WORK PLAN MEMORANDUM
PERFOAC
US.
MEDIAL RESPONSECONTROLLED
WASTE SITES
RACT NO. 68-01-6939
CAMP DRESSER & McKEE INC.PRIME CONTRACTOR
REGION V
Work Plan Memorandum forSkinner Landfill, West Chester, Ohio
Document Number 130-WP1-WM-AKVE-1
October 1984
COM CAMP DRESSER & McKEE INC.
. ic*nf«/» 11 Ea* **"• »«*. Suite 1500A mwwflWTW* con*//Mn« Chtcago, Illinois 60603
312 786-0253
October 15, 1984
Mr. Richard E. BarteltRegional Project OfficerU.S. Environmental Protection Agency230 South Dearborn StreetChicago, Illinois 60604
Mr. Gene WongRegional Site Project OfficerU.S. Envornmental Protection Agency230 South Dearborn StreetChicago, Illinois 6060*4
Work Assignment No.: 31-5L73
EPA Contract No.: 68-01-6939
Subject: Work Plan Memorandum forSkinner Landfill, West Chester, Ohio
Document No: 130-WP1-WM-AKVE-1
Dear Messrs. Bartelt and Wong:
Camp Dresser £ McKee Inc. is pleased to submit this Work Plan Memorandumfor the Skinner Landfill site located in West Chester, Ohio.
The scope, schedule and cost estimate for initial tasks defined by USEPAfor Skinner Landfill have been modified to include both tasks No. 1 and 2.Therefore, both the cost summary and the schedule included in this WorkPlan Memorandum reflect the increase in the level-of-effort.
Please note that the costs presented in this memorandum are based oncost data for Roy F. Weston, Inc., and represent direct and indirectcosts, without base fee or award fee. The detailed costs and fees w i l lbe presented in the Work Plan and will be supported by Optional Forms 60for each REM II Team firm's participation in the work assignment.
It has been determined that no conflict of interest exists for theRegional and Site Managers for this work assignment. Also, it has beendetermined that no organization conflict of interest exists for Roy F.Weston, Inc., or Camp, Dress £ McKee Inc. Signed conflict of intereststatements wi l l be submitted under separate cover.
CAMP DRESSER & McKEE INC.
Mr. Richard BarteltMr. Gene Wong
October 15,
If you have any questions or comments, please contact me.
Very truly yours,
CAMP DRESSER £ McKEE INC.
John W. Hawthorne, P.E.Region V, Manager
Approved: Approved:
David F. Doyle, P.E. Jonathan G. Curtis, P.E.Technical Operations Manager Finance and Administration Manager
cc: W.R. Topping, Contracting Officer, USEPAW.M. Kaschak, Project Officer, USEPA
Receipt by EPA Region V Acknowledged: Exceptions Taken
Regional Project Officer Date Yes No
Regional Site Project Officer Date Yes No
Explanation of exceptions attached ______ ____Yes No
Routing of Acknowledgement:
Return original to REM II Site Manager - Robert J. Karnauskas
Copies to:REM II Project Officer - W.M. KaschakREM II NPMO - J.G. Curtis
NORTHBFOOK OFFICE COURTSUITE 1502666 WEST DUNDEE ROADNOflTMBROOK IL 60062PHONE 312-496-9090
DES>
15 October 1984
Mr. John W. Hawthorne, P.E.Camp, Dresser and McKee, Inc.11 E. Adams StreetChicago, Illinois 60603
Re: Work Plan Memorandum for theSkinner Landfill SiteWork Assignment No. 31-5L73.0EPA Contract No. 68-01-6939Document No. 130-WTPl-WM-
Dear Mr. Hawthorne:
E n c l o s e d is the Work Plan M e m o r a n d u m for the S k i n n e rL a n d f i l l site in West Chester, Ohio. We have identified nosubstansive exceptions to the scope of work. However, in ane f f o r t to facilitate the preparation of project plans to beat tached to the work plan and expediting the preparation ofthe topograph ic map for the facility, we have estimated agrea te r level of e f f o r t in implementing the initial taskso u t l i n e d in this work plan m e m o r a n d u m . We have alsom o d i f i e d the order of the ass igned tasks in order toc o n f o r m to the REM II Standard Task Lists. If there are anyques t ions r ega rd ing this w o r k , please do not hesitate tocontact me.
Very truly yours,
ROY F. WESTON, INC.
/'Robert J. Karnauskas, P.G.REM II Site Manager
RJKrjts
cc: National Program Managers Office
TABLE OF CONTENTS
WORK PLAN MEMORANDUM
FOR
SKINNER LANDFILL SITE
REMEDIAL INVESTIGATION/FEASIBILITY STUDY
WEST CHESTER, OHIO
ITEM PAGE
1.0 INTRODUCTION.................................. 1
2.0 SCOPE OF SERVICES............................. 3
Task 0. Prepare Work Plan Memorandum......... 3
Task 1. Description of Current Situation..... 3
1.1 Obtain and Evaluate ExistingInformation...................... 4
1.2 Prepare Compiled Site Plan(s).... 61.3 Perform Initial Site Characteri-
zation ........................... 6
Task 2. Prepare Project Operations Plans..... 6
2.1 Quality Assurance Project Plan... 72.2 Site Health and Safety Plan...... 82.3 Sampling and Analysis............ 82.4 Site Management.................. 92.5 Quality Control Plan............. 92.6 Date Management.................. 92.7 Community Relations Plan......... 10
Task 3. Perform EPA Designated Activities.... 10
3.1 Perform Site Mapping............. 10
Task 4. Prepare Work Plan.................... 11
4.1 Prepare Draft Work Plan.......... 114.2 Agency Review.................... 134.3 Prepare Final Work Plan.......... 13
TABLE OF CONTENTS
(continued)
ITEM
Task 5. Technical and FinancialManagement.............
