world bank documentdocuments.worldbank.org/curated/en/... · the development objective of the...

23
The World Bank Skills Development Project (P131660) REPORT NO.: RES29214 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SKILLS DEVELOPMENT PROJECT APPROVED ON JUNE 19, 2014 TO REPUBLIC OF MALAWI EDUCATION AFRICA Regional Vice President: Makhtar Diop Country Director: Bella Bird Senior Global Practice Director: Jaime Saavedra Chanduvi Practice Manager/Manager: Sajitha Bashir Task Team Leader: Nobuyuki Tanaka Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 05-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

REPORT NO.: RES29214

RESTRUCTURING PAPER

ON A

PROPOSED PROJECT RESTRUCTURING

OF

SKILLS DEVELOPMENT PROJECT

APPROVED ON JUNE 19, 2014

TO

REPUBLIC OF MALAWI

EDUCATION

AFRICA

Regional Vice President: Makhtar Diop Country Director: Bella Bird

Senior Global Practice Director: Jaime Saavedra ChanduviPractice Manager/Manager: Sajitha Bashir

Task Team Leader: Nobuyuki Tanaka

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

ABBREVIATIONS AND ACRONYMS

ACE Africa Center of ExcellenceCSDS Community Skills Development CenterDLI Disbursement Linked IndicatorDLR Disbursement Linked ResultIDA International Development AssociationIIP Institutional Improvement PlanIR Intermediate ResultLUANAR Lilongwe University of Agriculture and Natural ResourcesMTR Mid-Term ReviewNCHE National Council for Higher EducationPDO Project Development ObjectivePI Participating InstitutionPIM Project Implementation ManualPPA Project Preparation AdvanceSDP Skills Development ProjectSDR Special Drawing RightsSPGA Sub-Project Grant AgreementTEVETA Technical, Entrepreneurial and Vocational Education and Training AuthorityTPV Third Party Validation

Page 3: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

BASIC DATA

Product Information

Project ID Financing Instrument

P131660 Investment Project Financing

Original EA Category Current EA Category

Partial Assessment (B) Partial Assessment (B)

Approval Date Current Closing Date

19-Jun-2014 30-Jun-2019

Organizations

Borrower Responsible Agency

Republic of Malawi Ministry of Finance, Economic Planning & Development

Project Development Objective (PDO)

Original PDOThe development objective of the proposed project is to increase access, market relevance, and results orientation of supported skills development institutions in agreed priority areas.OPS_TABLE_PDO_CURRENTPDOSummary Status of Financing

Ln/Cr/Tf Approval Signing Effectiveness ClosingNet

Commitment Disbursed Undisbursed

IDA-54720 19-Jun-2014 13-Aug-2014 11-May-2015 30-Jun-2019 41.90 21.11 16.28

IDA-H9590 19-Jun-2014 13-Aug-2014 11-May-2015 30-Jun-2019 4.90 3.52 .98

Policy Waiver(s)

Does this restructuring trigger the need for any policy waiver(s)?No

Page 4: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING

1. The Skills Development Project (SDP) was approved by the World Bank Board on June 19, 2014, and became effective on May 11, 2015. The project closing date is June 30, 2019. The project has realized a significant developmental impact to date. Four of the six PDO indicators are on track to being met and indeed exceeded; as are seven of nine intermediate results indicators. Project ratings have been steadily improving since Moderately Unsatisfactory in March 2016, and have been Moderately Satisfactory or Satisfactory for Implementation Progress for more than one year and progress towards achievement of the PDO for more than nine months.

2. Under Component 1, all participating institutions (PIs) have met all Disbursement Linked Results (DLRs) in Year 1 and Year 2, which have been verified by a third-party validation (TPV) firm for all five institutions. The validation of Year 3 results is currently underway. Under Component 2, NCHE plans to commission 20 consultancy services, out of which eight are concluded as of November 2017. Moreover, the PDO – to increase access, market relevance, and results orientation of supported skills development institutions in agreed priority areas – remains relevant, as in general do the PDO indicators with a focus on acquisition of skills by students, given the Government’s strategy for economic development will require enhanced skills in technical and scientific disciplines. The MTR also re-affirmed the relevance of the project design, given the achievements of the project to date, especially the use of Disbursement Linked Indicators (DLIs) to spur entrepreneurial behavior amongst the participating institutions and a focus on institutions identifying and pursuing their comparative advantages within an overall development strategy. The project has stepped up its use of technical assistance to address emerging issues.

3. Under a previous project restructuring, the disbursement category of unallocated funds (US$4.5 million equivalent) was cancelled, effective April 1, 2016. The amount was reallocated to the Malawi Africa Centers of Excellence (ACEs) under the ACEII project (P151847) upon request by the government, as foreshadowed in the SDP Project Appraisal Document.1 There has been only one project restructuring to date.

4. The government has incurred an estimated financial loss of about US$1.7 million arising from currency conversions from Special Drawing Rights (SDR) to US$ in the past two disbursements. The current exchange rate remains significantly below the rate at Approval despite recent gains, and though there is some uncertainty in calculating the loss over the total project period, it is clear that it will be a significant amount given the total disbursements to date, the prevailing exchange rate and the time to Closing. With an assumption that an exchange rate continues to be at the current level, the projected loss for the remainder of the project would be US$3.15 million, meaning a total loss of about US$4.85 million across the whole project period. The losses have led to reduced flexibility in the institutions’ budgets given that some large contracts were signed early during implementation. Some activities slated for the final year, such as instructional materials, equipment purchases as well as rehabilitative works may not be completed. Moreover, further financial loss is likely to affect the completion of the civil works at the institutions. Although Component 1 uses a DLI approach, the institutions rely on IDA funds disbursed upon the achievement of the results due to paucity of government funds.

