WinSLAMM v 9.4 Control Practice Cost Analysis/Batch Editor
Module 19
John Voorhees, PE, PHPV & Associates LLC
Metro Conservation Districts WinSLAMM Training
July 13-14, 2010
$$We will cover . . .
Cost Analysis Overview Sources of Cost Data Entering Cost Data Running the model with
Cost Data and Reviewing Cost Output
$$We will cover . . .
Cost Analysis Overview
Sources of Cost Data
Entering Cost Data Running the model
with Cost Data and Reviewing Cost Output
Cost Analysis Overview
Calculates the cost of the control practices listed in a model run
Allows you to compare the cost of different sets of practices
Provides the option of applying either pre-determined costs or user-defined costs
Doesn’t evaluate the cost reductions due to the use of control practices, ie, no asphalt pavement reduction determined if porous pavement is used.
What Does the Cost Analysis Program Do?
Cost Analysis OverviewPipe System Opportunity Cost for Grass
Swale Drainage System – cost spreadsheet v12.1b.xls
Design Parameters Segment I Segment II Segment III
Pipe Material 1 1 1
Pipe Diameter (in.) 1 1 1
Trench bottom width (in.) 26.2 26.2 26.2
Bedding depth (in.)
Trench slope 1 1 1
Trench top width (in.) 42.17 42.17 42.17
Backfill depth (in.)
Trench depth (ft.) 0.67 0.67 0.67
Select type of backhoe for trench excavation 1 1 1
Bedding material 1 1 1
Size of backhoe for backfill 1 1 1
Haul distance of backfill material (ft.) 1 1 1
Length of pipe with above conditions (ft.)
Inlets/Catchbasin andManholes/Junction boxes
Inlet inside diameter (ft.) 1 1 1
Invert depth of Inlet (ft.)
Number of inlets with above conditions
Manhole type 1 1 1
Depth of manhole (ft.)
Number of manholes with above conditions
Frames and Covers
Type Cast Iron frame - light traffic Cast Iron frame - heavy traffic Mass. State standard
Diameter 1 1 1
Total number of each unit
0 0 0
Curb and Gutter
Curb and gutter forms Wooden form
Curb and gutter type Straight Straight Radius
Width, in. 1 1 2
Total length of chosen curb, ft
Steel form
H=1, V=1 H=1, V=1 H=1, V=1
Corrugated Metal Pipe Corrugated Metal Pipe Corrugated Metal Pipe
H=1, V=1
Corrugated Metal Pipe Corrugated Metal Pipe
3/8 CY tractor loader/backhoe 3/8 CY tractor loader/backhoe
Crushed or screened bank run gravelCrushed or screened bank run gravelCrushed or screened bank run gravel
1 CY bucket
minimum haul minimum haul
1 CY bucket 1 CY bucket
minimum haul
4 4 4
3/8 CY tractor loader/backhoe
Crushed or screened bank run gravel
8 88 8
Brick, 4' I.D. Brick, 4' I.D. Brick, 4' I.D. Concrete blocks, 4' I.D.
24" 24" 30"
18" diameter, 100 lb 24" diameter, 400 lb 26" diameter, 475 lb 24" diameter, 350 lb
Cost Analysis Overview
How are the Cost Values Normalized?
Total Present Worth = Capital Cost + Land Cost +
Present Worth of Annual Maintenance Cost
P
A AA A AA
1 2 43 n
((i+1)N-1) / (i*(1+i)N )
Cost Analysis Overview
How are the Cost Values Normalized?
Uniform Series Worth = Annual Value of (Capital Cost + Land Cost) +
Annual Maintenance Cost
P
A AA A AA
1 2 43 n
(i*(1+i)N ) / ((i+1)N-1)
Cost Analysis Overview
Edit and Save the Cost Template.csv File
Select the Cost Data File for a Model Run
Run the Program Review the Cost
Output
What is the General Cost Evaluation Process?
$$We will cover . . .
