Workshop on XIIth Plan:
Vision, goals, strategy& way forward
(24-01-2012)
Planning DepartmentGovernment of Manipur
Plan of Presentation
2
12th Five Year Plan, 2012-17
- Timelines
- Performance of 11th Plan
- Development deficits.
- Vision
- Sectoral Monitorable Targets
- Priority Projects.
- Financing the Plan
- Delivery and Governance
- Plan for Inclusion
Annual Plan, 2012-13
- Priority projects
Annual Plan 2011-12, outlay and expenditure
3Planning Department , Govt . o f Manipur
Workshop for HoDs 23-24 Dec. 2011
Submission of drafts byDepartments
31th
Jan. 2012
Further consultations andpreparation of Draft State Plans
Feb. 2012
Submission of Draft Document toPlanning Commission
15th
March, 2012
Finalization of National Planincorporating States` Plan
31st
March, 2012
2. Outcome indicators: General and infrastructure
4
Particulars Manipur All India Average
General
Decennial growth rate of population (2001-2011) 18.65 17.64
Literacy Rate (2011) (in percentage) 74.04 79.84
IMR (per 1000 live births) 16 64
Agriculture
Food productivity (cereals) in Qtls/ Ha 23.3 17.0
Rice productivity in Qtls / Ha. 23.2 19.9
Fertilizer consumption in Kg/Ha 91.9 95.3
Banking and formal credit
No. of Banks per lakh of population 3.50 6.60
Per capita credit in Rupees 680.27 54,17.99
Infrastructure
Road density in km per 100 Sq km (2011) 56.51 62
Per capita consumption of power in KWH (2011) 153 360
No. of Villages electrified (in percent) (2011) 82.2 74.1
Index of Social & Economic Infrastructure 75.39 100.00
11th Plan Performance : Growth & Income (NSDP, constant 2004-05, %)
5
Growth in Income 2005-06 2008-09 2009-10 (Q)
Primary 0.95 10.68 9.89
Of which Agriculture 0.44 13.93 12.29
Secondary 7.84 2.37 3.94
Of which Construction 7.13 2.41 4.22
And Registered 9.89 9.12
Tertiary 9.12 10.3 9.00Of which Other Services (Edu,Health) 9.77 17.83 9.1
and Public Admn. 13.55 14.13 14.10
Total NSDP 6.66 7.52 7.50Income and poverty Manipur India
PK Income (Rs) (2008-09 Current) 21,062 37,490
Pop. below Poverty line (2004-05) 17.30 27.50
Workers (%) 42.18 37.46
6Planning Department , Govt . o f Manipur
Department/ Sector
Achievements
Agri & Allied activities
Against Target of Food grains production of 685 thousandsMT (in 20110-11), 669.22 thousand MT achieved.
Cropping intensity increased from 129% in 2002-03 to 149%in 2010-11. Against target of milk production of 107thousand MT, 79 thousand MT has been achieved andagainst target of 27,500 thousand MT of fish, 22,200 MTachieved.
Irrigation & Flood Control
Irrigation potential created from major, medium and minorirrigation schemes during the 11th FYP period is estimated at50,510 ha. of which 31410 ha. is from major and mediumirrigation schemes and 19,100 ha. resp. The utilization isassessed at 21,610 Ha from both MMI & Minor irrigationschemes.
7Planning Department , Govt . o f Manipur
Department/ Sector
Achievements
Connectivity Roads & Bridges: Total surfaced road length achieved is1915 kms (675 km – State Highways, 964 kms – MDR, 130kms – Other District Roads, 146 kms – Inter Village Roads).The road density in Manipur is 56.51 km per 100 sq kmsagainst All India average of 62 kms.
Power i) 2096 villages out of 2524 villages electrified. (2010-11)
ii) Increased per capita consumption of electricity from 141KWH (2007-08) to 153 KWH (2010-11)
iii) AT & C losses reduced from 71% to 63%.
iv) Electronic energy meters and providing them at 33 KVand 11 KV Feeder completed.
8Planning Department , Govt . o f Manipur
Department/ Sector
Achievements
Health Institutional delivery showing an increasing trend. 3878ASHAs trained. Under JNY, 17,375 women benefitted. 97health facilities registered Rogi Kalyan Samities.19661infants fully immunized. IMR is at 16 per 1000 live births andMMR now at 160 per lakh live births .