5. NCHE has executed the activities under the Component 2 (Technical Assistance). NCHE has conducted several consultancy activities, including the development of higher education student loans mechanism and tracer studies.

1 There was an amendment to the Financing Agreement on March 29, 2014 which corrected some errors in the DLI matrix. No formal restructuring was processed.

Page 5: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

NCHE also conducted staff capacity development activities. However, due to the capacity at NCHE, several activities have been delayed. In addition, NCHE, like the participating institutions, has also been affected by the loss due to exchange rate change between SDR and US$. In response, NCHE has prioritized the activities to be supported by the remaining balance of the funds, and has prepared a revised budget and procurement plan.

6. Finally, there is an unused balance from disbursement category for the Project Preparation Advance (PPA) which needs to be reallocated to another disbursement category to be available for disbursement.

7. Considering all this implementation experience, the government requested a project restructuring (letter dated October 18, 2017) to:

a. reallocate the unused balance from the PPA to complete the prioritized activities under Component 2b. change target values of some PDO Indicators, Disbursement Linked Indicators (DLIs) and intermediate

results (IR) indicators – moving many up and some down to more realistic target values; and,c. clarify the definitions of some indicators.

II. DESCRIPTION OF PROPOSED CHANGES

8. The proposed changes are: a) changes in the Results Framework, b) reallocation of funds between disbursement categories, and c) changes to the DLI matrix.

a) Changes in the Results Framework

9. The proposed changes in the results framework include: 1) changes in target values with clarification of the definitions for selected PDO and IR indicators, 2) replacement of one PDO indicator, and 3) addition of one sub IR Indicator.

PDO Indicators

10. Out of six PDO indicators and one sub-indicator, the government proposed to change the targets in five PDO indicators and one sub-indicator (though no changes to the wording of the indicators is proposed). The government also proposed to replace one PDO indicator with a new indicator.

11. PDO 1. Direct project beneficiaries. Based on implementation experience, the government proposed to increase the overall target number of direct project beneficiaries from 7,200 to 13,000 at the end of project. The direct project beneficiaries include both students and members of staff from the institutions participating in the project. Two developments indicate the target number should be increased: first, the newly developed programs in Community Skills Development Centers (CSDCs) are being used across CSDCs and not just the pre-selected twelve CSDCs, so students at all CSDCs should be considered project beneficiaries; and second, there are more staff trained through NCHE activities, and more students at LUANAR on face-to-face programs than had been anticipated. However, one development tends to reduce the original target: Polytechnic has indicated that it will not be able to reach its original student enrollment targets, mainly because of the circumstances beyond its control, i.e., the university imposing a steep increase in fees for its new diploma programs without students having access to government loans and continuing slow approvals of new

Page 6: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

programs and student enrollment by the university administration. Taking into consideration these aspects, the government proposed to revise the targets of the beneficiaries as in Table 1.

Table 1.Baseline Year 3 Year 4 Project end

Current 0 4,590 5,650 7,200Revised 0 5,920 7,790 13,000

12. PDO 1 sub-indicator. Proportion of female beneficiaries. The government proposed to reduce the end-project target from 44 percent to 31 percent. The current achievement is 27 percent, which represents a marginal improvement from the first year of 26 percent but which is 13 percentage points behind the expected progress by MTR (39 percent) and 18 percentage points away from the original end-project target (44 percent). At MTR, the originally agreed targets have proven to be unreasonably high. During project preparation, the target figures were estimated based on available data from relevant studies and the draft Institutional Improvement Plans (IIPs) submitted by PIs. However, at baseline no robust management information system existed (this is being pursued under Component 2) and the available data was not independently verified in the way that reporting under the project has been; plus, the project beneficiaries are mainly from programs which did not exist at the baseline. It was therefore to be expected that the target figures would be difficult to predict accurately. Through the project implementation, PIs and NCHE have improved their M&E function, and now the third-party validation agency has validated data submitted by PIs. Therefore, the proposed new targets can be considered more realistic and achievable, also reflecting on-going affirmative actions on female participation (for instance, more female students in science programs) at students’ selection for various institutions and science open days for secondary schools. The project will continue to contribute to and monitor improvements in female participation.

Table 2.Baseline Year 3 Year 4 Project end

Current 0% 40% 42% 44%Revised 0% 27% 28% 31%

13. PDO 2. Number of skills trainees from rural areas. The government proposed to increase the project-end target from 4,100 to 6,500, reflecting the fact that trainees from all 35 CSDCs —located in rural areas— now benefit from the project as opposed to the original target of the Project (trainees from the 12 CSDCs).

Table 3.Baseline Year 3 Year 4 Project end

Current 0 2,100 3,000 4,100Revised 0 2,170 3,170 6,500

14. PDO 4. The proportion of students/ trainees who pass the annual assessment. The government proposed to reduce the end-project target from 70 percent to 63 percent. This is mainly because the target of LUANAR for students passing the annual assessments of its new distance learning programs is more realistically estimated at 25 percent for Year 3 target, against the originally agreed target of 60 percent for Year 3, and accordingly the target of the overall project is proposed to decrease. Students enrolled in ODL programs tend to face challenges in passing assessments, compared to students in regular programs. For instance, one of the reasons to be considered is that students support services such as tutoring and mentoring provided at ODL satellite centers are still not sufficient despite of on-going efforts. The targets for other institutions remain the same and are on track to be achieved.

