Page 1: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

WORK PLAN MEMORANDUM

PERFOAC

US.

MEDIAL RESPONSECONTROLLED

WASTE SITES

RACT NO. 68-01-6939

CAMP DRESSER & McKEE INC.PRIME CONTRACTOR

Page 2: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

REGION V

Work Plan Memorandum forSkinner Landfill, West Chester, Ohio

Document Number 130-WP1-WM-AKVE-1

October 1984

Page 3: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

COM CAMP DRESSER & McKEE INC.

. ic*nf«/» 11 Ea* **"• »«*. Suite 1500A mwwflWTW* con*//Mn« Chtcago, Illinois 60603

312 786-0253

October 15, 1984

Mr. Richard E. BarteltRegional Project OfficerU.S. Environmental Protection Agency230 South Dearborn StreetChicago, Illinois 60604

Mr. Gene WongRegional Site Project OfficerU.S. Envornmental Protection Agency230 South Dearborn StreetChicago, Illinois 6060*4

Work Assignment No.: 31-5L73

EPA Contract No.: 68-01-6939

Subject: Work Plan Memorandum forSkinner Landfill, West Chester, Ohio

Document No: 130-WP1-WM-AKVE-1

Dear Messrs. Bartelt and Wong:

Camp Dresser £ McKee Inc. is pleased to submit this Work Plan Memorandumfor the Skinner Landfill site located in West Chester, Ohio.

The scope, schedule and cost estimate for initial tasks defined by USEPAfor Skinner Landfill have been modified to include both tasks No. 1 and 2.Therefore, both the cost summary and the schedule included in this WorkPlan Memorandum reflect the increase in the level-of-effort.

Please note that the costs presented in this memorandum are based oncost data for Roy F. Weston, Inc., and represent direct and indirectcosts, without base fee or award fee. The detailed costs and fees w i l lbe presented in the Work Plan and will be supported by Optional Forms 60for each REM II Team firm's participation in the work assignment.

It has been determined that no conflict of interest exists for theRegional and Site Managers for this work assignment. Also, it has beendetermined that no organization conflict of interest exists for Roy F.Weston, Inc., or Camp, Dress £ McKee Inc. Signed conflict of intereststatements wi l l be submitted under separate cover.

Page 4: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

CAMP DRESSER & McKEE INC.

Mr. Richard BarteltMr. Gene Wong

October 15,

If you have any questions or comments, please contact me.

Very truly yours,

CAMP DRESSER £ McKEE INC.

John W. Hawthorne, P.E.Region V, Manager

Approved: Approved:

David F. Doyle, P.E. Jonathan G. Curtis, P.E.Technical Operations Manager Finance and Administration Manager

cc: W.R. Topping, Contracting Officer, USEPAW.M. Kaschak, Project Officer, USEPA

Receipt by EPA Region V Acknowledged: Exceptions Taken

Regional Project Officer Date Yes No

Regional Site Project Officer Date Yes No

Explanation of exceptions attached ______ ____Yes No

Routing of Acknowledgement:

Return original to REM II Site Manager - Robert J. Karnauskas

Copies to:REM II Project Officer - W.M. KaschakREM II NPMO - J.G. Curtis

Page 5: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

NORTHBFOOK OFFICE COURTSUITE 1502666 WEST DUNDEE ROADNOflTMBROOK IL 60062PHONE 312-496-9090

DES>

15 October 1984

Mr. John W. Hawthorne, P.E.Camp, Dresser and McKee, Inc.11 E. Adams StreetChicago, Illinois 60603

Re: Work Plan Memorandum for theSkinner Landfill SiteWork Assignment No. 31-5L73.0EPA Contract No. 68-01-6939Document No. 130-WTPl-WM-

Dear Mr. Hawthorne:

E n c l o s e d is the Work Plan M e m o r a n d u m for the S k i n n e rL a n d f i l l site in West Chester, Ohio. We have identified nosubstansive exceptions to the scope of work. However, in ane f f o r t to facilitate the preparation of project plans to beat tached to the work plan and expediting the preparation ofthe topograph ic map for the facility, we have estimated agrea te r level of e f f o r t in implementing the initial taskso u t l i n e d in this work plan m e m o r a n d u m . We have alsom o d i f i e d the order of the ass igned tasks in order toc o n f o r m to the REM II Standard Task Lists. If there are anyques t ions r ega rd ing this w o r k , please do not hesitate tocontact me.

Very truly yours,

ROY F. WESTON, INC.

/'Robert J. Karnauskas, P.G.REM II Site Manager

RJKrjts

cc: National Program Managers Office

Page 6: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

TABLE OF CONTENTS

WORK PLAN MEMORANDUM

FOR

SKINNER LANDFILL SITE

REMEDIAL INVESTIGATION/FEASIBILITY STUDY

WEST CHESTER, OHIO

ITEM PAGE

1.0 INTRODUCTION.................................. 1

2.0 SCOPE OF SERVICES............................. 3

Task 0. Prepare Work Plan Memorandum......... 3

Task 1. Description of Current Situation..... 3

1.1 Obtain and Evaluate ExistingInformation...................... 4

1.2 Prepare Compiled Site Plan(s).... 61.3 Perform Initial Site Characteri-

zation ........................... 6

Task 2. Prepare Project Operations Plans..... 6

2.1 Quality Assurance Project Plan... 72.2 Site Health and Safety Plan...... 82.3 Sampling and Analysis............ 82.4 Site Management.................. 92.5 Quality Control Plan............. 92.6 Date Management.................. 92.7 Community Relations Plan......... 10

Task 3. Perform EPA Designated Activities.... 10

3.1 Perform Site Mapping............. 10

Task 4. Prepare Work Plan.................... 11

4.1 Prepare Draft Work Plan.......... 114.2 Agency Review.................... 134.3 Prepare Final Work Plan.......... 13

Page 7: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

TABLE OF CONTENTS

(continued)

ITEM

Task 5. Technical and FinancialManagement.............

