wimbledon to clapham junction - tfl consultations · wimbledon to clapham junction ... easier, less...

4
Crossrail 2 factsheet: Wimbledon to Clapham Junction Why do we need a Crossrail 2 station here? Large population growth is putting particular pressure on the Northern line. The Northern line between Balham and Stockwell is the most crowded part of the Tube network, and congestion is set to get significantly worse in future. New capacity on this part of the network is needed to avoid regular station closures in future. Tooting Broadway To relieve crowding on the Northern line, we had proposed a station at Tooting Broadway. Land for this was safeguarded earlier this year and further work on the station design has been completed to inform this consultation. Recent assessments have identified that ground conditions in the Tooting area would make it significantly more difficult to build a station at Tooting Broadway than originally thought. As a result of these challenges, we are looking at an alternative station location at Balham. Work to date has suggested that a station at Balham could be built with significantly less disruption and would still provide many of the same transport benefits as a station at Tooting Broadway. A station at Tooting Broadway would take up to two years longer to build, would require much larger worksites and thousands more lorry movements. This is because a station there would have to be built from the surface with more material removed by road. This would mean it would be more disruptive and cost nearly twice as much to build than a station at Balham. Further assessments of the ground conditions at Balham are required, but work to date suggests it would be faster, easier, less disruptive and cheaper to build a station here than at Tooting Broadway. Benefits of a station at Balham A Crossrail 2 station at Balham would still provide very similar benefits to one at Tooting Broadway, principally helping relieve crowding on the most congested parts of the Northern line. A route with a station at Balham would: • Improve your journey with up to 30 Crossrail 2 trains per hour to destinations including London, Hertordshire and Surrey • Provide a new route for onward journeys into central London • Connect with existing National Rail and London Underground services • Reduce crowding on the busiest part of the Northern line during peak periods by approximately 30 per cent • Provide step-free access from street level to the Crossrail 2 platforms • Added station capacity allowing up to 6,000 more passengers to use the station in peak hours • Improve access and support growth in Balham town centre 30 Trains per hour through the tunnelled section Reduction in crowding on existing services % Crossrail 2 is a proposed new railway line serving London and the South East, linking Surrey to Hertfordshire via central London destinations. Previous work on Crossrail 2 proposed a station at Tooting Broadway, but recent work has identified a number of problems with building a station at Tooting Broadway, and we are now considering an alternative station location at Balham. The earliest the scheme could be open by is 2030. All figures are based on current working assumptions and are subject to change. S12

Upload: lyphuc

Post on 04-Jun-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Crossrail 2 factsheet: Wimbledon to Clapham Junction

Why do we need a Crossrail 2 station here?Large population growth is putting particular pressure on the Northern line. The Northern line between Balham and Stockwell is the most crowded part of the Tube network, and congestion is set to get significantly worse in future. New capacity on this part of the network is needed to avoid regular station closures in future.

Tooting BroadwayTo relieve crowding on the Northern line, we had proposed a station at Tooting Broadway. Land for this was safeguarded earlier this year and further work on the station design has been completed to inform this consultation. Recent assessments have identified that ground conditions in the Tooting area would make it significantly more difficult to build a station at Tooting Broadway than originally thought. As a result of these challenges, we are looking at an alternative station location at Balham.

Work to date has suggested that a station at Balham could be built with significantly less disruption and would still provide many of the same transport benefits as a station at Tooting Broadway.

A station at Tooting Broadway would take up to two years longer to build, would require much larger worksites and thousands more lorry movements. This is because a station there would have to be built from the surface with more material removed by road. This would mean it would be more disruptive and cost nearly twice as much to build than a station at Balham.

Further assessments of the ground conditions at Balham are required, but work to date suggests it would be faster, easier, less disruptive and cheaper to build a station here than at Tooting Broadway.

Benefits of a station at BalhamA Crossrail 2 station at Balham would still provide very similar benefits to one at Tooting Broadway, principally helping relieve crowding on the most congested parts of the Northern line. A route with a station at Balham would:

• Improve your journey with up to 30 Crossrail 2 trains per hour to destinations including London, Hertordshire and Surrey

• Provide a new route for onward journeys into central London

• Connect with existing National Rail and London Underground services

• Reduce crowding on the busiest part of the Northern line during peak periods by approximately 30 per cent

• Provide step-free access from street level to the Crossrail 2 platforms

• Added station capacity allowing up to 6,000 more passengers to use the station in peak hours

• Improve access and support growth in Balham town centre

30Trains per hour through the tunnelled section

Reduction in crowding on existing services

%

Crossrail 2 is a proposed new railway line serving London and the South East, linking Surrey to Hertfordshire via central London destinations. Previous work on Crossrail 2 proposed a station at Tooting Broadway, but recent work has identified a number of problems with building a station at Tooting Broadway, and we are now considering an alternative station location at Balham. The earliest the scheme could be open by is 2030.

