Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW 0914-18-055 $823,469.99 3003 BEXAR VA 0915-12-478 $2,094,289.23 3004 BLANCO US 281 0252-03-045 $626,483.47 3005 BOWIE US 67 0010-13-085 $332,505.90 4015 BRAZORIA FM0655 6225-53-001 $1,464,902.60 3007 BURNET SH 29 0151-01-041 $2,199,792.56 3008 DALLAM SS 17 1702-03-001 $1,472,476.68 3010 DALLAS IH 30 0009-11-222 $4,194,227.95 4011 DENTON IH0035W 6220-56-001 $502,610.00 4012 DENTON IH0035E 6220-57-001 $413,125.00 3011 EL PASO FM 258 0002-14-037 $2,343,081.70 3012 ELLIS FM 983 1048-01-022 $724,515.87 4013 ELLIS SH0034 6222-81-001 $592,310.00 3013 HARRIS CS 0912-72-067 $707,983.75 3014 HARRIS IH 45 0500-03-553 $346,106.00 3015 HARRIS IH 610 0271-14-217 $170,992,025.96 3032 HARRIS FM 521 0111-01-090 $119,365.80 4007 HARRIS US0059 6221-67-001 $350,429.00 3016 HAYS RM 12 0683-05-010 $296,101.72 4008 HAYS RM0967 6223-42-001 $405,324.48 3017 HIDALGO US 281 0255-07-130 $2,387,459.64 3020 HOOD FM 2580 1601-03-012 $910,467.35 3021 HUNT PW 0901-22-099 $81,676.00 4001 HUNT FM1903 6217-78-001 $574,973.55 3022 JEFFERSON FM 365 0932-02-045 $653,589.55 3006 LEON FM 1146 1148-02-015 $560,860.90 4003 MCLENNAN SH0006 6224-48-001 $878,785.75 4004 MCLENNAN US0084 6224-83-001 $371,500.00 4014 ORANGE IH0010 6220-94-001 $1,375,000.00 3031 PALO PINTO SH 254 0539-04-034 $2,127,648.00 4006 RUSK FM1251 6224-74-001 $510,284.45 3023 SAN PATRICIO US 77 0372-01-094 $445,150.00 4010 SAN PATRICIO IH0037 6220-08-001 $775,984.00 3024 SHELBY FM 139 0742-01-045 $1,655,721.98 3025 SHELBY FM 2026 1879-01-019 $863,937.20 3026 SMITH US 69 0191-01-079 $245,357.25 4005 SMITH SH0110 6223-46-001 $643,157.00 3027 TARRANT BF1187C 1330-01-058 $663,335.51 4002 TARRANT IH0820 6221-51-001 $642,650.10 3019 TRAVIS IH 35 0015-10-059 $480,088.90 3034 TRAVIS RM 620 0683-02-053 $1,008,312.15 3028 TRAVIS FM 1327 1377-01-019 $313,056.00 <-CANCELLED 3029 UPSHUR FM 1404 1386-01-020 $113,587.50 3030 VAL VERDE US 90 0022-10-058 $154,198.55 4009 VICTORIA BU0077S 6225-21-001 $645,006.10 Cancelled Jobs: Active Jobs: 45 1 for for $191,257,621.17 $313,056.00 Report Summary www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Upload: others

Post on 20-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

Whitley & Siddons Bid Tabulations

TABULATIONS FOR MAY 3,2011 LETTING

3001 ANGELINA VA 0911-00-072 $453,290.003002 BASTROP PW 0914-18-055 $823,469.993003 BEXAR VA 0915-12-478 $2,094,289.233004 BLANCO US 281 0252-03-045 $626,483.473005 BOWIE US 67 0010-13-085 $332,505.904015 BRAZORIA FM0655 6225-53-001 $1,464,902.603007 BURNET SH 29 0151-01-041 $2,199,792.563008 DALLAM SS 17 1702-03-001 $1,472,476.683010 DALLAS IH 30 0009-11-222 $4,194,227.954011 DENTON IH0035W 6220-56-001 $502,610.004012 DENTON IH0035E 6220-57-001 $413,125.003011 EL PASO FM 258 0002-14-037 $2,343,081.703012 ELLIS FM 983 1048-01-022 $724,515.874013 ELLIS SH0034 6222-81-001 $592,310.003013 HARRIS CS 0912-72-067 $707,983.753014 HARRIS IH 45 0500-03-553 $346,106.003015 HARRIS IH 610 0271-14-217 $170,992,025.963032 HARRIS FM 521 0111-01-090 $119,365.804007 HARRIS US0059 6221-67-001 $350,429.003016 HAYS RM 12 0683-05-010 $296,101.724008 HAYS RM0967 6223-42-001 $405,324.483017 HIDALGO US 281 0255-07-130 $2,387,459.643020 HOOD FM 2580 1601-03-012 $910,467.353021 HUNT PW 0901-22-099 $81,676.004001 HUNT FM1903 6217-78-001 $574,973.553022 JEFFERSON FM 365 0932-02-045 $653,589.553006 LEON FM 1146 1148-02-015 $560,860.904003 MCLENNAN SH0006 6224-48-001 $878,785.754004 MCLENNAN US0084 6224-83-001 $371,500.004014 ORANGE IH0010 6220-94-001 $1,375,000.003031 PALO PINTO SH 254 0539-04-034 $2,127,648.004006 RUSK FM1251 6224-74-001 $510,284.453023 SAN PATRICIO US 77 0372-01-094 $445,150.004010 SAN PATRICIO IH0037 6220-08-001 $775,984.003024 SHELBY FM 139 0742-01-045 $1,655,721.983025 SHELBY FM 2026 1879-01-019 $863,937.203026 SMITH US 69 0191-01-079 $245,357.254005 SMITH SH0110 6223-46-001 $643,157.003027 TARRANT BF1187C 1330-01-058 $663,335.514002 TARRANT IH0820 6221-51-001 $642,650.103019 TRAVIS IH 35 0015-10-059 $480,088.90

3034 TRAVIS RM 620 0683-02-053 $1,008,312.153028 TRAVIS FM 1327 1377-01-019 $313,056.00 <-CANCELLED3029 UPSHUR FM 1404 1386-01-020 $113,587.503030 VAL VERDE US 90 0022-10-058 $154,198.554009 VICTORIA BU0077S 6225-21-001 $645,006.10

Cancelled Jobs:Active Jobs: 45

1 forfor $191,257,621.17

$313,056.00Report Summary

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 2: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: ANGELINA

81 WORKING DAYS

ESTIMATED COST: $453,290.00

PROJECT NUMBER: STP 2011(973)

ENGINEER: LEE, C. MICHAEL- NACOGDOCHES TX 75961 (936)564-7782

DESCRIPTION: CONCRETE JOINT AND PAVEMENT REPAIRS

CHECK: 9,000

LOW BIDDER:

DATE: 05/03/2011

HWY.NO.: VA

LENGTH: 64.229 ORDER READ: 3001

Eng. Estimate -> $ 453,290.00 Amount Left %Left

Cntr 1 MOORE BROTHERS CONSTRUCTION COMPANY..... 615,500.88

ANGELINA Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

MOORE BRItems

01042001 REMOVING CONC (PAV) SY 2,047.00 1 20.00 94.04

03162398 AGGR(TY-PE, TY-PL, TY-E, OR TY-L GR-4) CY 33.00 2 150.00 300.00

03162566 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 1,342.00 3 10.00 9.00

03402011 D-GR HMA(METH) TY-B PG64-22 TON 1,078.00 4 160.00 126.00

03402106 D-GR HMA(METH) TY-D PG64-22 TON 230.00 5 150.00 129.00

03612001 FULL-DEPTH REPAIR CRCP (8") SY 725.00 6 160.00 225.00

04002005 CEM STABIL BKFL CY 120.00 7 100.00 135.00

05002001 MOBILIZATION LS 1.00 8 41000.00 37000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.00 9 3000.00 3200.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 3: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BASTROP

117 WORKING DAYS

ESTIMATED COST: $823,469.99

PROJECT NUMBER: C 914-18-55

ENGINEER: SMITH, DANIEL- BASTROP TX 78602 (512)321-2195

DESCRIPTION: REPAIR/RECONSTRUCT ROADS AND PARKING

CHECK: 16,000

LOW BIDDER: APAC-TEXAS, INC.

DATE: 05/03/2011

HWY.NO.: PW

LENGTH: 0.002 ORDER READ: 3002

Eng. Estimate -> $ 823,469.99 Amount Left %Left

Cntr 1 APAC-TEXAS, INC......................... 884,680.71

2 BIG CREEK CONSTRUCTION, LTD............. 921,246.69 36,565.98 4.1

3 ASPHALT PAVING COMPANY OF AUSTIN, INC... 959,156.83 74,476.12 8.4

4 KNIFE RIVER CORPORATION - SOUTH......... 975,681.24 91,000.53 10.3

5 DEAN WORD COMPANY, LTD.................. 1,097,857.84 213,177.13 24.1

6 AUSTIN ENGINEERING CO., INC............. 1,101,528.84 216,848.13 24.5

7 AARON CONCRETE CONTRACTORS, L.P......... 1,125,171.96 240,491.25 27.2

BASTROP Page 1 of 4

Quantity No

Eng.

Est.

Cntr 1

APAC-TEX

Cntr 2

BIG CREEItems

Cntr 3

ASPHALT

Cntr 4

KNIFE RI

Cntr 5

DEAN WOR

Cntr 6

AUSTIN

Cntr 7

AARON CO

01322021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 250.00 1 14.00 45.00 25.00 37.20 33.00 39.69 6.00 60.00

01502002 BLADING HR 45.00 2 100.00 125.00 110.00 136.90 110.00 103.425 331.00 185.00

01522002 ROAD GRADER WORK (ORD COMP) SY 7,945.00 3 5.50 9.00 3.50 9.35 2.10 4.053 7.45 18.00

01602003 FURNISHING AND PLACING TOPSOIL (4") SY 1,300.00 4 1.50 5.75 4.50 3.15 3.20 8.432 5.45 5.00

01642003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 1,300.00 5 0.40 0.25 0.39 0.50 0.50 0.39 2.05 0.60

01682001 VEGETATIVE WATERING MG 20.00 6 22.00 50.00 5.00 53.35 26.00 26.25 30.00 51.00

02162001 PROOF ROLLING HR 25.00 7 70.00 50.00 100.00 48.90 56.00 46.043 100.00 81.00

02472096 FL BS (CMP IN PLC)(TY D GR 4) TON 1,694.00 8 29.00 41.50 40.00 32.40 25.50 37.173 32.00 41.00

03102002 PRIME COAT (AE-P) GAL 1,230.00 9 3.50 4.702 4.20 3.50 5.50 5.754 6.10 5.30

03162707 ASPH (TIER III) GAL 3,952.00 10 3.50 3.95 4.00 4.50 4.50 4.946 7.10 4.50

03162719 AGGR (TIER III) CY 85.00 11 66.00 75.00 120.00 122.60 240.00 243.359 204.00 99.00

03402011 D-GR HMA(METH) TY-B PG64-22 TON 469.86 12 69.00 70.00 90.00 125.00 89.00 102.73 100.00 76.00

03412104 D-GR HMA(QCQA) TY-D SAC-B PG64-22 TON 7,231.80 13 62.00 65.00 70.00 67.15 76.50 79.294 85.30 73.00

03512013 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") SY 350.00 14 22.00 18.576 30.00 48.65 35.00 28.382 41.00 34.00

04202001 CL A CONC (MISC) CY 96.21 15 300.00 400.00 450.00 536.20 440.00 498.75 520.00 360.00

04322001 RIPRAP (CONC)(4 IN) CY 0.60 16 400.00 750.00 1100.00 542.35 1500.00 1097.25 508.00 1444.00

04322027 RIPRAP (SPECIAL) CY 111.50 17 80.00 390.00 100.00 233.60 105.00 421.05 100.00 340.00

05002001 MOBILIZATION LS 1.00 18 75000.00 6000.00 45000.00 35000.00 86000.00 105289.7 30000.00 90000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.00 19 1200.00 1300.00 2000.00 2000.00 2400.00 1277.19 6600.00 545.00

05062024 BACKHOE WORK (EROSION & SEDM CONT) HR 20.00 20 80.00 45.00 55.00 60.00 66.00 77.385 185.00 52.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 4,114.00 21 3.50 2.00 3.00 2.20 2.10 1.55 2.80 1.50

05292002 CONC CURB (TY II) LF 94.00 22 16.00 17.00 32.00 9.75 17.00 8.40 31.50 11.00

05292003 CONC CURB & GUTTER (TY I) LF 495.00 23 17.00 17.00 22.00 11.20 18.00 15.96 16.25 18.00

05292004 CONC CURB & GUTTER (TY II) LF 1,923.00 24 16.00 17.00 15.00 11.30 18.00 15.96 16.25 16.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 4: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BASTROP

117 WORKING DAYS

ESTIMATED COST: $823,469.99

PROJECT NUMBER: C 914-18-55

ENGINEER: SMITH, DANIEL- BASTROP TX 78602 (512)321-2195

DESCRIPTION: REPAIR/RECONSTRUCT ROADS AND PARKING

CHECK: 16,000

LOW BIDDER: APAC-TEXAS, INC.

DATE: 05/03/2011

HWY.NO.: PW

LENGTH: 0.002 ORDER READ: 3002

Eng. Estimate -> $ 823,469.99 Amount Left %Left

Cntr 1 APAC-TEXAS, INC......................... 884,680.71

2 BIG CREEK CONSTRUCTION, LTD............. 921,246.69 36,565.98 4.1

3 ASPHALT PAVING COMPANY OF AUSTIN, INC... 959,156.83 74,476.12 8.4

4 KNIFE RIVER CORPORATION - SOUTH......... 975,681.24 91,000.53 10.3

5 DEAN WORD COMPANY, LTD.................. 1,097,857.84 213,177.13 24.1

6 AUSTIN ENGINEERING CO., INC............. 1,101,528.84 216,848.13 24.5

7 AARON CONCRETE CONTRACTORS, L.P......... 1,125,171.96 240,491.25 27.2

BASTROP Page 2 of 4

Quantity No

Eng.

Est.

Cntr 1

APAC-TEX

Cntr 2

BIG CREEItems

Cntr 3

ASPHALT

Cntr 4

KNIFE RI

Cntr 5

DEAN WOR

Cntr 6

AUSTIN

Cntr 7

AARON CO

05312035 CONCRETE SIDEWALKS (5')(4") LF 40.00 25 28.00 35.00 40.00 21.20 31.00 28.98 26.00 28.00

06442081 INS SM RD SN SUP&AM TY TWT(1) WS(P) EA 3.00 26 300.00 250.00 237.08 295.00 245.00 237.08 245.00 281.00

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 4,379.00 27 0.45 1.50 1.50 2.50 1.60 1.50 1.60 1.80

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 41.00 28 8.00 7.55 7.55 7.35 7.80 7.55 8.00 9.00

06662087 REFL PAV MRK TY I(W) (SYMBOL) (100MIL) EA 9.00 29 300.00 200.00 200.00 310.00 200.00 200.00 205.00 237.00

06662099 REF PAV MRK TY I(W)18"(YLD TRI)(100MIL) EA 43.00 30 40.00 16.00 16.00 52.15 17.00 16.00 16.25 19.00

07002001 POTHOLE REPAIR (STANDARD) SY 800.00 31 12.00 20.00 34.00 36.50 21.00 30.429 25.00 47.00

07522045 STUMP REMOVAL EA 1.00 32 400.00 500.00 450.00 1035.00 300.00 761.25 2300.00 900.00

54342001 WHEEL STOPS EA 113.00 33 100.00 35.00 86.00 35.00 59.00 45.15 105.00 45.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 5: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BASTROP

117 WORKING DAYS

ESTIMATED COST: $823,469.99

PROJECT NUMBER: C 914-18-55

ENGINEER: SMITH, DANIEL- BASTROP TX 78602 (512)321-2195

DESCRIPTION: REPAIR/RECONSTRUCT ROADS AND PARKING

CHECK: 16,000

LOW BIDDER: APAC-TEXAS, INC.

DATE: 05/03/2011

HWY.NO.: PW

LENGTH: 0.002 ORDER READ: 3002

Eng. Estimate -> $ 823,469.99 Amount Left %Left

Cntr 8 ANGEL BROTHERS ENTERPRISES, LTD......... 1,164,704.00 280,023.29 31.7

9 HUNTER INDUSTRIES, LTD.................. 1,780,607.02 895,926.31 101.3

BASTROP Page 3 of 4

Quantity No

Eng.

Est.

Cntr 8

ANGEL BR

Cntr 9

HUNTERItems

01322021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 250.00 1 14.00 45.00 65.28

01502002 BLADING HR 45.00 2 100.00 55.00 399.00

01522002 ROAD GRADER WORK (ORD COMP) SY 7,945.00 3 5.50 1.20 21.39

01602003 FURNISHING AND PLACING TOPSOIL (4") SY 1,300.00 4 1.50 6.50 4.38

01642003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 1,300.00 5 0.40 1.00 0.50

01682001 VEGETATIVE WATERING MG 20.00 6 22.00 40.00 48.18

02162001 PROOF ROLLING HR 25.00 7 70.00 50.00 163.02

02472096 FL BS (CMP IN PLC)(TY D GR 4) TON 1,694.00 8 29.00 36.00 28.29

03102002 PRIME COAT (AE-P) GAL 1,230.00 9 3.50 5.75 8.76

03162707 ASPH (TIER III) GAL 3,952.00 10 3.50 5.80 8.76

03162719 AGGR (TIER III) CY 85.00 11 66.00 200.00 179.13

03402011 D-GR HMA(METH) TY-B PG64-22 TON 469.86 12 69.00 140.00 138.03

03412104 D-GR HMA(QCQA) TY-D SAC-B PG64-22 TON 7,231.80 13 62.00 83.50 138.03

03512013 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") SY 350.00 14 22.00 50.00 61.71

04202001 CL A CONC (MISC) CY 96.21 15 300.00 320.00 315.00

04322001 RIPRAP (CONC)(4 IN) CY 0.60 16 400.00 585.00 840.00

04322027 RIPRAP (SPECIAL) CY 111.50 17 80.00 90.00 136.50

05002001 MOBILIZATION LS 1.00 18 75000.00 115000 150401.3

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.00 19 1200.00 7500.00 1345.45

05062024 BACKHOE WORK (EROSION & SEDM CONT) HR 20.00 20 80.00 50.00 125.40

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 4,114.00 21 3.50 1.90 1.85

05292002 CONC CURB (TY II) LF 94.00 22 16.00 25.00 23.10

05292003 CONC CURB & GUTTER (TY I) LF 495.00 23 17.00 25.00 24.15

05292004 CONC CURB & GUTTER (TY II) LF 1,923.00 24 16.00 20.00 19.95

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 6: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BASTROP

117 WORKING DAYS

ESTIMATED COST: $823,469.99

PROJECT NUMBER: C 914-18-55

ENGINEER: SMITH, DANIEL- BASTROP TX 78602 (512)321-2195

DESCRIPTION: REPAIR/RECONSTRUCT ROADS AND PARKING

CHECK: 16,000

LOW BIDDER: APAC-TEXAS, INC.

DATE: 05/03/2011

HWY.NO.: PW

LENGTH: 0.002 ORDER READ: 3002

Eng. Estimate -> $ 823,469.99 Amount Left %Left

Cntr 8 ANGEL BROTHERS ENTERPRISES, LTD......... 1,164,704.00 280,023.29 31.7

9 HUNTER INDUSTRIES, LTD.................. 1,780,607.02 895,926.31 101.3

BASTROP Page 4 of 4

Quantity No

Eng.

Est.

Cntr 8

ANGEL BR

Cntr 9

HUNTERItems

05312035 CONCRETE SIDEWALKS (5')(4") LF 40.00 25 28.00 40.00 42.00

06442081 INS SM RD SN SUP&AM TY TWT(1) WS(P) EA 3.00 26 300.00 350.00 238.00

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 4,379.00 27 0.45 1.60 1.50

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 41.00 28 8.00 25.00 7.55

06662087 REFL PAV MRK TY I(W) (SYMBOL) (100MIL) EA 9.00 29 300.00 400.00 200.00

06662099 REF PAV MRK TY I(W)18"(YLD TRI)(100MIL) EA 43.00 30 40.00 75.00 16.00

07002001 POTHOLE REPAIR (STANDARD) SY 800.00 31 12.00 65.00 96.36

07522045 STUMP REMOVAL EA 1.00 32 400.00 875.00 9120.00

54342001 WHEEL STOPS EA 113.00 33 100.00 75.00 71.40

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 7: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BEXAR

252 WORKING DAYS

ESTIMATED COST: $2,094,289.23

PROJECT NUMBER: STP 2011(978)

ENGINEER: COYLE, LAWRANCE- SAN ANTONIO TX 78223 (210)633-1401

DESCRIPTION: CONSTRUCT CURB RAMPS

CHECK: 42,000

LOW BIDDER: ENCINO LANDSCAPE, INC.

DATE: 05/03/2011

HWY.NO.: VA

LENGTH: 0.002 ORDER READ: 3003

Eng. Estimate -> $ 2,094,289.23 Amount Left %Left

Cntr 1 ENCINO LANDSCAPE, INC................... 2,030,157.45

2 JERDON ENTERPRISE, L.P.................. 2,093,093.93 62,936.48 3.1

3 KEN-DO CONTRACTING, LP.................. 2,173,211.05 143,053.60 7.0

4 E-Z BEL CONSTRUCTION, LLC............... 2,259,292.52 229,135.07 11.3

5 RYAN EQUIPMENT INC...................... 2,330,718.10 300,560.65 14.8

6 IOC COMPANY LLC......................... 2,539,368.90 509,211.45 25.1

BEXAR Page 1 of 4

Quantity No

Eng.

Est.

Cntr 1

ENCINO

Cntr 2

JERDONItems

Cntr 3

KEN-DO

Cntr 4

E-Z BEL

Cntr 5

RYAN EQU

Cntr 6

IOC COMP

01042009 REMOVING CONC (RIPRAP) SY 61.00 1 16.00 10.00 30.00 6.60 10.00 20.00 70.00

01042011 REMOVING CONC (MEDIANS) SY 72.00 2 15.00 10.00 34.00 6.60 10.00 20.00 50.00

01042017 REMOVING CONC (DRIVEWAYS) SY 212.00 3 12.50 10.00 27.00 15.00 10.00 6.20 25.00

01042029 REMOVING CONC (CURB OR CURB & GUTTER) LF 3,010.00 4 15.00 5.00 4.60 6.00 2.00 5.00 25.00

01042036 REMOVING CONC (SIDEWALK OR RAMP) SY 616.00 5 12.50 10.00 23.00 7.75 10.00 15.00 45.00

01612005 COMPOST MANUF TOPSOIL (PB) (4") SY 6,942.00 6 4.00 2.00 2.95 7.25 6.50 3.00 8.85

01622002 BLOCK SODDING SY 6,942.00 7 4.00 4.00 2.75 4.00 3.25 3.00 6.60

01682001 VEGETATIVE WATERING MG 108.28 8 25.00 40.00 55.00 68.75 54.00 40.00 85.00

03402050 D-GR HMA(METH) TY-C PG70-22 TON 29.90 9 150.00 300.00 210.00 133.00 120.00 200.00 250.00

03542024 PLANE ASPH CONC PAV(2" TO 4") SY 65.00 10 25.00 100.00 18.00 30.00 10.00 50.00 100.00

03602060 CONC PAV (JT REINF) VAR DEPTH (6"-13") SY 54.00 11 75.00 100.00 75.00 102.00 100.00 100.00 115.00

04322035 RIPRAP (CONC)(6 IN) CY 75.60 12 250.00 600.00 260.00 233.00 450.00 400.00 350.00

04322048 RIPRAP (CONC)(FLUME) CY 1.00 13 400.00 100.00 650.00 380.00 900.00 800.00 4800.00

04502073 RAIL (HANDRAIL)(TY B) LF 79.00 14 125.00 100.00 78.00 85.50 95.00 80.00 87.00

04792001 ADJ MANHS EA 11.00 15 450.00 2000.00 700.00 388.50 950.00 750.00 1000.00

05002001 MOBILIZATION LS 1.00 16 160000 150000 239988 170000 111000 179000 295000

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 13.00 17 3500.00 3000.00 9800.00 3600.00 13400.00 5000.00 6500.00

05062031 SANDBAGS FOR EROSION CONTROL EA 2,000.00 18 4.00 1.00 2.00 3.50 2.50 3.50 14.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 2,000.00 19 4.00 1.00 2.60 3.30 1.40 2.50 3.95

05282004 LANDSCAPE PAVERS SY 43.00 20 45.00 60.00 110.00 105.00 75.00 100.00 100.00

05292001 CONC CURB (TY I) LF 70.00 21 20.00 25.00 10.00 5.00 13.00 20.00 50.00

05292002 CONC CURB (TY II) LF 3,030.00 22 10.00 15.00 11.40 19.00 13.00 10.00 15.00

05292006 CONC CURB (MONO) (TY II) LF 117.00 23 10.00 10.00 11.50 8.00 13.00 20.00 30.00

05292011 CONC CURB & GUTTER (SAWTOOTH) LF 41.00 24 30.00 20.00 22.00 22.00 30.00 20.00 75.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 8: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BEXAR

252 WORKING DAYS

ESTIMATED COST: $2,094,289.23

PROJECT NUMBER: STP 2011(978)

ENGINEER: COYLE, LAWRANCE- SAN ANTONIO TX 78223 (210)633-1401

DESCRIPTION: CONSTRUCT CURB RAMPS

CHECK: 42,000

LOW BIDDER: ENCINO LANDSCAPE, INC.

DATE: 05/03/2011

HWY.NO.: VA

LENGTH: 0.002 ORDER READ: 3003

Eng. Estimate -> $ 2,094,289.23 Amount Left %Left

Cntr 1 ENCINO LANDSCAPE, INC................... 2,030,157.45

2 JERDON ENTERPRISE, L.P.................. 2,093,093.93 62,936.48 3.1

3 KEN-DO CONTRACTING, LP.................. 2,173,211.05 143,053.60 7.0

4 E-Z BEL CONSTRUCTION, LLC............... 2,259,292.52 229,135.07 11.3

5 RYAN EQUIPMENT INC...................... 2,330,718.10 300,560.65 14.8

6 IOC COMPANY LLC......................... 2,539,368.90 509,211.45 25.1

BEXAR Page 2 of 4

Quantity No

Eng.

Est.

Cntr 1

ENCINO

Cntr 2

JERDONItems

Cntr 3

KEN-DO

Cntr 4

E-Z BEL

Cntr 5

RYAN EQU

Cntr 6

IOC COMP

05292014 CONC CURB (TY C) LF 1,598.00 25 26.00 50.00 32.60 29.00 30.00 40.00 15.00

05292026 CONC CURB (ARMOR CURB SLOT) LF 99.00 26 60.00 150.00 171.00 153.00 185.00 99.00 150.00

05302010 DRIVEWAYS (CONC) SY 430.00 27 45.00 60.00 48.00 56.00 55.00 70.00 75.00

05302011 DRIVEWAYS (ACP) SY 54.00 28 27.50 40.00 37.00 80.00 37.00 23.00 200.00

05312004 CONC SIDEWALKS (6") SY 7,519.50 29 32.00 30.00 42.00 50.00 52.00 40.00 45.00

05312005 CURB RAMPS (TY 1) EA 95.00 30 1200.00 1100.00 880.00 1150.00 1050.00 1000.00 1100.00

05312006 CURB RAMPS (TY 2) EA 90.00 31 1200.00 1200.00 825.00 1200.00 1050.00 1500.00 1100.00

05312007 CURB RAMPS (TY 3) EA 117.00 32 1300.00 1300.00 925.00 1200.00 1000.00 1300.00 1100.00

05312008 CURB RAMPS (TY 4) EA 18.00 33 1500.00 1500.00 1160.00 1110.00 1000.00 1000.00 1100.00

05312009 CURB RAMPS (TY 6) EA 74.00 34 1500.00 1500.00 1104.00 1300.00 1000.00 1200.00 1100.00

05312010 CURB RAMPS (TY 7) EA 86.00 35 1000.00 1000.00 860.00 1000.00 1000.00 1000.00 1100.00

05312011 CURB RAMPS (TY 8) EA 13.00 36 1200.00 1200.00 950.00 1000.00 1000.00 1000.00 1100.00

05312012 CURB RAMPS (TY 9) EA 3.00 37 1500.00 1000.00 950.00 1000.00 1250.00 1000.00 1100.00

05312013 CURB RAMPS (TY 20) EA 10.00 38 1800.00 1500.00 1328.00 1900.00 2000.00 2500.00 1100.00

05312014 CURB RAMPS (TY 22) EA 6.00 39 2000.00 2300.00 1395.00 1900.00 2000.00 3000.00 1100.00

05312017 CURB RAMPS (TY 21) EA 19.00 40 1500.00 1500.00 1220.00 1300.00 2000.00 1500.00 1100.00

05312022 CURB RAMPS (TY 7)(MOD) EA 10.00 41 1500.00 1500.00 850.00 1000.00 1500.00 2000.00 1100.00

05312034 CONC SIDEWALK (DRAIN) LF 13.00 42 225.00 50.00 300.00 77.00 200.00 100.00 330.00

05312037 CONC SIDEWALK (BRIDGE)(5')(4") LF 91.00 43 350.00 100.00 450.00 105.00 400.00 900.00 330.00

05312040 CURB RAMPS (TY 5) EA 18.00 44 1500.00 1500.00 960.00 1110.00 1500.00 2500.00 1100.00

05312041 CURB RAMPS (TY 10) EA 40.00 45 1200.00 1000.00 1090.00 943.50 1500.00 1000.00 1100.00

05312046 CURB RAMPS (TY 11) EA 2.00 46 1500.00 1500.00 800.00 1054.50 1500.00 1100.00 1100.00

05502001 CHAIN LINK FENCE (INSTALL) (6') LF 70.00 47 15.00 70.00 55.00 57.00 40.00 1000.00 13.00

05502003 CHAIN LINK FENCE (REMOVE) LF 195.00 48 7.50 2.00 2.50 2.50 1.00 15.00 10.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 9: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BEXAR

252 WORKING DAYS

ESTIMATED COST: $2,094,289.23

PROJECT NUMBER: STP 2011(978)

ENGINEER: COYLE, LAWRANCE- SAN ANTONIO TX 78223 (210)633-1401

DESCRIPTION: CONSTRUCT CURB RAMPS

CHECK: 42,000

LOW BIDDER: ENCINO LANDSCAPE, INC.

DATE: 05/03/2011

HWY.NO.: VA

LENGTH: 0.002 ORDER READ: 3003

Eng. Estimate -> $ 2,094,289.23 Amount Left %Left

Cntr 1 ENCINO LANDSCAPE, INC................... 2,030,157.45

2 JERDON ENTERPRISE, L.P.................. 2,093,093.93 62,936.48 3.1

3 KEN-DO CONTRACTING, LP.................. 2,173,211.05 143,053.60 7.0

4 E-Z BEL CONSTRUCTION, LLC............... 2,259,292.52 229,135.07 11.3

5 RYAN EQUIPMENT INC...................... 2,330,718.10 300,560.65 14.8

6 IOC COMPANY LLC......................... 2,539,368.90 509,211.45 25.1

BEXAR Page 3 of 4

Quantity No

Eng.

Est.

Cntr 1

ENCINO

Cntr 2

JERDONItems

Cntr 3

KEN-DO

Cntr 4

E-Z BEL

Cntr 5

RYAN EQU

Cntr 6

IOC COMP

05502009 CHAIN LINK FENCE (INSTALL)(4') LF 125.00 49 15.00 45.00 38.00 39.00 27.00 20.00 11.50

06182038 CONDT (PVC) (SCHD 80) (3") LF 1,962.00 50 7.50 25.00 14.00 13.75 7.50 15.00 14.00

06182039 CONDT (PVC) (SCHD 80) (3") (BORE) LF 460.00 51 20.00 30.00 49.00 47.25 21.00 50.00 50.00

06202009 ELEC CONDR (NO. 6) BARE LF 1,962.00 52 2.00 2.00 1.10 1.25 0.95 2.00 1.10

06242013 GROUND BOX TY D (162922) EA 170.00 53 500.00 400.00 340.00 331.00 400.00 325.00 325.00

06442025 INS SM RD SN SUP&AM TY S80(1) SA(T) EA 13.00 54 640.00 500.00 570.00 610.50 600.00 550.00 325.00

06442032 INS SM RD SN SUP&AM TY S80(1) SB(P) EA 1.00 55 600.00 300.00 550.00 520.00 750.00 575.00 600.00

06442058 RELOCATE SM RD SN SUP & AM TY S80 EA 176.00 56 400.00 200.00 248.00 314.00 225.00 450.00 350.00

06662003 REFL PAV MRK TY I (W) 4" (BRK)(100MIL) LF 230.00 57 0.73 1.15 2.00 1.10 4.00 4.00 1.25

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 150.00 58 0.95 1.15 2.00 1.10 3.00 3.00 1.25

06662036 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 300.00 59 0.90 2.30 2.50 2.10 4.00 4.00 2.50

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 9,915.00 60 3.81 0.20 7.00 7.00 7.00 7.00 8.00

06662099 REF PAV MRK TY I(W)18"(YLD TRI)(100MIL) EA 14.00 61 48.07 70.00 70.00 57.00 50.00 50.00 69.00

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 150.00 62 0.60 1.15 2.00 1.10 4.00 4.00 1.25

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 150.00 63 0.96 1.15 2.00 1.10 3.00 3.00 1.25

06662132 REFL PAV MRK TY I (Y) 24"(SLD)(100MIL) LF 116.00 64 5.69 6.50 7.00 6.00 7.00 7.00 7.00

06662142 REF PAV MRK TY II (W) 4" (BRK) LF 230.00 65 0.31 0.60 1.00 0.60 2.00 2.00 0.60

06662145 REF PAV MRK TY II (W) 4" (SLD) LF 150.00 66 0.40 0.60 1.00 0.60 2.00 2.00 0.60

06662157 REF PAV MRK TY II (W) 24" (SLD) LF 9,875.00 67 6.00 3.00 2.60 2.50 2.50 2.50 3.00

06662174 REF PAV MRK TY II (W) 18" (YLD TRI) EA 7.00 68 23.91 25.00 30.00 21.00 25.00 25.00 25.00

06662176 REF PAV MRK TY II (Y) 4" (BRK) LF 150.00 69 0.25 0.60 1.00 0.60 2.00 2.00 0.60

06662178 REF PAV MRK TY II (Y) 4" (SLD) LF 150.00 70 0.47 0.60 1.00 0.60 2.00 2.00 0.60

06662185 REF PAV MRK TY II (Y) 24" (SLD) LF 76.00 71 1.73 1.50 1.80 2.00 2.50 2.50 1.90

06722022 TRAFFIC BUTTON TY II-C-R EA 30.00 72 7.02 28.00 30.00 23.00 5.00 5.00 26.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 10: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BEXAR

252 WORKING DAYS

ESTIMATED COST: $2,094,289.23

PROJECT NUMBER: STP 2011(978)

ENGINEER: COYLE, LAWRANCE- SAN ANTONIO TX 78223 (210)633-1401

DESCRIPTION: CONSTRUCT CURB RAMPS

CHECK: 42,000

LOW BIDDER: ENCINO LANDSCAPE, INC.