Page 7: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

Table 4.Baseline Year 3 Year 4 Project end

Current 0% 60% 65% 70%Revised 0% 53% 58% 63%

15. PDO 5. Course graduation/ completion rate. The government requested to reduce the end of project target from 65 percent to 59 percent. The target for LUANAR for completion of new distance learning programs is estimated to down to 35 percent, and accordingly the target of the overall project was proposed to decrease. Students enrolled in ODL programs tend to drop out more, compared to students in regular programs. For instance, one of the reasons to be considered is that students support services provided at ODL satellite centers are still not sufficient despite of on-going efforts. The targets for other institutions remain the same.

Table 5. Baseline Year 3 Year 4 Project end

Current 0% 0% 60% 65%Revised 0% 0% 54% 59%

16. PDO 6. Improvements in employer satisfaction levels with the skills and knowledge of graduates in priority areas. It was proposed that the project replace the original indicator which focused on employer satisfaction with the ‘graduate satisfaction’ indicator derived from the graduate tracer study data which has been completed successfully by all institutions. During the MTR, the World Bank team and the government agreed that it has not been possible to measure employer satisfaction reliably. A first employment survey was conducted under the project in 2016 but it was not possible to replicate the methodology used in 2008 for the baseline and moreover the 2016 methodology proved unsatisfactory.

17. The proposed new indicator – ‘Improvements in graduate labor market success rate’ – would combine the length of time a graduate took to get their first job with a measure of their satisfaction with their job. For length of time, this would take the percentage of those who obtain their first job within 12 months. For job satisfaction, this would be measured by a question in the graduate survey which provides a scale of 1 to 5, with 5 representing the highest level. Responses of 4 or 5 will be considered as being satisfied. On this basis, the satisfaction rate from the first graduate survey is calculated as 57 percent, and this will be taken as the baseline for this indicator. The end-of-project target will be set at an improvement of 5 percent, i.e., as 62 percent. This newly proposed indicator is measurable and data will be collected by the existing survey instrument (tracer study), and measures the market relevance of the project.

Table 6.Baseline Year 3 Year 4 Project end

New 57% - - 62%

IR Indicators

18. The government proposed to change the targets of two out of eight IR Indicators, change the definition of one IR indicator, and add one sub IR Indicator as part of IR Indicator 5.

Page 8: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

19. IR Indicator 3. Number of programs developed/ curriculum revised with private sector participation as per IIP and imparted during implementation period. The government proposed to increase the target number of the programs to be developed from 39 to 44 at the end of the project. During the MTR, the team observed that Chancellor College and Polytechnic have already developed and implemented more than what they originally planned, and LUANAR also met the end project target already. The TEVETA has developed 15 programs already, out of which 11 are being implemented. Reflecting this progress made to date, the revision of the target is proposed as follows.

Table 7.Baseline Year 3 Year 4 Project end

Current 0 39 39 39Revised 0 39 39 44

20. IR Indicator 4. Proportion of faculties selected for Staff Development Program returned to the institution after completing their training programs and resumed teaching. While the project retains the indicator, the government proposed to change the definition of ‘completing their training programs’ to mean, for those studying for a PhD only, that they have ‘successfully defended their dissertation/thesis proposal’. Following their successful defense, a candidate is given a notification letter from a university/ defense committee, and this will serve as the basis for verification. This change was proposed because of the one year delay in project effectiveness which has led insufficient time for staff in PhD programs to complete PhD programs, return to and resume teaching at the institutions within the project period.

21. IR Indicator 5. Published tracer studies as per action plan. The government proposed to reduce the number of tracer studies to be published throughout the project period from 17 to 12. Due to the lack of funds, and the delay of the technical assistance on the tracer study, PIs will not be able to conduct tracer studies as planned, and thus it was proposed to not conduct any tracer studies in Year 3. The table below shows the number of studies to be completed in each year (the table is not cumulative).

Table 8.Baseline Year 3 Year 4 Project end

Current 0 5 1 5Revised 0 0 1 5

22. Sub-indicator for IR Indicator 5. Proportion of graduates that the institution maintains contact with annually. In place of one tracer study, it was agreed that the PIs would be required to show they are maintaining contact with at least 50 percent of graduates from 2016. The PIs should demonstrate active communication between them and students after graduation, being in touch with their graduates at least once a year through recognized media (email, social media platforms etc.). In the fourth year of the project, the PIs are expected to demonstrate the proportion of 2016 graduates traced by them through active communication (contact should be with graduates ‘of the most recent year’). The indicator will assess only 2016 graduates (Polytechnic will also trace 2015 graduates). The result for each institution is measured in binary (zero or one): counting “1” for an institution that is in contact with 50 percent or more, and “0” for an institution which is not. It is expected that all the institutions maintain contact with at least 50 percent of graduates by Year 4 of the project.

