wmb katie coyne + marc coudert

12
Katie Coyne Marc Coudert Final Assignment Seminar ‘ClimateWalks’, 386M/350R Dr. -Ing. Petra Liedl April 28, 2014

Upload: ut-thermal-lab

Post on 24-Mar-2016

232 views

Category:

Documents


3 download

DESCRIPTION

ClimateWalks Spring 2014 Final Presentation: West Mall Building Microclimate. University of Texas at Austin.

TRANSCRIPT

Katie Coyne

Marc Coudert

Final Assignment

Seminar ‘ClimateWalks’, 386M/350R

Dr. -Ing. Petra Liedl

April 28, 2014

Outline

Regional weather conditions

Methods: Site micro-climate map

Findings

Micro-climate findings

Micro-climate survey findings

Campus circulation

Possible design intervention

Katie Coyne Final Assignment

Marc Coudert April 28, 2014

Weather on

March 26, 2014

&

April 16, 2014

According to

Weather Underground

Actual 03/26 Actual 04/16 Difference

Temperature

Mean Temperature 60 °F 57 °F -3

Max Temperature 66 °F 73 °F +7

Min Temperature 54 °F 40 °F -14

Moisture

Dew Point 47 °F 40 °F -7

Average Humidity 57 56 -1

Maximum Humidity 78 76 -2

Minimum Humidity 36 35 -1

Precipitation

Precipitation T in 0.10” +.10

Month to date

precipitation

1.26 2.35 +1.09

Year to date

precipitation

2.09 6.59

Wind

Wind Speed 10 mph (SSE) 7 mph (Sout

h)-3

Max Wind Speed 22 mph 16 mph -6

Max Gust Speed 33 mph 26 mph -7

Visibility 10 miles 10 miles similar

http://www.wunderground.com/history/airport/KATT/2014/3/26/DailyHistory.html?MR=1

Katie Coyne Final Assignment

Marc Coudert April 28, 2014

Katie Coyne Final Assignment

Marc Coudert April 28, 2014

Wednesday

March 26, 2014

1:00pm to 5:30pm

&

Wednesday

April 16, 2014

1:00pm to 5:30pm

Katie Coyne Final Assignment

Marc Coudert April 28, 2014

Climate Sensor 1Climate Sensor 2

Hobo Info for 2 sensorsPMVPETSolar radiation

Katie Coyne Final Assignment

Marc Coudert April 28, 2014

Climate Sensors

Katie Coyne Final Assignment

Marc Coudert April 28, 2014

-3

-2

-1

0

1

2

3

1:0

9

1:2

0

1:2

5

1:3

0

1:3

5

1:3

9

1:4

0

1:4

2

1:4

5

1:4

8

1:5

2

1:5

5

1:5

9

2:0

0

2:0

5

2:2

3

2:2

6

2:3

0

2:4

0

2:5

0

2:5

5

3:2

8

3:3

5

3:4

0

3:4

6

3:5

1

4:0

0

4:2

0

4:3

0

4:3

5

4:4

5

4:5

0

4:5

5

5:0

0

5:0

7

5:1

2

5:1

5

PMV for 3/26 & 4/16

PMV 03/26

PMV 04/16

-1: mean PMV for 3/260: mean PMV for 4/16

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1:0

9

1:2

0

1:2

5

1:3

0

1:3

5

1:3

9

1:4

0

1:4

2

1:4

5

1:4

8

1:5

2

1:5

5

1:5

9

2:0

0

2:0

5

2:2

3

2:2

6

2:3

0

2:4

0

2:5

0

2:5

5

3:2

8

3:3

5

3:4

0

3:4

6

3:5

1

4:0

0

4:2

0

4:3

0

4:3

5

4:4

5

4:5

0

4:5

5

5:0

0

5:0

7

5:1

2

5:1

5

CLO for 3/26 & 4/16

CLO 3/26

CLO 4/16

1: mean CLO for 3/260.5: mean CLO for 4/16

Clothing Insulation (CLO) & Predicted Mean Vote (PMV)

Katie Coyne Final Assignment

Marc Coudert April 28, 2014

CoolerHotterWindyCooler

Katie Coyne Final Assignment

Marc Coudert April 28, 2014

Key Points•East-West Connection

•Poor North-South Connection

•ADA access not convenient

•Poor connection btw buildings (library)

•More active spaces north but little active spaces south

Existing and Proposed Site plan

Katie Coyne Final Assignment

Marc Coudert April 28, 2014

Existing

Proposed

Better connection to Architecture Library

ADA accessible Staircase/Grand

Staircase

Large Live Oak focal point

Outdoor seating

Negative edge water feature

Section

Section

Example fountain

Existing

Katie Coyne Final Assignment

Marc Coudert April 28, 2014

Proposed

Section

Rendering

Katie Coyne Final Assignment

Marc Coudert April 28, 2014