Cost Analysis Overview
Sources of Cost Data
Entering Cost Data Running the model
with Cost Data and Reviewing Cost Output
Sources of Cost Data Pre-Determined
Costs SEWRPC 1991 Cost
Report Costs Updated Using
ENR Cost Indices Cost Indices Available
for 20 Cities
Atla
nta,
GA
Bal
timor
e, M
DB
irmin
gham
, AL
Bos
ton,
MA
Chi
cago
, IL
Cin
cinn
ati,
OH
Cle
vela
nd, O
HD
alla
s, T
XD
enve
r, C
OD
etro
it, M
IK
ansa
s C
ity, M
OLo
s A
ngel
es, C
AM
inne
apol
is, M
NN
ew O
rlean
s, L
AN
ew Y
ork,
NY
Phi
lade
lphi
a, P
AP
ittsb
urgh
, PA
San
Fra
ncis
co, C
AS
eattl
e, W
A
St.L
ouis
, MO
0
2000
4000
6000
8000
10000
12000
Co
st In
dex
Val
ue
Construction Cost Index by City
1989
2005
Sources of Cost Data
Pre-Determined Costs for each practice
Costs Available for – • Wet Detention• Porous Pavement• Grass Swales• Street Cleaning• Catchbasins• Infiltration Trenches
Wet Detention Pond Costs - SEWRPC 1989
1
10
100
1000
10 100 1000
Wet Detention Basin Water Volume (1000 cf)
Ca
pit
al
Co
st
in 1
98
9 D
oll
ars
($
10
00
's)
Low Cost
Med. Cost
High Cost
O&M Cost
Sources of Cost Data User-Defined Costs
for Each Practice Enter Items that Define the
Practice Select Unit Enter Cost per Unit Enter Quantity Program Calculates Cost
Program Determines Total Unit Cost
Enter Routine Maintenance Cost
$$We will cover . . .
Cost Analysis Overview
Sources of Cost Data
Entering Cost Data Running the model
with Cost Data and Reviewing Cost Output
Edit and Save the Cost Template.csv File
On the Summary Data Page Enter project life and interest rate information Enter Land Costs Select Cost Index
For Each Control Practice Select either Pre-Determined or User-Defined Costs For Pre-Determined Costs, select Cost Range For User-Defined Costs, enter Cost Data Enter Land Use Multiplier
Re-name and Save Cost Data File
Edit and Save the Cost Template.csv File
From the Main Menu go to the Options/Access Cost Data Summary Tab . . .
Edit and Save the Cost Template.csv File
Control Practice Cost Tabs and
Summary Data Tab
Cost File Management
Summary Data Tab
Edit and Save the Cost Template.csv File
Land Use CostsInterest Rate and
Project Life
Cost Index Selection
Summary Data Tab
Edit and Save the Cost Template.csv File
Pre-Determined Cost Table
Pre-Determined Capital Cost
Range
Wet Detention Pond Cost Data
Edit and Save the Cost Template.csv File
User-Defined
Cost Table
Maintenance Cost Data - Sediment Removal Costs
- Routine Maintenance Cost
Wet Detention Pond Cost Data
Total Unit Cost
per 1000 cubic feet
Land Area Multiplier
Edit and Save the Cost Template.csv File
Total Unit Cost Basis for User Defined Costs
Control Practice Total Unit Cost Units
Wet Detention Pond Sum of user-defined costs ($) / 1000 cf Pond Volume (datum to highest elevation)
Porous Pavement Sum of user-defined costs ($) / sf of Porous Pavement
Street Cleaning Street Cleaner capital cost ($) / Total curb-miles swept per year
Biofiltration Sum of user-defined costs ($) / cy Cut/Fill Volume
Catchbasin Cleaning Sum of user-defined costs ($) / Unit
Grass Swales Sum of user-defined costs ($) / lf of grass swale
$$We will cover . . .
Cost Analysis Overview
Sources of Cost Data
Entering Cost Data Running the Model
with Cost Data and Reviewing Cost Output
Two Types of Cost Output
1. File Run - Capital, Land, and Maintenance Costs on the Summary Tab of a WinSLAMM Model Run
2. Group File Run - Capital, Land, and Maintenance Costs included with the output when you run a set of .dat files using the Batch Processor
Enter the Cost Data File Name by checking the box and pressing the ‘Select Cost Data File’ Window
2. Output from a Set of .dat Files
Import the output file ‘DATSetOutput.CSV’ into Excel
2. Output from a Set of .dat Files
Cost Output for each .dat file
Import the output file ‘DATSetOutputCostDetail.CSV’ into Excel
2. Output from a Set of .dat Files
Cost Information for each control
practice
Import the output file ‘DATSetOutputCostDetail.CSV’ into Excel
2. Output from a Set of .dat Files
Additional Detention Pond Sediment and Biofilter Volume Information
Import the output file ‘DATSetOutputCostDetail.CSV’ into Excel
2. Output from a Set of .dat Files
Present Value and Annual Value Cost Information