WHY DIG TRENCHES WHEN THERE ARE BETTER SOLUTIONS?
trenchless technology – simple & easy
NATURAL GAS DISTRIBUTION NETWORKS
FIBRE OPTIC NETWORK CONSTRUCTION
SEWER CONSTRUCTIONWIND FARMS
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONSThe economic and ecological advantages of trenchless pipeline construction compared to open trenching are obvious:
Valuable surfaces and resources are preserved because time-consuming excavation and restoration work is omitted
Lesstrafficdisruptionandlessinconveniencefor residents
Minimal material costs and emissions Farquickerprocesstimeandsignificantlylowercosts
Our NODIG product range covers the complete applica-tionrangeof trenchlesstechnologies forsupplyanddis-posal.Whetheryouwanttoexpandyourpipelinenetwork,make connections to the end user or renew pipelines – all this can be all done underground without the need for dig-ging trenches.
Withtrenchlesstechnologies,pipelineengineeringisenvi-ronmentallyfriendly,sustainableandeconomical–regard-less of which application is used. Over the rest of the doc-umentyouwilllearnaboutthepossibilitiesourintelligentandflexibleNODIGsolutionsthatwecanofferandhowweandourpartnersworldwidecansupportyou intheplan-ningandimplementationofyourprojects.
E-MOBILITY
WATER PIPELINE CONSTRUCTION
PIPELINE CONSTRUCTION
DISTRICT HEATING CONSTRUCTION
GROUND CABLING
FURTHER INNOVATIVE APPLICATIONS
WATER PIPELINE CONSTRUCTION 4–13
FIBRE OPTIC NETWORK CONSTRUCTION 14–21
NATURAL GAS DISTRIBUTION NETWORKS 22–31
GROUND CABLING 32–39
SEWER CONSTRUCTION 40–49
E-MOBILITY 50–57
PIPELINE CONSTRUCTION 58–63
WIND FARMS 64–67
DISTRICT HEATING CONSTRUCTION 68–71
FURTHER INNOVATIVE APPLICATIONS 72–77
WHO WE ARE 78–79
WHAT CAN WE DO FOR YOU? 80–81
OUR PRODUCTS 82–83
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 02/03
BETTER SUPPLY & DEMANDWater management worldwide faces the constant chal-lengeofsecuring thesupplyofhigh-qualitydrinkingwa-ter and adapting the capacities of the pipeline network toincreasinglygrowingcustomerdemand.Inordertoen-surethis,whilekeepingcostsforutilitiesandconsumersas lowaspossible,trenchlesstechnologiesoffersustainableand reliable solutions.
RELIABLE WATER PIPELINE CONSTRUCTION
PROFITABLE PIPELINE NETWORKSWithourNODIGsystems,youcanbuildandmaintainyourwatersupplynetwork inaprofitableandenvironmental-ly friendlyway,usingexistingcomplex infrastructuresaswell as in areas where development in open construction isneitherecologicallynoreconomicallyreasonable.Vari-ousmethodscanbeused, fromthe installationofpres-surepipesforwatertransportanddistribution,tothefit-ting of a house connection and the sustainable renewal of damaged water pipes.
AT A GLANCE Reliable installation of water pipes along roads and under trafficandwaterwayswithshortorlongpipesmadeofallstandard materials
Underground construction of water house connections fromthebuildingordirectlyfromtheconnectionroomto the main pipe or in the opposite direction
IN DETAIL
NEW PIPE INSTALLATION 6–7
HOUSE CONNECTION TECHNOLOGY 8–11
PIPE RENEWAL 12–13
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 04/05
WAT
ER P
IPEL
INES
Trenchlessrenewalofirreparablydamagedtransport pipelines and house connections with the replacement of new pipes in the existing route in order to avoid water losses in the long term Trenchless pipe renewal enables the sustained prevention ofleakswhilesimultaneouslyadaptingthepipecapacityby1–2nominalwidths
Reliableandaccuratetechnology,reliableandprovenapplication
PARALLEL BORES
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter 32–710mmPipe materials PE,PP,steel,castironSoil classes 1–7,acc.toDIN18324
NODIG system GRUNDODRILLfluid-assistedHDDrigs
CROSSINGS UNDERNEATH TRAFFIC AND WATERWAYS
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter 32–710mmPipe materials PE,PP,steel,castironSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
WATER PIPELINES NEW PIPE INSTALLATION
CROSSINGS UNDERNEATH TRAFFIC WAYS
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,steel,castironSoil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
CROSSINGS UNDERNEATH TRAFFIC AND WATERWAYS
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE,PP,steel,castironSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPITfluid-assistedminidrillrigs
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 06/07
WAT
ER P
IPEL
INES
HOUSE CONNECTION: PIT–PIT
HOUSE CONNECTION: PIT–BASEMENT
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE,PP,steel,castironSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPITfluid-assistedminidrillrigs
WATER PIPELINES HOUSE CONNECTION TECHNOLOGY
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE,PP,steel,castironSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPITfluid-assistedminidrillrigs
HOUSE CONNECTION: PIT–PIT
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes)Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
HOUSE CONNECTION: KEYHOLE–BASEMENT
Method HDD horizontal directional drillingBore length Max.60mPipe diameter Up to 90 mmPipe materials PE(shortandlongpipes)Soil classes 1–5NODIG system GRUNDOPITkeyhole
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 08/09
WAT
ER P
IPEL
INES
HOUSE CONNECTION: BASEMENT–PIT
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE,PP,steel,castironSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPITfluid-assistedminidrillrigs
HOUSE CONNECTION: BASEMENT–PIT
Method Non-steerable soil displacement methodBore length 25mPipe diameter 160mmPipe materials PE,PVC(shortandlongpipes)Soil classes 1–5NODIG system GRUNDOMAT soil displacement hammers
WATER PIPELINES HOUSE CONNECTION TECHNOLOGY
HOUSE CONNECTION: BASEMENT–KEYHOLE
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes)Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 10/11
WAT
ER P
IPEL
INES
INSTALLATIONOFPIPESWITHSMALLER,EQUALORLARGERDIAMETER
Method Static pipe burstingBore length Max. 300 mPipe diameter 50–1,200mmPipe materials old pipe Greycastiron,ductilecastiron,asbestoscement,fibrecement,PE/PP,
PVC,glassfibrereinforcedplastics(GRP),steel,liner Pipe materials new pipe PE/PP,PVC,glassfibrereinforcedplastics(GRP),ductilecastiron,steelSoil classes Old pipes passable for bursting rodsNODIG system GRUNDOBURSTstaticpipeburstingsystems
WATER PIPELINES PIPE RENEWAL
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 12/13
WAT
ER P
IPEL
INES
HIGH-SPEED NETWORKINGA high-performance fibre optic network is the backboneof digitalisation. However, broadband expansion is notprogressingasquicklyasnecessary inmanyplaces.Thisisduetothehighcostsfor installingthecables,butalsotime-consuming civil engineering procedures. Costs and time can be improved if the the trenchless technologymethod is used.