All figures are based on current working assumptions and are subject to change.

S12

The proposalA new Crossrail 2 station at Balham would be underground and could include:

• 2 x 250 metre long platforms. Station platform tunnels around 30 metres below ground level to the top of the tunnel

• A new Crossrail 2 station entrance and ticket hall onto Balham High Road

• A dedicated passageway between Crossrail 2 and Northern line services

To construct Crossrail 2 at Balham we would require two worksites

Site A – Would be used for construction of a new Crossrail 2 station entrance, ticket hall, and southern station shaft. This site would also be used for station tunnelling works. This site includes an office block and self-store facility.

Site B – Would be used for construction of a northern station shaft and for some station tunnelling works. This site includes Waitrose supermarket.

Minimising our construction impactsDrawing on Crossrail 1’s, experience of building stations, the proposed Crossrail 2 station at Balham is estimated to take between five to eight years to complete and a shaft is estimated to take four to five years to complete. Activity on site would fluctuate during this period. Proposals for the scheme are still at the early stages of design.

Feedback from this and future consultations, together with further design and engineering work, will refine the proposals ahead of seeking permission to build the new railway.

All our contractors would have to adhere to a Code of Construction Practice which would be developed with local authorities. This would set out requirements for considerate construction practices that use the latest techniques to reduce noise and disruption both for surface and underground works.

As part of our Environmental Statement, a full evaluation of the potential impacts of construction and operation of the scheme would be documented along with proposed methods to minimise impacts where required. These proposals would then form commitments as part of the application for planning consent.

Shafts between Wimbledon and Clapham JunctionThe shafts would provide tunnel ventilation, access for the fire and rescue services and a safe evacuation route for passengers in the event of an emergency.

For further information about how shafts work, please refer to G2: Crossrail 2 shafts.

A station at Balham would require changes to the proposed Crossrail 2 tunnel alignment. This would mean that shafts would be required in new locations to those previously suggested.

To enable Crossrail 2 to operate safely, we would need two shafts at even intervals between Wimbledon and Balham stations and one shaft midway between Balham and Clapham Junction stations.

Our current preferred sites:

Between Wimbledon and Balham stations – one shaft in the Weir Road site and another within the Springfield Hospital development

Between Balham and Clapham Junction stations – one shaft on the eastern edge of Wandsworth Common, at the end of Honeywell Road.

A single worksite would be required to build each shaft and a typical shaft would take approximately five years to complete. Activity on site would fluctuate during this period. Once the site has been cleared and prepared, the major construction work to dig out the shaft would usually be complete within two years.

12971

76

41

68

115

1

2

61

55

13

2

1

2

85

1

211

1

2

44

100

44

155

1

2019

1

4

12

18

1

1

16

1

132

12

31 1

1

8

1

2

1

22

12

8

37

1

23

222

189

214

10

1

1

200

20

25

1

45

34

53

1

75

2

76

2

95

104

472

54

2

1

1

12

23

48

41

55

68

15

2

7766

1

46

169

4

101

22

92

PAK

ENH

AM

CLO

SE

N O R G R O V E S T R E E T

OLD

DA

I R Y

MEW

S

H I L D R E T H S T R E E T M S

H I L D R E T H S T R E E T

B E D F O R D H I L LP L A C E

CA

ISTO

R M

EWS

BA

LHA

M G

RO

VE

END

LESH

AM

RO

AD

R AV E N S L E A R O A D

F E R N S I D E R O A D

G O S B E R T O N R O A D

TA N TA L L O N R O A D

H E A R N V I L L E R O A D

CH

ESTN

UT G

RO

VE

B A L H A M PA R K R O A D

B O U N D A R I E S R O A D

END

LES

HA

M R

OA

D

CHESTN

UT G

ROVE

O A K M E A D R O A D

RA

MS

DEN

ROA

D

B A L H A M S TAT I O N R O A D

PENNY

MEW

S

RO

WFA

NT R

OA

D

H U N T E R C L O S E R AV E N S T O N E S T R E E T

O A K M E A D R O A D

L A R C H C L O S E

B Y R N E R O A D

ET

HE

LBE

RT

ST

RE

ET

R O S S I T E R R O A D

S I S T O V A R O A D

SH

IPK

A R

OA

D

LAI TW

OO

D R

OA

D

H A R B E R S O N R O A D

O R M E L E Y R O A D

O L D D E V O N S H I R E R O A D

BA

LH

AM

H

IG

H

RO

AD

F E R N L E A R O A D

BE

DF

OR

D

HI

LL

BA

L

HA

M

HI

GH

R

OA

D

Hornsby HouseSchool

Chestnut GroveSchool

BalhamBaptist Church

BalhamLibrary

Waitrose

Royal Mail Delivery andEnquiry Office Balham

Mosque

Trinity St. Marys C of EPrimary School

St. Mary &St. Johnthe Divine

RavenstonePrimary School

BalhamCommunityCentre

The BedfordTravelodge

Sainsbury’s

Balham

BalhamBalhamBalham

BalhamBalham

Du CaneCourt

Proposed Crossrail 2 stations

A

B

Proposed worksites

Crossrail 2 underground tunnels

Crossrail 2 platforms

New station entrances

Key local buildings

Station shaft

Key

Existing station entrances

Northern line

© Crown copyright and database rights 2015 Ordnance Survey 100035971/043© Copyright Transport for London 2015

On completion of the works at each site, an above-ground structure known as a ‘head-house’ would remain. The head-house would provide access to the shaft, the equipment within it and the tunnels below. It would also allow air to be drawn into and out of the tunnel ventilation system.

