work package 2 coordination with egee activities marco verlato (infn-padova) cyclops review 26...

16
Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

Upload: blake-fields

Post on 03-Jan-2016

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

Work Package 2Coordination with EGEE activities

Marco Verlato(INFN-Padova)

CYCLOPS Review26 October 2007

Bruxelles, Belgium

Page 2: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

2

Layout

INFN role in the project WP2 objectives WP2 results and future plans List of Deliverables Conclusions

Page 3: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

3

INFN role in the project

INFN is involved in several EU and National Grid projects (EGEE-II, EGI-DS, OMII-Europe, EUMed/China/IndiaGrid, EELA, BioinfoGRID, IGI, LIBI, etc.)

INFN is leading the Middleware Engineering activity in EGEE-II (and its successor EGEE-III)

INFN is involved in all of the 5 WPs of the CYCLOPS project

Its main role in CYCLOPS is leading the WP2, i.e. coordinating with the EGEE activities

A significant role played in WP4 too, i.e. defining research and innovation strategies for a e-infrastructure for Civil Protection applications

Page 4: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

4

WP2 objectives

From the DoW: CYCLOPS main goal is “to bridge the gap between

Grid and CP communities” WP2 aims “to carry out CP and Grid communities

inter-dissemination” (project objective 5)

Operational goals: “Tutorial on EGEE platform for Civil Protection

agencies” “Civil Protection framework and EGEE coordination”

to establish a two way communication channel between CYCLOPS and EGEE projects

Page 5: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

5

WPs Interdependencies

Management

Civil Protection systemAnalysis

Dissemination and Exploitation

Research & Innovation Strategy Definition

Full time coverage of the CYCLOPS core activities carried out by WP3 and WP4

Page 6: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

6

Start date: PM3 Duration: 18 Months WP Leader: INFN Tasks:

– T2.1: Dissemination and tutorial of the EGEE middleware to the Civil Protection community

– T2.2: Civil Protection Framework and EGEE middleware evolution coordination

Effort in Person Months: 21.5

WP2 tasks

Part. DDSC TEI-CR SNBPC

PeM 1,25 11,75 3,25 1,75 1,75 1,75

Page 7: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

7

Task 2.1 activities so far

T2.1: Dissemination and tutorial of the EGEE middleware to the Civil Protection community

– Talk about EGEE platform at Project Open Conference in June 2006

– Writing the Training Event Plan and the EGEE Cookbook for Civil Protection users

– 1st CYCLOPS Training Workshop held in Bologna the 11-13 April 2007

Agenda and training material available under the “Events” menu of the project web site www.cyclops-project.eu

A complete report is available in the First Training Workshop (D10) document

Page 8: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

8

The GILDA Project (https://gilda.ct.infn.it)

•15 sites in 3 continents•> 2800 certificates issued, >15% renewed at least once•> 100 tutorials and demos performed in 21 months•> 1,000,000 hits (> 50,000 unique visits) on (of) the web site from 10’s of different countries •> 0.6 TB of training material downloaded from the web site

Page 9: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

9

The First Training Workshop

It suffered the delay in the transfer of funds from EC to DPC and from this to Partners (ANPC and TEI-CR could not attend)

Delivered at PM11 (April ‘07) instead of PM7 14 participants (DPC, EMA, CNR-IMAA and INFN represented) First half day of workshop on CYCLOPS activities, then grid

tutorial with theory and hands-on Positively evaluated by participants through questionnaire

Page 10: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

10

Task 2.1 results and future plans

Measure of success according to DoW:– Number of training events 1

– Number of attendees at training events 14

– Questionnaire for self-evaluation of training events average score = 5/6

(1:poor, 2:insufficient, 3:fair, 4:good, 5:very good, 6:excellent)

Plans for next period:– DPC/IMAA/INFN team attending the “INFN School for

porting new applications to grid”, 12-23 November 2007

– the goal is to port RISICO application to grid

– the next training workshop, to be held close to a CP community event to broaden the audience, will include the RISICO porting experience as a practical example

Page 11: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

11

Task 2.2 activities so far

T2.2: Civil Protection Framework and EGEE middleware evolution coordination

– Talk at EGEE’06 Conference in Geneva, 27 September 2006

– Participation to periodical EGEE-ITF phone meetings

– Set up of cyclops VO services and resources on Grid.It, with CNR-IMAA Registration Authority of INFN CA