Using our innovative& trend-settingNODIG systems forthe underground installation of protection pipes and ca-bles,youcanquicklyandcost-efficientlyexpandyourfibreopticnetworkdirectlytothehouseor intothecellarandwithoutanyfollow-upcosts.
FAST FIBRE OPTICNETWORK CONSTRUCTION
MICROTRENCHING WAS YESTERDAYWithourNODIGsystems,youdon‘thavetocutdeepslitsintheasphaltinordertobringthefibreopticquicklyandsafe-ly to theendcustomer (FTTH).Whenusingour innovativetrenchlesshouseconnectiontechnology,thereisnolossofvalueintrafficareasorevenhighrestorationcosts,nor isthesupplynarrowedbyinsufficientinstallationdepths.
AT A GLANCE Fast underground installation of pipes and cables along roads(FTTC)andundertrafficrouteswithshortorlongpipes made of all standard materials
Installationoffibreopticcablesthroughexistingsewersis also possible
Trenchless technologies are suitable in rural areas and urban areas
IN DETAIL
DISTRIBUTION NETWORKS FTTC 16–17
HOUSE CONNECTION TECHNOLOGY FTTH/FTTB 18–21
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 14/15
FIBR
E O
PTIC
NET
WO
RKS
Constructionofsingleorserialfibreoptichouseconnectionsfromthedistributortothebuilding(FTTH)anddirectlytothebasement(FTTB)orviceversa
Proven techniques and tailor-made accessories guaranteemaximumspeedandprofitability
PARALLEL BORES
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter 32–710mmPipe materials PE(protectionpipes),singlepipesandpipebundlesSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
CROSSINGS UNDERNEATH TRAFFIC AND WATERWAYS
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter 63–710mmPipe materials PE(protectionpipes),singlepipesandpipebundlesSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
FIBRE OPTIC NETWORKSDISTRIBUTION NETWORKS FTTC
CROSSINGS UNDERNEATH TRAFFIC AND WATERWAYS
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE(protectionpipes),singlepipesandpipebundlesSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPIT fluid-assistedminidrillrigs
CROSSINGS UNDERNEATH TRAFFIC WAYS
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes)Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 16/17
FIBR
E O
PTIC
NET
WO
RKS
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE(protectionpipes),singlepipesandpipebundlesSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPIT fluid-assistedminidrillrigs
HOUSE CONNECTION: PIT–PIT
HOUSE CONNECTION: PIT–BASEMENT
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE(protectionpipes),singlepipesandpipebundlesSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPIT fluid-assistedminidrillrigs
FIBRE OPTIC NETWORKSHOUSECONNECTIONTECHNOLOGYFTTH/FTTB
HOUSE CONNECTION: KEYHOLE–BASEMENT
Method HDD horizontal directional drillingBore length Max.60mPipe diameter Up to 90 mmPipe materials PE(shortandlongpipes)Soil classes 1–5NODIG system GRUNDOPITkeyhole
HOUSE CONNECTION: MANHOLE–BASEMENT
Method HDD horizontal directional drillingBore length Max. 50mPipe diameter Upto160mmPipe materials PE(protectionpipes),singlepipesandpipebundlesSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPIT S fluid-assistedminidrillrigs
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 18/19
FIBR
E O
PTIC
NET
WO
RKS
FIBRE OPTIC NETWORKSHOUSECONNECTIONTECHNOLOGYFTTH/FTTB
HOUSE CONNECTION: BASEMENT–PIT
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE(protectionpipes),singlepipesandpipebundlesSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPIT fluid-assistedminidrillrigs
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes)Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
HOUSE CONNECTION: PIT–PIT
FIBRE OPTIC NETWORKSHOUSECONNECTIONTECHNOLOGYFTTH/FTTB
HOUSE CONNECTION: BASEMENT–KEYHOLE
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes)Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
HOUSE CONNECTION: BASEMENT–PIT
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes)Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 20/21
FIBR
E O
PTIC
NET
WO
RKS
PROFESSIONALLY NETWORKEDWell developednatural gasdistributionnetworksplay animportant role in the success of energy distribution. Inorder for the pipeline network to be able to transport and storesufficientquantitiesoffossilandincreasinglyrenew-able natural gas, high investments are required for themaintenance and expansion of the infrastructure. These expensescanbesignificantlyreducedwithtrenchlesstech-nologiesinanenvironmentallyfriendlyway,andexpansioncan be accelerated without compromising supply qualityandsecurity.
PROFESSIONAL NATURAL GAS DISTRIBUTION NETWORKS
A QUESTION OF SAFETYWhether it be pipelines for the feeding of natural gas pro-duced worldwide into national networks, pressure pipe-lines for transport and distribution, pipelines for storingsyntheticgasfromtheoverproductionofgreenelectricity,ortheconnectionofservicelinestotheendconsumer,allthese pipes can be installed and even renewed without open-cuttrenchesusingourNODIGprocesses–safelyandprofessionallyaccordingtothelatesttechnicalstandards.
