owning agriculture land in the affected zone and who consequently becomes a marginal farmer 8a“or continues to be a marginal farmer even after acquisition”8a shall get one time financial assistance equivalent to 500 days minimum agriculture wages if no land is allotted in lieu of acquired land. 6.12 Wages if after acquisition land owner becomes small farmer 8b“or continues to be a small farmer even after acquisition”8b: Each PAF owning agriculture land in this affected zone and who consequently becomes a small farmer 8c“or continuous to be a small farmer even after acquisition”8c shall get one time financial assistance equivalent to 375 days minimum agricultural wages if no land is allotted in lieu of acquired land. 6.13 Wages to Labourers: Each PAF belonging to the category of “agricultural labourer’ or “non- agricultural labourer" shall be provided a one time financial assistance equivalent to 625 days of the minimum agricultural wages. 6.14 (a) Subsistence allowance to displaced family Each PAF who is also a project displaced family shall at a one time subsistence allowance equivalent to 240 days of minimum agricultural wages. It will be in addition to any other benefit available to him as PAF.
6.14 (b) 9 “Each vulnerable person as defined at Para -3.10(b) will be paid a pension of Rs.500/- (Rupees Five hundred only) a moth for life by arranging the necessary annuity policies by the Project Administrator at its cost.”9
6.15 In the case of acquisition of land in emergent situation such as under Section 17 of the Land Acquisition Act 1894 or similar provision of other Act in force, each PAF shall be provided with transit accommodation, pending resettlement and rehabilitation scheme. Such families shall also get R&R benefits as mentioned in above Paras under the Policy. 6.16 The Project Affected Families who were in possession of forest lands prior to 25th October, 1980 shall get all the benefits of R&R as given in above paras under the Policy.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 18
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
6.17 The PAFs enjoying reservation benefits in the affected zone shall be entitled to get the same reservation benfits at the resettlement zone. 6.18 Basic Amenities To Be Provided At Resettlement Centre For Projects:While shifting the population of the Affected zone to the Resettlement zone, the Administrator for R&R may far as possible, ensure that:
a. In case the entire population of the Village / area to be shifted belongs to a particular community, such population/ families may be resettled enmasse in a compact area so that socio- cultural relations (social harmony) a amongst shifted families are not disturbed
b. The Re- settlement Center shall be provided with the basic amenities and infrastructure facilities of drinking water, Internal roads, Drainage Electricity, primary School building, playground, Community Center and access road to the resettlement site. In addition to these facilities, the other community center and access road to the resettlement site. In addition t these facilities, the other community facilities which were available in the village, at the time of acquisition, shall also be provided.
6.19 R&R Benefits Project Affected Families Of Scheduled Tribes :
a. Each project Affected Family of ST category shall be given preference in allotment of land.
b. Each Tribal PAF shall get additional Financial assistance equivalent to 500 days minimum agriculture wages
b 10“(i)Each non tribal PAF who is a member of a registered Fishermen Cooperative Society/Fishing license holders in the affected zone and who lost fishing rights and livelihood shall get additional financial assistance equivalent to 500 days minimum agricultural wages for loss of fishing rights.”10
c. Tribal PAF s will be re- settled close to their natural habitat of their choice, to the extent possible, in a compact block so that they can retain their ethnic, linguistic and cultural identify
d. Tribal PAFs resettled out of the district or out side tribal area will get 25% higher R&R benefits in monetary terms.
e. The Tribal families residing in the Project Affected Area having fishing rights in the river/ Pond/ dam shall be given fishing rights in the reservoir area.
f. The Tribal land Alienated in violation of the laws and regulation in force on the subject would be treated as null and void and the R&R benefits would be available only to the original tribal landowner.
f 11“i)The Non tribal families residing in the project affected areas having fishing rights in the river /pond/dam who is a member of a registered Fishermen Cooperative Society/Fishing license holders shall be given fishing rights in the reservoir area.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 19
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
g. All the Fishermen PAFs will be accorded priority in extending benefits under various schemes/programmes being implemented by the state fisheries Department in consultation with R&R authorities.
h. Newly impounded/completed Reservoirs under jalayagnam shall be stocked with Fish Seed on priority basis by the state Fisheries Department by utilizing funds available under different schemes with the Fisheries Department/DRDA/ITDA/SC Corporation/MADA/BC Corporation or by seeking provision of funds under R7R package as per requirement”11
6.20 Constitutional benefits to ST/SC/BC PAPs at the Re-settlement centre: The PAPs shall enjoy all the constitutional benefits at new settlement also to which they were entitled to at the village that was acquired for the project.
5. Substitued for Para 6.2 vide G.O.Ms.No.76, I & CAD (PW.LA.IV- R&R.I)Dept., dt:13-4-2006. 6. Substituted for Para 6.3 vide G.O.MS.No.271, I & CAD (PW.LA.IV- R&R)Dept., dt:11-12-2007. 7. The word “shall” incorporated substituting the word “may” vide G.O.MS.No. 119, I & CAD (PW-LA-IV, R&R.II) Dept., DT: 26-6-2006. 8. Substitued for Para 6.11 vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R)Dept., dt:28-2-2009. 8a Substitued for Para 6.11 vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R)Dept., dt:28-2-2009 8b. Substitued for Para 6.12 vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R)Dept., dt:28-2-2009. 8c. Substitued for Para 6.12 vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R)Dept., dt:28-2-2009. 9. Substitued for Para 6.14 as Para 6.14(b) vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R)Dept., dt:28-2-2009 & Para 6.14 shall be treated as Para6.14(a) vide G.O.Ms.No.46,I&CAD(PW:LA-IV-R&R)Dept., dt:28-2-2009. 10 &11. Added vide G.O.Ms.No.114 IRRIGATION & C.A.D.(PW: LA.IV-R&R) DEPARTMENT dt:08-09-2009.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 20
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
CHAPTER – VII
7.0 Dispute Redressal Mechanism
7.1 R&R Committee at Project level:
a. in respect of every project to which this Policy applies, the State Government shall constitute a Committee under the Chairmanship of the Administrator of that Project to be called the Resettlement and Rehabilitation Committee to monitor and review the progress of implementation of scheme/ plan of resettlement and rehabilitation of the Project Affected Families.
b. The Resettlement & Rehabilitation Committee constituted as above shall inter-alia include as one of its members:
1. a representative of women PAP residing in the affected zone;
2. a representative each of the Scheduled Castes and Scheduled Tribes, PAPs residing in the affected zone;
3. a representative of a voluntary organization;
4. a representative of the lead bank;
5. Chairperson of the PRIs located in the affected zone
6. MPs/MLAs of the area included in the affected zone
c. Procedure regulating the business of the Resettlement & Rehabilitation Committee shall be framed by the Appropriate Government
7.2 Grievance Redressal Cell:
a. In respect of every project to which this Policy applies, the State Government shall constitute a Grievance Redressal Mechanism under the Chairmanship of the Commissioner for Resettlement & Rehabilitation for redressal of grievances of the PAFs.
b. The composition, powers, functions and other matters relating to the functioning of the Grievance Redressal Mechanism shall be such as may be prescribed by the Appropriate Government.
c. Any Project Affected Family, if aggrieved, for not being offered the admissible R&R benefits as provided under this Policy, may move an appropriate petition for redressal of his grievances to the Grievance Redressal Mechanism.
d. The form and manner in which and the time within which complaints may be made to the Grievance Redressal Mechanism and disposed of shall be such as may be prescribed by the appropriate Government.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 21
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
7.3 The Grievance Redressal Mechanism shall have the power to consider and dispose of all complaints relating to resettlement and rehabilitation against the decision of the Administrator / R&R Committee at Project Level and issue such directions to the Administrator for Resettlement & Rehabilitation as it may deem proper for the Redressal of such grievances. 7.4 Commissioner for Resettlement and Rehabilitation may, by order in writing, delegate such of the administrative powers conferred and duties imposed on him by or under this policy to any officer not below the rank of Joint Collector. 7.5 INTER-STATE PROJECTS:
a. In case a project covers an area in more than one state or Union territory where the Project Affected Families and Project Displaced Families are or had been residing, or proposed to be resettled, the states and or GOI in consultation with each other, may appoint the Administrator for Resettlement & Rehabilitation and the Commissioner for Resettlement and Rehabilitation for the purposes of this Policy.
b. The method of implementation of plans schemes for resettlement and rehabilitation shall be mutually discussed by the State Governments and the Union territory administration and the common plan/ Schemes shall be notified by the Administrator for Resettlement & Rehabilitation in the State or Union territory administration, as agreed to, in Accordance with the procedure laid down in this policy.
c. If any difficulty arises in the implementation of the scheme/ plans, the matter shall be referred to the Central Government in the ministry of Rural Development (Department of Land Resources) for its decision and the decision of the Central Government shall be binding on the concerned States and Union territory.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 22
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
CHAPTER-VIII
8.0 MONITORING MECHANISM AND APPLICABILITY
8.1 STATE LEVEL MONITORING COMMITTEE:
12“The GOAP, Department of Revenue, Shall constitute a State Level Monitoring Committee, to be chaired by the Principle Secretary/ Secretary, Department of Revenue for reviewing and monitoring the progress of implementation of resettlement and rehabilitation scheme/ plan relating to all projects to which this policy applies. The committee shall meet at lest once in three months to review and monitor the implementation of R&R plan in all projects. The committee will have the following or his nominee not below the rank of Joint Secretary as its Members:
1. Special C.S. & CCLA, Chairman
2. Commissioner for R&R & E.O.Secretary to Govt.
3. Prl. Secretary, Revenue
4. Secretary, Planning
5. Secretary, Social Welfare
6. Secretary, Tribal Welfare
7. Secretary, MA & UD
8. Secretary, PR & RD
9. Secretary, Housing
10. Secretary, Education
11. Secretary, Agriculture
12. Secretary, Women and Child Welfare
13. Secretary, Energy
14. Secretary, Law
15. Secretary, Finance
16. State Level N.G.O
17. Chief Engineer/ Project Administrator Special invitee
18. Secretary, Requisition Department”12
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 23
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
8.2 THIRD PARTY CONCURRENT AUDIT OF IMPLEMNTATION:
Chairman State level committee shall put in place mechanism for each project for third party concurrent audit of implementation of R&R plan. The audit report of such concurrent audit shall be placed before state level committee form time to time.
8.3 PROJECT LEVEL MONITORING COMMITTEE:
The Administrative Department of the project for which land is being acquired, shall constitute a Project Level Monitoring Committee, to be chaired by the District Collector of the district in whose jurisdiction the main component of the project lies, in case main component projects spreads over more than one district, senior most of the District Collectors shall chair the committee for reviewing and monitoring the progress of implementation of resettlement and rehabilitation scheme/ plan relating to the project to which this Policy applies. The committee shall meet at least once in two months to review and monitor the implementation of R&R plan
The Committee will have following as its members”
13 “Joint Collector/ P.O ITDA- Convener
R&R officer- RDO/ Sub Collector of the division
SDC/ RDO/ Sub Collector, Land Acquisition
Project Director, DRDA
Chief Executive Officer, Zilla Parishad
District Panchayat Officer
District Education Officer
District Medical and Health Officer
District Level representative of DISCOM
Superintendent Engineer, RWS PanchayatRaj Department
Three members from PAPs, one at least women
One member from local NGO
Superintendent Engineer, Project site
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 24
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
Superintendent Engineer, Panchayat Raj
Superintendent Engineer, R&B
Executive Engineer, Social Welfare Department.”13 APPLICABILITY OF POLICY:
8.4 THE POLICY ON THE RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED FAMILIES AND PROJECT DISPLACED FAMILIES (PRR-2005) SHALL COME INTO EFFECT FROM THE DATE OF ISSUE OF GOVERNEMNT ORDER.
8.5 The Project to which this policy is made applicable, the provisions of G.O. Ms 98 Irrigation (Project Wing) Department Dated:15.4.1986 and G.O.Ms.No.64 Social Welfare (T) Department, Dated: 18-4-1990 or any other order issued by any other department on this subject shall cease to operate form the date of commencement of this policy.
12. . Substituted for para 8.1 vide G.O.Ms.No.184, I & CAD (PW:LA-IV- R&R) Dept, DT: 09-09-2008. 13. Added vide G.O.Ms.No.101, I & CAD (PW: LA-IV- R&R) Dept, DT: 24-08-2009.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 25
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
ANNEXURE 1.2: MODIFIED R&R POLICY PROVISIONS – VIDE G.O R T No. 1059
GOVERNMENT OF ANDHRA PRADESH
ABSTRACTR & B Department – R & R Policy on Resettlement and Rehabilitation for Project Affected Families. 2005 – Certain modifications – Accepted – Orders – Issued.
TRANSPORT, ROADS & BUILDINGS (R.IV) DEPARTMENT
G.O.Rt.No. 1059 Dated:20-11-2010.Read the following:
1. Govt. Memo No.13236/Roads.IV.2/07, Dated 25.01.2008. 2. From the Chief Engineer(R&B)CRN & M.D., APRDC Letter
No.1/APRDC/APRSP/R&R/NGO/2007, Dated 10.11.2010. -: xxxx :-
O R D E R:-
In supersession of the orders issued in the memo 1st read above, Government after careful examination of the matter approve the modifications proposed by the Chief Engineer (R&B) CRN & Managing Director. Andhra Pradesh Road Development Corporation appended to this order.
2. The Chief Engineer (R&B) CRN & Managing Director. Andhra Pradesh Road Development Corporation shall take necessary action accordingly.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
S.P. SINGHPRINCIPAL SECRETARY TO GOVERNMENT
ToThe Chief Engineer (R&B) CRN & Managing Director
Andhra Pradesh Road Development Corporation, Hyderabad(w.e).
Copy to:-The Engineer-in-Chief (Admn. & NH ), A.P., Hyderabad./The Engineer-in-Chief ( State Roads), A.P., Hyderabad.The Chief Engineer, NABARD, Hyderabad.The Chief Engineer, Buildings, Hyderabad.The Chief Engineer, HUDCO, Hyderabad.
//FORWARDED BY ORDER//
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 26
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
ANNEXURE TO G.O Rt. NO. 1059/Roads.IV/2/2007, T (R&B) DEPT., Dt: 20.11.2010
MODIFICATIONS IN THE AP R&R POLICY FOR ROAD SECTOR PROJECTS
S. Provisions under the Modifications proposed by ModificationsNo present AP R&R Policy Managing Director, APRDC, APRDC accepted by Govt.
20051 Para 1.3: ‘…. Provide Add “ and /or affected “ after displaced Accepted
succor to the assets lessrural poor. Who have beendisplacedPara 3.2 : The definition of Add one more parameter “( c ) for Acceptedaffected zone refers to linear projects area falling within thewater sector projects project corridor of impact”
2 Para 3.8: Project means the Replace the definition of the project as: Accepted project(s) notified under this “Project means the project(s) notified
policy and displacing. under this policy and resulting in partiala) 100 or more losses and/or displacing”.
families en-mass in Add one more parameter as (c) forplain areas linear project displacement is not en
b) 25 or more families mass but scattereden mass in tribalareas or in areasmentioned inSchedule V of theconstitution of Indiafrom their landsand or houses
3
Para 3.0: There is no Add the following efinition: Accepted mention under the policy of Families with no legal titles are the families with no legal title personsand non – agricultural (i)Occupyingfamilies. government/other land for
cultivation to earn theirliving
(ii)Residing or carrying outeconomic activity instructures built within theaffected zone/corridor ofimpact
Non agricultural families: meanswhose primary source of livelihood isfrom non agricultural source (like
trading, business and manufacturingetc.) within the affected zone/corridorof impact
4 Para 3.16: A Project Under Para 3.16 (b) replace 50% by AcceptedDisplaced Family is defined 25% and add (d) families losing moreas one whose more than than25% of their50% of land is required residential/commercial structures.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 27
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
5 Para 3.17 project displaced Revise the definition as follows: AcceptedFamily is defined as “Project Displaced family“ means any“means any family. family, who on account of acquisitionDwelling house in the of dwelling house and structures usedvillage in the affected. for commercial purposes including…Dwelling house” business/trade in the affected zone for
the purpose of the project, has beendisplaced from such dwellings and/orcommercial structures.
6 The notification under Add: under Chapter III, the following Acceptedsection 4(i) of LA Act Cut off date: For the legal owners ofpertains to those whose the land and structures the date of landlands/other immovable acquisition notification will be the cutproperties are acquired off date. For squatters/encroachers the
date of social survey will be the cut offdate for R&R entitlements.
7 Para 5.4: Procedure to be Revise Para 5.4 (b) as follows: Acceptedfollowed for survey and “Project affected families… agriculturecensus of PAFs and PDFs land business/work place,etc. employment…. Or vocation. Also add
the following:(e). The project affected persons whohave unauthorized occupied the land/structures in the affected area.
8 Para 5.14: After Revise Para 5.14 as under: Acceptedcompletion…. In After completion. In consultation withconsultation with. …Project Project Affected families and Projectarea is situated. Displaced families and their
representatives, women,Chairpersons…Area is situated.
9 Para 5.18: Contents of Add the following: AcceptedDraft Scheme/Plan of R&R n) The time schedule to extend R&R
entitlements to project affected /displaced families
10 Para 6.2: Free house sites: Add: Accepted asThis is presently available Any project displaced family (including suggested: “Any PDFto losing their private squatters losing dwelling/shops/work according to theirproperties place) has been acquired should be eligibility will be
allotted site for suitably(i) Dwelling house site free of compensated”.
cost(ii) Site for shop 30 sq.m in
rural areas 25 sq.m inurban areas, free of cost.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 28
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
11 Para 6.3: The Policy Include the following: As aboveprovides house Project displaced families includingconstruction grant squatters who are of BPL category
would get house construction grant.Any displaced person (includingsquatters) losing shop/work placeshould be allotted a site for shop freeof cost 30 Sq.m. in rural areas, 25Sq.m in urban areas. Each of thedisplaced families would also beengiven a grant of Rs. 10,000/- towardsconstruction of alternate shop/workplace.
S.P. SINGHPRINCIPAL SECRETARY TO GOVERNMENT
//FORWARDED:: BY ORDER//
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 29
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
ANNEXURE 1.3: R&R ENTITLEMENT FRAMEWORK
Type of Loss Unit of Entitlement
R&R Entitlement Framework
Agricultural land
Titleholder Family
(i) Compensation as per the LA Act through consent award.
(ii) If consent award fails to reach agreement the difference between replacement value and market value (approved by the Government) will be paid in the form of rehabilitation assistance.
(iii) If alternate land is provided under section 6.4 of APRRP, the cost of land will be deducted from the compensation amount and the rehabilitation grant will be proportionately reduced, however other R&R entitlements will be extended as per APRRP 2005
(iv) At least 3 months notice will be given in advance of crop harvest, failing which compensation for crop lost will be paid.
(v) A one time lump sum amount equal to 750 days, 500 days and 375 days of minimum agricultural wages will be paid to those (owner) PAFs who after LA become landless, marginal, small farmers respectively. Training will be arranged for income generation activities (IGA) to one member of such PAFs in suitable IG activities.
Special benefit to ST families
Preference in allotment of land A lump sum amount equal to 500 days minimum wages for lost
customary rights or use of forest produce (if any)Share Cropper An affected share cropper will get a sum equal to the un-expired lease
period
Homestead (or non-agril. land)
Titleholder (i) Compensation as per LA Act for the loss of homestead land
(ii) If more than 25% of the structure is lost, such affected people will be categorized as ‘displaced’
(iii) Those affected but not displaced will get compensation for the portion of homestead land and structure affected by the project and permission to salvage construction material.
(iv) Those displaced will get
Compensation for the structure affected (part or full) computed at BSR without deducting depreciation
Permission to salvage construction material Alternate house site (to a maximum extent of 150 sqm in rural areas
and 75 sqm. in urban areas) or cash in lieu of site to those getting physically displaced.
A sum total of Rs 50,000 as one time financial assistance to BPL for house construction and 3000 for lavatory construction.
Subsistence allowances equal to 240 days of minimum agriculture wages.
Grant for a cattle shed equivalent to a sum total of Rs 15000. IGA grant to affected artisans, small traders, and self employed
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 30
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
Type of Loss Unit of Entitlement
R&R Entitlement Framework
persons at Rs 25,000 per PDF Grant for transporting materials at Rs 5,000 per PDF
Tenant/ Lease holder
Only displaced tenant will get:
A sum equal to two months rental in consideration of the disruption caused.
Transportation allowance of Rs. 5,000 towards shifting household materials.
Land under commercial use
Titleholder
(Owner and occupier)
(i) Compensation for the loss of land (commercial).
(ii) For the structure affected (part or full), compensation will be computed at BSR without deducting depreciation
(iii) Permission to salvage construction material
(iv) If more than 25% of the structure is lost, the affected business/work place will be categorized as ‘displaced’.
(v) PAFs affected but not displaced will get compensation for the portion of land lost and the structure (at BSR without depreciation) affected by the project.
(vi) Those displaced will get
An alternate site (40 sq.mtr in rural areas or 25 sq.mtr. in urban areas) free of cost or cash equivalent in lieu there of.
A construction assistance of Rs 10,000 for each PDF(v) If alternate shop/work place is allotted by the project, those displaced will not be eligible for alternate site and construction assistance.
(v) Other assistance:
Subsistence allowances equal to 240 days of minimum agriculture wages.
A transportation allowance of Rs 7,000 to Residence cum commercial. A transportation allowance of Rs 2,000 to commercial units.
Titleholder(Absentee Land Lord)
(i) Only compensation for both land and structure (owned)
(ii) Permission to salvage materials from demolished structure.
Tenant/Lease holder
Only displaced tenant will get:
A sum equal to two months rental in consideration of the disruption caused.
Transportation allowance of Rs. 1,000 towards shifting.
Other assets Owner affected family
Loss of other assets (including wells, trees) will be compensated equivalent to their replacement value.
Encroachers (Agril. land)
Family If a PAF is dependent on the public land required for the project for the livelihood and belongs to ‘vulnerable’ groups he/she will get assistance to
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 31
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
Type of Loss Unit of Entitlement
R&R Entitlement Framework
take up self-employment activities by dovetailing government programs or providing an assistance of Rs 25,000 to take up IG Activity.
Encroachers (Non-agril. land)
Family If encroached land is used for housing and/or commercial purpose and if the affected person loses more than 25% of the built up structure (including one’s own portion) and if physically displace will be given the same R&R assistance as available to a displaced family. However, such PAFs will not get the compensation for the encroached land.
Squatters (for homestead purpose)
Vulnerable Family
If the public land is occupied for homestead purpose and if the affected person has no alternate housing he/she will get:
Notice to remove the structure An alternate site of 150 sq.mtr in rural areas or 75 sq.mtr. in urban
areas or cash equivalent and compensation for lost structure without depreciation. If the family is allotted alternate weaker section housing, he/she will not be eligible for compensation and assistance or alternate housing equivalent to IAY.
House construction grant Rs 10,000A transportation assistance of Rs 2,000
Squatters (for commercial)
Vulnerable Family
If the PDF has no alternate place, he/she will get:
Notice to remove the structure An alternate site of 40 sq.mtr in rural areas or 25 sq.mtr. in urban areas
or cash equivalent and compensation for lost structure without depreciation. If the project allots an alternate commercial place developed by it, the PDF will not be eligible for neither compensation nor house construction assistance or Rs 10,000 for shop construction as per amended policy for APRSP.
A transportation assistance of Rs 1,000 A maintenance allowance of Rs 2,000 (one time) PAFs from vulnerable sections will be provided training to take up self
employment activity by dovetailing ongoing Government schemesKiosks Vendor Ambulatory vendors licensed for fixed locations will be considered as
kiosks and each affected vendor will get
Alternate site for kiosks or a sum of Rs.5000 for self relocationNOTE: Vendors in groups (of more than 50) will be considered for relocating in a commercial complex, if developed by the project. Those allotted space there will not get any assistance.
Common infrastructure and common Property Resources
Community Common properties will be replaced in consultation with the community
Civic infrastructure will be replaced in consultation with the affected community and the local administration
Any Unforeseen
Affected community
Any unforeseen impact would be mitigated/enhance as per the APRRP 2005 or through any additional measures as may be required
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 32
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
Type of Loss Unit of Entitlement
R&R Entitlement Framework
Impacts and/persons
ANNEXURE 2.1: LIST OF PROJECT AFFECTED FAMILIES AND
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 33
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
PROJECT DISPLACED FAMILIES
Machilipatnam Division Project Affected Famalies(PAF'S) of PEDNA - NUZVID -VISANNAPETA Road.