– Technical Expert Group (TEG) meeting with Bob Jones (EGEE leader) and all partners in Rome, 30 November 2006

– Several technical meetings with WP3 and WP4 partners

– Supporting the grid implementation of a WCS prototype

– Supporting the grid implementation of RISICO prototype

– Talk at OGF20 in Manchester, 7 May 2007

– Talk at EGEE User Forum in Manchester, 11 May 2007

– Poster at EGEE’07 Conference in Budapest, 1-5 October 2007

Page 12: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

12

CYCLOPS VO-enabled resources in Grid.It

Central VO services:LFC: lfcserver.cnaf.infn.itVOMS: voms2.cnaf.infn.it

WMS: prod-wms-01.pd.infn.it, glite-rb-00.cnaf.infn.it

Computing and Storage resources:#CPU Free Total Jobs Running Waiting ComputingElement---------------------------------------------------------- 4 1 30 0 30 gridce.ilc.cnr.it:2119/jobmanager-lcgpbs-grid 70 1 40 1 39 gridba2.ba.infn.it:2119/jobmanager-lcgpbs-short 70 1 1762 34 1728 gridba2.ba.infn.it:2119/jobmanager-lcgpbs-long 70 1 2307 11 2296 gridba2.ba.infn.it:2119/jobmanager-lcgpbs-infinite 44 14 8 6 2 grid0.fe.infn.it:2119/jobmanager-lcgpbs-grid 44 0 36 15 21 prod-ce-01.pd.infn.it:2119/jobmanager-lcglsf-grid 539 4 30 4 26 gridce2.pi.infn.it:2119/jobmanager-lcglsf-grid4 25 9 15 12 3 grid001.ts.infn.it:2119/jobmanager-lcglsf-grid 12 2 14 10 4 gridce.sns.it:2119/jobmanager-lcgpbs-grid

738 total CPU-cores (not dedicated)

Avail Space(Kb) Used Space(Kb) Type SEs---------------------------------------------------------- 395156380 4970248 n.a gridse.ilc.cnr.it 445299512 1364038152 n.a grid007g.cnaf.infn.it3912509084 481669476 n.a prod-se-01.pd.infn.it 52670212 656381412 n.a gridit002.pd.infn.it3840000000 250000000 n.a prod-se-02.pd.infn.it2322948608 19715584 n.a grid002.ts.infn.it 67267572 3758208 n.a gridse.sns.it

> 10 TB (not dedicated)

Page 13: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

13

WCS grid implementation schema

The production grid infrastructure used as test-bed to implementa grid Web Coverage Service

Page 14: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

14

Task 2.2 results and future plans

Measure of success according to DoW:– Number and impact of feedback provided by CYCLOPS to EGEE

presence at 3 EGEE conferences and 1 TEG meeting

– Timeliness of information about new middleware functionalities implemented by EGEE project no significant functionalities added to gLite after the training workshop, but cyclops VO resources kept continuously updated w.r.t. middleware upgrades

Plans for next period:– Report to TEG annual meeting and next EGEE events (EGEE

User Forum in February 2008) the results of WP3 and WP4 activities, most notably the “EGEE Request for Enhancement” document (D14)

– Keep running the cyclops VO infrastructure and open it to support RISICO and Flash Flood prototype applications

Page 15: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

15

Deliverables list for WP2

Jun

e

200

6P

M

1

Ap

r 2

00

7P

M

11

May

200

8P

M

24

Nov

200

6P

M

6

done

Au

g

200

6P

M

3

Dec

200

6P

M

7

Gen

2

00

8P

M

20

Ap

r 2

00

8P

M

23

D17WP2 activity final report

D5Training Events

Plan

D7EGEE Cookbook:A guide for CP

grid users

D10First Training

Workshop

D13Second Training

Workshop

M2.1Training Plan

published

done

due

done

Jun

2

00

7P

M

13

M2.2EGEE explained to CP community

due planned

Page 16: Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium

16

Conclusions

Grid concepts and the EGEE middleware services have been disseminated in several occasions

– Towards a wide heterogeneous Civil Protection related audience (at the Project Open Conference)

– Towards CYCLOPS partners (at the Training Workshop and at several technical meetings)

A more focused training action, aiming to investigate grid integration approaches and prototyping the selected use-cases is planned for the next period

CYCLOPS feedback to EGEE planned at next User Forum at Clermont-Ferrand, 11-14 February 2008