3.0 BUDGET......

4.0 SCHEDULE...,

5.0 KEY STAFF..,

6.0 ATTACHMENTS ,

PAGE

13

14

14

14

14

Attachments AAttachments BAttachments CAttachments DAttachments EAttachments FAttachments G

Summary of CostsDetailed CostsSchedule of ActivitiesSchedule of DeliverablesInitial Tasks Flow ChartSite Manager's ResumeConflict of Interest Declarations

Page 8: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

WORK PLAN MEMORANDUM

For

SKINNER LANDFILL

For

PREPARATION OF A REMEDIAL INVESTIGATION/FEASIBILITY STUDY

1.0 INTRODUCTION

This work plan memorandum describes the tasks to beperformed in preparation of the work plan for the SkinnerLandfill located near West Chester, Ohio, in accordance withEPA's Work Assignment No. 31-5L73.0.

The Skinner Landfill is a sanitary landfill locatedapproximately 1 mile northeast of the Town of West Chesterin Union Township, Butler County, Ohio (Figure 1). SeeFigure 2 for a location map of the landfill site. Thelandfill is approximately 50 feet higher than thesurrounding terrain and consists of 50 to 70 acres of land;the boundaries are not clearly distinguishable by visualinspection. The initial owners of the landfill were Mr. andMrs. Albert Skinner and their sons; the present owner isElsa Skinner, wife of Albert Skinner. The property isbounded on the north and east by wooded land, the south bywooded and agricultural land, and on the west by theCincinnati-Dayton Road and scattered single-family resi-dences.

The entire site, including the presently used landfill area,is scattered with debris such as tires, wood, aerosol cans,numerous large tanks, engines, washers, and dryers.

Access to the site is obtained from the Cincinnati-DaytonRoad. There is a complex pattern of trailways leading intoand through the landfill. One residence is located in thelandfill area itself. Refer to the site map (Figure 3) fora general layout of the area.

The site is hidden from the public community by thesurrounding trees and other vegetation which appears to benormal and healthy. Trails leading to the six water pondssuggest possible dumping activities or usage of the water.Two intermittent drainages traverse the base of the landfillflowing southwest through the Town of West Chester wherethey meet to form the East Fork of Mill Creek.

-1-

Page 9: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

RICHMOND

SCALE IN MILES

Reference: Skinner Landfill Site - Remedial Action Master PlanHay 18, 1983; CH2M-H111, Inc.

FIGURE 1VICINITY MAPSKINNER LANDFILL

Page 10: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

SOURCE. U.S.0.1. 7.8' OLENOALE. OHIO QUADRANGLE.

Reference: Skinner Landfill Site - Remedial Action Master PlanMay 18, 1983; CH2M-Hill, Inc. FIGURE 2

LOCATION MAPSKINNER LANDFILL

Page 11: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

APPROXIMATE LOCATIONOP OLD INCINERATOR

'APPROXIMATE*AREA OF OLDLAGOON

APPROXIMATELOCATION OFSON-IN-LAWSRESIDENCE

LEGEND

— — LANDFILL BOUNDARY

• STANDING WATER PONDS1000

•00SCALE IN FEET

Reference: Skinner Landfill Site - Remedial Action Master PlanMay 18, 1983; CH2M-H111, Inc.

FIGURE 3SITE MAPSKINNER LANDFILL SITE

Page 12: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

From photo analysis, it appears that the land was originallyused in the 1930s for the extraction of sand and gravel.

During the next several decades, the Skinners acceptedgeneral municipal refuse. As early as 1964, hazardous wastewas reportedly accepted at the landfill and cyanide wasconfirmed to have been disposed of at the site. In 1976,toxic chemicals from the Chem-Dyne Corp. were reportedlyplaced in the landfill.

The site was never permitted as a municipal landfill and ispresently unpermitted. Application for a permit was madebut never approved because the area had previously beenzoned as a rural residential area. Because the landfill wasnot permitted, regular inspections were not conducted.Therefore, records concerning the landfill operation arescarce.

In 1977, the landfill operators were charged by Ohio EPAwith improperly disposing of hazardous waste material at thesite. Approximately 100 drums, allegedly containingindustrial and chemical wastes, were photographed on site.In a subsequent court case, in which the Ohio EPA attemptedto force the landowners to remove the drums, the presidingjudge ruled that the Ohio EPA failed to present sufficientevidence that the drums posed a danger. The same judge didprohibit the landowners from using the facility for futuredisposal or storage of industrial wastes of any natureexcept under legal permit.

Another business activity was conducted on site by JohnSkinner, son of the landfill owners. Beginning in the early1960s, John Skinner worked for the Chem-Dyne Corporation(now in receivership), cleaning, washing and repairingChem-Dyne equipment used to haul chemical wastes. Thisactivity apparently began under the auspices of WilliamKovacs, a vice president of Chem-Dyne Corp. It is unknownwhen this business began or ended; however, in the courtcase referred to above, which was tried in October 1978, thepresiding judge allowed this activity to continue.

Industrial chemicals from the Chem-Dyne Corporation havereportedly been dumped in an old lagoon area in thelandfill. The dumped material consists of drums, brokendrums and free standing liquid. The lagoon area was coveredwith soil from the landfill in 1976 and the limits of theold chemical dump are not presently known. Samples of thesechemicals were found to contain toxic concentrations ofhazardous chemical substances. Groundwater contamination isa possibility.

-2-

Page 13: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

Leachate has been reported seeping from the bank in the areaof the old lagoon. Surface water contamination of the twostreams tnat traverse the base of the landfill is apossibility.