AT A GLANCE Professional installation of protection and product pipes alongroadsandundertrafficandwaterways,withshortor long pipes made of all standard materials
Trenchless construction of gas house connections fromthepit/keyholetothebuildingordirectlyintothesupplyroomandviceversa
Theminimallyinvasivekeyholetechnologyhasbeen developedespeciallyfortheserialinstallationand renewalofgashouseconnections.Itreallycouldn‘tbe moreeasyandeconomical
IN DETAIL
NEW PIPE INSTALLATION 24–25
HOUSE CONNECTION TECHNOLOGY 26–29
PIPE RENEWAL 30–31
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 22/23
NAT
URA
L G
AS N
ETW
ORK
S
Trenchless renewal of damaged gas pipelines and house connections,bythereplacementwithnewpipesintheexistingroute(pipebursting)enablesthesustainedpre-ventionofleakswhilesimultaneouslyadaptingthepipecapacityby1–2nominalwidths
Maximumplanningandtechnicalsafetywhilemain-taining the latest regulations
Preciseproofanddocumentationofposition,functionand tightness of the new pipelines
PARALLEL BORES
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter 32–710mmPipe materials PE,steel(mediaorprotectionpipes),PA12Soil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
CROSSINGS UNDERNEATH TRAFFIC AND WATERWAYS
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter 63–710mmPipe materials PE,steel(mediaorprotectionpipes),PA12Soil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
NATURAL GAS DISTRIBUTION NETWORKSNEW PIPE INSTALLATION
CROSSINGS UNDERNEATH TRAFFIC WAYS
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes),PA12Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
CROSSINGS UNDERNEATH TRAFFIC AND WATERWAYS
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE,steel(mediaorprotectionpipes),PA12Soil classes 1–7,acc.toDIN18324NODIG system GRUNDOPIT fluid-assistedminidrillrigs
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 24/25
NAT
URA
L G
AS N
ETW
ORK
S
NATURAL GAS DISTRIBUTION NETWORKSNEW PIPE INSTALLATION
HOUSE CONNECTION: PIT–BASEMENT
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE(protectionpipes),singlepipesandpipebundles,PA12Soil classes 1–7,acc.toDIN18324NODIG system GRUNDOPIT fluid-assistedminidrillrigs
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE(protectionpipes),singlepipesandpipebundles,PA12Soil classes 1–7,acc.toDIN18324NODIG system GRUNDOPIT fluid-assistedminidrillrigs
HOUSE CONNECTION: PIT–PIT
NATURAL GAS DISTRIBUTION NETWORKSHOUSE CONNECTION TECHNOLOGY
HOUSE CONNECTION: PIT–PIT
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes),PA12Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
HOUSE CONNECTION: KEYHOLE–BASEMENT
Method HDD horizontal directional drillingBore length Max.60mPipe diameter Up to 90 mmPipe materials PE(shortandlongpipes),PA12Soil classes 1–5NODIG system GRUNDOPITkeyhole
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 26/27
NAT
URA
L G
AS N
ETW
ORK
S
NATURAL GAS DISTRIBUTION NETWORKSHOUSE CONNECTION TECHNOLOGY
HOUSE CONNECTION: BASEMENT–PIT
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE(protectionpipes),singlepipesandpipebundles,PA12Soil classes 1–7,acc.toDIN18324NODIG system GRUNDOPIT fluid-assistedminidrillrigs
NATURAL GAS DISTRIBUTION NETWORKSHOUSE CONNECTION TECHNOLOGY
HOUSE CONNECTION: BASEMENT–PIT
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes),PA12Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 28/29
NAT
URA
L G
AS N
ETW
ORK
S
RENEWAL OF NATURAL GAS PIPELINES
Method DynamicpipeburstingBore length Max. 300 mPipe diameter Upto508mPipe materials old pipe Steel,glassfibrereinforcedplastics(GRP),PA12Pipe materials new pipe Steel,PE/PP,PVC,PA12Soil classes Old pipes passable for winch ropeNODIG system GRUNDOCRACK
NATURAL GAS DISTRIBUTION NETWORKSPIPE RENEWAL
INSTALLATIONOFPIPESWITHSMALLER,EQUALORLARGERDIAMETER
Method Static pipe burstingBore length Max. 300 mPipe diameter 50–1,200mmPipe materials old pipe Steel,glassfibrereinforcedplastics(GRP),PA12Pipe materials new pipe Steel,PE/PP,PVC,PA12
Soil classes Old pipes passable for bursting rods
NODIG system GRUNDOBURSTstaticpipeburstingsystems
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 30/31
NAT
URA
L G
AS N
ETW
ORK
S
GUARANTEED POWER SUPPLY Thebasicsupplyofelectricityrequiresadenseandflex-ible electricity network. However, high costs for under-ground cable construction and open line installation often prevents theelectricity fromgetting towhere it isneed-ed.Thesolutionistheecologicallyandeconomicallygen-tle underground construction method. With trenchless technologies,undergroundcabling ispossiblepracticallyeverywhere: whether in complex urban areas or acrosscountry,includingprotectedareasorunderwater.
CLEVER GROUND CABLING
ENVIRONMENTALLY FRIENDLY INSTALLATIONS WithourNODIGsystemsyoucaninstallprotectionpipesfor transport and distribution of medium and high-voltage poweroverlongdistances,justaseasilyandenvironmen-tallyfriendlyastheservicelinestotheenduser,evendi-rectlyintothesupplyroom.Bylayingcablesunderground,youcanalsorealiseprojectsthatwouldotherwisenotbefeasible for nature conservation reasons. Innovative tech-nologiesandprovenstandardsmakethiseasierthanyouthink.
