Page 1: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

PAST PRODUCING

With In f ras t ruc ture

in F l in F lon , Mani toba

GOLD MINE

Page 2: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

Forward Looking Statements

CERTAIN INFORMATION CONTAINED IN THIS PRESENTATION CONSTITUTES FORWARD-LOOKING STATEMENTS. FORWARD-

LOOKING STATEMENTS ARE BASED ON THE REASONABLE OPINIONS AND ESTIMATES OF MANAGEMENT OF SATORI AND

ARE SUBJECT TO A VARIETY OF RISKS, UNCERTAINTIES AND OTHER FACTORS THAT COULD CAUSE ACTUAL EVENTS OR

RESULTS TO DIFFER MATERIALLY FROM THOSE PROJECTED IN THE FORWARD-LOOKING STATEMENTS AND SATORI

DISCLAIMS ANY OBLIGATION TO UPDATE ANY FORWARD-LOOKING STATEMENTS, EXCEPT AS REQUIRED BY LAW.

THE TARTAN LAKE MINE WAS OPERATED BY GRANGES INC. FROM 1986 TO 1989 AND SOME HISTORICAL ESTIMATES

REFERRED TO IN THIS POWER POINT PRESENTATION ARE BASED ON TECHNICAL DATA OF GRANGES INC. DERIVED FROM

MINE SHUT-DOWN REPORTS. THIS HISTORIC INFORMATION IS NOT COMPLIANT WITH THE REQUIREMENTS OF NATIONAL

INSTRUMENT 43-101, AND IT HAS NOT BEEN VERIFIED BY SOURCES INDEPENDENT FROM SATORI RESOURCES INC.

HISTORICAL ESTIMATES OF THE AMOUNT OF GOLD CONTAINED IN THE TAILINGS POND AT TARTAN LAKE WERE DERIVED

FROM ASSAY RESULTS FROM SAMPLES TAKEN BY GRANGES INC. AND ANALYZED BY ACME ANALYTICAL LTD. IN 1990. THE

RESULTS ARE NOT COMPLIANT WITH THE REQUIREMENTS OF NATIONAL INSTRUMENT 43-101 AND SHOULD NOT BE

RELIED UPON.

ESTIMATES WITH RESPECT TO THE AMOUNT OF GOLD CURRENTLY CONTAINED IN THE TAILINGS POND AT TARTAN LAKE

HAVE BEEN DERIVED FROM A REPORT PREPARED BY BETTERIDGE ENTERPRISES LTD. (“THE BETTERIDGE REPORT”), A

COMPANY SPECIALIZING IN THE RECOVERY OF MATERIALS FROM TAILINGS FACILITIES. THE REPORT IS NOT COMPLIANT

WITH THE REQUIREMENTS OF NATIONAL INSTRUMENT 43-101 AND SHOULD NOT BE RELIED UPON.

UNLESS OTHERWISE INDICATED, THE TECHNICAL INFORMATION PRESENTED HEREIN HAS BEEN REVIEWED BY THE

COMPANY’S GEOLOGIST CONSULTANT, PETER KARELSE, P.GEO, A QUALIFIED PERSON IN ACCORDANCE WITH NATIONAL

INSTRUMENT 43-101 – STANDARDS FOR DISCLOSURE FOR MINERAL PROJECTS.

Page 3: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

The Satori Advantage

Canadian past producing gold deposit with exploration potential

Tartan Lake Gold Project (100% owned) located in Flin Flon, Manitoba, Canada, is a past- producing high-grade underground mine (47,000 oz Au of production between 1987- 1989) that remains open at depth and along strike; numerous gold showings throughout property

Limited drilling to-date; extensive land package (2,670 hectares) under-explored by modern techniques

Substantial infrastructure in place

Decline ramp with 2,100 metres of underground development down to 310 metres, 6 Levels of development, vent raise, tailings pond, operational power, 500 tpd mill (requires refurbishment)

Page 4: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

Corporate

CAPITAL SUMMARY LEADERSHIP

Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director

Shares Outstanding 43,631,507 Pete Shippen, CFA Chairman

Share Price $0.075 Julio DiGirolamo CFO

52 Week Range $0.01 - $0.08 Jennifer Lomax Director

Options 4,150,000 Al Charron Director

Warrants Outstanding 19,305,003 Shanda Kilborn Corporate Secretary

Page 5: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

TARTAN LAKE

Over v iew and Potent ia l

GOLD MINE PROJECT

Page 6: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

Geographic Location

▪Tartan Lake Gold Mine Project is located NorthEast of the

mining town of Flin Flon, Manitoba, Canada.

