No. 0104-1112-114-2 www.schneider-holz.com WOOD FIBER EXTERNAL THERMAL INSULATION COMPOSITE SYSTEM Installation Guidelines Best things made of wood! Best things made of wood!

Upload: others

Post on 18-May-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

No. 0104-1112-114-2

www.schneider-holz.com

WOOD FIBER EXTERNAL THERMALINSULATION COMPOSITE SYSTEMInstallation Guidelines

Best things made of wood!Best things made of wood!

Page 2: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

2

Wood fiber insulation board by best woodThe right insulation boards for every application

MULTITHERM 140Insulation board -

universal application

MULTITHERM 110Insulation board -

universal application

TOPFrontage insulation

WALL 140Render baseboard

FLEX 50Flexible insulation board

FLEX 50FLEXIBLE DÄMMUNG

FLEX 50Flexible insulation board

WALL 180Render baseboard for timber

framed constructions

TOP 140 / 160 / 180 / 220Weatherproof insulation board

under roof

ROOM 140Render baseboard for

interior application

FLOOR 140 / 220Floor insulation

ROOM 140Render baseboard for

interior application

Page 3: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

3

TABL

E OF

CON

TENT

S

System constructionFor timber-framed constructions ........................................................................................................

For continuous and load-bearing solid timber substrates ..................................................................

For mineral substrates .......................................................................................................................

Product overview of wood fiber insulation boardsWall 140 for solid timber and masonry for exterior applications .......................................................

Wall 180 for timber-framed constructions for exterior applications ...................................................

Wall 180 reveal board ........................................................................................................................

Accessories for wood fiber insulation boardsWide-back staples ..............................................................................................................................

Ejotherm STR H screw-in anchor for insulation boards for timber construction .................................

Ejotherm STR U 2G screw-in anchor for insulation boards for concrete and masonry .......................

FDM adhesive sealant for joints .........................................................................................................

Base profiles .......................................................................................................................................

Base profile extensions .......................................................................................................................

Base connecting profile for inner corners ...........................................................................................

Base connecting profile for outer corners .........................................................................................

illmod 600 joint insulation tape ........................................................................................................

Render systembest wood adhesive and reinforcing mortar (UP)................................................................................

best wood mineral final render (MOP) ..............................................................................................

best wood silicone-resin final render (SOP) ........................................................................................

Silicone-resin paint .............................................................................................................................

Accessories for the render systemSchneider fiber reinforcement mesh....................................................................................................

Reinforcing arrow ...............................................................................................................................

Corner bead with fiber mesh ..............................................................................................................

Architrave bead with telescope function and sealing lip.....................................................................

Drip bead ............................................................................................................................................

Render stop bead ...............................................................................................................................

Sheet metal connection profile ...........................................................................................................

Expansion joint bead for corners ........................................................................................................

Expansion joint bead for continuous surfaces ....................................................................................

CONTENTS

Seite 06

Seite 06

Seite 07

Seite 08

Seite 08

Seite 09

Seite 10

Seite 10

Seite 10

Seite 10

Seite 11

Seite 11

Seite 11

Seite 11

Seite 11

Seite 12

Seite 12

Seite 13

Seite 13

Seite 14

Seite 14

Seite 14

Seite 14

Seite 15

Seite 15

Seite 15

Seite 15

Seite 15

Page 4: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

4

TABLE OF CONTENTS

Transportation and storage of best wood WALL 140 / 180 wood fiber insulation boards and best wood render system .......................................................................................

General information on board installation ............................................................................................

Installation of WALL 180 in timber-framed constructions ....................................................................

Installation of WALL 140 on continuous and load-bearing solid timber substrates .............................

Installation of WALL 140 on solid mineral substrates ...........................................................................

Minimum lengths of the fasteners ........................................................................................................

Minimum quantity of fasteners required for installation of WALL 180 in timber-framed constructions

Minimum quantity of fasteners required for installation of WALL 140

on continuous and load-bearing solid timber substrates ......................................................................

Minimum quantity of fasteners required for installation of WALL 140

on mineral substrates ..........................................................................................................................

Window connections and window sillsGeneral information ..............................................................................................................................

Window connection and installation of the window sill .......................................................................

Important information ..........................................................................................................................

Installation guidelines for the best wood render systemGeneral information ..............................................................................................................................

Checking the substrate .........................................................................................................................

Installation of additional reinforcementn ..............................................................................................

Application of the base coat and fiber reinforcement mesh in two steps ............................................

Application of the base coat .................................................................................................................

Embedding the fiber reinforcement mesh .............................................................................................

Application of the base coat and fiber reinforcement mesh in one step...............................................

Application of the final render ..............................................................................................................

Application of the leveling coat ............................................................................................................

Maintenance of the facade ...................................................................................................................

Page 16

Page 16

Page 18

Page 19

Page 20

Page 21

Page 22

Page 23

Page 25

Page 26

Page 27

Page 30

Page 31

Page 31

Page 32

Page 32

Page 32

Page 32

Page 33

Page 33

Page 34

Page 34

Installation guidelines for best wood WALL 140 / 180 wood fiber insulation boards

Page 5: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

5

Construction detailsBase point

outside splash water range with ≥ 30 cm between ground surface and base point .........................

within splash water range with gravel bed and ≥ 15 cm between ground surface and base point ..

within splash water range with gravel bed and ≥ 5 cm between ground surface and base point ....

Patio door level with grating ..............................................................................................................

Window jointwith 20 mm reveal board ...................................................................................................................

with 40 mm reveal board....................................................................................................................

without reveal board and with roller shutter guide rail ....................................................................

on window sill with second sealing layer ..........................................................................................

on window sill with second sealing layer – 3-D view .......................................................................

Window lintel .....................................................................................................................................

Exposed projecting roller shutter housing, version 1 .........................................................................

Exposed projecting roller shutter housing, version 2..........................................................................

Projecting roller shutter housing for plastering over ..........................................................................

Venetian blind facing .........................................................................................................................

Storey transitions for pre-fabricated components ..............................................................................

Roof connection

Eaves with adjustable hanger ............................................................................................................

Eaves without adjustable hanger .......................................................................................................

Verges ................................................................................................................................................

on dormer cheeks ...............................................................................................................................

Monopitch roof on an exterior wall ...................................................................................................

Structural expansion joints

Corner joints on existing buildings ....................................................................................................

Continuous joints on existing buildings .............................................................................................

TABL

E OF

CON

TENT

S

Page 36

Page 37

Page 38

Page 39

Page 40

Page 41

Page 42

Page 43

Page 44

Page 45

Page 46

Page 47

Page 48

Page 49

Page 50

Page 51

Page 52

Page 53

Page 54

Page 55

Page 56

Page 57

Page 6: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

6

Classical timber-framed construction with an insulated frame construction. OSB boards on the inside for bracing and for a vapor barrier and airtight seal with stapled wood fiber insulati-on boards for a service cavity. Renderable best wood WALL 180 wood fiber insulation board on the outside.