Sl.No
Name of the Village
Cha
nage
Division Name of the HouseHold Head(HHH)
Father\husband name
Loc
atio
n
(Lef
t\Rig
ht)
Titl
e ho
lder
(TH
)/Non
Titl
eHol
der
(NT
H)
No
of F
amily
Mem
bers
Type of House
Nature of House
1 Pedna 7+000 Machilipatnam Moganti Prasad Narayanna Rao L-1 TH 4 Semipucc
a Com
2 7+000 Machilipatnam Moganti Prasad Narayanna Rao L-1 TH 4 Katcha Res
3 7+000 Machilipatnam Varudhu Balaji Kumar Narayanna Rao R-1 TH 5 Semipucc
a Com
4 7+000 Machilipatnam Dinduluri Srinivasarao Kalkimurthy R-1 TH 4 Semipucca Com
5 7+000 Machilipatnam Madisetty Maruthi Late
Satyanarayana R-1 TH 5 Semipucca
Com
6 7+020 Machilipatnam Varudhu malleswararao Subbarao R-3 TH 3 Katcha Res
7 7+020 Machilipatnam Varudhu Ramachandrarao Subbarao R-3 TH 3 KatchaCattle Shed
8 7+120 Machilipatnam jonabattula koteswaramma Nancharayya R-2 NTH 5 Katcha
Cattle Shed
9 7+120 Machilipatnam jonabattula koteswaramma Nancharayya R-3 NTH 6 Katcha Res
10 7+140 Machilipatnam Garikimukkala Sriramulu Mahamkali R-4.5 NTH 3 Katcha Res
11 7+140 Machilipatnam Chinnam Suramraju Person not
Available L-4 TH 0Pucca
Res
12 7+200 Machilipatnam Varudhu Venkateswararo Govind L-2 NTH 4 Pucca Res
13 7+200 Machilipatnam Varudhu
NagamalleswarammaVenkateswarulu R-6 TH 4
KatchaRes
14 7+220 Machilipatnam Varudhu Nancharayya Subbarao R-4.5 TH 6 Semipucca Res
15 7+220 Machilipatnam Varudhu Nancharayya Subbarao R-4.5 TH 6 KatchaCattle Shed
16 7+240 Machilipatnam Bulusuru Symalarao Subramanyam L-7 TH 4 Katcha Res
17 7+260 Machilipatnam maddemsetty Rambabu Nancharayya R-6 TH 5 Semipucca Res
18 7+280 Machilipatnam Varudhu Venkaranarayana Marillu L-3 TH 2 Semipucc
a Res
19 7+280 Machilipatnam Varudhu Venkateswararo Subbayya R-5 NTH 3 Katcha Res
20 7+280 Machilipatnam Varudhu Ragavayya Subbayya R-6 NTH 3 KatchaCattle Shed
21 7+300 Machilipatnam Varudhu kondayya Krishana R-6 TH 6 Katcha Res
22 7+310 Machilipatnam Varudhu Venkataswamy Krishana R-6 TH 3 Semipucca Res
23 7+320 Machilipatnam Varudhu Venkanna Nageswarao R-2 TH 4 Pucca Res
24 7+320 Machilipatnam Varudhu Balaji Kumar Nageswarao R-2 TH 5 Semipucca Res
25 7+325 Machilipatnam Maruboiena Naga
malleswararao Nageswarao R-5 TH 4Katcha
Res
26 7+325 Machilipatnam Maruboiena SriniVasarao Nageswarao R-5 TH 5 Katcha Res
27 7+325 Machilipatnam Maruboiena Srinivasarao Nageswarao R-6 TH 6 Katcha Cattle
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 34
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
Shed
28 7+325 Machilipatnam Koutarapu Naga Durga
Bhavani Ganapathi L-3 TH 4 Semipucca
Res
29 7+350 Machilipatnam Varudhu Baburao Seetayya L-3 TH 2 Pucca Res
30 7+360 Machilipatnam Varudhu Venkateswararo Koteswararo L-4 NTH 4 Katcha Res
31 7+360 Machilipatnam Varudhu Venkateswararo Koteswararo L-5 NTH 5 KatchaCattle Shed
32 7+420 Machilipatnam Maddisetty Anasuya Koteswararo R-5 TH 7 Katcha Res
33 7+430 Machilipatnam Varudhu Suryachanrraro Venkatasubbayya R-7 NTH 11 Semipucc
a Res
34 7+430 Machilipatnam Varudhu Suryachanrraro Venkatasubbayya R-8 NTH 12 Katcha Res
35 7+430 Machilipatnam Varudhu Suryachanrraro Venkatasubbayya R-9 NTH 13 Katcha
Cattle Shed
36 7+450 Machilipatnam Varudhu Durgarao Madavarao R-6 NTH 3 Pucca Res
37 7+450 Machilipatnam Varudhu Subbarao Madavarao R-6 NTH 6 Katcha Res
38 7+450 Machilipatnam Varudhu Subbarao Madavarao R-6 NTH 7 KatchaCattle Shed
39 7+450 Machilipatnam Varudhu Venkata
Ramanjeyaneyulu Nageswarao L-2 TH 4 Semipucca
Res
40 7+500 Machilipatnam Varudhu Pitchemma Narasimharao R-2 TH 8 Katcha Res
41 9+650 Machilipatnam MD.Sardhar Awa L-5 NTH 3 Kisok Kiosk
42 9+850 Machilipatnam Vanka Rani Subbayya L-7.5 NTH 3 Katcha Res
43 Nadupuru 10+700 Machilipatnam Parusa Pandurangarao Durgarao L-6.2 NTH 2 Katcha Res
44 10+800 Machilipatnam Pamarthi Bramajirao Narasimharao R-6.3 NTH 4 Katcha
Res&Com
45 10+800 Machilipatnam Rajulapati Gowri rajulu Gurunadham L-6 NTH 5 Katcha
Res&Com
46 10+900 Machilipatnam Polagiri Jaganadham Srimanrao L-7.8 NTH 4 Katcha Res
47 10+930 Machilipatnam Polagiri nageswararao Srimahathi R-6.5 NTH 4 Katcha
Cattle Shed
48 10+940 Machilipatnam Yarlagedda Sethratnam Venkataratna
m R-6.5 NTH 1 Katcha Res
49 11+020 Machilipatnam Gandikota Dhanaraju Kotayya L-7 NTH 7 Katcha
Res &Com
50 11+65
0 Machilipatnam Vallaba PamuluLaxmayya
L-7.2 NTH 3 KatchaRes
51 11+66
0 Machilipatnam kanakavalli Subadra Benarji R-6.5 NTH 2Katcha
Res
52 11+67
0 Machilipatnam Nimmagedda Rajarao Person not Available L-7
NTH 2 KatchaRes
53 11+75
0 Machilipatnam Kandara Anjeneyulu Venkateswrulu L-7.2
NTH 4 KatchaRes
54 11+76
0 Machilipatnam Davu RamakrishanaSubbarao L-8.5
NTH 4 Semipucca Res
55 11+80
0Machilipatnam
Ede.Sobanadri Sitaramayya R-8.2 NTH2
Katcha Res
56 11+82
0Machilipatnam
Borra Haribabu Veraraghavulu R-9 NTH4
Katcha Res
57 12+05
0 Machilipatnam Parasa Gopalkrishana Nancharayya R-4.5 NTH 5 KioskKiosk
58 12+05
0 Machilipatnam Parasa Ramachandrarajulu Nancharayya R-4.5 NTH 3 Semipucc
a Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 35
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
59 12+00
0 Machilipatnam Sammeta Nagasehagirirao Veerabadrayya R-8.3 NTH 5 Semipucc
aRes&Com
60 12+05
0 Machilipatnam Tontipakala.Lalitamba Person not Available R-7.8 NTH 1 Katcha Res
&Com
61 12+100 Machilipatnam Bellamkonda Tatayya H/o
mastanamma L-8.5 NTH 3 Katcha Res
Gudivada Division Project Affected Famalies(PAF'S) PEDNA - NUZVID -VISANNAPETA Road.
Sl.No
Name of the Village
Cha
nage
Division Name of the HouseHold Head(HHH)
Father\husband name
Location(Left\Right)
Titl
e ho
lder
(TH
)/Non
Titl
eHol
der(
NT
H)
No
of F
amily
Mem
bers
Type of Structure
Nature of Stucture
1Reddipalaem 13+400 Gudivada Bojana Nagayya Veeraswamy L-7.8 NTH 3 Katcha Res
2 13+400 Gudivada Madamala Ramarao Nancharayya L-8 NTH 2 Katcha Res
3 13+410 Gudivada B.Nancharayya H|0 Venkamma L-6.2 NTH 3 Katcha Res
4 13+410 Gudivada Bojana Lazar Nagayya R-7.5 NTH 5 Katcha Res
5 13+420 Gudivada Modugummdi Veramma pandurangarao R-8 NTH 2 Katcha Res
6 13+420 Gudivada Katta Laxminarayana Subbayya R-8.2 TH 5 Katcha Cattle Shed
7 13+420 Gudivada ponki nagaraju verayya R-8.2 NTH 3 Katcha Res
8 13+420 Gudivada Chittibomma Nagababu Srinivasarao L-7.5 NTH 4 Katcha Res
9 13+420 GudivadaChittibomma Srinivasarao Subramanyam R-6.4 NTH 5 Katcha Res
10 13+425 GudivadaBellamkonda Venkateswarao Mallikarjunarao L-7.5 NTH 4 Katcha
Cattle Shed
11 13+425 GudivadaBellamkonda Sahademudu Mallikarjunarao L-7.5 NTH 3 Katcha
Cattle Shed
12 13+500 Gudivada Panku Chinaveerayya Subbarao L-8.2 NTH 3 Katcha Res
13 13+510 GudivadaPamarthi VeeraVenkateswarao Rangarao R-8 NTH 5 Katcha Cattle
Shed
14 13+510 Gudivada Kandula Sesayya Nancharayya R-6.4 NTH 6 Katcha Res
15 13+520 Gudivada Botla Koteswaerarao Anjayya R-8.2 NTH 1 Katcha Res
16 13+525 Gudivada Pamarthi Venkataswamy Ramayya R-7 NTH 4 KatchaCattle Shed
17 13+530 Gudivada Bethapudi Srinivasarao pandu R-6.2 NTH 4 Katcha Res
18 13+550 Gudivada Katta Srinivasarao Nancharayya L-7.2 NTH 3 Katcha Res
19 13+420 Gudivada Katta Laxminarayana Subbayya L-7.5 TH 5 Katcha Res
20 13+550 Gudivada Kagitha Pabma Nancharayya L-6.5 TH 2 Katcha Res
21 13+700 Gudivada Shop related to TempleAnjeneya Swamy L-7.5 NTH
4S
SemiPucca Com
22 13+750 Gudivada Sodagani laxmarao Veeraswamy R-7.7 NTH 1 Katcha Res
23 13+790 GudivadaModugumudi Mallikarjunarao Laxmipathi L-7.6 NTH 2 Katcha Com
24 13+790 GudivadaModugumudi Harikrishana Buchiyya R-8 NTH 3 Katcha Res
25 13+750 Gudivada Modugumudi Haribabu Ramachandrarao L-5.7 NTH 4SemiPucca Res
26 13+800 GudivadaBellamkonda Srininvasarao Mallikarjunarao L-7.2 NTH 3
SemiPucca Res
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 36
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
27 13+890 Gudivada Pamarthi RameshDasaradharamayya R-7 NTH 4 Katcha
Cattle Shed
28 13+900 Gudivada Pamarthi Ankalarao Ragavulu R-7.5 NTH 2 KatchaCattle Shed
29 14+400 Gudivada Parasa Reddemma Durgayya L-8 NTH 2 Katcha Res
30 14+400 Gudivada Parasa Reddemma Durgayya L-9 NTH 3 KatchaCattle Shed
31Vaddlamannadu 15+190 Gudivada Abdhul Azeez Basha R-6.8 NTH 3 Katcha Res
32 15+160 Gudivada AvarlanDammidayya Veerayya R-6.5 NTH 2 Katcha Res
33 15+400 Gudivada Kolusu Reddayya Veraraju L-6.5 TH 4 Katcha Res
34 15+400 Gudivada Kolusu Reddayya Veraraju L-6.5 TH 5 Katcha Cattle Shed
35 15+400 Gudivada Kolusu Veraraju Ragavulu L-5.5 TH 2 Katcha Res
36 15+400 Gudivada Kolusu Koteswarararo Veraraju L-6.5 NTH 4 Katcha Res
37 15+420 Gudivada Pari devamani Late)Yakobu L-6.5 TH 6 Katcha Res
38 15+420 Gudivada Madamala Sivaleela Venkateswararao R-5 NTH 2 Katcha Cattle
Shed
39 15+430 Gudivada Iku Adilaxmi Late)Gopayya L-5.2 TH 1 Katcha Res
40 15+430 Gudivada S.Bayrasi Not Available R-5.6 NTH 0 Katcha Res
41 15+440 Gudivada Jakkula Sureshbabu Balayya L-5 NTH 4SemiPucca Com
42 15+440 Gudivada Sk.Raheman Not Available L-5 NTH 0 Kiosk Kiosk
43 15+450 Gudivada N.Sambasivarao Not Available L-5.5 NTH 0 Kiosk Kiosk
44 15+450 Gudivada Gudivada Venkateswarao Person Not
Available R-6.2NTH
0Katcha
Com
45 15+480 Gudivada Vallabapurapu
nancharayya Venkateswarulu R-6.5NTH
3Katcha
Com
46 15+480 Gudivada Udayagiri
Venkateswararao Person Not Available R-6.5
NTH0
KioskKiosk
47 15+520 Gudivada Thota Laxmayya krishanamurthy R-6.8 NTH 4SemiPucca Com
48 15+520 Gudivada Thota Umashankar Person Not
Available L-7 NTH 3Kiosk
Kiosk
49 15+550 Gudivada Thota venkatanagaanjeneyulu Hunumantharao L-6.8 NTH 2 Kiosk Kiosk
50 15+560 Gudivada Penneru jayapattabiramayya Venugopalarao L-6.8 NTH 2
SemiPucca Com
51 15+560 Gudivada G.Nageswararao Person Not
Available L-6.5 NTH 0Kiosk
Kiosk
52 15+560 Gudivada Gandam RangaraoVenkatakrishanarao R-6.5 NTH 0 Kiosk Kiosk
53 15+560 Gudivada Garikipathi Tulasiram Ragavulu R-6.8 NTH 4SemiPucca Com
54 15+560 Gudivada Garikipati laxmayya Ragavayya R-6.8 NTH 4 Kiosk Kiosk
55 15+560 Gudivada Meda Venkateswarao Adinarayana R-7.2 NTH 4 Katcha Com
56 15+560 Gudivada Yadaala Ramarao Rajarao L-6.2 NTH 2 Katcha Cattle Shed
57 15+560 Gudivada manda prasad Ramarao L-7 NTH 3 Katcha Com
58 15+580 Gudivada NKV Subbarao Venu R-6.8 NTH 4 Kiosk Kiosk
59 15+590 Gudivada kundeti Verayya Ramayya R-6.6 NTH 2 Katcha Com
60 15+600 Gudivada Atchuta jaganmohanarao Subbarao R-5.9 NTH 3 Katcha Res
61 15+650 Gudivada Degala Srinu Venkataswamy R-6.5 NTH 4 Katcha Res
62 15+650 Gudivada Degala Venkataswamy Rammurthy R-6.2 NTH 4 Katcha Res
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 37
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
63 15+660 Gudivada Maddela Veramma Durgapraasad R-6.5 NTH 3 Katcha Res
64 15+670 Gudivada Atchuta kasturi Person Not
Available R-4.4NTH
1Katcha
Res
65 15+670 Gudivada Atchuta Srinivasarao Nancharayya L-5.1 TH 3 Katcha Res
66 15+750 Gudivada Atchuta Sivashankararo Subbarao L-5.3 NTH 4 Katcha Res
67 15+750 Gudivada Penta Ramu Laxmayya R-5.5 NTH 3 Katcha Res
68 15+360 Gudivada DegalanSubbarao Chinnappayya R-6.2 NTH 2 Katcha Res
69Vemavaram 16+740 Gudivada Parasa
VenkatasubbammaKrishanamurthy L-4.7 NTH 4
KatchaRes
70 16+780 Gudivada Padamata Pandu Basavayya L-6.9 TH 4 Katcha Res
71 16+785 Gudivada Venka Nageswarao Rammurthy L-6.3 TH 3 Katcha Res
72 16+785 Gudivada Veranji Kanakam Krishanamurthy R-4.5 NTH 2 Katcha Res
73 16+785 Gudivada Chillimuntha Badrachalam Gangadaram L-5.8 NTH 0 Katcha Res
74 16+820 Gudivada Yarlagadda hunumantharao Rammurthy L-4.5 NTH 4 Katcha
Cattle Shed
75 16+880 Gudivada Pamarthi Samrajam Rangarao L-4.5 NTH 2 KatchaCattle Shed
76 16+880 Gudivada Padamati Veraswamy Venkanna L-4.3 NTH 3 Katcha Res
77 16+890 Gudivada Madugu Pedaverayya Subbarao R-4.5 NTH 0 Katcha Res
78 16+900 Gudivada Vemula Srinivasarao Veraragavulu R-4.3 NTH 5 Katcha Com
79 16+900 Gudivada Mannem Venkateswarama Venkateswaralu L-5.2 NTH 2 Katcha Res
80 16+900 Gudivada Yaragani Mohanarao Mamillu L-5.2 NTH 4 KatchaRes&Com
81 16+900 Gudivada Mannem Basavayya Laxmayya L-6.2 NTH 2 Katcha Res
82 16+900 Gudivada Yarlagadda Nagapanindhra M/o Vijayamma L-5.5 NTH 2 Katcha Res
83 16+900 Gudivada Yarlagadda Nagapanindhra M/o Vijayamma L-5.5 NTH 3 Katcha Cattle
Shed
84 17+050 Gudivada Sonti Venkateswarao Veraswamy L-5.2 TH 4 Katcha Res
85 17+050 Gudivada Sonti Venkateswarao Veraswamy L-5.2 TH 5 Katcha Cattle Shed
86 17+050 Gudivada Mulala edukondalu Pakeer R-5.1 NTH 8 Katcha Res
87 17+060 Gudivada Borra Durgamma Ragavulu L-6.2 NTH 1 Katcha Res
88 17+070 Gudivada pandiri Kurmarao narasimharao L-5.3 NTH 3 Katcha Res
89 17+100 Gudivada Vemula Durgarao Danayya L-4.5 NTH 2 KatchaCattle Shed
90 17+120 Gudivada Shaik Adem H\o Haseenabegum L-4.3 NTH 5 Katcha Res
91 17+140 Gudivada Vemula Veraanjeneyulu Venkateswaralu L-4.5 NTH 2 Katcha Cattle Shed
92 17+140 Gudivada Mannem Gopalarao Daharmayya L-4.5 NTH 3 Katcha Cattle Shed
93 17+150 Gudivada Mannem ChinaRagavulu Daharmayya L-4.5 NTH 2 Katcha Cattle Shed
94 17+160 Gudivada Mannem Nageswararao Venkateswaralu L-4.5 NTH 4 Katcha Cattle Shed
95 17+180 Gudivada Mannem Pedaragavayya Venkateswaralu L-4.5 NTH 5 Katcha Cattle Shed
96 17+200 Gudivada Abdhul Baseer Sattar L-4.1 NTH 1 Katcha Res
97 17+200 Gudivada Naragani Venugopal Ankinaidu L-4.5 NTH 5 Katcha Res
98 17+630 Gudivada M.Ismail Kondayya L-4.2 NTH 6 Kisosk Kiosk
99 17+690 Gudivada Mannem Srinu Venkateswaralu l-4.5 NTH 4 Katcha Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 38
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
100 17+690 Gudivada Mannem Somulu Venkateswaralu l-4.6 NTH 5 Katcha Com
101 17+690 Gudivada Mannem Ragavulu Anjayya L-4.5 NTH 5 Katcha Com
102 17+690 Gudivada Bolla Ankalu nageswarrao L-4.6 NTH 5 Katcha Com
103 17+690 Gudivada Mannem Ramachandrudu Subbayya L-4.6 NTH 5 Katcha Com
104 17+690 Gudivada Matta Ragavayya Saianna L-4.6 NTH 4 Katcha Com
105 17+690 Gudivada Chettibomma Tulasamma Malleswararao L-4.5 NTH 4 Katcha Com
106 17+690 Gudivada Mannem Nageswararao Venkateswaralu L-4.5 NTH 1 Kisosk Kiosk
107 17+700 Gudivada Pappula Peramma Nancharayya L-4.5 NTH 1 Katcha Com
108 17+700 Gudivada Mannem NageswararaoPerson Not Available L-4.5 NTH 2 Kisosk Kiosk
109 17+710 Gudivada Tammisetty nookalu nookalu L-4.5 NTH 3 Kisosk Kiosk
110 17+710 Gudivada Tammisetty nookalu nookalu L-4.5 NTH 3 Katcha Com
111 17+720 Gudivada Tammisetty Durgarao Suryanarayana L-4.5 NTH 4 Katcha Com
112 17+730 Gudivada Matta Ragavayya Saianna L-4.5 NTH 4 Katcha Com
113 17+730 Gudivada Akurathi hema Srinivasarao L-4.5 NTH 4 Kisosk Kiosk
114 17+730 Gudivada mannem Pitchemma pothuraju L-4.5 NTH 4 Katcha Com
115 17+730 Gudivada Munagala Pramela Danumjay L-4.5 NTH 4 Kisosk Kiosk
116 17+730Gudivada
SatyanarayanaPerson Not Available L-4.5 NTH 3 Kisosk Kiosk
117 17+750 Gudivada Tammesetti Satyanarayana Suryanarayana L-4.5 NTH 4
SemiPucca
Res &Com
118 17+750 Gudivada Narepalli Srinivasarao Rangarao L-4.5 NTH 4 Katcha Com
119 17+780Gudivada
SrisylamPerson Not Available L-4.5 NTH 3 Kisosk Kiosk
120 17+780 Gudivada Manda Nagamani Ramanjeneyulu R-4.5 NTH 5SemiPucca Com
121 17+810Gudivada
SarveswararaoPerson Not Available L-4.5 NTH 0 Kisosk Kiosk
122 17+810Gudivada
BasaveswararaoPerson Not Available L-4.6 NTH 0 Kisosk Kiosk
123 17+820Gudivada Tammisetty
SuryanarayanaPerson Not Available R-6 NTH 0 Kisosk Kiosk
124 17+820Gudivada
kagita VeranjeneyuluPerson Not Available R-6 NTH 0 Kisosk Kiosk
125 17+830Gudivada
BapanayyaPerson Not Available R-6 NTH 0 Kisosk Kiosk
126 17+830 Gudivada Chetturu jaganadharao nageswarrao R-6 NTH 4 Kisosk Kiosk
127 17+840 Gudivada Narapalem krishana Rangarao L-6 NTH 5 Kiosk Kiosk
128 17+840 Gudivada Bodda Romahanaramesh pullarao L-6 NTH 3 Kiosk Kiosk
129kowthvaram-Gv-1 22+065 Gudivada koreni Appayamma Chittibabu L-4.4 NTH 3 Katcha Kiosk
130 22+070 Gudivada Allu suryanarayana W/o Atchinaidu L-6 NTH 3SemiPucca Kiosk
131 22+090 Gudivada Allu Apparao Adinarayana L-7.5 NTH 4 KatchaRes&Com
132 22+090 Gudivada Jakka Nagamani S/o Sanganna R-5.3 NTH 2 KatchaRes&Com
133 22+100 Gudivada Allu Narasamma Apparao R-6.8 NTH 1 KatchaRes&Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 39
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
134 22+100 Gudivada Geduturi Rajarao Yarayya R-6.6 NTH 2 Katcha Res
135 22+100 Gudivada Tummala Rajarao Suryanarayana L-7.3 TH 2SemiPucca res
136 22+120 Gudivada Juvvadi Edukondalu Venkateswarao L-6.9 NTH 3SemiPucca Com
137 22+120 Gudivada Sonayala Suryanarayan a Satyam R-6.8 NTH 1 Kiosk Kiosk
138 22+120 Gudivada Nasethi Ramesh Subbarao R-6.8 TH 3 Katcha Res
139 22+120 Gudivada koripalli Sanyasirao Appannna R-6.7 NTH12 Katcha Res
140 22+140 Gudivada Javvari Nageswarao Venkateswarao R-6.8 NTH 5 Katcha Res
141 22+140 Gudivada Kasani Sowbagyarao Edukondalu L-8 NTH 3 Katcha Com
142 22+140 Gudivada Paramati Sitaramamma Venkataramana L-8 NTH 3SemiPucca Com
143 22+200 Gudivada Muttireddy Pichheswarao hunumantarao R-7.3 NTH 5 Katcha Res
144 22+200 Gudivada Allu Bullemma Appalaswamy R-6.3 NTH 2 Katcha Res
145 22+200Gudivada
Atmakuri Nagaprasad hunumantarao L-7.5 NTH 4SemiPucca Com
146 22+200 Gudivada malireddy Srinivasarao Suribabu R-7.3 NTH 4 Katcha Com
147 22+200Gudivada
muttireddy SrinivasaraoPerson Not Available R-6.3 NTH 5 Katcha Res
148 22+125 Gudivada Ramabalapala Durgaprasad Satyanarayana R-5.3 NTH 4 Katcha Res
149 22+200 Gudivada Arji Applanarasamma Laxmayya(late0 R-7.3 NTH 2 Katcha Res
150 22+200 Gudivada Kagitha Gangadhararao narasimharao R-8.1 NTH 4 Katcha Res
151 22+200 Gudivada matireddy Suribabu hunumantarao L-7.5 NTH 5 Katcha Res
152 22+200 Gudivada Nekipeti Chinayya Janayya R-8 NTH 2 Katcha Res
153 22+200 Gudivada Dokku Durgarao Subbarao R-8 NTH 4 Katcha Res
154 22+200 Gudivada Doddi Ramu Paidayya R-7.8 NTH 0 Katcha Res
155 22+200Gudivada Vinshuntumurthula.