Table 9.Baseline Year 3 Year 4 Project end

New - - 5 6

Page 9: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

23. The proposed revised DLI matrix for each PI —Annex 1 of the Restructuring Paper— is in line with the proposed changes in the Results Framework.

b) Reallocation between Disbursement Categories

24. As described in the above section of the project status, the government partially used the funds allocated to the PPA. The government requested for reallocating SDR 513,033, the balance of Disbursement Category (3) Refund of Project Preparation Advance, to Category (2) Goods, non-consulting services, consultant services, training and operating costs under Part B of the Project so that NCHE will fully utilize available financial resources to complete prioritized activities (the development of a higher education management system, a higher education student financing mechanism, and a national quality assurance mechanism) under Component 2 (Part B of Schedule 1 to the Financing Agreement), which aims for system strengthening and policy reform. These activities have a higher priority than using the funding for an additional tracer study (since it is not necessary to carry out a tracer study every year as market conditions do not generally change so rapidly).

c) Changes in the Disbursement Linked Indicator matrix

25. Since some of the PDO and IR indicators are also included in the DLI Matrix (Annex 4 of the Financing Agreement), this Matrix (which comprises targets at the level of the PIs) will be amended to reflect these changes.

26. In addition, the DLI Matrix will be amended to clarify how partial achievement of Disbursement Linked Results will be rewarded in line with the understandings as set out in the PAD, specifically:

- For DLI #2, rather than having annual targets to achieve, the PIs will have an overall project target (consisting of the sum of the yearly targets as set out in the Results Framework) and will be able to claim disbursement as follows:

Table 10.If institutions meet DLI target by: DLI amount to be disbursed

80% and above 100%70-79% 90%60-69% 80%50-59% 60%

- For DLRs 3.3 and 3.4, rather than having annual targets to achieve, the PIs will have an overall project target to complete all construction activities, but will be able to claim disbursement as follows:

Table 11.If institutions meet DLI target by: DLI amount to be disbursed

80% and above 100%40-79% 75%15-39% 35%

27. Moreover, the DLI Matrix will be amended to reflect the changes of the targets of IR Indicator 5 and the introduction of a sub-Indicator for IR Indicator 5 (para 19 and 20), specifically:

Page 10: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

- DLR 6.2 and allocated amount to this DLR for Polytechnic, Chancellor College, LUANAR, and Mzuzu University will be removed. Similarly, DLR 6.3 and allocated amount to this DLR for TEVETA will be removed. Allocated amounts for the DLRs are different from PI to PI as in the Financing Agreement.

- A new DLR —trace 50% of 2016 graduates through database creation— will be introduced for Year 5 under DLI #6 for all five PIs, and the exact amount removed from DLR 6.3 for TEVETA and DLR 6.2 from the other four PIs will be attached to this new DLR.

28. Furthermore, the DLI Matrix will be amended to reflect the reduction of student enrollment targets for PDO Indicator 1 (para 10), specifically

- DLR 2.1 and allocated amount (SDR 275,000) for Polytechnic will be removed.

- A new DLR —trace 50% of 2015 graduates through database creation— will be introduced for Year 4 under DLI#6 for Polytechnic and the exact amount removed from DLR2.1 from Polytechnic will be attached to this new DLR.

29. A proposed revision of the DLI matrix is attached as Annex 1.2

30. The Sub-Project Grant Agreements (SPGAs) (Section I. C. of Schedule 2 to the Financing Agreement) and the Project Implementation Manual (PIM) (Section I. B. of Schedule 2 to the Financing Agreement) need to be aligned with the amendment to the Financing Agreement and the revisions to the Results Framework proposed under this restructuring. The government needs to revise the SPGAs and PIM and submit them to IDA for its review and clearance.

31. If approved, this will be the second restructuring of the project.

2 A typographical error appears in the revised DLI Matrix (Annex 4 to the Financing Agreement) as agreed in March 2014 and will be corrected (in DLI#4 for Mzuzu University the Amount of the Financing Allocated should be 1,170,000 rather than 1,117,000).

Page 11: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

III. SUMMARY OF CHANGES

Changed Not Changed

Change in Results Framework ✔

Reallocation between Disbursement Categories ✔

Change in Implementing Agency ✔

Change in DDO Status ✔

Change in Project's Development Objectives ✔

Change in Components and Cost ✔

Change in Loan Closing Date(s) ✔

Cancellations Proposed ✔

Change in Disbursements Arrangements ✔

Change in Disbursement Estimates ✔

Change in Overall Risk Rating ✔

Change in Safeguard Policies Triggered ✔

Change of EA category ✔

Change in Legal Covenants ✔

Change in Institutional Arrangements ✔

Change in Financial Management ✔

Change in Procurement ✔

Change in Implementation Schedule ✔

Other Change(s) ✔

Change in Economic and Financial Analysis ✔

Change in Technical Analysis ✔

Change in Social Analysis ✔

Change in Environmental Analysis ✔

IV. DETAILED CHANGE(S)

OPS_DETAILEDCHANGES_RESULTS_TABLE

RESULTS FRAMEWORK

Project Development Objective Indicators PDO_IND_TABLE

Page 12: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

The Proportion of students/trainees who pass the annual assessmentUnit of Measure: PercentageIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 0.00 84.00 63.00 Revised

Date 28-Jun-2013 22-Sep-2017 28-Jun-2019

Improvements in Employer satisfaction levels with the skills and knowledge of graduates in higher education/ TEVETA in priority areasUnit of Measure: PercentageIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 34.00 67.00 60.00 Marked for Deletion

Date 31-Aug-2016 31-Aug-2016 28-Jun-2019

Proportion of new intakes in priority areas to the overall new intakes in the participating institutionsUnit of Measure: PercentageIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 21.00 44.00 37.00 No Change

Date 28-Jun-2013 12-Jul-2017 28-Jun-2019

Course graduation/ completion rateUnit of Measure: PercentageIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 0.00 0.00 59.00 Revised

Date 28-Jun-2013 15-Feb-2017 28-Jun-2019

Direct project beneficiariesUnit of Measure: NumberIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 0.00 5538.00 13000.00 Revised