Education Drop-out rate for class (I-V) reduced from 37.49% (2010-11)to 10.27% in 2010-11 and class (VI-VIII) from 4.33% to1.60%. Out of school children reduced from 54,351 to21,340 in 2010-11. All the 3063 Pr & UP Schools arecovered under MDM with 193111 students at Primary leveland 41217 students at Upper Primary.
9Planning Department , Govt . o f Manipur
Department/ Sector
Achievements
Rural Development
For alleviation of rural poverty, 337.04 lakh mandaysemployment created under MGNREGS with average wagerate of Rs.81.40. (2010-11)
Under PMGSY, 1694 number of new roads with a total roadlength of 3215 km taken up and 459 nos of upgradation ofexisting roads with total road length of 606 kms achieved.
Skills and Jobs 275 Nos of SHGs assisted and about 550 Nos of youthsimparted training programme with placement opportunity.
Governance and Inclusiveness
Elections to ADCs held after 20 years
Implementation of RD (and other) programmes devolved
State functions devolved to Local Bodies
Governance reforms in Urban areas .
4. Development Deficits
10
• Agri/Allied and Industry: Limited output, Poor growth Lack of mechanisation; low investment;
• Infrastructure for growth: Connectivity, power, processing, administrative, banking… Institutional: Policies, processes, skills and capacity
• Employment: Skewed: High in construction. Other sectors not growing
Educated unemployed: 6.8 lakhs registered (2010). High agricultural unemployment too. NREGA not filling the gap.
• Private Investment and Foreign Trade: Low interest in investment: Security and Infrastructure barriers Formal International Trade: Low volume, unstable; Informal/illegal.
• Human Development: Reach and Quality of education; Health care at doorstep, HIV-AIDS…
Development Deficits: Major areas of concern
11
Infrastructure- Roads: Limited network, Poor upkeep - Power: Serious deficits both in generation and transmission; non-sustainable AT&C losses, poor management - Minor Irrigation: Potential created, but unutilised. - Water supply: limited reach, poor distribution network.
Basic services- Education: Poor School Infrastructure; Untrained Teachers. - Health: Inadequate Infrastructure; Shortage of Specialists.- Poor Bank Spread/credit support - Poor governance and administrative network & Capacities.
Sector-wise growth targets for 11th Plan vis-à-vis 12th Plan
Plan Period Agri Industry Services Total
MANIPUR
11th Plan (Target) 1.2 8.0 7.0 5.9
(Realization) 8.9 3.4 8.0 6.6
ALL INDIA
11th Plan (Target) 4.0 10 – 11 9 – 11 9
(Realization) 3.1 7.5 10.0 8.1
MANIPUR - 12th Plan (Target) 5.31 6.07 8.71 7.05
ALL INDIA - 12th Plan (Target) 4.00 9.6 10.0 9.1
12Planning Department , Govt . o f Manipur
5. XIIth Plan: Vision
13
• Faster, inclusive and sustainable growth• Broad policy objectives - Enhance Agricultural and Industrial growth - Create more sustainable service sector- Invest in human resource (education, skills and health)- Jobs through leveraging strengths: Foreign Trade, Tourism,
Food Processing and Information Technology. NREGA. - Focus on performance of Flagship Programmes/CSS - Target gaps among backward groups/regions
• Better results through better implementation
6. Sectoral Monitorable targets – Agri and allied
14
Agriculture : Increase in food grain production to reduce deficit from present 20% to
10%.Horticulture :
Expansion of horticulture area from 24% of total horticultural potentialarea to at least 30% (passion fruit, orange, lemon, pineapple, banana,kiwi, spices)
Irrigation : Increase irrigation potential from 50.51 thousand hectares to 75.14
thousand hectares. Use the potential.Vety & A.H. :
Increase milk production from the present 79, 000 mt to 150,000 mt; Eggproduction from 1114.86 lakh to 5000 lakh and meat production from 28thousand MT to 60 thousand MT.
Fisheries : To achieve self sufficiency in fish production by increasing from present
20,000 MT to 32,000 MT.