DATE: 05/03/2011

HWY.NO.: VA

LENGTH: 0.002 ORDER READ: 3003

Eng. Estimate -> $ 2,094,289.23 Amount Left %Left

Cntr 1 ENCINO LANDSCAPE, INC................... 2,030,157.45

2 JERDON ENTERPRISE, L.P.................. 2,093,093.93 62,936.48 3.1

3 KEN-DO CONTRACTING, LP.................. 2,173,211.05 143,053.60 7.0

4 E-Z BEL CONSTRUCTION, LLC............... 2,259,292.52 229,135.07 11.3

5 RYAN EQUIPMENT INC...................... 2,330,718.10 300,560.65 14.8

6 IOC COMPANY LLC......................... 2,539,368.90 509,211.45 25.1

BEXAR Page 4 of 4

Quantity No

Eng.

Est.

Cntr 1

ENCINO

Cntr 2

JERDONItems

Cntr 3

KEN-DO

Cntr 4

E-Z BEL

Cntr 5

RYAN EQU

Cntr 6

IOC COMP

06722024 TRAFFIC BUTTON TY W EA 32.00 73 2.95 28.00 30.00 23.00 10.00 10.00 26.00

06772001 ELIM EXT PAV MRK & MRKS ( 4") LF 136.00 74 1.55 1.75 1.80 2.00 3.00 3.00 1.90

06772007 ELIM EXT PAV MRK & MRKS (24") LF 9,423.00 75 1.19 1.75 1.60 2.00 4.00 4.00 1.90

06772008 ELIM EXT PAV MRK & MRKS (ARROW) EA 3.00 76 57.46 65.00 100.00 58.00 50.00 50.00 69.00

06782001 PAV SURF PREP FOR MRK ( 4") LF 680.00 77 0.42 1.00 0.70 0.70 0.50 0.50 0.75

06782003 PAV SURF PREP FOR MRK ( 8") LF 300.00 78 0.26 1.15 1.30 1.20 0.75 0.75 1.25

06782006 PAV SURF PREP FOR MRK (24") LF 10,031.00 79 0.29 1.00 0.90 1.00 1.00 1.00 1.00

06782019 PAV SURF PREP FOR MRK (18") (YLD TRI) EA 7.00 80 6.74 20.00 15.00 11.50 20.00 20.00 14.00

06822014 PED SIG SEC (12 IN) LED (2 INDICATIONS) EA 34.00 81 388.43 450.00 350.00 342.00 475.00 350.00 410.00

06842009 TRF SIG CBL (TY A) (12 AWG) ( 4 CONDR) LF 9,190.00 82 0.74 2.00 1.45 1.40 1.25 1.35 1.60

06842028 TRF SIG CBL (TY A) (14 AWG) ( 2 CONDR) LF 33,195.00 83 0.78 1.20 0.95 0.95 1.00 1.10 1.10

06872001 PED POLE ASSEMBLY EA 50.00 84 1250.00 900.00 765.00 1000.00 1100.00 900.00 885.00

06882001 PED DETECT (2 INCH PUSH BTN) EA 219.00 85 125.00 200.00 175.00 172.50 237.00 175.00 200.00

06902005 INSTALL OF VEHICLE DETECTORS LF 60.00 86 50.00 100.00 76.00 73.50 20.00 80.00 88.50

06902024 REMOVAL OF SIGNAL HEAD ASSM EA 41.00 87 65.00 100.00 105.00 100.00 50.00 250.00 120.00

06902026 INSTALL OF SIGNAL HEAD ASSM EA 29.00 88 150.00 400.00 260.00 252.00 75.00 260.00 300.00

06902027 REMOVAL OF SIGNAL RELATED SIGNS EA 101.00 89 180.00 40.00 43.00 40.00 25.00 42.00 48.00

06902029 INSTALL OF SIGNAL RELATED SIGNS EA 56.00 90 140.00 200.00 176.00 168.00 25.00 175.00 200.00

06902030 REMOVAL OF PEDESTRIAN PUSH BUTTONS EA 107.00 91 50.00 30.00 27.00 26.50 25.00 30.00 30.00

06902032 INSTALL OF PEDESTRIAN PUSH BUTTONS EA 66.00 92 200.00 100.00 27.00 26.50 25.00 30.00 30.00

06902128 REMOVE PED POLE ASSM EA 6.00 93 200.00 200.00 175.00 320.00 100.00 175.00 180.00

06902182 MODIFY OF GROUND BOXES EA 43.00 94 400.00 250.00 135.00 500.00 100.00 150.00 150.00

55222006 RETROFIT DET WARN SURF(SURF APP OR CIP) EA 123.00 95 350.00 300.00 370.00 305.25 650.00 200.00 1000.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 11: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BLANCO

99 WORKING DAYS

ESTIMATED COST: $626,483.47

PROJECT NUMBER: BR 2011(955)

ENGINEER: LYONS, HOWARD- BURNET TX 78611 (512)715-5701

DESCRIPTION: REPLACE BRIDGE AND APPROACHES

CHECK: 12,000

LOW BIDDER: DEAN WORD COMPANY, LTD.

DATE: 05/03/2011

HWY.NO.: US 281

LENGTH: 0.114 ORDER READ: 3004

Eng. Estimate -> $ 626,483.47 Amount Left %Left

Cntr 1 DEAN WORD COMPANY, LTD.................. 742,748.14

2 ACME BRIDGE COMPANY, INC................ 939,913.58 197,165.44 26.5

3 ALLEN KELLER COMPANY.................... 953,420.31 210,672.17 28.4

4 AUSTIN ENGINEERING CO., INC............. 1,030,754.20 288,006.06 38.8

5 HUNTER INDUSTRIES, LTD.................. 1,033,880.76 291,132.62 39.2

6 CAPITAL EXCAVATION COMPANY.............. 1,039,616.87 296,868.73 40.0

7 DAN WILLIAMS COMPANY.................... 1,086,010.69 343,262.55 46.2

BLANCO Page 1 of 3

Quantity No

Eng.

Est.

Cntr 1

DEAN WOR

Cntr 2

ACME BRIItems

Cntr 3

ALLEN KE

Cntr 4

AUSTIN

Cntr 5

HUNTER

Cntr 6

CAPITAL

Cntr 7

DAN WILL

01002002 PREPARING ROW STA 9.10 1 1000.00 1361.631 1580.00 2000.00 2000.00 8107.50 2500.00 2000.00

01042009 REMOVING CONC (RIPRAP) SY 473.00 2 10.00 16.563 9.50 6.00 8.00 9.56 10.00 10.00

01102001 EXCAVATION (ROADWAY) CY 762.00 3 9.00 5.735 9.80 11.30 20.00 87.84 22.00 15.00

01322005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 1,402.00 4 5.00 22.041 10.00 13.20 15.00 37.11 22.00 15.00

01602003 FURNISHING AND PLACING TOPSOIL (4") SY 4,131.00 5 1.00 1.253 1.45 2.80 5.50 2.72 3.00 2.00

01642023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 4,131.00 6 0.18 0.30 0.23 0.25 0.30 0.30 0.22 0.35

01642029 CELL FBR MLCH SEED(TEMP)(WARM) SY 2,066.50 7 0.13 0.20 0.21 0.25 0.20 0.35 0.20 0.25

01642031 CELL FBR MLCH SEED(TEMP)(COOL) SY 2,066.50 8 0.13 0.20 0.21 0.25 0.20 0.35 0.20 0.25

01682001 VEGETATIVE WATERING MG 83.00 9 13.00 31.51 36.30 35.00 35.00 24.63 50.00 35.00

02472392 FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS) CY 586.00 10 30.00 29.476 77.10 66.50 61.00 51.82 45.00 55.00

03102002 PRIME COAT (AE-P) GAL 391.00 11 3.00 5.779 4.85 7.20 5.60 8.76 5.50 6.00

03162705 ASPH (TIER I) GAL 2,067.00 12 2.30 4.096 5.00 5.50 5.85 7.62 6.00 6.00

03162717 AGGR (TIER I) CY 43.00 13 48.00 159.226 167.00 200.00 117.00 198.90 162.00 120.00

03402004 D-GR HMA(METH) TY-A PG64-22 TON 751.00 14 51.00 71.465 81.40 84.00 88.00 71.88 80.00 90.00

03412048 D-GR HMA(QCQA) TY-C SAC-B PG70-22 TON 931.00 15 55.00 65.134 81.40 78.00 79.30 79.23 82.00 80.00

03412260 D-GR HMA(QCQA) TY-B SAC-B PG64-22 TON 352.00 16 51.00 78.045 81.40 78.00 79.30 71.88 85.00 80.00

04002002 STRUCT EXCAV (BOX) CY 660.00 17 2.00 7.09 7.60 9.80 25.00 18.00 10.00 5.00

04022001 TRENCH EXCAVATION PROTECTION LF 136.00 18 16.00 18.22 8.20 175.00 5.00 12.00 1.00 1.00

04032001 TEMPORARY SPL SHORING SF 234.00 19 10.00 13.872 70.00 70.00 15.00 25.00 29.00 60.00

04322002 RIPRAP (CONC)(5 IN) CY 35.00 20 305.00 328.115 318.00 325.00 335.00 350.00 405.00 350.00

04322039 RIPRAP (MOW STRIP)(4 IN) CY 22.00 21 205.00 430.968 476.00 370.00 425.00 450.00 425.00 350.00

04502161 RAIL (TY T223) LF 256.00 22 61.00 64.33 63.70 100.00 85.00 58.00 62.00 75.00

04622034 CONC BOX CULV (10 FT X 10 FT) LF 420.00 23 450.00 523.245 794.00 690.00 526.00 595.00 760.00 860.00

04662057 WINGWALL (PW)(HW=13 FT) EA 2.00 24 29000.00 19310.00 33000.00 25000.00 63000.00 20500.00 30000.00 30000.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 12: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BLANCO

99 WORKING DAYS

ESTIMATED COST: $626,483.47

PROJECT NUMBER: BR 2011(955)

ENGINEER: LYONS, HOWARD- BURNET TX 78611 (512)715-5701

DESCRIPTION: REPLACE BRIDGE AND APPROACHES

CHECK: 12,000

LOW BIDDER: DEAN WORD COMPANY, LTD.

DATE: 05/03/2011

HWY.NO.: US 281

LENGTH: 0.114 ORDER READ: 3004

Eng. Estimate -> $ 626,483.47 Amount Left %Left

Cntr 1 DEAN WORD COMPANY, LTD.................. 742,748.14

2 ACME BRIDGE COMPANY, INC................ 939,913.58 197,165.44 26.5

3 ALLEN KELLER COMPANY.................... 953,420.31 210,672.17 28.4

4 AUSTIN ENGINEERING CO., INC............. 1,030,754.20 288,006.06 38.8

5 HUNTER INDUSTRIES, LTD.................. 1,033,880.76 291,132.62 39.2

6 CAPITAL EXCAVATION COMPANY.............. 1,039,616.87 296,868.73 40.0

7 DAN WILLIAMS COMPANY.................... 1,086,010.69 343,262.55 46.2

BLANCO Page 2 of 3

Quantity No

Eng.

Est.

Cntr 1

DEAN WOR

Cntr 2

ACME BRIItems

Cntr 3

ALLEN KE

Cntr 4

AUSTIN

Cntr 5

HUNTER

Cntr 6

CAPITAL

Cntr 7

DAN WILL

04962005 REMOV STR (WINGWALL) EA 2.00 25 1000.00 2390.50 2200.00 4000.00 7140.00 2500.00 5000.00 3500.00

04962008 REMOV STR (BOX CULVERT) LF 235.00 26 100.00 45.623 143.00 115.00 155.00 100.00 150.00 80.00

05002001 MOBILIZATION LS 1.00 27 62244.00 73897.71 84800.00 70000.00 126894 119294.4 83000.00 80000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.00 28 2000.00 1625.125 742.00 6500.00 4870.00 1472.55 2000.00 2500.00

05062002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 272.00 29 19.00 16.50 19.10 18.00 16.80 15.00 18.00 17.00

05062009 ROCK FILTER DAMS (REMOVE) LF 272.00 30 6.00 4.50 6.40 6.00 4.60 5.00 6.00 5.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 1,600.00 31 2.00 1.55 2.30 2.15 2.00 1.35 2.15 1.60

05082001 CONSTRUCTING DETOURS STA 5.00 32 1000.00 8714.83 2370.00 6000.00 7100.00 6150.00 20550.00 25000.00

05122049 PORT CTB (DES SOURCE)(F-SHAPE)(TY 1) LF 460.00 33 8.00 7.624 10.70 23.00 24.00 25.25 11.00 20.00

05122050 PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 460.00 34 5.00 5.338 3.95 5.00 10.50 23.67 4.00 6.00

05122051 PORT CTB (STOCKPILE)(F-SHAPE)(TY 1) LF 460.00 35 7.00 6.752 10.50 15.00 22.00 24.49 11.00 20.00

05402001 MTL W-BEAM GD FEN (TIM POST) LF 100.00 36 15.00 21.88 23.30 18.00 18.30 21.88 21.88 20.00

05402011 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.00 37 1300.00 1528.85 1410.00 1055.00 1275.00 1328.00 1328.00 1500.00

05422001 REMOVING METAL BEAM GUARD FENCE LF 629.00 38 1.60 1.00 1.05 1.00 1.05 1.00 1.00 1.00

05422002 REMOVING TERMINAL ANCHOR SECTION EA 2.00 39 110.00 85.00 90.40 100.00 128.00 85.00 85.00 130.00

05442001 GUARDRAIL END TREATMENT (INSTALL) EA 4.00 40 1840.00 1885.00 2000.00 1835.00 1855.00 1885.00 1885.00 1900.00

05442003 GUARDRAIL END TREATMENT (REMOVE) EA 2.00 41 215.00 75.00 79.80 300.00 355.75 75.00 75.00 350.00

05452001 CRASH CUSH ATTEN (INSTL) EA 2.00 42 11000.00 1384.13 1010.00 1000.00 2500.00 950.00 950.00 1200.00

05452002 CRASH CUSH ATTEN (MOVE & RESET) EA 2.00 43 2000.00 1000.00 1060.00 1000.00 1500.00 1000.00 1000.00 3500.00

05452003 CRASH CUSH ATTEN (REMOVE) EA 2.00 44 1000.00 500.00 532.00 600.00 100.00 500.00 500.00 1000.00

06442001 INS SM RD SN SUP&AM TY 10BWG(1) SA(P) EA 4.00 45 340.00 402.00 487.00 460.00 485.00 325.00 458.25 500.00

06442004 INS SM RD SN SUP&AM TY 10BWG(1) SA(T) EA 1.00 46 450.00 377.00 431.00 405.00 420.00 400.00 405.25 420.00

06442025 INS SM RD SN SUP&AM TY S80(1) SA(T) EA 2.00 47 550.00 497.00 555.00 522.00 560.00 575.00 522.15 560.00

06442060 REMOVE SM RD SN SUP & AM EA 5.00 48 65.00 59.00 69.10 65.00 97.00 65.00 65.00 100.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 13: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BLANCO

99 WORKING DAYS

ESTIMATED COST: $626,483.47

PROJECT NUMBER: BR 2011(955)

ENGINEER: LYONS, HOWARD- BURNET TX 78611 (512)715-5701

DESCRIPTION: REPLACE BRIDGE AND APPROACHES

CHECK: 12,000

LOW BIDDER: DEAN WORD COMPANY, LTD.

DATE: 05/03/2011

HWY.NO.: US 281

LENGTH: 0.114 ORDER READ: 3004

Eng. Estimate -> $ 626,483.47 Amount Left %Left

Cntr 1 DEAN WORD COMPANY, LTD.................. 742,748.14

2 ACME BRIDGE COMPANY, INC................ 939,913.58 197,165.44 26.5

3 ALLEN KELLER COMPANY.................... 953,420.31 210,672.17 28.4

4 AUSTIN ENGINEERING CO., INC............. 1,030,754.20 288,006.06 38.8

5 HUNTER INDUSTRIES, LTD.................. 1,033,880.76 291,132.62 39.2

6 CAPITAL EXCAVATION COMPANY.............. 1,039,616.87 296,868.73 40.0

7 DAN WILLIAMS COMPANY.................... 1,086,010.69 343,262.55 46.2

BLANCO Page 3 of 3

Quantity No

Eng.

Est.

Cntr 1

DEAN WOR

Cntr 2

ACME BRIItems

Cntr 3

ALLEN KE

Cntr 4

AUSTIN

Cntr 5

HUNTER

Cntr 6

CAPITAL

Cntr 7

DAN WILL

06582258 INSTL DEL ASSM (D-SW)SZ (TYC)CTB EA 6.00 49 14.00 11.00 13.80 13.00 12.75 20.00 13.00 1.50

06582260 INSTL DEL ASSM (D-SW)SZ (TYC)GF1 EA 6.00 50 14.00 11.00 13.80 13.00 12.75 20.00 13.00 1.50

06622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 140.00 51 0.75 1.172 1.05 1.00 2.00 2.73 1.00 3.50

06622115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 100.00 52 0.75 1.172 1.05 1.00 2.00 3.50 1.00 4.00

06662002 REFL PAV MRK TY I (W) 4" (BRK)(090MIL) LF 1,824.00 53 0.30 0.30 0.69 0.65 0.30 0.30 0.70 0.30

06662011 REFL PAV MRK TY I (W) 4" (SLD)(090MIL) LF 1,824.00 54 0.30 1.24 0.69 0.65 1.30 1.24 0.70 1.30

06662110 REFL PAV MRK TY I (Y) 4" (SLD)(090MIL) LF 1,824.00 55 0.30 1.24 0.69 0.65 1.30 1.24 0.70 1.30

06722012 REFL PAV MRKR TY I-C EA 824.00 56 3.00 2.95 4.80 4.50 3.00 2.95 5.00 3.00

06722015 REFL PAV MRKR TY II-A-A EA 826.00 57 2.75 2.95 4.80 4.50 3.00 2.95 5.00 3.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 14: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BOWIE

44 WORKING DAYS

ESTIMATED COST: $332,505.90

PROJECT NUMBER: STP 2011(945)SB

ENGINEER: ICENHOWER, KENNETH- TEXARKANA TX 75501 (903)838-8574

DESCRIPTION: INSTALL LEFT TURN LANES

CHECK: 7,000

LOW BIDDER: FRED WEBER, INC.

DATE: 05/03/2011

HWY.NO.: US 67

LENGTH: 1.206 ORDER READ: 3005

Eng. Estimate -> $ 332,505.90 Amount Left %Left

Cntr 1 FRED WEBER, INC......................... 375,977.64

2 H. V. CAVER, INC........................ 398,617.17 22,639.53 6.0

3 LONGVIEW BRIDGE AND ROAD, LTD........... 401,076.39 25,098.75 6.7

4 EAST TEXAS BRIDGE, INC.................. 436,127.44 60,149.80 16.0

5 B&H CONTRACTING, L.P.................... 640,103.80 264,126.16 70.3

BOWIE Page 1 of 3

Quantity No

Eng.

Est.

Cntr 1

FRED WEB

Cntr 2

H. V. CAItems

Cntr 3

LONGVIEW

Cntr 4

EAST TEX

Cntr 5

B&H CONT

01042022 REMOVING CONC (CURB AND GUTTER) LF 343.00 1 5.00 6.00 5.00 8.00 7.00 23.00

01322002 EMBANKMENT (FINAL)(DENS CONT)(TY A) CY 1,923.00 2 9.00 6.00 21.00 8.00 12.00 29.00

01342002 BACKFILL (TY B) STA 27.30 3 105.00 165.00 250.00 125.00 275.00 430.00

01622004 MULCH SODDING SY 6,517.00 4 6.00 2.50 3.00 4.25 2.00 3.35

01642001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 6,517.00 5 0.10 0.21 0.21 0.22 0.23 0.22

01642009 BROADCAST SEED (TEMP) (WARM) SY 1,629.00 6 0.10 0.25 0.25 0.27 0.30 0.26

01642011 BROADCAST SEED (TEMP) (COOL) SY 1,629.00 7 0.10 0.50 0.50 0.53 0.55 0.53

01682001 VEGETATIVE WATERING MG 156.00 8 1.00 10.00 0.01 4.00 20.00 74.00

01692003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 200.00 9 1.00 2.50 2.50 2.65 2.75 2.63

02472322 FL BS (CMP IN PLC)(TY D GR 2)(8") SY 2,767.00 10 12.00 14.50 14.00 16.00 15.00 28.00

02752001 CEMENT TON 52.00 11 110.00 115.00 150.00 130.00 165.00 200.00

02752010 CEMENT TREAT (SUBGRADE) (8") SY 3,580.00 12 1.50 2.85 4.50 2.00 4.75 17.00

03102019 PRIME COAT (MC-30 OR SS-1) GAL 886.00 13 4.00 5.00 6.00 4.00 11.00 7.75

03162705 ASPH (TIER I) GAL 11,372.00 14 3.00 4.50 5.00 3.85 4.50 5.10

03162706 ASPH (TIER II) GAL 1,183.00 15 3.00 4.50 5.00 3.65 7.00 5.10

03162717 AGGR (TIER I) CY 253.00 16 90.00 85.00 80.00 90.00 115.00 180.00

03162718 AGGR (TIER II) CY 37.00 17 90.00 110.00 80.00 125.00 225.00 230.00

03412106 D-GR HMA(QCQA) TY-D PG64-22 TON 338.00 18 80.00 120.00 120.00 110.00 150.00 120.00

04202014 CL C CONC (CURB OUTLET)(TY I) EA 1.00 19 1200.00 1800.00 600.00 700.00 2000.00 2600.00

04202015 CL C CONC (CURB OUTLET)(TY II) EA 3.00 20 1000.00 1100.00 700.00 650.00 1500.00 2300.00

04302010 CL C CONC FOR EXT STRU(CULV)(5'X 5') LF 13.00 21 290.00 730.00 300.00 450.00 500.00 1500.00

04302012 CL C CONC FOR EXT STRU (CULV)(3'X 2') LF 5.00 22 200.00 710.00 200.00 385.00 500.00 1300.00

04662051 WINGWALL (PW)(HW=7 FT) EA 1.00 23 8000.00 12000.00 8000.00 7800.00 12000.00 16400.00

04672023 SET (TY I)(S= 3 FT)(HW= 3 FT)(3:1)(C) EA 1.00 24 3500.00 4100.00 3000.00 4500.00 4000.00 6000.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 15: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BOWIE

44 WORKING DAYS

ESTIMATED COST: $332,505.90

PROJECT NUMBER: STP 2011(945)SB

ENGINEER: ICENHOWER, KENNETH- TEXARKANA TX 75501 (903)838-8574

DESCRIPTION: INSTALL LEFT TURN LANES

CHECK: 7,000

LOW BIDDER: FRED WEBER, INC.

DATE: 05/03/2011

HWY.NO.: US 67

LENGTH: 1.206 ORDER READ: 3005

Eng. Estimate -> $ 332,505.90 Amount Left %Left

Cntr 1 FRED WEBER, INC......................... 375,977.64

2 H. V. CAVER, INC........................ 398,617.17 22,639.53 6.0

3 LONGVIEW BRIDGE AND ROAD, LTD........... 401,076.39 25,098.75 6.7

4 EAST TEXAS BRIDGE, INC.................. 436,127.44 60,149.80 16.0

5 B&H CONTRACTING, L.P.................... 640,103.80 264,126.16 70.3

BOWIE Page 2 of 3

Quantity No

Eng.

Est.

Cntr 1

FRED WEB

Cntr 2

H. V. CAItems

Cntr 3

LONGVIEW

Cntr 4

EAST TEX

Cntr 5

B&H CONT

05002001 MOBILIZATION LS 1.00 25 30000.00 37000.00 27000.00 30000.00 42000.00 61000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 12.00 26 2000.00 275.00 1700.00 1800.00 1200.00 1000.00

05062002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 85.00 27 30.00 29.30 29.30 31.50 32.00 30.77

05062003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 50.00 28 50.00 48.90 48.90 52.50 54.00 51.35

05062009 ROCK FILTER DAMS (REMOVE) LF 135.00 29 7.00 14.00 14.00 15.00 15.00 14.70

05062022 EARTHWORK (ERSN & SEDM CONT, IN VEH) CY 200.00 30 15.00 10.00 25.00 15.00 18.00 25.98

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 1,300.00 31 3.00 2.40 2.40 2.55 2.65 2.52

05292004 CONC CURB & GUTTER (TY II) LF 445.00 32 20.00 23.00 16.00 22.00 18.00 47.35

05302015 TURNOUTS (SURF TREAT) EA 1.00 33 1000.00 500.00 2500.00 1200.00 2500.00 2200.00

05602032 MAILBOX INSTALLTION(SINGLE)INSTALL ONLY EA 1.00 34 200.00 140.00 150.00 150.00 155.00 147.00

06442004 INS SM RD SN SUP&AM TY 10BWG(1) SA(T) EA 2.00 35 400.00 415.00 415.00 445.00 460.00 435.75

06442006 INS SM RD SN SUP&AM TY 10BWG(1) SA(U) EA 1.00 36 350.00 550.00 550.00 585.00 600.00 577.50

06442027 INS SM RD SN SUP&AM TY S80(1) SA(U) EA 1.00 37 300.00 650.00 650.00 695.00 700.00 682.50

06442081 INS SM RD SN SUP&AM TY TWT(1) WS(P) EA 7.00 38 275.00 300.00 300.00 320.00 330.00 315.00

06442082 INS SM RD SN SUP&AM TY TWT(1) WS(T) EA 5.00 39 300.00 325.00 325.00 345.00 360.00 341.25

06582316 INSTL OM ASSM (OM-2Z)(FLX)GND EA 2.00 40 45.00 45.00 45.00 48.00 50.00 47.25

06622004 WK ZN PAV MRK NON-REMOV (W) 4" (SLD) LF 1,837.00 41 0.20 2.00 2.35 4.25 2.60 2.47

06662036 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 2,391.00 42 0.80 1.00 1.00 0.85 1.10 1.05

06662153 REF PAV MRK TY II (W) 8" (SLD) LF 2,391.00 43 0.50 1.00 0.35 0.35 0.40 0.37

06682105 PREFAB PAV MRK TY C (W) (24") (SLD) LF 183.00 44 11.00 11.50 11.00 11.25 12.00 11.55

06682106 PREFAB PAV MRK TY C (W) (ARROW) EA 6.00 45 155.00 205.00 200.00 160.00 225.00 210.00

06682116 PREFAB PAV MRK TY C (W) (WORD) EA 6.00 46 200.00 205.00 225.00 230.00 250.00 236.25

06682128 PREFAB PAV MRK TY C (Y) (24") (SLD) LF 910.00 47 9.50 11.50 11.00 10.50 12.00 11.55

06722015 REFL PAV MRKR TY II-A-A EA 502.00 48 3.00 3.50 3.50 3.85 3.85 3.68

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 16: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BOWIE

44 WORKING DAYS

ESTIMATED COST: $332,505.90

PROJECT NUMBER: STP 2011(945)SB

ENGINEER: ICENHOWER, KENNETH- TEXARKANA TX 75501 (903)838-8574

DESCRIPTION: INSTALL LEFT TURN LANES

CHECK: 7,000

LOW BIDDER: FRED WEBER, INC.

DATE: 05/03/2011

HWY.NO.: US 67

LENGTH: 1.206 ORDER READ: 3005

Eng. Estimate -> $ 332,505.90 Amount Left %Left

Cntr 1 FRED WEBER, INC......................... 375,977.64

2 H. V. CAVER, INC........................ 398,617.17 22,639.53 6.0

3 LONGVIEW BRIDGE AND ROAD, LTD........... 401,076.39 25,098.75 6.7

4 EAST TEXAS BRIDGE, INC.................. 436,127.44 60,149.80 16.0

5 B&H CONTRACTING, L.P.................... 640,103.80 264,126.16 70.3

BOWIE Page 3 of 3

Quantity No

Eng.

Est.

Cntr 1

FRED WEB

Cntr 2

H. V. CAItems

Cntr 3

LONGVIEW

Cntr 4

EAST TEX

Cntr 5

B&H CONT

06722017 REFL PAV MRKR TY II-C-R EA 109.00 49 3.50 3.50 3.50 3.85 3.85 3.68

82512003 RE PM W/RET REQ TY I(W)4"(BRK)(100MIL) LF 30.00 50 0.35 0.97 0.54 1.60 0.60 0.57

82512006 RE PM W/RET REQ TY I(W)4"(SLD)(100MIL) LF 7,217.00 51 0.40 0.97 0.47 1.60 0.52 0.49

82512015 RE PM W/RET REQ TY I(Y)4"(BRK)(100MIL) LF 759.00 52 0.45 0.97 0.53 1.60 0.60 0.56

82512018 RE PM W/RET REQ TY I(Y)4"(SLD)(100MIL) LF 9,415.00 53 0.45 0.97 0.47 1.60 0.52 0.49

82512025 RE PM W/RET REQ TY II (W) 4" (BRK) LF 30.00 54 0.13 0.45 0.22 1.10 0.25 0.23

82512026 RE PM W/RET REQ TY II (W) 4" (SLD) LF 7,217.00 55 0.20 0.45 0.20 0.75 0.22 0.21

82512029 RE PM W/RET REQ TY II (Y) 4" (BRK) LF 759.00 56 0.20 0.45 0.22 1.10 0.25 0.23

82512030 RE PM W/RET REQ TY II (Y) 4" (SLD) LF 9,415.00 57 0.20 0.45 0.20 0.75 0.22 0.21

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 17: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BRAZORIA

129 W

ESTIMATED COST: $1,464,902.60

PROJECT NUMBER: RMC - 622553001

ENGINEER: PAUL, ELIZA- ANGLETON TX 77515 (979)864-8500

DESCRIPTION: BASE REPAIR AND SEAL COAT

CHECK: 30,000

LOW BIDDER: ANGEL BROTHERS ENTERPRISES, LTD.

DATE: 05/03/2011

HWY.NO.: FM0655

LENGTH: 0.000 ORDER READ: 4015

Eng. Estimate -> $ 1,464,902.60 Amount Left %Left

Cntr 1 ANGEL BROTHERS ENTERPRISES, LTD......... 1,359,928.00

2 FORDE CONSTRUCTION COMPANY, INC......... 1,410,953.73 51,025.73 3.8

3 DURWOOD GREENE CONSTRUCTION CO.......... 1,530,146.48 170,218.48 12.5

4 HASSELL CONSTRUCTION COMPANY, INC....... 1,659,884.70 299,956.70 22.1

BRAZORIA Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

ANGEL BR

Cntr 2

FORDE COItems

Cntr 3

DURWOOD

Cntr 4

HASSELL

03162220 AGGR(TY-PB GR-3S SAC-B) CY 962.00 1 106.72 120.00 94.00 85.00 94.00

03162567 ASPH(AC-15P OR20-5TR OR20XP OR10-2TR) GAL 38,460.00 2 2.60 4.00 3.00 3.45 3.50

03512007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(11") SY 24,875.00 3 44.76 38.50 43.35 49.00 49.50

05002001 MOBILIZATION LS 1.00 4 77900.00 78000.00 80000.00 50000.00 129000

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.00 5 3000.00 1100.00 1500.00 1500.00 6000.00

06622004 WK ZN PAV MRK NON-REMOV (W) 4" (SLD) LF 60,152.00 6 0.20 0.20 0.14 0.14 0.16

06622016 WK ZN PAV MRK NON-REMOV (W) 24" (SLD) LF 60.00 7 1.55 1.60 3.00 3.00 1.40

06622030 WK ZN PAV MRK NON-REMOV (Y) 4" (BRK) LF 440.00 8 0.67 0.20 0.20 0.20 0.29

06622032 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 12,160.00 9 0.46 0.20 0.20 0.20 0.18

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 60,152.00 10 0.49 0.45 0.35 0.35 0.34

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 60.00 11 3.96 5.60 6.00 6.00 9.70

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 440.00 12 0.27 0.50 0.35 0.35 0.40

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 12,160.00 13 0.37 0.45 0.35 0.35 0.36

06722015 REFL PAV MRKR TY II-A-A EA 174.00 14 3.42 3.55 5.00 5.00 5.30

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 18: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BURNET

46 WORKING DAYS

ESTIMATED COST: $2,199,792.56

PROJECT NUMBER: STP 2011(948)

ENGINEER: LYONS, HOWARD- BURNET TX 78611 (512)756-2316

DESCRIPTION: LEVEL UP AND SEAL COAT

CHECK: 44,000

LOW BIDDER: BIG CREEK CONSTRUCTION, LTD.

DATE: 05/03/2011

HWY.NO.: SH 29

LENGTH: 20.917 ORDER READ: 3007

Eng. Estimate -> $ 2,199,792.56 Amount Left %Left

Cntr 1 BIG CREEK CONSTRUCTION, LTD............. 2,224,094.33

2 APAC-TEXAS, INC......................... 2,335,022.28 110,927.95 5.0

3 KNIFE RIVER CORPORATION - SOUTH......... 2,394,800.34 170,706.01 7.7

4 J.D. RAMMING PAVING CO., LTD............ 2,514,054.67 289,960.34 13.0

5 DEAN WORD COMPANY, LTD.................. 2,526,111.53 302,017.20 13.6

6 LINDSEY CONTRACTORS, INC................ 2,529,045.24 304,950.91 13.7

7 STEPHENS MARTIN PAVING, L.P............. 2,641,931.74 417,837.41 18.8

BURNET Page 1 of 4

Quantity No

Eng.

Est.