Numerous storage tanks and 55-gallon drums are scatteredthroughout the landfill. The contents of these tanks anddrums are unknown. During a site visit, the instrumentreadings in two of the tanks registered high concentrationsof organics. It is not known if there are buried drums inareas other than the lagoon area.

Six standing water ponds lie along the western boundary ofthe landfill. Based on visual inspection, these ponds donot appear to be contaminated. Trucks have been seenbacking up to these ponds indicating possible dumping.

To date there have been no remedial actions taken to rectifythe problems at the Skinner Landfill site.

(Source: Final Remedial Action Plan prepared by CH2M-Hill,May 1983).

2.0 SCOPE OF SERVICES

Task 0. Prepare Work Plan Memorandum

Objective: Prepare a Work Plan Memorandumdescribing the tasks to be performed inorder to prepare the Work Plan andProject Operations Plans; identify thelevel of effort (LOE) and associatedcosts and schedule.

Data Sources: 1. Tasks 1 and 2 of the Skinner Land-fill Remedial Investigation andFeasibility Study Statement of Work.

2. Remedial Action Master Plan forSkinner Landfill Site Property Site(1983).

3. REM II Policy and GuidanceProcedures.

Deliverables: Work Plan Memorandum

Task 1. Description of Current Situation

-3-

Page 14: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

Subtask 1.1 - Obtain and Evaluate Existing Information

Objective: Develop a file of existing availableinformation for use in preparing theWork Plan for the Remedial Investigation(RI) and preparing the FeasibilityStudy (FS). This task will act as aforum for the kickoff meeting describedin the Statement of Work under Activity1. Task 1.

Date Sources: 1. U.S. EPA Region V file data.

2. Ohio EPA file data.

3. Ohio Department of Health file data.

4. Skinner Landfill - ResponsibleParty Search, April 1983, EPAContract No. 68-01-6543.

5. Final Remedial Action Master Plan,Skinner Landfill Site, prepared byCH2M-Hill, May 18, 1983.

6. Southwestern Area Air PollutionControl Agency file data.

7. United States Geological Surveytopography maps and geological data.

8. Soil Conservation Service, SoilSurvey of Butler County.

9. West Chester/Butler County SkinnerLandfill - A Preliminary Hydrogeo-logical Report. Ron St. John, OhioTDDf FS-3110-4 prepared by Ecologyand Environment, Inc., 1981.

10. Ohio Attorney General file data.

11. Report of Geology and GroundwaterResources, West Chester, ButlerCounty, Ohio., J.L. Hosier, OhioEPA Southwest District Office, April22, 1982.

12. Groundwater Resources of theCincinnati Area, Butler andHamilton Counties, Ohio,

-4-

Page 15: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

13.

F.H. Klair, Jr.? D.G. Thompson, U.S.Geological Survey Water Supply Paper999.

Butler County Health Department filedata.

14. Union Township file data.

15. Local newspapers.

Assumptions: 1

Deliverables:

Most of the information discussedabove can be obtained from U.S. EPAand Ohio EPA. The agencies listed asdata sources will be contacted to seeif additional information has beendeveloped since the preparation ofthe RAMP.

U.S. EPA and State agencies willprovide access to and furnishadditional data required.

Site data is valid with respect toQA/QC protocols.

Data gathered as part of Subtask 1.1will be used to develop the followinginformation which will be included inthe Interim Report.

1. List of information obtained to in-clude an updated chronologicalhistory of operations and responseactions conducted at the site and alisting of all materials known tohave been deposited or stored at thesite.

2. Description of the nature and extentof the problem at the site with anemphasis on the threat or potentialthreat to public health and the envi-ronment .

3. Description of known or potentialproblems associated with the existingdata, including the identification ofdata gaps.

4. Description of enforcement activitiestaken, if any, and actions to identi-fy responsible parties and/or recovercosts.

-5-

Page 16: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

5. A history of public concerns andinformation on outreach activities atthis site.

Subtask 1.2 - Prepare Compiled Site Plan(s) (Maps)

Objective: Prepare a site map based on existingdata showing in as much detail aspossible the planimetric and topographicfeatures. Location of storage tanks andconglomerated drum locations will beshown if the data is available.Detailed site mapping will be conductedunder Subtask 3.1 to be discussed later.

Data Sources: 1. U.S.G.S. information.

2. Existing information developed inSubtask 1.1.

Assumptions:

3. Available historic and currentaerial photography.

1. Compiled site plan(s) are primarilyfor use in conceptualizing the workplan requirements.

Deliverables: The compiled site plan will be part ofthe Interim Report.

Subtask 1.3 - Perform Initial Site Characterization

Objective: To determine the level of hazard atthe site and to determine the scopeof additional work required toaccurately complete the Work Plan forthe Skinner RI/FS.

Data Sources: 1. As listed in Task 1.

2. Initial site visit by REM II teammembers.

Deliverables: Subtask 1.3 is deliverable as part ofthe Interim Report.

Task 2. Prepare Project Operations Plans

-6-

Page 17: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

Objectives:

Date Sources:

Assumptions:

To prepare those project plans necessaryfor the execution of the work and toensure that the work is conducted in aconsistent manner that satisfies thereviewing and using agencies'requirements prior to execution.

1. Information collected from sitefiles compiled in Task 1 and aninitial site inspection.

2. REM II Guidance Documents.

3. Region V directives and procedures.

4. State and local directives and pro-cedures

5. U.S. EPA-approved REM II Health andSafety Assurance Manual.

6. Quality Assurance Program Plan forPerformance and Remedial ResponseActivities of Uncontrolled HazardousWaste Sites.

7. User's Guide to the Contract Labo-ratory Program—U.S. EPA, July 1984.

1. The REM II approved program planswill form the basis for the respec-tive site specific plans.

2. Laboratory Quality Control will beperformed by the Contract Laborato-ries or the Central Regional Labora-tory, as applicable.

