with infrastructure in flin flon, manitoba · corporate capital summary leadership symbol (tsxv)...
TRANSCRIPT
PAST PRODUCING
With In f ras t ruc ture
in F l in F lon , Mani toba
GOLD MINE
Forward Looking Statements
CERTAIN INFORMATION CONTAINED IN THIS PRESENTATION CONSTITUTES FORWARD-LOOKING STATEMENTS. FORWARD-
LOOKING STATEMENTS ARE BASED ON THE REASONABLE OPINIONS AND ESTIMATES OF MANAGEMENT OF SATORI AND
ARE SUBJECT TO A VARIETY OF RISKS, UNCERTAINTIES AND OTHER FACTORS THAT COULD CAUSE ACTUAL EVENTS OR
RESULTS TO DIFFER MATERIALLY FROM THOSE PROJECTED IN THE FORWARD-LOOKING STATEMENTS AND SATORI
DISCLAIMS ANY OBLIGATION TO UPDATE ANY FORWARD-LOOKING STATEMENTS, EXCEPT AS REQUIRED BY LAW.
THE TARTAN LAKE MINE WAS OPERATED BY GRANGES INC. FROM 1986 TO 1989 AND SOME HISTORICAL ESTIMATES
REFERRED TO IN THIS POWER POINT PRESENTATION ARE BASED ON TECHNICAL DATA OF GRANGES INC. DERIVED FROM
MINE SHUT-DOWN REPORTS. THIS HISTORIC INFORMATION IS NOT COMPLIANT WITH THE REQUIREMENTS OF NATIONAL
INSTRUMENT 43-101, AND IT HAS NOT BEEN VERIFIED BY SOURCES INDEPENDENT FROM SATORI RESOURCES INC.
HISTORICAL ESTIMATES OF THE AMOUNT OF GOLD CONTAINED IN THE TAILINGS POND AT TARTAN LAKE WERE DERIVED
FROM ASSAY RESULTS FROM SAMPLES TAKEN BY GRANGES INC. AND ANALYZED BY ACME ANALYTICAL LTD. IN 1990. THE
RESULTS ARE NOT COMPLIANT WITH THE REQUIREMENTS OF NATIONAL INSTRUMENT 43-101 AND SHOULD NOT BE
RELIED UPON.
ESTIMATES WITH RESPECT TO THE AMOUNT OF GOLD CURRENTLY CONTAINED IN THE TAILINGS POND AT TARTAN LAKE
HAVE BEEN DERIVED FROM A REPORT PREPARED BY BETTERIDGE ENTERPRISES LTD. (“THE BETTERIDGE REPORT”), A
COMPANY SPECIALIZING IN THE RECOVERY OF MATERIALS FROM TAILINGS FACILITIES. THE REPORT IS NOT COMPLIANT
WITH THE REQUIREMENTS OF NATIONAL INSTRUMENT 43-101 AND SHOULD NOT BE RELIED UPON.
UNLESS OTHERWISE INDICATED, THE TECHNICAL INFORMATION PRESENTED HEREIN HAS BEEN REVIEWED BY THE
COMPANY’S GEOLOGIST CONSULTANT, PETER KARELSE, P.GEO, A QUALIFIED PERSON IN ACCORDANCE WITH NATIONAL
INSTRUMENT 43-101 – STANDARDS FOR DISCLOSURE FOR MINERAL PROJECTS.
The Satori Advantage
Canadian past producing gold deposit with exploration potential
Tartan Lake Gold Project (100% owned) located in Flin Flon, Manitoba, Canada, is a past- producing high-grade underground mine (47,000 oz Au of production between 1987- 1989) that remains open at depth and along strike; numerous gold showings throughout property
Limited drilling to-date; extensive land package (2,670 hectares) under-explored by modern techniques
Substantial infrastructure in place
Decline ramp with 2,100 metres of underground development down to 310 metres, 6 Levels of development, vent raise, tailings pond, operational power, 500 tpd mill (requires refurbishment)
Corporate
CAPITAL SUMMARY LEADERSHIP
Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director
Shares Outstanding 43,631,507 Pete Shippen, CFA Chairman
Share Price $0.075 Julio DiGirolamo CFO
52 Week Range $0.01 - $0.08 Jennifer Lomax Director
Options 4,150,000 Al Charron Director
Warrants Outstanding 19,305,003 Shanda Kilborn Corporate Secretary
TARTAN LAKE
Over v iew and Potent ia l
GOLD MINE PROJECT
Geographic Location
▪Tartan Lake Gold Mine Project is located NorthEast of the
mining town of Flin Flon, Manitoba, Canada.
