  • WORK INSTRUCTION FOR

    INSPECTION OF RAW MATERIAL

    WORK INSTRUCTION FOR INSPECTION OF RAW MATERIAL

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Plastic Raw Materials

    Responsibility:

    Stores Assistant \ store keeper

    Description :

    1. Check the quantity of the inward items as per the purchase

    order.

    2. Take the sample size as 5 bags for lot on a randam basis

    3. For all raw materials check the material Name ( if applicable)

    4. Check whether the items are free from physical damages

    5. For raw materials which have specific values ( mentioned in

    the P.O) check the specification

    6. Record the status of inspection in the GRN

    7. If any rejection (Product NC) is found during this inward it

    will be handled as per QSP\ 04

    The below table may be used for reference to Handle the

    Inward Inspection

    Parameter to Inspect Specification Measuring Techinique Sampling Size

    Material Name \

    Quantity \ Free

    From Damage

    As per P.OVisual Inspection \

    Weighing Machine 5 Bags \ Lot

  • WORK INSTRUCTION FOR

    RAW MATERIAL RECEIPT ,STORAGE &

    HANDLING

    WORK INSTRUCTION FOR RAW MATERIAL RECEIPT ,

    STORAGE & HANDLING

    PREPARED BY: APPROVED BY:

    Raw Material Receipt

    The Raw material received from supplier should be checked For the following

    1. Quantity as per the Invoice \ D.C

    2. The Raw Material mentioned in the Invoice \ D.C and the raw

    material received

    3. Packing condition , There should not be any tear and the

    material should not spill from the bags

    4. The bags should not be damp

    Incase of discrepancies, talk to the Supplier and take necessary action immediately

    STORAGE

    1. The raw materials should be kept in the pallet allocated for the

    material

    2. The distance between one material and the other should be

    atleastone foot

    3. The raw material name should be clearly displayed

    4. The raw material register should be updated immediately

    HANDLING

    1. The raw material required for production should be taken from the

    stores only after entering in the raw material register.

    2. Once the bag is opened and the material is taken, the bag shouild be

    closed

    3. Never keep the bags with raw material in OPEN CONDITION

  • WORK INSTRUCTION FOR

    MOULD LOADING

    WORK INSTRUCTION FOR MOULD LOADING

    Nkhy;L Vw;Wtjw;fhd nray;Kiw tpsf;fk;

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Check the Mould Properly with all auxillary system is available like locating

    ring,lifting bar, Eye bolt ,cooling Nipples & verify the Mould check list.Nkhy;il Vw;Wtjw;f;F Kd; Nkhy;L nrf; yp];by; cs;s midj;Jk; (NyhNfl;bq;rpq;> ypg;bq; ghu;> I Nghy;l;& ypq; ypg;gpy;) cs;sjh vd cWjp nra;J nfhs;sTk;.

    2. Select Ejector rod & fix to the related Holes Nkhy;bw;F jFe;j Vn[f;lu; uhL vLj;J nk\pdpy; jFe;j ,lj;jpy; nghUj;jTk;.

    3. Confirm machine platen is sufficiently open and hydraulic

    ejector is in fully back positionnk\pdpd; gpNsl;bid Nkhy;Lf;F Vw;wthW jpwe;J nfhs;sTk; kw;Wk; Il;uhypf; Vn[f;lu; KOtJk; gpd;Gwkhf ,Uf;FkhW cWjp nra;J nfhs;sTk;.

    4. Lift the mould using the crane by means of Eyebolt & chain/RopeNkhy;il I Nghy;l;> Nuhg; kw;Wk; fpNudpd; cjtpAld; J}f;fTk;.

    5. Locate the mould in the fixed platen of the machine guiding

    the locating ring.Nkhy;il nk\pdpd; gpf;];L gpNsl;ldpy; NyhNfl;bq;upq; cjtpAld; nghUj;jNtz;Lk;.