EXAMPLE OF INSTALLATION

best wood external rendering

best wood WALL 180 60 mm

best wood FLEX 50 between studs 140 mm

OSB board 15 mm

best wood ROOM 140 60 mm

Internal plastering

EXAMPLE OF INSTALLATION

best wood external rendering

best wood WALL 140 160 mm

Cross laminated timber wall 120 mm

best wood ROOM 140 60 mm

Internal plastering

Cross laminated timber wall for the structural load-bearing structure and for a vapor barrier and airtight seal. Stapled wood fiber insulation boards on the inside for a service cavity. Renderable best wood WALL 140 wood fiber insulation board on the outside.

FOR TIMBER-FRAMED CONSTRUCTIONS

FOR CONTINUOUS AND LOAD-BEARING SOLID TIMBER SUBSTRATES

SYSTEM CONSTRUCTION

Page 7: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

7

EXAMPLE OF INSTALLATION

best wood external rendering

best wood WALL 140 160 mm

Calcium silicate masonry walling 240 mm

best wood ROOM 140 60 mm

Internal plastering

Wood fiber insulation board fastened to masonry with adhesive on the inside for a service cavity. Renderable best wood WALL 140 wood fiber insulation board fastened with anchors.

FOR MINERAL SUBSTRATES

SYST

EM C

ONST

RUCT

ION

Page 8: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

8

Density 140 kg/m³

Nominal value of thermal conductivity λD 0,040 W/(m·K)

Rated value of thermal conductivity λ 0,042 W/(m·K)

Water vapor diffusion resistance μ 3

Thickness 60-200 mm

Approved insulation material thicknesses (ETICS)

60-160 mm

Approved ETICS length all board formats

Board format 580 x 1250, 1500, 2000 mm600 x 800,1250 mm

Edge profiles tongue+groove, shiplap edge, stump

best wood WALL 140 for continuous and load-bearing solid timber substrates and mineral substrates.

WOOD FIBER INSULATION BOARDS

WALL 140

Density 180 kg/m³

Nominal value of thermal conductivity λD 0,042 W/(m·K)

Rated value of thermal conductivity λ 0,044 W/(m·K)

Water vapor diffusion resistance μ 3

Thickness 40-160 mm

Approved insulation material thicknesses (ETICS)

60-100 mm

Approved ETICS length all board formats up to 2000 mm

Board format 580 x 1250, 1500, 2000, 2500 mm

Edge profiles Tongue+groove

WALL 180

PRODUCT OVERVIEW

best wood WALL 180 for installation on timber-framed constructions

Page 9: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

9

Density 180 kg/m³

Nominal value of thermal conductivity λD 0,042 W/(m·K)

Rated value of thermal conductivity λ 0,044 W/(m·K)

Water vapor diffusion resistance μ 3

Thickness 20 and 40 mm

Board format 600 x 1250, 1500, 2000, 2500 mm

Edge profiles stump

WALL 180 reveal board

WOO

D FI

BER

INSU

LATI

ON B

OARD

SPR

ODUC

T OV

ERVI

EW

best wood WALL 180 reveal board for cladding the window reveal.

Page 10: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

10

Wide-back staples for fastening best wood WALL 140 / 180 boards to continuous and load-bearing solid timber substrates and for use on timber-framed constructions.

Length 75 -150 mm

Effective penetration depth in solid wood substrates

≥ 30 mm

Made of stainless steel or equivalent

Screw-in insulation board anchor for surface fixed installation on continuous load-bearing solid timber substrates and for timber-framed constructions.

Pre-assembled universal screw-in anchor for surface fixed installa-tion in concrete and masonry. UV exposure from sunlight on unpro-tected anchor: ≤ 6 weeks.

Insulation anchor plate with polystyrene Ø

Ø 60 mm

Effective penetration depth in dependency on service class, see p. S. 21

≥ 25 mm bzw. ≥ 65 mm

Available lengths Ø 6 mm 80, 100, 120, 140, 160, 180, 200, 220, 240 mm

PRODUCT OVERVIEW

Wide-back staples

Assembly adhesive for fasten-ing reveal boards and for sealing joints in the wall insulation. The assembly adhesive can be pla-stered over.

For joint widths of 2 - 5 mm

290 ml cartridge 440 g Content

FDM adhesive sealant for jointsEjotherm STR H screw-in anchor for in-sulation boards for timber construction

Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry

ACCESSORIES FOR WOOD FIBER INSULATION BOARDS

Insulation anchor plate with polystyrene cap Diameter

Ø 60 mm

Effective penetration depth ≥ 35 mm

Available lengths for diameters of 6 mm

80, 100, 120, 140, 160, 180, 200, 220, 240 mm

Page 11: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

11

Extension for the base profile for an additional 40 mm of insulati-on material thickness. Base profile 160 mm + 40 mm base profile extension = 200 mm wide.

Plastic base rail system with base section and clip-on mesh rail.

Base profile with width of 60-160 mm

Base profile extension for a width of 200 mm

Corner connecting profile for per-fectly fitting outer corners of base profiles.

Corner connecting profile for per-fectly fitting inner corners of base profiles.

Pre-compressed expanding foam insulation tape for sealing open joints and connections in fron-tages against driving rain while permitting vapor diffusion. UV-resistant and watertight up to 600 Pa.

Typ 15/3-7, joint width 3 - 7 mm 8,0 lfm/ roll

Typ 15/5-10, joint width 5 - 10 mm 5,6 lfm/roll

Typ 20/10-18, joint width 10 - 18 mm 6,5 lfm/roll

Base connecting profile for outer corners

illmod 600 UV-resistant joint insulation tape

Base connecting profile for inner corners

ACCE

SSOR

IES

FOR

WOO

D FI

BER

INSU

LATI

ON B

OARD

SPR

ODUC

T OV

ERVI

EWLength 2,0 m

Length 2,0 m

Width 60, 80, 100, 120, 140, 160 mm

Each PU contains 25 slot-in connectors, butt joint connector,2 corner connecting profiles for outer

corners and 1 corner connecting profile for inner corners

Base profile with width of 40 mmAluminium base rail system with clip-on mesh rail.

Length 2,0 m

Width 40 mm

Rail connector 100 units / pack

Bag 10 units

Bag 10 units

Page 12: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

12

RENDER SYSTEM

best wood adhesive and reinforcing mortar with organic lightweight ag-gregates on a white cement base is a water vapor-permeable, water-repellent and fiber-reinforced adhesive and filling mortar which is easy to use and highly durable. It has high adhesive strength and excellent elasticity and as a filler it enhances the pressure resistance of the system as a whole. Schneider UP adhe-sive and reinforcing mortar is highly suitable for machine processing.

Consumption bonding ca. 3,0 - 3,5 kg/m²approx ca. 4,0 - 5,0 kg/m²

Mixing ratio approx. 9.5 liters of water per sack

Suitable for machine processing

yes

Processing temperature minimums +5°C

Storage trocken, auf Paletten

Storage life do not exceed 6 months

PU paper sack 25 kg

Scraped surface plaster texture 2,0 mm | 3,0 mm

Consumption 2,5 kg/m² | 3,5 kg/m²

Scraped fluted plaster texture 2,0 mm | 3,0 mm

Consumption 2,5 kg/m² | 3,5 kg/m²

Mixing ratio

Scraped surface plaster texture approx. 10,0 -11,0 liters of water per sack

Scraped fluted plaster texture approx. 8,00 Liter liters of water per sack

Suitable for machine processing yes

Processing temperature minimum +5°C

Storage dry, on pallets

Storage life do not exceed 6 months

PU paper sack 25 kg

best wood mineral plaster is a breatha-ble, water-repellent and moisture re-gulating final render with a brilliant surface texture. Having extremely high water retentivity it is guaranteed that it can be left open for a long time, making processing very easy and efficient.