Simhachalam Srinivasarao R-7.8 NTH 0 Katcha Res
156Gudlavalleru-2 22+760
Gudivada Erupuganti Umamaheswarrao
Sitarama Brahmam L-8 TH 0 Semi Com
157 22+780 Gudivada Alajangi Lingamurthy Sambayya R-9 NTH 0 Kiosk kiosk
158 23+000 Gudivada Ch.Krishana Musalayya R-8 NTH 4 Kiosk kiosk
159 23+000 Gudivada Miriyala veranjeneyulu Veravenkayya R-8 NTH 6 Kiosk kiosk
160 23+030 Gudivada Mukkudi Rajasekhar Setti narayana R-6 NTH 2 Kiosk kiosk
161 23+220 Gudivada kaja pandu Gangayya R-7 NTH 5 Kiosk kiosk
162 23+220Gudivada
katuri ArjunraoPerson Not Available R-7 NTH 4 Kiosk kiosk
163 23+790Gudivada Jupudi Krishana
mohanaraoPerson Not Available R-6 TH 2 Pucca Res
164 23+990Gudivada
Mutthireddy SekharNagamalleswararao L-6 NTH 4 Kiosk kiosk
165 23+995Gudivada
Nara janardhanarao Sobanadri L-6 TH 0SemiPucca Com
166 23+800 Gudivada Paruchuri Tripurantharao R-5.6 TH 4 Pucca Res
167 23+800 Gudivada vallabhapurapu Eswararao
Ramachandararao R-4.6 TH 5 Pucca Res
168 23+800 Gudivada Sonti Amareswari Venkanna R-5.2 NTH 4 Pucca Res&Co
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 40
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
m
169 23+810 Gudivada MD.Muzeeurrab Abdhullah R-6.2 TH 5 PuccaRes&Com
170 23+950Gudivada
A.A.SeshacharyuluPerson Not Available L-7.3 NTH 0 Pucca Res
171 23+980Gudivada Kunchapati
Venkateswwarao Pandurangarao R-4.6 TH 3 Pucca Res
172 24+000 Gudivada K.Kameswaramma KVKrishanarao R-5.7 TH 4SemiPucca
Res&Com
173 24+000Gudivada
V.NarasimharaoPerson Not Available R-4.8 TH 1 Pucca Res
174 24+000Gudivada
Polavarapu RajeswaraoPerson Not Available R-5.5 TH 1 Pucca Res
175 24+000Gudivada Gudlavalleti
Venkateswarao Gangajalam R-4.5 TH 4SemiPucca Res
176 24+050Gudivada
Bulla Ravibabu Koteswararao L-6.8 TH 5SemiPucca Res
177 23+834Gudivada
S.VenkannaPerson Not Available R-6.3 NTH 1 Pucca
Res &Com
178 23+860Gudivada
v.laxmiPrasadaraoPerson Not Available L-7.2 NTH 0 Kiosk Kiosk
179 Angalur 27+820 Gudivada Vadladi Jagadish Subbarao R-7.3 NTH 4 Kiosk Kiosk
180 27+820 Gudivada Dhulupudi Nagamalleswar Venkataramana R-7.3 NTH 2 kiosk Kiosk
181 27+830 Gudivada Kodali Madhu Venkataratnam L-6.7 NTH 5 Kiosk kiosk
182 27+840Gudivada Veeramasineni
JaganmohanraoPerson Not Available L-9.5 TH 3
SemiPucca com
183 27+850 Gudivada Merugumalla Srinivasarao Bheemarao R-8.8 NTH 4 Katcha Kiosk
184 27+860 Gudivada Rajulapati Srinivasarao Subbarao L-6.75 NTH 5 Katcha com
185 27+875 Gudivada Merugumalla Durgamaheswararao Venkataratnam L-6.75 NTH 4 Katcha com
186 27+880 Gudivada Lingam Venkataratnam Nagabhushanam L-8.85 NTH 3SemiPucca Res
187 27+900 Gudivada Merugamalla Visweswara Rao Nageswarao L-7.5 TH 2 Katcha Res
188 27+900 Gudivada Kaja Jhansi LaxmiMallikarjuna (Late) L-8.5 TH 4
SemiPucca Res
189 28+010 Gudivada Jonnalagadda Tirupathirao Venkataramaiah L-8.5 TH 6 Katcha Res
190 28+010 Gudivada Jonnalagadda ChittammaVenketeswararao R-9.5 TH 1 Katcha Res
191 Bommuluru 31+100 GudivadaGutta jagadesh chandrachowdary Venkata swamy R-7 NTH 4 Katcha
Cattleshed
192 31+100 GudivadaGutta Venuprasad Chowdary Venkata swamy R-7 NTH 4
Semipucca Res
193 31+150 Gudivada Gutta krishana narayana R-5.5 TH 2 Pucca Res
194 31+200 Gudivada Cheboiena UmadeviVenkateswararao R-8 NTH 2 kiosk kiosk
195 31+430 Gudivada Rangula Raju Tadayya R-8.5 NTH 4 kiosk kiosk
196 31+550 Gudivada Penumarthi Srinu nagendrudu L-5.6 NTH 4 Katcha Res
197 31+600 Gudivada Pallakattu veeraragavuluvenkatasubbayya L-5.6 NTH 4 Katcha Com
198 31+600 Gudivada Sonti Dhanalaxmi Late)Harinadh R-8.8 NTH 3 Kiosk Kiosk
199 31+610 Gudivada Chilakabatthina padalalu L-7.3 NTH 3 Kiosk Kiosk
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 41
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
Chinakoteswararao
200 31+620 Gudivada Chilakabatthula nagaraju Sreeramulu L-6.1 NTH 4 Kiosk Kiosk
201 31+620 Gudivada Talaie Satyanarayana Venkateswararo R-7.2 NTH 4 Katcha Res
202 31+620 Gudivada Uyyapatti koteswararo Duravasulu R-9 NTH 6 KatchaCattleshed
203 31+700 Gudivada Madda Sorojini Subhakararao L-8.5 NTH 4 Katcha Res
204 31+710 Gudivada Lankapalli Raju Musalayya L-7.8 NTH 5 Katcha Res
205 31+710 Gudivada Madda Mosayya Bhushanam L-8.1 NTH 2 Katcha Res
206 31+790 Gudivada Saradala Nagaraju Brahmayya L-6.5 NTH 0 Katcha Res
207 31+790 Gudivada Mocherla mamatha Srinu R-4.5 NTH 4 Katcha Res
208 31+790 Gudivada Vara samual Mosa R-5.2 NTH 0 Katcha Res
209 31+790 Gudivada Ganta Israyulu peddiraju L-5.9 TH 2 Katcha Res
210 31+800 Gudivada Akunoori Yesobu Eliya R-5.1 NTH 3 Katcha Res
211 31+800 Gudivada Chebrolu Ramarao Ramayya L-5.7 NTH 2 Katcha Res
212 31+800 Gudivada Sura Apparao Tatabbie L-5.8 NTH 3 Katcha Res
213 31+815 Gudivada Kandavalli Edukondalu Adishesu L-6.6 NTH 5 Katcha Res
214 31+820 Gudivada Usalla Devakanya Krishana L-6.8 NTH 3 Katcha Res
215 31+840 Gudivada Varigani Devamatha Adama L-4.6 NTH 2 Katcha Res
216 31+600 Gudivada Bura Srininvasarao Dasu(samual) L-5.1 NTH 5 Katcha Res
217 Gudiwada-1 37+220 Gudivada Ramanapudi SureshVenkateshswararao l-8 NTH 5 Kiosk Kiosk
218 37+400 Gudivada Painapurla PothurajuAnantharamurthy l-8.5 NTH 4 Katcha Com
219Janardhanapuram 39+400 Gudivada Godavalli Sambasivarao Parasuramayya L-5 NTH 2 Kiosk Kiosk
220 40+800 Gudivada Kandepalli Saritha Kiranreddy L-7.3 NTH 0 Pucca Res
221 40+800 Gudivada Devireddy Radharani Sattemma L-7.2 NTH 0 KatchaRes&Com
222 40+800 GudivadaVangapati Nageswaramma
Ramakridhanareddy R-8.2 NTH 0 Katcha Res
223 40+800 Gudivada Manda Srinu Kasimreddy L-6.6 NTH 4 Semi Com
224 40+810 Gudivada Alla Sundaramma Savireddy R-8.2 NTH 0 Katcha Res
225 40+810 GudivadaKandavalli Ramakrishanareddy Venkareddy L-8 TH 6 Pucca Res
226 40+820 Gudivada Kondapalli Ravi Akiripalli R-7 NTH 4 KatchaCattleshed
227 40+820 Gudivada Pullareddy RangareddyPerson Not Available L-6 TH 0 Pucca res
228 40+840 Gudivada NVS NagireddyRammohnareddy L-6.5 TH 0 Pucca res
229 40+840 Gudivada Konapalli narayanareddy Narayanaereddy L-6.5 TH 2 Pucca res
230 40+880 Gudivada Tammi Narapureddy Marikayalareddy L-9.5 NTH 0 Kiosk Kiosk
231 40+890 GudivadaBommanapalli Venkataswamy Chinna L-8.2 NTH 0 Kiosk Kiosk
232 41+000 Gudivadakokkerapati Subbaramayya krishana L-9.5 NTH 0 Kiosk Kiosk
233 41+080 Gudivada Annem koteswararao iyyanna R-6 NTH 5 Kiosk Kiosk
234 41+080 GudivadaVenkdaru mallikarjunarao Ramarao R-9 TH 5 Semi Com
235 41+080 Gudivada Swarna Vani Ramakrishana L-9 TH 3 Semi Com
236 41+080 Gudivada Gantala krishanaraoPerson Not Available L-9 TH 5 Semi Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 42
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
237 41+080 Gudivada Karamsetty Koteswararao Subbarao L-9 TH 4 Semi Com
238 41+080 Gudivada Karamsetty jagadeesh Subbarao L-9 TH 2 Semi Com
239 41+080 Gudivada Ponnati BabjiPerson Not Available L-9 TH 6 Semi Com
240 41+100 Gudivada Galla Dhanalaxmi Narasimharao L-9 NTH 2 Semi Com
241 41+100 GudivadaPuttalamm Ammavari Shoping complex
Person Not Available R-6.3 NTH 0 Pucca Com
242 41+100 Gudivada Pavisa RammohanaraoVenkatanarayana L-6.9 NTH 2 Kiosk Kiosk
243 41+100 Gudivada Manepalli subbarao Adinarayana R-6 NTH 2 Kiosk Kiosk
244 41+110 Gudivada Muddula Gopalakrishana Ramanjaneyulu R-6.5 NTH 4 Kiosk Kiosk
245 41+125 GudivadaVeruvada NarayanaNagabhusanam
Venkateshawararao L-6 NTH 4 Katcha res
246 41+150 Gudivada Manepalli Subramanyam Adinarayana L-6 NTH 6semiPucca
Res&Com
247 41+150 Gudivada Vempala VenkatalaxmiPerson Not Available L-5 NTH 0 Kiosk Kiosk
248 41+150 Gudivada C.VijayaPerson Not Available R-7 NTH 0 Kiosk Kiosk
249 41+150 Gudivada Vanapalli Adilaxmi Laxmanarao L-6.5 NTH 2 Katcha Res
250 41+150 Gudivada Saripalli Rameshreddy Rangareddy L-5.9 TH 3semiPucca Res
251 41+155 Gudivada S.VenkatasitaramayyaAmba lakshmaiah L-6.8 NTH 0 Kiosk Kiosk
252 41+160 Gudivada Malleboiena pitchayy Narasimha R-8.9 NTH 4 Katcha Res
253 41+170 Gudivada Malliboiena Anjeneyulu Chinaramulu R-7.8 NTH 5 Katcha Res
254 41+170 Gudivada Girijala Rammurthy Apparao R-7.2 NTH 0SemiPucca Com
255 41+200 Gudivada Malliboiena Devakamma Pandu L-7.5 NTH 2 Katcha Res
256 41+200 Gudivada Awalomdhar Ajibabau Hoozoor L-7 NTH 2 Kiosk Kiosk
257 41+210 Gudivada Mekala laxmi kanakapothuraju L-8 NTH 3 Kiosk Kiosk
258 41+220 Gudivada Badam Venkatanarayana Ragavayya L-7 NTH 3 Katcha Com
259 41+230 Gudivada Alugolu Rangachari Ramamurthy L-8 NTH 5semiPucca Com
260 41+240 Gudivada Tallaparthi Ramarao Appalasuri R-7.1 NTH 3 Katcha Res
261 41+240 Gudivada malliboiena Lingayya Chinaramulu R-7.2 NTH 4 Katcha Res
262 41+240 Gudivada Nakka Narasimharao Mahalaxmayya L-6.8 NTH 0 Katcha Res
263 41+245 Gudivada laveti DurgaraoVenkateswararao R-6.5 NTH 2 Katcha Res
264 41+310 Gudivada Suroju Nageswararao Laxmayya L-9 NTH 6semiPucca res
265 41+400 Gudivada Chegandi Kanakamma Krishanamurthy L-7.2 NTH 2 Katcha Res
266 41+400 Gudivada Pilli Srinivasaarao Subbarao L-7 NTH 4 KatchaCattleshed
267 41+400 GudivadaDevarapalli Satyanarayana Nomulu L-6.1 NTH 3 Katcha Res
268 41+450 Gudivada Vanam Venkateseararao Durgamma R-6.8 NTH 3 Katcha Res
269 41+460 Gudivada Katari Kotayya Anjeneyulu R-6.1 NTH 4 Katcha Res
270 41+500 Gudivada pattumuri Satyanarayana Krishana L-7.2 NTH 4 Kiosk Kiosk
271 41+500 Gudivada Gurram Nagaraju Sriramulu R-7.8 NTH 2 Katcha Res
272 41+515 Gudivada Nanganama bujjibabu Chitayya R-8.3 TH 4 Katcha Res
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 43
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
273 41+515 Gudivada Ekba Peddirajulu Ramayya L-6.4 NTH 0 Katcha Res
274 41+550 Gudivada Nagaram Laxmana Krishanamurthy R-7.5 NTH 0 Katcha Res
275 41+550 Gudivada Kadekollu Nagaraju Nallayya L-5.6 TH 4 Katcha Res
276 41+550 Gudivada Jalasuthram Rangamma Baskararao L-6.2 NTH 2 Katcha Res
277 41+550 Gudivada Gurram Srinu Ambaru R-7.5 NTH 3 Katcha Res
278 41+550 GudivadaKadavakollu tungabadrayya Nallayya R-7.3 NTH 7 Katcha Res
279 41+565 Gudivada Nakka Puttalamma Late) Bodayya L-6.4 TH 4 Katcha Res
280 41+600 Gudivada Kotaru Nagaraju Sitayya L-6.8 NTH 0 Katcha Res
281 41+600 Gudivada Nakka Venkateswararao Gopalam R-7.5 NTH 2 Katcha Res
282 41+600 Gudivada Ebba Srinivasu Ramayya R-7.2 NTH 4 Katcha Res
283 41+600 Gudivada Kataru Adinarayana Anjeneyulu R-7.4 NTH10 Katcha Res
284 41+620 Gudivada Katari Suramma Srinu R-7.8 NTH 4 Katcha Res
285 41+620 Gudivada Kataru Demuduvenkanna Badraju R-7.5 NTH 6 Katcha Res
286 41+555 Gudivada Incha Narashima Rao Ramaiah R-7.5 TH 0 Katcha Res
287 41+650 Gudivada NarapareddyPerson Not Available R-8 NTH 3 Katcha
Cattleshed
288 41+650 Gudivada RajaraoPerson Not Available R-8 NTH 4 Katcha
Cattleshed
289 41+770 GudivadaNagalam Venkateswararao Krishanamurthy R-6.2 NTH 5 Katcha Res
290 41+770 Gudivada Kagga Padma Srinu R-6.8 NTH 4 Katcha Res
291 41+770 GudivadaNangalam Venkatarammayya Krishanamurthy R-6.8 NTH 3 Katcha Res
292 Puttagunta 45+200 Gudivada Ranchari Laxmi Nageswararao L-6.6 NTH 0 Katcha Res
293 45+600 Gudivada Vinjavarapu Appalachari Bhrahmam R-5.5 TH 2 Pucca res
294 45+630 Gudivada Pamulapati RamireddyPerson Not Available R-5.8 TH 2 Pucca Res
295 45+650 Gudivada Valiveti Purna Subbarao R-6.5 NTH 0Semipucca Res
296 45+650 Gudivada Vankayalapati MuraliPerson Not Available R-7 TH 0 Pucca res
297 45+650 Gudivada Ravulapati Mangireddy Tatireddy L-7.2 NTH 0 Katcha Res
298 45+700 GudivadaBarapureddy Satyanarayana Dalayya L-6.8 NTH 0 Katcha Res
299 45+720 Gudivada Sammangi Ramarao Appalaswamy R-6 NTH 0Semipucca Com
300 45+800 Gudivada Valiveti Satyanarayana Jayaharinadh L-6.2 TH 2 KatchaRes&Com
301 45+800 Gudivada Oleti Satyavathi Apparao R-7 NTH 0Semipucca Com
302 45+800 Gudivada maddala VenkateswararoPerson Not Available L-8 NTH 0 Kiosk Kiosk
303 45+800 Gudivada Pokuri Balakrishanarao Perisetty L-7.5 NTH 2Semipucca Com
304 45+800 Gudivada Visnepalli Sitaravamma Yesudas R-8 NTH 0 Kiosk Kiosk
305 45+810 Gudivada Valiveti Seshagirirao Jayaharinadh L-6.9 TH 5 KatchaRes&Com
306 45+820 Gudivada Pakuri Laxmanarao Perisetty L-8 NTH 3 Pucca Res
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 44
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
307 46+180 Gudivada SarasammaPerson Not Available R-8 NTH 0 Katcha Res
308 46+200 Gudivada Juturi Durgarao Srinivasarao R-9 NTH 4 Katcha res
309 46+220 Gudivada Rajasani mutyalu Sancharao R-9 NTH 2 Katcha res
310 46+240 Gudivada Ramakuri Ragavulu parasaram R-8 NTH 2 Katcha res
311 46+400 Gudivada Kollu Someswararao Mallikarjunarao L-6.7 NTH 0 Katcha Res
312 46+400 Gudivada Mukkala Yesuamma Yesu R-7 NTH 1 Katcha res
313Shivayyapakalu 48+700 Gudivada Suvari Narasimhamurthy Ramachandrarao R-6.2 NTH 0
SemiPucca Com
314Shivayyapakalu 48+700 Gudivada Thota Chinayya Ramachandrarao R-6.7 NTH 0 Kiosk Kiosk
Nuzvid Division Project Affected Famalies(PAF'S) of PEDNA - NUZVID -VISANNAPETA Road.
Sl.N
o
Name of the Village
Cha
nage
Division
Name of the HouseHold Head(HHH)
Father\husband name
Loc
atio
n (L
eft\
Rig
ht)
Titl
e ho
lder
(TH
)/Non
Titl
eHol
d
No
of F
amily
Mem
bers
Type of Structure
Nature of Structure
1Arugolanu 50+500
NuzvidThota Venkataramana Anjayya(Late) R-7.2 NT
H 6 KatchaRes &Com
2 50+520
Nuzvidkoturi Srinivasarao Kanakarao` L-8.8 NT
H 5 KatchaRes &Com
3 50+600 Nuzvid Reddysobhana chalapathirao Atchiyya L-7.8NTH 2 Kiosk Kiosk
4 50+610 Nuzvid Betha Rangamma Rangarao R-8.2NTH 1 Katcha Com
5 50+630 Nuzvid Kunuku Sivashankararao Mohanarao L-8.5NTH 4 Katcha Com
6 50+650 Nuzvid Chukkapu Nageswararo Atchiyya L-5.8NTH 4 Katcha Com
7 50+700 Nuzvid Veeram SamrajayyamVenkateswararao(late) L-8.6
NTH 1
Semipucca Res
8 50+720 Nuzvid Chekati Chnnabbie Late)Chettemma R-8.5NTH 1
Semipacca Res
9 50+740 Nuzvid V.Kesavarao Varalaxmi R-6.2NTH 3 Kiosk Kiosk
10 50+740 Nuzvid Dogga Chinabbaie Rangayya(Late) R-8.6 TH 7Semipucca Res &Com
11 50+750 Nuzvid Chekka Chandrayya Bapujirao R-8 TH Pucca Res
12 50+760 Nuzvid Nadendla ChandramVenkataratnam(late) R-7.5 TH 4
Semipucca Res &Com
13 50+780 Nuzvid Veeram NageswararoVenkateswararao(late) L6.2
NTH 5 Katcha Com
14 50+790 Nuzvid Gottapu Sivanagamani Apparao R-6.5NTH Katcha Com
15 50+810 Nuzvid Balagam Satyanarayana Papa R-7.2NTH 2 Katcha Com
16 50+810 Nuzvid Nalla Sivanagaraju krishana` R-9NTH 6 Katcha Res &Com
17 50+820 Nuzvid Kunuku Sivashankararao Mohanarao L-7.8NTH 4
Semipucca Com
18 50+820 Nuzvid Dokala Apparao Appalaswamy L-8.3NTH 2 Katcha Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 45
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
19 50+820 Nuzvid Gottapu Simhachalam Paprao R-7.5NTH 2
Semipacca Res & Com
20 50+830 Nuzvid Punuku Sitamahalaxmi koteswararao L-8.5NTH 7
Semipucca Res &Com
21 50+840 Nuzvid Belagam Srinivasarao Sitaramayya L-8.5NTH 3 Katcha Res
22 50+850 Nuzvid Terli Venkateswararao Pentayya(late) L-8.5NTH 6 Katcha Com
23 50+850 Nuzvid Gottapu Kormaiah Paprao R-7.3NTH Katcha Com
24 50+900 Nuzvid Cheera Anilkumar swamy Shankararao R-7.3NTH Katcha Res & Com
25 50+900 Nuzvid Arisimilli Prasad Venkateswarao R-8NTH Katcha Com
26 51+000 Nuzvid Sk Kareemulla Murella(late) L-8NTH 9
Semipucca Com
27 51+000 Nuzvid Pasupuleti Subbarao Nagayya L-8 TH 2Semipucca Com
28 51+010 Nuzvid Shaik Bharani meerasaheb L-8NTH Katcha Res &Com
29 51+050 Nuzvid Poteneni lalithakumari Sambasivarao R-7 TH 2Semipucca Res
30 51+110 Nuzvid Devarakonda Subbarao Pitchayya L-9NTH 1
Semipacca Com
31 51+120 Nuzvid Teku nagaraju Dharmarao L-8NTH 4
Semipucca Res
32 51+150 Nuzvid Vadavalli Sivabully challyya Manikyarao L-6.5NTH Kiosk Kiosk
33 51+150 Nuzvid Pamarthi Sudharani Sivaramaprasad(late) L-7.8
NTH 3
Semipucca Res
34 51+180 Nuzvid Naraharasetty Somayya Laxmeswari(late) L-7.2NTH 1
Semipacca Res
35 51+180 Nuzvid katuri Venkatarao H/0 babysorojini L-8.8NTH 2
Semipacca Res & Com
36 51+180 Nuzvid Katuri Sivanageswararao Venkateswararao L-9NTH
Semipucca Res & Com
37 51+180 Nuzvid Visaie Parvathi Durgarao(Late) L-8NTH 3
Semipacca Res & Com
38 51+180 Nuzvid Geddala Sugunarao Subbarao L-9NTH Katcha Res
39 51+200 Nuzvid Padurthi Venkatasubbayya Chenyyasetti R-8.3NTH Katcha Res
40 51+200 Nuzvid Padurthi Chenyyasetti Satyanarayana R-8.3NTH Katcha Res
41 51+200 Nuzvid Pedarthi Venkateswararao chanchayya R-8.3NTH 1 Katcha Res & Com
42 51+200 Nuzvid Chippada Papayamma R-8.2NTH 1
Semipacca Res & Com
43 51+250 Nuzvid Singanapalli Venkateswararao Applaswamy(late) R-7 TH 7 Katcha Res
44 51+250 Nuzvid Poteneni Sivaramaprasad Nagabhusan R8.3 TH 2Semipucca Res &com
45 51+370 Nuzvid Mulipudi Venkateswararao Sesayya L-8.5NTH 4 Katcha Com
46 51+400 Nuzvid Batula venkateswararao 6.8NTH 2 Katcha Res
47 51+400 Nuzvid Mulupudi Butciyyachowdari Ramayya(late) R-7.8NTH Katcha Com
48 53+650 Nuzvid Varri Chakravarthi Rajarao R-8NTH 4 Katcha Res&Com
49 53+650 Nuzvid Varri Chakravarthi Rajarao R-8NTH 5 Katcha Cattele shed
50 Kanumolu 55+410 Nuzvid Ramalle Chinna DaVid R-5NTH 2 Katcha Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 46
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
51 55+420 Nuzvid Bethapudi Pramila Villasambabu R-4.5NTH 2 Katcha Com
52 55+420 Nuzvid Katumalla Kishorebabu Bisuff R-5.3NTH 4 Katcha Res
53 55+430 Nuzvid Dodda Koteswrarao Ratnam L-6NTH 6 Katcha Cattleshed
54 55+640 Nuzvid Shaik Mohhidin Meerasaheb R-8.5NTH 2 Katcha Res & Com
55 55+645 Nuzvid Chintapalli Prasannakumari Prabhakar(late) R-8NTH 3 Kiosk Kiosk
56 55+650 Nuzvid Darmavarapu Sambhasivarao Ramudu L-8NTH 2 Katcha Res