Subtask 2.1 Quality Assurance Project Plan (QAPP)

A site-specific QA Project Plan will bedeveloped in accordance with U.S. EPARegion V Quality Assurance Project PlanGuidance and consistent with U.S. EPA'sContract Laboratory Program. Preparationof this document will be tailored to thespecific requirements for the project inthe field and in the office. Since ana-lysis will be performed by a U.S. EPAContract Laboratory or the Central Re-gional Laboratory, the analytical QA/QC

-7-

Page 18: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

Deliverables;

Subtask 2.2

Deliverables:

Subtask 2.3

will be performed by the analytical lab-oratory and monitored by the Region VCentral Regional Laboratory. The Tableof Contents from a typical QAPP is shownin Figure 2-1.

Quality Assurance Project Plan

Health and Safety Plan

A site -specific health and safety plan(Safety Evaluation Form) will be pre-pared for approval, using input fromTask 1. The plan will include:

1. Personnel protective equipment re-quirements, keyed to generalized sitelocation and activity.

2. Safety equipment inventory.

3. Training requirements.

Medical surveillance program.4.

5.

6.

7.

8.

Specific medical procedures, as ap-propriate.

Personnel hygiene requirements.

Contingency plan and emergency pro-cedures.

Site personnel/activity safety moni-toring program.

9. Decontamination procedures.

The plan will be organized to apply toall RI field work.

Safety Evaluation Form

Sampling and Analysis Plan

A site-specific sampling and analysisplan based on the findings of the ini-tial investigations phase and the State-ment of Work will be developed. Table2-2 summarizes the sampling required bythe Statement of Work. The plan willinclude sampling and analytical require-

-8-

Page 19: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

TABLE 2-1

QUALITY ASSURANCE PROJECT PLANTABLE OF CONTENTS

Section Title

1 Introduction2 Project Organization and Responsibility3 QA Objectives for Measurement Data In Terms of

Precision, Accuracy, Completeness, Representativenessand Comparability

4 Sampling Objectives and Procedures5 . Sample Custody6 Calibration Procedures References and Frequency7 Preventive Maintenance Procedures and Schedules8 Analytical Procedures9 Analytical Quality Control Checks and Frequency

10 Specific Routine Procedures to be Used to Assess DataPrecision, Accuracy and Completeness of SpecificMeasurement Parameters Involved

11 Data Reduction, Validation and Reporting12 Performance and System Audits and Frequency13 Corrective Action14 Quality Assurance Reports to Management15 Internal Quality Control Checks and Frequency

Page 20: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

TABLE 2-2

SAMPLING AS REQUIREDIN THE

SKINNER LANDFILL SITEREMEDIAL INVESTIGATION AND FEASIBILITY STUDY

STATEMENT OF WORK

ACTIVITY TASK SAMPLED ITEM(S) NUMBER OFSAMPLES

ANALYSIS

2

3

4

2

3

4

4

Drums and Storage Tanks-70 82

Ground Water Monitoring Wells-11 11

Residential Wells-14 26

Surface Water-12 Locations 33

Sediment-12 Locations 33

Soil-20 borings, 3 monitoring 50wells and 15 surface samples

Organic and InorganicData Pkg..

Organic and InorganicData Pkg.

Organic and InorganicData Pkg.

Organic and InorganicData Pkg.

Organic and InorganicData Pkg. and EPToxicity (Ifnecessary)

Organic and InorganicData Pkg. and EPToxicity (Ifnecessary)

Total Number of Samples

1. Includes blanks and duplicates

235

Page 21: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

merits. The Rl/FS program will includesampling of air, soil, surface water,sediment and groundwater. The SiteManager will request all raw data fromthe Central Regional Laboratory and willprovide a separate and independentevaluation of this data. Procedures forthis independent verification will beidentified in the Sampling and AnalysisPlan.

Subtask 2.4 Site Management Plan

A plan detailing project operations atthe site, including site access and secu-rity, contingency plans for other thansite personnel, and the general coordina-tion and operational planning of activi-ties to be performed at the site will bedeveloped.

Subtask 2.5 Quality Control (QC) Plan

There are two Quality Analysis/QualityControl protocols that apply to theSkinner Landfill site: a QualityControl Plan that governs office workand deliverables, and a site specific Qu-ality Assurance Project Plan that coversfield and laboratory work. The types ofreviews included in the QC Plan areshown in Table 2-3. As part of the WorkPlan, a site-specific list ofdeliverables and reviews will beprepared. An example that applies tothis memorandum is included asAttachment D. The QAPP for field andlaboratory work are discussed in Sub-task 2.1. All field analyses and samplecollection shall be done in accordancewith accepted operating procedures andchain-of-custody procedures as providedby the U.S. EPA and Ohio EPA.

Subtask 2.6 Data Management Plan

A Data Management Plan will be preparedas part of the Project Operations Plan

.-9-

Page 22: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

TABLE 2-3

TYPES OF QUALITYCONTROL REVIEWS

QCP ACTIVITIES LEGEND

A. Single Person Review A Slgnoff1. Supervisor

a. Regional Managerb. Health A Safety Managerc. Technical Operations Managerd. Finance A Administration Director

2. Peer Review 4 Slgnoff*3. Technical Expert Review A Slgnoff*

(Identify Individual, provide resume A schedule time)B. Committee Review A Slgnoff

1. Assembled committee2. Blind committee

(appropriate technical disciplines must be Identified,resume provided, chairman Identified A time scheduled)

Slgnoff consists of approval signature block on the transmlttalpage of the deliverable signed and dated by the responsibleparty(les) or committee chairman prior to electronic submlttalto the NPMO for approval for release to the U.S. CPA region

Page 23: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

for internal use to guide the efficientmanagement of the large quantity of datawhich will result from this assignment.This plan will include:

1. Data recording/gathering format.

2. Data file type and location.

3. Data file control assignment (by in-dividual) and sign-out procedure.

4. Procedures/timing for return ofinformation to file (e.g., no dataleft at work station overnight).

5. Back-up file procedures, require-ments, locations, and updating per-iods .

Standardized REM II Team procedures willform the basis for Data Management Plandevelopment and usage.