3.0 BUDGET......
4.0 SCHEDULE...,
5.0 KEY STAFF..,
6.0 ATTACHMENTS ,
PAGE
13
14
14
14
14
Attachments AAttachments BAttachments CAttachments DAttachments EAttachments FAttachments G
Summary of CostsDetailed CostsSchedule of ActivitiesSchedule of DeliverablesInitial Tasks Flow ChartSite Manager's ResumeConflict of Interest Declarations
WORK PLAN MEMORANDUM
For
SKINNER LANDFILL
For
PREPARATION OF A REMEDIAL INVESTIGATION/FEASIBILITY STUDY
1.0 INTRODUCTION
This work plan memorandum describes the tasks to beperformed in preparation of the work plan for the SkinnerLandfill located near West Chester, Ohio, in accordance withEPA's Work Assignment No. 31-5L73.0.
The Skinner Landfill is a sanitary landfill locatedapproximately 1 mile northeast of the Town of West Chesterin Union Township, Butler County, Ohio (Figure 1). SeeFigure 2 for a location map of the landfill site. Thelandfill is approximately 50 feet higher than thesurrounding terrain and consists of 50 to 70 acres of land;the boundaries are not clearly distinguishable by visualinspection. The initial owners of the landfill were Mr. andMrs. Albert Skinner and their sons; the present owner isElsa Skinner, wife of Albert Skinner. The property isbounded on the north and east by wooded land, the south bywooded and agricultural land, and on the west by theCincinnati-Dayton Road and scattered single-family resi-dences.
The entire site, including the presently used landfill area,is scattered with debris such as tires, wood, aerosol cans,numerous large tanks, engines, washers, and dryers.
Access to the site is obtained from the Cincinnati-DaytonRoad. There is a complex pattern of trailways leading intoand through the landfill. One residence is located in thelandfill area itself. Refer to the site map (Figure 3) fora general layout of the area.
The site is hidden from the public community by thesurrounding trees and other vegetation which appears to benormal and healthy. Trails leading to the six water pondssuggest possible dumping activities or usage of the water.Two intermittent drainages traverse the base of the landfillflowing southwest through the Town of West Chester wherethey meet to form the East Fork of Mill Creek.
-1-
RICHMOND
SCALE IN MILES
Reference: Skinner Landfill Site - Remedial Action Master PlanHay 18, 1983; CH2M-H111, Inc.
FIGURE 1VICINITY MAPSKINNER LANDFILL
SOURCE. U.S.0.1. 7.8' OLENOALE. OHIO QUADRANGLE.
Reference: Skinner Landfill Site - Remedial Action Master PlanMay 18, 1983; CH2M-Hill, Inc. FIGURE 2
LOCATION MAPSKINNER LANDFILL
APPROXIMATE LOCATIONOP OLD INCINERATOR
'APPROXIMATE*AREA OF OLDLAGOON
APPROXIMATELOCATION OFSON-IN-LAWSRESIDENCE
LEGEND
— — LANDFILL BOUNDARY
• STANDING WATER PONDS1000
•00SCALE IN FEET
Reference: Skinner Landfill Site - Remedial Action Master PlanMay 18, 1983; CH2M-H111, Inc.
FIGURE 3SITE MAPSKINNER LANDFILL SITE
From photo analysis, it appears that the land was originallyused in the 1930s for the extraction of sand and gravel.
During the next several decades, the Skinners acceptedgeneral municipal refuse. As early as 1964, hazardous wastewas reportedly accepted at the landfill and cyanide wasconfirmed to have been disposed of at the site. In 1976,toxic chemicals from the Chem-Dyne Corp. were reportedlyplaced in the landfill.
The site was never permitted as a municipal landfill and ispresently unpermitted. Application for a permit was madebut never approved because the area had previously beenzoned as a rural residential area. Because the landfill wasnot permitted, regular inspections were not conducted.Therefore, records concerning the landfill operation arescarce.
In 1977, the landfill operators were charged by Ohio EPAwith improperly disposing of hazardous waste material at thesite. Approximately 100 drums, allegedly containingindustrial and chemical wastes, were photographed on site.In a subsequent court case, in which the Ohio EPA attemptedto force the landowners to remove the drums, the presidingjudge ruled that the Ohio EPA failed to present sufficientevidence that the drums posed a danger. The same judge didprohibit the landowners from using the facility for futuredisposal or storage of industrial wastes of any natureexcept under legal permit.
Another business activity was conducted on site by JohnSkinner, son of the landfill owners. Beginning in the early1960s, John Skinner worked for the Chem-Dyne Corporation(now in receivership), cleaning, washing and repairingChem-Dyne equipment used to haul chemical wastes. Thisactivity apparently began under the auspices of WilliamKovacs, a vice president of Chem-Dyne Corp. It is unknownwhen this business began or ended; however, in the courtcase referred to above, which was tried in October 1978, thepresiding judge allowed this activity to continue.
Industrial chemicals from the Chem-Dyne Corporation havereportedly been dumped in an old lagoon area in thelandfill. The dumped material consists of drums, brokendrums and free standing liquid. The lagoon area was coveredwith soil from the landfill in 1976 and the limits of theold chemical dump are not presently known. Samples of thesechemicals were found to contain toxic concentrations ofhazardous chemical substances. Groundwater contamination isa possibility.
-2-
Leachate has been reported seeping from the bank in the areaof the old lagoon. Surface water contamination of the twostreams tnat traverse the base of the landfill is apossibility.