Cntr 1

BIG CREE

Cntr 2

APAC-TEXItems

Cntr 3

KNIFE RI

Cntr 4

J.D. RAM

Cntr 5

DEAN WOR

Cntr 6

LINDSEY

Cntr 7

STEPHENS

03162705 ASPH (TIER I) GAL 147,949.00 1 2.84 3.50 3.05 3.23 3.05 3.162 3.30 3.15

03162717 AGGR (TIER I) CY 3,540.00 2 50.95 62.00 61.00 62.59 60.00 62.22 60.00 61.00

03402192 D-GR HMA(METH) TY-F SAC-B PG70-22 TON 17,784.00 3 68.00 59.00 64.00 69.14 75.00 76.768 72.00 77.27

03512013 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") SY 3,170.00 4 14.00 15.00 25.00 24.26 21.00 23.188 24.00 25.00

05002001 MOBILIZATION LS 1.00 5 84028.48 89000.00 150000 63000.00 125000 77239.29 149863 185000

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.00 6 3000.00 2500.00 2305.00 4000.00 5000.00 3953.72 7000.00 2000.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 400.00 7 1.60 3.00 4.00 3.00 0.10 1.75 2.00 5.00

06622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 20,037.00 8 0.65 0.50 0.50 0.85 0.35 0.958 0.50 1.00

06622115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 13,499.00 9 0.72 0.50 0.50 0.85 0.35 0.958 0.50 1.00

06662003 REFL PAV MRK TY I (W) 4" (BRK)(100MIL) LF 32,840.00 10 0.36 0.47 0.47 0.41 0.48 0.40 0.40 0.36

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 26,310.00 11 0.30 0.42 0.42 0.37 0.39 0.36 0.36 0.38

06662036 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 1,100.00 12 0.88 0.80 0.80 0.77 1.50 0.75 0.75 0.83

06662042 REFL PAV MRK TY I (W) 12"(SLD)(100MIL) LF 112.00 13 3.00 7.00 7.00 3.08 3.00 3.00 3.00 2.60

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 90.00 14 6.50 12.00 12.00 6.16 6.00 6.00 6.00 6.40

06662054 REFL PAV MRK TY I (W) (ARROW) (100MIL) EA 2.00 15 100.00 175.00 175.00 97.47 150.00 95.00 95.00 150.00

06662084 REFL PAV MRK TY I(W)(RR XING) (100MIL) EA 2.00 16 265.00 550.00 550.00 559.17 700.00 545.00 545.00 389.00

06662096 REFL PAV MRK TY I (W) (WORD) (100MIL) EA 2.00 17 120.00 225.00 225.00 143.64 165.00 140.00 140.00 150.00

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 109.00 18 0.31 0.47 0.47 0.41 1.00 0.40 0.40 0.55

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 29,140.00 19 0.30 0.42 0.42 0.37 0.41 0.36 0.36 0.38

06662126 REFL PAV MRK TY I (Y) 12"(SLD)(100MIL) LF 152.00 20 2.75 7.20 7.20 3.08 2.85 3.00 3.00 2.60

06662142 REF PAV MRK TY II (W) 4" (BRK) LF 32,840.00 21 0.14 0.13 0.13 0.10 0.25 0.10 0.10 0.13

06662145 REF PAV MRK TY II (W) 4" (SLD) LF 238,208.00 22 0.11 0.10 0.10 0.08 0.12 0.08 0.08 0.11

06662153 REF PAV MRK TY II (W) 8" (SLD) LF 1,100.00 23 0.30 0.20 0.20 0.21 0.75 0.20 0.20 0.44

06662155 REF PAV MRK TY II (W) 12" (SLD) LF 112.00 24 1.00 1.30 1.30 1.54 1.50 1.50 1.50 1.50

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 19: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BURNET

46 WORKING DAYS

ESTIMATED COST: $2,199,792.56

PROJECT NUMBER: STP 2011(948)

ENGINEER: LYONS, HOWARD- BURNET TX 78611 (512)756-2316

DESCRIPTION: LEVEL UP AND SEAL COAT

CHECK: 44,000

LOW BIDDER: BIG CREEK CONSTRUCTION, LTD.

DATE: 05/03/2011

HWY.NO.: SH 29

LENGTH: 20.917 ORDER READ: 3007

Eng. Estimate -> $ 2,199,792.56 Amount Left %Left

Cntr 1 BIG CREEK CONSTRUCTION, LTD............. 2,224,094.33

2 APAC-TEXAS, INC......................... 2,335,022.28 110,927.95 5.0

3 KNIFE RIVER CORPORATION - SOUTH......... 2,394,800.34 170,706.01 7.7

4 J.D. RAMMING PAVING CO., LTD............ 2,514,054.67 289,960.34 13.0

5 DEAN WORD COMPANY, LTD.................. 2,526,111.53 302,017.20 13.6

6 LINDSEY CONTRACTORS, INC................ 2,529,045.24 304,950.91 13.7

7 STEPHENS MARTIN PAVING, L.P............. 2,641,931.74 417,837.41 18.8

BURNET Page 2 of 4

Quantity No

Eng.

Est.

Cntr 1

BIG CREE

Cntr 2

APAC-TEXItems

Cntr 3

KNIFE RI

Cntr 4

J.D. RAM

Cntr 5

DEAN WOR

Cntr 6

LINDSEY

Cntr 7

STEPHENS

06662157 REF PAV MRK TY II (W) 24" (SLD) LF 90.00 25 2.15 1.90 1.90 3.08 3.00 3.00 3.00 3.00

06662160 REF PAV MRK TY II (W) (ARROW) EA 2.00 26 50.00 40.00 40.00 35.91 125.00 35.00 35.00 55.00

06662169 REF PAV MRK TY II (W) (RR XING) EA 2.00 27 80.00 100.00 100.00 143.64 300.00 140.00 140.00 91.00

06662173 REF PAV MRK TY II (W) (WORD) EA 2.00 28 55.00 50.00 50.00 35.91 125.00 35.00 35.00 55.00

06662178 REF PAV MRK TY II (Y) 4" (SLD) LF 238,208.00 29 0.11 0.10 0.10 0.10 0.12 0.10 0.10 0.11

06722012 REFL PAV MRKR TY I-C EA 1,740.00 30 3.15 2.80 2.80 2.72 3.50 2.65 2.65 3.10

06722015 REFL PAV MRKR TY II-A-A EA 1,770.00 31 2.87 2.80 2.80 2.72 3.50 2.65 2.65 3.10

80202003 REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF 75,566.00 32 0.70 0.90 0.90 1.00 0.91 0.97 0.97 0.94

80202008 REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL) LF 105,934.00 33 0.66 0.90 0.90 1.00 0.91 0.97 0.97 0.94

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 20: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BURNET

46 WORKING DAYS

ESTIMATED COST: $2,199,792.56

PROJECT NUMBER: STP 2011(948)

ENGINEER: LYONS, HOWARD- BURNET TX 78611 (512)756-2316

DESCRIPTION: LEVEL UP AND SEAL COAT

CHECK: 44,000

LOW BIDDER: BIG CREEK CONSTRUCTION, LTD.

DATE: 05/03/2011

HWY.NO.: SH 29

LENGTH: 20.917 ORDER READ: 3007

Eng. Estimate -> $ 2,199,792.56 Amount Left %Left

Cntr 8 HUNTER INDUSTRIES, LTD.................. 2,649,623.95 425,529.62 19.1

9 CLARK CONSTRUCTION OF TEXAS, INC........ 3,145,714.42 921,620.09 41.4

BURNET Page 3 of 4

Quantity No

Eng.

Est.

Cntr 8

HUNTER

Cntr 9

CLARK COItems

03162705 ASPH (TIER I) GAL 147,949.00 1 2.84 3.25 3.36

03162717 AGGR (TIER I) CY 3,540.00 2 50.95 64.05 60.00

03402192 D-GR HMA(METH) TY-F SAC-B PG70-22 TON 17,784.00 3 68.00 75.36 97.20

03512013 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") SY 3,170.00 4 14.00 20.57 43.09

05002001 MOBILIZATION LS 1.00 5 84028.48 225007 200000

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.00 6 3000.00 1553.20 1400.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 400.00 7 1.60 2.20 5.00

06622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 20,037.00 8 0.65 1.00 1.00

06622115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 13,499.00 9 0.72 1.00 1.00

06662003 REFL PAV MRK TY I (W) 4" (BRK)(100MIL) LF 32,840.00 10 0.36 0.40 0.40

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 26,310.00 11 0.30 0.36 0.40

06662036 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 1,100.00 12 0.88 0.75 0.86

06662042 REFL PAV MRK TY I (W) 12"(SLD)(100MIL) LF 112.00 13 3.00 3.00 3.45

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 90.00 14 6.50 6.00 6.90

06662054 REFL PAV MRK TY I (W) (ARROW) (100MIL) EA 2.00 15 100.00 95.00 172.50

06662084 REFL PAV MRK TY I(W)(RR XING) (100MIL) EA 2.00 16 265.00 545.00 402.50

06662096 REFL PAV MRK TY I (W) (WORD) (100MIL) EA 2.00 17 120.00 140.00 172.50

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 109.00 18 0.31 0.40 0.40

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 29,140.00 19 0.30 0.36 0.40

06662126 REFL PAV MRK TY I (Y) 12"(SLD)(100MIL) LF 152.00 20 2.75 3.00 3.45

06662142 REF PAV MRK TY II (W) 4" (BRK) LF 32,840.00 21 0.14 0.10 0.17

06662145 REF PAV MRK TY II (W) 4" (SLD) LF 238,208.00 22 0.11 0.08 0.17

06662153 REF PAV MRK TY II (W) 8" (SLD) LF 1,100.00 23 0.30 0.20 0.35

06662155 REF PAV MRK TY II (W) 12" (SLD) LF 112.00 24 1.00 1.50 1.73

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 21: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: BURNET

46 WORKING DAYS

ESTIMATED COST: $2,199,792.56

PROJECT NUMBER: STP 2011(948)

ENGINEER: LYONS, HOWARD- BURNET TX 78611 (512)756-2316

DESCRIPTION: LEVEL UP AND SEAL COAT

CHECK: 44,000

LOW BIDDER: BIG CREEK CONSTRUCTION, LTD.

DATE: 05/03/2011

HWY.NO.: SH 29

LENGTH: 20.917 ORDER READ: 3007

Eng. Estimate -> $ 2,199,792.56 Amount Left %Left

Cntr 8 HUNTER INDUSTRIES, LTD.................. 2,649,623.95 425,529.62 19.1

9 CLARK CONSTRUCTION OF TEXAS, INC........ 3,145,714.42 921,620.09 41.4

BURNET Page 4 of 4

Quantity No

Eng.

Est.

Cntr 8

HUNTER

Cntr 9

CLARK COItems

06662157 REF PAV MRK TY II (W) 24" (SLD) LF 90.00 25 2.15 3.00 3.45

06662160 REF PAV MRK TY II (W) (ARROW) EA 2.00 26 50.00 35.00 86.25

06662169 REF PAV MRK TY II (W) (RR XING) EA 2.00 27 80.00 140.00 230.00

06662173 REF PAV MRK TY II (W) (WORD) EA 2.00 28 55.00 35.00 86.25

06662178 REF PAV MRK TY II (Y) 4" (SLD) LF 238,208.00 29 0.11 0.10 0.17

06722012 REFL PAV MRKR TY I-C EA 1,740.00 30 3.15 2.65 3.45

06722015 REFL PAV MRKR TY II-A-A EA 1,770.00 31 2.87 2.65 3.45

80202003 REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF 75,566.00 32 0.70 0.97 1.04

80202008 REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL) LF 105,934.00 33 0.66 0.97 1.04

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 22: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: DALLAM

150 WORKING DAYS

ESTIMATED COST: $1,472,476.68

PROJECT NUMBER: STP 2011(992)

ENGINEER: FLEISCHMAN, DAN- DUMAS TX 79029 (806)273-5821

DESCRIPTION: NEW LOCATION 2 LANE RDWY

CHECK: 29,000

LOW BIDDER: HOLMES CONSTRUCTION CO., L.P.

DATE: 05/03/2011

HWY.NO.: SS 17

LENGTH: 3.003 ORDER READ: 3008

Eng. Estimate -> $ 1,472,476.68 Amount Left %Left

Cntr 1 HOLMES CONSTRUCTION CO., L.P............ 1,621,574.25

2 GILVIN-TERRILL, LTD..................... 1,736,916.63 115,342.38 7.1

3 J. LEE MILLIGAN, INC.................... 1,747,044.25 125,470.00 7.7

4 EARTH BUILDERS, L.P..................... 1,884,766.10 263,191.85 16.2

DALLAM Page 1 of 3

Quantity No

Eng.

Est.

Cntr 1

HOLMES

Cntr 2

GILVIN-TItems

Cntr 3

J. LEE

Cntr 4

EARTH BU

01002002 PREPARING ROW STA 98.59 1 175.00 1200.00 148.00 225.00 300.00

01002008 PREPARING ROW (TREE) (0" TO 6" DIA) EA 77.00 2 150.00 100.00 200.00 85.00 10.00

01042022 REMOVING CONC (CURB AND GUTTER) LF 260.00 3 2.50 8.00 5.00 4.00 10.00

01102001 EXCAVATION (ROADWAY) CY 58,892.00 4 4.50 4.25 6.00 5.55 6.50

01122001 SUBGRADE WIDENING (ORD COMP) STA 7.50 5 600.00 250.00 500.00 590.00 2000.00

01322004 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 11,417.00 6 5.00 3.90 6.00 8.35 2.00

01342002 BACKFILL (TY B) STA 7.50 7 100.00 800.00 200.00 235.00 1000.00

01642034 DRILL SEEDING (PERM) (RURAL) (SANDY) AC 17.79 8 500.00 500.00 450.00 400.00 500.00

01642044 DRILL SEEDING (TEMP) (COOL) AC 17.79 9 350.00 475.00 450.00 395.00 500.00

01682001 VEGETATIVE WATERING MG 1,391.10 10 9.00 20.00 21.50 10.00 35.00

02472258 FL BS (CMP IN PLC)(TY A OR B GR4)(12") SY 50,707.00 11 10.00 11.40 8.00 11.40 12.00

03102001 PRIME COAT (MC-30) GAL 11,126.00 12 3.50 4.00 4.00 3.80 4.00

03162172 AGGR(TY-B GR-3 SAC-B) CY 614.00 13 70.00 45.00 45.00 54.00 80.00

03162223 AGGR(TY-PB GR-4 SAC-B) CY 446.00 14 70.00 80.00 76.00 76.00 125.00

03162555 ASPH (AC10-2TR) GAL 36,821.00 15 3.60 2.25 4.50 3.90 5.00

03412126 D-GR HMA(QCQA) TY-D PG70-28 TON 220.00 16 125.00 90.00 130.00 120.00 150.00

03542048 PLANE ASPH CONC PAV (3") SY 833.00 17 5.00 2.00 6.00 5.75 10.00

04602004 CMP (GAL STL 24 IN) LF 720.00 18 60.00 40.00 35.00 26.50 50.00

04672303 SET (TY II)(24 IN)(CMP)(6:1)(P) EA 42.00 19 600.00 900.00 1200.00 510.00 300.00

04962004 REMOV STR (SET) EA 6.00 20 500.00 275.00 220.00 300.00 250.00

04962007 REMOV STR (PIPE) LF 237.00 21 10.00 15.00 6.00 10.00 10.00

05002001 MOBILIZATION LS 1.00 22 106998.2 90000.00 170000 174000 180000

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.00 23 3500.00 4000.00 11250.00 3200.00 1300.00

05062031 SANDBAGS FOR EROSION CONTROL EA 210.00 24 10.00 10.00 7.00 9.70 6.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 23: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: DALLAM

150 WORKING DAYS

ESTIMATED COST: $1,472,476.68

PROJECT NUMBER: STP 2011(992)

ENGINEER: FLEISCHMAN, DAN- DUMAS TX 79029 (806)273-5821

DESCRIPTION: NEW LOCATION 2 LANE RDWY

CHECK: 29,000

LOW BIDDER: HOLMES CONSTRUCTION CO., L.P.

DATE: 05/03/2011

HWY.NO.: SS 17

LENGTH: 3.003 ORDER READ: 3008

Eng. Estimate -> $ 1,472,476.68 Amount Left %Left

Cntr 1 HOLMES CONSTRUCTION CO., L.P............ 1,621,574.25

2 GILVIN-TERRILL, LTD..................... 1,736,916.63 115,342.38 7.1

3 J. LEE MILLIGAN, INC.................... 1,747,044.25 125,470.00 7.7

4 EARTH BUILDERS, L.P..................... 1,884,766.10 263,191.85 16.2

DALLAM Page 2 of 3

Quantity No

Eng.

Est.

Cntr 1

HOLMES

Cntr 2

GILVIN-TItems

Cntr 3

J. LEE

Cntr 4

EARTH BU

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 100.00 25 5.00 10.00 5.00 4.00 6.00

05082002 CONSTRUCTING DETOURS SY 3,808.00 26 6.00 14.50 18.00 11.20 10.00

05292004 CONC CURB & GUTTER (TY II) LF 286.00 27 25.00 18.00 17.00 20.40 25.00

05302021 INTRSCT, DRVWAYS, & TURNOUT(SURF TREAT) SY 2,248.00 28 9.00 15.00 23.55 22.20 14.00

05602013 MAILBOX INSTALL-D (TWG-POST) TY 2 FND EA 1.00 29 150.00 200.00 250.00 315.00 150.00

05602024 MAILBOX INSTALL-M(TWG-POST)TY 2 FND EA 1.00 30 350.00 350.00 340.00 400.00 400.00

06442001 INS SM RD SN SUP&AM TY 10BWG(1) SA(P) EA 31.00 31 310.00 400.00 271.50 435.00 225.00

06442004 INS SM RD SN SUP&AM TY 10BWG(1) SA(T) EA 11.00 32 380.00 425.00 375.00 505.00 350.00

06442006 INS SM RD SN SUP&AM TY 10BWG(1) SA(U) EA 2.00 33 555.00 650.00 565.00 635.00 500.00

06442025 INS SM RD SN SUP&AM TY S80(1) SA(T) EA 1.00 34 655.00 650.00 565.00 635.00 500.00

06442027 INS SM RD SN SUP&AM TY S80(1) SA(U) EA 2.00 35 650.00 750.00 650.00 715.00 600.00

06442028 INS SM RD SN SUP&AM TY S80(1)SA(U-1EXT) EA 1.00 36 800.00 800.00 855.00 910.00 675.00

06442030 INS SM RD SN SUP&AM TY S80(1) SA(U-BM) EA 2.00 37 950.00 750.00 795.00 845.00 750.00

06442060 REMOVE SM RD SN SUP & AM EA 25.00 38 40.00 70.00 7.55 13.00 25.00

06582330 INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI) EA 25.00 39 80.00 50.00 59.00 46.75 25.00

06622099 WK ZN PAV MRK REMOV (Y) 4" (SLD) LF 22,135.00 40 0.25 0.94 0.85 0.45 0.85

06622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 9.00 41 1.00 1.50 1.00 1.00 0.50

06622115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 1,005.00 42 1.00 1.50 1.00 1.00 0.50

06662002 REFL PAV MRK TY I (W) 4" (BRK)(090MIL) LF 30.00 43 0.28 0.40 0.37 0.38 0.40

06662011 REFL PAV MRK TY I (W) 4" (SLD)(090MIL) LF 4,825.00 44 0.28 0.40 0.37 0.38 0.40

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 20,437.00 45 0.30 0.40 0.39 0.40 0.40

06662035 REFL PAV MRK TY I (W) 8" (SLD)(090MIL) LF 591.00 46 0.60 0.70 0.64 0.67 0.70

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 157.00 47 2.50 5.45 4.95 5.20 5.00

06662053 REFL PAV MRK TY I (W) (ARROW) (090MIL) EA 2.00 48 400.00 143.00 130.00 136.50 150.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 24: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: DALLAM

150 WORKING DAYS

ESTIMATED COST: $1,472,476.68

PROJECT NUMBER: STP 2011(992)

ENGINEER: FLEISCHMAN, DAN- DUMAS TX 79029 (806)273-5821

DESCRIPTION: NEW LOCATION 2 LANE RDWY

CHECK: 29,000

LOW BIDDER: HOLMES CONSTRUCTION CO., L.P.

DATE: 05/03/2011

HWY.NO.: SS 17

LENGTH: 3.003 ORDER READ: 3008

Eng. Estimate -> $ 1,472,476.68 Amount Left %Left

Cntr 1 HOLMES CONSTRUCTION CO., L.P............ 1,621,574.25

2 GILVIN-TERRILL, LTD..................... 1,736,916.63 115,342.38 7.1

3 J. LEE MILLIGAN, INC.................... 1,747,044.25 125,470.00 7.7

4 EARTH BUILDERS, L.P..................... 1,884,766.10 263,191.85 16.2

DALLAM Page 3 of 3

Quantity No

Eng.

Est.

Cntr 1

HOLMES

Cntr 2

GILVIN-TItems

Cntr 3

J. LEE

Cntr 4

EARTH BU

06662095 REFL PAV MRK TY I (W) (WORD) (090MIL) EA 2.00 49 300.00 170.00 155.00 162.75 175.00

06662104 REFL PAV MRK TY I (Y) 4" (BRK)(090MIL) LF 250.00 50 0.28 0.40 0.37 0.39 0.40

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 2,130.00 51 0.30 0.43 0.39 0.41 0.42

06662110 REFL PAV MRK TY I (Y) 4" (SLD)(090MIL) LF 2,227.00 52 0.28 0.40 0.37 0.39 0.40

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 3,535.00 53 0.30 0.43 0.39 0.41 0.42

06772001 ELIM EXT PAV MRK & MRKS ( 4") LF 435.00 54 0.85 0.71 0.65 0.68 0.75

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 25: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: DALLAS

102 WORKING DAYS

ESTIMATED COST: $4,194,227.95

PROJECT NUMBER: IM 0301(056)

ENGINEER: WILLIAMS, PAUL- MESQUITE TX 75150 (214)320-6240

DESCRIPTION: PLANE, ACP OVERLAY, SHOULDER REPAIR, PVMT MRKS

CHECK: 84,000

LOW BIDDER: APAC-TEXAS, INC.

DATE: 05/03/2011

HWY.NO.: IH 30

LENGTH: 5.190 ORDER READ: 3010

Eng. Estimate -> $ 4,194,227.95 Amount Left %Left

Cntr 1 APAC-TEXAS, INC......................... 5,269,891.17

2 AUSTIN BRIDGE & ROAD, LP................ 5,290,587.08 20,695.91 0.4

3 SILVER CREEK CONSTRUCTION, INC.......... 5,415,558.40 145,667.23 2.8

4 B&H CONTRACTING, L.P.................... 5,770,506.97 500,615.80 9.5

5 LINDSEY CONTRACTORS, INC................ 6,438,748.28 1,168,857.11 22.2

6 CLARK CONSTRUCTION OF TEXAS, INC........ 6,798,305.46 1,528,414.29 29.0

7 ED BELL CONSTRUCTION COMPANY............ 6,940,860.80 1,670,969.63 31.7

DALLAS Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

APAC-TEX

Cntr 2

AUSTINItems

Cntr 3

SILVER

Cntr 4

B&H CONT

Cntr 5

LINDSEY

Cntr 6

CLARK CO

Cntr 7

ED BELL

03462018 STONE-MTRX-ASPH SMA-D SAC-B PG76-22 TON 25,117.00 1 80.00 108.00 97.42 110.00 114.50 123.00 141.39 122.50

03542002 PLAN & TEXT ASPH CONC PAV(0" TO 2") SY 228,331.00 2 1.50 1.20 1.29 1.00 1.44 1.90 1.75 1.25

03542138 PLANE ASPH CONC PAV (11") SY 11,359.00 3 2.50 22.00 22.00 20.00 22.40 23.00 22.77 12.00

05002001 MOBILIZATION LS 1.00 4 382000 314000 520000 500000 275000 722718.6 400000 600000

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.00 5 3500.00 6950.00 8000.00 15000.00 714.88 16000.00 1400.00 40000.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 1,000.00 6 2.00 2.30 2.99 1.50 4.16 3.00 3.00 1.83

06622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 8,420.00 7 0.63 0.85 1.60 4.00 0.69 1.00 1.00 0.67

06622114 WK ZN PAV MRK SHT TERM (TAB) TY Y EA 190.00 8 0.46 0.85 1.60 4.00 0.69 1.00 1.00 0.67

06662015 REFL PAV MRK TY I (W) 6" (BRK)(100MIL) LF 27,587.00 9 0.35 0.61 0.60 0.70 0.62 0.60 0.55 0.73

06662024 REFL PAV MRK TY I (W) 6" (SLD)(100MIL) LF 37,370.00 10 0.35 0.56 0.55 0.70 0.57 0.55 0.55 0.67

06662072 REFL PAV MRK TY I(W)(ENTR GORE)(100MIL) EA 6.00 11 700.00 625.00 630.00 700.00 650.00 625.00 523.25 763.11

06662075 REFL PAV MRK TY I(W)(EXIT GORE)(100MIL) EA 8.00 12 1000.00 550.00 560.00 600.00 572.00 550.00 638.25 671.54

06662087 REFL PAV MRK TY I(W) (SYMBOL) (100MIL) EA 5.00 13 1170.00 165.00 168.00 200.00 171.60 165.00 255.30 201.46

06662096 REFL PAV MRK TY I (W) (WORD) (100MIL) EA 6.00 14 110.00 170.00 170.00 200.00 176.80 170.00 255.30 207.57

06662120 REFL PAV MRK TY I (Y) 6" (SLD)(100MIL) LF 37,370.00 15 0.35 0.56 0.55 0.70 0.57 0.55 0.55 0.67

06722017 REFL PAV MRKR TY II-C-R EA 1,383.00 16 2.50 4.00 4.00 5.00 4.16 4.00 5.75 4.88

06882002 VEH LP DETECT (SAWCUT) LF 64,830.00 17 6.50 5.20 5.20 5.75 7.05 5.15 9.27 5.49

31992002 FAST TRK CONC (CNT RNF HY STL)(11 IN) SY 11,359.00 18 65.00 96.00 99.25 79.00 106.65 103.00 111.85 175.00

32102001 MEMBRANE UNDERSEAL GAL 57,090.00 19 3.00 2.80 3.00 4.00 4.57 4.50 3.50 2.99

50492002 BIODGRD EROSION CONTROL LOGS (18" DIA) LF 1,000.00 20 12.00 1.30 4.00 3.00 8.32 8.00 5.00 8.55

68342002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.00 21 4800.00 9500.00 8700.00 5000.00 4923.92 7000.00 10000.00 31275.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 26: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: DENTON

114 W

ESTIMATED COST: $502,610.00

PROJECT NUMBER: RMC - 622056001

ENGINEER: NABORS, KEITH- DENTON TX 76201 (940)387-1324

DESCRIPTION: VEGETATION MANAGEMENT

CHECK: 10,000

LOW BIDDER: MASSANA CONSTRUCTION, INC.

DATE: 05/03/2011

HWY.NO.: IH0035W

LENGTH: 0.000 ORDER READ: 4011

Eng. Estimate -> $ 502,610.00 Amount Left %Left

Cntr 1 MASSANA CONSTRUCTION, INC............... 362,556.60

2 MANN ROBINSON & SON, INC................ 411,458.00 48,901.40 13.5

3 DEANGELO BROTHERS, INC.................. 413,742.92 51,186.32 14.1

4 TEXAS TREE & LANDSCAPE, LTD............. 420,066.00 57,509.40 15.9

5 C & C MOWING CONTRACTORS, INC........... 511,433.46 148,876.86 41.1

DENTON Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

MASSANA

Cntr 2

MANN ROBItems

Cntr 3

DEANGELO

Cntr 4

TEXAS TR

Cntr 5

C & C MO

07302002 FULL-WIDTH MOWING AC 13,654.00 1 35.00 21.30 27.00 27.98 29.00 34.99

70392001 BROADCAST HERBICIDE VEGETATION CONTROL AC 896.00 2 20.00 62.90 25.00 24.00 25.00 30.00

71852001 BRDCST HRB APPL VEG CNTL(PVMT EDGE&STR) MI 68.00 3 100.00 226.00 300.00 150.00 25.00 100.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 27: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: DENTON

84 W

ESTIMATED COST: $413,125.00

PROJECT NUMBER: RMC - 622057001

ENGINEER: NABORS, KEITH- DENTON TX 76201 (940)387-1324

DESCRIPTION: VEGETATION MANAGEMENT

CHECK: 8,000

LOW BIDDER: MASSANA CONSTRUCTION, INC.

DATE: 05/03/2011

HWY.NO.: IH0035E

LENGTH: 0.000 ORDER READ: 4012

Eng. Estimate -> $ 413,125.00 Amount Left %Left

Cntr 1 MASSANA CONSTRUCTION, INC............... 297,739.95

2 TEXAS TREE & LANDSCAPE, LTD............. 331,018.77 33,278.82 11.2

3 ANTHONY SERVICES........................ 338,907.52 41,167.57 13.8

4 DEANGELO BROTHERS, INC.................. 366,015.81 68,275.86 22.9

5 GANT CONTRACTORS, INC................... 377,376.16 79,636.21 26.7

6 C & C MOWING CONTRACTORS, INC........... 404,504.79 106,764.84 35.9

7 MANN ROBINSON & SON, INC................ 423,650.00 125,910.05 42.3

DENTON Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

MASSANA

Cntr 2

TEXAS TRItems

Cntr 3

ANTHONY

Cntr 4

DEANGELO

Cntr 5

GANT CON

Cntr 6

C & C MO

Cntr 7

MANN ROB

07302002 FULL-WIDTH MOWING AC 11,563.00 1 35.00 23.35 27.79 28.28 29.87 31.49 34.00 35.00

70392001 BROADCAST HERBICIDE VEGETATION CONTROL AC 421.00 2 20.00 65.90 23.00 28.28 49.00 31.49 26.99 45.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 28: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: EL PASO

100 WORKING DAYS

ESTIMATED COST: $2,343,081.70

PROJECT NUMBER: STP 1102(015)HES

ENGINEER: ROMERO, RICARDO- EL PASO TX 79936 (915)849-5550

DESCRIPTION: CONTINUOUS LIGHTING

CHECK: 47,000

LOW BIDDER: THE LEVY COMPANY, L.P.

DATE: 05/03/2011

HWY.NO.: FM 258

LENGTH: 6.436 ORDER READ: 3011

Eng. Estimate -> $ 2,343,081.70 Amount Left %Left

Cntr 1 THE LEVY COMPANY, L.P................... 1,613,265.94

2 TRI STATE ELECTRIC, LTD................. 1,707,887.80 94,621.86 5.9

3 F & W ELECTRICAL CONTRACTORS, INC....... 1,746,801.00 133,535.06 8.3

EL PASO Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

THE LEVY

Cntr 2

TRI STATItems

Cntr 3

F & W EL

01102003 EXCAVATION (SPECIAL) CY 4.00 1 120.00 259.89 100.00 102.00

04162029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 1,792.00 2 190.00 97.41 150.00 129.00

04322066 RIPRAP (CONC)(CL B) CY 78.50 3 455.00 602.37 500.00 450.00

05002001 MOBILIZATION LS 1.00 4 175000 114149.2 80000.00 30000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.00 5 6000.00 11947.62 5000.00 4000.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 400.00 6 4.00 4.14 5.00 11.65

06102019 INS RD IL AM (TY SA) 30T-8 (.25 KW)S EA 8.00 7 2500.00 1885.52 2100.00 2390.00

06102024 INS RD IL AM (TY SA) 40T-10 (.25 KW)S EA 27.00 8 2700.00 2278.73 2400.00 2700.00

06102040 INS RD IL AM (TY SA) 50T-12 (.4 KW)S EA 100.00 9 3000.00 2465.88 2600.00 3330.00

06102071 INS RDWY ILL ASSEM (SPECIAL) EA 105.00 10 500.00 328.90 450.00 428.00

06102089 INS RD IL AM (TY SA)40T-12-12(.25 KW)S EA 89.00 11 3000.00 3151.46 2700.00 3225.00

06182018 CONDT (PVC) (SCHD 40) ( 2") LF 26,976.00 12 12.00 5.78 8.00 9.00

06182019 CONDT (PVC) (SCHD 40) (2") (BORE) LF 14,102.00 13 26.00 17.17 12.00 16.00

06202010 ELEC CONDR (NO. 6) INSULATED LF 126,974.00 14 2.30 0.93 1.70 1.00

06242008 GROUND BOX TY A (122311) W/APRON EA 26.00 15 750.00 504.90 650.00 465.00

06282014 ELC SRV TY A 240/480 060 (NS)SS(E)GC(O) EA 13.00 16 3500.00 3643.09 3500.00 4675.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 29: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: ELLIS

288 WORKING DAYS

ESTIMATED COST: $724,515.87

PROJECT NUMBER: BR 1102(029)

ENGINEER: PIERCE, WILLIAM- WAXAHACHIE TX 75167 (972)938-1570

DESCRIPTION: REPLACE BRIDGE AND APPROACHES

CHECK: 15,000

LOW BIDDER: REBCON, INC.

DATE: 05/03/2011

HWY.NO.: FM 983

LENGTH: 0.245 ORDER READ: 3012

Eng. Estimate -> $ 724,515.87 Amount Left %Left

Cntr 1 REBCON, INC............................. 963,907.10

2 INTERSTATE HIGHWAY CONSTRUCTION, INC.... 979,436.43 15,529.33 1.6

3 NORTH TEXAS BRIDGE COMPANY, INC......... 1,031,952.48 68,045.38 7.1

4 B&H CONTRACTING, L.P.................... 1,109,153.85 145,246.75 15.1

5 ED BELL CONSTRUCTION COMPANY............ 1,197,698.32 233,791.22 24.3

6 LINDER CONSTRUCTION CO., INC............ 1,225,091.39 261,184.29 27.1

ELLIS Page 1 of 4

Quantity No

Eng.

Est.