57 55+655 Nuzvid Nerella sarveswarao Narayana R-7NTH
Semipucca Res
58 55+670 Nuzvid Chinnam Siyyaon Somayya R-7NTH 1 Kiosk Kiosk
59 55+670 Nuzvid Turak Esobu Karunavaraprasad L-8.3NTH 5
Semipucca Res
60 55+670 Nuzvid Kandhula Kesavarao Venkateswararao R-8.6 TH 3Semipucca Res
61 55+680 NuzvidKandula veeravenkatanagaprasad
Chinavenkateswarao L-6.2 TH 3 Pucca Res
62 55+700 Nuzvid Gopalarao OLD BUILDING L-6.2NTH
Semipucca Res
63 55+740 Nuzvid kattumala Adrutstarao Imannual R-5.5NTH 1 Kiosk Kiosk
64 55+780 Nuzvid Narikimalli Seshachalam Suryanarayana L-5.5NTH 4 Katcha Res
65 55+780 Nuzvid Karamsetti sikshamani Denoji R-8.8 TH 1 Katcha Res
66 55+790 Nuzvid Polimetta vijayaratna kumari Chinni(late) R-8.5NTH 2 Pucca Res
67 55+795 Nuzvid Kurupati parisuddam Gonnaprakash R-6.2NTH 2
Semipucca Res
68 55+800 Nuzvid Bejwada Nageswararao Hanumantharao L-6.3NTH 1
Semipucca Com
69 55+800 Nuzvid Matta Narayanarao Venkataswamy L-6.3NTH
Semipucca Com
70 55+810 Nuzvid Chamarthi SubbarajammaVekateswararao(late) L-7.3
NTH 4
Semipucca Res
71 55+810 Nuzvid Pilli Edukondalu Srinivasarao L-7.3NTH
Semipucca Com
72 55+820 NuzvidChalamarasetty Suryaprakasarao Ramayya L-6
NTH 3 Pucca Res
73 55+820 NuzvidChamarthi venkatanarasimharao Viswanadham R-6.2
NTH 2 Pucca Res&Com
74 55+820 Nuzvid Chamarthi Venkateswarao Viswanadham R-5.5NTH 2 Pucca Res
75 55+830 Nuzvid Chamarthi Anjeneyulu venkatappayya R-6.2NTH 7 Pucca Res
76 55+860 Nuzvid Allamuri Murali Krishana Prasadarao L-6.2NTH 4 Pucca Res&Com
77 55+870 Nuzvid Chamarthi Venketeswararao Rammohanarao R-5NTH Pucca Res&Com
78 55+870 Nuzvid Chamarthi Anjeneyulu Venkatappayya R-5NTH 7 Katcha Res
79 55+870 Nuzvid Mareedu Subbarao Chalapathirao(late) L-8NTH 2
Semipucca Res&Com
80 55+880 Nuzvid Majjiga Nagraju Keratalu L-8NTH 3
Semipucca Com
81 55+890 Nuzvid Garikipati Umamaheswarao Venkateswararao L-5.2NTH 2 Pucca Com
82 55+900 Nuzvid Vanamala Eswararao Nageswararao R-6.5NTH 4
Semipucca Res&Com
83 55+930 Nuzvid Vemulapalli SubramanyamSrivenkataramalingacharya R-5.7
NTH
Semipucca Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 47
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
84 55+930 Nuzvid Morla Venkateswramma Vasantharao R-5.5NTH 1
Semipucca Res&Com
85 55+930 Nuzvid polasi Pothuraju Abimanyarao R-5.5NTH 4 Pucca Res&Com
86 55+940 Nuzvid Maredu Rambabu Sobhanachalam R-5.7NTH 4
Semipucca Res&Com
87 55+940 Nuzvid Suri Satyanarayana Venkoji L-6NTH 4
Semipucca Com
88 55+950 Nuzvid Tavva Badrinadh Krishana murthy L-7.3NTH 3 Pucca Com
89 55+950 Dondi Durgarao L-7 TH 3 Pucca Com
90 55+960 Nuzvid Bhemavarapu Rangarao mangayya R-5NTH 3 Pucca Res&Com
91 55+960 NuzvidChintala Ravivenkatasatyanarayana
Satyavenkataramarao R-5.7
NTH 4 Pucca Res&Com
92 55+960 Nuzvid China Srinivasarao Ramarao R-5.7 TH 4 Pucca Com
93 55+980 Nuzvid Reddi Chinalaxmayya Chittemma L-5.7 TH 2 Pucca Res
94 55+980 Nuzvid Chinta MuralikrishanaSatyavenkataramarao R-5.5
NTH Pucca Com
95 56+980 Nuzvid Panchakarla Satyanarayana Venkataramana R-8NTH 4 Kiosk Kiosk
96 56+980 NuzvidLingamallu veravenkata jaganmohanarao Venkataratnam L-5.5
NTH 3 Pucca Res
97 56+980 Nuzvid Vijayakumar Bhyragi R-4.2NTH Kiosk Kiosk
98 56+000 Chinta Apparao Swamulu L-5.5NTH 5
Semipucca Res
99 56+000 Nuzvid N.V.Ramanarao ChinaSurayya R-4 TH 4Semipucca Res
100 56+000 Nuzvid Nanduri Venkatamma
Krishana murthy(late) R-5 TH
Semipucca Res
101 56+000 Nuzvid Volusuri Venugopal L-4.2 TH 5 Pucca Res&Com102 56+000 Nuzvid Anisetty Timmaraju Boogeswararao L-5
NTH 4 Pucca Res
103 56+050 Nuzvid Gandimeda Venkatasivarao kottayya(late) R-8
NTH 3 Pucca Res&Com
104 56+050 Nuzvid Rellu Subbarao Ngeswrarao R-6.2 TH 7 Pucca Com105 56+060 Nuzvid Rellu nageswararao Bhemayya R-9 TH 7 Pucca Res&Com106 56+070 Nuzvid Vaddi Venkateswararo Sobhanachalam L-8
NTH 3 Katcha Com
107 56+070 Nuzvid Pulla Nageswarrao R-9 TH Pucca Res
108 56+070 Vanukuri Edukondalu Satyanarayana(late) L-10
NTH Kiosk Kiosk
109 56+200 Nuzvid Bandili Satyanarayana singh Subbisingh L-6
NTH
Semipucca Res&Com
110 56+210 Nuzvid Bayya Ratnagandi Ranganayakulu R-8 TH 6 Pucca Res111 56+210 Nuzvid Bayya Ramamohanarao Ranganayakulu R-8 TH 4 Pucca Res112 56+210 Nuzvid Sunkara Laxmanarao Surayya L-5.5 TH 2 Pucca Res113 56+300 Nuzvid Moganti Chandra sekhar krishanarao R-6
NTH
Semipucca Res
114 56+320 Nuzvid Chamarthi Anjeneyulu laxminarayana R-8 TH 5 Pucca Res&Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 48
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
115 56+340 Nuzvid Chamarthi Sambasivarao Venkatakrishanarao R-9 TH 5 Pucca Res
116 56+340 Nuzvid Chamathi mallikarjunarao Venkatakrishanarao R-9 TH
Semipucca Res&Com
117 56+340 Nuzvid
Chintapalli Umameheaswararao
Venkatakanadurgarao L-7.5
NTH 4 Katcha Com
118 56+350 Nuzvid Naraharasetty Venkateswraro Venkataratnam R-7 TH 2
Semipucca Res&Com
119 56+350 Nuzvid Naraharasetty Gangadhar Venkataratnam R-7 TH 4
Semipucca Res
120 56+350 Nuzvid
Naraharasetty Venkatasatya Gangadhar Venkataratnam R-7 TH 4
Semipucca Res&Com
121 56+360 Nuzvid Sunkara Laxmanarao Surayya L-5.5
NTH 2 Katcha Com
122 56+370 Nuzvid
MD.Salem,Jafarali,Halem Bro's (Reg.off) R-7.5
NTH
Semipucca Com
123 56+390 Nuzvid Naraharasetty Prabhavathi Venkataratnam R-7 TH 2
Semipucca Res
124 56+390 Nuzvid Naraharasetty Gangadhar Venkataratnam R-9 TH 4
Semipucca Com
125 56+450 Nuzvid Badicherla Narasimharao Koteswararo R-7.5
NTH 6 Katcha Res
126 56+450 Nuzvid Badicherla Narasimharao Koteswararo R-7.5
NTH 6 Katcha Cattleshed
127 56+460 Nuzvid Chintapalli Durgarao Venkateswarao R-9
NTH 3
Semipucca Res
128 Perikeedu 56+950 Nuzvid Annala Bujji D/0.Krishana L-8.8 TH 2
Semipucca Res
129 56+975 Nuzvid Venkatakonda Gandhi Koteswararo L-6.8 TH 3
Semipucca Res
130 56+980 Nuzvid Kamella Satyanarayana Ragavayya L-7.8 TH 7
Semipucca Res
131 57+300 Nuzvid Singireddy Narakumari Chennakesavarao L-7
NTH 4
Semipucca Res&Com
132 57+300 Nuzvid Vegireddy Apparao Applaswamy R-8.7
NTH 7 Pucca Res
133 57+300 Nuzvid Vegireddy Gandhi Applaswamy R-8.7
NTH 8 Pucca Res
134 57+300 Nuzvid Vegireddy Suryanarayana Applaswamy R-8.7
NTH 9 Pucca Res
135 57+300 Nuzvid Vegireddy Paparao Applaswamy R-8.7
NTH 10 Pucca Res
136 57+300 Nuzvid Vegireddy Apparao Applaswamy R-8.7
NTH 7
Semipucca Com
137 57+300 Nuzvid Vegireddy Paparao Applaswamy R-8.7
NTH 10
Semipucca Com
138 57+310 Nuzvid Sammangi Sateshkumar Nageswararao L-7 TH 4
Semipucca Res
139 57+310 Nuzvid
Sammangi Mohanasuresh kumar Nageswararao L-7 TH 4
Semipucca Res
140 57+320 Nuzvid Gottapu Koteswararao Paparao L-7
NTH 3
Semipucca Res&Com
141 57+320 Nuzvid Bandaru Swetha satyanarayana Krishanarao L-7
NTH 5 Katcha Res
142 57+350 Nuzvid Maradani Sivanagaraju Tatayya L-7
NTH 3 Katcha Res
143 57+350 Nuzvid Vankuri Hunumantharao Verayya L-7
NTH Kiosk Kiosk
144 57+360 Nuzvid
Rajamahendravarapu satyaswathi Venkateswararaju L-7
NTH Katcha Res
145 57+360 Nuzvid Allu Trimurtulu Narayanarao L-6.5
NTH 4
Semipucca Res&Com
146 57+360 Nuzvid Terli Puspalatha Venkateswarao R-8.5
NTH 5 Katcha Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 49
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
147 57+365 Nuzvid Suggisetty tulasi Subbarao R-8.5
NTH 5
Semipucca Com
148 57+560 Nuzvid Tavva Suryaprakasarao Purnayya L-7.2
NTH 6 Katcha Cattleshed
149 57+650 Nuzvid Lanka Gopalarao Appalarao L-6.5
NTH Katcha Com
150 57+650 Nuzvid Kella Apparao Satyanarayana R-7.5
NTH 6 Katcha Com
151 57+650 Nuzvid Pabolu SS varaprasad Nageswararao L-6.5
NTH 4
Semipucca Com
152 57+650 Nuzvid Singarapu Durgarao Simhachalam R-7.5
NTH Kiosk Kiosk
153 57+650 Nuzvid Bayya Mohanarao Pitchiyya(late) L-7
NTH 7 Pucca Res
154 57+700 Nuzvid Jalidi Balakrishana Raeddiyya R-6.5 TH
Semipucca Res
155 57+700 Nuzvid Botcha.Krishanarao Venkayya R-7
NTH 4
Semipucca Com
156 57+720 Nuzvid Chintapenta krishanarao Seshagirirao R-8
NTH 3
Semipucca Com
157 57+720 Nuzvid Valiveti Anil(Naveen) R-8.5
NTH
Semipucca Res
158 58+150 Nuzvid Akkubolu Koteswararao krishanamurthy R-7.5
NTH 2
Semipucca Com
159 58+400 Nuzvid Nagulapalli Edukondalu Nageswararao R-7
NTH 13 Katcha Com
160 58+500 Nuzvid Maddila Ganga Venkateswarao R-7
NTH 4 Katcha Com
161 58+550 Nuzvid Battu Manikyalarao Baskararao R-7
NTH 3
Semipucca Com
162 58+650 Nuzvid Partipati Agnesamma Prabakar L-7
NTH 9
Semipucca Com
163 58+660 Nuzvid Partipati Nageswararo manikayam R-8
NTH 3 Katcha Res
164 58+670 Nuzvid Gujjala veraswamy(israyulu) Ramaswamy L-7
NTH 3 Katcha Res
165 58+750 Nuzvid Partipati Vijaykumar Balaswamy R-6.5
NTH 8 Katcha Com
166 58+880 Nuzvid Padmala Venkateswararo Venkatanarasayya L-7
NTH 5 Katcha Res
167 58+880 Nuzvid Padmala Venkateswararo Venkatanarasayya L7
NTH 6 Katcha Cattleshed
168
Marribandam 64+300 Nuzvid Pidugu Prasad Anjeneyulu R-7
NTH 4 Katcha Com
169 64+500 Nuzvid Nadakudur Muttaiah Subbarao L-7
NTH 3 Katcha Com
170 64+500 Nuzvid Nadakudur Chinabrahmam Subbarao R-9
NTH 6 Katcha Com
171 64+530 Nuzvid Peddoji Rangachari Nagachari L-8
NTH 4 Katcha Com
172 64+500 Nuzvid Shaik Babji Mabu L-6.7
NTH 10 Katcha Com
173 64+600 Nuzvid Kowkuri Soroja rimannarayana R-9
NTH 3
Semipucca Com
174 64+680 Nuzvid Chandrakala
Person Not Available R-9
NTH 0
Semipucca Res
175 64+680 Nuzvid Sk Baji
Person Not Available L-8
NTH 0
Semipucca Com
176 64+700 Nuzvid Rayavarapu Swami Rangarao L-6.4
NTH 4 Kiosk Kiosk
177 64+720 Nuzvid Aladangi Ugadi Chinnarao L-6
NTH 4 Kiosk kiosk
178 64+745 Nuzvid Vaddadi Trinadh Appalaswamy L-7
NTH 0 Kiosk kiosk
179 64+780 Nuzvid Rayavarapu Subbarao
Person Not Available L-7
NTH 4 Katcha Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 50
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
180 64+800 Nuzvid Vajja Someswararo Subbarao R-8.2
NTH 8 Katcha Com
181 64+800 Nuzvid Chirugudu Nagaraju Appalaswamy L-6.5
NTH 4 Katcha Com
182 64+810 Nuzvid Ponikanti Ramarao Ragavayya R-8
NTH 3 Katcha Com
183 64+810 Nuzvid Machavarapu Tirupatayya Ramdhar L-6
NTH 2 Kiosk kiosk
184 65+100 Nuzvid Podhuri Srinu Rattayya R-7
NTH 3 Katcha cattleshed
185 65+550 Nuzvid Kanikanti Prasad Nagabhusan R-8
NTH 4 Katcha Com
186 65+800 Nuzvid Potakamuri Rajababu Gandhi L-7
NTH Katcha Com
187 65+850 Nuzvid Vadduluri Venkateswararo Raghavalu L-8.1
NTH 6 Kiosk Kiosk
188 65+850 Nuzvid Vemuluri Nageswaramma Satyanarayana L-8.1
NTH 4 Katcha Res & Com
189 65+850 Nuzvid Jakkula Laxmi Venkataramana L-8.1
NTH 2
Kiosk(2shops Kiosk
190 65+850 Nuzvid Chabathina Ratnasamual Samual R-8
NTH Kiosk kiosk
191 65+850 Nuzvid Peddaji Ragavachari
Person Not Available R-9
NTH
Semipucca Com
192 65+850 Nuzvid Palakurthi Ammulu Putalayya R-9
NTH 2 Katcha Res
193 65+890 Nuzvid Chinathadu Bhupathi Varahalu L-8
NTH 8 Katcha Res & Com
194 65+900 Nuzvid Kombati Satyanarayana Gopalam R-6.8
NTH Katcha Com
195
Meerjapuram 67+450 Nuzvid Kota Simhachalam Krishana R-7
NTH 3 Katcha Res
196 67+460 Nuzvid Vallepu Parameswararao Raju R-7.1
NTH 6 Katcha Res
197 67+490 Nuzvid Merapadu Baskhararao Maranna L-6
NTH 3 Katcha Com
198 67+500 Nuzvid Olipi Venkateswarrao Verayya R-6.4
NTH 3 Katcha Res
199 67+500 Nuzvid Tegala Chittemma Verayya R-6
NTH 3 Katcha res
200 67+510 Nuzvid Garika Bhagyam Sambayya R-6
NTH 2 Katcha Res
201 67+520 Nuzvid Busi Adam Prabhakararao R-6
NTH 2 Katcha Res
202 67+540 Nuzvid Mindiya Venkateswararao Maddiramayya R-6
NTH 5 Katcha Res
203 67+550 Nuzvid Tegala Guruvulu Veerayya R-5.4
NTH 6 Katcha Res
204 67+550 Nuzvid Dasari Yesu Baalaraju R-5.4
NTH 4 Katcha Res
205 67+560 Nuzvid Gandikota Anjeneyulu Venkateswararao R-6.5
NTH 3 Katcha Res
206 67+570 Nuzvid Paramanthi Prabhakararao Sriramamurthy L-8
NTH 4 Katcha Res
207 67+620 Nuzvid Badipati Isak
Person Not Available L-6.2
NTH 5 Katcha Res & Com
208 67+620 Nuzvid Mareedu Nancharamma Nageswararao R-8
NTH 1 Katcha Res & Com
209 67+660 Nuzvid Rajulapati Nageswararo Venkateswararao L-6.9
NTH 10 Katcha Res
210 67+700 Nuzvid Vaka Baskararao Venkateswararao L-8
NTH 4
Semipucca Com
211 67+740 Nuzvid Kothala Apparao
Person Not Available L-8
NTH 1 Katcha Res
21 67+785 Nuzvid Moduri Ranganadham Laxminarasimha L-7.2 NT 4 Semipucc Res & Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 51
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
2 H a213 67+790 Nuzvid Tegala Chantibabu Ramulu L-7
NTH 2 Katcha Res
214 67+800 Nuzvid Tegala Tirupathirao Ramulu L-7
NTH 6 Katcha Res
215 67+801 Nuzvid Tegala Tirupathirao Ramulu L-7
NTH 7 Katcha Cattleshed
216 68+480 Nuzvid Mathina Subbarao Veerayya L-7
NTH 2 Katcha Com
217 68+580 Nuzvid Seelam Sekhar Raghavayya l-8
NTH
Semipucca Com
218 68+800 Nuzvid Selam Satyanarayana Seshagirirao R-6
NTH 4
Semipucca Com
219 68+850 Nuzvid Pamidikondala Radhakrishana Ramachandrarao L-5
NTH 2 Katcha Res & Com
220 68+850 Nuzvid Gollapu Satyanarayanamma Venkateswarulu R-9
NTH 3 Katcha Com
221 68+900 Nuzvid Varagala Prasad Subbarao R-9
NTH 2 Katcha Com
222 68+905 Nuzvid Varala Nancharamma Sobhanadri R-8
NTH 2 Katcha Com
223 68+910 Nuzvid Sk Hamid Abbulnabi R-7
NTH 2 Katcha Com
224 68+910 Nuzvid Sedirala Koteswararao Venkatasubbarao L-8
NTH kiosk Kiosk
225 68+910 Nuzvid SK Kadarvali Mastansaheb l-8
NTH Katcha Com
226 68+920 Nuzvid Sk Mastan Parisaheb L-6
NTH 2 Katcha Com
227 68+940 Nuzvid Goduguri Sivaprasad Muralikrishana R-9
NTH Katcha Com
228 68+940 Nuzvid Sutrala Rangarao Subbarao R-7.3
NTH kiosk Kiosk
229 68+940 Nuzvid Maragani Nehrukanth Ayanna R-9
NTH 5 kiosk Kiosk
230 68+940 Nuzvid Maragani Nehrukanth Ayanna R-9
NTH 6 Katcha Res & Com
231 68+960 Nuzvid Sk.Mastanvali Nagusaheb L-9
NTH
Semipucca Com
232 68+960 Nuzvid Sk.Anwar Hussain L-9
NTH Katcha Com
233 68+960 Nuzvid Sk.Kalishavali
Person Not Available L-9
NTH Katcha Res & Com
234 68+960 Nuzvid Maddirala NagaSriragavarao Venu L-9
NTH kiosk Kiosk
235 68+960 Nuzvid Sk.Meera Sherlu L-9
NTH
Semipucca Com
236 68+960 Nuzvid Jogi Venkateswarao Gurumurthy L-9
NTH
Semipucca Com
237 68+990 Nuzvid Naidu Srininvasarao Venkateswararao R-7.8
NTH 4 Katcha Res
238 68+995 Nuzvid Durga
Person Not Available R-7
NTH Katcha Res
239 69+000 Nuzvid Maridu Rangamma Raghavulu L-8.8
NTH Katcha Com
240 69+000 Nuzvid Tellaboiena Srinivasarao Pedavenkanna L-8.8
NTH 5 Katcha Res & Com
241 69+030 Nuzvid Yarramsetty Loknadh Tirupatiayya L-8.5
NTH kiosk Kiosk
242 Gollapalli 72+000 Nuzvid Irrala Baskararao Pottiyya R-8
NTH 5 Katcha Res
243 72+000 Nuzvid Pakandi Dhanalaxmi Laxmayya R-8
NTH 7 Katcha Res
244 72+050 Nuzvid Pamarthi Venkamma Laxmayya R-8
NTH 2 Katcha Res
24 72+050 Nuzvid Battula Srinivasarao Sriramulu R-8 NT 5 Katcha Res
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 52
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
5 H246 72+050 Nuzvid Venula Durgaprasad kameswarao R-7
NTH 3 Katcha Res
247 72+070 Nuzvid Pamarthi Kriskanakumari Radhakrishana L-7
NTH 1 Katcha Res & com
248 Nuzvid Chodagani Laxmi Nani L-9
NTH katcha Com
249 72+100 Nuzvid Penumada Kalebu Venkataratnam L-9
NTH 3 kiosk Kiosk
250 72+100 Nuzvid Reddi Gopalarao Sriramulu R-8
NTH 3 Katcha Res
251 72+100 Nuzvid Attili Brahmam
Person Not Available R-6
NTH Katcha Com
252 72+100 Nuzvid Tata Pullarao Srirangam R-7
NTH 4 Katcha Res
253 72+140 Nuzvid Boodu Nagaraju Ayodhayaramayya R-8
NTH 4 Katcha Res
254 72+160 Nuzvid Vinnakota Veeraragavamma BalaramSwamy L-9
NTH 1
Semipucca Com
255 72+180 Nuzvid Tummala Ramakrishana Adinarayana R-8
NTH 4 Katcha Res
256 72+180 Nuzvid Koduru Nageswararao Subbarao L-7
NTH 2 kiosk Kiosk
257 72+200 Nuzvid Owner not Available
Person Not Available
NTH kiosk Kiosk
258 72+210 Nuzvid Parusuri Vijayalaxmi
Person Not Available R-8
NTH 1 Katcha Res
259 72+210 Nuzvid Konda vaddikasulu Anjeneyulu R-7
NTH 4 Katcha Res
260 72+220 Nuzvid Nandigama Ammaji Bhaskarrao R-8
NTH 3 Katcha Res
261 72+220 Nuzvid Tata Rangarao
Person Not Available R-6.1
NTH 2 Katcha Res
262 72+220 Nuzvid Gollapalli Pothuraju Suryanarayana L-8
NTH 2 Katcha Res
263 72+220 Nuzvid Tata Nageswararamma Venkateswararao L-8
NTH 1 Katcha Res
264 72+230 Nuzvid Katta `Sakuntala Somulu R-8
NTH 2 katcha Res
265 72+265 Nuzvid Shaik Meerjavali Kaream R-6
NTH 4 Kiosk Kiosk
266 72+380 Nuzvid Pamarthi Koteswararao Anjeneyulu L-8
NTH 0
Semipucca Res
267 72+380 Nuzvid Pamarthi Srinivasarao Krinayya L-8
NTH 0 Katcha Res
268 72+400 Nuzvid Shaik Dilshadbagem Munnabasha R-5.4
NTH 3 Katcha Com
269 72+405 Nuzvid Valiveti Satyanarayana Venkatakrishana R-5.6 TH 2
Semipucca Res
270 72+405 Nuzvid Shaik Babu Abdhul L-5.7
NTH 6
Semipucca Res & Com
271 72+410 Nuzvid Seeram Shivashankaraaro Rosayya R-7.3
NTH 3
Semipucca Res & Com
272 72+410 Nuzvid Mylavarapu Tirapatirao Raghunadam L-6.8
NTH 0 kiosk Kiosk
273 72+480 Nuzvid Bonala VijayaRangarao Gopayya R-9
NTH 4
Semipucca Res
274 72+500 Nuzvid Namala Jayaolaiah Rangarao R-6
NTH 0 Katcha Res
275 72+530 Nuzvid Shaik Choti Mahaboob R-6.8
NTH 4 Katcha Res
276 72+565 Nuzvid Talam Sriramulu Ramayya L-5.9
NTH 3 Katcha Res
27 72+565 Nuzvid Taluri Prubudas Yesudas L-6 NT 6 katcha Res
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 53
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
7 H278 72+590 Nuzvid Aripalli Suryanarayana Veerayya L-5
NTH 2 Katcha Res
279 72+600 Nuzvid Bokinala Subbarao Raghunadam L-6
NTH 6 katcha Res
280 72+610 Nuzvid Chittiboiena Rani Kittarao L-6
NTH 6 Katcha Res
281 72+630 Nuzvid Gandikota Rajarao Ragunadam R-8
NTH 3 katcha Res
282 72+680 Nuzvid Kokilagedda Vajrakumari Kantharao L-8
NTH 3 Katcha Res
283 72+680 Nuzvid Adumalli Venkatarao Subbarao R-9