Numerous storage tanks and 55-gallon drums are scatteredthroughout the landfill. The contents of these tanks anddrums are unknown. During a site visit, the instrumentreadings in two of the tanks registered high concentrationsof organics. It is not known if there are buried drums inareas other than the lagoon area.
Six standing water ponds lie along the western boundary ofthe landfill. Based on visual inspection, these ponds donot appear to be contaminated. Trucks have been seenbacking up to these ponds indicating possible dumping.
To date there have been no remedial actions taken to rectifythe problems at the Skinner Landfill site.
(Source: Final Remedial Action Plan prepared by CH2M-Hill,May 1983).
2.0 SCOPE OF SERVICES
Task 0. Prepare Work Plan Memorandum
Objective: Prepare a Work Plan Memorandumdescribing the tasks to be performed inorder to prepare the Work Plan andProject Operations Plans; identify thelevel of effort (LOE) and associatedcosts and schedule.
Data Sources: 1. Tasks 1 and 2 of the Skinner Land-fill Remedial Investigation andFeasibility Study Statement of Work.
2. Remedial Action Master Plan forSkinner Landfill Site Property Site(1983).
3. REM II Policy and GuidanceProcedures.
Deliverables: Work Plan Memorandum
Task 1. Description of Current Situation
-3-
Subtask 1.1 - Obtain and Evaluate Existing Information
Objective: Develop a file of existing availableinformation for use in preparing theWork Plan for the Remedial Investigation(RI) and preparing the FeasibilityStudy (FS). This task will act as aforum for the kickoff meeting describedin the Statement of Work under Activity1. Task 1.
Date Sources: 1. U.S. EPA Region V file data.
2. Ohio EPA file data.
3. Ohio Department of Health file data.
4. Skinner Landfill - ResponsibleParty Search, April 1983, EPAContract No. 68-01-6543.
5. Final Remedial Action Master Plan,Skinner Landfill Site, prepared byCH2M-Hill, May 18, 1983.
6. Southwestern Area Air PollutionControl Agency file data.
7. United States Geological Surveytopography maps and geological data.
8. Soil Conservation Service, SoilSurvey of Butler County.
9. West Chester/Butler County SkinnerLandfill - A Preliminary Hydrogeo-logical Report. Ron St. John, OhioTDDf FS-3110-4 prepared by Ecologyand Environment, Inc., 1981.
10. Ohio Attorney General file data.
11. Report of Geology and GroundwaterResources, West Chester, ButlerCounty, Ohio., J.L. Hosier, OhioEPA Southwest District Office, April22, 1982.
12. Groundwater Resources of theCincinnati Area, Butler andHamilton Counties, Ohio,
-4-
13.
F.H. Klair, Jr.? D.G. Thompson, U.S.Geological Survey Water Supply Paper999.
Butler County Health Department filedata.
14. Union Township file data.
15. Local newspapers.
Assumptions: 1
Deliverables:
Most of the information discussedabove can be obtained from U.S. EPAand Ohio EPA. The agencies listed asdata sources will be contacted to seeif additional information has beendeveloped since the preparation ofthe RAMP.
U.S. EPA and State agencies willprovide access to and furnishadditional data required.
Site data is valid with respect toQA/QC protocols.
Data gathered as part of Subtask 1.1will be used to develop the followinginformation which will be included inthe Interim Report.
1. List of information obtained to in-clude an updated chronologicalhistory of operations and responseactions conducted at the site and alisting of all materials known tohave been deposited or stored at thesite.
2. Description of the nature and extentof the problem at the site with anemphasis on the threat or potentialthreat to public health and the envi-ronment .
3. Description of known or potentialproblems associated with the existingdata, including the identification ofdata gaps.
4. Description of enforcement activitiestaken, if any, and actions to identi-fy responsible parties and/or recovercosts.
-5-
5. A history of public concerns andinformation on outreach activities atthis site.
Subtask 1.2 - Prepare Compiled Site Plan(s) (Maps)
Objective: Prepare a site map based on existingdata showing in as much detail aspossible the planimetric and topographicfeatures. Location of storage tanks andconglomerated drum locations will beshown if the data is available.Detailed site mapping will be conductedunder Subtask 3.1 to be discussed later.
Data Sources: 1. U.S.G.S. information.
2. Existing information developed inSubtask 1.1.
Assumptions:
3. Available historic and currentaerial photography.
1. Compiled site plan(s) are primarilyfor use in conceptualizing the workplan requirements.
Deliverables: The compiled site plan will be part ofthe Interim Report.
Subtask 1.3 - Perform Initial Site Characterization
Objective: To determine the level of hazard atthe site and to determine the scopeof additional work required toaccurately complete the Work Plan forthe Skinner RI/FS.
Data Sources: 1. As listed in Task 1.
2. Initial site visit by REM II teammembers.
Deliverables: Subtask 1.3 is deliverable as part ofthe Interim Report.
Task 2. Prepare Project Operations Plans
-6-
Objectives:
Date Sources:
Assumptions:
To prepare those project plans necessaryfor the execution of the work and toensure that the work is conducted in aconsistent manner that satisfies thereviewing and using agencies'requirements prior to execution.
1. Information collected from sitefiles compiled in Task 1 and aninitial site inspection.
2. REM II Guidance Documents.
3. Region V directives and procedures.
4. State and local directives and pro-cedures
5. U.S. EPA-approved REM II Health andSafety Assurance Manual.
6. Quality Assurance Program Plan forPerformance and Remedial ResponseActivities of Uncontrolled HazardousWaste Sites.
7. User's Guide to the Contract Labo-ratory Program—U.S. EPA, July 1984.
1. The REM II approved program planswill form the basis for the respec-tive site specific plans.
2. Laboratory Quality Control will beperformed by the Contract Laborato-ries or the Central Regional Labora-tory, as applicable.