Sectoral Monitorable targets: Basic services
15
Health : NRHM goals as framework. IMR, Institutional Delivery, Immunisation Complete all medical buildings – JNIMS / District Hospitals/ PHSC/
PHC/ CHC. Equip and staff health facility, equitably Contain and reduce spread of HIV/AIDS.
Education: Right to Education: Framework (physical, teachers, food, vocational…) Provide school buildings in hill districts – 39 schools without
classroom. Reduction of out-of-school children from 42,681 to 10,000 , and drop
out rate at Ele. Level from 11.87 % to 5%. Improving science/mathematics teaching in hill area schools.
Poverty alleviation: BPL census. Reduce BPL families from 17 % to …… Increase per capita income from Rs.25,494 to all India level. Mandays of employment MG-NREGA, Livehoods under NRLM,
Sectoral Monitorable target: Infrastructure
16
Roads : Connect all eligible villages (PMGSY) Increase overall road length by 660 km from 1212.17 km to 1870.17 km. Ensure upgradation of Highways and priority roads Provide for upkeep of roads
Power: Electrify all villages as per RGGVY targets Complete ongoing Power projects and start new ones Bring down AT & C losses by 3 % per year Draw up and implement Power sector reforms project – generation,
transmission, connectivity, billing Water supply :
Reduce the gap between demand & supply of water. Fully cover all habitations (including remaining 1481 habitation) Complete ongoing W/S projects and start new ones
Priority projects for 12th Plan period (Human Dev)
17
Sector Projects Cost (Cr) Details
Health JNIMS 867.00 To be upgraded from 300 to 500 bedded Hospital . Class started – 100 Students.
Constn of 100 bedded Hospital, CCP
7.22 100 bedded Hospital
Bishnupur District Hospital
10.24 100 bedded Hospital
Constn of 100 bedded Hospital, Imphal West
7.22 100 bedded Hospital
Constn of 100 bedded Hospital, Imphal East
7.22 100 bedded Hospital
Education Construction of 300 schools in six ADCs
137.77 300 schools in six ADCs(Under NLCPR)
Mgt Capacity Construction of Capital Project
841.843 1. Assembly – Rs.285.133 Crs2. High Court – Rs.131.585 Crs3. Civil Secretariat – Rs.425.126 Crs
Envn. & Sustainable dev.
Conservation & Mgt of Loktak Lake
500.00 Short Term & Long Term Action Plan.
Priority projects for 12th Plan (Infrastructure)
18
Sector Project Cost (Cr) Details
Envn…(contd.)
Restoration and Conservation of 19Wetland Areas
80.00 Conservation and Management of 19 Wetland Areas.
WATER SUPPLY
Aug of WS for ImphalCity by 45 MLD from Thoubal Dam
678.11 To cater to the need of drinking water for Imphal City. Proposed to be funded under EAP (JICA / any other sources)
Sewerage Project (ZoneII & III)
600.00 Safe disposal of human excreta & wastewater. (Balance )
POWER Intra state transmission & distribution network
727.67 To be funded under World Bank. To strengthen the Transmission and distribution network.
Loktak Down Stream Hydro Electric Project 66 MW
867.77 To be implemented through JVC formedbetween NHPC and State Govt.
Tipaimukh Hydro Electrict Project
8138.79 1500 MW. To be implemented trough JVC between NHPC (69%), SJVNL (26 %) and State Govt. ( 5%)
Priority projects for 12th Plan (Infrastructure)
19
Sector Project Cost (Cr) Details
IFCD Regional Jiri Irrigation Project 200.00 Expand irrigation facilities
Chakpi Multipurpose Project 549.65 Expand irrigation facilities
TPT/Roads
Jiri – Tupul – Imphal Railway Line Completion by 2016 for dependable Surface Connectivity.
