Why kicking Colombia out of the world cup could help keep the lights on in Rio. Erika Wilson, Managing Director, Wilson Power Solutions. “Easy energy efficiency gains through super low loss amorphous technology”. Agenda. Brief intro Wilson Power Solutions Why do transformer losses matter? - PowerPoint PPT PresentationTRANSCRIPT
Why kicking Colombia out of the world cup could help keep the lights on in Rio
“Easy energy efficiency gains through super low loss amorphous technology”Erika Wilson, Managing Director, Wilson Power Solutions
1. Brief intro Wilson Power Solutions2. Why do transformer losses matter?3. How can we mitigate losses?4. Amorphous core technology5. Additional savings through VO6. The proof is in the pudding - Case studies7. Q&A
Agenda
A) I walkedB) By trainC) Took the carD) I flew in by helicopterE) Other
How did you get to the venue today?
2
5
1 1
0
A B C D E
Wilson Power Solutions• Leaders in energy efficient power distribution• 67 years of power engineering, family run and
managed in 3rd generation• Pioneers in super low loss amorphous technology
A) 0.5%B) 0.75%C) 1%D) 2%E) >2.5%
How much energy is wasted through transformer losses worldwide?
0 0
21
7
A B C D E
Transformer losses worldwide
“energy generated wasted through
transformer losses”
3%
Transformer losses Europe
• 4.6 million distribution transformers (EU)• Losses exceed 38 TWh /year
• = Annual energy consumption Columbia
• = 30 million tonnes CO2
Transformer losses
Two types of losses:• No load losses = Core (iron)
losses• Load losses = Copper
(winding) losses
Our solution- The Wilson e2
• Creating UK’s first super low loss amorphous transformer– Amorphous metal core – Low current density conductors
• Reduced core losses by 75%• Reduced combined losses by 50%
A) FlexibleB) ShapelessC) HollowD) ResilientE) Madly in love
What does “amorphous” mean?
2
5
3
2
0
A B C D E
Amorphous core technology
CRGO core Amorphous core
ámorphos: origin Greek; shapeless
• Random atomic structure
• Lower hysteresis losses
• Lower eddy current losses
• Less friction when magnetic field applied
• Lower operating temperature
• Transformer technology since mid 70’s
Amorphous metal core manufacture
PRESPOOLING
CUTTING STACKING
EDGE FINISHINGANNEALING
V
CORE FORMING
CORE LACING
Amorphous metal core and coil assembly
Core Coil Assembly
HV tap leads In tank assembly
Amorphous Core
A) 3,000kWh - £270B) 13,000kWh - £1170C) 23,000kWh - £2070D) 33,000kWh - £2970E) 43,000kWh - £3870
How much will a 1MVA Wilson e2 typically save through reduced losses per year?
12
3
8
4
A B C D E
Transformer loss comparison
Size Standard loss (CRGO) Super low loss amorphous (AMT) –e2
Watts saved*
kWh saved*
£’s saved*
CoreLosses [W]
Load losses [W]
TotalWatts
Core losses [W]
Load losses [W]
TotalWatts
1000kVA 1,350 12,500 13,850 500 6,530 7,030 6,820 33,072 £2,976
*annual savings based on 70% load and electricity costs of £0,09/kWh
Savings through transformer losses
• Typically save 33,000kWh =£3000 /pa**
• Lifetime savings: £75,000 (25yrs)
• Mitigating ~ 17.5t CO2 /pa*
*Carbon factor: 1kWh = 0.537 kg/CO2** Cost at terminals: 1kWh = £0.09
• Guaranteed savings through reduced transformer losses– Core losses
reduced up to 75%– Combined losses
cut in half– Typical 1MVA
saves £3000 pa
Two areas for energy savings
• Potential savings through voltage management /VO– Extended tapping range – No additional costs– 2in1 solution– Typical electricity savings
5-8%
Savings through Voltage Management
• 2in1 solution
• Extended tapping range
• No additional system losses
• Available with OLTC
• 3 - 12% electricity savings
• Allows constant output voltage –215 volts to 254 volts• 17 positions in 1% steps• Fully automatic AVR relay• Maximising savings- improved savings up to 2%• Safety & Security of supply
Wilson e2 PLUS with OLTC – On Load Tap Changer
Do you think that Voltage Optimisation/Management actually saves energy?
A) Yes- for some applicationsB) No C) Don’t knowD) Maybe – I need more
detail
10
0
54
A B C D
Customer Installations
• Example installations– TX in series with VO equipment (ASDA)– TX retrofit (NHS)– TX new build (TESCO)
• Example customer energy savings
Wilson e2 in series with Voltage Optimisation (VO) equipment
• Wilson e2 in series with VO equipment
• VO set to reduce Voltage to ~223V
• Wilson e2 on nominal tap setting
Wilson e2 in series with VO equipment
• VO equipment removed from circuit
• Wilson e2 tapped down to deliver ~223V
• Load & power consumption measured
RESULT: Further 3% reduction in kWh consumption
Bypass
•5.8% voltage reduction
•Reduced transformer losses
• Overall 6.5% reduction in energy consumption
•Payback on capital investment = 18 months
Wilson e2 transformer retrofit
•Specify Wilson e2 (based on loss values)
•No dedicated VO equipment in new stores
“The Wilson e2 saves Tesco 9 million kWh per year”
TESCO Technical Standards Manager
Wilson e2 transformer - New build
Over 400 client installations
• Leading hotel chain: 12% reduction in kWh
• Major retailer: 7.1% reduction in kWh
• Paper manufacturer: 3.5% reduction in kWh
• Food supplier: 11% reduction kWh /t product
• Major tourist attraction: 5.8% reduction in kWh
• Leading snacks producer: 9% reduction in kWh
A) Would never considerB) Might consider but need
more infoC) Will likely considerD) Will definitely consider
Would you choose amorphous transformers for your sites?
0
3 3
4
A B C D
Any Questions?
Q&A