Work Product Identification
Below is the tabular representation of the work product in each step. The first
column shows the complete list of outputs in each step. The second column shows the
target dates of completion. Lastly, the point of contact is shown at the last column.
Activity Accomplishment date Point of contact
OBJECTIVESPrepare materials and start
the evaluation of the lounge
September 21, 2015Monday
Daren B. Rosales
Review the result of evaluation for guide
September 23, 2015Wednesday
Daren B. Rosales
Construct the design of the bench
September 23, 2015Wednesday
Daren B. Rosales
Create and provide manuals for the function of
the bench
September 24, 2015Thursday
Daren B. Rosales
OBJECTIVESPrepare materials and start
the evaluation of system September 21, 2015
MondayDaren B. Rosales
Review the result of evaluation for guide
September 23, 2015Wednesday
Daren B. Rosales, Programmer
Create the queuing and information system
September 27,2015Sunday
Daren B. Rosales, Programmer
Implement the system October 26, 2015Monday
Daren B. Rosales, Programmer
Create and provide manuals for the system
October 28, 2015Wednesday
Daren B. Rosales, Programmer
The target dates of completion may vary depending on the duration of the pre-
requisite activity of each step. The point of contact will be the one in charge of the
evaluation process upon the accomplishment of the product. Monitoring of the target
accomplishment date is needed to avoid delays in the project. The point of contact will
secure immediate solutions to the deterrents, to ensure the success of the project plan.