At this early stage of Crossrail 2’s design, we expect a typical head-house to be at least two storeys high and to occupy an area of around 25 metres by 25 metres. As the scheme develops further, we would engage with the local authority, interested stakeholders and local communities to inform the designs for each head-house.

For further information about head-houses please refer to G2: Crossrail 2 shafts.

Proposed shaft at SpringfieldThe shaft would ideally be within the Springfield Hospital redevelopment (off Burntwood Lane). We would discuss possible locations for the shaft with Springfield Hospital in the next stage of Crossrail 2’s development. Our current preferred site has been selected to avoid taking land in residential areas to the east and to minimise the chance of encountering bad ground conditions during construction.

Map of proposed shaft at Springfield

Preferred area for the shaft location

Crossrail 2 underground tunnels

Key

Proposed shaft on Wandsworth Common (Honeywell Road)The shaft would be on the eastern edge of Wandsworth Common, at the end of Honeywell Road (off Bolingbroke Grove). Our current preferred site has been selected because it is the only non-residential piece of land in the area which is large enough to allow construction of a shaft.

Map of proposed shaft on Wandsworth Common

Crossrail 2 underground tunnels

Key local buildings

Indicative head-house location

Key

Proposed worksite

WimbledonPark Lake

River Wandle

River Wandle

River Wandle

Rive

r W

andl

e

River Wandle

WimbledonPark

Waterfall Garden

AshenGrove

Wimbledon Park

King George’s Park

Durnsford RoadRecreation Ground

WimbledonCemetery

LambethCemetery

WimbledonCemetery

LambethCemetery

StreathamCemetery

Garratt Park

WandsworthCemetery

StreathamCemetery

FountainRecreation Ground

Gap RoadCemetery

BREM

AN

S ROW

ST.