AT A GLANCE Clever installation of protection pipes and cables along roadsandundertrafficandwaterwayswithshortorlong pipes made of all standard materials
Trenchless construction of power connections from the pit/keyholetothebuildingordirectlytothesupplyroom and vice versa Trouble-freerealisationofthenecessaryinstallation
depths for safe underground cable installation
IN DETAIL
NEW PIPE INSTALLATION 34–35
HOUSE CONNECTION TECHNOLOGY 36–39
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 32/33
GRO
UN
D C
ABLI
NG
Maximumplanningandtechnicalsafetythrough consideration of the latest regulations Preciseproofposition,functionandtightnessofthe
new pipelines Recognisedbyenvironmentalassociationsassustain-abletechniqueswithverifiablylowconsumptionofnature capital
PARALLEL BORES
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter Upto710mm(pipebundles)forsingleconductorsupto250mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
CROSSINGS UNDERNEATH TRAFFIC AND WATERWAYS
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter Upto710mm(pipebundles)forsingleconductorsupto250mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
GROUND CABLINGNEW PIPE INSTALLATION
CROSSINGS UNDERNEATH TRAFFIC WAYS
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes)Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
CROSSINGS UNDERNEATH TRAFFIC AND WATERWAYS
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPITfluid-assistedminidrillrigs
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 34/35
GRO
UN
D C
ABLI
NG
HOUSE CONNECTION: PIT–PIT
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPITfluid-assistedminidrillrigs
HOUSE CONNECTION: PIT–BASEMENT
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPITfluid-assistedminidrillrigs
GROUND CABLINGHOUSE CONNECTION TECHNOLOGY
HOUSE CONNECTION: PIT–PIT
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes)Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
HOUSE CONNECTION: KEYHOLE–BASEMENT
Method HDD horizontal directional drillingBore length Max.60mPipe diameter Up to 90 mmPipe materials PE(shortandlongpipes)Soil classes 1–5NODIG system GRUNDOPIT keyhole
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 36/37
GRO
UN
D C
ABLI
NG
HOUSE CONNECTION: BASEMENT–PIT
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPITfluid-assistedminidrillrigs
GROUND CABLINGHOUSE CONNECTION TECHNOLOGY
HOUSE CONNECTION: BASEMENT–PIT
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes)Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 38/39
GRO
UN
D C
ABLI
NG
GUARANTEED ACCURACYIn Germany alone, the sewer networks transport morethan20billioncubicmetersofwastewaterayear,whichiscontaminatedwithawidevarietyofpollutants.Inordertoprevent infiltrationof the groundwater, the construc-tion ofwastewater pipes is subject to strict regulations.To ensure that the pressure pipes and gravitation lines to pumping stations,manholes, collectors andbuildingsareabsolutelytightandaccurate,sewerconstructionre-quires installation of the highest precision. This precision is guaranteed in trenchless pipeline construction, if thepipes are being installed or renewed. Pipe cleaning is also possible.
PRECISE SEWER CONSTRUCTION
SUSTAINABLE SAFETYRepair is not a solution for massive pipe damage such as cracks,rootingrowthsorsocketmis-alignment.HowerverourNODIGsystemsforpiperenewalareperfectlysuita-ble for the sustainable renewal of damaged sewer pipes and house connections with minimum constructional and financial expenditure, and for the renovation of sewersystems.
AT A GLANCE Precise installation of sewage pressure pipes as well asgravitylinesalongroadsandundertrafficandwaterways,withshortorlongpipesmadeofstandardmaterials,alsofrommanholetomanhole
Preciseundergroundinstallationofgravitylinesforsewer house connections from or to manholes or pits
IN DETAIL
NEW PIPE INSTALLATION 42–44
PIPE CLEANING 45
PIPE RENEWAL 46–49
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 40/41
SEW
ER C
ON
STRU
CTIO
N
Trenchlessreplacementofnonrepairablepipes,for houseconnectionsbyreplacingthemwithnewpipes for the sustained prevention of leaks while simultane ouslyadaptingthepipecapacityby1–2nominalwidths Quickandaccuratereplacementofsquareandround
manhole covers By-the-bookandpinpointtechniques,reliableand
proven application Preciseproofanddocumentationofposition,function
and tightness of the new pipelines
GRAVITY PIPES: PARALLEL BORES FROM MANHOLE-MANHOLE
Method Steerable auger boringBore length 25mPipe diameter Upto280mmPipe materials Asbestoscement,stoneware,concrete,PPSoil classes Displaceable soilsNODIG system GRUNDOBORE200Saugerboringrigs
SEWER CONSTRUCTIONNEW PIPE INSTALLATION
GRAVITY PIPES
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter Upto710mm(pipebundles)forsingleconductorsupto250mmPipe materials PE,steel,ductileSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 42/43
SEW
ER C
ON
STRU
CTIO
N
GRAVITY PIPES: HOUSE CONNECTIONS FROM MANHOLE-PIT
Method Steerable auger boringBore length 25mPipe diameter Upto280mmPipe materials Asbestoscement,stoneware,concrete,PPSoil classes Displaceable soilsNODIG system GRUNDOBORE200Saugerboringrigs
CROSSINGSUNDERNEATHTRAFFICANDWATERWAYS(PRESSUREPIPES)
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter Upto710mm(pipebundles)forsingleconductorsupto250mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
SEWER CONSTRUCTIONNEWPIPEINSTALLATION/PIPECLEANING
CLEANING OF SEWER PIPES
Method Pipe cleaningBore length Max. 300 mPipe diameter Upto1,200mmPipe materials AllSoil classes O ld pipes passable for bursting rodsNODIG system Pulling rig of GRUNDOBURST
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 44/45
SEW
ER C
ON
STRU
CTIO
N
RENEWAL OF SEWER PIPES: PIT–MANHOLE
Method DynamicpipeburstingBore length Max. 300 mPipe diameter Upto508mmPipe materials old pipe Stoneware,concrete,stoneware-concrete,GG,PVC,AC/FCPipe materials new pipe PE/PP,steel,PVCSoil classes Old pipes passable for winch ropeNODIG system GRUNDOCRACK
RENEWAL OF SEWER PIPES: PIT–PIT
Method DynamicpipeburstingBore length Max. 300 mPipe diameter Upto508mmPipe materials old pipe Stoneware,concrete,stoneware-concrete,castiron,PVC,AC/FCPipe materials new pipe PE/PP,steel,PVCSoil classes Old pipes passable for winch ropeNODIG system GRUNDOCRACK
SEWER CONSTRUCTIONPIPE RENEWAL
RENEWAL OF HOUSE CONNECTIONS: MANHOLE–BASEMENT
RENEWAL OF SEWER PIPES: PIT–PIT
Method Static pipe burstingBore length Max. 300 mPipe diameter 50–1,200mmPipe materials old pipe Stoneware,concrete,stoneware-concrete,steel,greycastiron,PE/PP,