    6. All operations should be done in Mould set up mode.midj;J nray;ghLfisAk; nrl;bq; Nkhby; nra;aTk;.

    7. Close the moving side platen slowely till touch the mould%tpq; irL bNsl;lid nkJthf Nkhy;il njhLk;tiu FNsh]; nra;aTk;.

    8. Ensure the mould position and level is correct by touching

    injection nozzle.Nkhy;L NyhNfl;bq; nra;jJ rupahf cs;sjh vd;gij ,d;n[f;\d; eh\piyitj;J rupghu;j;J nfhs;sTk;.

  • WORK INSTRUCTION FOR

    MOULD LOADING

    WORK INSTRUCTION FOR MOULD LOADING

    PREPARED BY: APPROVED BY:

    9. After confirming the mould setup, Actuate the lockingNkhy;L NyhNfl;bq; nra;j gpwF> nk\pdpy; Nkhy;bw;F Vw;wthW yhf;fpq; nfhLf;fTk;.

    10. Clamp the mould using clamps, spacers, washer, bolts, allen keys,

    Spanners & pipes];Ngru;> thru;> Myd; Nghy;l;> Myd; fP> ];ghdu;]; & igg; cjtpAld; Nkhy;il nghUj;j Ntz;Lk;.

    11. Remove lifiting bar & locking plates from the mould Nkhy;bypUe;J ypg;bq; ghu; kw;Wk; yhf;fpq; gpNsl;il fow;w Ntz;Lk;.

    12. Open the mould slowlly and check inside surface first by cleaningNkhy;il nkJthf Xgd; nra;J NkYk; Nkhy;il Rj;jk; nra;Jcl;Gwk; ed;whf cs;sjh vd rupghu;f;fTk;.

    13. Fix the ejector strokes depends upon the mould constructionNkhy;bw;F Vw;wthW Vn[f;lu; ];l;Nuhf; nrl; nra;aTk;.

    14. Connect the inlet and outlet of the water lines to the mould,d;yl; kw;Wk; MTl;yl; thl;lu; iyid Nkhy;by; ,izf;fTk;.

    15. Provide normal \ Chiller \ MTC as applicableNjitf;Nfw;g ehu;ky; / rpy;yu; / vk; b rp nfhLf;f Ntz;Lk;.

  • WORK INSTRUCTION FOR

    MOULD UNLOADING

    WORK INSTRUCTION FOR MOULD UNLOADINGNkhy;L ,wf;Ftjw;fhd nray;Kiw tpsf;fk;.

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Clean the mould & apply rust preventive spray to the core and cavity Nkhy;il Jilj;J Jug;gbf;fhky; ,Ug;gjw;Fupa ];gpNuia Nfhu; kw;Wk; Nftpl;b irby; mbf;fTk;.

    2. Remove water line and clean the water channels with

    blowing air.thl;lu; iyd;fis Row;wp thl;lu; Nrdypy; GNshapq; Vu; %yk; fpsPd; nra;a Ntz;Lk;.

    3. Ensure that hydraulic ejector (M/Cs) is in backwardIl;uhypf; vn[f;rd; KOtJk; gpd;Gwkhf ,Uf;FkhW cWjp nra;J nfhs;sTk;.

    4. Using the safety mode, close the mould slowelynk\pdpy; Nrg;l;b Nkhby; itj;J Nkhy;il nkJthf FNsh]; nra;aTk;.

    5. Fix the lifting bar \ locking plate to the mouldNkhy;by; ypg;bq; ghu; kw;Wk; yhf;fpq; gpNsl;il ,izf;fTk;.

    6. Suspend the mould with crane by menas of eyebolt & chainNkhy;il I Nghy;l; kw;Wk; ];by;Nuhg; %yk; fpNudpy; gpbf;fTk;.

    7. Remove all the clamps from the platens.Midj;J fpshk;GfisAk; gpNsl;ldpy; ,Ue;J fow;wTk;.

    8. Open the platen slowely till is required to lift the mould

    from machine gpNsl;lid nkJthf Xg;gd; nra;J Nkhy;il nk\pdpy; ,Ue;J ntspNa vLf;fTk;.