Subtask 2.1 Quality Assurance Project Plan (QAPP)
A site-specific QA Project Plan will bedeveloped in accordance with U.S. EPARegion V Quality Assurance Project PlanGuidance and consistent with U.S. EPA'sContract Laboratory Program. Preparationof this document will be tailored to thespecific requirements for the project inthe field and in the office. Since ana-lysis will be performed by a U.S. EPAContract Laboratory or the Central Re-gional Laboratory, the analytical QA/QC
-7-
Deliverables;
Subtask 2.2
Deliverables:
Subtask 2.3
will be performed by the analytical lab-oratory and monitored by the Region VCentral Regional Laboratory. The Tableof Contents from a typical QAPP is shownin Figure 2-1.
Quality Assurance Project Plan
Health and Safety Plan
A site -specific health and safety plan(Safety Evaluation Form) will be pre-pared for approval, using input fromTask 1. The plan will include:
1. Personnel protective equipment re-quirements, keyed to generalized sitelocation and activity.
2. Safety equipment inventory.
3. Training requirements.
Medical surveillance program.4.
5.
6.
7.
8.
Specific medical procedures, as ap-propriate.
Personnel hygiene requirements.
Contingency plan and emergency pro-cedures.
Site personnel/activity safety moni-toring program.
9. Decontamination procedures.
The plan will be organized to apply toall RI field work.
Safety Evaluation Form
Sampling and Analysis Plan
A site-specific sampling and analysisplan based on the findings of the ini-tial investigations phase and the State-ment of Work will be developed. Table2-2 summarizes the sampling required bythe Statement of Work. The plan willinclude sampling and analytical require-
-8-
TABLE 2-1
QUALITY ASSURANCE PROJECT PLANTABLE OF CONTENTS
Section Title
1 Introduction2 Project Organization and Responsibility3 QA Objectives for Measurement Data In Terms of
Precision, Accuracy, Completeness, Representativenessand Comparability
4 Sampling Objectives and Procedures5 . Sample Custody6 Calibration Procedures References and Frequency7 Preventive Maintenance Procedures and Schedules8 Analytical Procedures9 Analytical Quality Control Checks and Frequency
10 Specific Routine Procedures to be Used to Assess DataPrecision, Accuracy and Completeness of SpecificMeasurement Parameters Involved
11 Data Reduction, Validation and Reporting12 Performance and System Audits and Frequency13 Corrective Action14 Quality Assurance Reports to Management15 Internal Quality Control Checks and Frequency
TABLE 2-2
SAMPLING AS REQUIREDIN THE
SKINNER LANDFILL SITEREMEDIAL INVESTIGATION AND FEASIBILITY STUDY
STATEMENT OF WORK
ACTIVITY TASK SAMPLED ITEM(S) NUMBER OFSAMPLES
ANALYSIS
2
3
4
2
3
4
4
Drums and Storage Tanks-70 82
Ground Water Monitoring Wells-11 11
Residential Wells-14 26
Surface Water-12 Locations 33
Sediment-12 Locations 33
Soil-20 borings, 3 monitoring 50wells and 15 surface samples
Organic and InorganicData Pkg..
Organic and InorganicData Pkg.
Organic and InorganicData Pkg.
Organic and InorganicData Pkg.
Organic and InorganicData Pkg. and EPToxicity (Ifnecessary)
Organic and InorganicData Pkg. and EPToxicity (Ifnecessary)
Total Number of Samples
1. Includes blanks and duplicates
235
merits. The Rl/FS program will includesampling of air, soil, surface water,sediment and groundwater. The SiteManager will request all raw data fromthe Central Regional Laboratory and willprovide a separate and independentevaluation of this data. Procedures forthis independent verification will beidentified in the Sampling and AnalysisPlan.
Subtask 2.4 Site Management Plan
A plan detailing project operations atthe site, including site access and secu-rity, contingency plans for other thansite personnel, and the general coordina-tion and operational planning of activi-ties to be performed at the site will bedeveloped.
Subtask 2.5 Quality Control (QC) Plan
There are two Quality Analysis/QualityControl protocols that apply to theSkinner Landfill site: a QualityControl Plan that governs office workand deliverables, and a site specific Qu-ality Assurance Project Plan that coversfield and laboratory work. The types ofreviews included in the QC Plan areshown in Table 2-3. As part of the WorkPlan, a site-specific list ofdeliverables and reviews will beprepared. An example that applies tothis memorandum is included asAttachment D. The QAPP for field andlaboratory work are discussed in Sub-task 2.1. All field analyses and samplecollection shall be done in accordancewith accepted operating procedures andchain-of-custody procedures as providedby the U.S. EPA and Ohio EPA.
Subtask 2.6 Data Management Plan
A Data Management Plan will be preparedas part of the Project Operations Plan
.-9-
TABLE 2-3
TYPES OF QUALITYCONTROL REVIEWS
QCP ACTIVITIES LEGEND
A. Single Person Review A Slgnoff1. Supervisor
a. Regional Managerb. Health A Safety Managerc. Technical Operations Managerd. Finance A Administration Director
2. Peer Review 4 Slgnoff*3. Technical Expert Review A Slgnoff*
(Identify Individual, provide resume A schedule time)B. Committee Review A Slgnoff
1. Assembled committee2. Blind committee
(appropriate technical disciplines must be Identified,resume provided, chairman Identified A time scheduled)
Slgnoff consists of approval signature block on the transmlttalpage of the deliverable signed and dated by the responsibleparty(les) or committee chairman prior to electronic submlttalto the NPMO for approval for release to the U.S. CPA region
for internal use to guide the efficientmanagement of the large quantity of datawhich will result from this assignment.This plan will include:
1. Data recording/gathering format.
2. Data file type and location.
3. Data file control assignment (by in-dividual) and sign-out procedure.
4. Procedures/timing for return ofinformation to file (e.g., no dataleft at work station overnight).
5. Back-up file procedures, require-ments, locations, and updating per-iods .
Standardized REM II Team procedures willform the basis for Data Management Plandevelopment and usage.