NTH 3 Katcha Res
284 72+680 Nuzvid Pallipamula Prakasam Venkateswararao L-8.7
NTH 5 Katcha Res
285 72+710 Nuzvid Ulaga Krishana Venkayya L-5.7
NTH 4 Kiosk Kiosk
286 72+720 Nuzvid Mohamad Basha Sulemansaheb L-7.7 TH 5 Katcha Res287 72+720 Nuzvid Mylavarapu Venkateswararao Subbarao R-5.3
NTH 4 Kiosk Kiosk
288 72+720 Nuzvid Kamaravalli Salman Jalachandrudu R-8
NTH 0 Katcha Com
289 72+730 Nuzvid Ketineni Kasturamma Ramachandrarao L-7
NTH 0 Katcha Res
290 72+730 Nuzvid Arepalli Bhushanam Nageswararao L-7.1
NTH 0 Katcha Res
291 72+770 Nuzvid Arepalli mohanarao Chinaverayya L-4.9
NTH 4 Katcha Res
292 72+770 Nuzvid Makaraju Rangaraju Subbaraju L-5.2 TH 2
Semipucca Com
293 72+780 Nuzvid Mallavalli Rambabu Poturaju L-7.8
NTH 0 Katcha Com
294 73+700 Nuzvid Sodagiri Vilasana Bhusanam R-9
NTH 3 Katcha Com
295 Morsapudi 75+040 Nuzvid Parasa Sesayya Sriramulu R-8
NTH 4 Katcha Com
296 75+100 Nuzvid MD Yusuf Ibraheem L-5
NTH 4 Katcha Com
297 75+110 Nuzvid Bejawada Bujji Rangarao R-5.5
NTH 4 Katcha Com
298 75+120 Nuzvid Vamula Jayalaxmi Venkateswararao L-8.5
NTH 2 Katcha Res & Com
299 75+200 Nuzvid G.Apparao
Person Not Available R-6.4
NTH 4 Kiosk Kiosk
300 75+200 Nuzvid Buddala Prabhakararao Ramadasu W/0 R-6.4
NTH 5 Katcha Res
301 75+210 Nuzvid Boddupathi Sandya Apparao R-7.2
NTH 4 Katcha Res
302 75+220 Nuzvid Mekhala Nagamma Sayilu R-6.6
NTH 4 Katcha Res
303 75+220 Nuzvid Arepalli Bhushanam Sayidulu L-7.8
NTH 4 Katcha Res
304 75+220 Nuzvid Devarakonda Mahalaxmi Darmayya L-7.5
NTH 3 Katcha Res
305 75+220 Nuzvid Shaik Mastansaheb Hussainsaheb R-8.2
NTH 0 Katcha Res
306 75+230 Nuzvid Chintala Nirma Mariyadas R-7.8
NTH 0 Katcha Res
307 75+230 Nuzvid Poturu Rangamma Venkateswararao R-7.5
NTH 0 Katcha Res
308 Tukkuluru 78+380 Nuzvid Polimetala Devasahayam Abraham R-6.5
NTH 3 Katcha Res
309 78+410 Nuzvid Palagani Rangarao Peerayya L-7.2
NTH 6
Semipucca Com
310 78+420 Nuzvid Mohamad Kareemulla Ibraheem L-6.8
NTH 4
Semipucca Com
31 78+420 Nuzvid Sk Kalisha Ismail L-8 NT 0 Semipucc Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 54
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
1 H a312 78+420 Nuzvid Gonduboiena Sekhar Venkatesh R-6
NTH 2 Katcha Com
313 78+430 Nuzvid Badugu Venkateswararao Kondayya L-8
NTH 5 Kiosk Kiosk
314 78+430 Nuzvid Kosuri Srinivasarao Venkateswararao R-6.8
NTH 4 Kiosk Kiosk
315 78+430 Nuzvid Kosaraju Rajarao
Person Not Available R-7.2
NTH 6 Kiosk Kiosk
316 78+600 Nuzvid Kosaraju Ramesh Rajarao R-9
NTH 5 Pucca Res
317 Nuzvid 84+200 Nuzvid Polavarapu Narasimharao
Rajasekar weigh bridge R-9 TH Pucca Com
318 84+200 Nuzvid Puram Samrajyam Venkateswararo L-5
NTH
Semipucca Com
319 84+440 Nuzvid Bala Vijayalaxmi Rammohanarao R-6.2
NTH 3
Semipucca Res
320 84+440 Nuzvid Atluri Venugopalarao Amarayya R-6.2
NTH 2
Semipucca Res
321 84+415 Nuzvid Kandikatla Bullemma Ramarao R-5.5
NTH 2
Semipucca Res
322 84+415 Nuzvid Andela Kotamma Changayya R-6.2
NTH 2 Katcha Res
323 84+480 Nuzvid Vanapalli Laxmanarao Narayana R-6.4
NTH 5 Katcha Com
324 84+520 Nuzvid Balani Atcharao Gangaraju L-7.3
NTH 2
Semipucca Res
325 84+520 Nuzvid Balani Veerababu Atcharao L-8
NTH Katcha Res
326 84+600 Nuzvid Chikka Asirinaidu Appalaswamy L-6.5
NTH 4 Katcha Res
327 84+610 Nuzvid Devarakonda Venkateswararo Late)Gurvayya L-8
NTH 3 Katcha Res
328 84+615 Nuzvid Sriramulu Satyanarayana Sambayya L-8
NTH 3 Katcha Res
329 85+400 Nuzvid Naradala Baskararao Venkataswamulu L-6.5
NTH 5 Katcha Res
330
Annavaram 86+310 Nuzvid Mulugumati Subbarao Ramulu R-7
NTH 4 Katcha Res
331 86+310 Nuzvid Chodapamula Maratamma (late) Esu R-8
NTH 0 Katcha Res
332 86+310 Nuzvid Kanaparthi Vasantharao Nagindra R-7.2 TH 0 Katcha Res333 86+310 Nuzvid SK Nanasaheb Ameersaheb L-5.6
NTH 0
Semipucca Res
334 86+310 Nuzvid Sk Chandbasha Ameersaheb L-5.8
NTH 0
Semipucca Res
335 86+320 Nuzvid Pilli Venkateswararo Venkayya R-6.9
NTH 4 Katcha Res
336 86+320 Nuzvid Sudagani Saibabu Gopiraju R-6.4 TH 3
Semipucca Res
337 86+330 Nuzvid Bejawada Venkatanarasanna Koteswararao R-8
NTH 0 Katcha Res
338 86+340 Nuzvid Modepalli Suryanarayana
Person Not Available L-8.5
NTH 4
Semipucca Com
339 86+390 Nuzvid Chukkala Nageswarrao Kurmayya R-4.6
NTH 4 Katcha Com
340 86+400 Nuzvid Abdurao(late)
Person Not Available R-7
NTH 3
Semipucca Res
341 86+400 Nuzvid Kolusu Sambasivaraju Peddiraju L-7.5
NTH 4 Katcha Com
342 86+500 Nuzvid Yadala Rajarao Ramulu L-5.8 TH 5
Semipucca Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 55
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
343 86+505 Nuzvid P.Madhusudhanarao
Person Not Available R-6.2
NTH Katcha Res
344 86+505 Nuzvid Kumpati Rajarao Veerayya R-8
NTH Katcha Res
345 86+505 Nuzvid Ede Savitri Sambasivarao R-5.4 TH 4 Katcha Res & Com346 86+520 Nuzvid Akula Srinivasarao Somayya(late) R-8
NTH 0 Katcha Com
347 86+600 Nuzvid Ganapuvarapu Chinayya kotayya R-8
NTH 0 Katcha Res&Com
348 86+610 Nuzvid Katuri Laxmanarao Venkateswararao L-8
NTH 0 Katcha Res
349 86+610 Nuzvid Shaik Lalahmad Ameersaheb L-7.8
NTH 0
Semipucca Res
350 86+630 Nuzvid Somu Nageswararao Kotiveraragavalu R-8.5
NTH 0 Katcha Res&Com
351 86+720 Nuzvid Ramisetti Venkateswararo Nageswararao L-6.3
NTH 4 Katcha Res
352 86+720 Nuzvid Pamarthi Satyanarayana Ramaswamy R-9
NTH 0 Katcha Com
353 86+720 Nuzvid Katuri Subbarao Venkayya L-6.7
NTH 0 Katcha Res & Com
354 86+750 Nuzvid Shaik Kaleeshavali Kasimsaheb R-6.7 TH 6
Semipucca Com
355 86+750 Nuzvid Shaik Chanbasha Ameersaheb R-6.7
NTH 4
Semipucca Com
356 86+760 Nuzvid Nerusu Upendhra Koteswararao L-7
NTH 0 Katcha Com
357 86+760 Nuzvid Gholla Laxmayya Chintayya L-7.2
NTH 0 Katcha Cattleshed
358 86+770 Nuzvid Satyanarayana Jaganadham L-7.8
NTH 0 Kiosk Kiosk
359 86+795 Nuzvid Ganduboiena Nagaraju Ramarao R-8
NTH 3 Katcha Com
360 86+820 Nuzvid Kolusu Renukamma Kanakayya L-8
NTH 0
Semipucca Com
361 86+820 Nuzvid Koppakala Sitaramayya Venkateswrarao L-7.5
NTH 0 Kiosk Kiosk
362 86+820 Nuzvid Ganduboiena Nagaraju Ramarao R-8
NTH 3 Katcha Cattleshed
363 86+820 Nuzvid Indala Pullayyya Rajesh L-6.3
NTH 0 Pucca Res
364 86+840 Nuzvid A.Krishanachai Badrayyya L-6.2
NTH 0 Katcha Res
365 86+820 Nuzvid Mareedu Chennakesavarao Narayana L-5.9
NTH 5
Semipucca Res & Com
366 87+020 Nuzvid Dasireddy Satyanarayana Venkatakrishana L-5.8
NTH 3
Semipucca Com
367 87+190 Nuzvid Kota Suryanarayana Venkataswamy R-7
NTH 2 Katcha Com
368 87+190 Nuzvid SK.Nagulu Daveed L-6.3
NTH 0 Katcha Res
369 87+190 Nuzvid Ramadasu Narasimhapatrudu Ayyannapatrudu L-6.2
NTH 3 Katcha Res
370 87+210 Nuzvid Modipalli Suryanarayana Ramakrishana R-6.5
NTH 0 Katcha Res
371
Venkatadhripuram 88+350 Nuzvid Velpuri Ramarao Somayya R-8.5
NTH 4
Semipucca Res&Com
372
Hunumuntulagudem 89+700 Nuzvid Banavathi Symku Laxmayya(late) R-8
NTH 0
Semipucca Res
373 89+710 Nuzvid Ippagunta krishana Narasimharao R-6
NTH 0
Semipucca Com
374 89+880 Nuzvid Polapaka Sudhakar Prasadarao L-8
NTH 5 kiosk kiosk
37 89+900 Nuzvid Polapaka nageswararo Pullayya L-8.5 NT 2 Katcha Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 56
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
5 H376 90+100 Nuzvid Rankuri Puspa Asiyya L-7.2
NTH 3 Katcha Res
377 90+350 Nuzvid Reddi Krishana Venkatadri L-8.5
NTH 6 Katcha Com
378 90+350 Nuzvid Peddavarapu Venkateswarulu Laxmayya L-7.5
NTH 0 Katcha Com
379 90+350 Nuzvid Nalliboiena Malleswararao Sriramulu L-7.3
NTH 0 Katcha Com
380 90+400 Nuzvid Patra Balakrishana Sesayya R-8
NTH 4 Katcha Res
381 90+400 Nuzvid Pilli Venkataraju Venkateswararao R-7.8
NTH 4 Katcha Res & Com
382
Mittagudem 90+400 Nuzvid Vilavalli Muralikrishana Adinarayana L-8.2
NTH 0 Katcha Com
383 90+680 Nuzvid Velivela Narasimharao Venkataratnam R-6
NTH 4
Semipucca Res
384 90+680 Nuzvid Velivela Gopalaswamy Venkataratnam R-8.8
NTH 2 Kiosk Kiosk
385 90+700 Nuzvid Batta Lalitha Subbarao R-9
NTH 0
Semipucca Com
386 90+700 Nuzvid Palagi Rambabu Ayodya L-8.2
NTH 0
Semipucca Res &Com
387 90+700 Nuzvid Palagani Ayodya Subbayya L-8.2
NTH 0
Semipucca Res &Com
388 90+700 Nuzvid Ambati Srinu Kotesh L-9
NTH 2 Katcha Com
389 90+705 Nuzvid Chalamala Sambasivarao Bulliramayya R-7.8
NTH 6 Kiosk Kiosk
390 90+760 Nuzvid Jalasutram Pullarao Madiramayya R-8
NTH 5
Semipucca Res
391 90+795 Nuzvid Dovvadi Suseela narasingarao R-8
NTH 1 Katcha Res
392 90+795 Nuzvid Mulagani Pitchayya Subbayya R-8
NTH 0 Katcha Res
393 90+800 Nuzvid Konakala Krishana Rambabu R-7.3
NTH 4 Katcha Com
394 90+900 Nuzvid Srihari L-7.3
NTH 0 Katcha Com
395 90+900 Nuzvid Janga Somasundhar Yakobu L-7.5
NTH 0 Kiosk Kiosk
396 90+960 Nuzvid Kalangi Devid Kanakambaram L-8.3
NTH 0 Katcha Com
397 Leelanager 92+180 Nuzvid Kethe Jaganadharao Seetayya L-8
NTH 4 Kiosk Kiosk
398 92+180 Nuzvid Kethe Sheshamma Tirupatayya L-6.9
NTH 5 Kiosk Kiosk
399 92+240 Nuzvid Pilla Venkateswaramma Rangarao R-5.8 TH 8 Katcha Res400 92+270 Nuzvid Simhadri Sitaramaya h/0Nagamalleswari R-5.9 TH 2 Katcha Res401 92+300 Nuzvid J.Subramanneswararao L-5.6
NTH 4 Katcha Com
402 92+300 Nuzvid Dontu Sitaramayya Sobanachalam R-9
NTH 0 Katcha Com
403 92+300 Nuzvid Doddula Satyanarayana Jaganadham R-9
NTH 0 Katcha Com
404 92+300 Nuzvid Mustina Koteswararao Anjayya L-7.8
NTH 0 Katcha Com
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 57
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
ANNEXURE : 2.2 PROJECT DISPLACED FAMILIES
PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Residential Category
Sl.N
o
Name of the Village
Cha
nage
Revenue Division
Name of the HouseHold Head(HHH) Father\husband name
Loca
tion
(Lef
t\ R
ight
)
Title
ho
lder
(TH
)/Non
Title
Hol
der(
NTH
)
No
of F
amily
Mem
bers
Type of Structure
1 Pedna 7+000 Machilipatnam Moganti Prasad Narayanna Rao L-1 TH 4 Katcha
2 Pedna 7+020 Machilipatnam Varudhu malleswararao Subbarao R-3 TH 3 Katcha
3 Pedna 7+120 Machilipatnam jonabattula koteswaramma Nancharayya R-3 NT
H 6 Katcha
4 Pedna 7+140 Machilipatnam Garikimukkala Sriramulu Mahamkali R-4.5 NT
H 3 Katcha
5 Pedna 7+140 Machilipatnam Chinnam Suramraju Person not Available L-4 TH 0 Pucca
6 Pedna 7+200 Machilipatnam Varudhu Venkateswararo Govind L-2 NT
H 4 Pucca
7 Pedna 7+200 Machilipatnam Varudhu Nagamalleswaramma Venkateswarulu R-6 TH 4 Katcha
8 Pedna 7+220 Machilipatnam Varudhu Nancharayya Subbarao R-4.5 TH 6 Semipucca
9 Pedna 7+240 Machilipatnam Bulusuru Symalarao Subramanyam L-7 TH 4 Katcha
10 Pedna 7+260 Machilipatnam maddemsetty Rambabu Nancharayya R-6 TH 5 Semipucca
11 Pedna 7+280 Machilipatnam Varudhu Venkaranarayana Marillu L-3 TH 2 Semipucca
12 Pedna 7+280 Machilipatnam Varudhu Venkateswararo Subbayya R-5 NT
H 3 Katcha
13 Pedna 7+300 Machilipatnam Varudhu kondayya Krishana R-6 TH 6 Katcha
14 Pedna 7+310 Machilipatnam Varudhu Venkataswamy Krishana R-6 TH 3 Semipucca
15 Pedna 7+320 Machilipatnam Varudhu Venkanna Nageswarao R-2 TH 4 Pucca
16 Pedna 7+320 Machilipatnam Varudhu Balaji Kumar Nageswarao R-2 TH 5 Semipucca
17 Pedna 7+325 Machilipatnam Maruboiena Naga malleswararao Nageswarao R-5 TH 4 Katcha
18 Pedna 7+325 Machilipatnam Maruboiena SriniVasarao Nageswarao R-5 TH 5 Katcha
19 Pedna 7+325 Machilipatnam Koutarapu Naga Durga Bhavani Ganapathi L-3 TH 4 Semipucca
20 Pedna 7+350 Machilipatnam Varudhu Baburao Seetayya L-3 TH 2 Pucca
21 Pedna 7+360 Machilipatnam Varudhu Venkateswararo Koteswararo L-4 NT
H 4 Katcha
22 Pedna 7+420 Machilipatnam Maddisetty Anasuya Koteswararo R-5 TH 7 Katcha
23 Pedna 7+430 Machilipatnam Varudhu Suryachanrraro Venkatasubbayya R-7 NT
H11 Semipucca
24 Pedna 7+450 Machilipatnam Varudhu Durgarao Madavarao R-6 NT
H 3 Pucca
25 Pedna 7+450 Machilipatnam Varudhu Subbarao Madavarao R-6 NT
H 6 Katcha
26 Pedna 7+450 Machilipatnam
Varudhu Venkata Ramanjeyaneyulu Nageswarao L-2 TH 4 Semipucca
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 58
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
27 Pedna 7+500 Machilipatnam Varudhu Pitchemma Narasimharao R-2 TH 8 Katcha
28 Nadupuru 10+700 Machilipatnam Parusa Pandurangarao Durgarao L-6.2 NT
H 2 Katcha
29 Nadupuru 10+940 Machilipatnam Yarlagedda Sethratnam Venkataratnam R-6.5 NT
H 1 Katcha
30 Nadupuru 11+660 Machilipatnam kanakavalli Subadra Benarji R-6.5 NT
H 2 Katcha
31 Nadupuru 11+670 Machilipatnam Nimmagedda Rajarao Person not Available L-7
NTH 2 Katcha
32 Reddipalaem 13+410 Gudivada B.Nancharayya H|0 Venkamma L-6.2NTH 3 Katcha
33 Reddipalaem 13+420 Gudivada Chittibomma Srinivasarao Subramanyam R-6.4NTH 5 Katcha
34 Reddipalaem 13+510 Gudivada Kandula Sesayya Nancharayya R-6.4NTH 6 Katcha
35 Reddipalaem 13+530 Gudivada Bethapudi Srinivasarao pandu R-6.2NTH 4 Katcha
36 Reddipalaem 13+550 Gudivada Kagitha Pabma Nancharayya L-6.5 TH 2 Katcha
37 Reddipalaem 13+750 Gudivada Modugumudi Haribabu Ramachandrarao L-5.7NTH 4 SemiPucca
38 Vaddlamannadu 15+190 Gudivada Abdhul Azeez Basha R-6.8NTH 3 Katcha
39 Vaddlamannadu 15+160 Gudivada AvarlanDammidayya Veerayya R-6.5NTH 2 Katcha
40 Vaddlamannadu 15+400 Gudivada Kolusu Reddayya Veraraju L-6.5 TH 4 Katcha
41 Vaddlamannadu 15+400 Gudivada Kolusu Veraraju Ragavulu L-5.5 TH 2 Katcha
42 Vaddlamannadu 15+400 Gudivada Kolusu Koteswarararo Veraraju L-6.5NTH 4 Katcha
43 Vaddlamannadu 15+420 Gudivada Pari devamani Late)Yakobu L-6.5 TH 6 Katcha
44 Vaddlamannadu 15+430 Gudivada Iku Adilaxmi Late)Gopayya L-5.2 TH 1 Katcha
45 Vaddlamannadu 15+430 Gudivada S.Bayrasi Not Available R-5.6NTH 0 Katcha
46 Vaddlamannadu 15+600 Gudivada Atchuta jaganmohanarao Subbarao R-5.9NTH 3 Katcha
47 Vaddlamannadu 15+650 Gudivada Degala Srinu Venkataswamy R-6.5NTH 4 Katcha
48 Vaddlamannadu 15+650 Gudivada Degala Venkataswamy Rammurthy R-6.2NTH 4 Katcha
49 Vaddlamannadu 15+660 Gudivada Maddela Veramma Durgapraasad R-6.5NTH 3 Katcha
50 Vaddlamannadu 15+670 Gudivada Atchuta kasturi Person Not Available R-4.4NTH 1 Katcha
51 Vaddlamannadu 15+670 Gudivada Atchuta Srinivasarao Nancharayya L-5.1 TH 3 Katcha
52 Vaddlamannadu 15+750 Gudivada Atchuta Sivashankararo Subbarao L-5.3NTH 4 Katcha
53 Vaddlamannadu 15+750 Gudivada Penta Ramu Laxmayya R-5.5NTH 3 Katcha
54 Vaddlamannadu 15+360 Gudivada DegalanSubbarao Chinnappayya R-6.2NTH 2 Katcha
55 Vemavaram 16+740 Gudivada Parasa Venkatasubbamma Krishanamurthy L-4.7NTH 4 Katcha
56 Vemavaram 16+780 Gudivada Padamata Pandu Basavayya L-6.9 TH 4 Katcha
57 Vemavaram 16+785 Gudivada Venka Nageswarao Rammurthy L-6.3 TH 3 Katcha
58 Vemavaram 16+785 Gudivada Veranji Kanakam Krishanamurthy R-4.5NTH 2 Katcha
59 Vemavaram 16+785 Gudivada Chillimuntha Badrachalam Gangadaram L-5.8NTH 0 Katcha
60 Vemavaram 16+880 Gudivada Padamati Veraswamy Venkanna L-4.3NTH 3 Katcha
61 Vemavaram 16+890 Gudivada Madugu Pedaverayya Subbarao R-4.5NTH 0 Katcha
62 Vemavaram 16+900 Gudivada Mannem Venkateswarama Venkateswaralu L-5.2NTH 2 Katcha
63 Vemavaram 16+900 Gudivada Mannem Basavayya Laxmayya L-6.2 NT 2 Katcha
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 59
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
H
64 Vemavaram 16+900 Gudivada Yarlagadda Nagapanindhra M/o Vijayamma L-5.5NTH 2 Katcha
65 Vemavaram 17+050 Gudivada Sonti Venkateswarao Veraswamy L-5.2 TH 4 Katcha
66 Vemavaram 17+050 Gudivada Mulala edukondalu Pakeer R-5.1NTH 8 Katcha
67 Vemavaram 17+060 Gudivada Borra Durgamma Ragavulu L-6.2NTH 1 Katcha
68 Vemavaram 17+070 Gudivada pandiri Kurmarao narasimharao L-5.3NTH 3 Katcha
69 Vemavaram 17+120 Gudivada Shaik Adem H\o Haseenabegum L-4.3NTH 5 Katcha
70 Vemavaram 17+200 Gudivada Abdhul Baseer Sattar L-4.1NTH 1 Katcha
71 Vemavaram 17+200 Gudivada Naragani Venugopal Ankinaidu L-4.5NTH 5 Katcha
72 kowthvaram 22+100 Gudivada Geduturi Rajarao Yarayya R-6.6NTH 2 Katcha
73 kowthvaram 22+120 Gudivada Nasethi Ramesh Subbarao R-6.8 TH 3 Katcha
74 kowthvaram 22+120 Gudivada koripalli Sanyasirao Appannna R-6.7NTH
12 Katcha
75 kowthvaram 22+140 Gudivada Javvari Nageswarao Venkateswarao R-6.8NTH 5 Katcha
76 kowthvaram 22+200 Gudivada Allu Bullemma Appalaswamy R-6.3NTH 2 Katcha
77 kowthvaram 22+200 Gudivada muttireddy Srinivasarao Person Not Available R-6.3NTH 5 Katcha
78 kowthvaram 22+125 Gudivada Ramabalapala Durgaprasad Satyanarayana R-5.3NTH 4 Katcha
79 Gudlavalleru 23+790 Gudivada Jupudi Krishana mohanarao Person Not Available R-6 TH 2 Pucca
80 Gudlavalleru 23+800 Gudivada Paruchuri Tripurantharao R-5.6 TH 4 Pucca
81 Gudlavalleru 23+800 Gudivada vallabhapurapu Eswararao Ramachandararao R-4.6 TH 5 Pucca
82 Gudlavalleru 23+980 Gudivada Kunchapati Venkateswwarao Pandurangarao R-4.6 TH 3 Pucca
83 Gudlavalleru 24+000 Gudivada V.Narasimharao Person Not Available R-4.8 TH 1 Pucca
84 Gudlavalleru 24+000 Gudivada Polavarapu Rajeswarao Person Not Available R-5.5 TH 1 Pucca
85 Gudlavalleru 24+000 Gudivada Gudlavalleti Venkateswarao Gangajalam R-4.5 TH 4 SemiPucca
86 Gudlavalleru 24+050 Gudivada Bulla Ravibabu Koteswararao L-6.8 TH 5 SemiPucca
87 Bommuluru 31+100 Gudivada Gutta Venuprasad Chowdary Venkata swamy R-7NTH 4 Semipucca
88 Bommuluru 31+150 Gudivada Gutta krishana narayana R-5.5 TH 2 Pucca
89 Bommuluru 31+550 Gudivada Penumarthi Srinu nagendrudu L-5.6NTH 4 Katcha
90 Bommuluru 31+620 Gudivada Talaie Satyanarayana Venkateswararo R-7.2NTH 4 Katcha
91 Bommuluru 31+790 Gudivada Saradala Nagaraju Brahmayya L-6.5NTH 0 Katcha
92 Bommuluru 31+790 Gudivada Mocherla mamatha Srinu R-4.5NTH 4 Katcha
93 Bommuluru 31+790 Gudivada Vara samual Mosa R-5.2NTH 0 Katcha