    9. Place the mould in its positionNkhy;il mjw;Fupa ,lj;jpy; itf;fTk;.

    10. Clean the machine areank\pid Rw;wp Jilf;f Ntz;Lk;

  • WORK INSTRUCTION FOR

    HOPPER CLEANING & BARREL

    CLEANING PROCEDURE

    WORK INSTRUCTION FOR HOPPER CLEANING

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Empty the present material from the hopper

    2. clean the mesh , magnet and hopper inside

    3. Ensure that no foreign material or colour granules present

    in the hopper

    4. Keep the Hopper Lid closed always after cleaning and after

    loading the material

    5. Hopper cleaning should be carried out while processing

    and different material and master batch

  • WORK INSTRUCTION FOR

    HOPPER CLEANING & BARREL

    CLEANING PROCEDURE

    WORK INSTRUCTION FOR BARREL CLEANING

    PREPARED BY: APPROVED BY:

    FOR THE SAME MATERIAL WITH DIFFERENT COLOUR

    1. Purge all the material in the barrel in small size

    2. Load the required material to the feed throat of the barrel

    and purge with High Back Pressure and High screw speed

    3.Purging tobe done till the required colour is achived

    FOR USING DIFFERENT MATERIAL

    1. Purge all the material in the barrel in small size

    2. Then use natural colour PP granuales to purge till the

    original colour of PP comes.

    3. Set the required temperature for the material tobe

    processed

    4. Load the required material into the hopper

    5. Wait till the set temperature is reached

    6. Purge the material till the required colour is achieved

  • WORK INSTRUCTION FOR

    HOPPER CLEANING & BARREL

    CLEANING PROCEDURE

    WORK INSTRUCTION FOR BARREL CLEANING

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Fill the throat of the injection barrel with the material tobe

    purged

    2. Set the temperature of Barrel to the melting temperature of

    the resin

    3. Set the machine to manual mode

    4. Adjust the plasticising stroke to the maximum limit of the

    machine

    5. Press the screw retracting button till the screw retracts to the maximum limit

    6. Purge the material in small size till screw position reaches

    to zero mm.

  • PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Oil level,oil temperature are within specified limits of the machineMapy; nyty;> Mapy; temp k; nk\pdpw;F Vw;w msT (30 c) cs;sjh vd ghuf;fTk;.

    2. Machine, hopper and barrel are cleaned as per the requirementNjitf;F Vw;whw; Nghy; nk\pd;p fhg;gu; kw;Wk; / Nguy; Rj;jk; nra;a Ntz;Lk;.

    3. The mould is loaded as per mould loading instructionNkhy;il Nkhy;L Nyhbq; nray; Kiw tpsf;fj;jpy; Fwpg;gpl;Ls;s gb Vw;wNtz;Lk;.

    4. The material is pre dried (if required) and free from

    contamination and is loaded to the hoppernkl;bupaYf;F Njitg;gl;lhy; preheat nra;J J}R ,y;;yhky; Hopper I nfhl;l Ntz;Lk;.

    5. The hopper is closedHopper - I %l Ntz;Lk;

    6. The MTC or Cooling water line is connected to the mould

    as per requirement (with out Leakage) Mould cooling water line (or) M.T.C. line. - I mjw;F jFe;jhw;Nghy;; nrhUf Ntz;Lk;. (ntspapy; rpe;jhky;)

    WORK INSTRUCTION FOR MACHINE STARTUPnk\pid Jtf;Ftjw;fhd nray;Kiw tpsf;fk;.

    WORK INSTRUCTION FOR

    MACHINE START UP

  • WORK INSTRUCTION FOR

    MACHINE START UP

    WORK INSTRUCTION FOR MACHINE STARTUPnk\pid Jtf;Ftjw;fhd nray;Kiw tpsf;fk;.