Subtask 2.7 Community Relations Plan
Participation in Community Relationswill be discussed in the work plan.
Deliverables: None.
Task 3. Perform EPA Designated Activities
Subtask 3.1
Objective:
Perform Site Mapping
Prepare a site base map(s) in sufficientdetail to show pertinent planimetric andtopographic features of the site.Special emphasis will be given to showstorage tanks and conglomerated drumlocation. Off-site areas will beincluded in the mapping to allow forevaluation of surface drainage andpossible off- site effects.
Data Sources: 1. U.S.G.S. information.
2. Existing information developed inSubtask 1.2.
-10-
3. Control survey and aerialphotography to be conducted as partof this subtask. Aerial photographywill include infrared andstereoscopic photography if it isdetermined to be of value.
Deliverables: Site maps.
Task 4. Prepare Work Plan
Subtask 4.1
Objectives:
Data Sources:
Assumption:
Prepare Draft Work Plan
Prepare a Draft Work Plan for theRemedial Investigation/Feasibility Study(RI/FS), using the results and outputsof Task 2 (Prepare Project Plans) and anevaluation of investigative activitiesrequired at the site. A consolidateddraft work plan document will beprepared including estimated schedulesand budgets.
1. Interim Report and Project Plans(Task 2).
2. REM II Guidance Documents.
3. Remedial Action Master Plan (1983).
4. Skinner Landfill RemedialInvestigation and Feasibility StudyStatement of Work.
1.
Deliverables: 1.
The Draft Work Plan will be based onthe statement of work and theresults of the preceding Tasks.
Consolidated Draft Work Planincluding estimated Budgets andSchedules for the RI/FS addressingon-site contamination for air,soils, sediments, groundwater,surface water, vegetation and localwater supply wells.
The Draft Work Plan will includespecific, discrete tasks to beperformed under each phase of work.The plan will include the itemslisted below:
-11-
o Introductiono Background of Siteo Work Scopeo Technical Approacho Detailed Site Topographic Mapping
including:
- Property boundaries, owners, welllocations
- Monitoring well locations andelevations
- Topography indicating two footcontours
- Disposal/contamination areas- Sample collection locations- Test pit and soil boringlocations
- Land use- Water table elevations (groundwa-ter flow directions)
o Site Investigations, including:
- Waste characterization (if neces-sary)
- Air quality investigation- Soil/sediment investigation- Geophysical investigation- Groundwater/hydrogeologic inves-tigation
- Surface water investigation- Investigation of water supplywells
- Biological investigation
o Endagerment Assessmento Description of Remedial Responseo Response objectives and criteriao Identification of Remedial Alterna-tives
o Identification of appropriate tech-nology
o Specific Engineering considerations(i.e., pilot facilities)
o Laboratory Studies, as appropriateo Evaluation of Alternatives,including
- Risk assessment- Cost evaluation
-12-
- Cost effectiveness methodo-logy for analysis of alter-natives
- Recommendation of selected al-ternative
o Conceptual Design/Final Reporto Community Relationso Scheduleo Budgeto Deliverableso Appendix
- CPM diagram- Project plans
Subtask 4.2 - Agency Review
Objective: To provide agency input andconcurrence to the work plan.
InformationSources: Not applicable
Subtask 4.3 - Prepare Final Work Plan
Objectives: Produce documents to direct the SkinnerLandfill Site RI/FS incorporatingappropriate agency, industry, and publiccomments as provided in writing by EPA.
Data Sources: 1. Draft Work Plan (Subtask 4.1) and re-sults of Public Scoping meeting (Sub-task 4.2).
Assumption: EPA will indicate which comments fromthe public scoping meeting are to beincorporated into the Final Work Plan.
Deliverable: Final Work Plan
Task 5. Technical and Financial Management
Objective: Prepare technical and financial reports,attend meetings, perform QA/QC audit,evaluate laboratory reports, performdocument control, etc.
-13-
Data Sources: 1. Results of Task 0 through Task 4
2. Federal, State and Local Agencies
3. Management information systemestablished for the REM II Contract(REMIS)
Assumptions: 1.
2.
Monthly reports will be preparedduring the initial period inconformance with standard monthlyreport format
Monthly progress meetings will berequired during the initial period
Deliverables
3.0 BUDGET
Monthly Progress Reports
The costs associated with the initial tasks are presented inAttachments A and B. Attachment A presents a summary of allcosts associated with the initial tasks and Attachment Bpresents a detailed breakout of labor by category and taskexpenses and other direct costs (ODCs) by task. These costsare in accordance with our understanding of the requirementsof this project.
4.0 SCHEDULE
The Schedule of Activities by task and subtask is presentedin Attachment C. As shown, we estimate that the final WorkPlan will be completed the week of December 24, 1984.
The Schedule of Deliverables is presented in Attachment Dand shows distribution and approval dates. We have notincluded distribution to any idnetified potentialresponsible parties; we look to your guidance in theseareas.
We have also included an Initial Tasks Flow Chart asAttachment E to present graphically the interrelationshiptasks and generalized flow of information.
5.0 KEY STAFF
1. Robert J. Karnauskas, P.G., Roy F. Weston, Inc.will be the site manager for the Skinner Landfillsite assignment. His resume is included asAttachment F.
