PENGELOLAAN SDA TERPADU DI INDONESIA PENGELOLAAN SDA TERPADU DI INDONESIA 

Presented in:ADB Water Learning Week

Manila, 7‐11 November 2011

Page 2: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 2/20

R BASIN TERRITORY

2

Page 3: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 3/20

ores re uc on enun a onsin Upper Catchment

Page 4: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 4/20

Page 5: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 5/20

WATER SECURITY  : DURING DRY  SEASON, PEOPLE  WALK  MORE  THAN 5 KM TO GET  WATER

Page 6: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 6/20

Settlement in River

Zone

Page 7: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 7/20

Page 8: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 8/20

 

ISSUES?

Page 9: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 9/20

Page 10: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 10/20

Citarum Hilir :

Penanganan Infrastruktur Banjir secara darurat :

 

Citarum Hulu‐Hilir secara keseluruhan :

1. Perbaikan dan

 rehabilitasi

  jaringan

 

FLOOD COUNTERMEASURES CITARUM RB ( 1 Ci)

‐ Tanggul Kritis sepanjang 16.600 M

Citarum Hilir :

1. Penanganan Secara Permanen : 

drainase

2. Perencanaan dan pelaksanaan 

normalisasi S. Citarum dan anak‐anak 

sungainya secara bertahap serta 

melaksanakan pemeliharaan secara 

berkelanjutan

.  anggu

‐ Rehabilitasi tanggul dari Kampung Bojong s/d Muara 

Gembong sepanjang 154 Km

‐ Pembuatan tanggul baru antara Walahar s/d Kampung 

Kampung

Bo on

‐ Pembuatan tanggul dan bangunan pengendali banjir S. 

Cibeet.

B. Pengerukan atau Normalisasi :

S. Citarum

 Hilir

 dan

 Kali

 Bungin

Citarum Tengah :2. PENGAMANAN PANTAI DAN MUARA CITARUM DARI 

ABRASI • Optimalisasi Sistim Operasi Waduk Saguling‐Cirata‐Jatiluhur

• Rehabilitasi Struktur Bangunan Dam

• Rehabilitasi Hidro‐Mekanikal

• Rehabilitasi Instrumentasi

• Pemasangan pintu Radial pada Emergency Spill Way di Ubrug

• Normalisasi Saluran Buang Emergency Spill Way

 .   . 

CitarumHulu :

1. Rehabilitasi S Citarum hulu (Nanjung – Sapan)

  –  .  – . 

S. Cimande

S. Cikijing

S. Cikeruh (2.5 km)

Page 11: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 11/20

FLOOD COUNTERMEASURES FOR CILIWUNG CISADANE RB ( 2 Ci)

Menyelesaikan Pembangunan BKT

1

DED & Pelaksanaan Normalisasi: Sungai Pesanggrahan, Angke & Sunter;

Sungai Ciliwung dari Kalibata s.dManggarai

Sudetan Sungai Ciliwung-BKT

Sungai Ciliwung LamaDED & Pelaksanaan: 30 Polder di Jakarta

4

 

Manggarai & Pintu Air Karet

2

Sistem Drainase

Jabodetabek

Waduk Retensi

Cengkareng Floodway 2

DED & PelaksanaanRevitalisasiSitu, Sumur Resapan, Dam

Parit dan Penghijauan diTengah dan Hulu DAS

Ciliwung.DED & Pelaksanaan:3

,• Cirarab,• Cisadane,• Cengkareng Drain,• Kali Sabi & Kali

Dadap,• Grogol,

• Krukut,• Mampang,• Cideng,• Cipinang,• Buaran,• Jati Kramat,• a ung,• Blencong,• Bekasi,

• Cikarang,• CBL,• Cilemah Abang.

Page 12: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 12/20

FLOOD COUNTERMEASURES FOR CIUJUNG, CIDANAU, CIDURIAN (3 Ci)

Page 13: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 13/20

Serang

DICisadane

(22.089 ha)

DICisadane

(22.089 ha)

DI Ciujung(15.600ha)DI Ciujung(15.600ha)

DKI

Jakarta

Tangerang

13.713.7

 (21.271

ha)

 (21.271

ha)

Bekasi

11.111.1

 Cidurian(10.280

ha)

 Cidurian(10.280

ha)

DI JatiluhurBarat

(62.564 ha)

DI JatiluhurBarat

(62.564 ha)

,Cilego

n

5.65.6

DI JatiluhurUtara

(90.504 ha)

DI JatiluhurUtara

(90.504 ha)

5

2

Krenceng

2Unregulated:

Depok

4.14.1

DI JatiluhurTimur

(83.246 ha)

DI JatiluhurTimur

(83.246 ha)

Lebak,

Pandeglang

2.02.0 Karawang

PurwakartaSubang

Unregulated:Pesanggrahan

& Krukut

3 0.4

Cidanau

Bogor

(kab.-kota)

JatiluhurJatiluhur

10.010.0Cipancuh

Unregulated:Cisadane

2

Unregulated:Ciujung ..

Cirat

a

Bandung

18.618.6SagulingSaguling

Page 14: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 14/20

Page 15: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 15/20

Page 16: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 16/20

Page 17: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 17/20

Page 18: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 18/20

St ak eholder in Wat er Resourc es Managem entSt ak eholder in Wat er Resourc es Managem ent

REGULATOR(Government + RBO

OPERATOR

(Province PJT)Local Goverment)

COORDINATINGPLATFORM(Council, TKPSDA)

Secr. At RBO

USER DEVELOPER(Government)

18

Page 19: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 19/20

Integrated Planning Strategy for Space and Water

Water resourcesLocation of  Population  /  

Irrigated   Area and  related  Water Law

basin scope)wa er  nee s

POLA / RENCANA

,

PP 42/2008

Quantification ofProjections for

Zoning 

land use

Spatial planning(national-, island

Zoning Definition and Impact of 

WRD on Spatial Spatial LawSpatial Lawscope)

RTRW UU 26/2007UU 26/2007

Page 20: WLW Day 4: Implementation of IWRM in Indonesia

8/3/2019 WLW Day 4: Implementation of IWRM in Indonesia

http://slidepdf.com/reader/full/wlw-day-4-implementation-of-iwrm-in-indonesia 20/20

MASUKMASUKHALAMANHALAMAN

THANK YOU

To establish sustainable water resources development