windpower - arbeitskreis energie · 2019. 9. 26. · pioneeringwind power in burgenland...
TRANSCRIPT
![Page 1: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/1.jpg)
WINDPOWER INSIGHTS
ÖPG Fachtagung09/25/2019
Entwicklung, Errichtung und Betriebvon Windkraftanlagen
![Page 2: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/2.jpg)
Family owned business
15 wind farms in Austria and Hungary
>100 turbines
242 Megawatt of installed capacity in AT
Electricity for 200.000 households
Pioneering wind power in Burgenland
More than 20 years of experience Project development, construction, operation
f i.M. Unter
Großinzersdor
Obersiebenbrunn
Engelhar tstett
HoritschonNikitsch
Rechnitz
T
Gols Mönc hhof
Gattendor
Halbturn
Leopoldsdorf UntersiebenbrunnEngelhartstetten
ScharndorScharndorf
Trautmannsdorf
Gols Mönchhof
Gattendorf
Halbturn
Region MittelburgenlandDiverse Gemeinden
Introduction PÜSPÖK Group
Development Construction Operation
![Page 3: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/3.jpg)
Installed capacity (MW)
50
270
408
0
50
100
150
200
250
300
350
400
450
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
![Page 4: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/4.jpg)
Installed wind power capacity in Austria0 1 11 8 9 13 37 18 45
268
200
215
148
19 14 18 90
279
315 40
8
325
228
196
230
209
0 1 12 20 29 42 79 94 139
407 606
817 964
983
994
994
1.012 1.099 1.377
1.690
2.097
2.421 2.649 2.844 3.045
3.241
-100
400
900
1.400
1.900
2.400
2.900
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
![Page 5: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/5.jpg)
Installed capacity Europe - Growth
![Page 6: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/6.jpg)
Installed capacity Europe
189.229 MW (Europe)178.826 MW (EU)
Ende 2018
![Page 7: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/7.jpg)
Wind Power Worldwide
Installed capacity in total 2018:591GW
Added capacity 2018:51,3GW
100 countries
One third of the capacity installed in China.One third in Europe.
![Page 8: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/8.jpg)
By the end of 2018:1313 turbineswith a total capacity of 3045 MW
Annual production: 7 billion kWh (7 TWh)Production* = 11 % of total consumption in AustriaElectricity for more than 1.9 Mio. households(more than 50% of all Austrian households)
…compensates 4.3 Mio. tons of CO2 –as much CO2, as 1.9 Mio. cars on the road are emmitting per year(37 % of all cars in Austria).
…and created/sustained 4.500 jobs(in 2018)
Strong figures in AT
![Page 9: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/9.jpg)
Wind Situation Austria
Distribution of wind power potential6
![Page 10: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/10.jpg)
What we do
10
DEVELOPING
BUILDING
OPERATING
Communities / land owners / politics / nature / permissions / financing
Cost / safety / timeline
Availability / technical difficulties / performance / sales
![Page 11: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/11.jpg)
Biggest challenges
11
+
![Page 12: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/12.jpg)
Politics
12
Eignungszonen in NÖ
![Page 13: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/13.jpg)
Birds
13
![Page 14: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/14.jpg)
Project costs
Anlage80%
Netzanschluss12%
Kabel3%
Wege3%
Planung2%
![Page 15: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/15.jpg)
Size matters.
![Page 16: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/16.jpg)
Levelized Cost of Electricity
![Page 17: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/17.jpg)
Our Situation
![Page 18: WINDPOWER - Arbeitskreis Energie · 2019. 9. 26. · Pioneeringwind power in Burgenland Morethan20yearsofexperience Projectdevelopment,construction,operation f i.M. Unter Großinzersdor](https://reader035.vdocuments.site/reader035/viewer/2022071509/6129ec2630e0130e95169e4e/html5/thumbnails/18.jpg)
Our Choice