Cntr 1

REBCON,

Cntr 2

INTERSTAItems

Cntr 3

NORTH TE

Cntr 4

B&H CONT

Cntr 5

ED BELL

Cntr 6

LINDER

01002002 PREPARING ROW STA 8.00 1 250.00 3000.00 444.00 3000.00 1600.00 7500.00 550.00

01042010 REMOVING CONC (RIPRAP) CY 19.00 2 100.00 215.00 80.20 90.00 85.00 145.89 92.00

01042017 REMOVING CONC (DRIVEWAYS) SY 67.00 3 8.30 17.00 15.50 24.00 15.00 14.96 10.75

01102001 EXCAVATION (ROADWAY) CY 961.00 4 3.60 18.00 10.30 9.00 22.00 24.48 21.05

01322006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 539.00 5 3.40 15.00 8.51 22.00 18.49 37.02 12.62

01612002 COMPOST MANUF TOPSOIL (BOS) (4") SY 2,541.00 6 0.80 4.35 1.40 3.00 4.15 2.68 1.12

01622002 BLOCK SODDING SY 32.00 7 1.70 16.50 21.50 7.00 15.75 5.36 8.02

01642023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 2,541.00 8 0.20 0.75 0.57 0.60 0.68 0.56 0.84

01642029 CELL FBR MLCH SEED(TEMP)(WARM) SY 3,805.00 9 0.15 0.60 0.52 0.50 0.58 0.76 0.85

01642031 CELL FBR MLCH SEED(TEMP)(COOL) SY 3,805.00 10 0.15 0.60 0.52 0.30 0.58 0.75 0.84

01682001 VEGETATIVE WATERING MG 9.00 11 10.00 60.50 112.00 200.00 100.00 45.10 77.20

02042003 SPRINKLING (DUST CONTROL) MG 8.00 12 10.00 50.00 48.40 120.00 150.00 48.01 100.94

02472305 FL BS (CMP IN PLACE) (TY D GR 1) (15") SY 1,515.00 13 19.90 18.00 55.60 27.00 30.00 32.34 41.89

03052052 SALV, HAUL & STKPL RCL APH PV (0-12") SY 913.00 14 4.80 16.50 21.10 16.00 11.00 17.50 25.72

03102001 PRIME COAT (MC-30) GAL 386.00 15 3.10 10.00 6.77 5.00 7.00 9.00 13.46

03402048 D-GR HMA(METH) TY-C SAC-B PG70-22 TON 950.00 16 78.00 95.55 113.00 87.00 105.00 87.00 130.15

03402239 D-GR HMA(METH) TY-B SAC-B PG64-22 TON 444.00 17 55.00 89.00 122.00 91.00 95.00 81.00 121.18

04032001 TEMPORARY SPL SHORING SF 141.00 18 7.50 11.00 143.00 50.00 70.00 10.00 35.29

04162004 DRILL SHAFT (36 IN) LF 235.00 19 90.00 125.00 158.00 250.00 140.00 200.00 204.45

04202006 CL C CONC (RAIL FOUNDATION) CY 3.60 20 232.75 650.00 497.00 900.00 1200.00 750.00 697.56

04202041 CL C CONC (ABUT)(HPC) CY 60.40 21 480.00 780.00 689.00 900.00 1120.00 800.00 904.59

04202256 CL S CONC(APPR SLAB)(HPC) CY 73.00 22 350.00 514.00 388.00 900.00 580.00 400.00 447.87

04222003 REINF CONC SLAB (HPC)(CL S) SF 4,273.00 23 12.90 16.00 18.90 17.00 24.00 30.00 27.67

04252067 PRESTR CONC GIRDER (TX46) LF 715.29 24 120.00 122.00 156.00 170.00 173.00 135.00 188.36

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 30: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: ELLIS

288 WORKING DAYS

ESTIMATED COST: $724,515.87

PROJECT NUMBER: BR 1102(029)

ENGINEER: PIERCE, WILLIAM- WAXAHACHIE TX 75167 (972)938-1570

DESCRIPTION: REPLACE BRIDGE AND APPROACHES

CHECK: 15,000

LOW BIDDER: REBCON, INC.

DATE: 05/03/2011

HWY.NO.: FM 983

LENGTH: 0.245 ORDER READ: 3012

Eng. Estimate -> $ 724,515.87 Amount Left %Left

Cntr 1 REBCON, INC............................. 963,907.10

2 INTERSTATE HIGHWAY CONSTRUCTION, INC.... 979,436.43 15,529.33 1.6

3 NORTH TEXAS BRIDGE COMPANY, INC......... 1,031,952.48 68,045.38 7.1

4 B&H CONTRACTING, L.P.................... 1,109,153.85 145,246.75 15.1

5 ED BELL CONSTRUCTION COMPANY............ 1,197,698.32 233,791.22 24.3

6 LINDER CONSTRUCTION CO., INC............ 1,225,091.39 261,184.29 27.1

ELLIS Page 2 of 4

Quantity No

Eng.

Est.

Cntr 1

REBCON,

Cntr 2

INTERSTAItems

Cntr 3

NORTH TE

Cntr 4

B&H CONT

Cntr 5

ED BELL

Cntr 6

LINDER

04282001 CONC SURF TREAT (CLASS I) SY 455.00 25 1.50 4.00 7.71 11.00 5.00 1.47 2.20

04322066 RIPRAP (CONC)(CL B) CY 118.00 26 282.25 300.00 196.00 269.54 400.00 521.73 317.99

04502161 RAIL (TY T223) LF 36.00 27 59.24 260.00 100.00 50.00 93.00 244.78 199.05

04502206 RAIL (TY T223)(HPC) LF 220.00 28 51.54 110.00 120.00 50.00 93.00 131.55 163.62

04522002 REMOV RAIL (METAL ELEMENTS) LF 167.00 29 8.00 10.00 10.30 9.00 21.00 6.66 9.49

04542001 SEALED EXPANSION JOINT (4 IN)(SEJ-A) LF 93.00 30 90.20 120.00 147.00 110.00 150.00 143.88 122.42

04592014 GABIONS (3' X 3')(GALV) CY 80.00 31 135.00 451.00 144.00 220.00 176.40 330.90 220.79

04602004 CMP (GAL STL 24 IN) LF 10.00 32 42.00 55.00 75.40 50.00 65.00 127.60 61.40

04642005 RC PIPE (CL III)(24 IN) LF 230.00 33 40.20 45.00 48.20 60.00 75.00 84.71 80.33

04652003 INLET (COMPL)(TY H) EA 1.00 34 2700.00 1500.00 3075.00 3500.00 2400.00 3604.38 3539.55

04672288 SET (TY II)(24 IN)(RCP)(6:1)(P) EA 2.00 35 772.20 960.00 754.00 1500.00 1500.00 989.12 1204.06

04672303 SET (TY II)(24 IN)(CMP)(6:1)(P) EA 4.00 36 800.00 1050.00 961.00 1500.00 1500.00 282.98 943.75

04722005 REMOV & RE-LAY PIPE (24 IN) LF 180.00 37 25.00 32.00 20.10 35.00 75.00 51.05 85.03

04962004 REMOV STR (SET) EA 5.00 38 240.45 595.00 47.40 375.00 500.00 415.16 209.36

04962007 REMOV STR (PIPE) LF 13.00 39 8.50 24.00 11.60 21.00 24.00 31.78 24.68

04962009 REMOV STR (BRIDGE 0-99 FT LENGTH) EA 1.00 40 9000.00 25000.00 11700.00 25000.00 35000.00 50000.00 31204.68

05002001 MOBILIZATION LS 1.00 41 75000.00 90000.00 79300.00 95000.00 105000 115000 27452.17

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 14.00 42 3850.00 655.00 732.00 1200.00 500.00 305.00 2029.56

05062003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 31.00 43 40.00 71.19 18.30 70.00 67.99 51.04 39.64

05062009 ROCK FILTER DAMS (REMOVE) LF 31.00 44 6.60 16.49 5.65 17.00 15.75 19.94 24.68

05062016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 78.00 45 18.00 22.27 31.80 60.00 21.26 15.57 25.73

05062019 CONSTRUCTION EXITS (REMOVE) SY 78.00 46 7.00 8.80 4.78 7.00 8.40 6.01 16.08

05062024 BACKHOE WORK (EROSION & SEDM CONT) HR 15.00 47 59.50 109.00 143.00 120.00 70.00 285.22 49.19

05062027 BLADING WORK (EROSION & SEDM CONT) HR 15.00 48 80.00 124.00 158.00 180.00 135.00 234.43 49.19

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 31: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: ELLIS

288 WORKING DAYS

ESTIMATED COST: $724,515.87

PROJECT NUMBER: BR 1102(029)

ENGINEER: PIERCE, WILLIAM- WAXAHACHIE TX 75167 (972)938-1570

DESCRIPTION: REPLACE BRIDGE AND APPROACHES

CHECK: 15,000

LOW BIDDER: REBCON, INC.

DATE: 05/03/2011

HWY.NO.: FM 983

LENGTH: 0.245 ORDER READ: 3012

Eng. Estimate -> $ 724,515.87 Amount Left %Left

Cntr 1 REBCON, INC............................. 963,907.10

2 INTERSTATE HIGHWAY CONSTRUCTION, INC.... 979,436.43 15,529.33 1.6

3 NORTH TEXAS BRIDGE COMPANY, INC......... 1,031,952.48 68,045.38 7.1

4 B&H CONTRACTING, L.P.................... 1,109,153.85 145,246.75 15.1

5 ED BELL CONSTRUCTION COMPANY............ 1,197,698.32 233,791.22 24.3

6 LINDER CONSTRUCTION CO., INC............ 1,225,091.39 261,184.29 27.1

ELLIS Page 3 of 4

Quantity No

Eng.

Est.

Cntr 1

REBCON,

Cntr 2

INTERSTAItems

Cntr 3

NORTH TE

Cntr 4

B&H CONT

Cntr 5

ED BELL

Cntr 6

LINDER

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 1,368.00 49 2.00 1.70 2.94 4.00 1.73 1.37 4.82

05122049 PORT CTB (DES SOURCE)(F-SHAPE)(TY 1) LF 720.00 50 8.95 12.00 11.30 17.00 11.00 14.48 17.35

05122050 PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 660.00 51 4.50 7.00 1.86 6.00 8.20 8.92 6.46

05122052 PORT CTB (REMOVE)(F-SHAPE)(TY 1) LF 720.00 52 4.60 6.00 9.28 9.00 11.00 10.68 14.16

05122077 PCTB(MOVE)(F-SHAPE)(TY 1)(MOD) LF 90.00 53 6.65 74.00 3.10 60.00 8.20 60.91 33.24

05122078 PCTB(REMOVE)(F-SHAPE)(TY 1)(MOD) LF 90.00 54 7.95 25.00 25.70 18.00 11.00 13.41 56.67

05122080 PCTB(DES SOURCE)(F-SHAPE)(TY 1)(MOD) LF 90.00 55 35.00 15.00 13.80 33.00 120.00 31.08 97.15

05302010 DRIVEWAYS (CONC) SY 32.00 56 39.10 66.00 98.80 90.00 55.00 243.59 121.74

05302011 DRIVEWAYS (ACP) SY 66.00 57 27.25 55.00 71.80 75.00 55.00 50.00 83.40

05402011 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 3.00 58 1320.00 2000.00 1665.00 2000.00 1126.65 1601.94 1605.24

05422001 REMOVING METAL BEAM GUARD FENCE LF 25.00 59 1.50 5.30 4.27 7.00 2.89 2.12 4.11

05422005 RM MTL BM GD FENCE TRANS (T101) EA 4.00 60 200.00 218.00 241.00 165.00 162.75 350.00 231.88

05442003 GUARDRAIL END TREATMENT (REMOVE) EA 4.00 61 208.56 334.00 342.00 220.00 231.00 249.31 329.13

05442004 GDRAIL END TRT(INST)(WOOD POST)(TY I) EA 3.00 62 1700.00 2537.00 2745.00 2000.00 1857.45 1805.09 2646.48

05452008 CRASH CUSH ATTEN (MOVE&RESET)(TRACC) EA 6.00 63 2000.00 2500.00 2020.00 800.00 1365.00 1452.09 2094.44

05452009 CRASH CUSH ATTEN (REMOVE)(TRACC) EA 4.00 64 1005.60 600.00 1165.00 600.00 787.50 916.57 1122.02

05452023 CRASH CUSH ATTEN (MOVE&RESET)(REACT)(N) EA 1.00 65 1200.00 3100.00 2485.00 1500.00 1680.00 4533.14 3430.87

06442025 INS SM RD SN SUP&AM TY S80(1) SA(T) EA 1.00 66 600.00 660.79 1140.00 712.50 498.75 579.04 1071.08

06442056 RELOCATE SM RD SN SUP & AM TY 10BWG EA 14.00 67 279.75 46.18 402.00 800.00 367.50 393.14 228.81

06442060 REMOVE SM RD SN SUP & AM EA 4.00 68 61.00 65.00 101.00 85.00 78.75 81.79 171.96

06582238 INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF(BI) EA 9.00 69 21.81 25.29 67.10 200.00 189.00 46.73 134.64

06582316 INSTL OM ASSM (OM-2Z)(FLX)GND EA 8.00 70 51.75 15.39 67.10 70.00 50.40 47.58 64.33

06582328 REMOVE DELIN & OBJECT MARKERS ASSMS EA 9.00 71 15.00 35.00 46.90 11.00 10.50 10.77 29.92

06622067 WK ZN PAV MRK REMOV (W) 4" (SLD) LF 16,000.00 72 0.80 0.71 0.64 0.55 0.68 0.75 0.86

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 32: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: ELLIS

288 WORKING DAYS

ESTIMATED COST: $724,515.87

PROJECT NUMBER: BR 1102(029)

ENGINEER: PIERCE, WILLIAM- WAXAHACHIE TX 75167 (972)938-1570

DESCRIPTION: REPLACE BRIDGE AND APPROACHES

CHECK: 15,000

LOW BIDDER: REBCON, INC.

DATE: 05/03/2011

HWY.NO.: FM 983

LENGTH: 0.245 ORDER READ: 3012

Eng. Estimate -> $ 724,515.87 Amount Left %Left

Cntr 1 REBCON, INC............................. 963,907.10

2 INTERSTATE HIGHWAY CONSTRUCTION, INC.... 979,436.43 15,529.33 1.6

3 NORTH TEXAS BRIDGE COMPANY, INC......... 1,031,952.48 68,045.38 7.1

4 B&H CONTRACTING, L.P.................... 1,109,153.85 145,246.75 15.1

5 ED BELL CONSTRUCTION COMPANY............ 1,197,698.32 233,791.22 24.3

6 LINDER CONSTRUCTION CO., INC............ 1,225,091.39 261,184.29 27.1

ELLIS Page 4 of 4

Quantity No

Eng.

Est.

Cntr 1

REBCON,

Cntr 2

INTERSTAItems

Cntr 3

NORTH TE

Cntr 4

B&H CONT

Cntr 5

ED BELL

Cntr 6

LINDER

06622079 WK ZN PAV MRK REMOV (W) 24" (SLD) LF 36.00 73 3.50 9.90 9.39 8.00 9.45 10.00 10.47

06622099 WK ZN PAV MRK REMOV (Y) 4" (SLD) LF 12,000.00 74 0.85 0.71 0.64 0.55 0.68 0.75 0.72

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 12.00 75 4.25 13.19 13.40 12.00 12.60 8.00 14.96

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 561.00 76 0.35 0.86 0.84 0.66 0.82 0.60 0.94

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 5,328.00 77 0.35 0.80 0.87 0.66 0.77 0.60 0.97

06722015 REFL PAV MRKR TY II-A-A EA 98.00 78 2.75 4.40 6.70 8.80 4.20 5.00 7.48

06772001 ELIM EXT PAV MRK & MRKS ( 4") LF 13,535.00 79 0.30 0.22 0.43 0.40 0.21 0.35 0.64

06772007 ELIM EXT PAV MRK & MRKS (24") LF 12.00 80 0.75 0.38 3.35 3.30 0.37 2.00 3.74

06782001 PAV SURF PREP FOR MRK ( 4") LF 13,535.00 81 0.05 0.14 0.13 0.22 0.14 0.08 0.15

06782003 PAV SURF PREP FOR MRK ( 8") LF 287.00 82 0.15 0.22 0.34 0.66 0.21 0.20 0.37

06782006 PAV SURF PREP FOR MRK (24") LF 12.00 83 0.35 0.40 1.34 1.10 0.37 2.00 1.50

06812001 TEMP TRAF SIGNALS EA 1.00 84 30790.00 45000.00 23300.00 20000.00 42000.00 50000.00 106140.9

50492002 BIODGRD EROSION CONTROL LOGS (18" DIA) LF 44.00 85 4.50 7.00 6.82 15.00 6.56 4.52 8.75

80202003 REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF 7,646.00 86 0.75 1.20 1.34 1.10 1.16 1.10 1.50

80202012 REF PROF PAV MRK TY I(W)8"(SLD)(100MIL) LF 287.00 87 1.10 2.20 1.34 1.10 2.10 2.25 1.50

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 33: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: ELLIS

120 W

ESTIMATED COST: $592,310.00

PROJECT NUMBER: RMC - 622281001

ENGINEER: ANTHONY, MICHAEL- WAXAHACHIE TX 75167 (972)938-7546

DESCRIPTION: VEGETATION MANAGEMENT

CHECK: 12,000

LOW BIDDER: DEANGELO BROTHERS, INC.

DATE: 05/03/2011

HWY.NO.: SH0034

LENGTH: 0.000 ORDER READ: 4013

Eng. Estimate -> $ 592,310.00 Amount Left %Left

Cntr 1 DEANGELO BROTHERS, INC.................. 382,658.36

2 JASCO................................... 405,816.00 23,157.64 6.1

3 MASSANA CONSTRUCTION, INC............... 450,675.00 68,016.64 17.8

4 MANN ROBINSON & SON, INC................ 517,370.00 134,711.64 35.2

ELLIS Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

DEANGELO

Cntr 2

JASCO...Items

Cntr 3

MASSANA

Cntr 4

MANN ROB

07302002 FULL-WIDTH MOWING AC 11,344.00 1 41.00 27.98 28.50 21.15 35.00

70392001 BROADCAST HERBICIDE VEGETATION CONTROL AC 3,438.00 2 37.00 18.98 24.00 61.30 35.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 34: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

74 WORKING DAYS

ESTIMATED COST: $707,983.75

PROJECT NUMBER: HP 2010(930)

ENGINEER: VOLK,JEFF- HOUSTON TX 77034 (281)464-5500

DESCRIPTION: CONSTRUCT PEDESTRIAN TRAIL

CHECK: 16,000

LOW BIDDER: LONE STAR ROAD CONSTRUCTION, LTD.

DATE: 05/03/2011

HWY.NO.: CS

LENGTH: 1.073 ORDER READ: 3013

Eng. Estimate -> $ 707,983.75 Amount Left %Left

Cntr 1 LONE STAR ROAD CONSTRUCTION, LTD........ 733,040.69

2 SPRING EQUIPMENT CO., INC............... 742,707.61 9,666.92 1.3

3 JERDON ENTERPRISE, L.P.................. 755,555.55 22,514.86 3.1

4 ROZCO CONTRACTING, INC.................. 759,195.93 26,155.24 3.6

5 TRIPLE B SERVICES, L.L.P................ 768,221.36 35,180.67 4.8

6 HASSELL CONSTRUCTION COMPANY, INC....... 777,248.76 44,208.07 6.0

7 METRO CITY CONSTRUCTION, L.P............ 802,825.93 69,785.24 9.5

HARRIS Page 1 of 2

Quantity No

Eng.

Est.

Cntr 1

LONE STA

Cntr 2

SPRINGItems

Cntr 3

JERDON

Cntr 4

ROZCO CO

Cntr 5

TRIPLE

Cntr 6

HASSELL

Cntr 7

METRO CI

01002002 PREPARING ROW STA 61.84 1 250.00 115.00 1000.00 400.00 1000.00 400.00 640.00 128.77

01042015 REMOVING CONC (SIDEWALKS) SY 29.00 2 8.00 20.00 13.00 3.00 10.00 20.00 2.15 2.24

01052011 REMOVING STAB BASE AND ASPH PAV (2"-6") SY 2,371.25 3 2.00 4.00 10.00 5.00 4.00 4.50 5.75 3.98

01102001 EXCAVATION (ROADWAY) CY 2,103.00 4 6.50 15.00 12.00 5.00 11.00 15.00 9.00 6.90

01322006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 4.00 5 5.00 150.00 30.00 40.00 60.00 25.00 12.50 25.00

01342002 BACKFILL (TY B) STA 61.84 6 200.00 230.00 150.00 100.00 300.00 255.00 200.00 440.58

01502001 BLADING STA 61.84 7 70.00 200.00 90.00 150.00 200.00 87.00 110.00 193.68

01612009 EROSION CONTROL COMPOST CY 455.00 8 12.00 23.00 23.00 15.00 40.00 23.00 20.00 16.28

01622002 BLOCK SODDING SY 39,257.00 9 2.75 2.20 2.20 2.14 2.25 2.85 2.75 2.75

01642041 DRILL SEEDING (TEMP) (WARM) SY 39,257.00 10 0.25 0.10 0.07 0.07 0.01 0.14 0.12 0.15

01642045 STRAW OR HAY MULCHING SY 39,257.00 11 0.15 0.17 0.15 0.15 0.03 0.18 0.15 0.25

01662001 FERTILIZER AC 24.33 12 500.00 450.00 460.00 458.00 400.00 430.00 425.00 511.59

01682001 VEGETATIVE WATERING MG 8.17 13 20.00 1250.00 11.60 40.00 75.00 55.00 12.50 12.91

02602006 LIME TRT (EXST MATL) (6") SY 6,999.00 14 2.50 3.50 3.50 5.50 4.00 3.60 2.10 2.45

02602012 LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON 125.97 15 150.00 180.00 160.00 160.00 150.00 150.00 145.00 161.90

04812013 PVC PIPE (SCH 40)(8 IN) LF 40.00 16 21.00 20.00 30.00 60.00 25.00 45.00 29.00 68.27

04812015 PVC PIPE (SCH 40)(12 IN) LF 100.00 17 25.00 30.00 40.00 70.00 30.00 50.00 40.00 42.61

05002001 MOBILIZATION LS 1.00 18 52159.83 40000.00 70000.00 72521.29 69000.00 40000.00 71250.00 33603.87

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.00 19 1471.00 2500.00 375.00 2000.00 1600.00 800.00 400.00 1198.39

05062016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 333.00 20 15.00 25.00 16.00 20.00 11.00 16.00 21.00 23.13

05062019 CONSTRUCTION EXITS (REMOVE) SY 333.00 21 6.00 10.00 9.00 6.00 4.00 5.50 7.10 9.94

05062030 CONSTRUCTION PERIMETER FENCE LF 2,820.00 22 5.00 8.00 1.50 1.40 3.00 2.00 1.55 1.80

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 6,801.00 23 4.00 10.00 1.25 1.40 2.00 2.20 1.75 1.60

05082005 CONSTRUCTING DETOURS (EBSS) SY 497.00 24 10.00 12.00 8.00 6.00 12.00 7.00 44.00 24.37

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 35: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

74 WORKING DAYS

ESTIMATED COST: $707,983.75

PROJECT NUMBER: HP 2010(930)

ENGINEER: VOLK,JEFF- HOUSTON TX 77034 (281)464-5500

DESCRIPTION: CONSTRUCT PEDESTRIAN TRAIL

CHECK: 16,000

LOW BIDDER: LONE STAR ROAD CONSTRUCTION, LTD.

DATE: 05/03/2011

HWY.NO.: CS

LENGTH: 1.073 ORDER READ: 3013

Eng. Estimate -> $ 707,983.75 Amount Left %Left

Cntr 1 LONE STAR ROAD CONSTRUCTION, LTD........ 733,040.69

2 SPRING EQUIPMENT CO., INC............... 742,707.61 9,666.92 1.3

3 JERDON ENTERPRISE, L.P.................. 755,555.55 22,514.86 3.1

4 ROZCO CONTRACTING, INC.................. 759,195.93 26,155.24 3.6

5 TRIPLE B SERVICES, L.L.P................ 768,221.36 35,180.67 4.8

6 HASSELL CONSTRUCTION COMPANY, INC....... 777,248.76 44,208.07 6.0

7 METRO CITY CONSTRUCTION, L.P............ 802,825.93 69,785.24 9.5

HARRIS Page 2 of 2

Quantity No

Eng.

Est.

Cntr 1

LONE STA

Cntr 2

SPRINGItems

Cntr 3

JERDON

Cntr 4

ROZCO CO

Cntr 5

TRIPLE

Cntr 6

HASSELL

Cntr 7

METRO CI

05312024 CONC SIDEWALK (5") SY 5,678.00 25 35.00 23.00 35.50 41.00 33.00 41.00 41.00 48.78

06182028 CONDT (PVC) (SCHD 80) (1") LF 2,760.00 26 5.30 4.00 3.15 3.50 3.15 3.80 3.25 7.59

06182030 CONDT (PVC) (SCHD 80) (1 1/2") LF 1,820.00 27 6.16 5.00 3.70 4.10 3.70 4.40 4.00 8.15

06182031 CONDT (PVC) (SCHD 80) (1 1/2") (BORE) LF 40.00 28 74.92 8.00 6.75 7.50 6.75 10.20 7.25 43.82

06202005 ELEC CONDR (NO. 3) BARE LF 1,818.00 29 1.50 3.00 2.60 2.90 2.60 2.80 2.85 2.48

06202006 ELEC CONDR (NO. 3) INSULATED LF 3,636.00 30 2.09 3.50 3.00 3.30 3.00 3.25 3.30 2.65

06202009 ELEC CONDR (NO. 6) BARE LF 966.00 31 1.00 1.50 1.00 1.10 1.00 1.12 1.10 1.43

06202010 ELEC CONDR (NO. 6) INSULATED LF 1,932.00 32 1.79 2.00 1.25 1.40 1.25 1.40 1.30 1.51

06202011 ELEC CONDR (NO. 8) BARE LF 1,812.00 33 0.95 1.50 0.80 0.90 0.80 0.90 0.85 1.19

06202012 ELEC CONDR (NO. 8) INSULATED LF 3,625.00 34 1.05 2.00 0.95 1.05 0.95 1.10 1.00 1.26

06282009 ELC SRV TY A 120/240 100 (NS)SS(E)GC(O) EA 1.00 35 5000.00 6000.00 4950.00 5400.00 4980.00 5500.00 5100.00 6291.49

06442001 INS SM RD SN SUP&AM TY 10BWG(1) SA(P) EA 3.00 36 375.00 700.00 490.00 540.00 615.00 850.00 475.00 686.65

10182002 TREE PROTECTION AC 2.54 37 1000.00 5000.00 1000.00 4400.00 5000.00 5700.00 2750.00 2000.00

50492001 BIODGRD EROSION CONTROL LOGS (8" DIA) LF 126.00 38 6.00 12.00 1.90 3.00 6.00 3.25 2.85 2.10

50492002 BIODGRD EROSION CONTROL LOGS (18" DIA) LF 50.00 39 6.00 12.00 4.65 6.00 7.00 8.00 7.70 5.16

58842001 REMOVABLE BOLLARDS EA 3.00 40 400.00 1000.00 1100.00 1400.00 1500.00 400.00 275.00 390.78

59232001 REMOVE AND REPLACE BENCH EA 2.00 41 1000.00 2500.00 900.00 300.00 2000.00 1600.00 1300.00 2233.01

59242001 DISTANCE MARKER EA 11.00 42 200.00 450.00 400.00 150.00 500.00 85.00 220.00 139.57

75902001 REMOVE AND REPLACE WOODEN BOLLARD EA 10.00 43 60.00 200.00 300.00 90.00 125.00 110.00 110.00 100.49

87312001 LED AREA TYPE LIGHTING FIXTURE AND POLE EA 23.00 44 4268.00 4000.00 3895.00 4400.00 3890.00 4300.00 4000.00 4421.37

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 36: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

36 WORKING DAYS

ESTIMATED COST: $346,106.00

PROJECT NUMBER: IM 0451(338)

ENGINEER: STEPHENS,DOUGLAS- HUMBLE TX 77396 (281)319-6400

DESCRIPTION: MISC WORK: ARMOR JOINT & WIDE FLANGE BEAM REPAIR

CHECK: 7,000

LOW BIDDER: SPRING EQUIPMENT CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 45

LENGTH: 0.209 ORDER READ: 3014

Eng. Estimate -> $ 346,106.00 Amount Left %Left

Cntr 1 SPRING EQUIPMENT CO., INC............... 364,992.00

2 ISI CONTRACTING, INC.................... 411,652.00 46,660.00 12.8

3 SCR CONSTRUCTION CO., INC............... 498,073.20 133,081.20 36.5

4 MAIN LANE INDUSTRIES, LTD............... 523,501.50 158,509.50 43.4

HARRIS Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

SPRING

Cntr 2

ISI CONTItems

Cntr 3

SCR CONS

Cntr 4

MAIN LAN

03612044 FULL-DEPTH REPAIR CRCP (11") HES SY 72.00 1 130.00 730.00 300.00 500.00 375.00

03612060 FULL-DEPTH REPAIR CRCP (13") HES SY 60.00 2 160.00 935.00 320.00 550.00 410.00

04292011 CNC STR REP (REMOVE & REPLACE) CY 8.00 3 200.00 700.00 2000.00 800.00 350.00

04382002 CLEAN AND SEAL EXIST JOINTS LF 1,490.00 4 3.00 9.00 28.00 15.00 24.00

04422048 STRUCTURAL STEEL(MISC NON-BRIDGE) LB 3,738.00 5 2.00 9.00 9.00 6.40 1.75

04542001 SEALED EXPANSION JOINT (4 IN)(SEJ-A) LF 600.00 6 90.00 97.00 200.00 117.00 69.00

05002001 MOBILIZATION LS 1.00 7 45000.00 28000.00 40000.00 49000.00 50000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.00 8 5000.00 5000.00 1500.00 2000.00 4000.00

05122019 PORT CTB (MOVE)(SAFETY SH)(TY 1) LF 480.00 9 10.00 6.00 18.00 80.00 50.00

44912001 TYPE CAC CONCRETE CY 86.00 10 2000.00 1000.00 975.00 2300.00 3150.00

64732005 MULTIPOLYMER PAV MRK (W)(6")(BRK) LF 100.00 11 2.00 6.00 10.00 30.00 15.00

68342002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.00 12 8800.00 4000.00 10000.00 5000.00 11500.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 37: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 1 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

01002001 PREPARING ROW AC 14.60 1 15000.00 25000.00 9800.00 20000.00 664382

01002002 PREPARING ROW STA 239.33 2 10000.00 60000.00 9800.00 20000.00 5000.00

01042001 REMOVING CONC (PAV) SY 276,407.00 3 3.50 3.00 3.00 1.00 4.00

01042009 REMOVING CONC (RIPRAP) SY 11,181.00 4 2.00 4.00 3.00 3.50 5.00

01042011 REMOVING CONC (MEDIANS) SY 609.00 5 79.00 5.00 3.00 6.50 12.00

01042017 REMOVING CONC (DRIVEWAYS) SY 7,306.00 6 2.50 5.00 3.00 6.50 6.00

01042023 REMOVING CONC (CTB) LF 17,469.00 7 4.00 2.00 3.00 7.00 12.00

01042024 REMOVING CONC (RETAINING WALLS) SY 7,690.00 8 25.00 25.00 45.00 1.00 17.00

01042028 REMOVING CONC (MISC) SY 616.00 9 2.00 5.00 3.00 8.00 14.00

01042029 REMOVING CONC (CURB OR CURB & GUTTER) LF 11,614.00 10 3.50 2.00 0.50 2.50 3.00

01042036 REMOVING CONC (SIDEWALK OR RAMP) SY 10,885.00 11 2.50 4.00 1.00 2.10 7.00

01042037 REMOVE CONC (RAIL) LF 1,974.00 12 4.00 10.00 3.00 6.00 6.00

01042044 REMOVING CONC (FLUME) SY 350.00 13 2.00 7.00 3.00 1.20 12.00

01052026 REMOVE STAB BASE & ASPH PAV (13"-18") SY 29,499.00 14 4.50 3.00 1.74 1.75 5.00

01052084 REM STAB BASE & ASPH (6"-12") SY 277,726.00 15 3.75 3.00 1.13 1.00 3.00

01052088 REMOVING STAB BASE AND ASPH PAV(0"-5") SY 20,513.00 16 2.50 3.00 0.69 1.00 2.00

01052089 REMOVING STAB BASE AND ASP PAV(19"-20") SY 2,085.00 17 6.00 10.00 2.40 1.90 6.00

01102001 EXCAVATION (ROADWAY) CY 218,851.00 18 4.80 3.00 6.50 5.60 7.00

01102003 EXCAVATION (SPECIAL) CY 203,343.00 19 6.00 3.00 5.50 3.80 7.00

01322006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 454,590.00 20 4.00 2.00 2.50 5.50 5.00

01322036 EMBANK(FINAL)(DC)(TY E)(CSBE) CY 57,802.00 21 28.00 20.00 25.00 22.00 25.00

01322037 EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR CY 12,335.00 22 28.00 30.00 27.00 33.00 25.00

01322039 EMB(FNL)(DC)(TYE)(CSBE)(RWALL RNF VOL) CY 1,102.00 23 28.00 30.00 27.00 20.00 25.00

01342001 BACKFILL (TY A) STA 62.10 24 267.00 300.00 2000.00 225.00 1500.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 38: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 2 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

01502002 BLADING HR 40.00 25 59.00 55.00 75.00 80.00 135.00

01612012 GENERAL USE COMPOST CY 1,297.00 26 23.00 15.00 16.64 16.00 15.79

01612017 COMPOST MANUF TOPSOIL (BIP) (4") SY 18,479.00 27 1.00 0.50 0.59 0.57 1.50

01622002 BLOCK SODDING SY 78,099.00 28 2.00 2.50 2.37 2.30 2.25

01622003 STRAW OR HAY MULCH SY 232,686.00 29 0.10 0.10 0.14 0.14 0.13

01642037 DRILL SEEDING (PERM) (URBAN) (SANDY) SY 64,626.00 30 0.10 0.10 0.09 0.10 0.09

01642051 DRILL SEED (TEMP)(WARM OR COOL) SY 155,308.00 31 0.10 0.10 0.05 0.06 0.05

01662001 FERTILIZER AC 61.03 32 400.00 450.00 450.00 430.00 430.00

01682001 VEGETATIVE WATERING MG 4,680.52 33 12.00 1.00 12.50 14.00 16.00

01922064 PLANT BED PREP (TYPE II) SY 23,336.00 34 0.20 0.15 0.18 0.17 0.17

02602006 LIME TRT (EXST MATL) (6") SY 378,604.00 35 1.40 0.80 1.15 2.00 1.00

02602012 LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON 5,088.07 36 140.00 150.00 150.00 154.00 140.00

02762224 CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6") SY 342,806.00 37 4.50 4.00 5.90 6.75 7.00

02922007 ASPHALT STAB BASE (GR 2)(PG 64) TON 19,531.00 38 55.00 45.00 62.36 63.00 59.33

02922017 ASPHALT STAB BASE (GR 4)(PG 64) TON 20,343.00 39 55.00 45.00 62.64 63.00 59.59

03052014 SALV,HAUL& STKPL RCL APH PV(VAR DEPTH) SY 22,555.00 40 2.00 1.00 1.93 2.10 2.00

03402050 D-GR HMA(METH) TY-C PG70-22 TON 325.00 41 75.00 60.00 84.00 85.00 80.85

03412135 D-GR HMA(QCQA) TY-D SAC-A PG76-22 TON 5,850.66 42 75.00 65.00 74.00 75.00 71.40

03412138 D-GR HMA(QCQA) TY-D PG76-22 TON 5,661.19 43 75.00 60.00 71.00 72.00 67.73

03602003 CONC PVMT (CONT REINF-CRCP)(10") SY 132,631.00 44 35.00 20.00 37.00 52.00 42.00

03602008 CONC PVMT (CONT REINF-CRCP)(15") SY 194,134.00 45 46.00 20.00 51.00 67.00 58.00

03602023 CONC PAV (JOINT REINF) (6") SY 1,868.00 46 30.00 20.00 34.00 38.00 40.00

03682001 WIDE FLANGE PAVEMENT TERMINALS LF 2,078.52 47 350.00 250.00 260.00 260.00 400.00

04002001 STRUCT EXCAV CY 6,160.00 48 6.00 5.00 6.00 4.00 10.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 39: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 3 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