    PREPARED BY: APPROVED BY:

    7. Set the Processing parameters for the machine using the

    standard process parameter for the component and wait

    till the temperature are reached to the set levelM/C - y; standard process parameter - I gad;gLj;jp process setting nra;a Ntz;Lk; gpwF me;j component - f;Fupa temp milAk; tiu fhj;jpUf;f Ntz;Lk;

    8. Switch on to safety mode in the machine and close the

    moving platen till it reaches 0.0 mm (This can be seen in

    the mould closing page of the machineRtpl;ir Md; nra;J nrl;bq; nkhby; itj;J %tpq; gpNsl;lid 0-0 mmtUk; tiu close nra;aTk; (,ij PLC - y; mould closing page - y; ghu;f;fTk;)

    9. Switch on to manual mode , set the mould closing &

    Opening speed according to the mouldnk\pid manual nrl;bq;fpy; itj;J> mould closing & opening speed Nkhy;bw;F Vw;wthW nrl; nra;aTk;.

    10. Now the machine is ready for operation,g;nghOJ cw;gj;jpia Jtf;Ftjw;F nk\pd; jahuhf cs;sJ.

    11. Set the machine counter to Zero M/c - y; counter - I Zero nrl; nra;aTk;

    12. Start the production ,Once the components are made as

    per the requirements get the production clearance from

    Quality & continue the production. cw;gj;jpia Jtf;fTk;> juk; tha;e;j cw;gj;jp Jtq;fpaTld; juf;fl;Lg;ghl;blk; Production clearance ngw;wTld;> cw;gj;jpia njhluTk;.

  • WORK INSTRUCTION FOR

    MACHINE STOPPAGE

    WORK INSTRUCTION FOR MACHINE STOPPAGE

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Close the Hopper

    2. Run the machine till Hopper material is empty

    3. Take out the injection unit back

    4. Remove the material from hopper

    5. Clean the hopper with Air or Cloth

    6. Purge out the remaining Hopper material in Small Size

    7. Use PP or PS granules and do further purging to ensure no

    traces of PA, PC,POM & PBT resin is left out in the barrel

    which will affects the barrel.

    8. Disconnect the mould water circulating lines

    9. Unload the mould as per the Mould Unloading procedure

  • WORK INSTRUCTION FOR PRE DESPATCH AUDIT

    AND DESPATCH PROCEDURE

    PREPARED BY: APPROVED BY:

    1. All components before despatch should be inspected for the compliance of all

    the parameters as per control plan followed by us.nghUl;fs; mDg;Gtjw;F Kd;G juf;fl;LghL jpl;lj;jpd;fPo; mjw;Fupa fUtpfis nfhz;L Ma;T nra;j gpd;G mDg;gLfpwJ.

    2. The sampling of components should be made as per our sampling plannghUl;fs; sampling plan mbg;gilapy; gupNrhjpf;fg;gl;LfpwJ.

    3. Packing slips should be pasted to the bins giving all the details like

    componenet name, Qty, Customer name , colour , date , etcjahupj;j nghUl;fs; mlq;fpa Bin apd; Nkw;gFjpapy; mjDila ngau;> vz;zpf;if thbf;ifahsu; ngau;> epwk;> Njjp kw;Wk; gpw tpguq;fs; xl;lg;gl;bUf;Fk;.

    4. Incase if the parameter are not complying with the requirements,

    inform customer about the same and arrange to get deviation for

    the lot if required most urgentmtrufhyj;jpy; nghUl;fs; gupkhdj;jpy; VjhtJ Fiw ,Ug;gpd; mij thbf;ifahsu;fSf;F njuptpj;J Fwpg;gpl;l vz;zpf;iff;F mDkjp ngw;W mDg;gLfpwJ.

    5. Inform invoicing supersvisor for making the Invoice by filling Despatch RequisitionmDg;Gk; nghUl;fspd; tpguj;ij tpiyg;gl;bay; Nkw;ghu;itahsUf;F gl;bay; ,lg;gLfpwJ.