AN

DR

EW’S

C

OUR T

ALD

R I CH T ERRA

CE

B R O A D G AT E S

R O A D

D O U N E S F O R T H G A R D E N S

FLOCK M

I L L P LACE

B R A M S T O N RO A D

BARNF I E LD C LOSE

DA

WN

AY

GA

RD

ENS

S T. G E O R G E ’ S G

RO V E

S Q U I R E S C O U R T

BE

NT

LEY

CLO

SE

G R E S H A M WAY

LYND

ON

YAR

D

R O S E M A R Y R D

H O P WO O D C

L O S E

G L E N TA N N E R WAY

BR ICK F I E LD

ROA

D

WAY N F L E T E S T R E E T

TRAN

MERE RO

AD

V ICTOR IA ME W S

SWA

BY RO

AD

LEC

KFO

RD

RO

AD

OPEN

V I EWH

EAD

ING

TON

ROA

D

L I D I A R D R O A D

OPEN

V I EW

F I E LDV I EW

F I E LDV I EW

G U N N E R S R O A D

GO

DLEY RO

AD

T I L EHU

RST ROA

D

E L L ERTON

ROA

D

MELRO

SE AVENU

E

BRA

EMA

R AVENU

E

R E V E L S T O K E R O A D

ELSEN

HA

M S

TREET

HEYTH

OR

P S

TREET

CLO

NM

OR

E STR

EET

S O U T H D E A N G A R D E N S

L AV E N H A M R O A D

GA

RT

MO

OR

GA

RD

EN

S

ELS

EN

HA

M S

TR

EE

T

HE

YT

HO

RP

ST

RE

ET

K I N G S C L I F F E G A R D E N S

CLO

NM

OR

E S

TR

EE

T

EN

GA

DIN

E S

TR

EE

T

B R O O K W O O D R O A D

B R O O K W O O D R O A D

WEYB

OU

RN

E STR

E ET

WE

IR R

OA

D

S T E E R F O R T H S T R E E T

ST

EE

RFO

RT

H S

TR

EE

T

T H O R N D E A N S T R E E T

BR

OO

KLA

ND

S A

VEN

UE

T R E W I N T S T R E E T

DA

WL I

SH

AV

ENU

E

S K E L B R O O K S T R E E T

SUM

MERLE

Y STREET

H A S L E M E R E AV E N U E

R AV E N S B U R Y R O A D

RA

VEN

SB

UR

Y T E RR

AC

E

G R O T O N RO A D

P E N W I T H R O A D

S T R AT H V I L L E R O A D

T H O R N S E T T R O A D

KNA

RESB OROUGH DR I VE P E N W I T H R O A D

RIV

ERD

ALE D

RI V

E

S T U A R T R O A D

A S H E N G R O V E

WE

LL ING

TO

N R

OA

D

NO

RMA

NTO

N AVEN

UE

ALVERSTO

NE AVEN

UE

WO

LSE L E Y AVEN

UE

H AVA N A R O A D

DU

RNSFO

RD A

VENU

E

G O R D O N D A L E R O A D

LUC

I EN R

OA

D

R E V E L S T O K E R O A D M O U N T R O A D

R AV E N S B U R Y R O A D

ENG

AD

INE S

TREET

E LBO

RO

UG

H S

TREET

P E N W I T H R O A D

TR

EN

TH

AM

ST

RE

ET

AS

TO

NV

I L L E S

TR

EE

T

AC

UB

A R

OA

DS T R AT H V I L L E R O A D

B O D M I N S T R E E T

L AV E N H A M R O A D

AR

RA

GO

N R

OA

D

ELB

OR

OU

GH

ST

RE

ET

TR

EN

TH

AM

ST

RE

ET

AS

TO

NV

I L L E S

TR

EE

T

F R E S H F O R D ST R E E T

I S I S S T R E E T

Q U I N T O N S T R E E T

L I T T L E T O N S T R E E T

WA L D R O N R O A D

F R A N C H E CO U R T R

O A D

BR ID

GFO

RD S TREET

FRANCHE COURT ROAD

TRAN

MERE RO

AD

PEARTREE AVENUE

SWA

BY RO

AD

D AW N AY R O A D

DEE

SID

E R

OA

D

S T R AT H D O N D R I V E

OPEN

V I EW

S T. G E O R G E ’ S G R O V E

AT

KIN

SO

N M

OR

LEY

AV

EN

UE

L A N E S B O R O U G H WAY

G R O S V E N O R WAY

H O M E PA R K R O A D

VIN

EYA

RD

HI L

L R

OA

D

MELROSE AVENUE

VIN

EYA

RD

HI L

L R

OA

D

HO

ME PA

RK

RO

AD

S T R O U D R O A D

R Y F O L D R O A D

HO

ME PA

RK

RO

AD

FARQ

UH

AR RO

AD

THE C

RES

CEN

T

C R E S C E N T G A R D E N S

STR

ATHM

OR

E RO

AD

TH

E C

RE

SC

EN

T

PI T

T C

RES

CEN

T

P I T T C R E S C E N T

A R C H W AY C L O S E

EN

DE

AV

OU

R W

AY

WE

IR R

OA

D

WE

I R R

OA

D

R I V E R S I D E R O A D

RO

SEM

AR

Y RO

AD

SIW

AR

D R

OA

D

R I V E R S I D E R O A D

