working group 1

18
Working Group 1 IDO 1. More resilient livelihoods for vulnerable households in marginal areas IDO 4. More sustainable and equitable management of land and water resources in pastoral and agro-pastoral

Upload: cgiar-research-program-on-dryland-systems

Post on 02-Jul-2015

114 views

Category:

Technology


0 download

DESCRIPTION

Synthesis of the outputs for working group 1, facilitated by Mohamed Ouessar of IRA Tunisia, focused on IDO 1: More resilient livelihoods for vulnerable households in marginal areas and IDO 4: More sustainable and equitable management of land and water resources in pastoral and agro-pastoral settings. The team of scientists in group 1 went through a process that included validation, clustering, prioritization and filling gaps in the performance management system. Activities were narrowed from 28 to 14 and a budget was set through December of 2013. Lessons learned included the necessity of not creating or adding new activities, that preparation cards are crucial and should always refer to the agreed activity per IDO and that representation of the group per IDO affects prioritization. Milestones and deliverables were also set for 2013 and 2014.

TRANSCRIPT

Page 1: WORKING GROUP 1

Working Group 1

IDO 1. More resilient livelihoods for vulnerable households in marginal areas

IDO 4. More sustainable and equitable management of land and water

resources in pastoral and agro-pastoral

Page 2: WORKING GROUP 1

Working Group 1

3 ICARDA + 5 NARS = 8

Page 3: WORKING GROUP 1

Mohamed Ouessar

IRA TUNISIAFacilitator

Mounir LouhaichiICARDA

Rapporteur

Yahya ShakhatrehPlant Breeding

JORDAN

Cyrus AmiriniaAnimal Breeding

IRAN

Hichem Ben Salem

INRA TUNISIALivestock

Halim Ben HadjSalah

ICARDAWest Asia

Ahmed MazidICARDA

Agro-economist

Working Group 1

Mohammad Reza Balali

Soil & WaterIRAN

Page 4: WORKING GROUP 1

Process

• Validate

• Cluster

• Prioterize

• Fill in empty cells

Page 5: WORKING GROUP 1

IDO1 & IDO4

28 Activities 14 Activities 50%

Outputs

Page 6: WORKING GROUP 1

IDO 1

IDO 1= 18 Activities IDO 1= 9 Activities

Page 7: WORKING GROUP 1

1.1= 9 Activities 1.1= 6 Activities

3

0

0

9

9

4

Page 8: WORKING GROUP 1

1.2= 9 Activities 1.2= 3 Activities

4

2

3

Page 9: WORKING GROUP 1

IDO 4

IDO 4= 10 Activities IDO 4= 5 Activities

Page 10: WORKING GROUP 1

4.1= 6 Activities 4.1= 3 Activities

14

16

3

Page 11: WORKING GROUP 1

4.2= 4 Activities 4.2= 2 Activities

4

6

Page 12: WORKING GROUP 1

Detailed IDOs

Show excel file

Page 13: WORKING GROUP 1

Lessons Learned

• We cannot create or add new activities– However we can cluster into existing activity– One activity can be represented in more than 1 IDO

• Preparation cards/activity is crucial and should always refer to the agreed activity per IDO.

• Representation of the group per IDO affects the prioritization. Some activities got low score because were mostly not technical and we only had one person representing SEPER.

• Budget for 2013?– Only what you are able to spend by 31st of December 2013– Can go back earlier date in 2013– When the funds will be available?– 250k is per activity– Suggested budget per activity is rough estimate and needs revision

Page 14: WORKING GROUP 1

Requested Budget

IDO 1Number of Activities Funding - specify amount for each 2013

Total Funding

9W1&2 W3 Bilateral

6,650 1,147 50 1,950

IDO 4

Number of Activities Funding - specify amount for each 2013 Total

Funding

5W1&2 W3 Bilateral

5,350 500 25 1,250

Page 15: WORKING GROUP 1

IDOs 1&4_WG Summary

IDOs Outputs # Activities

IDO1 Output 1 6

Output 2 3

IDO4 Output 1 3

Output 2 2

TOTAL 14

Page 16: WORKING GROUP 1

IDOs 1_Indicators

IDOs IndicatorsIDO1 1. Areas under CA increased

2. Adoption rate increased

3. Dual purpose barley developed

4. SR productivity increased

5. Capacity development of stakeholders enhanced

6. SR feeding cost reduced

7. SR dietetic products attained (milk and meat)

8. Forage productivity increased using treated waste water

9. WUE for livestock production enhanced

10. Regional bio-economic models to assess potential impact and out-scaling opportunities developed

11. Erosion and water balance models developed

Page 17: WORKING GROUP 1

IDOs 4_Indicators

IDOs IndicatorsIDO4 1. Rangeland degradation alleviated

2. Social capital increased due to land tenure and access

3. Tools and protocols for monitoring and assessing rangeland degradation developed

4. Key rangeland species conserved and valorized

5. Soil and water erosion rates reduced

6. Volume of mobilized surface water increased

7. Productivity and biodiversity of landscape depressions in pastoral ecosystems increased

8. Agreement (MoU) for CBOs signed

9. Partnership and networking among all stakeholders enhanced

10. Community development plan developed

Page 18: WORKING GROUP 1

IDOs 1&4_Milestones/Deliverables

IDOs Milestones - Deliverables

IDO1&4 2013

1. Target sites, community, interventions identified2. Launching and community awareness workshops organized3. Status report on the experiences, lessons learned and potential areas of interventions

2014

1. Implementation priorities of agreed activities on the five sites2. Baseline data collected and analyzed