PRODUCT OVERVIEW

best wood ADHESIVE AND REINFORCING MORTAR (UP)

best wood MINERAL FINAL RENDER (MFR) FOR SCRAPED SURFACE OR SCRAPED FLUTED PLASTER TEXTURES

Page 13: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

13

best wood silicone-resin plaster is wea-therproof and watertight against dri-ving rain and may be used for decora-tive finishing on exteriors and interiors. It is easy to process, highly adhesive and shockproof, watertight against dri-ving rain, water-repellent, low in tensi-on, vapor-permeable and resistant to alkalis. The silicone-resin final render is only available with ETICS approval for installation of WALL 140 boards on mi-neral substrates.

Scraped surface plaster texture

2,0 mm | 3,0 mm

Consumption 3,0 kg/m² | 4,0 kg/m²

Scraped fluted plaster texture

2,0 mm | 3,0 mm

Consumption 3,0 kg/m² | 4,0 kg/m²

Processing temperature minimum +5°C

Storage cool, but in a frost-free place

Storage life do not exceed 6 months

PU plastic tub 25 kg

best wood silicone-resin paint is a wa-ter-repellent, full-bodied, extremely wa-ter vapor-permeable and dirt-repellent facade paint. It retains its color well, has a very high covering capacity and is easy to apply without lap marks. Maxi-mum water repellence prevents marks even in heavy rain. Fungicide/algicide can be added to best wood silicone-resin paint at the factory if required.

Bonding agent base silicone-resin emulsion

Pigment base titanium dioxide

Use interiors and exteriors

Surface (similar to mineral paint)

matt, smooth and tactile

Consumption per coat 150 - 200 ml/m²

Mixing ratio with approx. 10% water

Processing/application by brush, roller, airless spraying

Processing temperature minimum +5°C

Storage cool, but in a frost-free place

Storage life do not exceed 6 months

PU plastic tub 12,5 l

best wood SILICONE-RESIN FINAL REN-DER (SRFR) FOR SCRAPED SURFACE OR SCRAPED FLUTED PLASTER TEXTURES

best wood SILICONE-RESIN PAINT

REND

ER S

YSTE

MPR

ODUC

T OV

ERVI

EW

Page 14: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

14

ACCESSORIES FOR THE RENDER SYSTEM

PRODUCT OVERVIEW

Alkali-resistant glass fiber mesh, non-slip with high tear-resistance.

Consumption 1,1 lfm/m²

Mesh width 4 x 4 mm

Width 100 cm

Roll length 50 m

Corner bead with fiber mesh for diagonal reinforcement on buil-ding openings.

Mesh width 4 x 4 mm

Plastic profile with integrated fi-ber mesh for forming corners and edges.

Length 2,5 m

May be used for forming con-nection joints (e.g. window/door frames, etc.). The telescoping mo-vement function (horizontal and vertical) allows greater expansion in the connection area to be ab-sorbed.

Length 1,4 / 2,4 m

best wood fiber reinforcement mesh

best wood corner bead with fiber mesh

best wood reinforcing arrow

Best wood architrave bead with telescope function and sealing lip

Page 15: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

15

Plastic profile with integrated fi-ber mesh for forming horizontal render stops.

Length 2,5 m

Plastic profile for forming move-ment joints on offset wall surfaces (inner corners).

Length 2,0 m

best wood drip bead

best wood expansion joint bead for corners

Plastic profile for forming render stops.

Length 2,0 m

best wood render stop bead

Clip-on profile with drip and in-tegrated fiber mesh for flexible connections between plaster and sheet metal.

Length 2,0 m

best wood sheet metal connec-tion profile with drip

Plastic profile for forming move-ment joints on continuous wall surfaces.

Length 2,0 m

best wood expansion joint bead for conti-nuous surfaces

ACCE

SSOR

IES

FOR

THE

REND

ER S

YSTE

M

PROD

UCT

OVER

VIEW

Page 16: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

16

TRANSPORTATION AND STORAGE

Transportation and storage of best wood WALL 140 / 180 boards and best wood render system

For technical reasons and reasons relating to building regu-lations, as well as warranty considerations, it is important to ensure that only best wood system components or approved materials are used.

The system components should be checked in an incoming goods inspection on delivery arrival and delivery notes and packing specifications should be kept in a safe place for fu-ture reference.

Sufficient storage space which is protected from the weather must be available at the place of delivery. The material must always be stored in a dry place where it is protected from UV exposure and mechanical damage.

WALL 140 / 180 products are delivered stacked flat on pallets. A fork lifter or crane with suitable lifting gear must be ready on site for unloading the pallets on delivery. These should also be used for all subsequent transportation of the pallets.

A maximum of two packs of small format WALL 140 / 180 products or three packs of large format versions are allowed to be stacked on top of each other. A sufficient number of sleepers must be used for stacking purposes in order to pre-vent excessive pressure, as such pressure could cause dents in the WALL 140 / 180 boards at the top or bottom.

Paste-like plastering components need to be protected from frost and direct sunlight both during transportation and while in storage. In addition the shelf-life given on the containers has to be observed.The packs of plaster must not be stored at the building site without supports underneath and foil covering on top. The shelf-life of 6 months must not be exceeded.

INSTALLATION GUIDELINES

best wood WALL 140 / 180 wood fiber insulation boards must always be stored and installed in dry locations. Once installed the boards have to be protected from direct expo-sure to moisture.

For the bottom edge connection of the WALL 140 / 180 board, use a base rail. Ensure that a splash water zone of ≥ 30 cm above final ground level is provided in the area of the base unless other additional measures are taken. WALL 140 / 180 boards are not designed to be used in the ground.

All standard cutting equipment for cutting wood, such as bench-type circular saws and hand-held circular saws, can

be used to cut WALL 140 / 180 boards to size. Given the dust which is generated when cutting WALL 140 / 180 boards, it is advisable to use a vacuum extractor.

Make sure that the groove on the board always faces down-wards when installing Wall 140 / 180 boards. This will en-sure that any rainwater during construction will run off ef-fectively and will not remain in the recess. WALL 140 / 180 boards can be used on both sides.

General information and instructions for the installation of best wood wood fiber insulation boards

Page 17: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

17

Avoid board edges at the corners of window openings, otherwise there is a risk of notch cracks developing in this area. Install the boards on a staggered basis with an offset of at least 25 cm to each other vertically (avoid cross joints). The edges of the board must be precisely fitted together at all joint areas and should be pressed tightly together as far as possible.

Joints of up to 2 mm at the board edges can be plastered over. Joints of 2-5 mm are to be sealed with best wood FDM adhesive sealant for joints. Seal all joints greater than 5 mm with strips of best wood WALL 140 / 180 wood fi-ber insulation board. On outer corners and window edges the WALL 140 / 180 boards must have a stump edge. Any tongue-and-groove sections must be cut back before the boards are installed.