Subtask 2.7 Community Relations Plan

Participation in Community Relationswill be discussed in the work plan.

Deliverables: None.

Task 3. Perform EPA Designated Activities

Subtask 3.1

Objective:

Perform Site Mapping

Prepare a site base map(s) in sufficientdetail to show pertinent planimetric andtopographic features of the site.Special emphasis will be given to showstorage tanks and conglomerated drumlocation. Off-site areas will beincluded in the mapping to allow forevaluation of surface drainage andpossible off- site effects.

Data Sources: 1. U.S.G.S. information.

2. Existing information developed inSubtask 1.2.

-10-

Page 24: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

3. Control survey and aerialphotography to be conducted as partof this subtask. Aerial photographywill include infrared andstereoscopic photography if it isdetermined to be of value.

Deliverables: Site maps.

Task 4. Prepare Work Plan

Subtask 4.1

Objectives:

Data Sources:

Assumption:

Prepare Draft Work Plan

Prepare a Draft Work Plan for theRemedial Investigation/Feasibility Study(RI/FS), using the results and outputsof Task 2 (Prepare Project Plans) and anevaluation of investigative activitiesrequired at the site. A consolidateddraft work plan document will beprepared including estimated schedulesand budgets.

1. Interim Report and Project Plans(Task 2).

2. REM II Guidance Documents.

3. Remedial Action Master Plan (1983).

4. Skinner Landfill RemedialInvestigation and Feasibility StudyStatement of Work.

1.

Deliverables: 1.

The Draft Work Plan will be based onthe statement of work and theresults of the preceding Tasks.

Consolidated Draft Work Planincluding estimated Budgets andSchedules for the RI/FS addressingon-site contamination for air,soils, sediments, groundwater,surface water, vegetation and localwater supply wells.

The Draft Work Plan will includespecific, discrete tasks to beperformed under each phase of work.The plan will include the itemslisted below:

-11-

Page 25: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

o Introductiono Background of Siteo Work Scopeo Technical Approacho Detailed Site Topographic Mapping

including:

- Property boundaries, owners, welllocations

- Monitoring well locations andelevations

- Topography indicating two footcontours

- Disposal/contamination areas- Sample collection locations- Test pit and soil boringlocations

- Land use- Water table elevations (groundwa-ter flow directions)

o Site Investigations, including:

- Waste characterization (if neces-sary)

- Air quality investigation- Soil/sediment investigation- Geophysical investigation- Groundwater/hydrogeologic inves-tigation

- Surface water investigation- Investigation of water supplywells

- Biological investigation

o Endagerment Assessmento Description of Remedial Responseo Response objectives and criteriao Identification of Remedial Alterna-tives

o Identification of appropriate tech-nology

o Specific Engineering considerations(i.e., pilot facilities)

o Laboratory Studies, as appropriateo Evaluation of Alternatives,including

- Risk assessment- Cost evaluation

-12-

Page 26: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

- Cost effectiveness methodo-logy for analysis of alter-natives

- Recommendation of selected al-ternative

o Conceptual Design/Final Reporto Community Relationso Scheduleo Budgeto Deliverableso Appendix

- CPM diagram- Project plans

Subtask 4.2 - Agency Review

Objective: To provide agency input andconcurrence to the work plan.

InformationSources: Not applicable

Subtask 4.3 - Prepare Final Work Plan

Objectives: Produce documents to direct the SkinnerLandfill Site RI/FS incorporatingappropriate agency, industry, and publiccomments as provided in writing by EPA.

Data Sources: 1. Draft Work Plan (Subtask 4.1) and re-sults of Public Scoping meeting (Sub-task 4.2).

Assumption: EPA will indicate which comments fromthe public scoping meeting are to beincorporated into the Final Work Plan.

Deliverable: Final Work Plan

Task 5. Technical and Financial Management

Objective: Prepare technical and financial reports,attend meetings, perform QA/QC audit,evaluate laboratory reports, performdocument control, etc.

-13-

Page 27: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

Data Sources: 1. Results of Task 0 through Task 4

2. Federal, State and Local Agencies

3. Management information systemestablished for the REM II Contract(REMIS)

Assumptions: 1.

2.

Monthly reports will be preparedduring the initial period inconformance with standard monthlyreport format

Monthly progress meetings will berequired during the initial period

Deliverables

3.0 BUDGET

Monthly Progress Reports

The costs associated with the initial tasks are presented inAttachments A and B. Attachment A presents a summary of allcosts associated with the initial tasks and Attachment Bpresents a detailed breakout of labor by category and taskexpenses and other direct costs (ODCs) by task. These costsare in accordance with our understanding of the requirementsof this project.

4.0 SCHEDULE

The Schedule of Activities by task and subtask is presentedin Attachment C. As shown, we estimate that the final WorkPlan will be completed the week of December 24, 1984.

The Schedule of Deliverables is presented in Attachment Dand shows distribution and approval dates. We have notincluded distribution to any idnetified potentialresponsible parties; we look to your guidance in theseareas.

We have also included an Initial Tasks Flow Chart asAttachment E to present graphically the interrelationshiptasks and generalized flow of information.

5.0 KEY STAFF

1. Robert J. Karnauskas, P.G., Roy F. Weston, Inc.will be the site manager for the Skinner Landfillsite assignment. His resume is included asAttachment F.