National Highways Double laying and Bridges replacement on NH 53, 39 & 150
Improvement of Tadubi-Tolloi & Pfutsero (Khezokhonema) Road
141.75 Road length of 94.5 Km
Improvement of Tamenglong-Tousem-Haflong Road
136.50 Road length of 91 Km
Construction of Kangchup-Tamenglong Road
100.65 Road length of 61 Km
BorderTrade
Integrated Check Post at Moreh 145.00 To regulate border trade
(Priority Project) Service Sector and Employment
20
Sector Programme /Project Details
SERI Manipur Sericulture Project (Phase – II) (366 cr./SCA)
60 thousand No. of Family to be given employment
IT Software Technology Park 2200 youths to be given employment
Tourism Promotion of Tourism 20 thousand no. of youths to be given employment
MOBC Skill Development through economic development programme
29 thousand youths to be given skill development training
MSDS Skill Development Training programme
3000 youths to be skilled for enhancing Employability + Skilling of Handloom Weavers
ITI Skill Development 20 thousand youths to be given training programme
Financing the XIIth Plan
21
• Own resources:- Inherent limitations here. - But ARM measures being enforced. Bearing fruits.
• Private investment: Investment and PPP measures- Health taking the lead.- Potentials in Technical Education, Tourism/Hospitality, ITES
• Central transfers:- ACA, SCA/SPA, CSS..need stepping up- Main need in infrastructure projects and basic services - More flexibility with CSS to allow easy deployment/and meeting
local conditions.
Improving delivery through reforms
22
• Processes - Better project planning, implementation and management - More efficient Financial Management system • Systems - Local level planning, implementation and monitoring- Greater ownership of PRIs: ZPs (and Panchayats) and ADCs • Capacity - Of Line departments- Of PRI representatives and officials- Civil Society Organisations • Accountability- Transparency / RTI - Delivery of Public services (Citizens charters and timeline..) - Grievance Redressal (including penalties and compensation)
Participation and inclusion
23
• Plans for Inclusion - Revitalizing District Planning- Strengthening PRIs (ZPs/Panchayats and ADCs) for Planning and
implementing- Local and Participatory monitoring: District Level MC - Transparency and use of RTI: Use of Internet, and the youth
• Vulnerable groups - Hills/tribals: Powers and ownership, Large Investment, TSP - Women, SCs, Minorities: Affirmative action, Targeted
interventions (Women, SCSP, MSDP, 15 Point Programme) - Victims of violence; Victims of HIV AIDS: Tailor made programmes,
Annual Plan 2012-13Projects
25Planning Department , Govt . o f Manipur
Name of the Project
1. Dolaithabi Barrrage Project – to be completed by March, 2013
2. Thoubal Multipurpose Project – to be completed by March, 2013.
3. Upgradation of infrastructure of JNIMS – Phase I (500 cr) and Phase II
4. Capital Project – Conclude Secretariat
5. Installation of 132/33 KV SS at Hundung
6. Sewerage Project Phase – I for Imphal City
7. Construction of Mini-Secretariat in District HQs
8. Construction of District Hospital for IE & IW
9. Construction of Urban Hat at Imphal
10. Construction of Secured Housing (Phase-II)
11. Administrative Infra Development of 6 ADCs
12. Construction of Godown at Jiribam (5000 MT)
14. Upgradation of Infrastructure of Govt. College.
15. Erection of 33 KV feeder from Power Grid Sub-Station at Yurembam.
New projects: water bodies, Home,
Important Priority projects for 2012-13
Annual Plan 2011-12
• Expenditure and Revised outlay
Approved Outlay: Rs.3210.00 crAdditional (extras+ carry-over): Rs. 70.91 cr
Total: Rs.3280.91cr
Releases by GoI to date: Rs.1267.72 cr
Expdr., as on 31 Dec.2011: Rs.778.20 cr(23.72 %)
Percentage expdr (against release): 61.38 %
Expenditure position : Annual Plan 2011-12
27Planning Department , Govt . o f Manipur
Release of funds by GoI (as on 31-12-2011)
28Planning Department , Govt . o f Manipur
Approved outlay: Rs.3280.91 CrsOutlay (Cr.) Released by GoI (Cr.)