    6. Send the material to the customer along with the Invoicethbf;ifahsu;fSf;F nghUl;fs; cld; tpiyg;gl;bay; mDg;gLfpwJ.

    7. If the material is being send through the transporter, ensure that the transporters

    Lorry Receipt is completely filled and keep necessary copies with us for future

    reference and followupnghUl;fis thfdj;jpy; mDg;Gk; nghOJ thfdk; kw;Wk; nghUl;fspd; tpguk; gw;wpa efy; G+u;j;jp nra;ag;gl;L Nfhg;gpy;p itf;fg;gLfpwJ.

    WORK INSTRUCTION FOR PRE DESPATCH AUDIT &

    DESPATCH PROCEDUREnghUl;fs; mDg;Gtjw;F Kd;G gpd;gw;w Ntz;ba topKiwfs;

  • WORK INSTRUCTION FOR IDENTIFICATION

    AND TRACEABILITY PROCEDURE

    PREPARED BY: APPROVED BY:

    AT RECEIPT STAGE

    All the inward items should be kept in an idendified area,Based on GRN Status , Vendor

    Product card (Accepted, Rejected, Waiting for Inspection ) shall be put and disposition

    of the items shall be taken accordingly.cs;tUk; nghUl;fs; midj;Jk; milahsk; kw;Wk; xg;Gjy; ngw;w gpd;G mjw;Fupa ,lj;jpy; itf;fg;gLk;.

    AT INPROCESS STAGE

    During Inprocess stage all the items shall be accompany with the Production slip giving

    the details of operations done and the operations tobe donejahupg;G Kw;W ngw;w epiyapy; mjDila epiyia gw;wpa tpguq;fs; xl;lg;gLk;.

    AT FINAL STAGE

    After pre despatch Inspection the packing slips should be pasted to the bins giving all the

    details like component name, Qty, Customer name,Colour, date etc.,jahupj;j nghUl;fs; Ma;T nra;j gpd;G> nghUl;fs; mlq;fpa Bin - apd; Nkw;gFjpapy; nghUl;fspd; ngau;> vz;zpf;if> thbf;ifahsu; ngau;> epwk; kw;w tpguq;fs; xl;lg;gl;bUf;Fk;.

    USEAGE OF STATUS CARD

    The production slip shall accompany the item if the items is accepted and can proceed for

    further operations.

    nghUl;fs; xg;Gjy; ngw;w gpd;G> mL;;j;j epiyf;F mDg;gg;gLfpwJ.

    The Hold card shall accompany the items of their if their disposition is not decided or they

    have to be reworked and they will be kept in the non conformance area.

    jahupg;gpy; juf;FiwT fhuzkhf epWj;jp itf;fg;gl;l nghUl;fs; rupgLj;jNth my;yJ Nkw;nfhz;L KbT nra;tjw;fhf cWjp nra;ag;glhj ,lj;jpw;F khw;wp itf;fg;gLk;.

    The rejected card shall accompany the items, which are not acceptable for further

    processing or despatch and shall be kept separately in an identified area or sent for granulation.

    juf;Fiwthd nghUl;fSf;F jdp milahs ml;il xl;lg;gl;L miuf;Fk; ,lj;jpw;F mDg;gLfpwJ.

    WORK INSTRUCTION FOR IDENDIFICATION & TRACEABILITY milahskpLjy;> gpd;njhlUjy; gw;wpa Ntiy topKiwfs;.