All joints with adjoining elements of the building must be tightly sealed against driving rain and wind with render stop connection profiles and joint insulation tape.

A second sealing layer in the form of a watertight and heat-resistant foil should always be installed beneath window sills. The end pieces of the window sills must be capable of absorbing movements in the rendered facade and the win-dow sill. The installation of window sill end pieces with sli-ding bearings is recommended. When installing the window

sill, joint insulation tape must be fitted to all the connection joints between the sill and the WALL 140 / 180 boards.

If installing over vertically or horizontally changing substra-tes, use movement/expansion joints.

The render system must be installed no later than 8 weeks after the WALL 140 / 180 boards are installed. If this is not possible, cover the wall with a tarpaulin, making sure air can circulate behind the tarpaulin.

Examine the WALL 140 / 180 boards for moisture and sur-face stability before applying the render. The board moisture content must not exceed 13% of the weight (if the setting on the electronic moisture meter is for spruce/pine, the ma-ximum permitted value is 19.5%). Unevenness in the exteri-or surface of the boards must be smoothed out by sanding, e.g. with a K16 sanding board.

Countersink wide-back staples 1 mm into the boards. If screw-in insulation board anchors or fasteners are used, the anchor plate must be flush with the surface of the board.

If loose insulation fill which is blown into the building ca-vities is to be used, the filling process must be completed before the render is applied.

TRAN

SPOR

TATI

ON A

ND S

TORA

GEIN

STAL

LATI

ON G

UIDE

LINE

S

≥25 cm

Install by staggering the boards by at least 25 cm. Avoid joints between boards at the corners of openings!

CORRECT√

INCORRECT x

Page 18: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

18

Examine the substrate before starting to install the WALL 180 boards. The timber-framed construction must be dry (wood moisture content below 18%), clean and level (no differences in height).

INSTALLATION OF WALL 180 IN TIMBER-FRAMED CONSTRUCTIONS

Checking the substrate

The base section of the base rail must be aligned horizontally and fastened to the wooden sill with spacing of approx. 30 cm and must be connected with butt joint connectors at all the longitu-dinal ends.

At the outer and inner corners, join the base sections together with miter-cut joints. For the clip-on mesh rails, pre-assembled corner connecting profiles are available. They can also be miter-cut as an alternative.

All butt joints on the base profiles must be sealed with durable, weatherproof and temperature-stable adhesive tape, e.g. Tescon Vana. The best wood WALL 180 boards must be a minimum of 30 cm above final ground level unless other additional measures are taken.

Fastening the base rail

The groove at the bottom of the boards in the first row of WALL 180 boards has to be cut off and the boards then fitted fully into the base rail. It is advisable to use a marking chord to check that the top of the first row is correctly aligned in the horizontal.

Installing the first row of WALL 180 boards in the area of the base

Fasten the WALL 180 boards directly to timber studs, which must have widths of at least 60 mm, using wide-back staples or screw-in anchors for insulation boards. The number of fasteners required must be determined in accordance with DIN 1055-4 and they must be distributed accordingly over the timber stud – see installation ex-ample for WALL 180 boards for timber-framed constructions. Each WALL 180 board must be fastened to at least two timber studs.

The edges of the boards must be precisely fitted at all joint are-as and should be pressed tightly together as far as possible. In the area of storey joints it is essential that open joints are avo-ided, because they can encourage the formation of creases. As an alternative, fitting pieces which are fastened to the sill and head rail can also be used – see detail of the ceiling joint.

The fasteners need to be anchored to a sufficient depth in the tim-ber studs. The effective minimum penetration depth of the wide-back staples is ≥ 30 mm and for the screw-in anchors for insulation boards it is ≥ 35 mm. The boards must be installed on a staggered basis with a minimum offset of 25 cm to each other vertically. The boards do not need to have indented joints at the outer corners, but they must be precisely fitted together. Joints should be avoided.

Installing the WALL 180 boards

Page 19: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

19

Examine the substrate before starting to install the WALL 140 boards. The solid timber substrate must be dry (wood moisture content below 18%), clean and level (no differences in height).

INSTALLATION OF WALL 140 ON CONTINUOUS AND LOAD-BEARING SOLID TIMBER SUBSTRATES

Checking the substrate

Fastening the base rail

The groove at the bottom of the boards in the first row of WALL 140 boards has to be cut off and the boards then fitted fully into the base rail. It is advisable to use a marking chord to check that the top of the first row is correctly aligned in the horizontal.

Fasten the WALL 140 boards directly to the load-bearing solid timber substrate using wide-back staples or screw-in anchors for insulation boards. The number of fasteners re-quired must be determined in accordance with DIN 1055-4 and they must be distributed accordingly over the WALL 140 – see installation example for WALL 140 boards on load-bearing solid timber substrates.

Take care to ensure that the WALL 140 boards do not move apart when using screw-in anchors for insulation boards for fastening them at the butt joints.

The edges of the boards must be precisely fitted at all joint areas and should be pressed tightly together as far as pos-sible.

The fasteners need to be anchored to a sufficient depth in the solid timber substrate. The effective minimum penetra-tion depth of the wide-back staples is ≥ 30 mm and for the screw-in anchors for insulation boards it is ≥ 35 mm. The boards must be installed on a staggered basis with a minimum offset of 25 cm to each other vertically. The boards do not need to have indented joints at the outer corners, but they must be precisely fitted together. Joints should be avoided.

As an alternative to the WALL 140 board with a tongue-and-groove edge, a WALL 140 board with a stump edge can also be fastened to the solid timber substrate.

Installing the WALL 140 boards

Installing the first row of WALL 140 boards in the area of the base

INST

ALLA

TION

OF

WAL

L 14

0 / 1

80

INST

ALLA

TION

GUI

DELI

NES

The base section of the base rail must be aligned horizontally and fastened to the solid timber substrate with spacing of approx. 30 cm and must be connected with butt joint connectors at all the longitudinal ends.

At the outer and inner corners, join the base sections together with miter-cut joints. For the clip-on mesh rails, pre-assembled corner connecting profiles are available. They can also be miter-cut as an alternative.

All butt joints on the base profiles must be sealed with durable, weatherproof and temperature-stable adhesive tape, e.g. Tescon Vana. The best wood WALL 140 boards must be a minimum of 30 cm above final ground level unless other additional measures are taken.

Page 20: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

20

Examine the substrate before starting to install the WALL 140 boards. The substrate must be dry, clean and level. Remove all loose plaster and cover over the flaws with suitable material. Areas of unevenness in the substrate of up to 10 mm can be effectively smoothed out with best wood adhesive and reinforcing mortar. Larger areas of unevenness need to be smoothed out with leveling plaster or similar.

The wall temperature and ambient temperature must be a mini-mum of +5°. For renovation work on older buildings, the structu-ral conditions of the building need to be investigated with parti-cular regard to structural and physical considerations in relation to the planned ETICS. The masonry must be free of rising damp.