-14-
jonn W. Hawthorne, P.E., Camp Dresser & McKee, isthe Region V Manager.
Camp Dresser & McKee will provide direction andinput on health and safety, quality assurance andon specific tasks as required.
ICF will provide direction and input into theCommunity Relations Plan.
Clement Associates will provide guidance on theexposure and risk assessment and on theendangerment assessment.
C.C. Johnson and Associates will provide input on atask specific basis.
-15-
ATTACHMENT AREM II
FIRM LEVEL
*Cod. 31-5L73.0
HA Manager NMe KarnauskasSSAN 326-46-4170
Site NuMber
Site Name _
Phase ___
130
Skinner
WP1
Firm RFW
Start Date
End Date
9/26
12/28
(4)
TASK»mmmmmmmmmm »••••••••••
-{LJJ. itarJi-ElAH-MfiHK1.0 Current Sit'n
2.U Project Plans
3.0 EPA Activities
4.0 Work Plan
5.0 Tech /pin. Mgrol
TOTAL
US. FIRM MA">
| Profes1
I Hoursmmmmmmmmm
[....IB...210
280
56
360 •
74
1058(6)
ilonal$
_a£jai4.8275
11225
2408
14117
4694
44403(7)
Sup)Hours
_ 12 __32
58
16
88
64
270(8)
>ort$
_ 22J—739
1339
369
2031
1696
6451(9)
Equipment$
1 AA
300
100
500(10)
Travel$
—— 6.0 ——1890
100
540
85
85
2760(11)
OOC's$
—— 2,6.0 ——820
1070
370
1550
220
4290(12)
Sub-Pool$
6000*
6000(13)
Indirect$
(14)
Total$
_ 43A1 _
12024
13734
9787
_!77_8_2__
__6_6_9_§._
64404(2)
. (ATTACHMENT B
im »»»•:: ..?*•_.___Sill IMS Skinner Landfill "5"3-0
Sitt Hiwitr: *; .•?.-
SJM: ..326-4.6-4.J70Dili:
REM H
LABOR
TASKIlMMt
0.0 Work Plan M*K>
2.0 Project Plana2.1 Proj. Opn. Plat, . . . . . . , , , , ., ..i ,
" • " • • • ' ' • ««— — • *•""""""••"••
2JU3_Sit« Mg«t. ___
21.4 Quality Centre
2.2 QAPP
2.3 Data Mg»t
2.4 CCMM. Ral'ni.
3.0 EPA D«». Act.
4.0 Work Plan
4.1 Draft
4.2 Agancy Ravlew
4.3 Final
5.0 Tach/Fn M<jntlOTM,
rrtfti•
————HMM
22
on4?5 ——
———
'-M-16
1
2
2
8
20,
4
50
148
mil 4
70\3]
1547
914
'
————141
1125
———
141
————141
562
———1406
562
281
3516
10406
FroftiiiKul 3l/Hr.
HMI
8
36
40
24
. 2
2m
40
16
16 _
24
1
4#.91
392
1763
_JJL1959
98
196
98
98
392
1959
784
784
1176
202 :989S
frolniionil 1I/HI.
Houri
48
136
SO
8
16
24
40
120
16
40
572
1745
4945
291
2909
1164_
145
291
582
873
1454
4363
582
1454
Frotwnr.ll 1l/Hr.
Hwrt :,,! ,,
————
————————
————————
————————
——————— -
207981
————
————
————
————
————
————
- ———————
Irchf.it il Il/Hr.
24
_»_
———
80
583
21Z_
1942
136 9302
iKhmcil 1l/Hr.
HMM : 1
———
———
TDiM, TEtMHUl101
HWM : 1
210 : 8275
::
JA».-';~tll&.
34 | 1262
6 : 243
14 : 628
18 : 680
28 : 1112
56 : 2408:
260 : 9670
40 '• 1928-——:———
60 : 2519
74 : 4694
11058 44403
Cliricil 3l/Hr.
HMM
40
40
jta!
Clrncil 2l/Hr.
*™J.2*.9i...12..
..~i..
.21..
4
g
4
g
16
60
4
24
1142* 24
..2.73.
.JSS4.-
92
185
92
185
369
1385
92
554
554........|— ......1142)230 5309
Clrncil 1
I k'jri : 1
«... — .
lotil
Ho-us : 1
...90...
.242..
..J.4...
jar..
10
22
22
36
72
320
44
84
|l38
11328
jau.3014—
.2X24—
-4447—335
813
772
1297
2777
11055
2020
3073
6390
50854IJSUWK.IM
REM II
EXPENSESATTACHMENT B-1
Site Nunbert .
Site Names _
Phasei WP1
130
SkinnerSite Manager:
SSAN:
Date:
Karnauskas
326-46-417010/12/84
MA Codei 31-5L73.Q
TASK
I Equipment1 $/dayi1 Days
0.0 Work Plan Meida 1— — ———1.0 Current Sit'H 3——————2.0 Project Plans!
3.0 EPA Act. 1_ _ _ _ _ _ _ _ _ _ _ — . _ _ _ _ _ _ _ .4.0 Work Plan
1_ i___._.__.____ ————— ( — _____5.0 Tech/Pin. Mgnlt
TOTALi ————————————— .
i $
100
300
100
———————
——————
500
Per 01 em$90/day
Days $
__ _ ____ __ 2SL __6
1
540———————25———————90__________25__________25——————
——————
——————
——————
__________
__________735
Transpor-tation
S
30
1350
75
450
60
60
2025
Sub-Pool
$
6000*
6000
G & A*0.01
$
Total
$__a_s»_:s
160
2190
100
6640
85
85
9260. —————— i
EtNA.EXP
* Subcontractor pool excluded from G&A computation*EST.