  • WORK INSTRUCTION FOR

    MATERIAL PRE HEATING

    PREPARED BY: APPROVED BY:

    WORK INSTRUCTION FOR MATERIAL PRE HEATING

    Scope :

    Applicable to Injection moulding & Plastic Raw

    material section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    INSTRUCTION:

    1. Idendify the material tobe used

    2. Take the material from the bag

    3. Weigh the material and put in the trey

    4. Put the oven in OFF condition, before opening the door

    5. Set the temperature as recommended in the instruction sheet

    and also time duration

    6. Switch on the motor after closing the door

    7. Switch on the heater also

    8. Temperature will be set as given bellow

    ABS

    NYLON 6,66

    POM

    PTFE (TEFLON)

    PC

    PBT

    PMMA

    80- 90 C

    95 -110 C

    75 - 85 C

    70 - 80 C

    100 -120 C

    100 -120 C

    90 - 100 C

    2 TO 3

    2 TO 3

    2 TO 3

    1.5 TO 2.5

    3 TO 4

    2 TO 3

    2 TO 3

    MATERIAL PREDRYING TEMP ( DEG CENT) DURATION ( HRS)

  • WORK INSTRUCTION FOR

    FILL HOSE ASSEMBLY

    WORK INSTRUCTION FOR FILL HOSE ASSY (NEW FAUCET)

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Fill hose Assy section

    Responsibility:

    Operators \ Trainee \ Supervisor

    Description :

    1. Dipping of Fill Hose in Hot bath at both ends

    2. Inserting Cup & Coupler Faucet at one end of Fill hose

    and L Connector M/C End on other side of Fill Hose

    3. Crimping of Cup Fitted Fill Hose at Both ends

    4. Pull of force checking 50 kg (With stand) (S)

    5. Pressure Checking 10 Bar (With stand) (S)

    6. 100% Leak Testing

    7. Cleaning of Fill hose for water after leak testing

    8. Assembly of Adaptor Faucet Sub assy with

    Coupler Faucet (fitted at one end of the Hose)

    9. Final Inspecion

    10. Packing and Despatch

  • WORK INSTRUCTION FOR

    FILL HOSE ASSEMBLY

    WORK INSTRUCTION FOR FILL HOSE ASSY (NEW FAUCET)

    Shree

    Mother

    Group

    PREPARED BY: APPROVED BY:

    DOC NO: SMG \ P \ WI \ 02

    REV NO : 01

    DATE : 10.03.07

    PAGE : 1 OF 2

    Scope :

    Applicable to Fill hose Assy section

    Responsibility:

    Operators \ Trainee \ Supervisor

    Description :

    1. Dipping of Fill Hose in Hot bath at both ends

    2. Inserting Cup & Coupler Faucet at one end of Fill hose

    and L Connector M/C End on other side of Fill Hose

    3. Crimping of Cup Fitted Fill Hose at Both ends

    4. Pull of force checking 50 kg (With stand) (S)

    5. Pressure Checking 10 Bar (With stand) (S)

    6. 100% Leak Testing

    7. Cleaning of Fill hose for water after leak testing

    8. Assembly of Adaptor Faucet Sub assy with

    Coupler Faucet (fitted at one end of the Hose)

    9. Final Inspecion

    10. Packing and Despatch

  • WORK INSTRUCTION FOR

    ADAPTOR FAUCET SUB ASSY

    WORK INSTRUCTION CHANDINI SUB ASSY

    Shree

    Mother

    Group

    PREPARED BY: APPROVED BY:

    DOC NO: SMG \ P \ WI \ 02

    REV NO : 01

    DATE : 10.03.07

    PAGE : 1 OF 2

    Scope :

    Applicable to Fill Hose assy section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1.

  • WORK INSTRUCTION FOR

    MACHINE STOPPAGE

    WORK INSTRUCTION FOR MACHINE STOPPAGE

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Close the Hopper

    2. Run the machine till Hopper material is empty

    3. Take out the injection unit back

    4. Remove the material from hopper

    5. Clean the hopper with Air or Cloth

    6. Purge out the remaining Hopper material in Small Size

    7. Use PP or PS granules and do further purging to ensure no

    traces of PA, PC,POM & PBT resin is left out in the barrel

    which will affects the barrel.