INSTALLATION OF WALL 140 ON SOLID MINERAL SUBSTRATES

Checking the substrate

Fastening the base rail

Using the spot-and-bead method, apply a bead of adhesive mor-tar of about 5 cm in width all around the edge of the WALL 140 board and 2-3 spots of adhesive mortar to the middle as well, such that at least 40% of the board’s surface is glued. This me-thod of bonding prevents ventilation at the back of the insulation material and the ingress of moisture to the ETICS by convection.

Fastening and bonding wood fiber insulation boards in the area of the base

For the installation of the first row of boards, the WALL 140 board has to be fitted fully into the base rail. Particular care needs to be taken here to ensure that no adhesive gets between the vertical edge of the base rail and the Wall 140 board.

It is advisable to use a marking chord to check that the top of the first row is correctly aligned in the horizontal.

The WALL 140 board requires a little pushing to fit it onto the base. To ensure firm contact with the wall, a rubber hammer can be used to tap the board against the wall. The boards must be installed on a staggered basis with a minimum offset of 25 cm to each other vertically.

Once the boards have been fitted, immediately remove any adhe-sive which has escaped at the sides. Make sure that no adhesive gets between the butt joints of the boards. Also make sure that the boards are installed with a precise fit. The boards must have indented joints at the outer corners.

In addition to being fastened to the substrate with adhesive, the WALL 140 boards also have to be fastened with screw-in anchors for insulation boards. The adhesive has to be completely dry first. The number of fasteners required must be determined in accor-dance with DIN 1055-4 and they must be distributed accordin-gly over the WALL 140 – see installation example for WALL 140 boards on solid mineral substrates. The screw-in anchors for insu-lation boards must be fastened in the surface area of the boards only, not in the joints between the boards.

The insulation board anchors need to be anchored to a suffici-ent depth in the substrate. The effective embedment depth of the screw-in anchors for insulation boards for service category A-D is ≥ 25 mm and for service category E it is ≥ 65 mm.

Fastening anchors to the wood fiber insulation boards

The base section of the base rail must be aligned horizontally and fastened to the solid timber substrate with spacing of approx. 30 cm and must be connected with butt joint connectors at all the longitudinal ends.

At the outer and inner corners, join the base sections together with miter-cut joints. For the clip-on mesh rails, pre-assembled corner connecting profiles are available. They can also be miter-cut as an alternative.

All butt joints on the base profiles must be sealed with durable, weatherproof and temperature-stable adhesive tape, e.g. Tescon Vana. The best wood WALL 180 boards must be a minimum of 30 cm above final ground level unless other additional measures are taken.

Page 21: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

21

INST

ALLA

TION

OF

WAL

L 14

0 / 1

80

INST

ALLA

TION

GUI

DELI

NES

Installation substrate

Timber-framed con-structions or solid timber substrates

Timber-framed con-structions or solid timber substrates

Mineral substrates in new buildings 1)

Mineral substrates in existing buildings 2)

Insulation material thickness WALL 140

/ 180 in mm

Haubold or equi-valent wide-back

staples, min. length in mm

Ejotherm STR H screw-in anchor for insulation boards, min. length in mm

Ejotherm STR H screw-in anchor for insulation

boards, min. length in mm

Ejotherm STR U 2G screw-in anchor for insulation boards, min. length in mm

40 75 80 - - - -

60 90 100 115 135 115 155

80 110 120 115 155 135 175

100 130 140 135 175 155 195

120 150 160 155 195 175 215

140 - 180 175 215 195 235

160 - 200 195 235 215 255

180 - 220 215 255 235 275

200 - 240 235 275 255 295

Service category A-D E A-D E

Approved insulation material thicknesses for ETICS for WALL 140 60-160 mm and for WALL 180 60-100 mm

MINIMUM LENGTHS OF THE FASTENERS

1) For a 10 mm layer of adhesive | 2) For a 10 mm layer of adhesive and 20 mm of existing plaster or leveling plaster

A: Standard concrete and concrete facing layersB: Clay masonry units, solid clay masonry units, concrete solid bricks and lightweight concrete solid bricksC: Vertically perforated clay masonry units, perforated calcium-silicate bricks and lightweight concrete hollow blocksD: Lightweight aggregate concrete with open structureE: Autoclaved aerated concrete (e.g. Ytong)

Service category

Determining the correct anchor length is essential for ensuring that the boards are fastened as securely as possible. The specific conditions associated with each individual building therefore have to be taken into consideration. The required anchor length varies according to the effective embedment depth + tolerance compensation + insulation material thickness. The tolerance compensation comprises the non-load-bearing layers (e.g. existing plaster, tile facings, etc.), the thickness of the adhesive mortar layer and the additional layer for smoothing out uneven areas on the wall.

Page 22: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

22

Installation example for studs with unit spacing of 62.5 cm

6 or 8 anchors/m²

6 anchors/m² 8 anchors/m²

Installation example for studs with unit spacing of 83.3 cm

16 staples/m²

16 staples/m²

3 anchors/stud 6 staples/stud

3 anchors/stud 4 anchors/stud

8 staples/stud

MINIMUM QUANTITY OF FASTENERS REQUIRED FOR INSTALLATION OF WALL 180 IN TIMBER-FRAMED CONSTRUCTIONS

x xx 62,5 cm 62,5 cm

x83,3 cm 83,3 cmx x

Minimum number of fasteners per m²

Wind pressure we according to DIN 1055-4 [kN/m²]

Reliable vertical maximum spacing between wide-back staples

-1,00 -1,60

STR H screw-in anchor for insulation boards H

6 8

Wide-back staple 16 16 120 mm

Page 23: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

23

MINIMUM QUANTITY OF FASTENERS REQUIRED FOR INSTALLATION OF WALL 140 ON CONTINUOUS AND LOAD-BEARING SOLID TIMBER SUBSTRATES

INST

ALLA

TION

EXA

MPL

ESIN

STAL

LATI

ON G

UIDE

LINE

S

Minimum number of fasteners per m²

Wind pressure we according to DIN 1055-4 [kN/m²]

Reliable vertical maximum spacing between wide-back staples

-1,00 -1,60

STR H screw-in anchor for insulation boards

10 14

Wide-back staple 16 20 120 mm

Minimum number of faste-ners per board

Wind pressure we according to DIN 1055-4 [kN/m²]

-1,00 -1,60 -1,00 -1,60

WALL 140 board formats in mm

STR H screw-in anchor for insulation boards Wide-back staples

580/600 x 800 5 7 8 10

580/600 x 1250 8 11 12 15

580/600 x 1500 9 13 15 18

580/600 x 2000 12 17 20 24

5 anchors/board 8 anchors/board

9 anchors/board 12 anchors/board

Installation examples for STR H screw-in anchors for insulation boards

Page 24: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

24

Installation examples for wide-back staples

8 staples/board 12 staples/board

15 staples/board 20 staples/board

MINIMUM QUANTITY OF FASTENERS REQUIRED FOR INSTALLATION OF WALL 140 ON CONTINUOUS AND LOAD-BEARING SOLID TIMBER SUBSTRATES

Page 25: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

25

INST

ALLA

TION

EXA

MPL

ESIN

STAL

LATI

ON G

UIDE

LINE

S

Installation examples for STR U 2G screw-in anchors for insulation boards

3 anchors/board 4 anchors/board

5 anchors/board 7 anchors/board

8 anchors/board 10 anchors/board

Minimum number of fasteners per board (per m²)

Wind pressure we according to DIN 1055-4 [kN/m²]

-0,77 -1,00 -1,60 -2,20

WALL 140 board formats in mm

600 x 800 3 (6,3) 3 (6,3) 4 (8,3) 6 (12,5)

600 x 1250 3 (4,0) 4 (5,3) 7 (9,3) 9 (12,0)

600 x 1500 4 (4,4) 5 (5,6) 8 (8,9) 11 (12,2)

600 x 2000 5 (4,2) 7 (5,8) 10 (8,3) 14 (11,7)

MINIMUM QUANTITY OF FASTENERS REQUIRED FOR INSTALLATION OF WALL 140 ON MINERAL SUBSTRATES

The STR U 2G screw-in anchors for insulation boards must be fastened in the surface area of the WALL 140 boards only, not in the joints between the boards.

