Wind Indiana 2008
Indianapolis
June 17-18
By : Jamal Alsawalhi
![Page 2: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/2.jpg)
In my presentation
• Purpose of conference
• 20% Wind Energy Plan
• Wind Energy in Indiana
• Conclusion
![Page 3: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/3.jpg)
Sponsors
• Sponsored by:-– Indiana Wind Working Group– The Indiana Office of Energy & Defense
Development– Purdue University
• Partially funded by National Renewable Energy Laboratory
![Page 4: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/4.jpg)
Some Companies Involved in the Conference
• Indiana Utility Regulatory Commission• IMPA• Duke Energy• Indiana Power and Light (IPL)• GE Energy• Hoosier Environmental Council• White Construction
![Page 5: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/5.jpg)
Some Speakers
• Lt. Governor Becky Skillman
• Larry Flower, National Technical director of Wind Powering America
• Joan Wealing, past president of Benton County Advisory Plan Commission
• Richard Benedict, Indianapolis Power and Light (IPL)
• Diane Jenner, Duke Energy
![Page 6: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/6.jpg)
Purpose of Conference
• Highlight the great wind energy opportunities in IN
• Talk about current wind energy projects taking place in IN and other states
• Discuss potential challenges and solutions regarding those projects
![Page 7: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/7.jpg)
Why Wind Energy
• High oil prices
• Environmental Benefits
• Economical Benefits
![Page 8: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/8.jpg)
US Lagging Other Countries for Wind as a Percentage of Electricity Consumption
![Page 9: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/9.jpg)
U.S. Leads World in Annual Wind Capacity Additions; Third in Cumulative Capacity
![Page 10: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/10.jpg)
20% Wind Energy by 2030
• This will create many job opportunities in IN and other states.
• According to Paul Cummings 300GW is needed to meet the 20% plan by 2030
• http://www.20percentwind.org/
![Page 11: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/11.jpg)
Key challenges for the 20% plan• Production Tax Credit (PTC) : 1.5 cents/ KWh for the first ten years of
renewable energy facility's operation. It expires in December 31 2008
• Transmission Lines
• Materials
• Trained Labor
• Time
• Public Acceptance
![Page 12: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/12.jpg)
IN and Wind Energy
• Lt. Governor Becky Skillman announced that IN will supply 530 MW of wind energy by the end of 2008
• Two main Projects:– Benton County Wind Farm (130.5MW)– Fowler Ridge Wind Farm (399.6MW)– http://www.awea.org/projects/
![Page 13: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/13.jpg)
January 2006
![Page 14: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/14.jpg)
January 2006
![Page 15: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/15.jpg)
January 2006
![Page 16: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/16.jpg)
IN Current Power Plants
• In 2006 IN Produced 3.2% of electricity in the US
• Power plants are aging and demand for energy increasing
• Need both Coal and Wind
![Page 17: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/17.jpg)
Environmental Benefits
• Reduction of SOx, NOx and CO2 gasses
• No Water
![Page 18: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/18.jpg)
Public Acceptance
• Landowners concerns
• The government, landowners and developers should work together
• In general communities like the one in Benton County are looking forward for wind energy
![Page 19: Wind Indiana 2008 Indianapolis June 17-18 By : Jamal Alsawalhi](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649d2f5503460f94a069e3/html5/thumbnails/19.jpg)
Conclusion
• The purpose of the conference was to discuss why wind energy is important and discuss current projects in IN
• 20% Wind Energy plan is possible
• Unfortunately , No discussion regarding electric machinery involved