    8. Disconnect the mould water circulating lines

    9. Unload the mould as per the Mould Unloading procedure

  • WORK INSTRUCTION FOR

    MACHINE STOPPAGE

    WORK INSTRUCTION FOR MACHINE STOPPAGE

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Close the Hopper

    2. Run the machine till Hopper material is empty

    3. Take out the injection unit back

    4. Remove the material from hopper

    5. Clean the hopper with Air or Cloth

    6. Purge out the remaining Hopper material in Small Size

    7. Use PP or PS granules and do further purging to ensure no

    traces of PA, PC,POM & PBT resin is left out in the barrel

    which will affects the barrel.

    8. Disconnect the mould water circulating lines

    9. Unload the mould as per the Mould Unloading procedure

  • WORK INSTRUCTION FOR

    MACHINE STOPPAGE

    WORK INSTRUCTION FOR MACHINE STOPPAGE

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Close the Hopper

    2. Run the machine till Hopper material is empty

    3. Take out the injection unit back

    4. Remove the material from hopper

    5. Clean the hopper with Air or Cloth

    6. Purge out the remaining Hopper material in Small Size

    7. Use PP or PS granules and do further purging to ensure no

    traces of PA, PC,POM & PBT resin is left out in the barrel

    which will affects the barrel.

    8. Disconnect the mould water circulating lines

    9. Unload the mould as per the Mould Unloading procedure

  • WORK INSTRUCTION FOR

    MACHINE STOPPAGE

    WORK INSTRUCTION FOR MACHINE STOPPAGE

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Close the Hopper

    2. Run the machine till Hopper material is empty

    3. Take out the injection unit back

    4. Remove the material from hopper

    5. Clean the hopper with Air or Cloth

    6. Purge out the remaining Hopper material in Small Size

    7. Use PP or PS granules and do further purging to ensure no

    traces of PA, PC,POM & PBT resin is left out in the barrel

    which will affects the barrel.

    8. Disconnect the mould water circulating lines

    9. Unload the mould as per the Mould Unloading procedure

  • WORK INSTRUCTION FOR

    MACHINE STOPPAGE

    WORK INSTRUCTION FOR MACHINE STOPPAGE

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Close the Hopper

    2. Run the machine till Hopper material is empty

    3. Take out the injection unit back

    4. Remove the material from hopper

    5. Clean the hopper with Air or Cloth

    6. Purge out the remaining Hopper material in Small Size

    7. Use PP or PS granules and do further purging to ensure no

    traces of PA, PC,POM & PBT resin is left out in the barrel

    which will affects the barrel.

    8. Disconnect the mould water circulating lines

    9. Unload the mould as per the Mould Unloading procedure

  • WORK INSTRUCTION FOR

    MACHINE STOPPAGE

    WORK INSTRUCTION FOR MACHINE STOPPAGE

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Close the Hopper

    2. Run the machine till Hopper material is empty

    3. Take out the injection unit back

    4. Remove the material from hopper

    5. Clean the hopper with Air or Cloth

    6. Purge out the remaining Hopper material in Small Size

    7. Use PP or PS granules and do further purging to ensure no

    traces of PA, PC,POM & PBT resin is left out in the barrel

    which will affects the barrel.

    8. Disconnect the mould water circulating lines

    9. Unload the mould as per the Mould Unloading procedure

  • WORK INSTRUCTION FOR

    MACHINE STOPPAGE

    WORK INSTRUCTION FOR MACHINE STOPPAGE

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Close the Hopper

    2. Run the machine till Hopper material is empty

    3. Take out the injection unit back

    4. Remove the material from hopper

    5. Clean the hopper with Air or Cloth

    6. Purge out the remaining Hopper material in Small Size

    7. Use PP or PS granules and do further purging to ensure no

    traces of PA, PC,POM & PBT resin is left out in the barrel

    which will affects the barrel.