ATTACHMENT B-2
REM II
ODC's
Site Nunbert 13°
Site NMiet
Phasei
Skinner
WP1
Site Manager: Karnauskas
SSAN: 326-46-4170
Date: 10/12/84
HA Code. 31-5173.0
TASK
o_oitori_^l8_UM1.0 Current Sit'n
2.0 Project Plans
3.0 EPA Activitie
4.0 Work Plan
5.0 Tech/Fin. Mgm
TOTAL
Xerox___—._.
$
3 .Iflfl.
300——————500
— — — -5 50——————
500
:. 100___ — . ———
"""
1550
Blue-prints
— ——— —$
——————100————100
100————500——————
—— — — —
——————
——————800
Mail/Courier
——————$
.««.»_._«
_ 5D _____100
100
50
100
20
——————
..........
——————420
Supplies
$
1IL100
100
100
100
————
— — — —
___________410
Tele-phone
$
__ .5£L __100
20
20
50
50
290
Computer
$•—»—»--
120———————250
50
300
50
——————
——————
——————
__________
________
820
$
——————
——————
...__._.__
_-_—._—
G & A
—.._._-$
.»«»._.
——————
——————
——————
——————
——————
——————
——————
-——>——•-
__________
TOTAL
$
26-0-820
1070
370
1550
220
WEiHA.OOC
SCHEDULE OF ACTIVITIES ATTACHMENT CSKINNER LANDFILL SITE, WEST CHESTER, OHIOACTIVITY
0.0 work Plan Memorandum1.0 Description of Current Situation
1.1 Obtain t Evaluate Existing Information1.2 Prepare Compiled Site Maps1.3 Perform Initial Site Characterixation
2.0 Prepare Project Plans
2.1 Quality Assurance (OA) Plan2.2 Health and Safety Plan2.3 sampling and Analysis Plan2.4 Site Management Plan2.5 Quality Control (OC) Plan2.6 Data Management Plan2.7 Community Relations Plan
3.0 Perform BPA Designated Activities
3.1 Perform Site Mapping
4.0 Prepare Work Plan4.1 Draft work Plan4.2 Agency Review Meeting4.3 Final Work Plan
5.0 Monthly Reports
SEPTEMBER6 10 17 26
OCTOBERt 0 16 23 SO
——————— »
1 ——————
1 ————— I1 —— 1
h1 —————1 —————
1 ——i ——1 ——
I ————
*
NOVEMBERB̂ 13 20 27
———————— ,
— 1
————— 1— 1
4 —————————————————————— 1————— 1
1 —————————
t —————————————
| —————————————
*
DECEMBER4 11 IS 25
—————————— 1
—————————— 1
—— 1—— 1
————————————— 1
————— 1
* ——— 1*
SCHEDULE OF DEUVERABLES ATTACHMENT DSKINNER LANDFILL SITE, WEST CHESTER, OHIO
DELIVERABLE
Work Man MaanrandtaiInttrln RtportQuality Aaauranc* flanHMlth 4 Saf«ty Plan.Draft Saapllns I Anil. FluFinal Suplloi t Anal.' PlanSit* Management PlmnQuality Control PlanData Management Plan-CoBBunlty Iclatlona PlanSit* HapDraft Work Plan
Final Work PlanMonthly Report*
WORKASSIGNMENT
AUTH.
-26-26-26-26
9-26-26-26-26-26
9-269-269-26
9-269-26
DUE
10-1611-2111-U11-711-2812-1911-2111-1412-512-J10-3112-13
12-28on golni
QUALITYCONTROL PLAN
(OCP)
ACTIVITY
A.I. aA.I. aA.l.aA.l.hA.l.cA.I. aA. .cA. .aA. .aA. .aA. .aB.
A. .aA. .a
DATE
10-910-1411-711-211-2312-1211-1611-711-2811-2810-2411-30
12-21
QUALITYSURVEILLANCE
ACTIVITY DATE
REM II APPROVAL
2E
10-910-111-710-311-212-111-111-711-2111-2J10-2412-6
12-21
2O»-
10-12
11-1611-911-211-2312-1411-1611-911-3011-3010-2612-10
12-27
V)
10-1
11-111-911-21-2312-1'11-U11-911-3C11 -3(10-2112-K
12-2
2u.
10-1211-1611-911-211-2312-1411-1611-911-3011-3010-2612-10
12-27
•
U8EPAREVIEW
O
10-111-211-111-911-312-211-211-1612-712-711-212-15
1-3
OU
10-111-211-1
11-911-312-211-211-112-712-711-212-1
1-3
O0,C
10- 1
11-211-111-911-312-211-211-112-712-711-212-1
1-3
O0,•»K
10-1911-211-1611-911-3012-211-2311-1612-712-711-212-15
1-3
o£
10-1
1-231-1611-911-3112-211-211-112-712-711-217-1
1-3
STATEREVIEW
2<g f c
10-211-211-211-112-312-211-211-2012-1112-1111-612-19
1-7
OTHERREVCW
START HWORK PLAN MEMO
COMPILED SITEPLANS
EXISTING INFOR-MATIONINTERIM REPORT
LEGEND: I ACTIVITY 1
GUIDANCE
PROJECT MANAGEMENT ACTIVITIES
DATA MANAGEMENT PLAN
I SITE"~ENTRY''~~I|£ROTOCOLS I
SITE CHARAC-TERIZATION
COMMUNITYRELATIONSPLAN
PROJECT OPERATIONSPLAN
-Health & SafetyPlan-Sampling & Analy-sis Plan
-Site ManagementPlan-Quality Control(QC) Plan
-Quality Assurance(QA) Plan
FINAL WORK PLAN
ATTACHMENT E INITIAL TASKS FLOW CHART
ATTACHMENT F
Robert J. Karnauskas, P.G.
