working with robotic integrators - automate show

25
Calvary Robotics Private and Confidential Michael Marseglia Director of Robotics Calvary Robotics Working with Robotic Integrators

Upload: others

Post on 22-Mar-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Calvary Robotics Private and Confidential

Automation: 3 Critical Steps

Step 1. - Assessing Automation Needs

Step 2. - Assessing Integrators

Step 3. - Key Project Success Factors

Calvary Robotics Private and Confidential

• Manufacturing Strategies

Manual and Semi Automatic Lean Cells

Islands of Automation

Manufacturing Platforms

Movement of product - Logistics

Factory Integration – Front Office to Shipping

Step 1.

Assessing Automation Needs

Calvary Robotics Private and Confidential

• Scalable Automation…

Requirement?

Flexible?

2x Equipment = 2x Output?

Scale with Production Requirements

Invest Capital with Production Increases

Step 1.

Assessing Automation Needs

Calvary Robotics Private and Confidential

• Re-deployable Automation…

Requirement?

Flexible/Dedicated?

Re-use

Re-tool

Retrofit

Step 1.

Assessing Automation Needs

Calvary Robotics Private and Confidential

• Appropriate Technologies…

Control Platform and Architecture

Robotics

Vision

Safety

Process Based:

Joining Fastening Methods

Inspection (Vision, Laser, Etc…)

Testing (In Process or Custom Functional Test)

Marking

Packing

Data Acquisition – data management

Step 1.

Assessing Automation Needs

Calvary Robotics Private and Confidential

• Overall Capabilities…

Business Model

Engineering Disciplines / Experience

Technology /Integration Experience

Project Management and Execution

Certifications and Compliance

Manufacturing Capabilities

Step 2.

Assessing Integrators

Calvary Robotics Private and Confidential

• Business Model..

Small, medium, large scale systems

Main industries served

In-house design/manufacturing/assembly

Build to print

Custom designs/standard products

Step 2.

Assessing Integrators

Calvary Robotics Private and Confidential

• Engineering…

Engineering Disciplines?

Process/Product Specific Experience or Comparable?

Technology Experience

Motion control

PLCs/PC

SCADA

Robotics

Vision

Safety

Step 2.

Assessing Integrators

Calvary Robotics Private and Confidential

• Technologies…

Control Platform and Architecture

Robotics

Vision

Safety

Process based:

Joining Fastening Methods

Inspection (vision, laser, etc…)

Testing (in process or custom functional test)

Marking

Packing

Data Acquisition – data management

Step 2.

Assessing Integrators

Calvary Robotics Private and Confidential

• Project Execution…

Established & Documented Processes

Project Management

Engineering

Supply Chain

Manufacturing

Evidence of Following Systems & Processes

Proven Track Record of On-Time Delivery

Positive Customer Feedback

Industry / Customer references

Step 2.

Assessing Integrators

Calvary Robotics Private and Confidential

• Certifications…

ISO Certification

Regulatory Certifications (i.e….)

Other Regulatory & Third Party certifications (whether

relevant to your needs or not, indicating the company

commitment to higher standards)

Self Audit and Third Party Audits

In-House Standards

Industry and Regulatory Standards and documentation

Step 2.

Assessing Integrators

Calvary Robotics Private and Confidential

• Manufacturing Capabilities…

Tooling, Fabrication

Quality, Inspection, Certification

Supply Chain

Skilled Trades

Tool \Room

Certifications

Audits

Step 2.

Assessing Integrators

Calvary Robotics Private and Confidential

Step 3.

Key Project Success Factors

Clear Communication of Requirements

Identify / Establish Milestones

Identify Key Contributors

?

Calvary Robotics Private and Confidential

• Effectively Communicating Requirements

Creating an RFQ/URS

Company, Industry and Regulatory Standards

Integrator Standards

Integrator knowledge of Industry and Regulatory Standards

Step 3.

Key Project Success Factors

Calvary Robotics Private and Confidential

• Identify and Establish Milestones…

What are the quote phase milestones?

What are the project Milestones?

What is the automation time line?

What is your total project time line?

Do they align?

What is your contingency plan?

What is considered successful?

Step 3.

Key Project Success Factors

Calvary Robotics Private and Confidential

• Identify the Key Contributors…

Single points of contact customer and supplier?

Establish roles and responsibilities

Who are the decision makers?

Establish, agree and communicate rules of engagement

Identify project team members representing main disciplines

Plan for periodic “buy in” from your internal customers

Step 3.

Key Project Success Factors

Summary

Calvary Robotics Private and Confidential

Step 1. - Assess Automation Needs

Step 2. - Engage and Assess Integrators

Step 3. - Align Critical Project Milestones With Your Needs

Calvary Robotics Private and Confidential

• Michael Marseglia Director of Robotics / Business Development Manager Calvary Robotics 855 Publishers Parkway Webster, New York USA

• Telephone: 585-347-6127 Email: [email protected] www.calvaryrobotics.com

Combined Strength Distinctive Expertise