PVC,GRP,AC/FC,linerPipe materials new pipe PE/PP,steel,PVC,greycastiron,stoneware,PC,stoneware-concreteSoil classes Old pipes passable for bursting rodsNODIG system GRUNDOBURST
Method Static pipe burstingBore length Max.100mPipe diameter Upto280 mmPipe materials old pipe Stoneware,concrete,stoneware-concrete,steel,greycastiron,PE/PP,
PVC,GRP,AC/FC,linerPipe materials new pipe PE/PP,steel,PVC,greycastiron,stoneware,PC,stoneware-concreteSoil classes Old pipes passable for bursting rodsNODIG system GRUNDOBURST400S
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 46/47
SEW
ER C
ON
STRU
CTIO
N
RENEWAL OF SEWER PIPES: MANHOLE–MANHOLE
Method DynamicpipeburstingBore length Max. 300 mPipe diameter Upto508mm
Pipe materials old pipe Concrete,reinforcedconcrete,stoneware,greycastiron,PVC,asbestoscement,fibrecement
Pipe materials new pipe PE/PP,PVC,steelSoil classes Old pipes passable for winch ropeNODIG system GRUNDOCRACK
RENEWAL OF SEWER PIPES: PIT–MANHOLE
Method Static pipe burstingBore length Max. 300 mPipe diameter 50–1,200mm
Pipe materials old pipe Stoneware,concrete,reinforcedconcrete,greycastiron,ductilecastiron,asbestoscement,fibrecement,PE/PP,PVC,glassfibrereinforcedplastics(GRP),steel,liner
Pipe materials new pipe PE/PP,PVC,glassfibrereinforcedplastics(GRP),ductilecastiron,steel,stoneware,concrete
Soil classes Old pipes passable for bursting rodsNODIG system GRUNDOBURST
SEWER CONSTRUCTIONPIPE RENEWAL
RENEWAL OF SEWER PIPES: MANHOLE–MANHOLE
Method Core drillingNODIG system Core drill unitsDiameter Upto1,500mmCutting depth Upto600mmSurface types Concrete,Asphaltandmixedsurfacing
OVERCUTTINGOFMANHOLECOVERS(EXCHANGE)
Method Static pipe burstingBore length Max.100mPipe diameter Upto280mm
Pipe materials old pipe Stoneware,concrete,reinforcedconcrete,greycastiron,ductilecastiron,asbestoscement,fibrecement,PE/PP,PVC,glassfibrereinforcedplastics(GRP),steel,liner
Pipe materials new pipe PE/PP,PVC,glassfibrereinforcedplastics(GRP),ductilecastiron,steel,stoneware,concrete
Soil classes old pipes passable for bursting rodsNODIG system GRUNDOBURST400S
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 48/49
SEW
ER C
ON
STRU
CTIO
N
NODIG MAKES E-MOBILEThe expansion of e-mobility plays a key role in reducingclimate-damaging greenhouse gases in line with global cli-mateprotection targets.However, theacceptanceby theconsumerofe-mobilitydependsonasufficientnumberofreadily available charging stations. Trenchless installationtechniques offer intelligent, economical and sustainablesolutionsfortheefficientandlow-emissionexpansionforthis charging station infrastructure.
INTELLIGENT E-MOBILITY
BE E-INTELLIGENTOurcleverNODIGsystemscanbeusedwhereverchargingstations can be installed or connected to the power grid. Becauseyoucaninstallpipesandcablesinanydirectionwithoutdamagingpavedsurfaces,ourtechnologyissuit-able for the installation of charging stations on public and privategroundaswellassub-distributionconnectivity. Ifusingtheinnovativekeyholetechnology,theconstructionpit also provides the foundation of the charging station. Youcan’tsaythatisn’tabsolutelye-intelligent.
AT A GLANCE Fast and simple underground installation of protection pipesforpowerandcontrolcables,fromtheconnec-tionpoint(sub-distribution)tothechargingstationandbetween the charging stations
Thetechnologyisequallyeconomicalforsmallorlarge amounts of individual charging stations Houseconnectionstopowersupplyofthecharging
stations can also be installed without trenches
IN DETAIL
NEW PIPE INSTALLATION 52–53
HOUSE CONNECTION TECHNOLOGY 54–57
CABLING OF CHARGING STATIONS 57
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 50/51
E-M
OBI
LITY
Withtheminimallyinvasivekeyholetechnique,theconstruction pit can be used as the foun dation of the charging station
Elaborate,provenandtestedsystemtechnology
PARALLEL BORES
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter Upto710mm(pipebundles)forsingleconductorsupto250mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
CROSSINGS UNDERNEATH TRAFFIC AND WATERWAYS
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter Upto710mm(pipebundles)forsingleconductorsupto250mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
E-MOBILITY NEW PIPE INSTALLATION
CROSSINGS UNDERNEATH TRAFFIC AND WATERWAYS
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPITfluid-assistedminidrillrigs
CROSSINGS UNDERNEATH TRAFFIC WAYS
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes)Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 52/53
E-M
OBI
LITY
HOUSE CONNECTION: PIT-BASEMENT
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPITfluid-assistedminidrillrigs
HOUSE CONNECTION: PIT–PIT
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPITfluid-assistedminidrillrigs
E-MOBILITY HOUSE CONNECTION TECHNOLOGY
HOUSE CONNECTION: PIT–PIT
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes)Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
HOUSE CONNECTION: KEYHOLE–BASEMENT
Method HDD horizontal directional drillingBore length Max.60mPipe diameter Up to 90 mmPipe materials PE(shortandlongpipes)Soil classes 1–5NODIG system GRUNDOPITkeyhole
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 54/55
E-M
OBI
LITY
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPITfluid-assistedminidrillrigs
HOUSE CONNECTION: BASEMENT–PIT
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes)Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
HOUSE CONNECTION: BASEMENT–PIT
E-MOBILITY HOUSECONNECTIONS/CABLINGOFCHARGINGSTATIONS
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes)Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
HOUSE CONNECTION: BASEMENT–KEYHOLE
Method HDD horizontal directional drillingBore length Max.60mPipe diameter Up to 90 mmPipe materials PE(shortandlongpipes)Soil classes 1–5NODIG system GRUNDOPITkeyhole
CABLING: FROM KEYHOLE TO KEYHOLE
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 56/57
E-M
OBI
LITY
E-MOBILITY HOUSECONNECTIONS/CABLINGOFCHARGINGSTATIONS
PRODUCTIVE WITHOUT TRENCHESEfficient cross-border pipeline networks are essentialto reliablymeet the growing global demand for energy.The pipelines for transport from the producer to the dis-tributor are often several thousand kilometres long. The routes required cannot often be planned due to environ-mental regulations or structural obstacles. With trench-less techniques for installingthepipelinesunderground,these problems are a thing of the past.
