woodend industrial park > building ii

4
Accelerating success. Woodend Industrial Park > Building 2 9601 WOODEND ROAD, EDWARDSVILLE, KANSAS NEW TO THE MARKET ED ELDER sior DIR +1 816 556 1135 [email protected] DOUG HEDRICK sior, ccim DIR +1 816 556 1136 [email protected] JOHN STAFFORD sior, ccim DIR +1 816 556 1184 john.staff[email protected]

Upload: doug-hedrick

Post on 09-Feb-2017

45 views

Category:

Real Estate


1 download

TRANSCRIPT

Page 1: Woodend Industrial Park > Building II

Accelerating success.

Woodend Industrial Park > Building 2 9601 WOODEND ROAD, EDWARDSVILLE, KANSAS

NEW TO THE MARKET

ED ELDER siorDIR +1 816 556 [email protected]

DOUG HEDRICK sior, ccimDIR +1 816 556 [email protected]

JOHN STAFFORD sior, ccimDIR +1 816 556 [email protected]

Page 2: Woodend Industrial Park > Building II

Woodend Industrial Park > Building 29601 WOODEND ROAD, EDWARDSVILLE, KANSAS

Total Building SF: 270,000± SF

Available SF: 62,100 - 191,700± SF

Site Size: 17 acres

Building Dimensions: 270’ x 1,000’

Lease Rate: $4.60 - $4.75 PSF, net

Estimated Operating Expenses:

Taxes: $0.66 PSFInsurance: $0.10 PSFCAM: $0.25 PSF

Clear Height: 32’ - 34’

Column Spacing: 52’6” x 60’ (speed bays 60’ x 60’)

Lighting: T5 lighting

Sprinkler Specification: ESFR

Loading Doors: 13 dock-high (9’ x 10’), (for vacancy)1 drive-in (12’ x 14’), (for vacancy)

Truck Court: 138’

Door Knockouts: Additional 21 dock doors & 1 drive-in door available, (for vacancy)

Dock Equipment: 6 docks with pit levelers - 40,000 lbs., (for vacancy)

Dock Seals: Included in base building

Dock Bumper: Included in base building

Roof Specification: TPO - 45 mil / R 20 rating

Floor Thickness:

7” reinforced concrete (dowel baskets at control joints, diamond dowel plates at construction joints) (350 PSF / forklift loading 17,000 lbs / rack loading 6,500 lbs per post)

Warehouse Heating: Positive pressure direct gas-fired make-up air handling units minimum 60° @ 0° - outside

Electrical: 800 amps expandable (480/277 3-phase, 4-wire 60 cycles)

Utilities:

Electric: Westar EnergyWater: BPUGas: Atmos EnergySewer: City of Edwardsville

Auto Parking: 72 stalls, (for vacancy)

Trailer Parking: 55 future trailer stalls, (for vacancy)

Floor Sealer: Ashford Formula

Walls: Insulated concrete sandwich panel. R-14 rating

R.E. Tax Abatement: 60% for ten (10) years

Zoning: I-1

Access: Excellent access to I-435 and I-70 via Woodend Road

Paving & Surfacing:

Auto Parking: 4.5” asphalt supported by 6” crushed stone, 4.5” base course, 1.5” surface course

Truck Court: Concrete section - 8” concrete supported by 6” crushed stone Asphalt section - 6” asphalt supported by 8” crushed stone, 4.5” base course, 1.5” surface course

Ownership: Woodend Industrial II, LLC - a VanTrust Real Estate Development

Page 3: Woodend Industrial Park > Building II

DRIVE-IN 11 DOCK DOORS 2 DOCK DOORS 11 DOCK DOORS DRIVE-IN

53

105

9

61Woodend II191,700 SF Available

Woodend Road

(270’ x 710’)

(70 Future Trailer Spaces)

52.5’

60’

138’ Future parking

LEASED

Woodend Industrial Park > Building 2SITE PLAN

Page 4: Woodend Industrial Park > Building II

Accelerating success.

Colliers International4520 Main StreetSuite 1000Kansas City, MO 64111www.colliers.com

This document has been prepared by Colliers International for advertising and general information only. Colliers International makes no guarantees, representations or warranties of any kind, expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. Any interested party should undertake their own inquiries as to the accuracy of the information. Colliers International excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from. This publication is the copyrighted property of Colliers International and/or its licensor(s). ©2015. All rights reserved.

5-Mile

10-Mile

MissouriKansas

20-Mile

Site

NEW BNSF INTERMODAL

KCI AIRPORT

KANSAS CITY CBD

LEGENDS/KS SPEEDWAY

= 1 Mile

Excellent Interstate Access

= 5 Miles

= 8 Miles

= 4 Miles

= 7 Miles

GM FAIRFAX

Fastenal

Carlisle

Building 2 Building 1369,000 SF

Millard

Office Max

FedEx

Earp Distribution

International Paper

Old Dominion

Lagasse, INC.

Woodend Road

ED ELDER siorDIR +1 816 556 [email protected]

DOUG HEDRICK sior, ccimDIR +1 816 556 [email protected]

JOHN STAFFORD sior, ccimDIR +1 816 556 [email protected]

Woodend Industrial Park > Building 29601 WOODEND ROAD, EDWARDSVILLE, KANSAS