-14-

Page 28: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

jonn W. Hawthorne, P.E., Camp Dresser & McKee, isthe Region V Manager.

Camp Dresser & McKee will provide direction andinput on health and safety, quality assurance andon specific tasks as required.

ICF will provide direction and input into theCommunity Relations Plan.

Clement Associates will provide guidance on theexposure and risk assessment and on theendangerment assessment.

C.C. Johnson and Associates will provide input on atask specific basis.

-15-

Page 29: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

ATTACHMENT AREM II

FIRM LEVEL

*Cod. 31-5L73.0

HA Manager NMe KarnauskasSSAN 326-46-4170

Site NuMber

Site Name _

Phase ___

130

Skinner

WP1

Firm RFW

Start Date

End Date

9/26

12/28

(4)

TASK»mmmmmmmmmm »••••••••••

-{LJJ. itarJi-ElAH-MfiHK1.0 Current Sit'n

2.U Project Plans

3.0 EPA Activities

4.0 Work Plan

5.0 Tech /pin. Mgrol

TOTAL

US. FIRM MA">

| Profes1

I Hoursmmmmmmmmm

[....IB...210

280

56

360 •

74

1058(6)

ilonal$

_a£jai4.8275

11225

2408

14117

4694

44403(7)

Sup)Hours

_ 12 __32

58

16

88

64

270(8)

>ort$

_ 22J—739

1339

369

2031

1696

6451(9)

Equipment$

1 AA

300

100

500(10)

Travel$

—— 6.0 ——1890

100

540

85

85

2760(11)

OOC's$

—— 2,6.0 ——820

1070

370

1550

220

4290(12)

Sub-Pool$

6000*

6000(13)

Indirect$

(14)

Total$

_ 43A1 _

12024

13734

9787

_!77_8_2__

__6_6_9_§._

64404(2)

Page 30: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

. (ATTACHMENT B

im »»»•:: ..?*•_.___Sill IMS Skinner Landfill "5"3-0

Sitt Hiwitr: *; .•?.-

SJM: ..326-4.6-4.J70Dili:

REM H

LABOR

TASKIlMMt

0.0 Work Plan M*K>

2.0 Project Plana2.1 Proj. Opn. Plat, . . . . . . , , , , ., ..i ,

" • " • • • ' ' • ««— — • *•""""""••"••

2JU3_Sit« Mg«t. ___

21.4 Quality Centre

2.2 QAPP

2.3 Data Mg»t

2.4 CCMM. Ral'ni.

3.0 EPA D«». Act.

4.0 Work Plan

4.1 Draft

4.2 Agancy Ravlew

4.3 Final

5.0 Tach/Fn M<jntlOTM,

rrtfti•

————HMM

22

on4?5 ——

———

'-M-16

1

2

2

8

20,

4

50

148

mil 4

70\3]

1547

914

'

————141

1125

———

141

————141

562

———1406

562

281

3516

10406

FroftiiiKul 3l/Hr.

HMI

8

36

40

24

. 2

2m

40

16

16 _

24

1

4#.91

392

1763

_JJL1959

98

196

98

98

392

1959

784

784

1176

202 :989S

frolniionil 1I/HI.

Houri

48

136

SO

8

16

24

40

120

16

40

572

1745

4945

291

2909

1164_

145

291

582

873

1454

4363

582

1454

Frotwnr.ll 1l/Hr.

Hwrt :,,! ,,

————

————————

————————

————————

——————— -

207981

————

————

————

————

————

————

- ———————

Irchf.it il Il/Hr.

24

_»_

———

80

583

21Z_

1942

136 9302

iKhmcil 1l/Hr.

HMM : 1

———

———

TDiM, TEtMHUl101

HWM : 1

210 : 8275

::

JA».-';~tll&.

34 | 1262

6 : 243

14 : 628

18 : 680

28 : 1112

56 : 2408:

260 : 9670

40 '• 1928-——:———

60 : 2519

74 : 4694

11058 44403

Cliricil 3l/Hr.

HMM

40

40

jta!

Clrncil 2l/Hr.

*™J.2*.9i...12..

..~i..

.21..

4

g

4

g

16

60

4

24

1142* 24

..2.73.

.JSS4.-

92

185

92

185

369

1385

92

554

554........|— ......1142)230 5309

Clrncil 1

I k'jri : 1

«... — .

lotil

Ho-us : 1

...90...

.242..

..J.4...

jar..

10

22

22

36

72

320

44

84

|l38

11328

jau.3014—

.2X24—

-4447—335

813

772

1297

2777

11055

2020

3073

6390

50854IJSUWK.IM

Page 31: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

REM II

EXPENSESATTACHMENT B-1

Site Nunbert .

Site Names _

Phasei WP1

130

SkinnerSite Manager:

SSAN:

Date:

Karnauskas

326-46-417010/12/84

MA Codei 31-5L73.Q

TASK

I Equipment1 $/dayi1 Days

0.0 Work Plan Meida 1— — ———1.0 Current Sit'H 3——————2.0 Project Plans!

3.0 EPA Act. 1_ _ _ _ _ _ _ _ _ _ _ — . _ _ _ _ _ _ _ .4.0 Work Plan

1_ i___._.__.____ ————— ( — _____5.0 Tech/Pin. Mgnlt

TOTALi ————————————— .

i $

100

300

100

———————

——————

500

Per 01 em$90/day

Days $

__ _ ____ __ 2SL __6

1

540———————25———————90__________25__________25——————

——————

——————

——————

__________

__________735

Transpor-tation

S

30

1350

75

450

60

60

2025

Sub-Pool

$

6000*

6000

G & A*0.01

$

Total

$__a_s»_:s

160

2190

100

6640

85

85

9260. —————— i

EtNA.EXP

* Subcontractor pool excluded from G&A computation*EST.