HIGH-CAPACITY PIPELINE CONSTRUCTION
DRILL AND RECOVEROur NODIG systems permit the productive undergroundinstallation of small and large pipelines for the transport of liquidsandgasesinopenareas,plusalsoforcrossingriversandreservoirsinbuilt-upareas.Thesesystemscanalsobeusedtosuccessfullycompletecomplicatedsteerableboreseven under difficult surrounding conditions – keyword“HDD-Assist & -Rescue“.
AT A GLANCE Professional installation of protective and product
pipes made of plastic or steel along roads and under trafficandwaterways
Non-steerable techniques are suitable for spiral-weld-edpipes,seamlesspipesandpipeswithinsulationprotection
HDD-Assist & -Rescue techniques for bores in casing pipes,forlooseningstuckpipesandextractingdrillrods,aswellasforsalvagingstuckproductor protectionpipesofanydiameter
IN DETAIL
NEW PIPE INSTALLATION 60
HDD-ASSIST 60–61
HDD-RESCUE 62–63
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 58/59
PIPE
LIN
E CO
NST
RUCT
ION
Pipelineconstructionwithhigheconomicefficiency andmaximumproductivity Fastandenvironmentallyfriendlytechniques,quick licensing,hightechnicalsafety Precise proof and documentation of position and
tightness of the new pipelines
CROSSINGS UNDERNEATH TRAFFIC WAYS
Method Non-steerabledynamicpiperammingBore length Max.100mPipe diameter Upto4,000mmPipe materials SteelSoil classes 1–5NODIG system GRUNDORAM steel pipe rammers
HDD-ASSIST: PULL-BACK ASSIST
Method Non-steerabledynamicpiperammingBore length Max.100mPipe diameter Upto4,000mmPipe materials SteelSoil classes 1–5NODIG system GRUNDORAM steel pipe rammers
PIPELINE CONSTRUCTIONNEWPIPEINSTALLATION/HDD-ASSIST
HDD-ASSIST: PROTECTION PIPE RECOVERY
HDD-ASSIST: CONDUCTOR BARREL
Method Non-steerabledynamicpiperammingBore length Max.100mPipe diameter Upto4,000mmPipe materials SteelSoil classes 1–5NODIG system GRUNDORAM steel pipe rammers
Method Non-steerabledynamicpiperammingBore length Max.100mPipe diameter Upto4,000mmPipe materials SteelSoil classes 1–5NODIG system GRUNDORAM steel pipe rammers
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 60/61
PIPE
LIN
E CO
NST
RUCT
ION
HDD-RESCUE: DRILL ROD RECOVERY
Method Non-steerabledynamicpiperammingBore length Max.100mPipe diameter Upto4,000mmPipe materials SteelSoil classes 1–5NODIG system GRUNDORAM steel pipe rammers
PIPELINE CONSTRUCTIONHDD-RESCUE
HDD-RESCUE: BORE SALVAGE
Method Non-steerabledynamicpiperammingBore length Max.100mPipe diameter Upto4,000mmPipe materials SteelSoil classes 1–5NODIG system GRUNDORAM steel pipe rammers
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 62/63
PIPE
LIN
E CO
NST
RUCT
ION
RAISE YOUR POTENTIALInrecentyears,theuseofwindenergyhasbeengreatlydeveloped,making it a significant contribution topowersupply worldwide. Its potential for expansion is consid-ered the most economical of all renewable energies. The trenchless installation of the pipes for transporting and distributingthewindenergymakes itpossible toexploitthisgreatpotentialinaneconomicallysensibleandenvi-ronmentallyfriendlymanner.
EFFICIENT WIND FARMS
GAIN MORE ENERGYWhetheryougeneratewindenergyon landoratsea:ourinnovativeNODIGsystemsaresuitableforconnectingwindpowerplantsonshoreandoffshoreaswellasforcablingbe-tweenindividualturbines,ortothepowerplant.Usingflex-ible techniques, anefficientpipelinenetwork can increasetheavailabilityofwindenergywithminimumeffort.Andbe-causethetechnologiesareecologicalandemissionsarelow,the NODIG method can make a valuable contribution to the publicacceptanceofwindfarmstechnology.Aclassicalwin-win situation!
AT A GLANCE Underground installation of pipes for the transport ofelectricityfromoffshoreandonshorewindfarmsundertrafficandwaterways,withshortorlongpipesmade of all standard materials
Theabilityforconnectingpipelinestowindpower plants/windturbines,andthedistributorforfeeding windenergyintothenetwork,canalsobeinstalledwith- out trenches
IN DETAIL
CONNECTION OF
WIND POWER PLANTS/WIND TURBINES 66–67
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 64/65
WIN
D F
ARM
S Reducedspacerequirementsforthenecessarypipeline
construction Calculable costs for construction and expansion of the
pipeline network Sustainabletechniqueswithhigheconomicefficiency
CABLING: WIND TURBINE–WIND TURBINE
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter Upto710mm(pipebundles)forsingleconductorsupto250mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
CABLING: LAND–OFFSHORE WIND POWER PLANT
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter Upto710mm(pipebundles)forsingleconductorsupto250mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
WIND FARMSCONNECTIONOFWINDPOWERPLANTS/WINDTURBINES
CABLING: WIND TURBINE–DISTRIBUTION STATION
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter Upto710mm(pipebundles)forsingleconductorsupto250mmPipe materials PE,steelSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 66/67
WIN
D F
ARM
S
WIND FARMSCONNECTIONOFWINDPOWERPLANTS/WINDTURBINES
DISTRICT HEATING THAT PAYS OFFDistrictheatingoffers thehighestsecurityofsupplyamongall energy sources. The heat generated from fuels and in-creasinglyrenewableenergiesisinexpensiveandconvenientfortheuser,yetnotavailableeverywherebecauseeconom-icaspectsaredecisive in thedevelopmentof supplyareas.Trenchless installation of the transport and supply pipesmakes itpossible toexpand thesupplynetwork inaneco-nomicallyandecologicallyefficientmanner.
EFFICIENT DISTRICT HEATING CONSTRUCTION
EFFICIENCY THAT LASTSWithourNODIGsystemsyoubring themediumpipes forwater or steam district heating from the generator to the transferstationandfromtheretotheendcustomer‘ssupplyroom–force-fitandwithoutheatloss.Provenandflexibletechniques ensure that trenchless installation of insulated plasticpipesworksjustasquickly,gentlyandcost-effectivelyas that of corrugated steel pipes. This is what we understand byefficiency.