Date 28-Jun-2013 22-Sep-2017 28-Jun-2019

Page 13: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

Proportion of female beneficiariesUnit of Measure: PercentageIndicator Type: Custom Supplement

Baseline Actual (Current) End Target Action

Value 0.00 27.00 31.00 Revised

Number of skills trainees from rural areasUnit of Measure: NumberIndicator Type: Custom Supplement

Baseline Actual (Current) End Target Action

Value 0.00 2223.00 6500.00 Revised

Graduates satisfaction indexUnit of Measure: PercentageIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 57.00 62.00 New

Date 28-Jun-2013 28-Jun-2019

Intermediate IndicatorsIO_IND_TABLE

Timely submission of annual implementation report by NCHE, detailing analysis of performance against targetsUnit of Measure: NumberIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 0.00 1.00 5.00 No Change

Date 28-Jun-2013 12-Jul-2017 28-Jun-2019

Development of targeted and functional students' loan scheme as per action plan by year 3Unit of Measure: Yes/NoIndicator Type: Custom

Baseline Actual (Current) End Target Action

Page 14: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

Value No No Yes No Change

Date 28-Jun-2013 12-Jul-2017 28-Jun-2019

A National Quality Assurance Framework (NQAF) developedUnit of Measure: Yes/NoIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value No No Yes No Change

Date 28-Jun-2013 12-Jul-2017 28-Jun-2019

Annual intake (enrollments) in the priority areasUnit of Measure: NumberIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 150.00 2919.00 2500.00 No Change

Date 15-Apr-2014 12-Jul-2017 28-Jun-2019

Proportion of infrastructure targets met by participating institutions as per agreed IIPUnit of Measure: PercentageIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 0.00 40.00 100.00 No Change

Date 15-Apr-2014 20-Feb-2017 28-Jun-2019

Number of programs developed / curriculum revised with private sector participation as per IIP and impartedUnit of Measure: NumberIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 0.00 34.00 44.00 Revised

Date 15-Apr-2014 22-Sep-2017 28-Jun-2019

Proportion of faculties selected for staff development programs returned to the institution after completing training and resumed teachingUnit of Measure: PercentageIndicator Type: Custom

Baseline Actual (Current) End Target Action

Page 15: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

Value 0.00 38.00 100.00 No Change

Date 15-Apr-2014 12-Jul-2017 28-Jun-2019

Published Tracer studies as per Action PlanUnit of Measure: NumberIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 0.00 6.00 12.00 Revised

Date 15-Apr-2014 12-Jul-2017 28-Jun-2019

Proportion of graduates that the institution maintains contact with annuallyUnit of Measure: NumberIndicator Type: Custom Supplement

Baseline Actual (Current) End Target Action

Value 0.00 5.00 New

OPS_DETAILEDCHANGES_REALLOCATION _TABLE

REALLOCATION BETWEEN DISBURSEMENT CATEGORIES

Current Allocation Actuals + Committed Proposed Allocation Financing %(Type Total)

Current Proposed

IDA-54720-001 | Currency: XDR

iLap Category Sequence No: 1 Current Expenditure Category: Gds, Wks, NCS, CS, Trng & OC Pt A

25,920,000.00 14,851,802.73 25,920,000.00 100.00 100.00

iLap Category Sequence No: 2 Current Expenditure Category: Gds, NCS, CS, Trng & OC Pt B

0.00 0.00 513,033.00 100.00 100.00

iLap Category Sequence No: 3 Current Expenditure Category: Refund of Preparation Advance

Page 16: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

972,000.00 458,966.17 458,967.00

iLap Category Sequence No: 4 Current Expenditure Category: UNALLOCATED

0.00 0.00 0.00

Total 26,892,000.00 15,310,768.90 26,892,000.00

Annex 1. Proposed revised DLI Matrix

Malawi-The Polytechnic

Disbursement Linked Indicator Action to be Completed

Amount of the Financing Allocated (expressed in SDR)

Disbursement Calculation Formula

DLI #1: Each of the Participating Skills Development Institution has developed and adopted its Institution Improvement Plan

DLR#1.1: The Polytechnic has developed and adopted its Institution Improvement Plan in FY 2014-2015

970,000 DLR 1.1: 970,000

DLI #2: Student enrollment in agreed skills development programs increases

DLR#2.1: The number of student enrolled in agreed skills development programs increases by:(a) 80% and above of 900;(b) 70-79% of 900;(c) 60-69% of 900;(d) 50-59% of 900

1,100,000 DLR 2.1: 1,100,000(a) 100%(b) 90%(c) 80%(d) 60%

DLI #3: Each of the Participating Skills Development Institution achieves its infrastructure development targets as set out in the Institution Improvement Plan

DLR#3.1: The Polytechnic has adopted a procurement plan for infrastructure development and has signed at least 20% of contracts for the implementation of infrastructure works in FY 2014-2015DLR#3.2: The Polytechnic has signed 100% of contracts for the implementation of infrastructure works in FY 2015-2016DLR#3.3: Overall, works under the infrastructure contracts have been completed by:

(a) No less than 80%;(b) 40-79%;(c) 15-39%;

1,380,000 DLR 3.1: 275,000DLR 3.2: 275,000DLR 3.3: 830,000(a) 100%(b) 75%(c) 35%

Page 17: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

Disbursement Linked Indicator Action to be Completed

Amount of the Financing Allocated (expressed in SDR)

Disbursement Calculation Formula

DLI #4: Each of the Participating Skills Development Institution develops and implements the agreed skills development programs in consultation with the private sector