Page 26: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

26

WINDOW CONNECTIONS AND WINDOW SILLS

General information

In the window area, special attention must be paid to the need for the reveal area and the window sill to be expertly connected to ensure effective protection against the ele-ments. The complete system comprised of the wall, win-dow, solar protection elements and window sill have to be properly coordinated with each other and expertly planned in detail in advance. This is the only way of ensuring that inadequate or improvised “on site solutions” are avoided.

In the following it is important to make sure that the win-dow sill has a minimum overhang of 40 mm over the fi-nished coating of plaster and that the window sill slopes forward with a minimum gradient of 5°. Movements of the window sill (caused by thermal activity and the effects of wind/suction) are not allowed to be transferred into the fa-cade system. They have to be absorbed by the end pieces of the window sill via sliding bearings.

The lateral sides of the window sill end pieces must be wide enough for joint insulation tape to be fitted (minimum 25 mm). Holding-down plates for the window sill need to be installed in accordance with the recommendations of the manufacturer and in dependency on the projection and length of the window sill.

A second sealing layer in the form of a watertight and heat-resistant foil should always be installed beneath window sills. The window sill must not be stood on unless suitable additional support is provided. The connection of the WALL 140/180 boards to the window and all connection joints with the window sill or window sill end pieces must in all cases be made watertight against driving rain using suitable architrave beads and joint insulation tape.

Window connection and installation of the window sill

After the window has been installed in the wall in ac-cordance with applicable standards, the wood fiber insu-lation board for the window sill area has to be cut at an angle to match the gradient of the window sill (minimum 5°) before installation. There should be a gap of approx. 5 mm between the WALL 140 / 180 board and the window sill when installed.

At the side window connection the WALL 140 / 180 boards need to be set back by the thickness of the reveal board

which is to be installed later.

The advantage of using reveal boards is that it enables the joint insulation tape to be fitted more easily and precisely (flush with the front edge).

If housings for roller shutters and venetian blinds are to be installed, the applicable special details must be taken into account – see detailed drawings.

Page 27: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

27

WIN

DOW

CON

NECT

ION

INST

ALLA

TION

GUI

DELI

NES

Window connection and installation of the window sill

After the WALL 140 / 180 boards have been installed, the second sealing layer in the form of a watertight and heat-resistant foil has to be connected to the window frame in a trough shape with adhesive tape. The foil must overlap

upwards by a minimum of 6 cm on the side reveals. If self-adhesive foil is not used, best wood FDM adhesive sealant for joints should be used for gluing to the WALL140 / 180 boards.

Before installing the window sill, illmod 15/5-10 joint in-sulation tape needs to be applied to the WALL 140 / 180 boards beneath the window sill and at the side up to the level of the window sill end piece. Also, illmod 15/3-7 joint insulation tape needs to be applied to the back of the win-dow sill connection profile. This is for providing a watertight seal against driving rain for the joint between the window frame and window sill. It is important to make sure that the joint insulation tape is applied right at the very top of the vertical edge, otherwise a channel will be formed which will direct the water laterally to the window reveal.

To fasten the window sill, only use suitable fasteners which are compatible with the system (e.g. non-corrosive).

Movements of the window sill caused by thermal activity need to be taken into consideration when fastening, e.g. elongated holes could be used. The window sill should be screwed to the window in such a way that the rear vertical edge of the window sill slots into the drip edge of the win-dow frame.

On windows with aluminum facings in particular it is es-sential that the aluminium facing is backed, because water has to drain from it and the mitered joints onto a drip edge.

Drainage openings on the window must not be blocked off by the installation of the window sill. It is not recommen-dable to install the window sill on the window frame with stump joints.

The side window frame grooves and the facing grooves should be sealed with suitable sealing compound on the bottom ends if they have not already been sealed by the window manufacturer by structural or prefabrication means. This work is the responsibility of the window fitter.

Page 28: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

28

After the window sill has been installed, the side reveal boards can be installed. These should be cut to length with an angle-cut at the bottom to match the angle of the win-dow sill. After the reveal board has been cut to length, apply joint insulation tape along the parts facing the window and window sill end profile. Take particular care here to ensure that the joint insulation tape is expertly applied. The joint in-

sulation tape must be fitted with stump joints in the corners, with pressure, and must not be simply bent around the cor-ners. As a general principle the joint installation must always be fitted with the application of pressure, not by pulling it, otherwise there is a risk of it re-setting to its original length later.

CORRECT √ INCORRECT x

Window connection and installation of the window sill

Page 29: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

29

WIN

DOW

CON

NECT

IONS

AND

WIN

DOW

SIL

LSIN

STAL

LATI

ON G

UIDE

LINE

S

Once all the joint insulation tapes have been expertly ap-plied to the reveal board, the reveal board should be bon-ded to the WALL 140 / 180 boards using best wood FDM adhesive sealant for joints. Non-corrosive screws should

then be used to provide the reveal board with additional fastening. These will prevent the reveal boards from moving in response to the swelling of the compression tape.

After the reveal board has been installed, the lateral side of the window sill end piece should still overhang approx. 10 mm to provide sufficient space for the render layer in

the window reveal. After the plaster has been applied, the lateral side of the window sill end piece should be plastered over flush to the surface.

Page 30: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

30

Important information

When installing the window sill, it is important to make sure that all joints and openings which are produced as a result of the construction are protected against water ingress. See, for example, the constructional joint between the bottom edge of the window frame and the top edge of the weather panel end piece.

Take particular care with mitered, bonded PVC win-dows. Here there is a risk of water ingress through the miter-joint as far as the building structure.

This miter-joint should be sealed with suitable material or should be avoided at the outset by appropriate con-structional measures.

Guide rails for solar protection elements and roller shutters must drain directly onto the window sill and must be positioned on the inside of the side vertical edges of the window sill end piece. The guide rails must finish approx. 8 mm before the top edge of the window sill.