Page 32: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

ATTACHMENT B-2

REM II

ODC's

Site Nunbert 13°

Site NMiet

Phasei

Skinner

WP1

Site Manager: Karnauskas

SSAN: 326-46-4170

Date: 10/12/84

HA Code. 31-5173.0

TASK

o_oitori_^l8_UM1.0 Current Sit'n

2.0 Project Plans

3.0 EPA Activitie

4.0 Work Plan

5.0 Tech/Fin. Mgm

TOTAL

Xerox___—._.

$

3 .Iflfl.

300——————500

— — — -5 50——————

500

:. 100___ — . ———

"""

1550

Blue-prints

— ——— —$

——————100————100

100————500——————

—— — — —

——————

——————800

Mail/Courier

——————$

.««.»_._«

_ 5D _____100

100

50

100

20

——————

..........

——————420

Supplies

$

1IL100

100

100

100

————

— — — —

___________410

Tele-phone

$

__ .5£L __100

20

20

50

50

290

Computer

$•—»—»--

120———————250

50

300

50

——————

——————

——————

__________

________

820

$

——————

——————

...__._.__

_-_—._—

G & A

—.._._-$

.»«»._.

——————

——————

——————

——————

——————

——————

——————

-——>——•-

__________

TOTAL

$

26-0-820

1070

370

1550

220

WEiHA.OOC

Page 33: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

SCHEDULE OF ACTIVITIES ATTACHMENT CSKINNER LANDFILL SITE, WEST CHESTER, OHIOACTIVITY

0.0 work Plan Memorandum1.0 Description of Current Situation

1.1 Obtain t Evaluate Existing Information1.2 Prepare Compiled Site Maps1.3 Perform Initial Site Characterixation

2.0 Prepare Project Plans

2.1 Quality Assurance (OA) Plan2.2 Health and Safety Plan2.3 sampling and Analysis Plan2.4 Site Management Plan2.5 Quality Control (OC) Plan2.6 Data Management Plan2.7 Community Relations Plan

3.0 Perform BPA Designated Activities

3.1 Perform Site Mapping

4.0 Prepare Work Plan4.1 Draft work Plan4.2 Agency Review Meeting4.3 Final Work Plan

5.0 Monthly Reports

SEPTEMBER6 10 17 26

OCTOBERt 0 16 23 SO

——————— »

1 ——————

1 ————— I1 —— 1

h1 —————1 —————

1 ——i ——1 ——

I ————

*

NOVEMBERB̂ 13 20 27

———————— ,

— 1

————— 1— 1

4 —————————————————————— 1————— 1

1 —————————

t —————————————

| —————————————

*

DECEMBER4 11 IS 25

—————————— 1

—————————— 1

—— 1—— 1

————————————— 1

————— 1

* ——— 1*

Page 34: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

SCHEDULE OF DEUVERABLES ATTACHMENT DSKINNER LANDFILL SITE, WEST CHESTER, OHIO

DELIVERABLE

Work Man MaanrandtaiInttrln RtportQuality Aaauranc* flanHMlth 4 Saf«ty Plan.Draft Saapllns I Anil. FluFinal Suplloi t Anal.' PlanSit* Management PlmnQuality Control PlanData Management Plan-CoBBunlty Iclatlona PlanSit* HapDraft Work Plan

Final Work PlanMonthly Report*

WORKASSIGNMENT

AUTH.

-26-26-26-26

9-26-26-26-26-26

9-269-269-26

9-269-26

DUE

10-1611-2111-U11-711-2812-1911-2111-1412-512-J10-3112-13

12-28on golni

QUALITYCONTROL PLAN

(OCP)

ACTIVITY

A.I. aA.I. aA.l.aA.l.hA.l.cA.I. aA. .cA. .aA. .aA. .aA. .aB.

A. .aA. .a

DATE

10-910-1411-711-211-2312-1211-1611-711-2811-2810-2411-30

12-21

QUALITYSURVEILLANCE

ACTIVITY DATE

REM II APPROVAL

2E

10-910-111-710-311-212-111-111-711-2111-2J10-2412-6

12-21

2O»-

10-12

11-1611-911-211-2312-1411-1611-911-3011-3010-2612-10

12-27

V)

10-1

11-111-911-21-2312-1'11-U11-911-3C11 -3(10-2112-K

12-2

2u.

10-1211-1611-911-211-2312-1411-1611-911-3011-3010-2612-10

12-27

U8EPAREVIEW

O

10-111-211-111-911-312-211-211-1612-712-711-212-15

1-3

OU

10-111-211-1

11-911-312-211-211-112-712-711-212-1

1-3

O0,C

10- 1

11-211-111-911-312-211-211-112-712-711-212-1

1-3

O0,•»K

10-1911-211-1611-911-3012-211-2311-1612-712-711-212-15

1-3

10-1

1-231-1611-911-3112-211-211-112-712-711-217-1

1-3

STATEREVIEW

2<g f c

10-211-211-211-112-312-211-211-2012-1112-1111-612-19

1-7

OTHERREVCW

Page 35: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

START HWORK PLAN MEMO

COMPILED SITEPLANS

EXISTING INFOR-MATIONINTERIM REPORT

LEGEND: I ACTIVITY 1

GUIDANCE

PROJECT MANAGEMENT ACTIVITIES

DATA MANAGEMENT PLAN

I SITE"~ENTRY''~~I|£ROTOCOLS I

SITE CHARAC-TERIZATION

COMMUNITYRELATIONSPLAN

PROJECT OPERATIONSPLAN

-Health & SafetyPlan-Sampling & Analy-sis Plan

-Site ManagementPlan-Quality Control(QC) Plan

-Quality Assurance(QA) Plan

FINAL WORK PLAN

ATTACHMENT E INITIAL TASKS FLOW CHART

Page 36: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

ATTACHMENT F

Robert J. Karnauskas, P.G.