AT A GLANCE Efficientundergroundinstallationofflexibleandrigidpipesmadeofstandardmaterialsalongroads,undertraffic/waterwaysandflexibleborepaths
Easyparallelinstallationofthesupplyandreturnlines Trenchless installation of house connections lines
from the transfer station to the building Provenandflexibletechniquesforthesafe undergroundinstallationofvarioustypesofpipes
IN DETAIL
NEW PIPE INSTALLATION 70
HOUSE CONNECTION TECHNOLOGY 71
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 68/69
DIS
TRIC
T H
EATI
NG
Maximumplanningandtechnicalsafetyaccording to the latest technical standard Precise proof and documentation of position and
function of the new pipelines
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter 32–710mmPipe materials PE,PP,steel,castironSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter 32–710mmPipe materials PE,PP,steel,castironSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
PARALLEL BORES
CROSSINGS UNDERNEATH TRAFFIC AND WATERWAYS
DISTRICT HEATING NEWPIPEINSTALLATION/HOUSECONNECTIONTECHNOLOGY
Method Non-steerable soil displacement methodBore length Max.25mPipe diameter Upto160mmPipe materials PE,PP,PVC(shortandlongpipes)Soil classes 1–5,displaceablesoilsNODIG system GRUNDOMAT soil displacement hammers
Method HDD horizontal directional drillingBore length Max.100mPipe diameter 32–160mmPipe materials PE,PP,steel,castironSoil classes 1–7,acc.toDIN18324NODIG system GRUNDOPITfluid-assistedHDDrigs
HOUSE CONNECTION: PIT–PIT
HOUSE CONNECTION: PIT–PIT
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 70/71
DIS
TRIC
T H
EATI
NG
DISTRICT HEATING NEWPIPEINSTALLATION/HOUSECONNECTIONTECHNOLOGY
INNOVATIVE VARIETYOne of the main aims of TRACTO-TECHNIK is to develop versatileNODIGsystems thatbringmaximumbenefit totheusers.Thatiswhywealwayskeepaneyeonthemar-kettofindoutatanearlystagewhatrequirementsariseinpracticalapplications.Inthesearchforthebestsolution,we have developed a broad range repertoire of special trenchless solutions that go beyond the actual pipelineconstruction.
AWARD-WINNING SOLUTIONSThe spectrum of innovative applications ranges from such obvious variants as the vertical use of drilling rigs for foun-dation and pile foundations to complex special tools for connecting or reconnecting house connections through akeyhole.
FURTHER INNOVATIVE APPLICATIONS
IN DETAIL
DRAINAGE CONSTRUCTION 74
WELL CONSTRUCTION 75
VERTICAL APPLICATIONS 76–77
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 72/73
FUTH
ER A
PPLI
CATI
ON
S
Trenchlesstunnelscanbeoptimizedbyretrofittingwithinletandoutletpipesandridgeprotectionorbybuildingpipeshields for new tunnels. You can drain slopes, dikes orbuildingsgentlyandwithoutvibration. Inminingyoucanflexiblyrealizeverticalwellsandhorizontalsurgedrainagesystems.Youcanproducewellsforseawaterintakesorre-mediationofcontaminatedsitesevenindifficultgeologicalconditions.Andingeotechnicsyoucandrillanchorholestostabilizedams,dikesorrockwalls.
All theseapplications arenotonly technically innovativebut always practical and economical as well. The bestproofs of this are individual solutions for project part-ners such as GDF Suez or SGN which have turned into award-winning products.
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter 63–710mmPipe materials PE,PP,steel,castironSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
DRAINAGECONSTRUCTION(E.G.DYKES,SLOPES,DUMPS)
Indrainageconstruction,drainpipesforstabilisingdams,dikesorbuildingscanbeinstalledeasilyandwithoutvibration.Ingeotechnicsanchorholestostabilizedams,dikesorrockwallscanbedrilledontargetorborestosettleloads,tosealfloorsortoimprovethesoilcanbecarriedout.
FURTHER APPLICATIONS
Method HDD horizontal directional drillingBore length Max. 500 mPipe diameter 32–710mmPipe materials PE,PP,steel,castironSoil classes 1–7,acc.toDIN18324NODIG system GRUNDODRILLfluid-assistedHDDrigs
WELL CONSTRUCTION
In well construction trenchless technologies en able the cons-truction of horizontal wells for seawater intakes or remediation of contaminatedsiteseven indifficultgeological conditionsorflatwaterswithouttheneedforashaft.
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 74/75
FUTH
ER A
PPLI
CATI
ON
S
Method Foundationandpilefoundations,wellconstruction,sheetpilingNODIG system GRUNDORAM steel pipe rammers
VERTICAL APPLICATIONS
FURTHER APPLICATIONS
Method Pile foundationsNODIG system GRUNDOMAT soil displacement hammers
VERTICAL APPLICATIONS
The innovative vertical applications include foundation andpilefoundations,e.g.foroverheadsigns,noisebar-riers,buildingsecurities,theconstructionofwellsaswellas sheet piling.
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 76/77
FUTH
ER A
PPLI
CATI
ON
S
WE AREEvenaftermorethan50yearswearepassionateabouttheunderground installation and trenchless renewal of pipe-lines.Wearealwaysseekingtheperfectsolutionsandhavea fascination for the very latest in innovative technology,we have developed numerous groundbreaking solutions which have played a major role in shaping the industry.Basedoninnovation,experienceandquality,wehavebe-comean internationallysuccessfulbest-in-classmanufac-turerofspecialmachinery.
COULD YOU BE PASSIONATE FOR SOMETHINGYOUCAN‘TSEE?
Withover500employeesandcompetentpartnersworld-wide,weoperate inchallengingmarkets inmorethan70countries.Thatwayweensurefastsupplyandimmediateavailabilityforourcustomersworldwide–andmakethemfeelathomeintheTRACTO-TECHNIKfamily.
SMART SOLUTIONS WITH ADDED VALUE
Ourgoal is toofferourcustomershigh-qualityproductsand services that meet the highest environmental stand-ards.Indoingsoweaimtonotonlyprovidereliabletech-nology, but also complex and flexible solutions for sus-tainable economic success.