Normal Central Assistance (NCA) 757.57 527.42 Additional Central Assistance (ACA)
AIBP 290.00 - SCA to TSP 10.84 7.05 GIA under Art 275 (1) 9.37 9.37 BADP 20.00 20.00 Roads & Bridges (CRF) 11.23 22.00 Control of Shifting Cultivation 8.33 9.00 NSAP 16.25 13.74 NE Gap 3.46 0.95 BRGF 42.09 10.25 JNNURM 77.01 42.11 RKVY 41.80 11.13Externally Aided Projects (EAP) 100.00 -Special Central Assistance (SCA) 400.00 257.78Advance SPA 300.00 225.00Special Plan Assistance (SPA) 400.00 180.72 (+ 58.07)
Department-wise status ofExpenditure
Departments with ZERO expdr : Upto 31st Dec 2011 (Rs. in Crs)
30Planning Department , Govt . o f Manipur
Major Heads/ Minor Heads of Development
Approved Outlay for
AP 2011-12
Revised Outlay for
AP 2011-12
Expdr upto31
stDec.
2011
% age of Expdr
(against Rev)
RKVY 43.84 43.84 0.00 0.00Motor Vehicle (Transport) 0.30 0.30 0.00 0.00Fire Services 0.24 0.24 0.00 0.00GAD 0.00 1.03 0.00 0.00Home Department 0.00 4.83 0.00 0.00
Departments with LESS THAN 10% Expdr: Upto 31st Dec., 2011 (in Crs)
31Planning Department , Govt . o f Manipur
Major Heads/ Minor Heads of Development
Approved Outlay for AP
2011-12
Revised Outlay for AP
2011-12
Expdr upto31
stDec.
2011
% age of Expdr
(against Rev)
Rural Development 106.50 106.50 0.64 0.60Land Reforms 0.50 0.50 0.01 2.06Water Supply 205.00 205.00 7.43 3.62Legal Aids & Advice 1.05 1.05 0.04 3.81PWD 125.34 134.65 6.14 4.56SCERT 1.67 1.67 0.09 5.35Stationery 0.25 0.25 0.02 6.80Science & Technology 8.77 8.77 0.77 8.81
Departments with Expdr BETWEEN (10-20)% : Upto 31st Dec., 2011 (in Crs)
32Planning Department , Govt . o f Manipur
Major Heads/ Minor Heads of Development
Approved Outlay for AP
2011-12
Revised Outlay for AP
2011-12
Expdr upto31
stDec.,
2011
% age of Expdr
(against Rev)
Press 0.50 0.50 0.06 12.82Development of MOBC 21.21 21.21 2.80 13.19SAT 5.00 5.00 0.68 13.61Hariyali / IWDP 4.00 4.00 0.57 14.21Irrigation and Flood Control 309.27 372.74 58.72 15.75Tribal Development 40.10 40.10 6.54 16.31Sericulture 8.69 8.69 1.42 16.40School Education 73.50 75.17 13.16 17.51Sports (YAS) 37.18 37.18 6.56 17.64Arts & Culture 24.04 25.11 4.43 17.66Cooperation 6.83 6.83 1.26 18.42
Departments with Expdr. BETWEEN (20-50)% : Upto 31st Dec., 2011 (in Crs)
33Planning Department , Govt . o f Manipur
Major Heads/ Minor Heads of Development
Approved Outlay for AP
2011-12
Revised Outlay for AP
2011-12
Expdr upto31
stDec.,
2011
% age of Expdr
(against Rev)Social Welfare 47.17 47.17 9.87 20.92Labour & Labour Welfare 7.02 7.02 1.54 21.95Commerce & Industries 31.20 31.20 7.71 24.71Vety and A.H. 9.75 9.75 2.48 25.46Adult Education 0.95 0.95 0.29 30.77District Council/Hills 106.75 106.75 38.51 36.08Fisheries 9.85 9.85 3.75 38.12L.D.A. 8.60 8.60 3.29 38.26MAHUD 134.19 170.03 65.52 38.53Technical Education 5.50 5.50 2.30 41.80Police Housing 46.75 46.75 20.00 42.78Power 134.98 135.48 60.50 44.45Weights & Measure 0.25 0.25 0.11 44.92Information Technology (IT) 7.46 7.46 3.41 45.70Medical & Public Health 124.00 142.40 65.50 46.00Town Planning 0.22 0.22 0.10 46.18
Departments with ABOVE 50 % Expdr : Upto 31st Dec., 2011 (in Crs)
34Planning Department , Govt . o f Manipur
Major Heads/ Minor Heads of Development
Approved Outlay for AP
2011-12
Revised Outlay for AP
2011-12
Expdr upto31
stDec.,
2011