DLR#4.1: The Polytechnic has developed all the agreed skills development programs in consultation with the private sector in FY 2014-2015DLR#4.2: The Polytechnic has implemented at least 50% of all the agreed skills development programs in FY 2015-2016DLR#4.3: The Polytechnic has implemented all the agreed skills development programs in FY 2016-2017

1, 325,000 DLR 4.1: 465,000DLR 4.2: 465,000DLR 4.3: 395,000

DLI #5: Each of the Participating Skills Development Institution achieves its staff development targets as set out in the Institution Improvement Plan

DLR#5.1: The Polytechnic has adopted all staff training plans and at least 25% of staff have commenced training in FY 2014-2015DLR#5.2: At least 20% of staff have been trained and resumed work in FY 2015-2016DLR#5.3: At least 50% of staff have been trained and resumed work in FY 2016-2017DLR#5.4: At least 80% of staff have been trained and resumed work in FY 2017-2018DLR#5.5: All staff have been trained and resumed work in FY 2018-2019

1,155,000 DLR 5.1: 230,000DLR 5.2: 230,000DLR 5.3: 290,000DLR 5.4: 290,000DLR 5.5: 115,000

DLI #6: Each of the Participating Skills Development Institution carries out and publishes tracer studies on on-going and new skills development programs

DLR#6.1: The Polytechnic has carried out and published tracer studies on on-going skills development programs in FY 2014-2015DLR#6.2: The Polytechnic has traced 50% of 2015 graduates through database creation in FY 2017-2018 DLR#6.3: The Polytechnic has carried out and published on-going and new skills development programs in FY 2018-2019DLR#6.4: The Polytechnic has traced 50% of 2016 graduates through database creation in FY 2018-2019

550,000 DLR 6.1: 55,000DLR 6.2: 275,000DLR 6.3: 110,000DLR 6.4: 110,000

The Chancellor College

Disbursement Linked Indicator Action to be Completed

Amount of the Financing Allocated (expressed in SDR)

Disbursement Calculation Formula

DLI #1: Each of the Participating Skills Development Institution has developed and adopted its Institution Improvement Plan

DLR#1.1: The University of Malawi-Chancellor College has developed and adopted its Institution Improvement Plan in FY 2014-2015

970,000 DLR 1.1: 970,000

Page 18: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

Disbursement Linked Indicator Action to be Completed

Amount of the Financing Allocated (expressed in SDR)

Disbursement Calculation Formula

DLI #2: Student enrollment in agreed skills development programs increases

The number of student enrolled in agreed skills development programs increases by:(a) 80% and above of 920;(b) 70-79% of 920;(c) 60-69% of 920;(d) 50-59% of 920

1,055,000 DLR 2.1: 1,055,000(a) 100%(b) 90%(c) 80%(d) 60%

DLI #3: Each of the Participating Skills Development Institution achieves its infrastructure development targets as set out in the Institution Improvement Plan

DLR#3.1: The University of Malawi-Chancellor College has adopted a procurement plan for infrastructure development and has signed at least 20% of contracts for the implementation of infrastructure works in in FY 2014-2015DLR#3.2: The University of Malawi-Chancellor College has signed 100% of contracts for the implementation of infrastructure works signed in FY 2015-2016DLR#3.3: Overall works under the infrastructure contracts has been completed by:

(a) No less than 80%;(b) 40-79%;(c) 15-39%;

1,050,000 DLR 3.1: 210,000DLR 3.2: 210,000DLR 3.3: 630,000(a) 100%(b) 75%(c) 35%

DLI #4: Each of the Participating Skills Development Institution develops and implements the agreed skills development programs in consultation with the private sector

DLR#4.1: The University of Malawi-Chancellor College has developed all the agreed skills development programs in consultation with the private sector in FY 2014-2015DLR#4.2: The University of Malawi-Chancellor College has implemented at least 50% of all the agreed skills development programs in FY 2015-2016DLR#4.3: The University of Malawi-Chancellor College has implemented all the agreed skills development programs in FY 2016-2017

1,015,000 DLR 4.1: 355,000DLR 4.2: 355,000DLR 4.3: 305,000

DLI #5: Each of the Participating Skills Development Institution achieves its staff development targets as set out in the Institution Improvement Plan

DLR#5.1: The University of Malawi-Chancellor College has adopted all staff training plans and at least 25% of staff have commenced training in FY 2014-2015DLR#5.2: At least 20% of staff have been trained and resumed work in FY 2015-2016DLR#5.3: At least 50% of staff have been trained and resumed work in FY 2016-2017DLR#5.4: At least 80% of staff have been trained and resumed work in FY 2017-2018DLR#5.5: All staff have been trained and resumed work in FY 2018-2019

880,000 DLR 5.1: 175,000DLR 5.2: 175,000DLR 5.3: 220,000DLR 5.4: 220,000DLR.5.5: 90,000

Page 19: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

Disbursement Linked Indicator Action to be Completed

Amount of the Financing Allocated (expressed in SDR)

Disbursement Calculation Formula

DLI #6: Each of the Participating Skills Development Institution carries out and publishes tracer studies on on-going and new skills development programs

DLR#6.1: The University of Malawi-Chancellor College has carried out and published tracer studies on on-going skills development programs in FY 2014-2015DLR#6.2: Intentionally left blankDLR#6.3: The University of Malawi-Chancellor College has carried out and published tracer studies on on-going and new skills development programs in FY 2018-2019DLR#6.4: The University of Malawi-Chancellor College has traced 50% of 2016 graduates through database creation in FY 2018-2019