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 78/79
Our smart NODIG solutions cover the complete range of trenchlesspipelineconstructionforsupplyanddisposal.Perfectlymatchedaccessoriesandtailor-madeconsultingservices go hand in hand at TRACTO-TECHNIK. And be-causewethinkoutofthebox,weuseourglobalnetworktoconveyon-target industrial intelligencewhichenablesyouasclient,plannerorusertocreatemaximumvalue.
MAKE USE OF OUR KNOWDLEGEBasedonourprofoundindustryknowledge,weofferyouasasupplier,networkoperatororplanner comprehensiveservicesandconsultingtailoredspecificallytoyourrequirements.
EXHIBITIONS & EVENTSWe exhibit at national and international trade fairs and industryevents.Youcanfindanup-to-date timetableofthe trade fairs and exhibitions we will be exhibiting on our website.
PRESENTATION & INFORMATIVE VISITSWewouldbehappytoexplainthepossibilitiesandtechniquesofourNODIGequipmentandmachinerywithapersonalvisittoyourpremises,oryoucanvisitusinBedford.
TRAININGWeofferyouawiderangeofbasicandadvanced trainingcourseswith around 3,000 participants per year, also in
cooperation with competent partners from the pipeline constructionindustry.Details&datesonourwebsite.
TENDERSWewouldbepleasedtosupportyouinthepreparationoftenderdocuments foryourspecifications.Detailswillbeon our website soon.
TECHNICAL LITERATUREWe recommend the trade books “HDD Practice Hand-book“ and “Handbook of Pipe Bursting Practice“ to get an exact picture of the possibilities and applications.
WHAT CAN WE DO FOR YOU?
TAILOR-MADE SYSTEM PARTNERSHIPSAsasupplier,weofferyouawiderangeofsystempartnershipsthatareentirelytailoredtoyourindividualsituationandwishes.
EXTERNAL SERVICE PROVIDERSIfyoucooperatewithanexternalcontractorforyourconstruc-tionprojects,theycanaddappropriatetrenchlesstechnologytotheirmachineryanduseitforyou.
RECOMMENDATIONSWearehappytorecommendconstructioncompaniesthathaveboththetechnologyandtheexperiencetocarryoutyourtrenchlessconstructionprojects.
DEMONSTRATIONSWearehappytoarrangedemonstrationconstructionsitessoyoucanseeforyourselftheprinciplesofoperation inpracticeandhowefficientlytrenchlesstechnologieswork.
TRACTUELLIn our customer magazine TRACTUELL you will find nu-merousapplication reports about successfulprojectswithtrenchless technologies from all over the world. We will be happytosendyouyourpersonalcopy.
GEOSERVICESWearethereforyou–withplanninganddrilling-relatedad-viceagainstthebackgroundofsoilconditions,forexampleinthe course of planned HDD bore routes.
MACHINE PARK OWNERSIfyouoperateyourownmachineryasasupplier,youcanuseourmachinesandequipmentforyourtrenchlesscon-struction measures after appropriate instruction.
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 80/81
QUALITY MADE BY TRACTO-TECHNIKWith our precisely matched NODIG systems we coverall requirement profiles of trenchless pipeline construc-tion.Ourmoletechnologyhasprovenitselfthousandsoftimesworldwideindecadesofuse,isrobustanddurable.Tomakesurethatyoucanrelyonehundredpercentonit,weproduceexclusively inGermanyandusethemostmodern industrial engineering methods as well as elabo-rate hardening and tempering techniques. And of course we put our machines through their paces during the pro-ductionprocess.Whenitcomestoquality,wenevercom-promise.
OUR PRODUCTS FOR YOUR SUCCESS
GRUNDOMAT soil displacement hammers: non-steerable pipeinstallationND25to200mm GRUNDORAM horizontal rammers: non-steerable steel pipedrivinguptoND4,000mm
GRUNDOPITminifluid-assisteddrillrigs:steerableboresup toND200mmandkeyholetechnology GRUNDODRILL fluid-assisted HDD drill rigs: steerable boresuptoND710mm GRUNDOBOREaugerboringrigs:pilotpipejackingupto ND400mm GRUNDOBURST static pipe bursting: static pipe renewal uptoND1,200mm GRUNDOCRACKdynamicpipebursting:dynamicpipere-
newal up to ND 500 mm
GRUNDOMAT SOIL DISPLACEMENT HAMMERS
GRUNDOBURSTSTATIC PIPE BURSTING SYSTEMS
GRUNDORAMSTEEL PIPE RAMMERS
GRUNDOCRACKDYNAMIC PIPE BURSTING SYSTEMS
GRUNDOPITMINI FLUID-ASSISTED DRILL RIGS
GRUNDOBOREAUGER BORING UNITS
GRUNDODRILLFLUID-ASSISTED HDD DRILL RIGS
TRENCHLESS TECHNOLOGY FOR YOUR APPLICATIONS - 82/83
SwitzerlandTRACTO-TECHNIK Schweiz AGRatihard 38253DiessenhofenTel +4179820 38 [email protected]
United Kingdom TRACTO-TECHNIK UK Ltd10WindsorRoadBedfordMK429SUTel +441234342566Fax [email protected]
FranceTRACTO-TECHNIK France S.a.r.l. 1/3RuedelaPrairieF-77700BaillyRomainvilliersTél +33160424940Fax [email protected]
USATT TECHNOLOGIES Inc.2020EastNewYorkStreetAurora,IL.60502Tel +16308518200Fax [email protected]
AustraliaTRACTO-TECHNIK Australia Pty Ltd.10AliciajayCircuitLuscombe,Qld4207Tel +617 3420 [email protected]
GermanyTRACTO-TECHNIK GmbH & Co. KG HeadquartersPaul-Schmidt-Straße257368LennestadtTel.+492723808-0Fax-180info@TRACTO-TECHNIK.comwww.TRACTO-TECHNIK.com
TRACTO-TECHNIK Headquarters
TRACTO-TECHNIK Sister companies
TRACTO-TECHNIK Distributors
PresentedbyyourTRACTO-TECHNIKpartner:
MoroccoTRACTO-TECHNIK Afrique S.a.r.l.RoutedeTamesna4022Poste2044,12220TamesnaTel +212 5 37 40 13 63 / 64Fax +2125 37 40 13 [email protected]
WORLDWIDE
trenchless technology – simple & easy
IMG01EN
V04
Ed
ition
05/20
20Subjecttochange.