▪2,670 hectares of land within the prolific Flin Flon mining camp.

Page 7: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

Geographic Location

Tartan Lake Gold Mine Project is located NorthEast of the

mining town of Flin Flon, Manitoba, Canada

2,670 hectares of land within the prolific Flin Flon mining camp

Page 8: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

Updated Mineral Resources (Mining Plus - February 2017)

2.0 g/t Cut off 3.0 g/t Cut-off** 4.0 g/t Cut-off

Grade (g/t Au) 5.0 (indicated)

3.7 (inferred)

6.3 (indicated)

4.9 (inferred)

7.5 (indicated)

5.9 (inferred)

Au ounces 291,000 (indicated)

54,000 (inferred)

240,000 (indicated)

38,000 (inferred)

201,000 (indicated)

27,000 (inferred)

Tonnes 1,820,000 (indicated)

450,000 (inferred)

1,180,000 (indicated)

240,000 (inferred)

830,000 (indicated)

140,000 (inferred)

Years mill feed* 10 (indicated)

3 (inferred)7 (indicated)

1 (inferred)

5 (indicated)

1 (inferred)

*Potential, unsubstantiated

**56 gpt top-cut

Page 9: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

Tartan Lake Gold Mine Project: Mine Site: Substantial infrastructure in place

▪500 tpd mill complex (requires

refurbishment)

▪2,100 metre ramp (seven Levels of

decline to 310 meters)

▪Vent raise from surface down to 260

Level

▪Developed stoping areas

▪Hydro power intact and operational

▪Mining-friendly jurisdiction and

transparent permitting process

Page 10: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

Tartan Lake Gold Mine Project:Mine Site and Tailings Site: Substantial infrastructure in place

Tartan

LakeTailings Pond

(self

contained)

Tailings

Mine

infrastructure

Access

road Path to

tailings

Tailings

pipe

▪The mine site is accessed by all-season road and is hydro-serviced.

▪The tailings pond is accessed by path (safe for trucks and heavy equipment) and is approximately 1.5 km from the mine.

Page 11: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

Tartan Lake Gold Mine Project: Recent Drill Program

▪Commenced in late October

2016

▪6 diamond drill holes (1,600m)

▪Highlight assays include:

▪ TL16-01 (Main Zone):

10.88 g/t Au over 13.1m and

9.99 g/t Au over 11.2m

▪ TL16-04 (South Zone):

10.28 g/t Au over 5.1m

▪ TL16-06 (Main Zone):

3.56 g/t Au over 8.2m

Highlights of Past Drill Program:

Page 12: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

Recent Drilling Demonstrates High-Grade Potential

▪Successfully intersected 10.88 g/tAu over 13.1 m (within the existing mineral resource model)

▪Intersected a second zone of 9.99 g/t Au over 11.2 m (below and outside the existing mineral resource model)

▪TL16-01 was located within approximately 20 m of existing underground development and approximately 30 m east of hole NAP114 which intersected 20.93 g/t Au over 8.2 m.

Drillhole TL16-01 (Main Zone)

Page 13: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

Recent Drilling Demonstrates High-Grade Potential

▪Successfully intersected 10.28 g/t Au over 5.1m (within the existing resource model)

▪Located approximately 20 m down and east of hole NAP283 which intersected

▪7.94 g/t over 3.0m and 8.19 g/t Au over 5.0m as well as approximately 10m west (at the same elevation) of NAP292 which intersected 9.10 g/t Au over 8.5m

Drillhole TL16-04 (South Zone)

Page 14: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

Recent Drilling Demonstrates High-Grade Potential

▪Successfully intersected a zone of

3.56 g/t Au over 8.2m (above

and outside the existing mineral

resource model)

▪Satori’s 2016 drill program both

confirmed and expanded the

mineralization

Drillhole TL16-06 (Main Zone)

Page 15: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,

Exploration PotentialTartan Deposit remains open at depth and along strike; extensive land package under-explored by modern techniques

Page 16: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,
Page 17: With Infrastructure in Flin Flon, Manitoba · Corporate CAPITAL SUMMARY LEADERSHIP Symbol (TSXV) BUD Jennifer Boyle, BA, LLB CEO, Director Shares Outstanding 43,631,507 Pete Shippen,