210,000 DLR 6.1: 40,000DLR 6.2: Intentionally left blankDLR 6.3: 85,000DLR 6.4: 85,000

Lilongwe University of Agriculture and Natural Resources (LUANAR)

Disbursement Linked Indicator Action to be Completed

Amount of the Financing Allocated (expressed in SDR)

Disbursement Calculation Formula

DLI #1: Each of the Participating Skills Development Institution has developed and adopted its Institution Improvement Plan

DLR#1.1: LUANAR has developed and adopted its Institution Improvement Plan in FY 2014-2015

970,000 DLR 1.1: 970,000

DLI #2: Student enrollment in agreed skills development programs increases

The number of student enrolled in agreed skills development programs increases by:(a) 80% and above of 1,100;(b) 70-79% of 1,100;(c) 60-69% of 1,100;(d) 50-59% of 1,100

1,055,000 DLR 2.1: 1,055,000(a) 100%(b) 90%(c) 80%(d) 60%

DLI #3: Each of the Participating Skills Development Institution achieves its infrastructure development targets as set out in the Institution Improvement Plan

DLR#3.1: LUANAR has adopted a procurement plan for infrastructure development and has signed at least 20% of contracts for the implementation of infrastructure works in in FY 2014-2015DLR#3.2: LUANAR has signed 100% of contracts for the implementation of infrastructure works signed in FY 2015-2016DLR#3.3: Overall works under the infrastructure contracts has been completed by:

(a) No less than 80%;(b) 40-79%;(c) 15-39%;

1,050,000 DLR 3.1: 210,000DLR 3.2: 210,000DLR 3.3: 630,000(a) 100%(b) 75%(c) 35%

Page 20: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

Disbursement Linked Indicator Action to be Completed

Amount of the Financing Allocated (expressed in SDR)

Disbursement Calculation Formula

DLI #4: Each of the Participating Skills Development Institution develops and implements the agreed skills development programs in consultation with the private sector

DLR#4.1: LUANAR has developed all the agreed skills development programs in consultation with the private sector in FY 2014-2015DLR#4.2: LUANAR has implemented at least 50% of all the agreed skills development programs in FY 2015-2016DLR#4.3: LUANAR has implemented all the agreed skills development programs in FY 2016-2017

1,015,000 DLR 4.1: 355,000DLR 4.2: 355,000DLR 4.3: 305,000

DLI #5: Each of the Participating Skills Development Institution achieves its staff development targets as set out in the Institution Improvement Plan

DLR#5.1: LUANAR has adopted all staff training plans and at least 25% of staff have commenced training in FY 2014-2015DLR#5.2: At least 20% of staff have been trained and resumed work in FY 2015-2016DLR#5.3: At least 50% of staff have been trained and resumed work in FY 2016-2017DLR#5.4: At least 80% of staff have been trained and resumed work in FY 2017-2018DLR#5.5: All staff have been trained and resumed work in FY 2018-2019

880,000 DLR 5.1: 175,000DLR 5.2: 175,000DLR 5.3: 220,000DLR 5:4: 220,000DLR 5:5: 90,000

DLI #6: Each of the Participating Skills Development Institution carries out and publishes tracer studies on on-going and new skills development programs

DLR#6.1: LUANAR has carried out and published tracer studies on on-going skills development programs in FY 2014-2015DLR#6.2: Intentionally left blankDLR#6.3: LUANAR has carried out and published tracer studies on on-going and new skills development programs in FY 2018-2019DLR#6.4: LUANAR has traced 50% of 2016 graduates through database creation in FY 2018-2019

210,000 DLR 6.1: 40,000DLR 6.2: Intentionally left blankDLR 6.3: 85,000DLR 6.4: 85,000

Mzuzu University

Disbursement Linked Indicator Action to be Completed

Amount of the Financing Allocated (expressed in SDR)

Disbursement Calculation Formula

DLI #1: Each of the Participating Skills Development Institution has developed and adopted its Institution Improvement Plan

DLR#1.1: Mzuzu University has developed and adopted its Institution Improvement Plan in FY 2014-2015

970,000 DLR 1.1: 970,000

Page 21: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

Disbursement Linked Indicator Action to be Completed

Amount of the Financing Allocated (expressed in SDR)

Disbursement Calculation Formula

DLI #2: Student enrollment in agreed skills development programs increases

The number of student enrolled in agreed skills development programs increases by:(a) 80% and above of 2,700;(b) 70-79% of 2,700;(c) 60-69% of 2,700;(d) 50-59% of 2,700

1,220,000 DLR 2.1: 1,220,000(a) 100%(b) 90%(c) 80%(d) 60%

DLI #3: Each of the Participating Skills Development Institution achieves its infrastructure development targets as set out in the Institution Improvement Plan

DLR#3.1: Mzuzu University has adopted a procurement plan for infrastructure development and has signed at least 20% of contracts for the implementation of infrastructure works in in FY 2014-2015DLR#3.2: Mzuzu University has signed 100% of contracts for the implementation of infrastructure works signed in FY 2015-2016DLR#3.3: Overall works under the infrastructure contracts has been completed by:

(a) No less than 80%;(b) 40-79%;(c) 15-39%;

1,220,000 DLR 3.1: 245,000DLR 3.2: 245,000DLR 3.3: 730,000(a) 100%(b) 75%(c) 35%

DLI #4: Each of the Participating Skills Development Institution develops and implements the agreed skills development programs in consultation with the private sector