% age of Expdr
(against Rev)Forest 45.54 45.54 23.65 51.92Treasury 0.80 0.80 0.43 53.75Horticulture 12.83 12.83 7.16 55.77CAF & PD 1.07 1.07 0.60 55.90Ecology & Env. 10.00 12.00 7.04 58.67Survey & Statistics 1.13 1.13 0.68 60.03Higher Education 18.00 18.00 10.85 60.27Planning 56.55 61.30 38.25 62.40Border Area Dev. Prog(BADP) 20.00 25.00 15.60 62.41Agriculture 10.29 12.39 8.11 65.44Information & Publicity 1.35 1.35 0.89 66.16Manipur Dev Society (MDS) 35.00 51.28 40.30 78.60Tourism 3.00 12.61 10.31 81.79Command Area Dev. (CADA) 17.00 19.35 13.59 81.83Minor Irrigation 63.42 63.42 53.95 85.06
Departments achieved 100 % Expdr : Upto 31st Dec., 2011 (in Crs)
35Planning Department , Govt . o f Manipur
Major Heads/ Minor Heads of Development
Approved Outlay for AP
2011-12
Revised Outlay for AP
2011-12
Expdr upto31
stDec.,
2011
% age of Expdr
(against Rev)
Local Fund Audit (L.F.A.) 0.03 0.03 0.03 100.00Relief & Disaster Management
0.50 0.50 0.50 100.00
SPA 2011-12 status (in Crs)
Project Project cost
Outlay for 2011-12
Released Balance
Infra Dev. of JNIMS 223.05 132.00 58.51 14.22
Capital Project 317.54 72.80 36.50 -
C&M of Loktak Lake 373.99 73.00 22.12 9.93
APDRP in Gr. Imphal 58.72 25.85 25.85 -
Sewerage Project, Ph I 107.76 48.85 48.85 1.58
132/33 KV S/S at Ukhrul 38.22 11.00 10.90 5.00
Mini-Sectt buildings in dists. 260.89 36.50 36.50 26.43
Total released 400.00 239.23 57.15
Balance of Rs. 400 cr. 400.00 239.23 160.77
36Planning Department , Govt . o f Manipur
SCA 2011-12: Releases (Cr)Name of the Projects Outlay Releases
1 Manipur Sericulture Project (Ph-II) 9.20WORKS
1 Upgradation of various roads in both hills and valley district to provide conectivity
182.63
Health1 Equipping of District Hospital Thoubal 13.802 Construction of District Hospital for IE 4.603 Construction of District Hospital for IW 4.604 Construction of District Hospital for BPR 2.55
POWER1 Erection of 33 KV feeder from Power grid sub-station at
Yurembam4.60
FLOOD CONTROL1 Flood Control and Anti Erosion Schemes/ Projects 41.60
ECOLOGY AND ENVIRONMENT1 Bio-diversity Conservation of water bodies & Impvt. of
environment in four different places (JNIMS, Waithou, Heipokching & others, Moreh, )
7.35
SCA 2011-12: Releases and expenditure (in Crs)Name of the Projects Outlay Releases
POLICE / HOME1 Construction of left out portion of police housing/outposts
and VDF outposts8.62
2 Construction of Administrative Building posts for Police Stations
13.64
3 Constn of Police Housing / building & VDF outposts building
7.11
HIGHER EDUCATION1 Upgradation of infrastructure of 12 Govt Colleges 11.00
SCHOOL EDUCATION1 Special School for the differently abled children with
learning difficulties3.00
2 Upgradation of Infra of Manipur Public School, Koirengei 5.50TECHNICAL EDUCATION
1 Construction of Lab Block for applied Science & Engg 4.602 State support for NIT, Lamphel 4.60
SCA 2011-12: Releases and expenditure (in Crs)Name of the Projects Outlay Releases
DISTRICT COUNCIL / HILLS2 Administrative infrastructure Development of 6 ADCs. 27.60
CAF & PD1 Construction of godown at Jiribam (5000 MT) 5.50
MDS1 Construction of Urban Hat at Imphal 9.202 Construction of Integrated Irrigation Tank in 9 districts 24.103 Upgradation of infrastructure for Hotel Imphal 4.60
GRAND TOTAL (SCA) 400.00 257.87