Page 31: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

31

REND

ER S

YSTE

MIN

STAL

LATI

ON G

UIDE

LINE

S

General information

INSTALLATION GUIDELINES FOR THE BEST WOOD RENDER SYSTEM

When the best wood WALL 140 / 180 wood fiber insulation boards have been installed, they can be left exposed to the weather for a period of up to 8 weeks because they have water repellent finishing. However, they do require permanent protec-tion against UV exposure and moisture. If this cannot be gua-ranteed (small roof overhang, exposed location), we recommend that the facade should be protected with a diffusion-permeable underlay immediately after installation, or that the base coat of plaster be applied as quickly as possible

The ambient temperature and the temperature of the substrate must not be below + 5°C at any time during the application and drying of the plastering and paint products. The air temperature must not exceed 30°. Frost should be avoided for at least four days. No other materials are allowed to be mixed in and approp-riate measures should be taken to protect the fresh plaster from the influence of the weather (e.g. strong sunshine and heavy wind and rain). It may be advisable to hang tarpaulins from the

scaffolding. The substrates must be dry, absorbent and free of release agents, dust and loose particles.

Mineral types of plaster produce an alkaline reaction on con-tact with water and can therefore irritate the eyes and skin. The material must be kept away from children and contact with the eyes and skin must be avoided. Avoid generating dust. Suitable protective gloves, glasses and/or a face mask should always be used when working with the materials. If the materials do come into contact with eyes, the eyes of the affected person must be rinsed out thoroughly with water and a doctor should be consulted. It is prohibited to allow waterborne plasters to enter surface waters or the sewage system. Plaster which has fully hardened can be disposed of as building rubble.

Checking the substrate

Immediately before the reinforcement layer is applied, the com-plete facade of best wood WALL 140/180 wood fiber insulation boards should be examined to check its suitability. The subs-trate must be flat, dry, stable and clean. The board moisture content must not exceed 13% of the weight (if the setting on the electronic moisture meter is for spruce/pine, the maximum permitted value is 19.5%). It is essential that any differences in level at the butt joints between the boards are smoothed out by sanding, e.g. with a K16 sanding board. The sanding dust which is generated must be completely removed from the sur-

faces of the boards. Joints of up to 2 mm at the board edges can be plastered over. Joints of 2-5 mm are to be sealed with best wood FDM adhesive sealant for joints. Seal all joints greater than 5 mm with strips of best wood WALL 140 / 180 wood fiber insulation board. Screw-in anchors for insulation boards must be fitted flush with the surface of the best wood WALL 140 / 180 wood fiber insulation boards. Wide-back staples should be countersunk approx. 1 mm in the best wood WALL 140 / 180 wood fiber insulation boards.

Page 32: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

32

Installation of additional reinforcement

Before the reinforcement for the entire surface is installed, corner beads with fiber mesh have to be embedded in the compound on all the outer corners. At the same time, diagonal reinforcing arrows have to be embedded along the entire surface of all the openings in the wall. In the area of the connections to window

and door frames, architrave beads with telescope function have to be embedded. In addition all the special render profiles such as drip beads, render stop beads, sheet metal connection pro-files and expansion joint beads for corners/continuous surfaces also have to be embedded first.

Application of the base coat

After completion of the preparation work of embedding the ren-der stop connection profiles and the diagonal reinforcement, best wood adhesive and reinforcing mortar should be applied to the best wood WALL 140 / 180 wood fiber insulation boards either by machine or by hand with a 4-6 mm serrated trowel at an angle of approx. 45° to the surface of the boards, combing through the mortar to form a serrated layer. The resultant layer must be 3-4 mm thick. The serrated form of the mortar layer en-sures that the fiber reinforcement mesh is embedded in a layer which is of a sufficient thickness of at least 5 mm in the outer third of the reinforcement layer.

Furthermore, the application and hardening of the serrated layer of mortar prevents lignin from bleeding through and ensures that the render baseboard is protected against the weather for up to 5 months. This requires as a precondition that the connec-tions and joints are correctly sealed to ensure that the timber structure and best wood WALL 140 / 180 wood fiber insulation boards are effectively protected

Embedding the fiber reinforcement mesh

After the serrated mortar layer has dried, the fiber reinforce-ment mesh can be embedded. In this case the mortar has to be applied crosswise using a trowel which is moved flat across the surface. The fiber reinforcement mesh should be embedded in the crosswise mortar while it is still wet and the edges of the fiber mesh must overlap by a minimum of 10 cm. The fiber reinforcement mesh then has to be covered over with mortar on

a wet on wet basis until the fiber mesh is completely covered at every point. Avoid air pockets. Sand off any imperfections after the mortar has dried. The total thickness of the serrated layer of mortar, including the embedded fiber reinforcement mesh, should be approx. 6-7 mm.

Application of the base coat and fiber reinforcement mesh in two steps

1 2 3 4

1. best wood WALL 140 / 180

2. Serrated mortar layer

3. Fiber reinforcement mesh

4. Plaster and paint

Page 33: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

33

It is possible to apply the base coat/serrated mortar layer and the fiber reinforcement mesh in a single step. After completion of the preparation work of embedding the render stop connec-tion profiles and the diagonal reinforcement, best wood adhe-sive and reinforcing mortar should be applied to the best wood WALL 140 / 180 wood fiber insulation boards either manually or with mixing pumps/plastering machines and combed through with a 10 mm serrated trowel. Care must be taken to ensure that the material is evenly distributed and that the resultant layer is at least 5 mm thick.

The fiber reinforcement mesh should be embedded in the ma-terial while it is still wet and the edges of the fiber mesh must

overlap by a minimum of 10 cm. The fiber reinforcement mesh then has to be covered over with mortar on a wet on wet basis until the fiber mesh is completely covered at every point. Avo-id air pockets. Sand off any imperfections after the mortar has dried. The total thickness of the layer, including the embedded fiber reinforcement mesh, should be approx. 6-7 mm.

If the base coat/serrated mortar layer is applied in a single step, the person doing the work must ensure that the thicknesses of the layers are adhered to and that the fiber reinforcement mesh is positioned in the outer third of the coat.

REND

ER S

YSTE

MIN

STAL

LATI

ON G

UIDE

LINE

S

Application of the base coat and fiber reinforcement mesh in one step

Application of the final render

Before the final render is applied, the base coat must have har-dened and dried. For darker facades it is recommendable to apply the final render ready-colored. All of the material required for each area to be plastered has to be prepared in a single step.

To avoid overlapped edges in the surface of the plaster, a suf-ficient number of workers need to be deployed on each section of the scaffolding and the section of plaster should be comple-ted from corner to corner in a single operation. Excess material should be removed by scraping it off with a trowel at a steep angle. All uneven areas which are created should be corrected straight away.

Silicone-resin final render, which comes in tubs, needs to be thoroughly stirred and have water added if necessary to achieve

the right consistency. Use a stainless steel trowel to apply the plaster with a coat not exceeding the grain thickness, and then texture the surface afterwards.

Mineral final render comes in sacks and can be processed with all standard types of mixing pumps and plastering machines or by hand. This should be applied with a sponge float or plastic float. The mineral final render of a scraped surface plaster tex-ture should be rubbed using a circular motion, while the mineral final render of a fluted surface plaster texture should be rubbed using a circular, horizontal or vertical motion.

1. best wood WALL 140 / 180

2. Serrated mortar layer

3. Fiber reinforcement mesh

4. Plaster and paint

1 2 3 4

Page 34: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

34

Application of the leveling coat

The application of a leveling coat is always recommended because it lends surfaces a uniform appearance and also provides protection against the weather. Moreover, it helps slow down the rate at which material is lost from the render surface and also reduces the extent to which the surface is susceptible to the accumulation of dirt.

