Work Product Identification Below is the tabular representation of the work product in each step. The first column shows the complete list of outputs in each step. The second column shows the target dates of completion. Lastly, the point of contact is shown at the last column. Activity Accomplishment date Point of contact OBJECTIVES Prepare materials and start the evaluation of the lounge September 21, 2015 Monday Daren B. Rosales Review the result of evaluation for guide September 23, 2015 Wednesday Daren B. Rosales Construct the design of the bench September 23, 2015 Wednesday Daren B. Rosales Create and provide manuals for the function of the bench September 24, 2015 Thursday Daren B. Rosales OBJECTIVES Prepare materials and start the evaluation of system September 21, 2015 Monday Daren B. Rosales Review the result of evaluation for guide September 23, 2015 Wednesday Daren B. Rosales, Programmer Create the queuing and information system September 27,2015 Sunday Daren B. Rosales, Programmer Implement the system October 26, 2015 Monday Daren B. Rosales, Programmer Create and provide manuals for the system October 28, 2015 Wednesday Daren B. Rosales, Programmer

Upload: daren-bundalian-rosales

Post on 01-Feb-2016

215 views

Category:

Documents


0 download

DESCRIPTION

TechCom

TRANSCRIPT

Page 1: Work Product Identification

Work Product Identification

Below is the tabular representation of the work product in each step. The first

column shows the complete list of outputs in each step. The second column shows the

target dates of completion. Lastly, the point of contact is shown at the last column.

Activity Accomplishment date Point of contact

OBJECTIVESPrepare materials and start

the evaluation of the lounge

September 21, 2015Monday

Daren B. Rosales

Review the result of evaluation for guide

September 23, 2015Wednesday

Daren B. Rosales

Construct the design of the bench

September 23, 2015Wednesday

Daren B. Rosales

Create and provide manuals for the function of

the bench

September 24, 2015Thursday

Daren B. Rosales

OBJECTIVESPrepare materials and start

the evaluation of system September 21, 2015

MondayDaren B. Rosales

Review the result of evaluation for guide

September 23, 2015Wednesday

Daren B. Rosales, Programmer

Create the queuing and information system

September 27,2015Sunday

Daren B. Rosales, Programmer

Implement the system October 26, 2015Monday

Daren B. Rosales, Programmer

Create and provide manuals for the system

October 28, 2015Wednesday

Daren B. Rosales, Programmer

The target dates of completion may vary depending on the duration of the pre-

requisite activity of each step. The point of contact will be the one in charge of the

evaluation process upon the accomplishment of the product. Monitoring of the target

accomplishment date is needed to avoid delays in the project. The point of contact will

secure immediate solutions to the deterrents, to ensure the success of the project plan.