    8. Disconnect the mould water circulating lines

    9. Unload the mould as per the Mould Unloading procedure

  • WORK INSTRUCTION FOR

    MACHINE STOPPAGE

    WORK INSTRUCTION FOR MACHINE STOPPAGE

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Close the Hopper

    2. Run the machine till Hopper material is empty

    3. Take out the injection unit back

    4. Remove the material from hopper

    5. Clean the hopper with Air or Cloth

    6. Purge out the remaining Hopper material in Small Size

    7. Use PP or PS granules and do further purging to ensure no

    traces of PA, PC,POM & PBT resin is left out in the barrel

    which will affects the barrel.

    8. Disconnect the mould water circulating lines

    9. Unload the mould as per the Mould Unloading procedure

  • WORK INSTRUCTION FOR

    MACHINE STOPPAGE

    WORK INSTRUCTION FOR MACHINE STOPPAGE

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Close the Hopper

    2. Run the machine till Hopper material is empty

    3. Take out the injection unit back

    4. Remove the material from hopper

    5. Clean the hopper with Air or Cloth

    6. Purge out the remaining Hopper material in Small Size

    7. Use PP or PS granules and do further purging to ensure no

    traces of PA, PC,POM & PBT resin is left out in the barrel

    which will affects the barrel.

    8. Disconnect the mould water circulating lines

    9. Unload the mould as per the Mould Unloading procedure

  • WORK INSTRUCTION FOR

    MACHINE STOPPAGE

    WORK INSTRUCTION FOR MACHINE STOPPAGE

    nk\pid epWj;Jtjw;fhd nray;Kiw tpsf;fk ;.

    PREPARED BY: APPROVED BY:

    Scope :

    Applicable to Injection moulding section

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Close the HopperHopper - I %lTk;.

    2. Run the machine till Hopper material is emptynkl;bupay; midj;Jk; fhypahFk; tiu cw;gj;jpia njhluTk;.

    3. Take out the injection unit backM/c - d; ,d;n[f;\d; Adpl;il ntspNa vLf;fTk;.

    4. Remove the material from hopperfhg;gupypUe;J nkl;bupaiy ,wf;fTk;.

    5. Clean the hopper with Air or Clothfhg;giu mKj;jfhw;W my;yJ Jilg;ghd; cjtpAld; Rj;jk; nra;aTk;.

    6. Purge out the remaining Hopper material in Small Sizefhg;gupYs;s nkl;bupaiy rpwpa mstpyhd Purging - fhf vLf;fTk;.

    7. Use PP or PS granules and do further purging to ensure no

    traces of PA, PC,POM & PBT resin is left out in the barrel

    which will affects the barrel.PA, PC, POM & PBT kw;Wk; ,ju Engeering MaterialcgNahfg;gLj;jpapUe;jhy; PP my;yJ PS nkl;bupaiy cgNahfpj;J Nkw;$upa nkl;bupay; vJTk; Nguypy; ,y;yhjthW gu;[pq; nra;a Ntz;Lk;.

    8. Disconnect the mould water circulating linesNkhy;by; ,izf;fg;lLs;s Water Line - fis fow;wNtz;Lk;.

    9. Unload the mould as per the Mould Unloading procedureNkhy;il Nkhy;L ,wf;Ftjw;fhd nray; Kiw tpsf;fj;jpy; Fwpg;gpl;Ls;s gb ,wf;fTk;.

  • WORK INSTRUCTION FOR

    MACHINE STOPPAGE

    PREPARED BY: APPROVED BY:

    Scope :

    Responsibility:

    Operators \ Trainee \ Supervisor \ Engineer

    Description :

    1. Close the Hopper

    2. Run the machine till Hopper material is empty

    3. Take out the injection unit back

    4. Remove the material from hopper

    5. Clean the hopper with Air or Cloth

    6. Purge out the remaining Hopper material in Small Size

    7. Use PP or PS granules and do further purging to ensure no

    traces of PA, PC,POM & PBT resin is left out in the barrel

    which will affects the barrel.

    8. Disconnect the mould water circulating lines

    9. Unload the mould as per the Mould Unloading procedure