▪2,670 hectares of land within the prolific Flin Flon mining camp.
Geographic Location
Tartan Lake Gold Mine Project is located NorthEast of the
mining town of Flin Flon, Manitoba, Canada
2,670 hectares of land within the prolific Flin Flon mining camp
Updated Mineral Resources (Mining Plus - February 2017)
2.0 g/t Cut off 3.0 g/t Cut-off** 4.0 g/t Cut-off
Grade (g/t Au) 5.0 (indicated)
3.7 (inferred)
6.3 (indicated)
4.9 (inferred)
7.5 (indicated)
5.9 (inferred)
Au ounces 291,000 (indicated)
54,000 (inferred)
240,000 (indicated)
38,000 (inferred)
201,000 (indicated)
27,000 (inferred)
Tonnes 1,820,000 (indicated)
450,000 (inferred)
1,180,000 (indicated)
240,000 (inferred)
830,000 (indicated)
140,000 (inferred)
Years mill feed* 10 (indicated)
3 (inferred)7 (indicated)
1 (inferred)
5 (indicated)
1 (inferred)
*Potential, unsubstantiated
**56 gpt top-cut
Tartan Lake Gold Mine Project: Mine Site: Substantial infrastructure in place
▪500 tpd mill complex (requires
refurbishment)
▪2,100 metre ramp (seven Levels of
decline to 310 meters)
▪Vent raise from surface down to 260
Level
▪Developed stoping areas
▪Hydro power intact and operational
▪Mining-friendly jurisdiction and
transparent permitting process
Tartan Lake Gold Mine Project:Mine Site and Tailings Site: Substantial infrastructure in place
Tartan
LakeTailings Pond
(self
contained)
Tailings
Mine
infrastructure
Access
road Path to
tailings
Tailings
pipe
▪The mine site is accessed by all-season road and is hydro-serviced.
▪The tailings pond is accessed by path (safe for trucks and heavy equipment) and is approximately 1.5 km from the mine.
Tartan Lake Gold Mine Project: Recent Drill Program
▪Commenced in late October
2016
▪6 diamond drill holes (1,600m)
▪Highlight assays include:
▪ TL16-01 (Main Zone):
10.88 g/t Au over 13.1m and
9.99 g/t Au over 11.2m
▪ TL16-04 (South Zone):
10.28 g/t Au over 5.1m
▪ TL16-06 (Main Zone):
3.56 g/t Au over 8.2m
Highlights of Past Drill Program:
Recent Drilling Demonstrates High-Grade Potential
▪Successfully intersected 10.88 g/tAu over 13.1 m (within the existing mineral resource model)
▪Intersected a second zone of 9.99 g/t Au over 11.2 m (below and outside the existing mineral resource model)
▪TL16-01 was located within approximately 20 m of existing underground development and approximately 30 m east of hole NAP114 which intersected 20.93 g/t Au over 8.2 m.
Drillhole TL16-01 (Main Zone)
Recent Drilling Demonstrates High-Grade Potential
▪Successfully intersected 10.28 g/t Au over 5.1m (within the existing resource model)
▪Located approximately 20 m down and east of hole NAP283 which intersected
▪7.94 g/t over 3.0m and 8.19 g/t Au over 5.0m as well as approximately 10m west (at the same elevation) of NAP292 which intersected 9.10 g/t Au over 8.5m
Drillhole TL16-04 (South Zone)
Recent Drilling Demonstrates High-Grade Potential
▪Successfully intersected a zone of
3.56 g/t Au over 8.2m (above
and outside the existing mineral
resource model)
▪Satori’s 2016 drill program both
confirmed and expanded the
mineralization
Drillhole TL16-06 (Main Zone)
Exploration PotentialTartan Deposit remains open at depth and along strike; extensive land package under-explored by modern techniques
Contact Information
TSXV: BUD
401 Bay Street, Suite 2702
Toronto, Ontario
Canada M5H 2Y4
Email: [email protected]
Satori Resources Inc.