04002005 CEM STABIL BKFL CY 43,864.55 49 27.00 20.00 32.00 35.00 25.00

04002006 CUT & RESTORING PAV SY 163.00 50 63.00 125.00 180.00 80.00 90.00

04002008 CUT & RESTORING PAV (ASPH) SY 1,692.00 51 70.00 80.00 115.00 80.00 70.00

04002016 CEMENT STAB BACKFILL (INLET OR MH) CY 6,483.75 52 30.00 20.00 33.00 35.00 25.00

04012001 FLOWABLE BACKFILL CY 50.00 53 90.00 250.00 200.00 110.00 250.00

04022001 TRENCH EXCAVATION PROTECTION LF 51,453.00 54 1.50 1.00 1.00 1.40 1.00

04032001 TEMPORARY SPL SHORING SF 247,134.00 55 8.00 1.00 6.00 8.00 10.00

04162001 DRILL SHAFT (18 IN) LF 120.00 56 85.00 100.00 60.00 105.00 50.00

04162003 DRILL SHAFT (30 IN) LF 9,791.00 57 100.00 125.00 80.00 110.00 78.00

04162004 DRILL SHAFT (36 IN) LF 40,193.00 58 120.00 100.00 100.00 116.00 110.00

04162005 DRILL SHAFT (42 IN) LF 18,522.00 59 138.00 125.00 140.00 160.00 160.00

04162006 DRILL SHAFT (48 IN) LF 2,004.00 60 160.00 150.00 180.00 200.00 180.00

04162007 DRILL SHAFT (54 IN) LF 1,352.00 61 250.00 200.00 230.00 245.00 240.00

04162008 DRILL SHAFT (60 IN) LF 1,906.00 62 300.00 250.00 290.00 285.00 300.00

04162009 DRILL SHAFT (66 IN) LF 427.00 63 300.00 300.00 340.00 340.00 325.00

04162010 DRILL SHAFT (72 IN) LF 596.00 64 400.00 350.00 410.00 415.00 375.00

04162015 DRILL SHAFT (NON-REINFORCED)(12 IN) LF 35.00 65 60.00 61.00 64.27 55.00 61.00

04162017 DRILL SHAFT (SIGN MTS)(18 IN) LF 41.00 66 80.00 94.57 99.64 97.00 95.00

04162018 DRILL SHAFT (SIGN MTS)(24 IN) LF 122.00 67 80.00 109.87 115.76 106.00 110.00

04162020 DRILL SHAFT (SIGN MTS)(36 IN) LF 408.00 68 105.00 150.00 158.67 86.00 125.00

04162021 DRILL SHAFT (SIGN MTS)(42 IN) LF 772.00 69 200.00 175.00 228.62 222.00 180.00

04162022 DRILL SHAFT (SIGN MTS)(48 IN) LF 20.00 70 230.00 200.00 385.96 325.00 366.00

04162027 DRILL SHAFT (HIGH MAST POLE)(66 IN) LF 1,271.00 71 475.00 552.14 581.76 555.00 553.00

04162029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 8.00 72 121.00 436.26 459.66 440.00 437.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 40: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 4 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

04162032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF 116.00 73 150.00 137.04 144.39 140.00 138.00

04162033 DRILL SHAFT (TRF SIG POLE) (42 IN) LF 106.00 74 200.00 305.38 321.76 310.00 305.00

04162034 DRILL SHAFT (TRF SIG POLE) (48 IN) LF 89.00 75 250.00 424.22 446.97 425.00 425.00

04162047 DRILL SHAFT (96 IN) LF 42.00 76 525.00 1500.00 800.00 1500.00 800.00

04202003 CL C CONC (ABUT) CY 1,134.40 77 485.00 500.00 580.00 567.00 500.00

04202005 CL C CONC (FOOTING) CY 4,734.90 78 375.00 450.00 550.00 545.00 500.00

04202010 CL C CONC (SIGN COLUMN) CY 559.50 79 600.00 1000.00 900.00 1100.00 900.00

04202013 CL C CONC (MISC) CY 33.70 80 400.00 400.00 1250.00 1210.00 2500.00

04202018 CL C CONC (FOOTING)(MASS PLACEMENT) CY 1,598.60 81 450.00 500.00 400.00 480.00 400.00

04202019 CL C CONC (CAP) CY 310.90 82 500.00 1000.00 725.00 250.00 600.00

04202029 CL S CONC (SLAB) CY 528.00 83 450.00 400.00 375.00 425.00 400.00

04202031 CL S CONC (SHEAR KEY) CY 297.20 84 130.00 150.00 275.00 124.00 400.00

04202034 CL S CONC (BRIDGE SDWLK) CY 109.80 85 275.00 500.00 275.00 286.00 550.00

04202050 CL F CONC (CAP) CY 13,757.60 86 530.00 500.00 600.00 646.00 600.00

04202051 CL C CONC (COLUMN) CY 515.30 87 465.00 500.00 650.00 600.00 1000.00

04202055 CL C CONC (COLUMN)(MASS PLACEMENT) CY 11,668.60 88 475.00 500.00 625.00 790.00 650.00

04202059 CL C CONC (CAP)(MASS PLACEMENT) CY 111.40 89 565.00 1000.00 675.00 585.00 850.00

04202089 CL F CONC (CAP)(MASS PLACEMENT) CY 639.60 90 575.00 650.00 725.00 600.00 700.00

04202117 CL C CONC (SIGN FOOTING) CY 172.60 91 500.00 450.00 400.00 615.00 400.00

04222001 REINF CONC SLAB SF 1,410,567.00 92 9.00 5.00 11.00 13.00 12.00

04232005 RETAINING WALL (TEMP WALL) SF 50,640.00 93 10.00 7.00 9.00 6.80 8.00

04232012 RETAINING WALL (CAST-IN-PLACE) SF 3,586.00 94 40.00 60.00 50.00 44.00 45.00

04232022 RETAINING WALL (MSE)(VERTICAL SCHEME) SF 65,783.00 95 30.00 25.00 32.00 31.50 30.00

04232024 RETAINING WALL (MSE)(HORIZONTAL SCHEME) SF 240,772.00 96 30.00 25.00 32.00 29.50 30.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 41: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 5 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

04252004 PRESTR CONC BEAM (TY IV) LF 4,921.16 97 135.00 75.00 120.00 183.00 120.00

04252010 PRESTR CONC BOX BEAM (4B34) LF 406.92 98 190.00 85.00 150.00 184.00 160.00

04252011 PRESTR CONC BOX BEAM (5B34) LF 5,696.94 99 200.00 95.00 150.00 187.00 165.00

04252019 PRESTR CONC U-BEAM (U54) LF 114,615.15 100 170.00 100.00 175.00 193.00 200.00

04262001 POST-TENSIONING (GROUTED) MKF 620.00 101 675.00 100.00 195.00 280.00 180.00

04282001 CONC SURF TREAT (CLASS I) SY 154,305.00 102 1.50 0.50 1.50 0.90 1.50

04302002 CL C CONC FOR EXT STR (ABUT) CY 11.70 103 700.00 2000.00 775.00 720.00 1000.00

04302158 CL S CONC FOR EXT STR (SLAB) SF 6,274.00 104 40.00 15.00 14.00 14.40 25.00

04302172 CL F CONC FOR EXT STR (BENT) CY 20.30 105 900.00 1500.00 1200.00 1420.00 2000.00

04322001 RIPRAP (CONC)(4 IN) CY 2,754.90 106 250.00 300.00 375.00 300.00 300.00

04322002 RIPRAP (CONC)(5 IN) CY 497.80 107 300.00 300.00 425.00 310.00 300.00

04322021 RIPRAP (STONE PROTECTION)(18 IN) CY 252.00 108 100.00 80.00 75.00 107.00 70.00

04322039 RIPRAP (MOW STRIP)(4 IN) CY 517.60 109 300.00 300.00 375.00 300.00 400.00

04322066 RIPRAP (CONC)(CL B) CY 37.50 110 250.00 300.00 375.00 337.00 500.00

04322085 RIPRAP (CONC) (CL B) (6") CY 265.00 111 330.00 300.00 375.00 275.00 300.00

04342024 ELASTOMERIC BEAR (SPECIAL) EA 14.00 112 600.00 2000.00 1600.00 1025.00 5500.00

04422003 STR STL (TUB GIRDER) LB 5,999,263.00 113 1.38 1.64 2.09 2.06 2.15

04422047 STRUCTURAL STEEL(MISCELLANEOUS BRIDGE) LB 84,048.00 114 8.00 3.00 2.65 2.95 3.00

04502013 RAIL (TY SSTR) LF 93,303.91 115 33.00 25.00 32.00 27.50 38.00

04502025 RAIL (TY PR1) LF 77.00 116 60.00 125.00 92.00 68.50 65.00

04502109 RAIL (TY SSTR) W/DRAIN SLOTS LF 251.00 117 40.00 30.00 39.00 30.00 38.00

04502124 RAIL (TY SSCB)(1) LF 397.79 118 45.00 40.00 116.00 51.50 56.00

04502166 RAIL (TY C223) LF 1,023.00 119 75.00 75.00 130.00 115.00 100.00

04522001 REMOV RAIL (CONC ELEMENTS) LF 184.00 120 10.00 15.00 33.00 2.50 25.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 42: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 6 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

04542001 SEALED EXPANSION JOINT (4 IN)(SEJ-A) LF 805.00 121 150.00 100.00 90.00 150.00 90.00

04542002 SEALED EXPANSION JOINT (4 IN)(SEJ-P) LF 5,514.00 122 150.00 150.00 160.00 150.00 140.00

04542003 SEALED EXPANSION JOINT (5 IN)(SEJ-P) LF 268.00 123 160.00 150.00 160.00 167.00 140.00

04542005 ARMOR JOINT (WITH SEAL) LF 40.00 124 100.00 50.00 70.00 43.60 65.00

04602004 CMP (GAL STL 24 IN) LF 562.00 125 42.00 60.00 50.00 44.00 40.00

04622001 CONC BOX CULV (3 FT X 2 FT) LF 13.00 126 110.00 105.73 95.00 220.00 145.00

04622002 CONC BOX CULV (3 FT X 3 FT) LF 302.00 127 110.00 95.58 100.00 105.00 120.00

04622003 CONC BOX CULV (4 FT X 2 FT) LF 139.00 128 110.00 106.30 105.00 110.00 130.00

04622004 CONC BOX CULV (4 FT X 3 FT) LF 157.00 129 120.00 104.19 110.00 120.00 135.00

04622005 CONC BOX CULV (4 FT X 4 FT) LF 465.00 130 140.00 111.38 114.00 125.00 140.00

04622006 CONC BOX CULV (5 FT X 2 FT) LF 1,168.00 131 150.00 135.58 140.00 152.00 174.00

04622007 CONC BOX CULV (5 FT X 3 FT) LF 285.00 132 150.00 140.58 145.00 165.00 180.00

04622008 CONC BOX CULV (5 FT X 4 FT) LF 376.00 133 160.00 150.15 155.00 176.00 190.00

04622009 CONC BOX CULV (5 FT X 5 FT) LF 1,905.00 134 170.00 156.53 160.00 180.00 205.00

04622011 CONC BOX CULV (6 FT X 4 FT) LF 290.00 135 180.00 164.37 180.00 190.00 210.00

04622012 CONC BOX CULV (6 FT X 5 FT) LF 2,579.00 136 185.00 197.32 199.00 220.00 230.00

04622013 CONC BOX CULV (6 FT X 6 FT) LF 1,162.00 137 200.00 196.17 209.00 228.00 250.00

04622014 CONC BOX CULV (7 FT X 3 FT) LF 282.00 138 200.00 202.07 211.00 260.00 275.00

04622015 CONC BOX CULV (7 FT X 4 FT) LF 769.00 139 220.00 204.37 230.00 252.00 290.00

04622017 CONC BOX CULV (7 FT X 6 FT) LF 1,595.00 140 260.00 235.78 240.00 265.00 310.00

04622021 CONC BOX CULV (8 FT X 6 FT) LF 64.00 141 270.00 275.75 264.00 365.00 360.00

04622024 CONC BOX CULV (9 FT X 5 FT) LF 107.00 142 290.00 298.84 310.00 372.00 400.00

04642003 RC PIPE (CL III)(18 IN) LF 135.00 143 33.00 35.39 25.00 47.50 30.00

04642005 RC PIPE (CL III)(24 IN) LF 23,079.00 144 35.00 44.78 36.00 38.00 35.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 43: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 7 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

04642007 RC PIPE (CL III)(30 IN) LF 5,587.00 145 50.00 46.09 46.00 44.00 40.00

04642009 RC PIPE (CL III)(36 IN) LF 3,685.00 146 60.00 55.41 56.00 55.00 60.00

04642010 RC PIPE (CL III)(42 IN) LF 2,917.00 147 80.00 66.09 71.02 80.00 70.00

04642011 RC PIPE (CL III)(48 IN) LF 5,038.00 148 95.00 74.62 80.00 84.00 90.00

04642012 RC PIPE (CL III)(54 IN) LF 1,880.00 149 100.00 110.12 110.00 125.00 135.00

04642013 RC PIPE (CL III)(60 IN) LF 2,308.00 150 140.00 119.67 125.00 133.00 140.00

04642014 RC PIPE (CL III)(66 IN) LF 1,091.00 151 175.00 145.21 160.00 170.00 180.00

04652005 MANH (COMPL)(TY M) EA 129.00 152 2700.00 3056.90 2100.00 3400.00 3300.00

04652010 INLET (COMPL)(TY AAD) EA 52.00 153 4000.00 2925.10 2500.00 3600.00 2900.00

04652011 INLET (COMPL)(TY AD) EA 46.00 154 3000.00 2165.10 2300.00 2700.00 2500.00

04652013 MANH (COMPL)(TY A) EA 44.00 155 2600.00 3616.90 4900.00 4000.00 2400.00

04652091 MANH (COMPL)(JUNCT BOX)(SPL) EA 11.00 156 20000.00 15180.97 11000.00 14200.00 11000.00

04652098 INLET (COMPL)(TY C1) EA 123.00 157 3500.00 4365.29 3000.00 2900.00 3300.00

04652099 INLET (COMPL)(TY C1)(STAGE II) EA 16.00 158 2000.00 2381.71 1800.00 1500.00 1400.00

04652119 INLET (COMPL)(TY AZ) EA 13.00 159 3600.00 3515.10 3900.00 3900.00 3000.00

04652120 INLET (COMPL)(TY AZR) EA 22.00 160 3600.00 4106.64 4300.00 4200.00 5100.00

04652121 MANH (COMPL)(TY B) EA 1.00 161 3000.00 20426.90 9100.00 26000.00 3000.00

04652138 MANH (COMPL)(JCT BOX)(TY M)(SPL) EA 6.00 162 20000.00 8691.53 6200.00 9500.00 4500.00

04652152 MANH (COMPL)(RISER ONLY) EA 1.00 163 1800.00 4945.53 3400.00 1650.00 1000.00

04652198 INLET (COMPL)(TY AZ)(MOD 1) EA 1.00 164 3600.00 4370.10 5000.00 4950.00 5000.00

04652223 MANH (COMPL)(TY MH-M) EA 1.00 165 3500.00 4989.14 1400.00 6700.00 4600.00

04652229 INLET EXT (TY C1) EA 127.00 166 700.00 810.30 800.00 935.00 2000.00

04652255 INLET (COMP)(TY AZ2G) EA 96.00 167 4500.00 4139.85 5200.00 5600.00 4800.00

04652468 INLET (COMPL)(TY C1)(MOD) EA 31.00 168 3600.00 4743.32 5200.00 3850.00 4800.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 44: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 8 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

04652540 INLET (COMPL)(TY AZR2G) EA 64.00 169 4500.00 5090.64 5800.00 5300.00 7000.00

04652710 MANH (COMPL)(TY M)(MOD-2) EA 24.00 170 4000.00 4212.64 5000.00 5100.00 5000.00

04652734 MANH (COMP)(TY M)(MOD-1) EA 2.00 171 4000.00 6162.64 7900.00 9700.00 5000.00

04652735 INLET (COMP)(TY C1)(MOD-1) EA 21.00 172 3600.00 4582.64 4600.00 3750.00 5200.00

04662006 WINGWALL (SW-0)(HW=4 FT) EA 2.00 173 4000.00 6527.27 6900.00 4550.00 10000.00

04662007 WINGWALL (SW-0)(HW=5 FT) EA 2.00 174 4500.00 6723.38 7700.00 5950.00 10000.00

04662022 WINGWALL (FW-0)(HW=6 FT) EA 1.00 175 4500.00 8182.39 10000.00 6200.00 12000.00

04662130 HEADWALL (CH-PW-0)(DIA= 42 IN) EA 1.00 176 5000.00 9079.59 6800.00 3100.00 13000.00

04672224 SET (TY II)(24 IN)(RCP)(4:1)(C) EA 1.00 177 800.00 1517.69 1000.00 1330.00 1000.00

04712003 GRATE & FRAME EA 62.00 178 800.00 4000.00 1200.00 750.00 1200.00

04762002 JACK BOR OR TUN PIPE(24 IN)(RC)(CL III) LF 39.00 179 115.00 643.77 264.08 395.00 200.00

04762005 JACK BOR OR TUN PIPE(42 IN)(RC)(CL III) LF 55.00 180 500.00 1092.16 593.72 840.00 400.00

04762015 JACK BOR OR TUN PIPE(42 IN)(RC)(CL IV) LF 88.00 181 550.00 1137.00 555.71 800.00 400.00

04762053 JACK OR TUN BOX CULV (7 FT X 4 FT) LF 43.00 182 975.00 2061.92 1000.00 1650.00 1000.00

04792003 ADJ MANHS & INLETS EA 1.00 183 500.00 590.45 1100.00 430.00 900.00

04792006 ADJUST INLET (CAP) EA 36.00 184 500.00 1192.24 1100.00 355.00 600.00

04792007 ADJ MANH (CAP) EA 13.00 185 500.00 642.62 1000.00 395.00 600.00

04812010 PVC PIPE (SCH 40)(4 IN) LF 265.00 186 20.00 40.00 16.53 18.00 37.00

04812013 PVC PIPE (SCH 40)(8 IN) LF 3,135.00 187 20.00 45.00 61.19 65.00 37.00

04812014 PVC PIPE (SCH 40)(10 IN) LF 2,592.00 188 35.00 50.00 56.76 29.00 44.00

04962002 REMOV STR (INLET) EA 173.00 189 350.00 400.00 450.00 270.00 500.00

04962003 REMOV STR (MANHOLE) EA 51.00 190 450.00 500.00 550.00 270.00 500.00

04962007 REMOV STR (PIPE) LF 24,309.00 191 8.00 1.00 12.50 0.70 12.00

04962010 REMOV STR (BRIDGE 100-499 FT LENGTH) EA 5.00 192 25000.00 25000.00 75000.00 67000.00 60000.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 45: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 9 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

04962011 REMOV STR (BRIDGE 500-999 FT LENGTH) EA 4.00 193 100000 150000 120000 270000 145000

04962012 REMOV STR (BRIDGE 1000 FT OR GREATER) EA 1.00 194 185000 750000 750000 1300000 750000

04962019 REMOV STR (RAIL FOUNDATION) EA 96.00 195 200.00 35.00 350.00 10.00 350.00

04962024 REMOVE STR (ANCHOR LUG) EA 34.00 196 200.00 400.00 250.00 1050.00 800.00

04962043 REMOV STR (SMALL FENCE) LF 25.00 197 1.11 10.00 5.00 25.00 35.00

04962060 REMOV STR (BRIDGE SLAB) LF 170.00 198 100.00 200.00 70.00 48.00 150.00

04972001 SALV MATRL (CREDIT ITEM) LS 1.00 199 1.00 1.00 1.00 1.00 0.05

05002001 MOBILIZATION LS 1.00 200 15518000 16694000 16000000 14050000 21000000

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 43.00 201 15000.00 5000.00 12000.00 75000.00 12000.00

05062001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 50.00 202 20.00 21.00 35.00 18.10 14.50

05062009 ROCK FILTER DAMS (REMOVE) LF 50.00 203 7.00 7.00 10.00 8.60 7.75

05062016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 600.00 204 15.00 16.00 22.00 24.50 19.58

05062019 CONSTRUCTION EXITS (REMOVE) SY 600.00 205 5.00 6.00 4.00 7.70 7.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 15,924.00 206 2.00 3.00 3.00 1.50 4.50

05082002 CONSTRUCTING DETOURS SY 63,209.00 207 45.00 20.00 52.85 60.00 58.00

05122008 PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 40.00 208 29.42 25.00 46.74 51.00 54.00

05122009 PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 1,540.00 209 34.00 25.00 59.74 51.00 47.00

05122017 PORT CTB (DES SOURCE)(LOW PROF)(TY 1) LF 30,020.00 210 6.00 3.00 5.66 3.70 4.00

05122026 PORT CTB (MOVE)(LOW PROF)(TY 1) LF 112,280.00 211 4.00 3.00 4.18 2.15 3.00

05122027 PORT CTB (MOVE)(LOW PROF)(TY 2) LF 3,360.00 212 4.00 3.00 7.71 3.00 4.00

05122035 PORT CTB (STKPL)(LOW PROF)(TY 1) LF 30,020.00 213 6.00 3.00 6.17 4.00 4.00

05122036 PORT CTB (STKPL)(LOW PROF)(TY 2) LF 1,500.00 214 6.00 3.00 10.03 3.55 5.50

05122059 PORT CTB (DES SOURCE)(SNGL SLP)(TY J-J) LF 64,830.00 215 6.00 3.00 6.76 3.45 4.00

05122060 PORT CTB (MOVE)(SNGL SLP)(TY J-J) LF 118,260.00 216 4.00 3.00 5.12 2.20 4.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 46: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 10 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

05122061 PORT CTB (STKPL)(SNGL SLP)(TY J-J) LF 64,830.00 217 6.00 3.00 6.73 2.85 4.00

05142004 PERM CONC TRF BARR (SGL SLP)(TY 1)(42") LF 1,133.50 218 45.00 35.00 53.22 52.50 40.00

05142005 PERM CONC TRF BARR (SGL SLP)(TY 2)(42") LF 5,850.00 219 35.00 30.00 52.56 50.00 40.00

05142045 PERM CONC TRF BARR (SGL SLP)(J-J)(36") LF 26,550.00 220 35.00 25.00 55.47 43.50 48.00

05142057 PERM CONC TRF BAR (SGL SLP)(42IN)(SPL) LF 177.00 221 35.00 70.00 203.13 102.00 50.00

05282004 LANDSCAPE PAVERS SY 6,248.00 222 40.00 40.00 46.00 40.00 56.00

05292002 CONC CURB (TY II) LF 69.00 223 11.00 4.00 25.00 5.50 30.00

05292006 CONC CURB (MONO) (TY II) LF 43,072.00 224 2.00 4.00 2.80 2.65 4.00

05292007 CONC CURB (DOWEL) LF 19,437.00 225 4.60 7.00 8.50 5.50 8.00

05292009 CONCRETE CURB (SPECIAL) LF 1,059.00 226 10.00 40.00 55.00 23.00 14.00

05292013 CONC CURB (TY A)(BARRIER) LF 62.00 227 10.00 10.00 20.00 17.60 19.00

05292021 CONC CURB (DOWEL) (REINF) (TY II) LF 2,237.00 228 4.60 7.00 8.50 8.40 9.00

05292070 CONCRETE CURB (TYPE U-TURN)(SPECIAL) LF 2,645.00 229 20.00 35.00 21.00 15.80 28.00

05292071 CONC CURB (SLOTTED) LF 499.00 230 10.00 10.00 13.00 10.20 9.00

05302010 DRIVEWAYS (CONC) SY 6,794.00 231 60.00 45.00 68.00 33.50 55.00

05302011 DRIVEWAYS (ACP) SY 167.00 232 40.00 60.00 100.00 74.00 43.00

05312005 CURB RAMPS (TY 1) EA 20.00 233 1200.00 1000.00 1800.00 755.00 1200.00

05312006 CURB RAMPS (TY 2) EA 1.00 234 1200.00 1400.00 2200.00 920.00 1400.00

05312007 CURB RAMPS (TY 3) EA 1.00 235 1200.00 1700.00 1900.00 995.00 1400.00

05312008 CURB RAMPS (TY 4) EA 1.00 236 1200.00 1100.00 1900.00 1230.00 1400.00

05312010 CURB RAMPS (TY 7) EA 48.00 237 1200.00 1000.00 1900.00 1190.00 1200.00

05312012 CURB RAMPS (TY 9) EA 6.00 238 1200.00 800.00 1900.00 315.00 1200.00

05312014 CURB RAMPS (TY 22) EA 2.00 239 2000.00 2700.00 1700.00 672.00 1400.00

05312015 CONC SIDEWALKS (4") SY 15,699.00 240 35.00 45.00 35.00 43.50 28.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 47: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 11 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

05312017 CURB RAMPS (TY 21) EA 6.00 241 1200.00 1400.00 1500.00 325.00 1200.00

05312022 CURB RAMPS (TY 7)(MOD) EA 1.00 242 1200.00 1000.00 2500.00 1190.00 900.00

05312041 CURB RAMPS (TY 10) EA 9.00 243 1200.00 900.00 1900.00 1100.00 1500.00

05312046 CURB RAMPS (TY 11) EA 1.00 244 1200.00 2000.00 2400.00 1325.00 1400.00

05362003 CONC DIRECTIONAL ISLAND LF 605.00 245 30.00 20.00 35.00 15.25 15.00

05402001 MTL W-BEAM GD FEN (TIM POST) LF 538.00 246 20.00 39.50 22.13 20.00 19.50

05402005 TERMINAL ANCHOR SECTION EA 2.00 247 750.00 980.00 948.28 490.00 480.00

05402012 MTL BEAM GD FEN TRANS (TL2) EA 4.00 248 750.00 1440.00 737.55 645.00 640.00

05422001 REMOVING METAL BEAM GUARD FENCE LF 2,945.00 249 2.00 2.50 1.05 2.60 2.50

05422002 REMOVING TERMINAL ANCHOR SECTION EA 10.00 250 120.00 125.00 79.02 130.00 125.00

05442001 GUARDRAIL END TREATMENT (INSTALL) EA 6.00 251 1900.00 3075.00 2212.64 2100.00 2075.00

05442003 GUARDRAIL END TREATMENT (REMOVE) EA 11.00 252 800.00 270.00 158.05 275.00 270.00

05452001 CRASH CUSH ATTEN (INSTL) EA 63.00 253 15000.00 11400.00 15000.00 11500.00 11400.00

05452002 CRASH CUSH ATTEN (MOVE & RESET) EA 13.00 254 2500.00 1720.00 1500.00 1750.00 1720.00

05452003 CRASH CUSH ATTEN (REMOVE) EA 37.00 255 1000.00 915.00 800.00 920.00 915.00

05452058 CRASH CUSH ATTEN (INSTL) (N) EA 1.00 256 15000.00 12500.00 12000.00 12600.00 12500.00

05452061 CRASH CUSH ATTEN (INSTL) (W) EA 2.00 257 25000.00 21200.00 20000.00 21500.00 21200.00

05502001 CHAIN LINK FENCE (INSTALL) (6') LF 469.00 258 15.00 35.00 15.80 21.50 21.00

05502033 GATE (INSTALL) (DOUBLE) (6'X 34.60') EA 1.00 259 1500.00 2000.00 1264.37 3500.00 3425.00

06102041 INS RD IL AM (TY SA) 50T-12-12(.4 KW)S EA 1.00 260 3200.00 3875.29 4083.15 3900.00 3875.00

06102062 INS RD IL AM (U/P) (TY 1) (.25KW)S EA 3.00 261 1100.00 1501.08 1581.59 1550.00 1500.00

06102072 REMOVE RDWY ILL ASSEM EA 10.00 262 200.00 200.92 211.70 210.00 201.00

06102101 INS RD IL AM (U/P)(TY 2)(.25 KW) S EA 1.00 263 1200.00 2950.01 3108.24 3000.00 2950.00

06132008 HI MST IL POLE (175 FT) (100 MPH) EA 33.00 264 35500.00 34120.58 35950.73 35000.00 34120.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 48: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 12 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

06142001 HI MST IL ASM(12-400 WATT)(ASYM)(TY A) EA 4.00 265 23275.00 23107.82 24347.27 24000.00 23108.00

06142002 HI MST IL ASM(12-400 WATT)(ASYM)(TY B) EA 17.00 266 24225.00 23506.84 24767.69 24000.00 23507.00

06142003 HI MST IL ASM(12-400 WATT)(ASYM)(TY C) EA 5.00 267 23600.00 23080.71 24318.70 24000.00 23080.00

06142004 HI MST IL ASM(12-400 WATT)(SYM) EA 7.00 268 23600.00 23506.84 24767.69 24000.00 23506.00

06182018 CONDT (PVC) (SCHD 40) ( 2") LF 3,521.00 269 8.00 5.59 5.89 5.60 5.59

06182019 CONDT (PVC) (SCHD 40) (2") (BORE) LF 794.00 270 12.60 31.93 33.64 32.00 31.90

06182022 CONDT (PVC) (SCHD 40) (3") LF 33,390.00 271 6.00 5.62 5.92 5.70 5.65

06182023 CONDT (PVC) (SCHD 40) (3") (BORE) LF 7,400.00 272 16.00 11.57 12.19 11.60 11.60

06182032 CONDT (PVC) (SCHD 80) (1 1/4") LF 1,708.00 273 4.00 5.89 6.21 6.00 5.90

06182034 CONDT (PVC) (SCHD 80) (2") LF 54,519.00 274 5.00 5.80 6.11 6.00 5.80

06182035 CONDT (PVC) (SCHD 80) (2") (BORE) LF 5,188.00 275 11.00 11.53 12.15 11.60 11.50

06182038 CONDT (PVC) (SCHD 80) (3") LF 968.00 276 7.75 6.66 7.02 6.70 7.00

06182039 CONDT (PVC) (SCHD 80) (3") (BORE) LF 1,083.00 277 12.00 12.42 13.09 12.50 12.50

06182040 CONDT (PVC) (SCHD 80) (4") LF 1,987.00 278 12.00 9.60 10.11 9.70 9.60

06182041 CONDT (PVC) (SCHD 80) (4") (BORE) LF 184.00 279 14.00 12.83 13.52 13.00 13.00

06182044 CONDT (RM) (3/4") LF 212.00 280 8.50 9.07 9.56 9.50 9.00

06182046 CONDT (RM) (1") LF 3,660.00 281 10.00 8.04 8.47 8.50 8.00

06182048 CONDT (RM) (1 1/4") LF 750.00 282 12.00 10.07 10.61 10.50 10.00

06182052 CONDT (RM) (2") LF 4,743.00 283 14.50 10.56 11.13 11.00 11.00

06182056 CONDT (RM) (3") LF 26,213.00 284 22.50 19.81 20.87 20.00 20.00

06182060 CONDT (RM) (4") LF 914.00 285 40.00 26.61 28.04 27.00 26.00

06202001 ELEC CONDR (NO. 1) BARE LF 1,175.00 286 2.00 2.25 2.37 2.30 2.25

06202004 ELEC CONDR (NO. 2) INSULATED LF 5,280.00 287 1.58 2.14 2.25 2.15 2.00

06202007 ELEC CONDR (NO. 4) BARE LF 11,241.00 288 1.15 1.40 1.48 1.45 1.50

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 49: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 13 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

06202008 ELEC CONDR (NO. 4) INSULATED LF 28,242.00 289 1.30 1.56 1.64 1.60 1.60

06202009 ELEC CONDR (NO. 6) BARE LF 21,615.00 290 0.90 0.90 0.95 0.92 0.90

06202010 ELEC CONDR (NO. 6) INSULATED LF 24,126.00 291 1.00 1.01 1.06 1.05 1.00

06202011 ELEC CONDR (NO. 8) BARE LF 18,389.00 292 0.90 0.70 0.74 0.72 0.70

06202012 ELEC CONDR (NO. 8) INSULATED LF 49,946.00 293 0.80 0.79 0.83 0.80 0.80

06202015 ELEC CONDR (NO.12) BARE LF 5,680.00 294 0.75 0.52 0.55 0.54 0.50

06202016 ELEC CONDR (NO.12) INSULATED LF 15,788.00 295 0.85 0.56 0.59 0.57 0.60

06202018 ELEC CONDR (NO.14) INSULATED LF 27,570.00 296 0.60 0.49 0.52 0.50 0.50

06202020 ELEC CONDR (NO.1/0) INSULATED LF 138.00 297 3.00 3.39 3.57 3.40 3.40

06202022 ELEC CONDR (NO.2/0) INSULATED LF 3,525.00 298 3.00 3.91 4.12 4.00 4.00

06242002 GROUND BOX TY 1 (122422) W/APRON EA 16.00 299 1257.00 824.04 868.24 825.00 825.00

06242003 GROUND BOX TY 2 (243636) EA 2.00 300 575.00 807.27 850.57 810.00 810.00

06242004 GROUND BOX TY 2 (243636) W/APRON EA 121.00 301 1240.00 1050.09 1106.41 1100.00 1050.00

06242013 GROUND BOX TY D (162922) EA 32.00 302 480.00 333.02 350.88 335.00 335.00

06242014 GROUND BOX TY D (162922) W/APRON EA 228.00 303 532.00 569.91 600.48 570.00 570.00

06282006 ELC SRV TY A 120/240 060 (SS)SS(E)GC(U) EA 2.00 304 3600.00 3680.96 3878.40 3700.00 3700.00

06282039 ELC SRV TY A 240/480 100 (SS)SS(E)GC(U) EA 8.00 305 4950.00 4094.94 4314.58 4100.00 4100.00

06282100 ELC SRV TY D 120/240 070 (NS)SS(E)SP(O) EA 3.00 306 3415.00 2283.06 2405.52 2300.00 2300.00

06282125 ELC SRV TY D 120/240 100 (NS)SS(N)SP(O) EA 2.00 307 1986.00 2178.28 2295.12 2200.00 2200.00

06282158 REMOVE ELECTRICAL SERVICES EA 10.00 308 250.00 97.46 102.69 100.00 100.00

06282172 ELC SRV TY D 120/240 060 (NS)SS(E)SP(0) EA 1.00 309 2700.00 2138.03 2252.71 2200.00 2200.00

06282354 ELC SRV TY A 240/480 125 (SS)SS(E)GC(U) EA 2.00 310 2000.00 3341.72 3520.96 3400.00 3350.00

06362001 ALUMINUM SIGNS (TY A) SF 238.00 311 25.00 16.75 17.65 27.00 16.75

06362002 ALUMINUM SIGNS (TY G) SF 1,064.50 312 21.00 19.22 20.25 19.00 19.22

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 50: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 14 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