M A S K E L L R O A D

S T. MA R T I N ’ S W

AY

A L D R E N RO A D

B U R ME S T E R R

O A D

KE

BL

E STR EE T

HUNTSP I L L S TREET

H U N T S P I LL S

T R E E T

BE L L EW STREET

SQUAREY S TREET

HA

ZE LHU

RST ROA

DBUR F I E L D C L O S E

STRATHD

ON

D

R IVE

H A Z E L H U R S T R O A D

S T R AT H D O N D R I V E

THURSO S TREET

SMAL LW

OOD ROAD

ROSTE L LA ROAD

R O G E R S RO A D

DO

RA R

OA

D

KEN

I LW

OR

TH A

VEN

UE

WA L D E M A R R O A D

DO

RA

RO

AD

L A N D G R O V E R O A D

KEN

I LW

OR

TH A

VEN

UE

PO

PLA

R C

OU

RT

WE I R R

OA

D

HA

VE LO

CK

RO

AD

LAKE ROAD

V INEYA

RD H

I LL

ROA

D

CU

RR

I E HI L L C

LOS

E

CAM

ELO

T C LO

SE

LAMBOURN

E AVENUE

HOME P

ARK ROAD

F O U N TA I N R O A D

ALSTO

N RO

AD

W

ATERSI DE W

AY

PE VEN

SE Y ROADB E R TA L R O A D

ALSTO

N RO

AD

W O R S L A D E R O A D

C O P P E R M I L L L A N E

S M A L LW O O D R O A D

PE VENSEY ROA

D

FOSS RO

AD

CRANMER T ERRACE

FOUNTA IN R

OAD

FA I RL I G

HT ROAD

KHARTOUM R

OAD

EA

RL

SF

IE

LD

R

OA

D

MA

GD

AL E

N R

OA

D

GA

RR

AT

T

LA

NE

GA

RR

AT

T L

AN

E

GA

RR

AT

T

LA

NE

BU

RN

TW

OO

D L A

NE

AB

OY

NE

RO

AD

AB

OY

NE

R

OA

D

BU

RN

TW

OO

D L

AN

E

A R T H U R R O A D

DU

RN

SF

O

RD

RO

AD

PL

OU

GH

LA

NE

SU

M

ME

RS

TO

WN

G A R R A T T L A N E

WI M

B L E D O N R O A D

G A R R A T T L A N E

GA

RR

AT

T L

AN

E

ST

RA

TH

EA

RN

R

OA

D

ST

RA

TH

EA

RN

R

OA

D

G A P R O A D

DU

RN

SF

OR

D

RO

AD

P L O U G H L A N E

LE

OP

OL

D R O A D

LE

OP

OL

D

RO

AD

A R T H U R R O A D

AR

TH

UR

R

OA

D

BL

AC

KS

HA

W

RO

AD

DU

RN

SF

OR

D

RO

AD

ME

RT

ON

R

OA

D

DU

RN

SF

OR

D

RO

AD

Footbridge

BowlingGreen

Tennis Courts

Playground

War Memorial

War Memorial

Allotments

BowlingGreen

Sports Ground

Swaby GardensPlay Space

Tennis Court

Sports Ground

BowlingGreen

FootballGround

Sports Ground

War Memorial

War Memorial

Central LondonGolf Centre

BatterseaIronsides

Sports Club

BurntwoodSchool

Chapel

Chapel

SmallwoodPrimary School& Language Unit

FairlightChristianCentre

Ricards LodgeHigh School

Wimbledon ParkGolf Club

St. Luke’sChurch

Christ the KingCatholic Church

WimbledonMosque

Wimbledon ParkPrimary School

Chapel

TrainDepot

Chapel

Homebase

Early YearsCentre

TheRainbow

School

Wickes

Garratt ParkSchool

LambethCrematorium

SummerstownMission EvangelicalChurch

St. MarysChurch

Chapel

Chapel

Chapel(Former)

BurntwoodSchool

St. BarnabasC of E Church

SouthfieldsGroup Practice

SouthfieldsMethodist Church

TaraTheatre

EarlsfieldPractice

EarlsfieldBaptist Church

EarlsfieldLibrary

St. Andrew’sC of E Church

EarlsfieldPrimary School

The SpencerClub

Wimbledon ParkAthletics Track

Athletics Ground

Wimbledon ParkWatersports Centre

WimbledonParkWimbledonParkWimbledonParkW I M B L E D O N P

WE

IR R

OA

D

A R C H W

WE

IR R

OA

D

Y C L O S E

EN

DE

AV

OU

RW

AY

WE

I RR

OA

D

DR

O

AD

Homebasee

edonLake

River Wandllee

Riivver WWanddlllle

RiverW

andle

enenWaterfall Garde

AAshenGrGroveG

Wimbledon Park

King George’s Park

Durnsford RoadRecreation Ground

WimbledonCemetery

LambethCemetery

WimbledonCemetery

LambethCemetery

StreathamCemetery

Garratt Park

WandsworthCemetery

BREMM

AANN

SSRROO

W

ST.