Registration

Certified Professional Geological Scientist and Cer-tified Professional Geologist in the state of Indiana.

Fields of Competence

Geological aspects relating to localional and designconsiderations of solid and hazardous waste disposalfacilities; evaluation of organic and inorganic ground-water contamination problems; aquifer restoration andrehabilitation; land disposal of municipal and industrialwastewaters and sludges; physical and chemical char-acterization of industrial waste materials to assessgroundwater contamination potential; groundwatermodeling; evaluation of hydrogeologic aspects of con-struction problems; and NPDES permit program coor-dination.

Experience Summary

Six years of professional experience in consulting en-vironmental engineering. Project assignments haveblanketed a broad range of industries including pulp andpaper, solvent processing and recycling, electric powerutilities, food processing, private and public solid wasteoperations, foundries, and agriculture. Experience in-cludes the hydrogeologic evaluation of a wide variety ofsubsurface environments and groundwater contamina-tion concerns. Research experience has included theevaluation of leachate characteristics from municipaland industrial wastes as well as the development ofmethods for assessing leakage rates from Industrialwastewater lagoons.

CredentialsB.A., Geology and Geophysics—University of Wiscon-sin, Madison (1975)M.S., Geology (Hydrogeology)—University of Wiscon-sin, Madison (1977)M.S., Water Resources Management—University ofWisconsin, Madison (1977)

University of Wisconsin, Madison—Part-time graduatestudies in Business Management (1983)National Water Well Association, Technical DivisionAmerican Institute of Professional Geologists

Employment History

1983-Present WESTON1977-1983 Warzyn Engineering Inc.

Key Projects

Project Hydrogeologist and/or Project Manager forseveral major fly ash disposal facilities for WisconsinElectric Utilities, including site selection, subsurfacefeasibility evaluations, technical input to engineeringdesign, construction and groundwater monitoring.Project Hydrogeologist and Project Manager on a majorgroundwater contamination study of private water sup-ply wells from cheese manufacturing waste processes.Scope of work included identification, evaluation andmitigation of groundwater contaminant sources.Project Hydrogeologist for the subsurface evaluationand design of a major county zone of saturation landfill,including expert testimony at regulatory licensing hear-ings.Designed a detailed test monitoring area within a largefly ash disposal facility to evaluate leachate quality andquantity generated within and leaving the facility. Thetest program is designed to compare field results withpredicted leachate quality and environmental impactsfrom laboratory characterization of the ash.Project Manager on a detailed subsurface investigationevaluating PCB contamination in soils and groundwater.Project Hydrogeologist and Project Manager in-vestigating the scope and magnitude of solvent con-tamination in soils and groundwater at a solventreprocessing facility, including liaison with local andstate governmental agencies, and public relations.

Professional Profile10/83

Page 37: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

Project Hydrogeologlst and Project Manager in-vestigating contamination of a municipal water supplywell derived from food processing and canning wastes.Project Hydrogeologlst for a regional groundwaterresource evaluation Investigating agricultural water useand its effect on process water availability for a Wiscon-sin paper manufacturer.

Publications

Karnauskas, Robert J. and M. P. Anderson, "Ground-water Lake Relationships and Groundwater Quality Inthe Sand Plain Province of Wisconsin—Nepco Lake",Groundwater Journal, 1978.

Ham, R. K. and R. J. Karnauskas. "Leachate Productionfrom Milled and Unprocessed Refuse", InternationalSolid Waste Association Information Bulletin, 1974.Karnauskas, R. J., C. E. R. Lawson and M. E. Horn, "TheFeasibility of Fly Ash Utilization for FGD ScrubberSludge Stabilization, Columbia Generating Station, Por-tage, Wisconsin". Proceedings of Second Annual Con-ference of Applied Research and Practice on Municipaland Industrial Waste, 1979.Karnauskas, R. J. and P. J. Huettl, "Land Application ofWhey", Dairy Field, May and June, 1981.

Page 38: WORK PLAN MEMORANDUM · Mr. Gene Wong Regional Site Project Officer U.S. Envornmental Protection Agency 230 South Dearborn Street Chicago, Illinois 6060*4 Work Assignment No.: 31-5L73

ATTACHMENT G

[I

MEMORANDUM:

TO: D.F. Doyle, Manager of Techinal OperationsCamp, Dresser and McKee, Inc.1 Center PlazaBoston, Ma 02108

FROM: Robert J. Karnauskas, P.G.

DATE: October 16, 1984

PROJECT: EPA Contract No. 68-01-6939/NPM/MPMODocument No. 999-PMl-CD-AKTE-l

SUBJECT: Staff Conflict of Interest DeclarationSkinner Landfill Site, West Chester, OhioWork Assignment No. 31-5L73.0

ACTION: Immediate Response

I have reviewed the above work assignment for the EPAC o n t r a c t 68-01-6939, Remedial Response Act iv i t ies ofUncontrol led Hazardous Waste Sites. Based on this reviewand my understanding of the legal requirements of this work,I c e r t i f y that I have no known conf l ic t of interesta s s o c i a t e d w i t h the a s s i g n m e n t based on the knownpotential responsible parties or my past work experiencew i t h this site, if any. Also, I understand my professionalobligation to i n f o r m any staff working at my direction onthis assignment of the conflict of interest requirements andinsure that such staff have no conflict of interests.

Robert J. Karnauskas, P.G.REM II Site ManagerSenior Hydrogeologist/Project Manager

cc: J.G. CurtisCamp, Dresser and McKee, Inc.7630 Little River TurnpikeSuite 500Annandale, VA 22003