06362003 ALUMINUM SIGNS (TY O) SF 6,818.50 313 20.00 16.19 17.06 17.00 16.19

06442001 INS SM RD SN SUP&AM TY 10BWG(1) SA(P) EA 119.00 314 331.00 370.00 326.63 385.00 370.00

06442004 INS SM RD SN SUP&AM TY 10BWG(1) SA(T) EA 116.00 315 464.00 560.00 474.14 575.00 560.00

06442025 INS SM RD SN SUP&AM TY S80(1) SA(T) EA 16.00 316 590.00 860.00 948.27 1050.00 860.00

06442027 INS SM RD SN SUP&AM TY S80(1) SA(U) EA 27.00 317 586.00 860.00 737.55 735.00 860.00

06442031 INS SM RD SN SUP&AM TY S80(1) SA(U-WC) EA 2.00 318 600.00 880.00 2107.28 865.00 880.00

06442043 INS SM RD SN SUP&AM TY S80(2)SA(P-EXAL) EA 3.00 319 1300.00 1560.00 1011.49 1550.00 1560.00

06442060 REMOVE SM RD SN SUP & AM EA 70.00 320 55.00 45.00 56.90 88.00 45.00

06472001 INSTALL LRSS (STRUCT STEEL) LB 6,352.86 321 3.75 3.85 4.06 3.90 3.85

06472002 RELOCATE LRSA EA 12.00 322 777.00 2934.74 3092.15 3000.00 2935.00

06472003 REMOVE LRSA EA 11.00 323 197.00 545.23 574.47 560.00 545.00

06502028 INS OH SN SUP(30 FT CANT) EA 1.00 324 13568.00 18842.31 19852.97 19000.00 18845.00

06502030 INS OH SN SUP(30 FT CANT)(SPAN ONLY) EA 1.00 325 10112.00 20645.01 21752.36 21000.00 20645.00

06502036 INS OH SN SUP(35 FT CANT)(SPAN ONLY) EA 1.00 326 11665.00 24943.52 26281.43 30000.00 25000.00

06502040 INS OH SN SUP(40 FT CANT) EA 1.00 327 15000.00 10973.26 11561.84 11000.00 11000.00

06502043 INS OH SN SUP(40 FT BRDG) EA 1.00 328 21000.00 16354.79 17232.02 16500.00 16500.00

06502063 INS OH SN SUP(60 FT BRDG) EA 1.00 329 21525.00 25932.48 27323.44 26000.00 25950.00

06502065 INS OH SN SUP(60 FT BRDG)(SPAN ONLY) EA 1.00 330 22000.00 16864.54 17769.11 17000.00 16900.00

06502070 INS OH SN SUP(65 FT BRDG)(SPAN ONLY) EA 1.00 331 24000.00 18331.88 19315.16 18500.00 18500.00

06502080 INS OH SN SUP(75 FT BRDG)(SPAN ONLY) EA 1.00 332 26000.00 20111.14 21189.85 21000.00 20100.00

06502083 INS OH SN SUP(80 FT BRDG) EA 1.00 333 46000.00 34472.01 36321.01 34500.00 34500.00

06502085 INS OH SN SUP(80 FT BRDG)(SPAN ONLY) EA 1.00 334 26000.00 22162.95 23351.72 22500.00 23000.00

06502095 INS OH SN SUP(90 FT BRDG)(SPAN ONLY) EA 1.00 335 30000.00 26889.84 28332.15 27000.00 27000.00

06502105 INS OH SN SUP(100 FT BRDG)(SPAN ONLY) EA 2.00 336 38000.00 29964.91 31572.16 30000.00 30000.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 51: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 15 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

06502110 INS OH SN SUP(105 FT BRDG)(SPAN ONLY) EA 1.00 337 39000.00 33420.70 35213.31 33500.00 33500.00

06502173 REMOVE OVERHD SIGN SUP EA 6.00 338 4000.00 3825.81 4031.02 3850.00 3900.00

06582237 INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF EA 153.00 339 15.00 47.00 67.43 65.00 47.00

06582258 INSTL DEL ASSM (D-SW)SZ (TYC)CTB EA 553.00 340 5.00 17.25 4.21 11.50 17.25

06582267 INSTL DEL ASSM (D-SY)SZ 1(FLX)SRF EA 52.00 341 15.00 47.00 67.43 65.00 47.00

06582277 INSTL DEL ASSM (D-SY)SZ (TYC)CTB EA 411.00 342 5.00 17.25 4.21 11.50 17.25

06582278 INSTL DEL ASSM (D-SY)SZ (TYC)CTB(BI) EA 94.00 343 15.00 17.25 6.32 11.50 17.25

06622001 WK ZN PAV MRK NON-REMOV (W) 4" (BRK) LF 13,369.00 344 0.17 0.25 0.30 1.10 0.88

06622004 WK ZN PAV MRK NON-REMOV (W) 4" (SLD) LF 32,549.00 345 0.14 0.25 0.29 1.00 0.79

06622012 WK ZN PAV MRK NON-REMOV (W) 8" (SLD) LF 2,107.00 346 0.27 0.50 0.57 1.50 1.20

06622014 WK ZN PAV MRK NON-REMOV (W) 12" (SLD) LF 207.00 347 0.80 2.00 0.91 4.00 3.17

06622016 WK ZN PAV MRK NON-REMOV (W) 24" (SLD) LF 56.00 348 2.00 2.00 1.62 5.65 4.52

06622032 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 36,034.00 349 0.16 0.25 0.31 1.00 0.79

06622056 WK ZN PAV MRK REMOV (REFL) TY II-C-R EA 6,771.00 350 5.00 5.00 3.02 4.90 3.92

06622064 WK ZN PAV MRK REMOV (W) 4" (BRK) LF 52,591.00 351 0.50 0.60 0.72 1.70 1.11

06622065 WK ZN PAV MRK REMOV (W) 4" (DOT) LF 29,513.00 352 0.70 0.49 1.51 1.75 1.38

06622067 WK ZN PAV MRK REMOV (W) 4" (SLD) LF 161,587.00 353 0.60 0.45 0.67 1.02 0.66

06622073 WK ZN PAV MRK REMOV (W) 8" (DOT) LF 2,490.00 354 1.40 0.90 3.02 2.08 1.66

06622075 WK ZN PAV MRK REMOV (W) 8" (SLD) LF 10,898.00 355 1.20 0.90 1.19 2.00 1.58

06622077 WK ZN PAV MRK REMOV (W) 12" (SLD) LF 731.00 356 2.67 5.00 1.62 3.30 2.63

06622079 WK ZN PAV MRK REMOV (W) 24" (SLD) LF 719.00 357 2.00 10.00 3.24 4.75 3.80

06622084 WK ZN PAV MRK REMOV (W) (ARROW) EA 35.00 358 200.00 175.00 248.36 285.00 225.63

06622086 WK ZN PAV MRK REMOV (W) (ENTR GORE) EA 38.00 359 350.00 600.00 356.35 445.00 354.61

06622087 WK ZN PAV MRK REMOV (W) (EXIT GORE) EA 38.00 360 500.00 600.00 874.67 755.00 601.12

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 52: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 16 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

06622091 WK ZN PAV MRK REMOV (W) (SYMBOL) EA 3.00 361 500.00 200.00 377.94 580.00 463.09

06622094 WK ZN PAV MRK REMOV (W) (WORD) EA 35.00 362 250.00 185.00 215.97 405.00 323.80

06622099 WK ZN PAV MRK REMOV (Y) 4" (SLD) LF 161,197.00 363 0.55 0.45 0.67 1.15 0.73

06662183 REF PAV MRK TY II (Y) 12" (SLD) LF 1,880.00 364 0.60 2.00 0.64 0.82 0.80

06662188 REF PAV MRK TY II (Y) (MED NOSE) EA 1.00 365 100.00 100.00 140.38 87.00 86.26

06682106 PREFAB PAV MRK TY C (W) (ARROW) EA 71.00 366 185.00 150.00 248.36 190.00 188.35

06682107 PREFAB PAV MRK TY C (W) (DBL ARROW) EA 20.00 367 260.00 175.00 323.95 303.00 302.24

06682113 PREFAB PAV MRK TY C (W) (SYMBOL) EA 28.00 368 102.00 185.00 194.37 142.00 141.33

06682115 PREFAB PAV MRK TY C (W) (UTURN ARROW) EA 3.00 369 300.00 185.00 323.95 315.00 314.05

06682116 PREFAB PAV MRK TY C (W) (WORD) EA 73.00 370 280.00 185.00 431.94 260.00 257.10

06682131 PREFAB PAV MRK TY C (W) (BIKE ARROW) EA 2.00 371 120.00 85.00 92.87 132.00 131.97

06682132 PREFAB PAV MRK TY C (W) (BIKE SYMBOL) EA 2.00 372 165.00 85.00 118.78 160.00 159.88

06682136 PREFAB PAV MRK (TY C)(MULTI)(SHIELD) EA 13.00 373 1300.00 1600.00 1619.76 1850.00 1813.14

06682145 PREFAB PAV MRK TY C (W) (NUMBER) EA 4.00 374 130.00 175.00 118.78 85.00 83.55

06682147 PREFAB PAV MRK TY C(W)(U/LT TRN ARROW) EA 6.00 375 350.00 185.00 205.17 365.00 363.56

06722012 REFL PAV MRKR TY I-C EA 26.00 376 3.00 5.00 3.35 3.30 3.26

06722015 REFL PAV MRKR TY II-A-A EA 30.00 377 2.65 5.00 3.35 3.30 3.27

06722017 REFL PAV MRKR TY II-C-R EA 3,680.00 378 3.60 5.00 3.35 3.30 3.27

06722029 REFL PAV MRKR TY II-A-A (CALL OUT) EA 47.00 379 3.00 10.00 3.35 21.00 20.00

06772001 ELIM EXT PAV MRK & MRKS ( 4") LF 75,294.00 380 0.35 0.25 0.37 0.30 0.29

06772002 ELIM EXT PAV MRK & MRKS ( 6") LF 11,935.00 381 0.40 0.40 0.40 0.30 0.29

06772003 ELIM EXT PAV MRK & MRKS ( 8") LF 3,815.00 382 0.56 0.50 0.45 0.50 0.47

06772005 ELIM EXT PAV MRK & MRKS (12") LF 195.00 383 0.65 1.00 0.60 0.63 0.61

06772007 ELIM EXT PAV MRK & MRKS (24") LF 555.00 384 1.00 2.00 0.91 2.20 2.15

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 53: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 17 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

06772008 ELIM EXT PAV MRK & MRKS (ARROW) EA 13.00 385 30.00 25.00 45.35 84.00 83.64

06772009 ELIM EXT PAV MRK & MRKS (DBL ARROW) EA 2.00 386 40.00 35.00 60.48 105.00 104.54

06772010 ELIM EXT PAV MRK & MRKS (ENTR GORE) EA 2.00 387 150.00 200.00 118.78 175.00 174.83

06772011 ELIM EXT PAV MRK & MRKS (EXIT GORE) EA 4.00 388 200.00 200.00 118.78 175.00 174.47

06772015 ELIM EXT PAV MRK & MRKS (SYMBOL) EA 6.00 389 35.00 100.00 60.47 70.00 69.71

06772018 ELIM EXT PAV MRK & MRKS (WORD) EA 18.00 390 40.00 35.00 60.47 70.00 69.71

06772022 ELIM EXT PAV MRK & MRKS ( 9") LF 3,784.00 391 0.60 0.55 0.52 0.50 0.47

06782001 PAV SURF PREP FOR MRK ( 4") LF 379,949.00 392 0.01 0.01 0.03 0.11 0.10

06782002 PAV SURF PREP FOR MRK ( 6") LF 124,216.00 393 0.02 0.01 0.05 0.13 0.12

06782003 PAV SURF PREP FOR MRK ( 8") LF 34,392.00 394 0.04 0.02 0.11 0.13 0.12

06782004 PAV SURF PREP FOR MRK (12") LF 37,376.00 395 0.11 0.03 0.14 0.27 0.26

06782006 PAV SURF PREP FOR MRK (24") LF 1,920.00 396 0.20 0.06 0.29 0.32 0.31

06782007 PAV SURF PREP FOR MRK (ARROW) EA 92.00 397 6.00 1.00 7.23 30.00 29.75

06782008 PAV SURF PREP FOR MRK (DBL ARROW) EA 16.00 398 8.00 2.00 9.07 34.00 33.47

06782009 PAV SURF PREP FOR MRK (ENTR GORE) EA 38.00 399 50.00 5.00 118.78 150.00 147.54

06782010 PAV SURF PREP FOR MRK (EXIT GORE) EA 38.00 400 85.00 5.00 183.57 150.00 147.54

06782012 PAV SURF PREP FOR MRK (MED NOSE) EA 1.00 401 30.00 5.00 14.03 32.00 31.70

06782013 PAV SURF PREP FOR MRK (RPM) EA 4,035.00 402 1.50 1.00 0.49 0.33 0.31

06782015 PAV SURF PREP FOR MRK (SYMBOL) EA 28.00 403 0.10 1.00 7.23 39.00 38.24

06782016 PAV SURF PREP FOR MRK (UTURN ARR) EA 2.00 404 25.00 3.00 7.24 34.00 33.74

06782018 PAV SURF PREP FOR MRK (WORD) EA 93.00 405 6.00 5.00 7.23 30.00 29.75

06782025 PAV SURF PREP FOR MRKS (SHIELD) EA 12.00 406 50.00 10.00 72.35 90.00 89.17

06782044 PAV SURF PREP FOR MRK (NUMBER) EA 1.00 407 6.40 1.00 7.24 33.50 33.48

06782045 PAV SURF PREP FOR MRK (BIKE SYMBOL) EA 2.00 408 15.00 1.00 7.24 27.00 26.79

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 54: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 18 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

06782047 PAV SURF PREP FOR MRK (BIKE ARROW) EA 2.00 409 17.00 1.00 7.24 13.50 13.41

06782048 PAV SURF PREP FOR MRK (U/LT ARROW) EA 6.00 410 6.00 5.00 7.24 39.00 38.19

06802002 INSTALL HWY TRF SIG (ISOLATED) EA 3.00 411 16631.81 3649.83 3845.60 3700.00 3700.00

06802003 INSTALL HWY TRF SIG (SYSTEM) EA 5.00 412 12530.00 4024.93 4200.00 4100.00 4100.00

06812001 TEMP TRAF SIGNALS EA 5.00 413 20075.00 18657.30 20000.00 19000.00 19000.00

06822001 BACK PLATE (12 IN) (3 SEC) EA 68.00 414 74.00 68.57 72.25 70.00 70.00

06822002 BACK PLATE (12 IN) (4 SEC) EA 9.00 415 87.00 88.57 93.32 90.00 70.00

06822012 LOUVER (12 IN) (ADJUSTABLE) EA 4.00 416 168.11 248.58 261.91 250.00 250.00

06822021 VEH SIG SEC (12 IN) LED (HOUSING ONLY) EA 50.00 417 100.00 101.10 106.52 105.00 101.00

06822022 VEH SIG SEC (12 IN) LED (GRN ARW) EA 9.00 418 170.00 168.61 177.65 170.00 170.00

06822023 VEH SIG SEC (12 IN) LED (GRN) EA 68.00 419 174.00 175.51 184.92 180.00 175.00

06822024 VEH SIG SEC (12 IN) LED (YEL ARW) EA 9.00 420 168.00 157.11 165.54 160.00 160.00

06822025 VEH SIG SEC (12 IN) LED (YEL) EA 68.00 421 179.00 175.51 184.92 180.00 175.00

06822026 VEH SIG SEC (12 IN) LED (RED ARW) EA 22.00 422 275.00 165.34 174.21 170.00 165.00

06822027 VEH SIG SEC (12 IN) LED (RED) EA 68.00 423 151.00 159.42 167.97 160.00 160.00

06822043 PED SIG SEC (12")(2 IND)(HOUSING ONLY) EA 16.00 424 220.00 227.50 239.70 230.00 230.00

06822044 PED SIG SEC (12IN)(2 INDICAT IN 1 SEC) EA 8.00 425 400.00 333.47 351.36 335.00 340.00

06842007 TRF SIG CBL (TY A) (12 AWG) ( 2 CONDR) LF 7,011.00 426 0.95 1.47 1.55 1.50 1.50

06842009 TRF SIG CBL (TY A) (12 AWG) ( 4 CONDR) LF 7,066.00 427 1.40 1.80 1.90 1.90 1.80

06842012 TRF SIG CBL (TY A) (12 AWG) ( 7 CONDR) LF 10,609.00 428 1.75 2.00 2.11 2.10 2.00

06842028 TRF SIG CBL (TY A) (14 AWG) ( 2 CONDR) LF 3,890.00 429 1.00 1.06 1.12 1.10 1.10

06842030 TRF SIG CBL (TY A) (14 AWG) ( 4 CONDR) LF 8,200.00 430 1.10 1.54 1.62 1.60 1.55

06842033 TRF SIG CBL (TY A) (14 AWG) ( 7 CONDR) LF 10,064.00 431 1.25 1.87 1.97 1.90 1.90

06842080 TRF SIG CBL (TY C) (14 AWG) ( 2 CONDR) LF 11,553.00 432 0.65 1.39 1.46 1.40 1.40

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 55: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 19 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

06862031 INS TRF SIG PL AM(S) 1 ARM (32') EA 1.00 433 4550.00 5354.39 5641.59 5400.00 5400.00

06862035 INS TRF SIG PL AM(S) 1 ARM (36') EA 4.00 434 4865.00 5974.21 6294.65 6000.00 6000.00

06862039 INS TRF SIG PL AM(S) 1 ARM (40') EA 2.00 435 5000.00 6585.99 6939.25 6600.00 6500.00

06862043 INS TRF SIG PL AM(S) 1 ARM (44') EA 1.00 436 5300.00 6973.52 7347.56 7000.00 7000.00

06862103 INS TRF SIG PL AM(S) 2 ARM (32-32') EA 1.00 437 4530.00 8324.76 8771.28 8400.00 8400.00

06862139 INS TRF SIG PL AM(S) 2 ARM (40-32') EA 1.00 438 5300.00 9540.26 10051.98 9600.00 9500.00

06862155 INS TRF SIG PL AM(S) 2 ARM (44-28') EA 2.00 439 5500.00 9475.86 9984.13 9500.00 9500.00

06862159 INS TRF SIG PL AM(S) 2 ARM (44-32') EA 1.00 440 6130.00 9877.19 10406.98 9900.00 9900.00

06862163 INS TRF SIG PL AM(S) 2 ARM (44-36') EA 1.00 441 6400.00 10168.13 10713.52 10200.00 10200.00

06862171 INS TRF SIG PL AM(S) 2 ARM (50-24') EA 2.00 442 11750.00 14421.79 15195.34 14500.00 14500.00

06862175 INS TRF SIG PL AM(S) 2 ARM (50-28') EA 1.00 443 6000.00 14519.53 15298.32 14600.00 14500.00

06862183 INS TRF SIG PL AM(S) 2 ARM (50-36') EA 1.00 444 7980.00 15000.22 15804.80 15500.00 15000.00

06872001 PED POLE ASSEMBLY EA 29.00 445 1170.00 1157.40 1219.48 1160.00 1200.00

06882001 PED DETECT (2 INCH PUSH BTN) EA 51.00 446 155.00 90.20 95.04 91.00 91.00

06882002 VEH LP DETECT (SAWCUT) LF 8,217.00 447 7.00 6.97 7.34 7.00 7.00

07302113 FULL-WIDTH MOWING CYC 11.00 448 2000.00 1900.00 5000.00 4600.00 3700.00

07342002 LITTER REMOVAL CYC 11.00 449 1000.00 1400.00 1900.00 2350.00 3000.00

07352001 DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES) CYC 43.00 450 1000.00 2400.00 2000.00 1275.00 1700.00

07352003 DEBRIS REMOVAL (FRONTAGE ROADS) CYC 43.00 451 1000.00 1300.00 1500.00 1275.00 1700.00

07352005 DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS) CYC 43.00 452 1000.00 1200.00 1000.00 635.00 1200.00

07382001 CLEANING/SWEEPING (CENTER MEDIAN) CYC 43.00 453 500.00 1500.00 2200.00 1580.00 1800.00

07382003 CLEANING/SWEEPING (OUTSIDE MAIN LANE) CYC 43.00 454 500.00 1500.00 2200.00 1580.00 1800.00

07382005 CLEANING/SWEEPING (FRONTAGE ROAD) CYC 43.00 455 500.00 1500.00 2000.00 1480.00 1800.00

07382007 CLEANING/SWEEPING (ENTRANCE/EXIT RAMP) CYC 43.00 456 500.00 800.00 2000.00 945.00 1000.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 56: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 20 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

10092003 LANDSCAPE SOIL AMENDMENT (TYPE II) SY 23,336.00 457 0.15 0.10 0.12 0.12 0.11

10162001 LOOSE AGGREGATE FOR GROUNDCOVER (TY I) CY 338.00 458 60.00 60.00 55.00 49.00 50.00

30062001 FIXED BOLLARDS EA 2.00 459 300.00 100.00 1300.00 545.00 1500.00

30612001 FAST TRK CONC (CNT RNF HY STL)(12") SY 8,188.00 460 60.00 30.00 62.00 107.00 55.00

30612004 FAST TRK CONC(CONT REINF HY STL)(13") SY 14,076.00 461 60.00 35.00 65.00 99.00 70.00

40222002 INTRLOCK ARTICULATING CONC BLKS(6" MIN) SF 220,908.00 462 4.00 5.00 4.75 3.60 8.00

41162001 SOIL NAIL ANCHORS LF 59,404.00 463 10.50 10.00 18.20 15.00 18.00

41782003 HLMR BEARING (F-2000) EA 2.00 464 11000.00 5000.00 13000.00 12500.00 6000.00

41782004 HLMR BEARING (GE-1000) EA 4.00 465 11000.00 5000.00 13200.00 6000.00 6500.00

41782005 HLMR BEARING (GE-500) EA 6.00 466 11000.00 5000.00 5800.00 5500.00 5000.00

41782006 HLMR BEARING (E-1500) EA 6.00 467 11000.00 5000.00 13100.00 12500.00 5500.00

41782007 HLMR BEARING (E-2000) EA 2.00 468 11000.00 5000.00 13100.00 12500.00 6000.00

41832001 BRICK PLUGS EA 22.00 469 1000.00 300.00 450.00 404.00 600.00

45212001 TRENCH DRAIN LF 65.00 470 230.00 200.00 365.00 515.00 250.00

50492001 BIODGRD EROSION CONTROL LOGS (8" DIA) LF 1,223.00 471 3.00 5.00 2.25 2.45 1.95

50502001 CONC TRAF BAR CONNECT HDWDR (PORT) EA 1,501.00 472 30.00 10.00 21.41 44.00 46.00

54572002 WATER MAIN PIPE (PVC)(6IN) LF 112.00 473 35.00 30.00 135.11 125.00 45.00

54572003 WATER MAIN PIPE (PVC)(16IN) LF 280.00 474 65.00 80.00 248.07 225.00 125.00

54572005 CASING (STEEL)(18IN) LF 126.00 475 75.00 60.00 245.86 225.00 165.00

54572008 JCK TUN BOR OR AUG CSG(STL)(18IN) LF 94.00 476 180.00 240.00 328.92 300.00 140.00

54572011 JCK TUN BOR OR AUG WTR MAIN(PVC)(12IN) LF 117.00 477 70.00 180.00 249.18 227.00 90.00

54572014 CUT AND PLUG WATER MAIN (16IN) EA 2.00 478 850.00 5000.00 6423.29 5900.00 8000.00

54572017 WET CONNECTION (16IN) EA 2.00 479 2000.00 6000.00 6644.78 6100.00 1500.00

54572020 WATER MAIN PIPE (PVC)(8IN) LF 930.00 480 40.00 40.00 181.62 165.00 40.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 57: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 21 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

54572022 WATER MAIN PIPE (DI)(8IN) LF 498.00 481 60.00 110.00 209.31 190.00 80.00

54572023 FIRE HYDRANT EA 27.00 482 2500.00 2500.00 7198.51 6600.00 4500.00

54572025 CUT AND PLUG WATER MAIN (6IN) EA 4.00 483 450.00 900.00 1107.46 1050.00 900.00

54572026 CUT AND PLUG WATER MAIN (8IN) EA 13.00 484 500.00 1000.00 1439.70 1350.00 6500.00

54572027 CUT AND PLUG WATER MAIN (12IN) EA 6.00 485 500.00 2400.00 1882.69 1750.00 7000.00

54572028 GATE VALVE (6IN) EA 16.00 486 1000.00 1000.00 1218.21 1120.00 800.00

54572029 GATE VALVE (8IN) EA 9.00 487 1500.00 1500.00 1771.94 1620.00 1200.00

54572030 GATE VALVE (12IN) EA 9.00 488 2500.00 2000.00 3211.65 2950.00 2000.00

54572032 SERV LINE(SHORT SIDE)(5/8IN TO 1IN) EA 2.00 489 2000.00 2000.00 3322.40 3100.00 900.00

54572035 WET CONNECTION (8IN) EA 17.00 490 1000.00 2700.00 2214.93 2025.00 1000.00

54572036 WET CONNECTION (12IN) EA 6.00 491 1500.00 4600.00 3322.39 3100.00 1000.00

54572047 TAPPIND SLEEVE AND VALVE(12IN X 6IN) EA 3.00 492 3500.00 3000.00 6091.05 5600.00 4000.00

54572048 TAPPING SLEEVE AND VALVE(12IN X 8IN) EA 1.00 493 4000.00 3000.00 6312.54 5800.00 4500.00

54572052 WATER MAIN PIPE(DI)(12IN) LF 597.00 494 75.00 110.00 283.51 260.00 100.00

54572053 TAPPING SLEEVE AND VALVE(24IN X 12IN) EA 1.00 495 14000.00 4600.00 18273.15 17000.00 8000.00

54572055 REMOVING FIRE HYDRANT EA 25.00 496 245.00 300.00 332.24 310.00 600.00

54572079 EXTRA HAND EXCAVATION CY 233.00 497 150.00 130.00 53.16 49.00 120.00

54572086 JCK TUN BOR OR AUG CSG(STL)(16IN) LF 482.00 498 180.00 200.00 271.33 250.00 400.00

54572090 TAPPING SLEEVE AND VALVE(8INX6IN) EA 1.00 499 3000.00 2600.00 4208.37 3850.00 4000.00

54572093 JK TUN BOR OR AUG(WTR MAIN)(DI)(8IN) LF 537.00 500 75.00 200.00 217.06 200.00 100.00

54572094 CASING (STEEL)(20IN) LF 690.00 501 80.00 120.00 249.18 226.00 150.00

54572116 WATER MAIN PIPE (PVC)(12IN)(C-900) LF 4,652.00 502 55.00 50.00 165.01 150.00 45.00

54572119 JCK TUN BOR OR AUG CSNG(STEEL)(36IN) LF 120.00 503 250.00 300.00 708.78 645.00 600.00

54572134 JCK TUN BOR OR AUG CSG (STL)(30IN) LF 241.00 504 200.00 300.00 462.92 420.00 650.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 58: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 22 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

54572136 WATER MAIN PIPE (DI) (24IN) LF 172.00 505 100.00 200.00 510.54 465.00 250.00

54572137 CUT AND PLUG WATER MAIN (24IN) EA 2.00 506 1000.00 3500.00 7309.27 6700.00 6000.00

54572138 WET CONNECTION (24IN) EA 2.00 507 3000.00 8500.00 12957.33 12000.00 5000.00

58932001 ABANDON SANITARY SEWER (6IN) EA 3.00 508 500.00 1700.00 2657.91 2500.00 1200.00

58932002 ABANDON SANITARY SEWER (8IN) EA 8.00 509 600.00 1700.00 3100.90 2900.00 1200.00

58932003 ABANDON SANITARY SEWER (12IN) EA 1.00 510 800.00 2400.00 11185.39 10200.00 1500.00

58932004 ABANDON SANITARY SEWER (10IN) EA 1.00 511 700.00 2300.00 4651.35 4300.00 1200.00

58932006 MANHOLES (SANITARY SEWER)(TY 1) EA 4.00 512 5000.00 4200.00 4651.35 4300.00 4000.00

58932011 SANITARY SEWER (8 IN)(PVC)(SDR-26) LF 590.00 513 50.00 40.00 114.07 105.00 75.00

58932012 SANITARY SEWER (8 IN)(DI) LF 78.00 514 80.00 50.00 152.83 140.00 100.00

60072001 REMOVING TRAFFIC SIGNALS EA 10.00 515 2055.00 1665.70 1755.04 1700.00 10000.00

60082001 SHIFT OVERHEAD SIGN PANELS EA 5.00 516 1591.00 862.68 908.95 865.00 900.00

60082002 REMOVE OVERHEAD SIGN PANELS EA 3.00 517 493.43 862.68 908.95 865.00 900.00

60102031 COMM CABLE (22 AWG)(6 PAIR) LF 32,603.00 518 3.68 1.25 1.32 1.30 1.25

60142010 FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER) LF 12,347.00 519 4.81 0.78 0.82 0.80 0.80

60142017 FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER) LF 60,414.00 520 1.69 1.76 1.85 1.80 1.80

60142053 FIBER OPTIC CBL SPLICE (SNGLE-MODE) LF 3,738.00 521 4.00 0.62 0.65 0.65 0.65

60142054 FIBER OPTIC PATCH PANEL (144 POSITION) EA 13.00 522 5000.00 1740.39 1833.74 1750.00 1750.00

61222004 RELOCATE HIGH MAST LIGHTING (175 FT) EA 3.00 523 10000.00 10874.03 11457.29 11000.00 11000.00

62662001 VIVDS PROCESSOR SYSTEM EA 3.00 524 6200.00 8123.73 8559.47 8200.00 8200.00

62662002 VIVDS CAMERA ASSEMBLY EA 12.00 525 1090.00 1235.31 1301.57 1240.00 1235.00

62662003 VIVDS SET-UP SYSTEM EA 4.00 526 425.00 923.88 973.44 925.00 925.00

62662004 VIVDS CENTRAL CONTROL EA 2.00 527 4150.00 3430.11 3614.10 3450.00 3430.00

62662005 VIVDS COMMUNICATION CABLE (COAXIAL) LF 7,347.00 528 1.10 1.58 1.66 1.60 1.60

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 59: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 23 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

62662007 VIVDS TEMPORARY EA 3.00 529 13890.00 16708.93 17605.16 16800.00 16800.00

62782001 FIBER OPTIC RS-232 DATA MODEM (S/M) EA 19.00 530 1500.00 424.05 446.80 425.00 425.00

64732004 MULTIPOLYMER PAV MRK (W)(6")(SLD) LF 66,437.00 531 0.50 0.65 0.65 0.42 0.40

64732005 MULTIPOLYMER PAV MRK (W)(6")(BRK) LF 11,554.00 532 0.62 0.70 0.69 0.50 0.48

64732006 MULTIPOLYMER PAV MRK (W)(6")(DOT) LF 1,074.00 533 2.25 2.00 2.59 3.00 2.95

64732007 MULTIPOLYMER PAV MRK (W)(8")(SLD) LF 22,445.00 534 0.90 1.10 1.30 0.72 0.71

64732009 MULTIPOLYMER PAV MRK (W)(12")(SLD) LF 15,352.00 535 1.00 2.50 2.48 1.10 1.06

64732010 MULTIPOLYMER PAV MRK (W)(12")(LNDP) LF 1,847.00 536 1.00 2.00 2.48 1.50 1.45

64732014 MULTIPOLYMER PAV MRK (Y)(6")(SLD) LF 72,649.00 537 0.40 0.65 0.65 0.50 0.47

64732015 MULTIPOLYMER PAV MRK (Y)(6")(BRK) LF 1,602.00 538 0.40 0.70 0.69 0.55 0.54

64732017 MULTIPOLYMER PAV MRK (Y)(8")(SLD) LF 453.00 539 0.60 1.10 1.30 1.80 1.77

64732018 MULTIPOLYMER PAV MRK (Y)(12")(SLD) LF 30.00 540 1.00 2.50 4.54 2.05 2.02

64732020 MULTIPOLYMER PAV MRK (BLK)(6")(BRK) LF 11,554.00 541 0.40 0.75 0.68 0.52 0.51

64732021 MULTIPOLYMER PAV MRK (W)(24")(SLD) LF 2,037.00 542 4.00 5.00 8.96 4.50 4.42

64732022 MULTIPOLYMER PAV MRK (Y)(24")(SLD) LF 204.00 543 3.50 5.00 8.96 4.50 4.45

66232001 MULTI-DUCT CONDUIT (PVC) LF 32,063.00 544 8.50 9.22 9.71 9.50 9.25

66232002 MULTI-DUCT CONDUIT (PVC)(BORED) LF 7,210.00 545 25.00 23.26 24.51 24.00 23.30

66232003 MULTI-DUCT CONDUIT (RMC) LF 23,986.00 546 62.33 41.80 44.04 42.00 41.80

68342002 PORTABLE CHANGEABLE MESSAGE SIGN EA 25.00 547 5000.00 50.00 18000.00 5000.00 15000.00

69862017 PREFAB PV MK W/WNTY TY B(W)12"(BRK)CNST LF 25,921.00 548 7.80 6.94 10.26 8.40 7.91

80672001 CAMERA POLE STRUCTURE EA 1.00 549 9149.00 7587.94 7994.94 7600.00 7600.00

82602001 LED COUNTDOWN PEDESTRIAN MODULE EA 53.00 550 505.00 309.28 325.87 310.00 310.00

83682003 CONDUIT (PREPARE) LF 1,930.00 551 1.42 2.36 2.49 2.40 2.40

84452001 F O VIDEO DAT TX (S/M) EA 7.00 552 2500.00 578.28 609.30 580.00 600.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 60: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

1124 WORKING DAYS

ESTIMATED COST: $170,992,025.96

PROJECT NUMBER: STP 2011(998)MM

ENGINEER: RANFT, GREGORY- HOUSTON, TEXAS TX 77040 (713)934-5900

DESCRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE

CHECK: 100,000

LOW BIDDER: WILLIAMS BROTHERS CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: IH 610

LENGTH: 3.693 ORDER READ: 3015

Eng. Estimate -> $170,992,025.96 Amount Left %Left

Cntr 1 WILLIAMS BROTHERS CONSTRUCTION CO., INC. 151,578,391.02

2 BALFOUR BEATTY INFRASTRUCTURE, INC...... 187,664,544.73 36,086,153.71 23.8

3 J.D. ABRAMS, L.P........................ 203,954,201.20 52,375,810.18 34.6

4 WEBBER, LLC............................. 210,532,767.98 58,954,376.96 38.9

HARRIS Page 24 of 24

Quantity No

Eng.

Est.