AN

DR

EW’S

COUR TT

ALD

R I CH T ERRA

CE

B R O A D G

R O A

D O U N E S F O R T H G A R D E N S

B R A M S T O N RO A D

BARNF I E LD C LOSE

DA

WN

AY

GA

RD

ENS

S T. G E O R G E ’ SG RO V E

S Q U I R E S C O U R T

NT

LEY

BE

NT

L EY

CLO

SE

G R E S H A M WAY

LYND

ON

YAR

D

R O S E M A R Y R D

H O P WO O DO D C

L O S E

G L E N TA N N E R WAY

BR ICK F I E LD

ROA

D

WAY N F L E T E S T R E E T

TRAN

MERE

ROA

D

V ICTOR IA

ME W S

SWA

BY RO

AD

LEC

KFO

RD

RO

AD

OPEN

V I EWH

EAD

ING

TON

ROA

D

HEA

DIN

GTO

N RO

AD

OA

D

L I D I A R D R O A D

L I D

O A D

OPEN

V I EW

OPEN

V I EW

F I E LDV I EW

F I E LDV I EW

G U N N E R S R O A D

GO

DLEY RO

AD

T I L EHU

RST ROA

D

MELRO

SE AVENU

E

BRA

EMA

R AVENU

E

R E V E L S T O K E R O A D

ELSEN

HA

M S

TREET

HEYTH

OR

P S

TREET

CLO

NM

OR

E STR

EET

L AV E N H A M R O A D

ELS

EN

HA

M S

TR

EE

T

HE

YT

HO

RP

ST

RE

ET

CLO

NM

OR

E S

TR

EE

T

EN

GA

DIN

E S

TR

EE

T

B R O O K W O O D R O A D

WEYB

OU

RN

ES

TRE E

S T E E R F O R T HS T R E E T

ST

EE

RFO

RT

H S

TR

EE

T

T H O R N D E A N S T R E E T

BR

OO

KLA

ND

S A

VEN

UE

BR

OO

KLA

ND

S A

VEN

UE

T R E W I N T S T R E E T

DA

WL I

SH

AV

ENU

E

S K E L B R O O K S T R E E T

SUM

MERLE

Y STREET

H A S L E M E R E AV E N U E

R AV E N S B U R Y R O A D

RA

VEN

SB

UR

YT ER

RA

CE

G R O T O N RO A D

P E N W I T H R O A D

S T R AT H V I L L E R O A D

T H O R N S E T T R O A D

KNA

RESB OROUGHDR I VE P E N W I T H R O A D

IVE

S T U A R T R O A D

A S H E N G R O V E

WE

LL ING

TO

N R

OA

D

NO

RMA

NTO

N AVEN

UE

ALVERSTO

NE AVEN

UE

WO

LSE L E Y AVEN

UE

H AVA N A R O A D

DU

RNSFO

RD A

VENU

E

G O R D O N D A L E R O A D

LUC

I EN R

OA

D

R E V E L S T O K E R O A D M O U N T R O A D

R AV E N S B U R Y R O A D

ENG

AD

INE S

TREET

E LBO

RO

UG

H S

TREET

P E N W I T H R O A D

TR

EN

TH

AM

ST

RE

ET

AS

TO

NV

I L L E S

TR

EE

T

AC

UB

A R

OA

DS T R AT H V I L L E R O A D

B O D M I N S T R E E T

L AV E N H A M R O A D

AR

RA

GO

NR

OA

D

ELB

OR

OU

GH

ST

RE

ET

RE

NT

HA

M S

TR

EE

T

VI L L E

ST

RE

ET

F R E S H F O R D ST R E E T

I S I S S T R E E T

Q U I N T O N S T R E E T

R E E T

WA L D R O N R O A D

F R A N C H E CO U R T R

O A D

BR ID

GFO

RD S TREET

FRANCHE COURT ROAD

TRAN

MERE RO

AD

PEARTREE AVENUE

SWA

BY RO

AD

D AW N AY R O A D

D AW N AY R O A D

DEE

SID

ERRR

OOAAA

D

S T R AT H D O N D R I V E

T H D O N D R I V EE

OPEN

V I EW

OPPEN

V I EW

SS TT.. GG EE OO RR GG E ’’ SS GG R OO V E

AT

KIN

SO

N M

OR

LEY

AV

EN

UE

L A N E S B O R O U G H WAY

G R O S V E N O R WAY

H O M E PA R K R O A D

VIN

EYA

RD

HI L

L R

OA

D

MELROSE AVENUE

VIN

EYA

RD

HI L

L R

OA

D

HO

ME

PAR

KR

OA

D

S T R O U D R O A D

R Y F O L D R O A D

HO

ME PA

RK

RO

AD

EP

FARQ

UH

AR RO

AD

THE C

RES

CEN

TT

C R E S C E N T G A R D E N S

STR

ATHM

OR

E RO

AD

TH

EC

RE

SC

EN

T

NT

T T C R E S C E N TT C R E S C E N T

P

R I V E R S I D E R O A D

RO

SEM

AR

Y RO

AD

SIW

AR

D R

OA

D

R I V E R S I D E R O A DR I V E R S I D E R O

M A S K E L L R O A D

S T. MA R T I N ’ S W

AY

A L D R E N RO A D

B U R ME S T E R R

O A D

KE

BL

ESTR EE T

HUNTSP I L L S TREET

H U N T S P I LL S

T R E E T

BE L L EW STREET

SQUAREY S TREET

HA

ZE LHU

RST ROA

DBUR F II EE LL DD

C LL OO SS E