DLR#4.1: Mzuzu University has developed all the agreed skills development programs in consultation with the private sector in FY 2014-2015DLR#4.2: Mzuzu University has implemented at least 50% of all the agreed skills development programs in FY 2015-2016DLR#4.3: Mzuzu University has implemented all the agreed skills development programs in FY 2016-2017

1,170,000 DLR 4.1: 410,000DLR 4.2: 410,000DLR 4.3: 350,000

DLI #5: Each of the Participating Skills Development Institution achieves its staff development targets as set out in the Institution Improvement Plan

DLR#5.1: Mzuzu University has adopted all staff training plans and at least 25% of staff have commenced training in FY 2014-2015DLR#5.2: At least 20% of staff have been trained and resumed work in FY 2015-2016DLR#5.3: At least 50% of staff have been trained and resumed work in FY 2016-2017DLR#5.4: At least 80% of staff have been trained and resumed work in FY 2017-2018DLR#5.5: All staff have been trained and resumed work in FY 2018-2019

1,020,000 DLR 5.1: 205,000DLR 5.2: 205,000DLR 5.3: 255,000DLR 5.4: 255,000DLR 5.5: 100,000

Page 22: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

Disbursement Linked Indicator Action to be Completed

Amount of the Financing Allocated (expressed in SDR)

Disbursement Calculation Formula

DLI #6: Each of the Participating Skills Development Institution carries out and publishes tracer studies on on-going and new skills development programs

DLR#6.1: Mzuzu University has carried out and published tracer studies on on-going skills development programs in FY 2014-2015DLR#6.2: Intentionally left blankDLR#6.3: Mzuzu University has carried out and published tracer studies on on-going and new skills development programs in FY 2018-2019DLR#6.4: Mzuzu University has traced 50% of 2016 graduates through database creation in FY 2018-2019

240,000 DLR 6.1: 50,000DLR 6.2: Intentionally left blankDLR 6.3: 95,000DLR 6.4: 95,000

Technical, Entrepreneurial and Vocational Education and Training Authority (TEVETA)

Disbursement Linked Indicator Action to be Completed

Amount of the Financing Allocated (expressed in SDR)

Disbursement Calculation Formula

DLI #1: Each of the Participating Skills Development Institution has developed and adopted its Institution Improvement Plan

DLR#1.1: TEVETA has developed and adopted its Institution Improvement Plan in FY 2014-2015

650,000 DLR 1.1: 650,000

DLI #2: Student enrollment in agreed skills development programs increases

The number of student enrolled in agreed skills development programs increases by: (a) 80% and above of 6,500;(b) 70-79% of 6,500;(c) 60-69% of 6,500;(d) 50-59% of 6,500

745,000 DLR 2.1: 745,000(a) 100%(b) 90%(c) 80%(d) 60%

DLI #3: Each of the Participating Skills Development Institution achieves its infrastructure development targets as set out in the Institution Improvement Plan

- - -

DLI #4: Each of the Participating Skills Development Institution develops and implements the agreed skills development programs in consultation with the private sector

DLR#4.1: TEVETA has developed ten (10) skills development programs in consultation with the private sector in FY 2014-2015DLR#4.2: TEVETA has developed an additional five (5) skills development programs and has implemented the ten (10) skills development programs in FY 2015-2016

820,000 DLR 4.1: 205,000DLR 4.2: 205,000DLR 4.3: 205,000DLR 4.4: 205,000

Page 23: World Bank Documentdocuments.worldbank.org/curated/en/... · The development objective of the proposed project is to increase access, market relevance, and results orientation of

The World BankSkills Development Project (P131660)

Disbursement Linked Indicator Action to be Completed

Amount of the Financing Allocated (expressed in SDR)

Disbursement Calculation Formula

DLR#4.3: TEVETA has implemented thirteen (13) skills development programs in FY 2016-2017DLR#4.4: TEVETA has implemented all the agreed skills development programs in FY 2017-2018

DLI #5: Each of the Participating Skills Development Institution achieves its staff development targets as set out in the Institution Improvement Plan

DLR#5.1: TEVETA has trained 100 master craftsmen in FY 2014-2015DLR#5.2: TEVETA has trained 150 master craftsmen in FY 2015-2016DLR#5.3: TEVETA has trained 200 master craftsmen in FY 2016-2017DLR#5.4: TEVETA has trained 250 master craftsmen in FY 2017-2018DLR#5.5: TEVETA has trained 250 master craftsmen in FY 2018-2019

725,000 DLR 5.1: 145,000DLR 5.2: 145,000DLR 5.3: 180,000DLR 5.4: 180,000DLR 5.5 75,000

DLI #6: Each of the Participating Skills Development Institution carries out and publishes tracer studies on on-going and new skills development programs

DLR#6.1: TEVETA has carried out and published tracer studies on on-going skills development programs in FY 2014-2015DLR#6.2: TEVETA has carried out and published tracer studies on on-going skills development programs in FY 2015-2016DLR#6.3: Intentionally left blankDLR#6.4: TEVETA has carried out and published tracer studies on on-going skills development programs in FY 2017-2018DLR#6.5: TEVETA has carried out and published tracer studies on on-going and new skills development programs in FY 2018-2019DLR#6.6: TEVETA has traced 50% of 2016 graduates through database creation in FY 2018-2019

300,000 DLR 6.1: 60,000DLR 6.2: 60,000DLR 6.3: Intentionally left blankDLR 6.4: 60,000DLR 6.5: 60,000DLR 6.6: 60,000