Registration
Certified Professional Geological Scientist and Cer-tified Professional Geologist in the state of Indiana.
Fields of Competence
Geological aspects relating to localional and designconsiderations of solid and hazardous waste disposalfacilities; evaluation of organic and inorganic ground-water contamination problems; aquifer restoration andrehabilitation; land disposal of municipal and industrialwastewaters and sludges; physical and chemical char-acterization of industrial waste materials to assessgroundwater contamination potential; groundwatermodeling; evaluation of hydrogeologic aspects of con-struction problems; and NPDES permit program coor-dination.
Experience Summary
Six years of professional experience in consulting en-vironmental engineering. Project assignments haveblanketed a broad range of industries including pulp andpaper, solvent processing and recycling, electric powerutilities, food processing, private and public solid wasteoperations, foundries, and agriculture. Experience in-cludes the hydrogeologic evaluation of a wide variety ofsubsurface environments and groundwater contamina-tion concerns. Research experience has included theevaluation of leachate characteristics from municipaland industrial wastes as well as the development ofmethods for assessing leakage rates from Industrialwastewater lagoons.
CredentialsB.A., Geology and Geophysics—University of Wiscon-sin, Madison (1975)M.S., Geology (Hydrogeology)—University of Wiscon-sin, Madison (1977)M.S., Water Resources Management—University ofWisconsin, Madison (1977)
University of Wisconsin, Madison—Part-time graduatestudies in Business Management (1983)National Water Well Association, Technical DivisionAmerican Institute of Professional Geologists
Employment History
1983-Present WESTON1977-1983 Warzyn Engineering Inc.
Key Projects
Project Hydrogeologist and/or Project Manager forseveral major fly ash disposal facilities for WisconsinElectric Utilities, including site selection, subsurfacefeasibility evaluations, technical input to engineeringdesign, construction and groundwater monitoring.Project Hydrogeologist and Project Manager on a majorgroundwater contamination study of private water sup-ply wells from cheese manufacturing waste processes.Scope of work included identification, evaluation andmitigation of groundwater contaminant sources.Project Hydrogeologist for the subsurface evaluationand design of a major county zone of saturation landfill,including expert testimony at regulatory licensing hear-ings.Designed a detailed test monitoring area within a largefly ash disposal facility to evaluate leachate quality andquantity generated within and leaving the facility. Thetest program is designed to compare field results withpredicted leachate quality and environmental impactsfrom laboratory characterization of the ash.Project Manager on a detailed subsurface investigationevaluating PCB contamination in soils and groundwater.Project Hydrogeologist and Project Manager in-vestigating the scope and magnitude of solvent con-tamination in soils and groundwater at a solventreprocessing facility, including liaison with local andstate governmental agencies, and public relations.
Professional Profile10/83
Project Hydrogeologlst and Project Manager in-vestigating contamination of a municipal water supplywell derived from food processing and canning wastes.Project Hydrogeologlst for a regional groundwaterresource evaluation Investigating agricultural water useand its effect on process water availability for a Wiscon-sin paper manufacturer.
Publications
Karnauskas, Robert J. and M. P. Anderson, "Ground-water Lake Relationships and Groundwater Quality Inthe Sand Plain Province of Wisconsin—Nepco Lake",Groundwater Journal, 1978.
Ham, R. K. and R. J. Karnauskas. "Leachate Productionfrom Milled and Unprocessed Refuse", InternationalSolid Waste Association Information Bulletin, 1974.Karnauskas, R. J., C. E. R. Lawson and M. E. Horn, "TheFeasibility of Fly Ash Utilization for FGD ScrubberSludge Stabilization, Columbia Generating Station, Por-tage, Wisconsin". Proceedings of Second Annual Con-ference of Applied Research and Practice on Municipaland Industrial Waste, 1979.Karnauskas, R. J. and P. J. Huettl, "Land Application ofWhey", Dairy Field, May and June, 1981.
ATTACHMENT G
[I
MEMORANDUM:
TO: D.F. Doyle, Manager of Techinal OperationsCamp, Dresser and McKee, Inc.1 Center PlazaBoston, Ma 02108
FROM: Robert J. Karnauskas, P.G.
DATE: October 16, 1984
PROJECT: EPA Contract No. 68-01-6939/NPM/MPMODocument No. 999-PMl-CD-AKTE-l
SUBJECT: Staff Conflict of Interest DeclarationSkinner Landfill Site, West Chester, OhioWork Assignment No. 31-5L73.0
ACTION: Immediate Response
I have reviewed the above work assignment for the EPAC o n t r a c t 68-01-6939, Remedial Response Act iv i t ies ofUncontrol led Hazardous Waste Sites. Based on this reviewand my understanding of the legal requirements of this work,I c e r t i f y that I have no known conf l ic t of interesta s s o c i a t e d w i t h the a s s i g n m e n t based on the knownpotential responsible parties or my past work experiencew i t h this site, if any. Also, I understand my professionalobligation to i n f o r m any staff working at my direction onthis assignment of the conflict of interest requirements andinsure that such staff have no conflict of interests.
Robert J. Karnauskas, P.G.REM II Site ManagerSenior Hydrogeologist/Project Manager
cc: J.G. CurtisCamp, Dresser and McKee, Inc.7630 Little River TurnpikeSuite 500Annandale, VA 22003
CAMP DRESSER & McKEE INC.7630 LITTLE RIVER TURNPIKE
SUITE 300ANNAiNDALE, VIRGINIA 22003
703 642-5500