Cntr 1

WILLIAMS

Cntr 2

BALFOURItems

Cntr 3

J.D. ABR

Cntr 4

WEBBER,

84452002 F O VIDEO DAT RX (S/M) EA 7.00 553 2500.00 578.28 609.30 580.00 600.00

87192001 REMOVE HIGH MAST ILLUMINATION POLES EA 30.00 554 5000.00 2019.33 2127.64 2100.00 2100.00

87202001 LED UNDERPASS LIGHT ASSEMBLY EA 134.00 555 2000.00 1024.47 1079.42 1100.00 1100.00

87212003 CTMS RELOCATION (CCTV) EA 4.00 556 4340.00 1962.64 2067.91 2000.00 2000.00

87222001 DATA FIBER OPTIC TRANSCEIV (SINGLEMODE) EA 10.00 557 750.00 876.64 923.66 880.00 900.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 61: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

30 WORKING DAYS

ESTIMATED COST: $119,365.80

PROJECT NUMBER: STP 1102(061)

ENGINEER: VOLK, JEFF- HOUSTON TX 77034 (281)464-5501

DESCRIPTION: REPAIR BASE FAILURES AND CRACK SEAL

CHECK: 2,000

LOW BIDDER: MAIN LANE INDUSTRIES, LTD.

DATE: 05/03/2011

HWY.NO.: FM 521

LENGTH: 11.467 ORDER READ: 3032

Eng. Estimate -> $ 119,365.80 Amount Left %Left

Cntr 1 MAIN LANE INDUSTRIES, LTD............... 113,022.00

2 NATIONWIDE CONSTRUCTION & PAVING........ 115,215.50 2,193.50 1.9

3 FORDE CONSTRUCTION COMPANY, INC......... 120,339.50 7,317.50 6.5

4 SCR CONSTRUCTION CO., INC............... 124,022.00 11,000.00 9.7

5 DEVTEX INC.............................. 157,876.00 44,854.00 39.7

6 AUSTIMPACTORS LLC....................... 159,949.00 46,927.00 41.5

HARRIS Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

MAIN LAN

Cntr 2

NATIONWIItems

Cntr 3

FORDE CO

Cntr 4

SCR CONS

Cntr 5

DEVTEX

Cntr 6

AUSTIMPA

03512007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(11") SY 1,000.00 1 65.00 64.00 26.00 75.00 78.00 95.00 104.00

05002001 MOBILIZATION LS 1.00 2 10648.55 3000.00 9000.00 7000.00 2000.00 8000.00 15000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.00 3 1500.00 1500.00 4000.00 1500.00 500.00 9000.00 500.00

07122004 JT/CRCK SEAL (RUBBER-ASPHALT) LF 153,650.00 4 0.27 0.28 0.47 0.23 0.28 0.24 0.26

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 62: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

366 CALENDAR DAYS

ESTIMATED COST: $350,429.00

PROJECT NUMBER: RMC - 622167001

ENGINEER: STEPHENS, DOUGLAS- HUMBLE TX 77396 (281)319-6400

DESCRIPTION: CLEANING AND SWEEPING HIGHWAYS

CHECK: 7,000

LOW BIDDER: PANNELL INDUSTRIES, INC.

DATE: 05/03/2011

HWY.NO.: US0059

LENGTH: 0.000 ORDER READ: 4007

Eng. Estimate -> $ 350,429.00 Amount Left %Left

Cntr 1 PANNELL INDUSTRIES, INC................. 330,587.00

2 SWEEPING SERVICES OF TEXAS - OPERATING, 527,979.00 197,392.00 59.7

HARRIS Page 1 of 2

Quantity No

Eng.

Est.

Cntr 1

PANNELL

Cntr 2

SWEEPINGItems

07352068 DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1) CYC 36.00 1 600.00 500.00 750.00

07352070 DEBRIS-CNTR MEDIANS/MAINLANES-AREA (3) CYC 36.00 2 640.00 500.00 1250.00

07352072 DEBRIS-CNTR MEDIANS/MAINLANES-AREA (5) CYC 36.00 3 600.00 500.00 1250.00

07352074 DEBRIS-CNTR MEDIANS/MAINLANES-AREA (7) CYC 12.00 4 600.00 300.00 500.00

07352128 DEBRIS - DIRECT CONNECTOR - AREA (12) CYC 36.00 5 320.00 300.00 500.00

07352129 DEBRIS - DIRECT CONNECTOR - AREA (13) CYC 36.00 6 320.00 300.00 500.00

07352130 DEBRIS - DIRECT CONNECTOR - AREA (14) CYC 36.00 7 320.00 300.00 500.00

07382011 CLEANING/SWEEPING (HANDWORK) SY 61,316.00 8 0.25 0.75 0.25

07382094 CLEAN/SWEEP-CENTER MEDIAN-AREA (1) CYC 12.00 9 1100.00 1000.00 1000.00

07382096 CLEAN/SWEEP-CENTER MEDIAN-AREA (3) CYC 12.00 10 2000.00 1000.00 2500.00

07382098 CLEAN/SWEEP-CENTER MEDIAN-AREA (5) CYC 12.00 11 1950.00 1000.00 2500.00

07382100 CLEAN/SWEEP-CENTER MEDIAN-AREA (7) CYC 4.00 12 1000.00 700.00 1000.00

07382101 CLEAN/SWEEP-CENTER MEDIAN-AREA (8) CYC 3.00 13 900.00 900.00 650.00

07382102 CLEAN/SWEEP-CENTER MEDIAN-AREA (9) CYC 4.00 14 900.00 800.00 750.00

07382103 CLEAN/SWEEP-CENTER MEDIAN-AREA (10) CYC 3.00 15 300.00 700.00 1750.00

07382104 CLEAN/SWEEP-CENTER MEDIAN-AREA (11) CYC 3.00 16 1400.00 900.00 750.00

07382108 CLEAN/SWEEP-CENTER MEDIAN-AREA (15) CYC 3.00 17 400.00 800.00 1000.00

07382114 CLEAN/SWEEP-OUTSIDE MAIN LANE-AREA (1) CYC 12.00 18 1100.00 1000.00 1000.00

07382116 CLEAN/SWEEP-OUTSIDE MAIN LANE-AREA (3) CYC 12.00 19 1900.00 1000.00 2500.00

07382118 CLEAN/SWEEP-OUTSIDE MAIN LANE-AREA (5) CYC 12.00 20 1900.00 1000.00 2500.00

07382120 CLEAN/SWEEP-OUTSIDE MAIN LANE-AREA (7) CYC 4.00 21 1000.00 700.00 1000.00

07382121 CLEAN/SWEEP-OUTSIDE MAIN LANE-AREA (8) CYC 3.00 22 900.00 900.00 650.00

07382122 CLEAN/SWEEP-OUTSIDE MAIN LANE-AREA (9) CYC 4.00 23 900.00 700.00 750.00

07382123 CLEAN/SWEEP-OUTSIDE MAIN LANE-AREA (10) CYC 3.00 24 400.00 700.00 1750.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 63: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HARRIS

366 CALENDAR DAYS

ESTIMATED COST: $350,429.00

PROJECT NUMBER: RMC - 622167001

ENGINEER: STEPHENS, DOUGLAS- HUMBLE TX 77396 (281)319-6400

DESCRIPTION: CLEANING AND SWEEPING HIGHWAYS

CHECK: 7,000

LOW BIDDER: PANNELL INDUSTRIES, INC.

DATE: 05/03/2011

HWY.NO.: US0059

LENGTH: 0.000 ORDER READ: 4007

Eng. Estimate -> $ 350,429.00 Amount Left %Left

Cntr 1 PANNELL INDUSTRIES, INC................. 330,587.00

2 SWEEPING SERVICES OF TEXAS - OPERATING, 527,979.00 197,392.00 59.7

HARRIS Page 2 of 2

Quantity No

Eng.

Est.

Cntr 1

PANNELL

Cntr 2

SWEEPINGItems

07382124 CLEAN/SWEEP-OUTSIDE MAIN LANE-AREA (11) CYC 3.00 25 400.00 900.00 1000.00

07382128 CLEAN/SWEEP-OUTSIDE MAIN LANE-AREA (15) CYC 3.00 26 400.00 800.00 1000.00

07382135 CLEAN/SWEEP-FRONTAGE ROAD-AREA (2) CYC 4.00 27 3500.00 2900.00 7500.00

07382136 CLEAN/SWEEP-FRONTAGE ROAD-AREA (3) CYC 4.00 28 2200.00 2900.00 6000.00

07382139 CLEAN/SWEEP-FRONTAGE ROAD-AREA (6) CYC 4.00 29 1600.00 2900.00 5000.00

07382156 CLEAN/SWEEP-HOV - AREA (3) CYC 6.00 30 2000.00 900.00 1500.00

07382174 CLEAN/SWEEP (ENTR/EXT RMP)(AREA 3) CYC 6.00 31 1000.00 1000.00 2500.00

07382175 CLEAN/SWEEP (ENTR/EXT RMP)(AREA 4) CYC 6.00 32 1000.00 950.00 2000.00

07382176 CLEAN/SWEEP (ENTR/EXT RMP)(AREA 1) CYC 6.00 33 1000.00 950.00 2000.00

07382183 CLEAN/SWEEP-DIRECT CONNECTOR-AREA(12) CYC 12.00 34 500.00 1000.00 1000.00

07382184 CLEAN/SWEEP-DIRECT CONNECTOR-AREA(13) CYC 12.00 35 500.00 800.00 500.00

07382185 CLEAN/SWEEP-DIRECT CONNECTOR-AREA(14) CYC 12.00 36 500.00 1000.00 1000.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 64: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HAYS

20 WORKING DAYS

ESTIMATED COST: $296,101.72

PROJECT NUMBER: STP 2011(953)HES

ENGINEER: NYLAND, DONALD- AUSTIN TX 78744 (512)282-2113

DESCRIPTION: RESURFACE

CHECK: 6,000

LOW BIDDER: ANGEL BROTHERS ENTERPRISES, LTD.

DATE: 05/03/2011

HWY.NO.: RM 12

LENGTH: 11.195 ORDER READ: 3016

Eng. Estimate -> $ 296,101.72 Amount Left %Left

Cntr 1 ANGEL BROTHERS ENTERPRISES, LTD......... 337,959.74

2 HUNTER INDUSTRIES, LTD.................. 361,581.24 23,621.50 7.0

3 ASPHALT PAVING COMPANY OF AUSTIN, INC... 365,588.66 27,628.92 8.2

4 DEAN WORD COMPANY, LTD.................. 371,342.86 33,383.12 9.9

5 CLARK CONSTRUCTION OF TEXAS, INC........ 432,859.92 94,900.18 28.1

6 RONALD R. WAGNER & CO., LP.............. 433,131.62 95,171.88 28.2

7 ALLEN KELLER COMPANY.................... 435,134.31 97,174.57 28.8

HAYS Page 1 of 2

Quantity No

Eng.

Est.

Cntr 1

ANGEL BR

Cntr 2

HUNTERItems

Cntr 3

ASPHALT

Cntr 4

DEAN WOR

Cntr 5

CLARK CO

Cntr 6

RONALD

Cntr 7

ALLEN KE

03162705 ASPH (TIER I) GAL 33,300.00 1 2.50 3.25 3.66 3.60 3.546 3.75 4.38 4.30

03162717 AGGR (TIER I) CY 890.00 2 48.00 45.00 51.31 77.50 65.415 75.00 53.01 75.00

03512004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 1,469.00 3 27.00 40.00 41.92 42.55 41.411 45.00 57.176 55.00

05002001 MOBILIZATION LS 1.00 4 17451.36 26000.00 35016.04 12750.00 33052.71 65000.00 57301.25 31000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.00 5 7500.00 3400.00 2040.33 1150.00 4004.43 2000.00 702.81 6000.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 600.00 6 2.22 1.80 2.00 1.50 1.65 5.00 1.65 3.00

06622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 22.00 7 0.66 0.85 1.00 0.60 0.999 1.00 0.90 3.00

06622115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 2,768.00 8 0.92 0.85 1.00 0.65 0.999 1.00 0.90 1.00

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 73,455.00 9 0.34 0.40 0.37 0.42 0.37 0.35 0.38 0.42

06662036 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 540.00 10 0.74 0.80 0.74 0.82 0.74 0.70 1.00 0.82

06662042 REFL PAV MRK TY I (W) 12"(SLD)(100MIL) LF 228.00 11 2.99 3.00 2.80 3.25 2.80 3.00 2.60 3.25

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 128.00 12 5.96 6.00 5.50 6.20 5.50 6.00 5.40 6.20

06662054 REFL PAV MRK TY I (W) (ARROW) (100MIL) EA 7.00 13 94.14 120.00 110.00 85.00 110.00 145.00 100.00 85.00

06662096 REFL PAV MRK TY I (W) (WORD) (100MIL) EA 7.00 14 114.64 155.00 140.00 100.00 140.00 155.00 120.00 100.00

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 3,981.00 15 0.43 0.42 0.37 0.47 0.37 0.35 0.40 0.47

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 64,472.00 16 0.36 0.42 0.37 0.41 0.37 0.35 0.36 0.41

06662126 REFL PAV MRK TY I (Y) 12"(SLD)(100MIL) LF 2,420.00 17 3.80 3.00 2.80 3.25 2.80 3.00 2.30 3.25

06662145 REF PAV MRK TY II (W) 4" (SLD) LF 73,455.00 18 0.12 0.11 0.10 0.10 0.10 0.14 0.12 0.10

06662153 REF PAV MRK TY II (W) 8" (SLD) LF 540.00 19 0.57 0.23 0.20 0.20 0.20 0.40 1.00 0.20

06662155 REF PAV MRK TY II (W) 12" (SLD) LF 228.00 20 1.43 1.10 1.00 1.35 1.00 1.50 2.00 1.35

06662157 REF PAV MRK TY II (W) 24" (SLD) LF 128.00 21 2.22 2.20 2.00 2.25 2.00 2.00 4.00 2.25

06662160 REF PAV MRK TY II (W) (ARROW) EA 7.00 22 37.59 65.00 60.00 45.00 60.00 33.00 65.00 45.00

06662173 REF PAV MRK TY II (W) (WORD) EA 7.00 23 46.77 75.00 70.00 55.00 70.00 33.00 65.00 55.00

06662176 REF PAV MRK TY II (Y) 4" (BRK) LF 3,981.00 24 0.13 0.11 0.10 0.12 0.10 0.14 0.15 0.12

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 65: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HAYS

20 WORKING DAYS

ESTIMATED COST: $296,101.72

PROJECT NUMBER: STP 2011(953)HES

ENGINEER: NYLAND, DONALD- AUSTIN TX 78744 (512)282-2113

DESCRIPTION: RESURFACE

CHECK: 6,000

LOW BIDDER: ANGEL BROTHERS ENTERPRISES, LTD.

DATE: 05/03/2011

HWY.NO.: RM 12

LENGTH: 11.195 ORDER READ: 3016

Eng. Estimate -> $ 296,101.72 Amount Left %Left

Cntr 1 ANGEL BROTHERS ENTERPRISES, LTD......... 337,959.74

2 HUNTER INDUSTRIES, LTD.................. 361,581.24 23,621.50 7.0

3 ASPHALT PAVING COMPANY OF AUSTIN, INC... 365,588.66 27,628.92 8.2

4 DEAN WORD COMPANY, LTD.................. 371,342.86 33,383.12 9.9

5 CLARK CONSTRUCTION OF TEXAS, INC........ 432,859.92 94,900.18 28.1

6 RONALD R. WAGNER & CO., LP.............. 433,131.62 95,171.88 28.2

7 ALLEN KELLER COMPANY.................... 435,134.31 97,174.57 28.8

HAYS Page 2 of 2

Quantity No

Eng.

Est.

Cntr 1

ANGEL BR

Cntr 2

HUNTERItems

Cntr 3

ASPHALT

Cntr 4

DEAN WOR

Cntr 5

CLARK CO

Cntr 6

RONALD

Cntr 7

ALLEN KE

06662178 REF PAV MRK TY II (Y) 4" (SLD) LF 64,472.00 25 0.15 0.11 0.10 0.10 0.10 0.14 0.12 0.10

06662183 REF PAV MRK TY II (Y) 12" (SLD) LF 2,420.00 26 1.49 1.10 1.00 1.35 1.00 1.50 2.00 1.35

06722012 REFL PAV MRKR TY I-C EA 22.00 27 3.33 4.50 4.00 4.00 4.00 3.00 4.00 4.00

06722015 REFL PAV MRKR TY II-A-A EA 881.00 28 2.86 4.50 4.00 3.00 4.00 3.00 3.70 3.00

68342001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 60.00 29 83.60 25.00 81.19 75.00 81.19 200.00 75.00 80.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 66: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HAYS

35 W

ESTIMATED COST: $405,324.48

PROJECT NUMBER: RMC - 622342001

ENGINEER: NYLAND, DON- AUSTIN TX 78744 (512)282-2113

DESCRIPTION: ONE COURSE SURFACE TREATMENT

CHECK: 8,000

LOW BIDDER: HUNTER INDUSTRIES, LTD.

DATE: 05/03/2011

HWY.NO.: RM0967

LENGTH: 0.000 ORDER READ: 4008

Eng. Estimate -> $ 405,324.48 Amount Left %Left

Cntr 1 HUNTER INDUSTRIES, LTD.................. 459,330.79

2 ASPHALT PAVING COMPANY OF AUSTIN, INC... 460,427.59 1,096.80 0.2

3 DEAN WORD COMPANY, LTD.................. 464,160.01 4,829.22 1.1

4 J.D. RAMMING PAVING CO., LTD............ 526,109.34 66,778.55 14.5

HAYS Page 1 of 2

Quantity No

Eng.

Est.

Cntr 1

HUNTER

Cntr 2

ASPHALTItems

Cntr 3

DEAN WOR

Cntr 4

J.D. RAM

03162705 ASPH (TIER I) GAL 44,572.00 1 2.92 3.61 3.45 3.366 4.00

03162717 AGGR (TIER I) CY 1,140.00 2 52.05 48.80 75.65 62.373 85.00

03402245 D-GR HMA(METH)TY-C OR D PG64-22(LVL-UP) TON 1,000.00 3 59.79 57.52 57.05 73.198 85.00

03512004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 200.00 4 30.20 48.96 74.20 37.481 65.00

03512008 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") SY 600.00 5 37.24 69.59 56.80 56.204 60.00

05002001 MOBILIZATION LS 1.00 6 23135.00 39352.46 14000.00 32699.31 25000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.00 7 2500.00 1623.57 765.00 3593.67 2500.00

06622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 24.00 8 0.92 1.00 0.65 0.951 0.50

06622115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 3,969.00 9 0.82 1.00 0.65 0.951 0.50

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 94,804.00 10 0.35 0.37 0.42 0.36 0.36

06662036 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 475.00 11 0.71 0.82 0.75 0.80 0.80

06662042 REFL PAV MRK TY I (W) 12"(SLD)(100MIL) LF 48.00 12 3.62 2.96 4.45 2.90 2.90

06662054 REFL PAV MRK TY I (W) (ARROW) (100MIL) EA 2.00 13 111.91 137.72 80.00 135.00 135.00

06662096 REFL PAV MRK TY I (W) (WORD) (100MIL) EA 2.00 14 139.41 153.03 105.00 150.00 150.00

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 4,744.00 15 0.38 0.38 0.42 0.37 0.37

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 61,915.00 16 0.37 0.37 0.40 0.36 0.36

06662126 REFL PAV MRK TY I (Y) 12"(SLD)(100MIL) LF 391.00 17 3.31 2.96 4.05 2.90 2.90

06662145 REF PAV MRK TY II (W) 4" (SLD) LF 94,804.00 18 0.17 0.09 0.11 0.09 0.09

06662153 REF PAV MRK TY II (W) 8" (SLD) LF 475.00 19 0.35 0.17 0.21 0.17 0.17

06662155 REF PAV MRK TY II (W) 12" (SLD) LF 48.00 20 1.31 1.33 1.00 1.30 1.30

06662160 REF PAV MRK TY II (W) (ARROW) EA 2.00 21 64.20 40.81 40.00 40.00 40.00

06662173 REF PAV MRK TY II (W) (WORD) EA 2.00 22 73.85 40.81 50.00 40.00 40.00

06662176 REF PAV MRK TY II (Y) 4" (BRK) LF 4,744.00 23 0.16 0.09 0.11 0.09 0.09

06662178 REF PAV MRK TY II (Y) 4" (SLD) LF 61,915.00 24 0.12 0.09 0.11 0.09 0.09

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 67: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HAYS

35 W

ESTIMATED COST: $405,324.48

PROJECT NUMBER: RMC - 622342001

ENGINEER: NYLAND, DON- AUSTIN TX 78744 (512)282-2113

DESCRIPTION: ONE COURSE SURFACE TREATMENT

CHECK: 8,000

LOW BIDDER: HUNTER INDUSTRIES, LTD.

DATE: 05/03/2011

HWY.NO.: RM0967

LENGTH: 0.000 ORDER READ: 4008

Eng. Estimate -> $ 405,324.48 Amount Left %Left

Cntr 1 HUNTER INDUSTRIES, LTD.................. 459,330.79

2 ASPHALT PAVING COMPANY OF AUSTIN, INC... 460,427.59 1,096.80 0.2

3 DEAN WORD COMPANY, LTD.................. 464,160.01 4,829.22 1.1

4 J.D. RAMMING PAVING CO., LTD............ 526,109.34 66,778.55 14.5

HAYS Page 2 of 2

Quantity No

Eng.

Est.

Cntr 1

HUNTER

Cntr 2

ASPHALTItems

Cntr 3

DEAN WOR

Cntr 4

J.D. RAM

06662183 REF PAV MRK TY II (Y) 12" (SLD) LF 391.00 25 1.72 1.33 1.00 1.30 1.30

06722012 REFL PAV MRKR TY I-C EA 24.00 26 2.86 3.21 3.00 3.15 3.15

06722015 REFL PAV MRKR TY II-A-A EA 1,106.00 27 2.69 3.21 2.75 3.15 3.15

68342001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 75.00 28 100.32 81.19 75.00 75.00 75.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 68: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HIDALGO

40 WORKING DAYS

ESTIMATED COST: $2,387,459.64

PROJECT NUMBER: NH 2011(975)

ENGINEER: GONZALEZ, HECTOR P.- PHARR TX 78577 (956)702-6251

DESCRIPTION: OVERLAY (MAIN LANES)

CHECK: 48,000

LOW BIDDER: LEAL CONSTRUCTION, INC.

DATE: 05/03/2011

HWY.NO.: US 281

LENGTH: 6.193 ORDER READ: 3017

Eng. Estimate -> $ 2,387,459.64 Amount Left %Left

Cntr 1 LEAL CONSTRUCTION, INC.................. 2,243,447.31

2 FOREMOST PAVING, INC.................... 2,469,316.28 225,868.97 10.1

HIDALGO Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

LEAL CON

Cntr 2

FOREMOSTItems

01342001 BACKFILL (TY A) STA 317.00 1 150.00 21.23 65.00

03412135 D-GR HMA(QCQA) TY-D SAC-A PG76-22 TON 29,870.00 2 67.00 65.30 71.57

03542051 PLANE ASPH CONC PAV (0" TO 1 1/2") SY 33,110.00 3 1.30 0.98 1.25

05002001 MOBILIZATION LS 1.00 4 114000 50000.00 75000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.00 5 2000.00 3857.76 4800.00

06622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 11,635.00 6 0.95 0.54 0.81

06622115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 3,393.00 7 0.95 0.81 0.81

06662003 REFL PAV MRK TY I (W) 4" (BRK)(100MIL) LF 22,108.00 8 0.45 0.41 0.38

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 65,931.00 9 0.35 0.35 0.32

06662036 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 17,058.00 10 0.65 0.97 0.90

06662039 REFL PAV MRK TY I (W) 12"(LNDP)(100MIL) LF 960.00 11 1.60 3.78 3.50

06662042 REFL PAV MRK TY I (W) 12"(SLD)(100MIL) LF 3,000.00 12 2.50 3.02 2.80

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 1,977.00 13 0.45 0.48 0.44

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 67,844.00 14 0.40 0.37 0.34

06682106 PREFAB PAV MRK TY C (W) (ARROW) EA 12.00 15 185.00 172.80 160.00

06682116 PREFAB PAV MRK TY C (W) (WORD) EA 11.00 16 240.00 194.40 180.00

06722017 REFL PAV MRKR TY II-C-R EA 2,520.00 17 4.50 3.13 2.90

06782021 PAV SURF PREP FOR MRK (BLAST CLN)(4") LF 5,362.00 18 0.10 0.11 0.10

06782023 PAV SURF PREP FOR MRK (BLAST CLN)(12") LF 1,010.00 19 0.48 0.32 0.30

06782028 PAV SURF PREP FOR MRK (BLST CLN)(ARRWS) EA 4.00 20 30.36 21.60 20.00

50492003 BIODGRD EROSION CONTROL LOGS (12" DIA) LF 50.00 21 3.50 8.64 8.00

60552001 IN-LANE OR TRANSVERSE RUMBLE STRIP LF 6,640.00 22 9.73 12.96 12.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 69: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HOOD

141 WORKING DAYS

ESTIMATED COST: $910,467.35

PROJECT NUMBER: BR 2011(900)

ENGINEER: MCENDREE, MARC- STEPHENVILLE TX 76401 (254)965-3511

DESCRIPTION: REPLACE BRIDGE AND APPROACHES

CHECK: 18,000

LOW BIDDER: ELLIS-MCGINNIS CONSTRUCTION CO.

DATE: 05/03/2011

HWY.NO.: FM 2580

LENGTH: 0.309 ORDER READ: 3020

Eng. Estimate -> $ 910,467.35 Amount Left %Left

Cntr 1 ELLIS-MCGINNIS CONSTRUCTION CO.......... 1,137,525.20

2 HODGES AND SON CONSTRUCTION COMPANY, INC 1,208,004.60 70,479.40 6.2

3 LINDER CONSTRUCTION CO., INC............ 1,504,639.97 367,114.77 32.3

4 ED BELL CONSTRUCTION COMPANY............ 1,536,454.36 398,929.16 35.1

HOOD Page 1 of 3

Quantity No

Eng.

Est.

Cntr 1

ELLIS-MC

Cntr 2

HODGESItems

Cntr 3

LINDER

Cntr 4

ED BELL

01002002 PREPARING ROW STA 10.15 1 1500.00 3200.00 1200.00 18792.97 14000.00

01042009 REMOVING CONC (RIPRAP) SY 112.00 2 8.00 8.00 30.00 16.40 12.10

01102001 EXCAVATION (ROADWAY) CY 119.00 3 10.00 20.00 15.00 14.47 41.34

01102002 EXCAVATION (CHANNEL) CY 213.00 4 10.00 11.00 15.00 14.47 21.37

01322002 EMBANKMENT (FINAL)(DENS CONT)(TY A) CY 1,437.00 5 10.00 12.00 12.00 36.39 27.08

01612008 EROSION CONTROL COMPOST (2") SY 3,814.00 6 2.00 1.10 1.00 1.40 1.05

01642001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 3,814.00 7 0.25 0.30 1.00 0.32 0.24

01642009 BROADCAST SEED (TEMP) (WARM) SY 1,907.00 8 0.35 0.90 1.00 0.94 0.86

01642011 BROADCAST SEED (TEMP) (COOL) SY 1,907.00 9 0.35 0.90 1.00 0.99 0.90

01682001 VEGETATIVE WATERING MG 63.00 10 15.00 25.00 1.00 107.00 72.84

02472044 FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS) CY 405.00 11 40.00 40.00 100.00 84.93 45.00

02472060 FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS) CY 328.00 12 35.00 32.00 100.00 35.84 45.00

02752001 CEMENT TON 12.00 13 150.00 150.00 200.00 220.69 120.00

02752018 CEMENT TREAT (NEW BASE)(36") SY 328.00 14 16.00 12.60 18.00 1.56 30.00

03102001 PRIME COAT (MC-30) GAL 538.00 15 6.00 6.60 8.00 8.36 6.25

03412011 D-GR HMA(QCQA) TY-B PG64-22 TON 310.00 16 75.00 86.00 90.00 109.68 82.00

03412136 D-GR HMA(QCQA) TY-D SAC-B PG76-22 TON 204.00 17 80.00 123.00 120.00 156.49 117.00

04032001 TEMPORARY SPL SHORING SF 270.00 18 50.00 30.00 28.00 18.07 22.00

04162004 DRILL SHAFT (36 IN) LF 534.00 19 150.00 370.00 180.00 299.69 143.44

04202003 CL C CONC (ABUT) CY 48.20 20 600.00 810.00 900.00 866.04 2000.00

04202004 CL C CONC (BENT) CY 39.20 21 700.00 830.00 1000.00 893.45 4000.00

04202033 CL S CONC (APPR SLAB) CY 64.20 22 400.00 440.00 600.00 373.66 600.00

04202091 CL B CONC (MISC) CY 10.00 23 300.00 330.00 350.00 381.37 450.00

04222001 REINF CONC SLAB SF 6,720.00 24 15.00 18.30 22.00 26.45 30.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 70: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HOOD

141 WORKING DAYS

ESTIMATED COST: $910,467.35

PROJECT NUMBER: BR 2011(900)

ENGINEER: MCENDREE, MARC- STEPHENVILLE TX 76401 (254)965-3511

DESCRIPTION: REPLACE BRIDGE AND APPROACHES

CHECK: 18,000

LOW BIDDER: ELLIS-MCGINNIS CONSTRUCTION CO.

DATE: 05/03/2011

HWY.NO.: FM 2580

LENGTH: 0.309 ORDER READ: 3020

Eng. Estimate -> $ 910,467.35 Amount Left %Left

Cntr 1 ELLIS-MCGINNIS CONSTRUCTION CO.......... 1,137,525.20

2 HODGES AND SON CONSTRUCTION COMPANY, INC 1,208,004.60 70,479.40 6.2

3 LINDER CONSTRUCTION CO., INC............ 1,504,639.97 367,114.77 32.3

4 ED BELL CONSTRUCTION COMPANY............ 1,536,454.36 398,929.16 35.1

HOOD Page 2 of 3

Quantity No

Eng.

Est.

Cntr 1

ELLIS-MC

Cntr 2

HODGESItems

Cntr 3

LINDER

Cntr 4

ED BELL

04252065 PRESTR CONC GIRDER (TX34) LF 954.00 25 140.00 130.00 190.00 169.21 150.00

04282002 CONC SURF TREAT (CLASS II) SY 957.00 26 6.00 4.00 5.00 3.68 3.50

04322040 RIPRAP (MOW STRIP)(5 IN) CY 77.70 27 350.00 420.00 350.00 379.21 425.00

04322041 RIPRAP (STONE COMMON)(DRY)(18 IN) CY 193.00 28 75.00 62.00 150.00 102.70 100.00

04502161 RAIL (TY T223) LF 356.00 29 60.00 100.00 85.00 138.32 75.00

04542001 SEALED EXPANSION JOINT (4 IN)(SEJ-A) LF 84.00 30 100.00 115.00 120.00 110.52 100.00

04962010 REMOV STR (BRIDGE 100-499 FT LENGTH) EA 1.00 31 50000.00 90000.00 60000.00 120648.1 130000

05002001 MOBILIZATION LS 1.00 32 80000.00 90000.00 90000.00 23836.86 140000

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 9.00 33 2500.00 850.00 2000.00 2356.81 320.00

05062002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 171.00 34 25.00 14.00 30.00 28.95 13.43

05062009 ROCK FILTER DAMS (REMOVE) LF 171.00 35 10.00 5.00 20.00 22.26 5.24

05082002 CONSTRUCTING DETOURS SY 391.00 36 50.00 55.00 55.00 122.05 49.95

05122049 PORT CTB (DES SOURCE)(F-SHAPE)(TY 1) LF 180.00 37 10.00 20.00 25.00 62.15 36.37

05122050 PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 150.00 38 5.00 15.00 20.00 23.76 33.72

05122051 PORT CTB (STOCKPILE)(F-SHAPE)(TY 1) LF 180.00 39 10.00 19.00 25.00 47.29 19.48

05402001 MTL W-BEAM GD FEN (TIM POST) LF 875.00 40 18.00 17.50 20.00 23.45 14.37

05402011 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.00 41 1500.00 1150.00 1500.00 1538.18 1509.63

05422001 REMOVING METAL BEAM GUARD FENCE LF 1,599.00 42 2.00 1.30 2.00 1.67 2.00

05422002 REMOVING TERMINAL ANCHOR SECTION EA 4.00 43 110.00 100.00 200.00 133.75 150.00

05442002 GUARDRAIL END TREATMENT (MOVE & RESET) EA 3.00 44 1000.00 750.00 2000.00 1003.16 1100.00

05442003 GUARDRAIL END TREATMENT (REMOVE) EA 1.00 45 250.00 125.00 200.00 167.19 200.00

05442006 GDRAIL END TRT(INST)(WOOD POST)(TY III) EA 5.00 46 2500.00 2200.00 2500.00 2942.60 2175.00

05452001 CRASH CUSH ATTEN (INSTL) EA 2.00 47 7500.00 9500.00 12000.00 14712.99 9806.85

05452002 CRASH CUSH ATTEN (MOVE & RESET) EA 2.00 48 2000.00 960.00 2000.00 1337.54 1029.75

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 71: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HOOD

141 WORKING DAYS

ESTIMATED COST: $910,467.35

PROJECT NUMBER: BR 2011(900)

ENGINEER: MCENDREE, MARC- STEPHENVILLE TX 76401 (254)965-3511

DESCRIPTION: REPLACE BRIDGE AND APPROACHES

CHECK: 18,000

LOW BIDDER: ELLIS-MCGINNIS CONSTRUCTION CO.

DATE: 05/03/2011

HWY.NO.: FM 2580

LENGTH: 0.309 ORDER READ: 3020

Eng. Estimate -> $ 910,467.35 Amount Left %Left

Cntr 1 ELLIS-MCGINNIS CONSTRUCTION CO.......... 1,137,525.20

2 HODGES AND SON CONSTRUCTION COMPANY, INC 1,208,004.60 70,479.40 6.2

3 LINDER CONSTRUCTION CO., INC............ 1,504,639.97 367,114.77 32.3

4 ED BELL CONSTRUCTION COMPANY............ 1,536,454.36 398,929.16 35.1

HOOD Page 3 of 3

Quantity No

Eng.

Est.

