May 2, 2023 Djahan Nabili, TDM Architects, Inc.
1
Whittier High School, “MN”Whittier High School, “MN”
Seismic Mitigation And Modernization Project
Whittier Union High School District
![Page 2: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/2.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
2
Project GoalsProject Goals
Ultimate goal of project; To convert (E) Gym to a Home Economic Classrooms
Relationship to other buildings; This Building is one of the oldest buildings on the campus ( Prior to 1920) and apparently one of the first school buildings in the state to obtain approval under the Original Field Act following the Long Beach Earthquake of 1933.
![Page 3: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/3.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
3
DescriptionDescription• The Building is one story with a full basement
and approximately 9,300 square feet.• It is constructed of un-reinforced brick
masonry (URM) that was reinforced with gunite in 1933. Roof rafters are supported by wood ledgers on the exterior URM walls. At the first floor the joists are supported by cast-in-place concrete beams which are supported on reinforced concrete basement walls.
• The seismic load resisting system of this building consists of the wood sheathed diaphragms (At roof and second floor) which span to the exterior URM shear walls
![Page 4: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/4.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
4
Design Team;Design Team; Integrated Design Service (IDS), Structural
Engineer TMAD (Pasadena), Mechanical, Plumbing
and Electrical Engineers ISDG, Data, Audio, Video and Security
Engineer URS, Construction Manager TDM Architects, Inc. Melkee Construction, General Contractor
![Page 5: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/5.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
5
Scope Of Work;Scope Of Work;
Asbestos abatement, demolition of all existing interior walls, all finishes including suspended ceiling, toilet fixtures and all utilities.
New structural steel tube, bracing, and epoxy pressure grouting. New metal stud walls, new suspended ceiling, new ADA bathrooms and new VCT flooring.
New Plumbing, Electrical (Including Data, Voice & Low voltage) & HVAC Systems, new Fire Sprinkler System for basement only, New doors, windows and new custom casework.
![Page 6: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/6.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
6
Floor Plans;Floor Plans;
![Page 7: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/7.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
7
![Page 8: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/8.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
8Old West Elevation
![Page 9: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/9.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
9
Old North - East Elevation
![Page 10: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/10.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
10Old North -West Elevation
![Page 11: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/11.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
11Old East Elevation
![Page 12: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/12.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
12Old Stair
![Page 13: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/13.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
13
Old Restroom
![Page 14: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/14.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
14Old Room 101
![Page 15: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/15.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
15Old Rooms 101 & 109
![Page 16: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/16.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
16Old Room 102
![Page 17: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/17.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
17
Old URS Office
![Page 18: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/18.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
18
Old South – West Elevation
![Page 19: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/19.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
19Old South – East Elevation
![Page 20: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/20.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
20
The New MN’s PicturesThe New MN’s Pictures
New West Elevation
![Page 21: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/21.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
21
New South – West Elevation
![Page 22: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/22.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
22New North – West Elevation
![Page 23: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/23.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
23New South Elevation
![Page 24: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/24.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
24New Restroom
![Page 25: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/25.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
25New Room 101
![Page 26: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/26.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
26
![Page 27: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/27.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
27
![Page 28: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/28.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
28
![Page 29: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/29.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
29
![Page 30: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/30.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
30
![Page 31: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/31.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
31
![Page 32: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/32.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
32
![Page 33: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/33.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
33
![Page 34: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/34.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
34
![Page 35: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/35.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
35
![Page 36: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/36.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
36
![Page 37: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/37.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
37
![Page 38: Whittier High School, Building -MN](https://reader036.vdocuments.site/reader036/viewer/2022062401/58f37eeb1a28abbd088b45d7/html5/thumbnails/38.jpg)
May 2, 2023 Djahan Nabili, TDM Architects, Inc.
38