94 Bommuluru 31+790 Gudivada Ganta Israyulu peddiraju L-5.9 TH 2 Katcha
95 Bommuluru 31+800 Gudivada Akunoori Yesobu Eliya R-5.1NTH 3 Katcha
96 Bommuluru 31+800 Gudivada Chebrolu Ramarao Ramayya L-5.7NTH 2 Katcha
97 Bommuluru 31+800 Gudivada Sura Apparao Tatabbie L-5.8NTH 3 Katcha
98 Bommuluru 31+815 Gudivada Kandavalli Edukondalu Adishesu L-6.6NTH 5 Katcha
99 Bommuluru 31+820 Gudivada Usalla Devakanya Krishana L-6.8NTH 3 Katcha
100 Bommuluru 31+840 Gudivada Varigani Devamatha Adama L-4.6NTH 2 Katcha
101 Bommuluru 31+600 Gudivada Bura Srininvasarao Dasu(samual) L-5.1 NT 5 Katcha
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 60
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
H
102Janardhanapuram 40+820 Gudivada Pullareddy Rangareddy Person Not Available L-6 TH 0 Pucca
103Janardhanapuram 40+840 Gudivada NVS Nagireddy Rammohnareddy L-6.5 TH 0 Pucca
104Janardhanapuram 40+840 Gudivada Konapalli narayanareddy Narayanaereddy L-6.5 TH 2 Pucca
105Janardhanapuram 41+125 Gudivada
Veruvada NarayanaNagabhusanam Venkateshawararao L-6
NTH 4 Katcha
106Janardhanapuram 41+150 Gudivada Vanapalli Adilaxmi Laxmanarao L-6.5
NTH 2 Katcha
107Janardhanapuram 41+150 Gudivada Saripalli Rameshreddy Rangareddy L-5.9 TH 3 semiPucca
108Janardhanapuram 41+240 Gudivada Tallaparthi Ramarao Appalasuri R-7.1
NTH 3 Katcha
109Janardhanapuram 41+240 Gudivada malliboiena Lingayya Chinaramulu R-7.2
NTH 4 Katcha
110Janardhanapuram 41+240 Gudivada Nakka Narasimharao Mahalaxmayya L-6.8
NTH 0 Katcha
111Janardhanapuram 41+245 Gudivada laveti Durgarao Venkateswararao R-6.5
NTH 2 Katcha
112Janardhanapuram 41+400 Gudivada Devarapalli Satyanarayana Nomulu L-6.1
NTH 3 Katcha
113Janardhanapuram 41+450 Gudivada Vanam Venkateseararao Durgamma R-6.8
NTH 3 Katcha
114Janardhanapuram 41+460 Gudivada Katari Kotayya Anjeneyulu R-6.1
NTH 4 Katcha
115Janardhanapuram 41+515 Gudivada Ekba Peddirajulu Ramayya L-6.4
NTH 0 Katcha
116Janardhanapuram 41+550 Gudivada Kadekollu Nagaraju Nallayya L-5.6 TH 4 Katcha
117Janardhanapuram 41+550 Gudivada Jalasuthram Rangamma Baskararao L-6.2
NTH 2 Katcha
118Janardhanapuram 41+565 Gudivada Nakka Puttalamma Late) Bodayya L-6.4 TH 4 Katcha
119Janardhanapuram 41+600 Gudivada Kotaru Nagaraju Sitayya L-6.8
NTH 0 Katcha
120Janardhanapuram 41+600 Gudivada Ebba Srinivasu Ramayya R-7.2
NTH 4 Katcha
121Janardhanapuram 41+770 Gudivada Nagalam Venkateswararao Krishanamurthy R-6.2
NTH 5 Katcha
122Janardhanapuram 41+770 Gudivada Kagga Padma Srinu R-6.8
NTH 4 Katcha
123Janardhanapuram 41+770 Gudivada Nangalam Venkatarammayya Krishanamurthy R-6.8
NTH 3 Katcha
124 Puttagunta 45+200 Gudivada Ranchari Laxmi Nageswararao L-6.6NTH 0 Katcha
125 Puttagunta 45+600 Gudivada Vinjavarapu Appalachari Bhrahmam R-5.5 TH 2 Pucca
126 Puttagunta 45+630 Gudivada Pamulapati Ramireddy Person Not Available R-5.8 TH 2 Pucca
127 Puttagunta 45+650 Gudivada Valiveti Purna Subbarao R-6.5NTH 0 Semipucca
128 Puttagunta 45+650 Gudivada Vankayalapati Murali Person Not Available R-7 TH 0 Pucca
129 Puttagunta 45+700 Gudivada Barapureddy Satyanarayana Dalayya L-6.8NTH 0 Katcha
130 Puttagunta 46+400 Gudivada Kollu Someswararao Mallikarjunarao L-6.7NTH 0 Katcha
131 Puttagunta 46+400 Gudivada Mukkala Yesuamma Yesu R-7NTH 1 Katcha
132 Arugolanu 51+050 Nuzvid Poteneni lalithakumari Sambasivarao R-7 TH 2 Semipucca
133 Arugolanu 51+250 Nuzvid Singanapalli Venkateswararao Applaswamy(late) R-7 TH 7 Katcha
134 Kanumolu 55+420 Nuzvid Katumalla Kishorebabu Bisuff R-5.3NTH 4 Katcha
135 Kanumolu 55+655 Nuzvid Nerella sarveswarao Narayana R-7NTH Semipucca
136 Kanumolu 55+680 Nuzvid Kandula veeravenkatanagaprasad Chinavenkateswarao L-6.2 TH 3 Pucca
137 Kanumolu 55+700 Nuzvid Gopalarao OLD BUILDING L-6.2 NT Semipucca
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 61
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
H
138 Kanumolu 55+780 Nuzvid Narikimalli Seshachalam Suryanarayana L-5.5NTH 4 Katcha
139 Kanumolu 55+795 Nuzvid Kurupati parisuddam Gonnaprakash R-6.2NTH 2 Semipucca
140 Kanumolu 55+820 Nuzvid Chalamarasetty Suryaprakasarao Ramayya L-6NTH 3 Pucca
141 Kanumolu 55+820 Nuzvid Chamarthi Venkateswarao Viswanadham R-5.5NTH 2 Pucca
142 Kanumolu 55+830 Nuzvid Chamarthi Anjeneyulu venkatappayya R-6.2NTH 7 Pucca
143 Kanumolu 55+870 Nuzvid Chamarthi Anjeneyulu Venkatappayya R-5NTH 7 Katcha
144 Kanumolu 55+980 Nuzvid Reddi Chinalaxmayya Chittemma L-5.7 TH 2 Pucca
145 Kanumolu 56+980 NuzvidLingamallu veravenkata jaganmohanarao Venkataratnam L-5.5
NTH 3 Pucca
146 Kanumolu 56+000 Chinta Apparao Swamulu L-5.5NTH 5 Semipucca
147 Kanumolu 56+000 Nuzvid N.V.Ramanarao ChinaSurayya R-4 TH 4 Semipucca
148 Kanumolu 56+000 Nuzvid Nanduri VenkatammaKrishana murthy(late) R-5 TH Semipucca
149 Kanumolu 56+000 Nuzvid Anisetty Timmaraju Boogeswararao L-5NTH 4 Pucca
150 Kanumolu 56+210 Nuzvid Sunkara Laxmanarao Surayya L-5.5 TH 2 Pucca
151 Kanumolu 56+300 Nuzvid Moganti Chandra sekhar krishanarao R-6NTH Semipucca
152 Kanumolu 56+350 Nuzvid Naraharasetty Gangadhar Venkataratnam R-7 TH 4 Semipucca
153 Kanumolu 56+390 Nuzvid Naraharasetty Prabhavathi Venkataratnam R-7 TH 2 Semipucca
154 Perikeedu 56+975 Nuzvid Venkatakonda Gandhi Koteswararo L-6.8 TH 3 Semipucca
155 Perikeedu 57+310 Nuzvid Sammangi Sateshkumar Nageswararao L-7 TH 4 Semipucca
156 Perikeedu 57+310 Nuzvid Sammangi Mohanasuresh kumar Nageswararao L-7 TH 4 Semipucca
157 Perikeedu 57+320 Nuzvid Bandaru Swetha satyanarayana Krishanarao L-7NTH 5 Katcha
158 Perikeedu 57+350 Nuzvid Maradani Sivanagaraju Tatayya L-7NTH 3 Katcha
159 Perikeedu 57+360 Nuzvid Rajamahendravarapu satyaswathi Venkateswararaju L-7NTH Katcha
160 Perikeedu 57+650 Nuzvid Bayya Mohanarao Pitchiyya(late) L-7NTH 7 Pucca
161 Perikeedu 57+700 Nuzvid Jalidi Balakrishana Raeddiyya R-6.5 TH Semipucca
162 Perikeedu 58+670 Nuzvid Gujjala veraswamy(israyulu) Ramaswamy L-7NTH 3 Katcha
163 Perikeedu 58+880 Nuzvid Padmala Venkateswararo Venkatanarasayya L-7NTH 5 Katcha
164 Meerjapuram 67+450 Nuzvid Kota Simhachalam Krishana R-7NTH 3 Katcha
165 Meerjapuram 67+460 Nuzvid Vallepu Parameswararao Raju R-7.1NTH 6 Katcha
166 Meerjapuram 67+500 Nuzvid Olipi Venkateswarrao Verayya R-6.4NTH 3 Katcha
167 Meerjapuram 67+500 Nuzvid Tegala Chittemma Verayya R-6NTH 3 Katcha
168 Meerjapuram 67+510 Nuzvid Garika Bhagyam Sambayya R-6NTH 2 Katcha
169 Meerjapuram 67+520 Nuzvid Busi Adam Prabhakararao R-6NTH 2 Katcha
170 Meerjapuram 67+540 Nuzvid Mindiya Venkateswararao Maddiramayya R-6NTH 5 Katcha
171 Meerjapuram 67+550 Nuzvid Tegala Guruvulu Veerayya R-5.4NTH 6 Katcha
172 Meerjapuram 67+550 Nuzvid Dasari Yesu Baalaraju R-5.4NTH 4 Katcha
173 Meerjapuram 67+560 Nuzvid Gandikota Anjeneyulu Venkateswararao R-6.5NTH 3 Katcha
174 Meerjapuram 67+660 Nuzvid Rajulapati Nageswararo Venkateswararao L-6.9 NT 1 Katcha
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 62
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
H 0
175 Meerjapuram 67+790 Nuzvid Tegala Chantibabu Ramulu L-7NTH 2 Katcha
176 Meerjapuram 67+800 Nuzvid Tegala Tirupathirao Ramulu L-7NTH 6 Katcha
177 Meerjapuram 68+995 Nuzvid Durga Person Not Available R-7NTH Katcha
178 Gollapalli 72+050 Nuzvid Venula Durgaprasad kameswarao R-7NTH 3 Katcha
179 Gollapalli 72+100 Nuzvid Tata Pullarao Srirangam R-7NTH 4 Katcha
180 Gollapalli 72+210 Nuzvid Konda vaddikasulu Anjeneyulu R-7NTH 4 Katcha
181 Gollapalli 72+220 Nuzvid Tata Rangarao Person Not Available R-6.1NTH 2 Katcha
182 Gollapalli 72+405 Nuzvid Valiveti Satyanarayana Venkatakrishana R-5.6 TH 2 Semipucca
183 Gollapalli 72+500 Nuzvid Namala Jayaolaiah Rangarao R-6NTH 0 Katcha
184 Gollapalli 72+530 Nuzvid Shaik Choti Mahaboob R-6.8NTH 4 Katcha
185 Gollapalli 72+565 Nuzvid Talam Sriramulu Ramayya L-5.9NTH 3 Katcha
186 Gollapalli 72+565 Nuzvid Taluri Prubudas Yesudas L-6NTH 6 katcha
187 Gollapalli 72+590 Nuzvid Aripalli Suryanarayana Veerayya L-5NTH 2 Katcha
188 Gollapalli 72+600 Nuzvid Bokinala Subbarao Raghunadam L-6NTH 6 katcha
189 Gollapalli 72+610 Nuzvid Chittiboiena Rani Kittarao L-6NTH 6 Katcha
190 Gollapalli 72+730 Nuzvid Ketineni Kasturamma Ramachandrarao L-7NTH 0 Katcha
191 Gollapalli 72+730 Nuzvid Arepalli Bhushanam Nageswararao L-7.1NTH 0 Katcha
192 Gollapalli 72+770 Nuzvid Arepalli mohanarao Chinaverayya L-4.9NTH 4 Katcha
193 Morsapudi 75+200 Nuzvid Buddala Prabhakararao Ramadasu W/0 R-6.4NTH 5 Katcha
194 Morsapudi 75+220 Nuzvid Mekhala Nagamma Sayilu R-6.6NTH 4 Katcha
195 Tukkuluru 78+380 Nuzvid Polimetala Devasahayam Abraham R-6.5NTH 3 Katcha
196 Nuzvid 84+440 Nuzvid Bala Vijayalaxmi Rammohanarao R-6.2NTH 3 Semipucca
197 Nuzvid 84+440 Nuzvid Atluri Venugopalarao Amarayya R-6.2NTH 2 Semipucca
198 Nuzvid 84+415 Nuzvid Kandikatla Bullemma Ramarao R-5.5NTH 2 Semipucca
199 Nuzvid 84+415 Nuzvid Andela Kotamma Changayya R-6.2NTH 2 Katcha
200 Nuzvid 84+600 Nuzvid Chikka Asirinaidu Appalaswamy L-6.5NTH 4 Katcha
201 Nuzvid 85+400 Nuzvid Naradala Baskararao Venkataswamulu L-6.5NTH 5 Katcha
202 Annavaram 86+310 Nuzvid Mulugumati Subbarao Ramulu R-7NTH 4 Katcha
203 Annavaram 86+310 Nuzvid SK Nanasaheb Ameersaheb L-5.6NTH 0 Semipucca
204 Annavaram 86+310 Nuzvid Sk Chandbasha Ameersaheb L-5.8NTH 0 Semipucca
205 Annavaram 86+320 Nuzvid Pilli Venkateswararo Venkayya R-6.9NTH 4 Katcha
206 Annavaram 86+320 Nuzvid Sudagani Saibabu Gopiraju R-6.4 TH 3 Semipucca
207 Annavaram 86+400 Nuzvid Abdurao(late) Person Not Available R-7NTH 3 Semipucca
208 Annavaram 86+505 Nuzvid P.Madhusudhanarao Person Not Available R-6.2NTH Katcha
209 Annavaram 86+720 Nuzvid Ramisetti Venkateswararo Nageswararao L-6.3 NT 4 Katcha
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 63
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
H
210 Annavaram 86+820 Nuzvid Indala Pullayyya Rajesh L-6.3NTH 0 Pucca
211 Annavaram 86+840 Nuzvid A.Krishanachai Badrayyya L-6.2NTH 0 Katcha
212 Annavaram 87+190 Nuzvid SK.Nagulu Daveed L-6.3NTH 0 Katcha
213 Annavaram 87+190 Nuzvid Ramadasu Narasimhapatrudu Ayyannapatrudu L-6.2NTH 3 Katcha
214 Annavaram 87+210 Nuzvid Modipalli Suryanarayana Ramakrishana R-6.5NTH 0 Katcha
215 Mittagudem 90+680 Nuzvid Velivela Narasimharao Venkataratnam R-6NTH 4 Semipucca
216 Leelanager 92+240 Nuzvid Pilla Venkateswaramma Rangarao R-5.8 TH 8 Katcha
217 Leelanager 92+270 Nuzvid Simhadri Sitaramaya h/0Nagamalleswari R-5.9 TH 2 Katcha
PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Commercial Category
Sl.N
o
Name of the Village
Cha
nage
Division Name of the HouseHold Head(HHH) Father\husband name
Loca
tion
(Lef
t\ R
ight
)
Title
ho
lder
(TH
)/Non
Title
Hol
der(
NTH
)N
o of
Fam
ily M
embe
rs
Type of Structure
1 Pedna 7+000 Machilipatnam Moganti Prasad Narayanna Rao L-1 TH 4 Semipucca
2 Pedna 7+000 Machilipatnam Varudhu Balaji Kumar Narayanna Rao R-1 TH 5 Semipucca
3 Pedna 7+000 Machilipatnam Dinduluri Srinivasarao Kalkimurthy R-1 TH 4 Semipucca
4 Pedna 7+000 Machilipatnam Madisetty Maruthi Late Satyanarayana R-1 TH 5 Semipucca
5 Nadupuru 12+050 Machilipatnam Parasa Ramachandrarajulu Nancharayya R-4.5 NTH 3 Semipucca
6 Vaddlamannadu 15+440 Gudivada Jakkula Sureshbabu Balayya L-5 NTH 4 SemiPucca
7 Vaddlamannadu 15+450 Gudivada Gudivada Venkateswarao Person Not Available R-6.2 NTH 0 Katcha
8 Vaddlamannadu 15+480 Gudivada Vallabapurapu nancharayya Venkateswarulu R-6.5 NTH 3 Katcha
9 Vaddlamannadu 15+520 Gudivada Thota Laxmayya krishanamurthy R-6.8 NTH 4 SemiPucca
10 Vaddlamannadu 15+560 Gudivada Penneru jayapattabiramayya Venugopalarao L-6.8 NTH 2 SemiPucca
11 Vaddlamannadu 15+560 Gudivada Garikipathi Tulasiram Ragavulu R-6.8 NTH 4 SemiPucca
12 Vaddlamannadu 15+560 Gudivada Meda Venkateswarao Adinarayana R-7.2 NTH 4 Katcha
13 Vaddlamannadu 15+560 Gudivada manda prasad Ramarao L-7 NTH 3 Katcha
14 Vaddlamannadu 15+590 Gudivada kundeti Verayya Ramayya R-6.6 NTH 2 Katcha
15 Vemavaram 16+900 Gudivada Vemula Srinivasarao Veraragavulu R-4.3 NTH 5 Katcha
16 Vemavaram 17+690 Gudivada Mannem Srinu Venkateswaralu l-4.5 NTH 4 Katcha
17 Vemavaram 17+690 Gudivada Mannem Somulu Venkateswaralu l-4.6 NTH 5 Katcha
18 Vemavaram 17+690 Gudivada Mannem Ragavulu Anjayya L-4.5 NTH 5 Katcha
19 Vemavaram 17+690 Gudivada Bolla Ankalu nageswarrao L-4.6 NTH 5 Katcha
20 Vemavaram 17+690 Gudivada Mannem Ramachandrudu Subbayya L-4.6 NTH 5 Katcha
21 Vemavaram 17+690 Gudivada Matta Ragavayya Saianna L-4.6 NTH 4 Katcha
22 Vemavaram 17+690 Gudivada Chettibomma Tulasamma Malleswararao L-4.5 NTH 4 Katcha
23 Vemavaram 17+700 Gudivada Pappula Peramma Nancharayya L-4.5 NTH 1 Katcha
24 Vemavaram 17+710 Gudivada Tammisetty nookalu nookalu L-4.5 NTH 3 Katcha
25 Vemavaram 17+720 Gudivada Tammisetty Durgarao Suryanarayana L-4.5 NTH 4 Katcha
26 Vemavaram 17+730 Gudivada Matta Ragavayya Saianna L-4.5 NTH 4 Katcha
27 Vemavaram 17+730 Gudivada mannem Pitchemma pothuraju L-4.5 NTH 4 Katcha
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 64
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
28 Vemavaram 17+750 Gudivada Narepalli Srinivasarao Rangarao L-4.5 NTH 4 Katcha
29 Vemavaram 17+780 Gudivada Manda Nagamani Ramanjeneyulu R-4.5 NTH 5 SemiPucca
30 kowthvaram 22+120 Gudivada Juvvadi Edukondalu Venkateswarao L-6.9 NTH 3 SemiPucca
31 Gudlavalleru 23+995 Gudivada Nara janardhanarao Sobanadri L-6 TH 0 SemiPucca
32 Angalur 27+860 Gudivada Rajulapati Srinivasarao SubbaraoL-6.75 NTH 5 Katcha
33 Angalur 27+875 Gudivada Merugumalla Durgamaheswararao Venkataratnam
L-6.75 NTH 4 Katcha
34 Bommuluru 31+600 Gudivada Pallakattu veeraragavulu venkatasubbayya L-5.6 NTH 4 Katcha
35Janardhanapuram 40+800 Gudivada Manda Srinu Kasimreddy L-6.6 NTH 4 Semi
36Janardhanapuram 41+100 Gudivada
Puttalamm Ammavari Shoping complex Person Not Available R-6.3 NTH 0 Pucca
37Janardhanapuram 41+170 Gudivada Girijala Rammurthy Apparao R-7.2 NTH 0 SemiPucca
38Janardhanapuram 41+220 Gudivada Badam Venkatanarayana Ragavayya L-7 NTH 3 Katcha
39 Puttagunta 45+720 Gudivada Sammangi Ramarao Appalaswamy R-6 NTH 0 Semipucca
40 Puttagunta 45+800 Gudivada Oleti Satyavathi Apparao R-7 NTH 0 Semipucca
41 Shivayyapakalu 48+700 Gudivada Suvari Narasimhamurthy Ramachandrarao R-6.2 NTH 0 SemiPucca
42 Arugolanu 50+650 Nuzvid Chukkapu Nageswararo Atchiyya L-5.8 NTH 4 Katcha
43 Arugolanu 50+780 Nuzvid Veeram NageswararoVenkateswararao(late) L6.2 NTH 5 Katcha
44 Arugolanu 50+790 Nuzvid Gottapu Sivanagamani Apparao R-6.5 NTH Katcha
45 Kanumolu 55+410 Nuzvid Ramalle Chinna DaVid R-5 NTH 2 Katcha
46 Kanumolu 55+420 Nuzvid Bethapudi Pramila Villasambabu R-4.5 NTH 2 Katcha
47 Kanumolu 55+800 Nuzvid Bejwada Nageswararao Hanumantharao L-6.3 NTH 1 Semipucca
48 Kanumolu 55+800 Nuzvid Matta Narayanarao Venkataswamy L-6.3 NTH Semipucca
49 Kanumolu 55+890 Nuzvid Garikipati Umamaheswarao Venkateswararao L-5.2 NTH 2 Pucca
50 Kanumolu 55+930 Nuzvid Vemulapalli SubramanyamSrivenkataramalingacharya R-5.7 NTH Semipucca
51 Kanumolu 55+940 Nuzvid Suri Satyanarayana Venkoji L-6 NTH 4 Semipucca
52 Kanumolu 55+950 Dondi Durgarao L-7 TH 3 Pucca
53 Kanumolu 55+960 Nuzvid China Srinivasarao Ramarao R-5.7 TH 4 Pucca
54 Kanumolu 55+980 Nuzvid Chinta Muralikrishana Satyavenkataramarao R-5.5 NTH Pucca
55 Kanumolu 56+050 Nuzvid Rellu Subbarao Ngeswrarao R-6.2 TH 7 Pucca
56 Kanumolu 56+360 Nuzvid Sunkara Laxmanarao Surayya L-5.5 NTH 2 Katcha
57 Perikeedu 57+650 Nuzvid Lanka Gopalarao Appalarao L-6.5 NTH Katcha
58 Perikeedu 57+650 Nuzvid Pabolu SS varaprasad Nageswararao L-6.5 NTH 4 Semipucca
59 Perikeedu 57+700 Nuzvid Botcha.Krishanarao Venkayya R-7 NTH 4 Semipucca
60 Perikeedu 58+400 Nuzvid Nagulapalli Edukondalu Nageswararao R-7 NTH 13 Katcha
61 Perikeedu 58+500 Nuzvid Maddila Ganga Venkateswarao R-7 NTH 4 Katcha
62 Perikeedu 58+550 Nuzvid Battu Manikyalarao Baskararao R-7 NTH 3 Semipucca
63 Perikeedu 58+650 Nuzvid Partipati Agnesamma Prabakar L-7 NTH 9 Semipucca
64 Perikeedu 58+750 Nuzvid Partipati Vijaykumar Balaswamy R-6.5 NTH 8 Katcha
65 Marribandam 64+300 Nuzvid Pidugu Prasad Anjeneyulu R-7 NTH 4 Katcha
66 Marribandam 64+500 Nuzvid Nadakudur Muttaiah Subbarao L-7 NTH 3 Katcha
67 Marribandam 64+500 Nuzvid Shaik Babji Mabu L-6.7 NTH 10 Katcha
68 Marribandam 64+780 Nuzvid Rayavarapu Subbarao Person Not Available L-7 NTH 4 Katcha
69 Marribandam 64+800 Nuzvid Chirugudu Nagaraju Appalaswamy L-6.5 NTH 4 Katcha
70 Marribandam 65+800 Nuzvid Potakamuri Rajababu Gandhi L-7 NTH Katcha
71 Marribandam 65+900 Nuzvid Kombati Satyanarayana Gopalam R-6.8 NTH Katcha
72 Meerjapuram 67+490 Nuzvid Merapadu Baskhararao Maranna L-6 NTH 3 Katcha
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 65
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
73 Meerjapuram 68+480 Nuzvid Mathina Subbarao Veerayya L-7 NTH 2 Katcha
74 Meerjapuram 68+800 Nuzvid Selam Satyanarayana Seshagirirao R-6 NTH 4 Semipucca
75 Meerjapuram 68+910 Nuzvid Sk Hamid Abbulnabi R-7 NTH 2 Katcha
76 Meerjapuram 68+920 Nuzvid Sk Mastan Parisaheb L-6 NTH 2 Katcha
77 Gollapalli 72+100 Nuzvid Attili Brahmam Person Not Available R-6 NTH Katcha
78 Gollapalli 72+400 Nuzvid Shaik Dilshadbagem Munnabasha R-5.4 NTH 3 Katcha
79 Gollapalli 72+770 Nuzvid Makaraju Rangaraju Subbaraju L-5.2 TH 2 Semipucca
80 Morsapudi 75+100 Nuzvid MD Yusuf Ibraheem L-5 NTH 4 Katcha
81 Morsapudi 75+110 Nuzvid Bejawada Bujji Rangarao R-5.5 NTH 4 Katcha
82 Tukkuluru 78+420 Nuzvid Mohamad Kareemulla Ibraheem L-6.8 NTH 4 Semipucca