SSSTTRRATHD

ON

DR IVE

H A Z E L H U R S T R O A D

S T R ATT HH DD OO NNDDD RRR III VVV EEE

THURSO S TREET

SMAL LW

OOD ROAD

ROSTE L LA ROAD

DO

RA

RO

AD

KEN

I LW

OR

TH A

VEN

UE

WE I R

R OA

D

V INEYA

RD H

I LL

ROA

D

CU

RR

I E HI L L C

LOS

E

CAM

ELO

T C LO

SE

AM

ELO

T C LO

SE

LAMBOURN

E AVENUE

HOME P

ARK ROAD

W

ATERSI DE

W

PE VEN

SE Y

ROADB E R TA L R O A D

ALSTO

N RO

AD

W O R S L A D E R O A D

R M I L L L A N E

C O P P E RS M A L LW O O D R O A D

PE VENSEYRO

AD

FOSS RO

AD

ROA

D

FA I RL

KHARTOUM R

OAD

MA

GD

AL E

N R

OA

D

GA

RR

AT

TL

AN

E

AT

T L

AN

E

GA

RR

AT

TL

AN

E

BU

RN

TW

OO

D L A

NE

AB

OY

NE

RO

AD

AB

OY

NE

RO

AD

AB

OA

BO

YN

E R

OA

D

AB

OY

NE

R

OA

D

AB

OY

NE

R

OA

D

AB

O

BU

RRN

TW

OO

DL

AAAN

A R T H U R R O A DR O A D

A R T H U R

A R T H U R R O A

DUU

RS

FO

RDD

RO

AD

PL

OU

GH

LA

NEE

SSSUUU

MMM

MMMEEE

RRRSSSS

TTTOOO

WWWNNN

G A R R A TT T L A N E

WI M

B L E D O N R O A D

M

G A R R A T T L A N E

AD

SST

RRA

TH

EAA

RRNNN

ROO

AADD

DU

RN

SF

OR

DR

LE

OP

OL

D

RO

AD

LE

OP

OL

D

RO

AD

A R T H UUU RRRRRR OOO AAA DDD

AAARRR

TTTHHH

UUURRR

RRROOO

AAADDD

BL

AC

KS

HA

WR

OA

D

DDDUUU

RRRNN

SSSFFF

OOORRR

DDRRR

OOOAAA

DDD

ME

RTT

OOONNN

RROOO

AAADDD

DDDDUUUU

RRNNN

SSSSFFF

OOOORRRR

DDDDRRRRR

OOOOOOAAAAAAAA

DDDDDDD

b dgetbridgFootFootbF

owlBowwlingeenGreeen

Tennis Courts

Playgroundygrou dPlayground

War Memorial

moriaorialem ialWar Mem

Allotments

wlingBoeenGre

Sports Grounds G undG

y Gaby GarSwaby ardensSpaceay Sp cePlay S e

Tennis Court

Sports Ground

BowlingGreen

FootballGround

War

Central LondCeolf CentreGo

BBatterseaIronsidesonsronsidesnns

ClubClubbSportststs Clubts Club

BurntwoodSchool

apeChapelChapelCh

C

woodmaSmaSmallwSmallwoloSchoolPrimPrimPrimary SPrimary Sc

tge Unitan& Langnguagenguage

FairlightChristianCentre

WimbbledWimbledon ParkWimbledimbledbGooGoGolf Cluolf Clu

uke’sSt. LukeukechhurchurcChuhur

hrist tC st the KingChrist trhrist theCCCaatholic ChurchathCCa

ledoWimbledonededdondonMosque

WimbledonWimbledo aWimbledon ParkWimbledon PaoolPrimaPrimaPPrimary SchoolPrimary School

rainTrDepotD

Chapel

Early Yly YeEarE y YearsssCCentre

TheRainbow

ScSchocc

Wickes

kkatt Pt ParGarratt Parkarratt ParkhoSchoolSchoolSchool

amLambethmambetLambethmtoriutorto iumCreCC mmaCrematoCremato

townnstowmmerstouuSuummummngelielicang licaloon EvanMisMisssioissio

Church

t. MSt. MaSt. MarysSt. MarysCChChurchCh

ChapelhhapeelhChCh

ChapelChChaFormer)(Fo(Fo

oonBurntwoodrntwooSchoolSchooSchoo

St. BarnabasC of E Church

ssouthhfiSouthfiefieldshfieldsticeiceceouup PraacGroup Pracacticactice

SouthfieldsSMethodist ChurchMMeMM

TaraTheatre

eldrlsEarlsrlsfierlsfiecececPracacticactic

eldEarEararlsfiearlsfiestst ChurchBaBaptptist ptist

EarlsfieldLibrary

w’ssSt. Andrew’ASt. AndreSt Andrewt Andrt Andre

S

ChurhurcC of E ChurchC of E C

ldldEarEarrlsfieldrlsfieldarEarlschoolcaaPP ary Scary ScPrimaPrima

erpencThe SpencncerncerClubCllulu

und

bledon Parkaraports Centrentrentre

nedonblbbmmmmmmmiWiPark

Rive

rW

andl

e

L I T T L E T O

E

lloll

nnnnni nonledobbliimmmmm eimbledoddbbbbbbbbbbbbbbbbbbbbbbbbbbbmmmmmmmmmmmiWiWiWWiWWWW ddddddeeeeeellllllllll oooooonnnnnnnnnnnnnnmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmiiiiiiiiiiWWWWWWWWWW ddooeeiiiiiiWimbledonkkPParParaaaaaaaa kkkkkkkkkkrrrrrrPPPPPP kkaa kkkkPark