A leveling coat is an essential requirement for mineral final render coats because of their susceptibility to efflorescence or cloudiness when they dry. Coating with paint levels out this appearance while significantly improving water repellence at the same time. Silicone-resin plasters do not have to be coa-ted over, but the leveling coat still provides the facade with valuable additional protection nevertheless. If you decide not to apply a leveling coat, it is recommended for reasons of appearance and for technical reasons that you apply a leve-ling primer coat to the whole surface of the substrate before applying the silicone-resin final render.

In terms of the color scheme for the ETICS facade, the selec-ted color must have a lightness value (LV) of ≥ 20%. Dark co-lors can lead to high levels of thermal stress and are therefore not permitted for the best wood external thermal insulation

composite system.

The final render must have thoroughly dried before the paint is applied. Silicone-resin paint can be applied by hand (by brush or roller) or with an airless spray gun. Silicone-resin paint should be diluted with a maximum of 10% water and should not be applied in direct sunlight.

If required, fungicide/algicide can be added to the silicone-resin paint at the factory to provide protection against algae and fungal attack. The use of this additive inhibits or retards algae and fungal attack. On the basis of the current state-of-the-art in technology it is not possible to guarantee perma-nent protection because, among other things, the resistance of biocidal treatment systems has to be time-limited in order to meet environmental biodegradability requirements.

Coats of paint on facades generally have to be applied in two steps.

Maintenance of the facade

Facade surfaces are permanently exposed to the weather and therefore need to be inspected and maintained at regular in-tervals. Particular attention needs to be given to all the con-nections between different components of the facade (e.g. window reveal connection,window sill connection, etc.).

This weather-related ageing varies considerably depending on the alignment and location of the building and on design measures taken to reduce the stress on the facade (roof over-hang, protection by trees and bushes).

With regard to maintenance intervals, there is no difference between wood fiber ETICS and other types of ETICS facades or other rendered facades. All best wood final renders provide effective resistance to the influence of the weather. This is further enhanced with the application of the leveling coat. The amount of time before the first maintenance coat is re-quired can therefore be considerably extended as a result. The products used for maintenance coats must be compatible with the system.

Page 35: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

35

REND

ER S

YSTE

MIN

STAL

LATI

ON G

UIDE

LINE

S

FOR YOUR NOTES:

Page 36: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

36

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

010813

BASE POINT

outside splash water range with ≥ 30 cm between ground surface and base point

CONSTRUCTION DETAILS

Page 37: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

37

CONS

TRUC

TION

DET

AILS

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

01082013

Splash area on the gravel and ≥ 15cm distance between ground edge and lower edge of the base point

BASE POINT

BASE

POI

NT

Page 38: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

38

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

010813

BASE POINT

on the splash area with gravel and ≥ 5 cm distance between ground edge and lower edge of the base point

Page 39: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

39

CONS

TRUC

TION

DET

AILS

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

01082013

Patio door level with grating

BASE POINT

BASE

POI

NT

Page 40: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

40

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

010813

with 20 mm reveal board

WINDOW CONNECTION

Page 41: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

41

CONS

TRUC

TION

DET

AILS

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

01082013

with 40 mm reveal board

WINDOW CONNECTION

WIN

DOW

CON

NECT

ION

Page 42: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

42

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

010813

without reveal board and with roller shutter guide rail

WINDOW CONNECTION

Page 43: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

43

CONS

TRUC

TION

DET

AILS

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

01082013

on window sill with second sealing layer

WINDOW CONNECTION

WIN

DOW

CON

NECT

ION

Page 44: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

44

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

010813

on window sill with second sealing layer – 3-D view

WINDOW CONNECTION

Page 45: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

45

CONS

TRUC

TION

DET

AILS

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

01082013

WIN

DOW

CON

NECT

ION

WINDOW CONNECTION

Window lintel

Page 46: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

46

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

010813

Exposed projecting roller shutter housing, version 1

WINDOW CONNECTION

Page 47: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

47

CONS

TRUC

TION

DET

AILS

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

01082013

Exposed projecting roller shutter housing, version 2

WINDOW CONNECTION

WIN

DOW

CON

NECT

ION

Page 48: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

48

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

010813

Projecting roller shutter housing for plastering over

WINDOW CONNECTION

Page 49: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

49

CONS

TRUC

TION

DET

AILS

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

01082013

WINDOW CONNECTION

Venetian blind facing

WIN

DOW

CON

NECT

ION

Page 50: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

50

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

010813

STOREY TRANSITIONS FOR PRE-FABRICATED COMPONENTS

Page 51: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

51

CONS

TRUC

TION

DET

AILS

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

01082013

Eaves with adjustable hanger

ROOF CONNECTION

STOR

EY T

RANS

ITIO

N | R

OOF

CONN

ECTI

ON

Page 52: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

52

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

010813

Eaves without adjustable hanger

ROOF CONNECTION

Page 53: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

53

CONS

TRUC

TION

DET

AILS

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

01082013

Verges

ROOF CONNECTION

ROOF

CON

NECT

ION

Page 54: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

54

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

010813

on dormer cheeks

ROOF CONNECTION

Page 55: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

55

CONS

TRUC

TION

DET

AILS

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

01082013

Monopitch roof on an exterior wall

ROOF CONNECTION

ROOF

CON

NECT

ION

Page 56: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

56

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

010813

Corner joints on existing buildings

STRUCTURAL EXPANSION JOINTS

Page 57: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

57

CONS

TRUC

TION

DET

AILS

This detailed drawing is intended as a general design suggestion. The actual construction needs to be checked by the designer/person responsible with regard to structural and physical conside-

rations for the specific building concerned and is the responsibility of that person. The installation guidelines and technical data sheets for best wood ETICS must be observed. This version of the

detailed drawing replaces all previous versions.

01082013

Continuous joints on existing buildings

STRUCTURAL EXPANSION JOINTS

STRU

CTUR

AL E

XPAN

SION

JOIN

TS

Page 58: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

58

FOR YOUR NOTES:

Page 59: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

59

FOR

YOUR

NOT

ES

Page 60: WOOD FIBER EXTERNAL THERMAL INSULATION ...Ejotherm STR U 2G screw-in anchor for insu-lation boards for concrete and masonry ACCESSORIES FOR WOOD FIBER INSULATION BOARDS Insulation

DE VE 09.13_1.1

HEADQUARTERS GERMANY

Holzwerk Gebr. Schneider GmbHKappel 2888436 Eberhardzell

Phone +49 (0)7355 9320-0Fax +49 (0)7355 9320-300E-Mail [email protected]

www.schneider-holz.com

SUBSIDIARY SWITZERLAND

Holzwerk Schneider u. CoBucherstrasse 109556 Affeltrangen

Phone +41 (0)71 918 79 79Fax +41 (0)71 918 79 78 E-Mail [email protected]

Stan

d 09

/ 20

14

WOOD FIBEREXTERNAL THERMAL INSULATION COMPOSITE SYSTEMSInstallation guidelines