83 Tukkuluru 78+420 Nuzvid Gonduboiena Sekhar Venkatesh R-6 NTH 2 Katcha
84 Nuzvid 84+200 Nuzvid Puram Samrajyam Venkateswararo L-5 NTH Semipucca
85 Nuzvid 84+480 Nuzvid Vanapalli Laxmanarao Narayana R-6.4 NTH 5 Katcha
86 Annavaram 86+390 Nuzvid Chukkala Nageswarrao Kurmayya R-4.6 NTH 4 Katcha
87 Annavaram 86+500 Nuzvid Yadala Rajarao Ramulu L-5.8 TH 5 Semipucca
88 Annavaram 86+750 Nuzvid Shaik Kaleeshavali Kasimsaheb R-6.7 TH 6 Semipucca
89 Annavaram 86+750 Nuzvid Shaik Chanbasha Ameersaheb R-6.7 NTH 4 Semipucca
90 Annavaram 86+760 Nuzvid Nerusu Upendhra Koteswararao L-7 NTH 0 Katcha
91 Annavaram 87+020 Nuzvid Dasireddy Satyanarayana Venkatakrishana L-5.8 NTH 3 Semipucca
92 Annavaram 87+190 Nuzvid Kota Suryanarayana Venkataswamy R-7 NTH 2 Katcha
93Hunumuntulagudem 89+710 Nuzvid Ippagunta krishana Narasimharao R-6 NTH 0 Semipucca
94 Leelanager 92+300 Nuzvid J.Subramanneswararao L-5.6 NTH 4 Katcha
PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Residential & Commercial Category
Sl.N
o
Name of the Village
Cha
nage
Division Name of the HouseHold Head(HHH)
Father\husband name
Loc
atio
n (L
eft\
Rig
ht)
Titl
e ho
lder
(TH
)/Non
Titl
e
No
of F
amily
Type of Structure
1 Nadupuru 10+800 Machilipatnam Pamarthi Bramajirao Narasimharao R-6.3 NT
H 4 Katcha
2 Nadupuru 10+800 Machilipatnam Rajulapati Gowri rajulu Gurunadham L-6 NT
H 5 Katcha
3 Nadupuru 11+020 Machilipatnam Gandikota Dhanaraju Kotayya L-7 NT
H 7 Katcha
4 Vemavaram 16+900 Gudivada Yaragani Mohanarao Mamillu L-5.2NTH 4 Katcha
5 Vemavaram 17+750 Gudivada Tammesetti Satyanarayana Suryanarayana L-4.5NTH 4 SemiPucca
6 kowthvaram 22+090 Gudivada Jakka Nagamani S/o Sanganna R-5.3NTH 2 Katcha
7 kowthvaram 22+100 Gudivada Allu Narasamma Apparao R-6.8NTH 1 Katcha
8 Gudlavalleru 23+800 Gudivada Sonti Amareswari Venkanna R-5.2NTH 4 Pucca
9 Gudlavalleru 23+810 Gudivada MD.Muzeeurrab Abdhullah R-6.2 TH 5 Pucca
10 Gudlavalleru 24+000 Gudivada K.Kameswaramma KVKrishanarao R-5.7 TH 4 SemiPucca
11 Gudlavalleru 23+834 Gudivada S.VenkannaPerson Not Available R-6.3
NTH 1 Pucca
12 Janardhanapuram 41+150 Gudivada Manepalli Subramanyam Adinarayana L-6NTH 6 semiPucca
13 Puttagunta 45+800 Gudivada Valiveti Satyanarayana Jayaharinadh L-6.2 TH 2 Katcha
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 66
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
14 Puttagunta 45+810 Gudivada Valiveti Seshagirirao Jayaharinadh L-6.9 TH 5 Katcha
15 Kanumolu 55+820 NuzvidChamarthi venkatanarasimharao Viswanadham R-6.2
NTH 2 Pucca
16 Kanumolu 55+860 Nuzvid Allamuri Murali Krishana Prasadarao L-6.2NTH 4 Pucca
17 Kanumolu 55+870 Nuzvid Chamarthi Venketeswararao Rammohanarao R-5NTH Pucca
18 Kanumolu 55+900 Nuzvid Vanamala Eswararao Nageswararao R-6.5NTH 4 Semipucca
19 Kanumolu 55+930 Nuzvid Morla Venkateswramma Vasantharao R-5.5NTH 1 Semipucca
20 Kanumolu 55+930 Nuzvid polasi Pothuraju Abimanyarao R-5.5NTH 4 Pucca
21 Kanumolu 55+940 Nuzvid Maredu Rambabu Sobhanachalam R-5.7NTH 4 Semipucca
22 Kanumolu 55+960 Nuzvid Bhemavarapu Rangarao mangayya R-5NTH 3 Pucca
23 Kanumolu 55+960 NuzvidChintala Ravivenkatasatyanarayana
Satyavenkataramarao R-5.7
NTH 4 Pucca
24 Kanumolu 56+000 Nuzvid Volusuri Venugopal L-4.2 TH 5 Pucca
25 Kanumolu 56+200 Nuzvid Bandili Satyanarayana singh Subbisingh L-6NTH Semipucca
26 Kanumolu 56+350 Nuzvid Naraharasetty Venkateswraro Venkataratnam R-7 TH 2 Semipucca
27 Kanumolu 56+350 NuzvidNaraharasetty Venkatasatya Gangadhar Venkataratnam R-7 TH 4 Semipucca
28 Perikeedu 57+300 Nuzvid Singireddy Narakumari Chennakesavarao L-7NTH 4 Semipucca
29 Perikeedu 57+320 Nuzvid Gottapu Koteswararao Paparao L-7NTH 3 Semipucca
30 Perikeedu 57+360 Nuzvid Allu Trimurtulu Narayanarao L-6.5NTH 4 Semipucca
31 Meerjapuram 67+620 Nuzvid Badipati IsakPerson Not Available L-6.2
NTH 5 Katcha
32 Meerjapuram 68+850 NuzvidPamidikondala Radhakrishana Ramachandrarao L-5
NTH 2 Katcha
33 Gollapalli 72+070 Nuzvid Pamarthi Kriskanakumari Radhakrishana L-7NTH 1 Katcha
34 Gollapalli 72+405 Nuzvid Shaik Babu Abdhul L-5.7NTH 6 Semipucca
35 Annavaram 86+505 Nuzvid Ede Savitri Sambasivarao R-5.4 TH 4 Katcha
36 Annavaram 86+720 Nuzvid Katuri Subbarao Venkayya L-6.7NTH 0 Katcha
37 Annavaram 86+820 Nuzvid Mareedu Chennakesavarao Narayana L-5.9NTH 5 Semipucca
PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Cattleshed Category
Sl.N
o
Name of the Village
Cha
nage
Division Name of the HouseHold Head(HHH)
Father\husband name
Loca
tion
(Lef
t\ R
ight
)
Title
ho
lder
(TH
)/Non
Title
Hol
der(
NTH
)N
o of
Fam
ily
Type of Structure
1 Pedna 7+020 Machilipatnam Varudhu Ramachandrarao Subbarao R-3 TH 3 Katcha
2 Pedna 7+120 Machilipatnam jonabattula koteswaramma Nancharayya R-2 NTH 5 Katcha
3 Pedna 7+220 Machilipatnam Varudhu Nancharayya Subbarao R-4.5 TH 6 Katcha
4 Pedna 7+280 Machilipatnam Varudhu Ragavayya Subbayya R-6 NTH 3 Katcha
5 Pedna 7+325 Machilipatnam Maruboiena Srinivasarao Nageswarao R-6 TH 6 Katcha
6 Pedna 7+360 Machilipatnam Varudhu Venkateswararo Koteswararo L-5 NTH 5 Katcha
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 67
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
7 Pedna 7+430 Machilipatnam Varudhu Suryachanrraro Venkatasubbayya R-9 NTH 13 Katcha
8 Pedna 7+450 Machilipatnam Varudhu Subbarao Madavarao R-6 NTH 7 Katcha
9 Nadupuru 10+930 Machilipatnam Polagiri nageswararao Srimahathi R-6.5 NTH 4 Katcha
10 Reddipalaem 13+420 Gudivada Katta Laxminarayana Subbayya R-8.2 TH 5 Katcha
11 Reddipalaem 13+425 Gudivada Bellamkonda Venkateswarao Mallikarjunarao L-7.5 NTH 4 Katcha
12 Reddipalaem 13+425 Gudivada Bellamkonda Sahademudu Mallikarjunarao L-7.5 NTH 3 Katcha
13 Reddipalaem 13+510 Gudivada Pamarthi VeeraVenkateswarao Rangarao R-8 NTH 5 Katcha
14 Reddipalaem 13+525 Gudivada Pamarthi Venkataswamy Ramayya R-7 NTH 4 Katcha
15 Reddipalaem 13+890 Gudivada Pamarthi Ramesh Dasaradharamayya R-7 NTH 4 Katcha
16 Reddipalaem 13+900 Gudivada Pamarthi Ankalarao Ragavulu R-7.5 NTH 2 Katcha
17 Reddipalaem 14+400 Gudivada Parasa Reddemma Durgayya L-9 NTH 3 Katcha
18 Vaddlamannadu 15+400 Gudivada Kolusu Reddayya Veraraju L-6.5 TH 5 Katcha
19 Vaddlamannadu 15+420 Gudivada Madamala Sivaleela Venkateswararao R-5 NTH 2 Katcha
20 Vaddlamannadu 15+560 Gudivada Yadaala Ramarao Rajarao L-6.2 NTH 2 Katcha
21 Vemavaram 16+820 Gudivada Yarlagadda hunumantharao Rammurthy L-4.5 NTH 4 Katcha
22 Vemavaram 16+880 Gudivada Pamarthi Samrajam Rangarao L-4.5 NTH 2 Katcha
23 Vemavaram 16+900 Gudivada Yarlagadda Nagapanindhra M/o Vijayamma L-5.5 NTH 3 Katcha
24 Vemavaram 17+050 Gudivada Sonti Venkateswarao Veraswamy L-5.2 TH 5 Katcha
25 Vemavaram 17+100 Gudivada Vemula Durgarao Danayya L-4.5 NTH 2 Katcha
26 Vemavaram 17+140 Gudivada Vemula Veraanjeneyulu Venkateswaralu L-4.5 NTH 2 Katcha
27 Vemavaram 17+140 Gudivada Mannem Gopalarao Daharmayya L-4.5 NTH 3 Katcha
28 Vemavaram 17+150 Gudivada Mannem ChinaRagavulu Daharmayya L-4.5 NTH 2 Katcha
29 Vemavaram 17+160 Gudivada Mannem Nageswararao Venkateswaralu L-4.5 NTH 4 Katcha
30 Vemavaram 17+180 Gudivada Mannem Pedaragavayya Venkateswaralu L-4.5 NTH 5 Katcha
31 Bommuluru 31+100 GudivadaGutta jagadesh chandrachowdary Venkata swamy R-7 NTH 4 Katcha
32 Bommuluru 31+620 Gudivada Uyyapatti koteswararo Duravasulu R-9 NTH 6 Katcha
33 Janardhanapuram 40+820 Gudivada Kondapalli Ravi Akiripalli R-7 NTH 4 Katcha
34 Janardhanapuram 41+400 Gudivada Pilli Srinivasaarao Subbarao L-7 NTH 4 Katcha
35 Janardhanapuram 41+650 Gudivada NarapareddyPerson Not Available R-8 NTH 3 Katcha
36 Janardhanapuram 41+650 Gudivada RajaraoPerson Not Available R-8 NTH 4 Katcha
37 Arugolanu 53+650 Nuzvid Varri Chakravarthi Rajarao R-8 NTH 5 Katcha
38 Kanumolu 55+430 Nuzvid Dodda Koteswrarao Ratnam L-6 NTH 6 Katcha
39 Kanumolu 56+450 Nuzvid Badicherla Narasimharao Koteswararo R-7.5 NTH 6 Katcha
40 Perikeedu 57+560 Nuzvid Tavva Suryaprakasarao Purnayya L-7.2 NTH 6 Katcha
41 Perikeedu 58+880 Nuzvid Padmala Venkateswararo Venkatanarasayya L7 NTH 6 Katcha
42 Marribandam 65+100 Nuzvid Podhuri Srinu Rattayya R-7 NTH 3 Katcha
43 Meerjapuram 67+801 Nuzvid Tegala Tirupathirao Ramulu L-7 NTH 7 Katcha
44 Annavaram 86+760 Nuzvid Gholla Laxmayya Chintayya L-7.2 NTH 0 Katcha
45 Annavaram 86+820 Nuzvid Ganduboiena Nagaraju Ramarao R-8 NTH 3 Katcha
PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Kiosks Category
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 68
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
Sl.N
o
Name of the Village
Cha
nage
Division Name of the HouseHold Head(HHH) Father\husband name
Loca
tion
(Lef
t\ R
ight
)
Title
ho
lder
(TH
)/Non
Titl
No
of F
amily
M
embe
rs
Type of Structure
1 Pedna 9+650 Machilipatnam MD.Sardhar Awa L-5 NT
H 3 Kisok
2 Nadupuru 12+050 Machilipatnam Parasa Gopalkrishana Nancharayya R-4.5 NT
H 5 Kiosk
3 Vaddlamannadu 15+440 Gudivada Sk.Raheman Not Available L-5NTH 0 Kiosk
4 Vaddlamannadu 15+450 Gudivada N.Sambasivarao Not Available L-5.5NTH 0 Kiosk
5 Vaddlamannadu 15+480 Gudivada Udayagiri Venkateswararao Person Not Available R-6.5
NTH 0 Kiosk
6 Vaddlamannadu 15+520 Gudivada Thota Umashankar Person Not Available L-7NTH 3 Kiosk
7 Vaddlamannadu 15+550 Gudivada Thota venkatanagaanjeneyulu Hunumantharao L-6.8
NTH 2 Kiosk
8 Vaddlamannadu 15+560 Gudivada G.Nageswararao Person Not Available L-6.5NTH 0 Kiosk
9 Vaddlamannadu 15+560 Gudivada Gandam Rangarao Venkatakrishanarao R-6.5NTH 0 Kiosk
10 Vaddlamannadu 15+560 Gudivada Garikipati laxmayya Ragavayya R-6.8NTH 4 Kiosk
11 Vaddlamannadu 15+580 Gudivada NKV Subbarao Venu R-6.8NTH 4 Kiosk
12 Vemavaram 17+630 Gudivada M.Ismail Kondayya L-4.2NTH 6 Kisosk
13 Vemavaram 17+690 Gudivada Mannem Nageswararao Venkateswaralu L-4.5NTH 1 Kisosk
14 Vemavaram 17+700 Gudivada Mannem Nageswararao Person Not Available L-4.5NTH 2 Kisosk
15 Vemavaram 17+710 Gudivada Tammisetty nookalu nookalu L-4.5NTH 3 Kisosk
16 Vemavaram 17+730 Gudivada Akurathi hema Srinivasarao L-4.5NTH 4 Kisosk
17 Vemavaram 17+730 Gudivada Munagala Pramela Danumjay L-4.5NTH 4 Kisosk
18 Vemavaram 17+730 Gudivada Satyanarayana Person Not Available L-4.5NTH 3 Kisosk
19 Vemavaram 17+780 Gudivada Srisylam Person Not Available L-4.5NTH 3 Kisosk
20 Vemavaram 17+810 Gudivada Sarveswararao Person Not Available L-4.5NTH 0 Kisosk
21 Vemavaram 17+810 Gudivada Basaveswararao Person Not Available L-4.6NTH 0 Kisosk
22 Vemavaram 17+820 Gudivada Tammisetty Suryanarayana Person Not Available R-6
NTH 0 Kisosk
23 Vemavaram 17+820 Gudivada kagita Veranjeneyulu Person Not Available R-6NTH 0 Kisosk
24 Vemavaram 17+830 Gudivada Bapanayya Person Not Available R-6NTH 0 Kisosk
25 Vemavaram 17+830 Gudivada Chetturu jaganadharao nageswarrao R-6NTH 4 Kisosk
26 Vemavaram 17+840 Gudivada Narapalem krishana Rangarao L-6NTH 5 Kiosk
27 Vemavaram 17+840 Gudivada Bodda Romahanaramesh pullarao L-6NTH 3 Kiosk
28 kowthvaram 22+065 Gudivada koreni Appayamma Chittibabu L-4.4NTH 3 Katcha
29 kowthvaram 22+070 Gudivada Allu suryanarayana W/o Atchinaidu L-6NTH 3 SemiPucca
30 kowthvaram 22+120 Gudivada Sonayala Suryanarayan a Satyam R-6.8NTH 1 Kiosk
31 Gudlavalleru 22+780 Gudivada Alajangi Lingamurthy Sambayya R-9NTH 0 Kiosk
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 69
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
32 Gudlavalleru 23+000 Gudivada Ch.Krishana Musalayya R-8NTH 4 Kiosk
33 Gudlavalleru 23+000 Gudivada Miriyala veranjeneyulu Veravenkayya R-8NTH 6 Kiosk
34 Gudlavalleru 23+030 Gudivada Mukkudi Rajasekhar Setti narayana R-6NTH 2 Kiosk
35 Gudlavalleru 23+220 Gudivada kaja pandu Gangayya R-7NTH 5 Kiosk
36 Gudlavalleru 23+220 Gudivada katuri Arjunrao Person Not Available R-7NTH 4 Kiosk
37 Gudlavalleru 23+990 Gudivada Mutthireddy Sekhar Nagamalleswararao L-6NTH 4 Kiosk
38 Gudlavalleru 23+860 Gudivada v.laxmiPrasadarao Person Not Available L-7.2NTH 0 Kiosk
39 Angalur 27+820 Gudivada Vadladi Jagadish Subbarao R-7.3NTH 4 Kiosk
40 Angalur 27+820 Gudivada Dhulupudi Nagamalleswar Venkataramana R-7.3NTH 2 kiosk
41 Angalur 27+830 Gudivada Kodali Madhu Venkataratnam L-6.7NTH 5 Kiosk
42 Angalur 27+850 Gudivada Merugumalla Srinivasarao Bheemarao R-8.8NTH 4 Katcha
43 Bommuluru 31+200 Gudivada Cheboiena Umadevi Venkateswararao R-8NTH 2 kiosk
44 Bommuluru 31+430 Gudivada Rangula Raju Tadayya R-8.5NTH 4 kiosk
45 Bommuluru 31+600 Gudivada Sonti Dhanalaxmi Late)Harinadh R-8.8NTH 3 Kiosk
46 Bommuluru 31+610 GudivadaChilakabatthina Chinakoteswararao padalalu L-7.3
NTH 3 Kiosk
47 Bommuluru 31+620 Gudivada Chilakabatthula nagaraju Sreeramulu L-6.1NTH 4 Kiosk
48 Gudiwada 37+220 Gudivada Ramanapudi Suresh Venkateshswararao l-8NTH 5 Kiosk
49Janardhanapuram 39+400 Gudivada Godavalli Sambasivarao Parasuramayya L-5
NTH 2 Kiosk
50Janardhanapuram 40+880 Gudivada Tammi Narapureddy Marikayalareddy L-9.5
NTH 0 Kiosk
51Janardhanapuram 40+890 Gudivada
Bommanapalli Venkataswamy Chinna L-8.2
NTH 0 Kiosk
52Janardhanapuram 41+000 Gudivada
kokkerapati Subbaramayya krishana L-9.5
NTH 0 Kiosk
53Janardhanapuram 41+080 Gudivada Annem koteswararao iyyanna R-6
NTH 5 Kiosk
54Janardhanapuram 41+100 Gudivada Pavisa Rammohanarao Venkatanarayana L-6.9
NTH 2 Kiosk
55Janardhanapuram 41+100 Gudivada Manepalli subbarao Adinarayana R-6
NTH 2 Kiosk
56Janardhanapuram 41+110 Gudivada Muddula Gopalakrishana Ramanjaneyulu R-6.5
NTH 4 Kiosk
57Janardhanapuram 41+150 Gudivada Vempala Venkatalaxmi Person Not Available L-5
NTH 0 Kiosk
58Janardhanapuram 41+150 Gudivada C.Vijaya Person Not Available R-7
NTH 0 Kiosk
59Janardhanapuram 41+155 Gudivada S.Venkatasitaramayya Amba lakshmaiah L-6.8
NTH 0 Kiosk
60Janardhanapuram 41+200 Gudivada Awalomdhar Ajibabau Hoozoor L-7
NTH 2 Kiosk
61Janardhanapuram 41+210 Gudivada Mekala laxmi kanakapothuraju L-8
NTH 3 Kiosk
62Janardhanapuram 41+500 Gudivada pattumuri Satyanarayana Krishana L-7.2
NTH 4 Kiosk
63 Puttagunta 45+800 Gudivada maddala Venkateswararo Person Not Available L-8NTH 0 Kiosk
64 Arugolanu 50+600 NuzvidReddysobhana chalapathirao Atchiyya L-7.8
NTH 2 Kiosk
65 Arugolanu 50+740 Nuzvid V.Kesavarao Varalaxmi R-6.2NTH 3 Kiosk
66 Arugolanu 51+150 Nuzvid Vadavalli Sivabully Manikyarao L-6.5 NT Kiosk
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 70
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
challyya H
67 Kanumolu 55+645 NuzvidChintapalli Prasannakumari Prabhakar(late) R-8
NTH 3 Kiosk
68 Kanumolu 55+670 Nuzvid Chinnam Siyyaon Somayya R-7NTH 1 Kiosk
69 Kanumolu 55+740 Nuzvid kattumala Adrutstarao Imannual R-5.5NTH 1 Kiosk
70 Kanumolu 56+980 NuzvidPanchakarla Satyanarayana Venkataramana R-8
NTH 4 Kiosk
71 Kanumolu 56+980 Nuzvid Vijayakumar Bhyragi R-4.2NTH Kiosk
72 Kanumolu 56+070 Vanukuri Edukondalu Satyanarayana(late) L-10NTH Kiosk
73 Perikeedu 57+350 Nuzvid Vankuri Hunumantharao Verayya L-7NTH Kiosk
74 Perikeedu 57+650 Nuzvid Singarapu Durgarao Simhachalam R-7.5NTH Kiosk
75 Marribandam 64+700 Nuzvid Rayavarapu Swami Rangarao L-6.4NTH 4 Kiosk
76 Marribandam 64+720 Nuzvid Aladangi Ugadi Chinnarao L-6NTH 4 Kiosk
77 Marribandam 64+745 Nuzvid Vaddadi Trinadh Appalaswamy L-7NTH 0 Kiosk
78 Marribandam 64+810 Nuzvid Machavarapu Tirupatayya Ramdhar L-6NTH 2 Kiosk
79 Marribandam 65+850 Nuzvid Vadduluri Venkateswararo Raghavalu L-8.1NTH 6 Kiosk
80 Marribandam 65+850 Nuzvid Jakkula Laxmi Venkataramana L-8.1NTH 2 Kiosk(2shops
81 Marribandam 65+850 Nuzvid Chabathina Ratnasamual Samual R-8NTH Kiosk
82 Meerjapuram 68+910 Nuzvid Sedirala Koteswararao Venkatasubbarao L-8NTH kiosk
83 Meerjapuram 68+940 Nuzvid Sutrala Rangarao Subbarao R-7.3NTH kiosk
84 Meerjapuram 68+940 Nuzvid Maragani Nehrukanth Ayanna R-9NTH 5 kiosk
85 Meerjapuram 68+960 NuzvidMaddirala NagaSriragavarao Venu L-9
NTH kiosk
86 Meerjapuram 69+030 Nuzvid Yarramsetty Loknadh Tirupatiayya L-8.5NTH kiosk
87 Gollapalli 72+100 Nuzvid Penumada Kalebu Venkataratnam L-9NTH 3 kiosk
88 Gollapalli 72+180 Nuzvid Koduru Nageswararao Subbarao L-7NTH 2 kiosk
89 Gollapalli 72+200 Nuzvid Owner not Available Person Not Available NTH kiosk
90 Gollapalli 72+265 Nuzvid Shaik Meerjavali Kaream R-6NTH 4 Kiosk
91 Gollapalli 72+410 Nuzvid Mylavarapu Tirapatirao Raghunadam L-6.8NTH 0 kiosk
92 Gollapalli 72+710 Nuzvid Ulaga Krishana Venkayya L-5.7NTH 4 Kiosk
93 Gollapalli 72+720 NuzvidMylavarapu Venkateswararao Subbarao R-5.3
NTH 4 Kiosk
94 Morsapudi 75+200 Nuzvid G.Apparao Person Not Available R-6.4NTH 4 Kiosk
95 Tukkuluru 78+430 Nuzvid Badugu Venkateswararao Kondayya L-8NTH 5 Kiosk
96 Tukkuluru 78+430 Nuzvid Kosuri Srinivasarao Venkateswararao R-6.8NTH 4 Kiosk
97 Tukkuluru 78+430 Nuzvid Kosaraju Rajarao Person Not Available R-7.2NTH 6 Kiosk
98 Annavaram 86+770 Nuzvid Satyanarayana Jaganadham L-7.8NTH 0 Kiosk
99 Annavaram 86+820 Nuzvid Koppakala Sitaramayya Venkateswrarao L-7.5NTH 0 Kiosk
100Hunumuntulagudem 89+880 Nuzvid Polapaka Sudhakar Prasadarao L-8
NTH 5 kiosk
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 71
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
101 Mittagudem 90+680 Nuzvid Velivela Gopalaswamy Venkataratnam R-8.8NTH 2 Kiosk
102 Mittagudem 90+705 Nuzvid Chalamala Sambasivarao Bulliramayya R-7.8NTH 6 Kiosk
103 Mittagudem 90+900 Nuzvid Janga Somasundhar Yakobu L-7.5NTH 0 Kiosk
104 Leelanager 92+180 Nuzvid Kethe Jaganadharao Seetayya L-8NTH 4 Kiosk
105 Leelanager 92+180 Nuzvid Kethe Sheshamma Tirupatayya L-6.9NTH 5 Kiosk
ANNEXURE 2.3: COMMUNITY PROPERTY RESOURCES OF PEDNA- NUZVID- VISANNAPETA ROAD.