WimbledonWimbledonWimbCemeteryCeme

eaanePlouough LaR rrkRetaai l Par

lhurstlhursthuHazelhursthurEstate

WimbledonWimb onononStadiumdiu

GarrattGarrattarssne rkBusineess ParkBussi es

eeAboyne Estate

he QuadrangleThThe Quadranhe Quadran

GarrattGreen

HortonnHalls

essRufRufu siBuss BusininesRufus esssssssssstCentree

P A KA R KS UU MS U MS UU M MMMMMMMM MM EMMMM RE RE RRRRE R O W NOO W NO WO WOS T O W NS T O WR SS

yW

R L

G

A

A

r

o

C

eL

G AA

ORIT V DA

o

bp

P

Proposed worksites

Crossrail 2 underground tunnels

New station entrances

Key local buildings

Station shaft

District line

Key

Existing station entrances

Proposed worksites

Crossrail 2 underground tunnels

New station entrances

Key local buildings

Station shaft

District line

Key

Existing station entrances

Proposed worksites

Crossrail 2 underground tunnels

New station entrances

Key local buildings

Station shaft

District line

Key

Existing station entrances

PI T

T C

RES

CEN

T

PI T

T

W AY

M

ET

T L E T O N S T R E E T

D

owhoolhoolchoochoo

P I T T

N

M EEE

Rive

G

ANN

EEE

Crossrail 2 underground tunnels

Key local buildings

Proposed shaft worksite

Key

Proposed worksite

Map of proposed shaft at Weir Road

Proposed shaft at Weir Road The shaft would be within the Weir Road industrial estate. It would be integrated with the larger facility proposed by Crossrail 2 at Weir Road (where we would park or ‘stable’ trains and wash, clean and maintain them in a depot - for further details see the Wimbledon station factsheet). Our current preferred site has been selected because it allows Crossrail 2 to avoid other underground tunnels in the area.

© Crown copyright and database rights 2015 Ordnance Survey 100035971/043© Copyright Transport for London 2015

© Crown copyright and database rights 2015 Ordnance Survey 100035971/043© Copyright Transport for London 2015

© Crown copyright and database rights 2015 Ordnance Survey 100035971/043© Copyright Transport for London 2015

To find out more Visit www.crossrail2.co.uk where you can view and download a range of factsheets, maps and other information about the scheme.

Come along to one of our drop-in events where you will have an opportunity to view our proposals and speak to members of the Crossrail 2 team. Please visit www.crossrail2.co.uk for details about events in your area.

Please contact us to request a copy of this leaflet and other Crossrail 2 consultation material in hard copy, large print, audio or another language.

Contact us • Email: [email protected]

• Helpline: 0343 222 0055*

• Post: Freepost Crossrail 2 Consultations

• Website: www.crossrail2.co.uk

*Service and network charges may apply. See tfl.gov.uk/terms for details

Have your say This consultation gives you the opportunity to comment on proposals for Crossrail 2. Visit www.crossrail2.co.uk to leave a comment or provide a response to the consultation questions. The consultation will close on Friday 8 January 2016.

Development is still at an early stage. There will more opportunity to provide feedback on Crossrail 2 as the scheme develops.

S12: Wimbledon to Clapham Junction / Oct 2015

HERTFORDSHIRE

HILLINGDON

WESTMINSTER TOWERHAMLETS

BARNET

ISLINGTON

WALTHAMFOREST

LAMBETHH

AM

MERSM

ITH

& FU

LHA

M

KENSINGTON& CHELSEA

HARROW

RICHMONDUPON

THAMES

MERTON

SOUTHWARK

CITY OFLONDON

KINGSTONUPON

THAMES

EALING

SUTTONSURREY

SURREY

SURREY

BROMLEY

HOUNSLOW

WANDSWORTH LEWISHAM

CROYDON

BRENT

HARINGEY

CAMDENHACKNEY

NEWHAM

ENFIELD

River Thames

Victoria

Clapham Junction

Wimbledon

Tooting Broadway

Balham

Epsom

Ewell West

Teddington

Stoneleigh

Worcester Park

Berrylands

Sunbury

NewMalden

Euston St. Pancras

Angel

HamptonWick

KemptonPark

Kingston

Norbiton

Tottenham Court Road

Surbiton

Hampton

Fulwell

Shepperton Hampton Court

Upper Halliford

Thames Ditton

Chessington South

Chessington North

Tolworth

MaldenManor

Dalston

Tottenham Hale

Northumberland Park

Angel Road

Ponders End

Brimsdown

Waltham Cross

Cheshunt

Broxbourne

Enfield Lock

Hackney Central

Wood GreenNew Southgate

Alexandra Palace

Seven Sisters

Turnpike Lane

King’s RoadChelsea

Key

Tramlink

Stations

National Rail

Highspeed 1

Highspeed 2

London Underground

London Overground

Crossrail 1

Tunnel portal

Intermediate shaft

Tunnelled section depots and stabling

Central core of route

Regional branches

Potential future Eastern branch

Route previously consulted on via Tooting Broadway

Newly proposed route

Option via Turnpike Lane and Alexandra Palace

Option via Wood Green

October 2015

Crossrail 2 route (autumn 2015)

MAYOR OF LONDON