S.no Name of the Common Property Resources ChainageLocation (Left/Right)
Distance from the Centre line in Mts) Remarks
1 Eadgah 9+300 Right 3Situated in Proposed By
pass
2 Hanuman Temple 12+020 Left 5 Direct Affect.
3 Human Temple 13+750 Left 6 Direct Affect.
4 Kondalamma Temple 17+700 Left 5 Direct Affect.
5 sai temple 22+100 Left 1.5 Indirect Affect.
6 Human Temple 23+650 Left 5 Direct Affect.
7 Ram temple 23+750 Left 5 Direct Affect.
8 Krishna Temple 24+000 Left 6.5 Direct Affect.
9 Hanuman Temple 27+850 Left 7.4 Direct Affect.
10 Krishana Temple 27+865 Right 7.3 Direct Affect.
11 Ram temple 31+160 Left 15 Indirect Affect.
12 Church 31+600 Left 6.5 Direct Affect.
13 Hunuman Temple 39+420 Right 8 Direct Affect.
14 Ayyappa Swami Temple 39+420 Right 9 Direct Affect.
15 Temple 39+450 Right 18 Indirect Affect.
16 Sivalayam Temple 41+000 Left 7 Direct Affect.
17 Ganapathi Temple 45+640 Left 5 Direct Affect.
18 Church 46+220 Right 8 Direct Affect.
19 Temple 47+800 Right 10 Direct Affect.
20 Temple 49+000 Left 10 Direct Affect.
21 Catalic Church 50+350 Left 8 Indirect Affect.
22 Temple 50+700 Left 8 Direct Affect.
23 Sai temple 50+975 Left 7 Direct Affect.
24 Sai temple 51+100 Right 8 Direct Affect.
25 Krishana temple 51+210 Left 8 Direct Affect.
26 Temple 51+400 Left 9 Direct Affect.
27 Temple 51+500 Left 12 Indirect Affect.
28 KrishanaTemple 53+700 Left 9 Direct Affect.
29 Church 55+625 Left 9 Indirect Affect.
30 Church prayer hall 55+700 Right 9 Indirect Affect.
31 Statue(Jesus & CPI) 55+800 Left 7 Direct Affect.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 72
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
32 Ramalayam Temple 55+810 Left 6 Direct Affect.
33 Ramalayam Temple 55+950 Left 7 Direct Affect.
34 Hanuman Temple & pond 56+050 Left 5.5 Direct Affect.
35 sai temple 56+200 Left 9 Direct Affect.
36 Temple 57+300 Left 4.5 Direct Affect.
37 Ayyappa Swami Statue 57+450 Left 5 Direct Affect.
38 Temple Ayyappa Swamy 57+450 Left 12 Indirect Affect.
39Statues of Gandhi garu and Subashchandrabosu
garu 57+550 Right 8.5 Direct Affect.
40 VinayakaTemple 64+300 Left 4.5 Direct Affect.
41 HunumanTemple 64+500 Right 6.5 Direct Affect.
42 Temple & Tap 65+810 Left 5.5 Direct Affect.
43 Temple 67+600 Left 5.5 Direct Affect.
44 Hunuman Temple 68+000 Right 7 Direct Affect.
45 Veerabramamgari Tempel 69+100 Right 8 Direct Affect.
46 Hanuman Temple 72+450 Left 7 Direct Affect.
47 Hanuman Statue 75+100 Left 7 Direct Affect.
48 Jesus statue 75+200 Left 7 Direct Affect.
49 Ganesh temple 75+400 Right 8 Direct Affect.
50 Hanuman temple 77+200 Left 6.2 Direct Affect.
51 mosque 78+250 Right 12.5 Indirect Affect.
52 Temple 84+200 Right 12 Indirect Affect.
53 Hanuman Temple 85+400 Right 12 Indirect Affect.
54 Temple 86+400 Left 6
55 Ram temple 86+700 Left 7
56 Temple, School 88+400 Left 20 Indirect Affect.
57 Hanuman Statue 89+500 Right 6.5 Direct Affect.
58 Hanuman temple 89+600 Right 8 Direct Affect.
59 church 90+700 Right 7 Direct Affect.
60 Hunman temple 91+750 Left 10 Direct Affect.
61 Temple, water tap 92+290 Left 8 Direct Affect.
62 Temple troc 93+300 Right 5.5 Direct Affect.
63 Hanuman temple 94+700 Left 10 Indirect Affect.
64 Trees 62+500 to 94+ 770 Both Sides5 to 6 mts distance Direct Affect.
65 Tree ( temple) 7+000 Right 1Situated in Proposed By
pass
66 Tree 23+850 L/R 7 Direct Affect.
67 Tree & Rachabanda 31+100 Left 8 Direct Affect.
68 Pond & Tree 45+650 Left 8 Direct Affect.
69 Tree ( temple) 56+100 Left 6 Direct Affect.
70 Tree & Rachabanda 64+720 Left 4 Direct Affect.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 73
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
71 Tree & Rachabanda 72+220 Left 8 Direct Affect.
72 Tree & Rachabanda 90+700 Right 5 Direct Affect.
73 Big pond 23+820 Left 9 Indirect Affect.
74 Pond 31+100 Left 8 Direct Affect.
75 Pond 40+900 Right 5 Direct Affect.
76 Big pond 43+200 & 500 Right 4 Direct Affect.
77 Pond 44+450 Right 8 Direct Affect.
78 Pond 46+750 Right 10 Indirect Affect.
79 Pond 55+400 Left 9 Indirect Affect.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 74
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
OTHER STRUCTURES OF PEDNA- NUZVID- VISANNAPETA ROAD.
S.no Name of the Other Property Resources ChainageLocation (Left/Right)
Distance from the Centre line in Mts) Remarks
1 School 31+350 Left 10 Indirect Affect.
2 School 51+400 Left 9 Direct Affect.
3 School 55+600 Left 5 Direct Affect.
4 School 56+300 Left 10
5 High School 56+350 Left 6 Direct Affect.
6 School 77+800 Right 12 Indirect Affect.
7 Well 7+550 Right 1Situated in Proposed By
pass
8 Tap 10+900 Right 5 Direct Affect.
9 Public Well 11+000 Left 6.5 Direct Affect.
10 Public Well 12+000 Left 6.5 Direct Affect.
11 Public Tap 12+020 Left 6.5 Direct Affect.
12 Well and Hand pump 17+000 Left 8 Direct Affect.
13 Public well 22+100 Left 10 Direct Affect.
14 tap 22+100 Left 6 Direct Affect.
15 Public well 22+200 Right 8 Direct Affect.
16 Water Tap 31+020 Right 6 Direct Affect.
17 Water Tap 37+350 Left 8.5 Direct Affect.
18 Direct Affect.
19 Tap 39+525 Right 7 Direct Affect.
20 Tap 41+600 Left 6 Direct Affect.
21 Tank, Tap, School 45+600 Right 15 Indirect Affect.
22 Tap 45+800 Right 7 Direct Affect.
23 Tap 45+850 Right 6 Direct Affect.
24 Tap 46+200 Right 6 Direct Affect.
25 Taps(Panchayathi) 50+500 to 50+750Left -2taps Right-
5taps 6 to 7 mts Direct Affect.
26 Temple & Tap 65+810 Left 5.5 Direct Affect.
27 Tap 67+640 Left 6 Direct Affect.
28 Tap 72+550 Left 8 Direct Affect.
29 Tap 75+180 Left 8 Direct Affect.
30 Hand pump 84+650 Right 5 Direct Affect.
31 Hand pump 87+950 Left 5 Direct Affect.
32 Tap 88+400 Left 6 Direct Affect.
33 Hand pump 88+600 Left 6 Direct Affect.
34 Hand pump 89+580 Left 5 Direct Affect.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 75
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
35 Hand pump 89+950 Left 6 Direct Affect.
36 Tap 90+580 Left 4 Direct Affect.
37 Temple, water tap 92+290 Left 8 Direct Affect.
38 Tap 92+500 Left 5 Direct Affect.
39 Tap 92+500 Right 5 Direct Affect.
40 Hand pump 93+300 Left 6 Direct Affect.
41 Govt.Ayurvedik Hospital 56+250 left 13 Indirect Affect.
42 BSNL tele Box 10+900 Left 7.8 Direct Affect.
43 Ele Bill Collection Center 23+650 Left 5 Direct Affect.
44 Milk Society 40+900 Right 5 Direct Affect.
45 Panchyat Office 41+100 Right 7 Direct Affect.
46 Panchyat Office 45+650 Right 7.6 Direct Affect.
47 Milk Society & Collection centre 51+240 8.5 Direct Affect.
48 library 51+250 Left 10 Direct Affect.
49 Panchyat Office 51+300 Left 9 Direct Affect.
50Agriculturel Cooprative Socity Building
&Gowdown 51+350 Right 9 Direct Affect.
51 Panchyat Office 56+010 Left 7 Indirect Affect.
52 library 56+260 Left 11 Indirect Affect.
53 Agriculturel Cooprative Socity Building 56+270 Left 9 Direct Affect.
54 Sub Register Office 56+350 Right 9 Indirect Affect.
55 BSNL office 58+950 Right 7.8 Indirect Affect.
56 Check Post 92+300 Left 5 Direct Affect.
57 Bus Shelter 10+650 Left 6 Direct Affect.
58 Bus Shelter 10+900 Left 7.8 Direct Affect.
59 Bus Shelter 13+750 Right 6.5 Direct Affect.
60 Bus Shelter 17+100 Right 8 Direct Affect.
61 Bus Shelter 17+820 Left 6 Direct Affect.
62 Bus Shelter 22+800 Left 7 Direct Affect.
63 Bus Shelter 23+650 Left 5 Direct Affect.
64 Committee Hall 23+800 Left 6 Direct Affect.
65 Subhasu Chandra Bose Statue 23+800 Left 6 Direct Affect.
66 Bus Shelter 23+900 Left 8 Direct Affect.
67 Krishna Temple Land 24+000 Left 6.5 Direct Affect.
68 Statue of NTR 24+050 Left 5 Direct Affect.
69 Bus Shelter 26+700 Left 5 Direct Affect.
70 Bus Shelter 27+820 Right 7.5 Direct Affect.
71 Bus Shelter 27+875 Left 8.35 Direct Affect.
72 NTR Statue 31+150 Left 8.5 Direct Affect.
73 Bus Shelter 31+200 Right 8 Direct Affect.
74 Br.Ambedkar Statue 37+200 Right 10 Indirect Affect.
75 Bus Shelter 37+450 Left 6.5 Direct Affect.
76 Municipal Waste 38+900 Right 10 Indirect Affect.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 76
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
77 Bus Shelter 39+300 Right 7 Direct Affect.
78 TDP Flag 40+800 Right 6 Direct Affect.
79 CPM Flag 40+800 Right 6 Direct Affect.
80 YSR Flag 40+810 Right 6 Direct Affect.
81 Community Hall 40+810 Right 6 Direct Affect.
82 Over Head Tank 41+000 Left 12 Indirect Affect.
83 YSR Statue 41+100 Left 8.5 Direct Affect.
84 Bus Shelter 41+100 Right 7 Direct Affect.
85 YSR Flag 45+790 Left 6 Direct Affect.
86 Community Hall 45+800 Left 8 Direct Affect.
87 Community Hall 46+400 Right 8 Direct Affect.
88 Ambedkar Statue 46+500 Right 13 Indirect Affect.
89 Bus Shelter 49+200 Left 6.4 Direct Affect.
90 Church Ground 50+350 Left 12 Indirect Affect.
91 Bus Shelter 50+800 Left 7 Direct Affect.
92 Abbedkar Statue 50+800 Left 8 Direct Affect.
93 Youth Community Hall 51+210 Left 9 Direct Affect.
94 Dr.Water Plant 51+230 Left 9 Direct Affect.
95 Nethaje Statue 50+300 Left 9 Direct Affect.
96 Over Head Tank 51+350 Left 8 Direct Affect.
97 Cemetery 55+300 Left 7 Direct Affect.
98 Over Head Tank 55+500 Right 15 Indirect Affect.
99 Ambedkar Statue 55+750 Right 12 Indirect Affect.
100 Statue(Jesus & CPI) 55+800 Left 7 Direct Affect.
101 Statue & Committee Hall 56+150 Left 9 Indirect Affect.
102 Bus Shelter 56+340 Left 8 Direct Affect.
103 Bus Shelter 57+550 Right 8.5 Direct Affect.
104Statues of Gandhi garu and Subashchandrabosu
garu 57+550 Right 8.5 Direct Affect.
105 JMJ junior College 58+925 Right 8.2 Indirect Affect.
106 JMJ junior College 58+950 Right 8.2 Indirect Affect.
107 NTR Statue 64+850 Left 6 Direct Affect.
108 Bus Shelter 68+500 Right 10 Direct Affect.
109 Over Head Tank 69+100 Right 15 Indirect Affect.
110 Bus Shelter 72+200 Right 9 Direct Affect.
111 Bus Shelter 72+400 Left 6 Direct Affect.
112 Bus Shelter 75+050 Left 6.5 Direct Affect.
113 TDP Flag 75+100 Left 6.5 Direct Affect.
114 Congrase Flage 75+110 Left 6 Direct Affect.
115 Bus Shelter 76+180 Left 7 Direct Affect.
116 Bus Shelter 78+500 Right 6.2 Direct Affect.
117 IFTU Flag 87+720 Left 5.5 Direct Affect.
118 CPI Statue 87+940 Left 5 Direct Affect.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 77
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
119 TDP Flag 87+950 Left 6.5 Direct Affect.
120 Bus Shelter 87+950 Right 6 Direct Affect.
121 Bus Shelter 90+050 Left 7 Direct Affect.
122 NREGS Board 90+18 Right 5.5 Direct Affect.
123 NRGS Board 91+830 Left 5 Direct Affect.
124 Scheme NGRY - Display Board 94+400 Left 4.5 Direct Affect.
125 Trees 62+500 to 94+ 770 Both Sides5 to 6 mts distance Direct Affect.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 78
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
ANNEXURE 2.4 : CONSULTATION FINDINGSVenue-Janardhanpuram, Machilipatnam
ParticipantProject Preparation Team: Social, environmental and technical expert of the consultant, environmental officer APRDC, Stakeholders: Local engineers(R&B),MRO, Dy S.P., MLA representatives, Revenue officials, Elected representatives of local self- Government
Issue Discussed
Relocation of temple in general from road side Importance and utility of ponds Cost of agricultural Land Submerged stretches Migration and HIV/AIDS issues
Suggestion Relocation is possible if replacement is done Pond is source of potable water , fish farming is done thus source of livelihood so minimize
impact on pond Cost of land is very high because it is a productive land of lower deltaic flood plain
Important Finding
Land acquisition should be minimized Direct purchasing of land should be done to avoid litigation HIV/AIDS is not considered important because of low level of awareness and people find
restricted themselves in discussing HIV/AIDS issueFuture course of Action
Land acquisition strategy should be devised HIV/AIDS awareness campaign should be part of social management plan to generate awareness
and BCC among general people
Venue: Nadupuru,Pedna,Krishna
Participant
Project Preparation Team: Social, environmental and technical expert of the consultant, environmental officer APRDC, Stakeholders: Local engineers(R&B),MRO, MLA representatives, Revenue officials, Elected representatives of local self- Government
Issue Discussed
All ready encroachment have been compensated by 2 Cents and Rs 33000 per family for construction
Cost of relocation of pucca structure in the village and cost of land Tree cutting Utility shifting Migration and HIV/AIDS issues
Suggestion Multiple displacement of commercial families should be avoided Acquisition of pucca structure should be avoided Cost of land is very high because it is a productive land of lower deltaic flood plain Tree cutting is part of Government so Government should take care of such issues
Important Finding
People are very cooperative. Involvement of local R&B engineers in project planning will be key to successful
implementation of land acquisition.Future course of Action
Land acquisition strategy has been devised HIV/AIDS awareness campaign has become of social management plan(SMP).
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 79
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
Annexure: 3.1: CHAINAGE WISE ENCUMBRANCE DETAILS
S.No Village
Chainage Type Of Encumberances
Remarks
From To LA LA and R&R
R&R and CPR
Encumbrance Free Stretch
PNV - 81 Pedna 7+000 7+500 500
7+500 9+650 2150 Bye Pass
9+650 9+850 200
9+850 10+700 850
2 Nadupuru 10+700 12+100 1400
12+100 13+400 1300 3 Reddipalem 13+400 14+400 1000 14+400 15+190 790
4 Vadlamadugu 15+190 15+360 170
15+360 16+740 1380 5 Vemavaram 16+740 17+840 1100 17+840 18+900 1060
6 Kowtaram 18+900 21+000 2100 Bye Pass
21+00 22+065 1065
22+065 22+200 135
22+200 22+760 560 7 Gudlavalleru 22+760 23+860 1100 23+860 25+500 1640
8 Anguluru 25+500 25+750 250
25+750 27+820 2070
27+820 28+010 190
28+010 31+000 2890 9 Bommuluru 31+000 31+330 330 31+330 31+430 100 31+430 37+220 5790
10 Gudivada 37+220 37+400 180
37+400 39+400 2000 11 Janardhanapuram 39+400 41+770 970
41+770 45+200 3430
12 Puttagunta 45+200 46+400 1200
46+400 48+700 2300 13 Shivayypakalu 48+700 48+710 10
48+710 50+500 1790
14 Arugolalu 50+500 51+400 900
51+400 54+000 2600
15 Kanumolu 54+000 54+400 400 54+400 54+760 360
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 80
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
54+760 55+200 440 55+200 55+410 210 55+410 56+460 1050 56+460 56+600 140
16 Perikeed 56+600 57+200 600
57+200 57+300 100
57+300 58+880 1580
58+880 59+000 200
Sub Total 5340 1430 11185 32625
59+000 62+000 It is not in the scope of the ProjectPNV- 9
62+000 64+300 2300Hanuman Junction ( NH5)
17 Marribandam 64+300 65+900 1600 65+900 67+450 1550
18 Meerjapuram 67+450 70+200 2750
70+200 71+250 1050 19 Gollapalle 71+250 72+000 750
72+000 72+780 780
72+780 75+040 2260
20 Morsapudi 75+040 75+230 190
75+230 78+380 3150 21 Tukkuluru 78+380 78+600 480
22 Nuzvid 78+600 83+400 4800 Bye Pass
83+400 84+200 800
84+200 84+615 415
84+615 86+100 1485
23 Annavaram 86+100 86+175 75 86+175 86+310 135 86+310 87+210 900 87+210 88+350 1140
24 Venkatdripuram 88+350 88+350 0
88+350 89+700 1350 25 Hunumanthulagudem 89+700 90+400 700
26 Mittagudem 90+400 90+960 560
90+960 92+180 1220 27 Leelanageer 92+180 92+300 120
92+300 96+000 3700 Sub Total 5625 3930 4565 20140
TOTAL 10965 5360 15750 55685
ANNEXURE : 5.1 : G.O Rt No. 1615 : PLMC CONSTITUTION
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 81
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
GOVERNMENT OF ANDHRA PRADESHABSTRACT
R&B Dept. – Andhra Pradesh Road Sector Project – Appointment of Commissioner at State level & Constitution of Project Level Monitoring Committee to monitor R&R Policy in the State - Orders-Issued.
TRANSPORT, ROADS & BUILDINGS (R.IV) DEPARTMENT
G.O.Rt.No.1615 Dt:03.11.2008.Read the following:
From the CE(R&B) Core Road Network & MD,APRDCLr.No.1/APRDC/APRSP/R&R/2007, dt:16.9.2008.
** ** **
ORDER:
The Government of Andhra Pradesh through Government of India has applied for financial assistance in the form of a Loan from the World Bank for the Andhra Pradesh Road Sector Project (APRSP) to a tune of US$ 320 million. Already 50% of the work has been commenced and tender processes also completed. As such it is felt that there is now necessity to appoint a Commissioner and Administrator to monitor the Rehabilitation and Resettlement activity of the APRSP.
2. Government, after careful examination of the matter, keeping Chapter IV & VIII of R&R Policy and in view of the recommendations of the Chief Engineer (R&B) Core Road Network & Managing Director,Andhra Pradesh Road Development Corporation in the reference read above, hereby issue orders for constitution of “Project Level Monitoring Committee” in each district of the State except Hyderabad.
3. The Project Level Monitoring Committee will be headed by Joint Collector of the concerned district in whose jurisdiction the main component of the project lies. In case the main component of the project spreads over more than one district, the senior among the Joint collectors involved shall chair the committee for reviewing and monitoring the progress of implementation of resettlement and rehabilitation relating to the project. The committee shall meet at least once in two months. The members of the committee will be as per the list under clause 8.3 of chapter VIII of R&R Policy with the Superintendent Engineer (R&B) of the concerned district as Convenor. 4. The Principal Secretary to Govt., T,R&B Department shall act as R&R Commissioner and Convenor at the State level.
2 The Chief Engineer [R&B] Core Road Network & Managing Director,Andhra Pradesh Road Development Corporation, Hyderabad shall take further action for constitution of Project Monitoring Committees with members as mentioned in the list under clause 8.3 of chapter 8 of R&R Policy.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 82
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
DR T CHATTERJEEPRINCIPAL SECRETARY TO GOVERNMENT
ToThe Chief Engineer (R&B) Core Road Network & Managing Director, Andhra Pradesh Road Development Corporation, Hyderabad.Copy to:The PS to Minister R&B. The PS to Prl.Secretary (TC).
// FORWARDED :: BY ORDER //
SECTION OFFICER
ANNEXURE 5.2: G O Rt. No. 167 – APPOINTMENT OF PROJECT ADMINISTRATOR
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 83
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
GOVERNMENT OF ANDHRA PRADESHA B S T R A C T
Roads & Buildings Department - Andhra Pradesh Road Sector Project - Appointment of Administrator for implementation of Resettlement and Rehabilitation activities – Orders –Issued.
5. - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - ------ TRANSPORT, ROADS & BUILDINGS (R.IV) DEPARTMENT
G.O.Rt.No. 167 Dated 19-02-2011.Read:
From the CE(R&B) CRN & Managing Director, APRDC. Lr.No. 1/APRDC/APRSP/R&R/2007, Dt: 25.01.2011 and even No. Dt.03.02.2011.
***O R D E R:
The Government of Andhra Pradesh through Government of India has taken financial assistance in the form of a Loan from the World Bank for the Andhra Pradesh Road Sector Project (APRSP) to a tune of US$ 320 million. Some packages have already been grounded, and the tender process for other packages is at various stages. As such, it is felt that there is now necessity to appoint Project Administrators to perform functions and duties envisaged under the policy on R&R for PAFs 2005, chapters IV, V and VI relating to the Resettlement and Rehabilitation activities of the Andhra Pradesh Road Sector Project. Implementation activities pertaining to Resettlement and Rehabilitation, some of which have already been carried out and also those which are yet to be carried out have to be taken up and completed by the Project Administrator i.e., the Joint Collector concerned.
1.The Chief Engineer (R&B) CRN & Managing Director, Andhra Pradesh Road Development Corporation has requested the Government to issue orders appointing Joint Collectors as Project Administrators of the districts, in which Widening and Strengthening of roads and PPP projects have been taken up.
2 Government after careful examination of the entire matter hereby appoint the following Joint Collectors as Project Administrators of the districts concerned against each road, in which Widening and Strengthening of roads and PPP projects have been taken up.
Sl. Road Name Distance in Districts Project Administrator
No. kms covered
I.
Widening and Strengthening Roads:
1. Chittoor Puttur 65 Chittoor Joint Collector,
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 84
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
Chittoor District.
2. Mydukur 45 Kadapa Joint Collector,
Jammalamadug Kadapa District
u
3. Kurnool 54 Kurnool Joint Collector,
Devanakonda Kurnool District.
4. Kandi 65 Mahaboob- Joint Collector,
Shadnagar nagar Mahaboobnagar
District.
Rangareddy Joint Collector,
Rangareddy District.
Medak Joint Collector, Medak
District.
5. Jagityal 58 Karimnagar Joint Collector,
Peddapalli Karimnagar District.
6. Kakinada 62 East Joint Collector, EastRajahmundry Godavari Godavari District.
7.Pedana – Nuzvid – Vissanapeta 95 Krishna Joint Collector,
Krishna District.II. PPP Roads:1. Hyderabad 207 Ranga- Joint Collector,
Karimnagar reddy Rangareddy District.Ramagundam
Medak Joint Collector, MedakDistrict.
Karim- Joint Collector,nagar, Karimnagar District.
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 85
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
Warangal Joint Collector,Warangal District.
Adilabad. Joint Collector,Adilabad District.
2. Narketpally 213 Nalgonda, Joint Collector,Addanki Nalgonda District.Medarametla
Guntur Joint Collector, GunturDistrict
Prakasam Joint Collector,Prakasam District.
3. Renigunta 58 Chittoor Joint Collector, ChittoorNaidupeta District.
Nellore Joint Collector, NelloreDistrict.
4. Renigunta 138 Kadapa Joint Collector, KadapaKadapa District.
Chittoor Joint Collector, ChittoorDistrict.
5. Khammam 177 Khammam Joint Collector, KhammamTallada District.Deverapalli
West Joint Collector, WestGodavari Godavari District.
4. The Joint Collectors are informed that the functions relating to the implementation of R & R activities such as approval of final Detailed Project Reports, minimizing displacements, identification of Project Affected Families (PAFs), holding consultations with PAFs, ensuring protection to the SC/STs and preparation of budgetary estimates etc. have been carried out and they are requested to carry out the remaining activities and take expeditious actions for immediate and complete implementation of Resettlement and Rehabilitation Plans.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
S.P.SINGHPRINCIPAL SECRETARY TO GOVERNMENT
The District Collectors concerned. The Joint Collectors concerned. Copy to:
Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 86
Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project
The Chief Engineer (R&B) Core Road Network & Managing Director, Andhra Pradesh Road Development Corporation, Hyderabad.The Chief Commissioner Land Administration AP, Hyderabad.The Commissioner, Govt.Printing press, Chancalaguda, Hyderabad for publication in the AP Gazette.The Special Officer AP Portal, IT and C Department, Secretariat.