Cntr 1

ELLIS-MC

Cntr 2

HODGESItems

Cntr 3

LINDER

Cntr 4

ED BELL

05452003 CRASH CUSH ATTEN (REMOVE) EA 2.00 49 1000.00 350.00 1000.00 668.77 772.31

06442060 REMOVE SM RD SN SUP & AM EA 4.00 50 75.00 50.00 200.00 66.88 560.14

06582259 INSTL DEL ASSM (D-SW)SZ (TYC)CTB(BI) EA 10.00 51 18.00 13.50 50.00 18.06 15.84

06582261 INSTL DEL ASSM (D-SW)SZ (TYC)GF1(BI) EA 21.00 52 25.00 15.00 50.00 20.06 21.13

06622004 WK ZN PAV MRK NON-REMOV (W) 4" (SLD) LF 1,413.00 53 0.25 1.80 2.00 2.68 2.00

06622067 WK ZN PAV MRK REMOV (W) 4" (SLD) LF 1,807.00 54 0.50 0.60 1.00 1.15 0.86

06622079 WK ZN PAV MRK REMOV (W) 24" (SLD) LF 33.00 55 4.00 10.00 4.00 4.72 3.53

06622099 WK ZN PAV MRK REMOV (Y) 4" (SLD) LF 4,800.00 56 0.50 0.60 1.00 1.29 0.86

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 1,352.00 57 0.50 1.80 2.00 2.37 1.77

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 160.00 58 0.50 2.50 2.00 2.68 2.00

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 430.00 59 0.50 1.80 2.00 2.37 1.77

06662145 REF PAV MRK TY II (W) 4" (SLD) LF 400.00 60 0.20 1.00 0.10 0.11 0.08

06662176 REF PAV MRK TY II (Y) 4" (BRK) LF 50.00 61 0.30 1.00 0.20 0.15 0.11

06662178 REF PAV MRK TY II (Y) 4" (SLD) LF 200.00 62 0.20 1.00 0.10 0.11 0.08

06722015 REFL PAV MRKR TY II-A-A EA 13.00 63 5.00 18.00 15.00 20.06 15.00

06782001 PAV SURF PREP FOR MRK ( 4") LF 1,942.00 64 0.10 1.00 0.30 0.33 0.25

06812001 TEMP TRAF SIGNALS EA 1.00 65 40000.00 35500.00 50000.00 43546.04 30000.00

50492003 BIODGRD EROSION CONTROL LOGS (12" DIA) LF 1,483.00 66 5.00 4.00 6.00 6.31 2.84

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 72: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HUNT

28 WORKING DAYS

ESTIMATED COST: $81,676.00

PROJECT NUMBER: C 901-22-99

ENGINEER: TINER, CHERYL- MINEOLA TX 75773 (903)569-2349

DESCRIPTION: TCST, HMAC BS, CURB & GUTTER, SDWLK, PV MK

CHECK: 2,000

LOW BIDDER: LONGVIEW BRIDGE AND ROAD, LTD.

DATE: 05/03/2011

HWY.NO.: PW

LENGTH: 0.153 ORDER READ: 3021

Eng. Estimate -> $ 81,676.00 Amount Left %Left

Cntr 1 LONGVIEW BRIDGE AND ROAD, LTD........... 130,227.25

2 PEACHTREE CONSTRUCTION, LTD............. 158,582.70 28,355.45 21.8

3 B&H CONTRACTING, L.P.................... 196,651.70 66,424.45 51.0

HUNT Page 1 of 2

Quantity No

Eng.

Est.

Cntr 1

LONGVIEW

Cntr 2

PEACHTREItems

Cntr 3

B&H CONT

01002002 PREPARING ROW STA 4.00 1 2400.00 2500.00 6500.00 2900.00

01042022 REMOVING CONC (CURB AND GUTTER) LF 50.00 2 5.00 25.00 19.00 26.00

01122002 SUBGRADE WIDENING (DENS CONT) STA 3.50 3 275.00 360.00 2900.00 3100.00

01602003 FURNISHING AND PLACING TOPSOIL (4") SY 650.00 4 1.00 6.75 6.00 13.21

01642009 BROADCAST SEED (TEMP) (WARM) SY 650.00 5 0.25 0.85 0.80 0.84

01642052 BROADCAST SEED (PERM)(SPECIAL MIX) SY 650.00 6 0.20 1.90 1.80 1.89

01682001 VEGETATIVE WATERING MG 15.00 7 7.00 25.00 22.00 360.00

02752001 CEMENT TON 11.00 8 115.00 140.00 240.00 230.00

02752019 CEMENT TREAT (SUBGRADE)(6") SY 720.00 9 1.60 3.50 15.00 19.50

03162363 AGGR (TY-PD GR-4 OR TY-PL GR-4)(SAC-B) CY 26.00 10 76.00 205.00 265.00 334.00

03162513 AGGR (TY-PD GR-3 OR TYL-PL GR-3) CY 33.00 11 73.00 175.00 215.00 290.00

03162671 ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR) GAL 2,127.00 12 4.00 4.25 5.10 6.30

03402032 D-GR HMA(METH) TY-C SAC-B PG64-22 TON 325.00 13 80.00 115.00 110.00 140.00

05002001 MOBILIZATION LS 1.00 14 7400.00 8000.00 14500.00 19000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.00 15 2800.00 1000.00 2500.00 500.00

05062024 BACKHOE WORK (EROSION & SEDM CONT) HR 20.00 16 50.00 85.00 75.00 125.00

05062030 CONSTRUCTION PERIMETER FENCE LF 800.00 17 3.00 2.00 2.50 2.52

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 1,000.00 18 2.50 2.60 3.00 2.00

05292003 CONC CURB & GUTTER (TY I) LF 50.00 19 25.00 12.00 40.00 75.00

05312024 CONC SIDEWALK (5") SY 43.00 20 35.00 65.00 55.00 180.00

06442048 INS SM RD SN SUP&AM TY TWT(1) UA(P) EA 1.00 21 360.00 750.00 300.00 1000.00

06622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 100.00 22 1.00 2.00 1.00 1.57

06622114 WK ZN PAV MRK SHT TERM (TAB) TY Y EA 200.00 23 1.00 2.00 1.00 1.57

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 270.00 24 0.30 3.25 1.50 4.20

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 73: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HUNT

28 WORKING DAYS

ESTIMATED COST: $81,676.00

PROJECT NUMBER: C 901-22-99

ENGINEER: TINER, CHERYL- MINEOLA TX 75773 (903)569-2349

DESCRIPTION: TCST, HMAC BS, CURB & GUTTER, SDWLK, PV MK

CHECK: 2,000

LOW BIDDER: LONGVIEW BRIDGE AND ROAD, LTD.

DATE: 05/03/2011

HWY.NO.: PW

LENGTH: 0.153 ORDER READ: 3021

Eng. Estimate -> $ 81,676.00 Amount Left %Left

Cntr 1 LONGVIEW BRIDGE AND ROAD, LTD........... 130,227.25

2 PEACHTREE CONSTRUCTION, LTD............. 158,582.70 28,355.45 21.8

3 B&H CONTRACTING, L.P.................... 196,651.70 66,424.45 51.0

HUNT Page 2 of 2

Quantity No

Eng.

Est.

Cntr 1

LONGVIEW

Cntr 2

PEACHTREItems

Cntr 3

B&H CONT

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 70.00 25 4.00 22.00 7.50 9.98

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 600.00 26 0.25 3.50 1.25 4.20

06682001 PREFAB PAV MRK (ACC PRK) EA 1.00 27 250.00 265.00 185.00 525.00

06722015 REFL PAV MRKR TY II-A-A EA 30.00 28 3.00 22.00 5.00 5.25

06782032 PAV SRF PREP FOR MRK(BLT CLN)(ENT GORE) EA 2.00 29 150.00 525.00 180.00 152.25

10182002 TREE PROTECTION AC 5.00 30 200.00 850.00 400.00 1000.00

50492003 BIODGRD EROSION CONTROL LOGS (12" DIA) LF 800.00 31 4.00 4.00 4.00 5.00

54342001 WHEEL STOPS EA 120.00 32 7.00 125.00 25.00 80.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 74: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HUNT

30 W

ESTIMATED COST: $574,973.55

PROJECT NUMBER: RMC - 621778001

ENGINEER: MISER, CRAIG- GREENVILLE TX 75402 (903)455-2363

DESCRIPTION: CONSTRUCT CONCRETE INTERSECTION

CHECK: 11,000

LOW BIDDER: LONGVIEW BRIDGE AND ROAD, LTD.

DATE: 05/03/2011

HWY.NO.: FM1903

LENGTH: 0.000 ORDER READ: 4001

Eng. Estimate -> $ 574,973.55 Amount Left %Left

Cntr 1 LONGVIEW BRIDGE AND ROAD, LTD........... 671,750.17

2 SAMMY GIST ENTERPRISES, INC............. 697,676.20 25,926.03 3.9

3 EAST TEXAS BRIDGE, INC.................. 725,461.30 53,711.13 8.0

4 MCMAHON CONTRACTING, L.P................ 736,342.86 64,592.69 9.6

5 ED BELL CONSTRUCTION COMPANY............ 749,428.45 77,678.28 11.6

6 B&H CONTRACTING, L.P.................... 811,382.03 139,631.86 20.8

HUNT Page 1 of 2

Quantity No

Eng.

Est.

Cntr 1

LONGVIEW

Cntr 2

SAMMY GIItems

Cntr 3

EAST TEX

Cntr 4

MCMAHON

Cntr 5

ED BELL

Cntr 6

B&H CONT

01042017 REMOVING CONC (DRIVEWAYS) SY 451.00 1 10.00 12.00 20.00 10.00 9.57 8.09 22.31

01042021 REMOVING CONC (CURB) LF 50.00 2 10.00 20.00 20.00 8.00 25.00 9.83 18.88

01102001 EXCAVATION (ROADWAY) CY 308.00 3 6.00 8.00 10.00 15.00 11.95 31.10 31.25

01322002 EMBANKMENT (FINAL)(DENS CONT)(TY A) CY 66.00 4 10.00 20.00 7.50 15.00 16.64 18.64 23.69

01342001 BACKFILL (TY A) STA 27.52 5 875.00 135.00 300.00 350.00 160.05 650.00 629.62

01522002 ROAD GRADER WORK (ORD COMP) SY 5,151.00 6 3.00 0.75 1.25 1.50 2.00 1.85 4.00

01642023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 5,151.00 7 0.35 0.30 0.30 0.35 0.33 0.44 0.30

01682001 VEGETATIVE WATERING MG 43.40 8 20.00 12.00 25.00 20.00 25.00 26.12 50.00

02512082 REWORK BS MTL (TY B)(18")(DENS CONT) SY 1,323.00 9 8.00 7.50 6.00 15.00 18.35 4.12 12.90

02602006 LIME TRT (EXST MATL) (6") SY 1,529.00 10 3.00 2.75 5.00 6.00 2.58 4.70 14.00

02602012 LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON 22.70 11 140.00 175.00 165.00 175.00 166.75 150.00 200.00

02752001 CEMENT TON 14.80 12 100.00 125.00 165.00 150.00 111.55 182.28 200.00

02752006 CEMENT TREAT (EXIST MATL) (10") SY 1,462.00 13 2.50 2.40 8.00 6.00 3.66 3.00 11.00

03102001 PRIME COAT (MC-30) GAL 286.00 14 3.50 4.00 8.00 6.00 5.75 5.25 7.50

03402011 D-GR HMA(METH) TY-B PG64-22 TON 254.90 15 80.00 100.00 105.00 125.00 103.50 94.50 106.00

03402104 D-GR HMA(METH) TY-D SAC-B PG64-22 TON 239.70 16 90.00 100.00 110.00 135.00 109.25 99.75 108.00

03602003 CONC PVMT (CONT REINF-CRCP)(10") SY 4,610.00 17 50.00 70.00 65.00 63.00 61.27 72.75 79.20

04322001 RIPRAP (CONC)(4 IN) CY 78.40 18 300.00 400.00 300.00 315.00 356.72 394.22 400.00

04962004 REMOV STR (SET) EA 1.00 19 280.00 190.00 250.00 500.00 1500.00 294.45 520.00

04962007 REMOV STR (PIPE) LF 30.00 20 12.00 10.00 10.00 10.00 60.00 14.88 30.50

05002001 MOBILIZATION LS 1.00 21 45000.00 55000.00 100000 71000.00 73000.00 75000.00 62000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.00 22 10000.00 2500.00 4400.00 3000.00 19719.10 16000.00 1000.00

05062001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 90.00 23 25.00 19.00 17.80 20.00 20.47 13.42 18.77

05062009 ROCK FILTER DAMS (REMOVE) LF 90.00 24 10.00 5.00 4.50 5.00 5.18 6.83 4.73

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 75: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: HUNT

30 W

ESTIMATED COST: $574,973.55

PROJECT NUMBER: RMC - 621778001

ENGINEER: MISER, CRAIG- GREENVILLE TX 75402 (903)455-2363

DESCRIPTION: CONSTRUCT CONCRETE INTERSECTION

CHECK: 11,000

LOW BIDDER: LONGVIEW BRIDGE AND ROAD, LTD.

DATE: 05/03/2011

HWY.NO.: FM1903

LENGTH: 0.000 ORDER READ: 4001

Eng. Estimate -> $ 574,973.55 Amount Left %Left

Cntr 1 LONGVIEW BRIDGE AND ROAD, LTD........... 671,750.17

2 SAMMY GIST ENTERPRISES, INC............. 697,676.20 25,926.03 3.9

3 EAST TEXAS BRIDGE, INC.................. 725,461.30 53,711.13 8.0

4 MCMAHON CONTRACTING, L.P................ 736,342.86 64,592.69 9.6

5 ED BELL CONSTRUCTION COMPANY............ 749,428.45 77,678.28 11.6

6 B&H CONTRACTING, L.P.................... 811,382.03 139,631.86 20.8

HUNT Page 2 of 2

Quantity No

Eng.

Est.

Cntr 1

LONGVIEW

Cntr 2

SAMMY GIItems

Cntr 3

EAST TEX

Cntr 4

MCMAHON

Cntr 5

ED BELL

Cntr 6

B&H CONT

05082002 CONSTRUCTING DETOURS SY 1,914.00 25 45.00 55.00 50.00 72.00 67.30 50.00 60.20

05292006 CONC CURB (MONO) (TY II) LF 330.00 26 7.00 10.00 10.00 6.00 2.00 0.74 6.50

05302010 DRIVEWAYS (CONC) SY 471.00 27 60.00 55.00 45.00 48.00 57.80 65.00 51.00

05302011 DRIVEWAYS (ACP) SY 100.00 28 30.00 50.00 45.00 50.00 37.95 75.00 38.00

06442056 RELOCATE SM RD SN SUP & AM TY 10BWG EA 9.00 29 300.00 425.00 350.00 440.00 460.00 374.87 420.00

06442058 RELOCATE SM RD SN SUP & AM TY S80 EA 14.00 30 270.00 460.00 350.00 475.00 494.50 511.26 451.50

06622063 WK ZN PAV MRK REMOV (TRAF BTN) TY Y LF 1,788.00 31 1.00 1.40 1.30 1.40 1.50 1.30 1.37

06662036 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 130.00 32 0.75 1.35 1.25 1.35 1.44 1.25 1.31

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 149.00 33 6.00 6.25 5.85 6.35 6.73 5.85 6.14

06662102 REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA 11.00 34 40.00 27.00 25.00 27.00 28.75 25.00 26.25

06662145 REF PAV MRK TY II (W) 4" (SLD) LF 2,003.00 35 0.20 0.07 0.06 0.10 0.07 0.06 0.06

06662153 REF PAV MRK TY II (W) 8" (SLD) LF 130.00 36 0.40 0.16 0.15 0.17 0.17 0.15 0.16

06662157 REF PAV MRK TY II (W) 24" (SLD) LF 149.00 37 3.00 3.20 3.00 3.25 3.45 3.00 3.15

06662175 REF PAV MRK TY II (W) 36" (YLD TRI) EA 11.00 38 5.50 7.50 7.00 7.55 8.05 7.00 7.35

06662178 REF PAV MRK TY II (Y) 4" (SLD) LF 2,240.00 39 0.20 0.07 0.06 0.10 0.07 0.06 0.06

06722015 REFL PAV MRKR TY II-A-A EA 158.00 40 4.00 5.25 5.00 5.40 5.75 5.00 5.25

06782001 PAV SURF PREP FOR MRK ( 4") LF 4,243.00 41 0.50 0.02 0.01 0.05 0.69 0.01 0.01

06782003 PAV SURF PREP FOR MRK ( 8") LF 130.00 42 0.50 0.03 0.02 0.05 1.38 0.02 0.02

06782006 PAV SURF PREP FOR MRK (24") LF 149.00 43 1.00 2.60 2.45 2.65 2.82 2.45 2.57

06782020 PAV SURF PREP FOR MRK (36") (YLD TRI) EA 11.00 44 5.00 5.25 5.00 5.40 5.75 5.00 5.25

82512006 RE PM W/RET REQ TY I(W)4"(SLD)(100MIL) LF 2,936.00 45 0.35 0.85 0.79 0.85 0.91 0.79 0.83

82512018 RE PM W/RET REQ TY I(Y)4"(SLD)(100MIL) LF 3,240.00 46 0.35 0.85 0.80 0.88 0.92 0.80 0.84

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 76: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: JEFFERSON

101 WORKING DAYS

ESTIMATED COST: $653,589.55

PROJECT NUMBER: STP 2011(956)HRR

ENGINEER: CARON, CHRIS- BEAUMONT TX 77708 (409)924-6521

DESCRIPTION: HAZZARD ELIMINATION

CHECK: 13,000

LOW BIDDER: NORMAN HIGHWAY CONSTRUCTORS, INC.

DATE: 05/03/2011

HWY.NO.: FM 365

LENGTH: 21.288 ORDER READ: 3022

Eng. Estimate -> $ 653,589.55 Amount Left %Left

Cntr 1 NORMAN HIGHWAY CONSTRUCTORS, INC........ 588,276.19

2 APAC-TEXAS, INC......................... 733,100.81 144,824.62 24.6

3 WIDGEON CONSTRUCTION, INC............... 734,463.23 146,187.04 24.9

4 BRYSTAR CONTRACTING, INC................ 767,664.20 179,388.01 30.5

5 A R BROTHERS CONSTRUCTION SERVICES, INC. 824,030.93 235,754.74 40.1

JEFFERSON Page 1 of 2

Quantity No

Eng.

Est.

Cntr 1

NORMAN

Cntr 2

APAC-TEXItems

Cntr 3

WIDGEON

Cntr 4

BRYSTAR

Cntr 5

A R BROT

01322003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 1,189.00 1 12.00 20.00 17.00 25.76 23.00 14.60

01642024 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) AC 0.40 2 892.00 1870.00 1275.00 504.00 1400.00 2212.50

01642030 CELL FBR MLCH SEED(TEMP)(WARM) AC 0.40 3 650.00 1870.00 1275.00 504.00 1400.00 2212.50

01642032 CELL FBR MLCH SEED(TEMP)(COOL) AC 0.40 4 650.00 1870.00 1275.00 504.00 1400.00 2212.50

01682001 VEGETATIVE WATERING MG 5.40 5 13.00 90.00 30.00 323.00 65.00 28.10

04002005 CEM STABIL BKFL CY 26.00 6 200.00 60.00 70.00 73.00 55.00 95.80

04002008 CUT & RESTORING PAV (ASPH) SY 23.00 7 40.00 80.00 125.00 113.00 140.00 97.00

04002009 CUT & RESTORING PAV (CONC) SY 39.00 8 123.00 125.00 180.00 137.00 120.00 100.00

04002010 CUT & RESTORING PAV (FLEX BASE) SY 273.00 9 25.00 30.00 120.00 28.35 30.00 23.00

04022001 TRENCH EXCAVATION PROTECTION LF 60.00 10 1.30 5.00 19.00 37.00 9.00 20.00

04322039 RIPRAP (MOW STRIP)(4 IN) CY 152.00 11 210.00 325.00 360.00 334.00 330.00 456.00

04502021 RAIL (TY T101RC) LF 575.41 12 55.00 59.00 55.00 74.00 70.00 66.00

04642002 RC PIPE (CL III)(15 IN) LF 16.00 13 35.00 33.00 57.00 25.00 45.00 31.00

04642003 RC PIPE (CL III)(18 IN) LF 412.00 14 35.00 27.00 41.00 30.20 48.00 45.00

04642005 RC PIPE (CL III)(24 IN) LF 832.00 15 45.00 32.00 49.00 33.40 52.00 62.00

04642007 RC PIPE (CL III)(30 IN) LF 206.00 16 70.00 42.00 68.00 56.25 60.00 98.00

04642009 RC PIPE (CL III)(36 IN) LF 396.00 17 80.00 62.00 82.00 71.00 75.00 113.00

04642011 RC PIPE (CL III)(48 IN) LF 24.00 18 106.00 90.00 123.00 195.00 170.00 201.00

04652003 INLET (COMPL)(TY H) EA 1.00 19 2118.00 2000.00 2300.00 3600.00 1600.00 4530.00

04652006 MANH (COMPL)(JUNCT BOX)(TY M) EA 3.00 20 3600.00 2000.00 2500.00 3896.00 1900.00 4250.00

04672208 SET (TY II)(15 IN)(RCP)(3:1)(C) EA 4.00 21 450.00 380.00 535.00 537.00 480.00 445.00

04672209 SET (TY II)(18 IN)(RCP)(3:1)(C) EA 4.00 22 700.00 385.00 540.00 514.00 500.00 458.00

04672211 SET (TY II)(24 IN)(RCP)(3:1)(C) EA 17.00 23 500.00 405.00 650.00 646.00 600.00 583.00

04672215 SET (TY II)(36 IN)(RCP)(3:1)(C) EA 9.00 24 1875.00 1450.00 980.00 1334.00 970.00 1911.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 77: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: JEFFERSON

101 WORKING DAYS

ESTIMATED COST: $653,589.55

PROJECT NUMBER: STP 2011(956)HRR

ENGINEER: CARON, CHRIS- BEAUMONT TX 77708 (409)924-6521

DESCRIPTION: HAZZARD ELIMINATION

CHECK: 13,000

LOW BIDDER: NORMAN HIGHWAY CONSTRUCTORS, INC.

DATE: 05/03/2011

HWY.NO.: FM 365

LENGTH: 21.288 ORDER READ: 3022

Eng. Estimate -> $ 653,589.55 Amount Left %Left

Cntr 1 NORMAN HIGHWAY CONSTRUCTORS, INC........ 588,276.19

2 APAC-TEXAS, INC......................... 733,100.81 144,824.62 24.6

3 WIDGEON CONSTRUCTION, INC............... 734,463.23 146,187.04 24.9

4 BRYSTAR CONTRACTING, INC................ 767,664.20 179,388.01 30.5

5 A R BROTHERS CONSTRUCTION SERVICES, INC. 824,030.93 235,754.74 40.1

JEFFERSON Page 2 of 2

Quantity No

Eng.

Est.

Cntr 1

NORMAN

Cntr 2

APAC-TEXItems

Cntr 3

WIDGEON

Cntr 4

BRYSTAR

Cntr 5

A R BROT

04672217 SET (TY II)(48 IN)(RCP)(3:1)(C) EA 6.00 25 3100.00 2390.00 3200.00 3615.00 3200.00 3177.00

04672222 SET (TY II)(18 IN)(RCP)(4:1)(C) EA 1.00 26 470.00 400.00 690.00 555.00 550.00 571.00

04672224 SET (TY II)(24 IN)(RCP)(4:1)(C) EA 14.00 27 770.00 570.00 700.00 721.00 650.00 705.00

04672225 SET (TY II)(30 IN)(RCP)(4:1)(C) EA 8.00 28 1350.00 865.00 1000.00 1018.00 970.00 1070.00

04672227 SET (TY II)(36 IN)(RCP)(4:1)(C) EA 7.00 29 2100.00 1800.00 1600.00 1560.00 1120.00 2262.00

04672236 SET (TY II)(24 IN)(RCP)(6:1)(C) EA 1.00 30 1125.00 660.00 960.00 886.00 830.00 854.00

04672286 SET (TY II)(18 IN)(RCP)(6:1)(P) EA 71.00 31 500.00 440.00 700.00 624.00 720.00 473.00

04672288 SET (TY II)(24 IN)(RCP)(6:1)(P) EA 90.00 32 650.00 660.00 840.00 886.00 850.00 809.00

04672290 SET (TY II)(30 IN)(RCP)(6:1)(P) EA 14.00 33 1500.00 1120.00 1295.84 1090.00 1300.00 1423.00

04672292 SET (TY II)(36 IN)(RCP)(6:1)(P) EA 16.00 34 2200.00 2730.00 2500.00 2670.00 2500.00 3559.00

04962006 REMOV STR (HEADWALL) EA 51.00 35 400.00 170.00 340.00 439.00 700.00 400.00

04962007 REMOV STR (PIPE) LF 1,667.00 36 12.00 4.00 13.00 10.25 4.50 11.00

05002001 MOBILIZATION LS 1.00 37 57000.00 16000.00 40000.00 30495.00 70000.00 79320.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.00 38 2000.00 425.00 390.00 541.00 400.00 557.49

05402001 MTL W-BEAM GD FEN (TIM POST) LF 875.00 39 20.00 20.00 18.50 25.31 20.00 18.50

05402013 MTL BEAM GD FEN TRANS (T101) EA 11.00 40 1000.00 950.00 865.00 1790.00 900.00 700.00

05442001 GUARDRAIL END TREATMENT (INSTALL) EA 11.00 41 1900.00 2100.00 2100.00 2977.00 2200.00 2400.00

05452001 CRASH CUSH ATTEN (INSTL) EA 5.00 42 8500.00 15100.00 14000.00 15000.00 17500.00 15800.00

06582261 INSTL DEL ASSM (D-SW)SZ (TYC)GF1(BI) EA 92.00 43 14.00 12.00 15.50 15.50 16.00 14.00

06582316 INSTL OM ASSM (OM-2Z)(FLX)GND EA 43.00 44 41.00 50.00 46.00 41.00 48.00 36.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 78: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: LEON

77 WORKING DAYS

ESTIMATED COST: $560,860.90

PROJECT NUMBER: STP 2011(958)HRR

ENGINEER: STEPHENS, DAVID- HUNTSVILLE TX 77808 (936)295-3462

DESCRIPTION: PROVIDE ADDITIONAL PAVEMENT WIDTH

CHECK: 11,000

LOW BIDDER: BIG CREEK CONSTRUCTION, LTD.

DATE: 05/03/2011

HWY.NO.: FM 1146

LENGTH: 6.138 ORDER READ: 3006

Eng. Estimate -> $ 560,860.90 Amount Left %Left

Cntr 1 BIG CREEK CONSTRUCTION, LTD............. 712,449.91

2 A. L. HELMCAMP, INC..................... 746,766.03 34,316.12 4.8

3 RYAN EQUIPMENT INC...................... 769,263.75 56,813.84 8.0

LEON Page 1 of 3

Quantity No

Eng.

Est.

Cntr 1

BIG CREE

Cntr 2

A. L. HEItems

Cntr 3

RYAN EQU

01002003 PREPARING ROW(TREE)(5" TO 12" DIA) EA 7.00 1 120.00 350.00 500.00 250.00

01042021 REMOVING CONC (CURB) LF 108.00 2 18.00 6.00 20.00 3.35

01122001 SUBGRADE WIDENING (ORD COMP) STA 201.40 3 150.00 350.00 130.00 300.00

01322006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 728.00 4 10.00 9.00 16.00 15.00

01502001 BLADING STA 203.40 5 80.00 150.00 95.00 72.85

01642001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 31,330.00 6 0.15 0.08 0.07 0.10

01642009 BROADCAST SEED (TEMP) (WARM) SY 15,665.00 7 0.10 0.06 0.06 0.10

01642011 BROADCAST SEED (TEMP) (COOL) SY 15,665.00 8 0.10 0.06 0.06 0.12

01682001 VEGETATIVE WATERING MG 313.00 9 10.00 1.00 8.00 9.28

02472336 FL BS (CMP IN PLC)(TY A GR 2)(10") SY 9,393.00 10 11.30 15.00 19.00 19.00

03162406 AGGR (TY-B GR-5 OR TY-L GR-5 SAC-B) CY 111.00 11 70.00 72.00 120.00 75.00

03162686 ASPH (CRS-2) OR (RC250) GAL 3,467.00 12 2.80 3.25 4.00 4.00

03162707 ASPH (TIER III) GAL 26,502.00 13 3.00 3.00 3.30 4.00

03162719 AGGR (TIER III) CY 505.00 14 80.00 75.00 80.00 80.00

04002005 CEM STABIL BKFL CY 39.00 15 75.00 100.00 140.00 96.00

04002006 CUT & RESTORING PAV SY 22.00 16 60.00 80.00 140.00 95.00

04022001 TRENCH EXCAVATION PROTECTION LF 29.00 17 1.30 10.00 8.00 2.25

04322039 RIPRAP (MOW STRIP)(4 IN) CY 49.00 18 220.00 400.00 380.00 400.00

04322049 BEDDING MATERIAL (VAR DEPTH) CY 15.00 19 300.00 100.00 140.00 80.00

04322084 RIPRAP (CONC) (CL B) (4") CY 1.74 20 300.00 1500.00 860.00 500.00

04502185 RAIL (TY T101 RAC-R)(MOD) LF 105.00 21 65.00 250.00 200.00 160.00

04602003 CMP (GAL STL 18 IN) LF 34.00 22 30.00 70.00 62.00 42.57

04602004 CMP (GAL STL 24 IN) LF 7.00 23 40.00 75.00 120.00 46.65

04602007 CMP (GAL STL 36 IN) LF 62.00 24 65.00 80.00 70.00 60.22

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 79: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: LEON

77 WORKING DAYS

ESTIMATED COST: $560,860.90

PROJECT NUMBER: STP 2011(958)HRR

ENGINEER: STEPHENS, DAVID- HUNTSVILLE TX 77808 (936)295-3462

DESCRIPTION: PROVIDE ADDITIONAL PAVEMENT WIDTH

CHECK: 11,000

LOW BIDDER: BIG CREEK CONSTRUCTION, LTD.

DATE: 05/03/2011

HWY.NO.: FM 1146

LENGTH: 6.138 ORDER READ: 3006

Eng. Estimate -> $ 560,860.90 Amount Left %Left

Cntr 1 BIG CREEK CONSTRUCTION, LTD............. 712,449.91

2 A. L. HELMCAMP, INC..................... 746,766.03 34,316.12 4.8

3 RYAN EQUIPMENT INC...................... 769,263.75 56,813.84 8.0

LEON Page 2 of 3

Quantity No

Eng.

Est.

Cntr 1

BIG CREE

Cntr 2

A. L. HEItems

Cntr 3

RYAN EQU

04662254 WINGWALL (SPECIAL) (HW=10FT) EA 2.00 25 10000.00 8000.00 14000.00 13000.00

04672249 SET (TY II)(24 IN)(CMP)(3:1)(C) EA 2.00 26 650.00 750.00 900.00 772.50

04672253 SET (TY II)(36 IN)(CMP)(3:1)(C) EA 2.00 27 1200.00 1500.00 1400.00 1834.44

04672262 SET (TY II)(24 IN)(CMP)(4:1)(C) EA 2.00 28 600.00 800.00 1000.00 900.00

04672286 SET (TY II)(18 IN)(RCP)(6:1)(P) EA 2.00 29 700.00 750.00 800.00 800.00

04672300 SET (TY II)(15 IN)(CMP)(6:1)(P) EA 2.00 30 610.00 700.00 750.00 700.00

04672301 SET (TY II)(18 IN)(CMP)(6:1)(P) EA 86.00 31 630.00 750.00 800.00 700.00

04672303 SET (TY II)(24 IN)(CMP)(6:1)(P) EA 10.00 32 750.00 800.00 1500.00 900.00

04672307 SET (TY II)(36 IN)(CMP)(6:1)(P) EA 2.00 33 2000.00 2000.00 2800.00 1876.00

04802001 CLEAN EXIST CULVS EA 17.00 34 500.00 800.00 350.00 670.00

04962016 REMOV STR (PIPE) EA 1.00 35 500.00 2000.00 1300.00 204.00

05002001 MOBILIZATION LS 1.00 36 40000.00 70000.00 65000.00 55000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.00 37 3000.00 2000.00 2400.00 4000.00

05062001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 90.00 38 20.00 15.00 24.00 20.00

05062002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 250.00 39 20.00 18.00 26.00 25.00

05062009 ROCK FILTER DAMS (REMOVE) LF 340.00 40 5.00 6.00 6.00 7.00

05062024 BACKHOE WORK (EROSION & SEDM CONT) HR 64.00 41 65.00 50.00 47.00 64.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 644.00 42 2.50 3.00 3.30 4.00

05302015 TURNOUTS (SURF TREAT) EA 15.00 43 300.00 50.00 75.00 850.00

05402001 MTL W-BEAM GD FEN (TIM POST) LF 150.00 44 15.00 20.25 23.00 21.00

05402013 MTL BEAM GD FEN TRANS (T101) EA 4.00 45 965.00 875.00 1000.00 975.00

05442006 GDRAIL END TRT(INST)(WOOD POST)(TY III) EA 4.00 46 2000.00 2150.00 2500.00 2160.00

06582260 INSTL DEL ASSM (D-SW)SZ (TYC)GF1 EA 6.00 47 14.00 22.50 25.00 25.00

06582316 INSTL OM ASSM (OM-2Z)(FLX)GND EA 6.00 48 60.00 45.00 55.00 60.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 80: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: LEON

77 WORKING DAYS

ESTIMATED COST: $560,860.90

PROJECT NUMBER: STP 2011(958)HRR

ENGINEER: STEPHENS, DAVID- HUNTSVILLE TX 77808 (936)295-3462

DESCRIPTION: PROVIDE ADDITIONAL PAVEMENT WIDTH

CHECK: 11,000

LOW BIDDER: BIG CREEK CONSTRUCTION, LTD.

DATE: 05/03/2011

HWY.NO.: FM 1146

LENGTH: 6.138 ORDER READ: 3006

Eng. Estimate -> $ 560,860.90 Amount Left %Left

Cntr 1 BIG CREEK CONSTRUCTION, LTD............. 712,449.91

2 A. L. HELMCAMP, INC..................... 746,766.03 34,316.12 4.8

3 RYAN EQUIPMENT INC...................... 769,263.75 56,813.84 8.0

LEON Page 3 of 3

Quantity No

Eng.

Est.

Cntr 1

BIG CREE

Cntr 2

A. L. HEItems

Cntr 3

RYAN EQU

06622115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 534.00 49 1.00 1.00 0.70 0.75

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 40,280.00 50 0.30 0.34 0.45 0.35

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 11.00 51 10.00 14.20 16.00 14.50

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 2,130.00 52 0.30 0.38 0.47 0.40

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 30,349.00 53 0.30 0.34 0.47 0.38

06722015 REFL PAV MRKR TY II-A-A EA 490.00 54 3.25 3.80 4.10 3.90

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 81: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: MCLENNAN

45 W

ESTIMATED COST: $878,785.75

PROJECT NUMBER: RMC - 622448001

ENGINEER: JASEK, JOHN- WACO TX 76712 (254)772-2890

DESCRIPTION: REPARI OF BASE FAILURES

CHECK: 17,000

LOW BIDDER: BIG CREEK CONSTRUCTION, LTD.

DATE: 05/03/2011

HWY.NO.: SH0006

LENGTH: 0.000 ORDER READ: 4003

Eng. Estimate -> $ 878,785.75 Amount Left %Left

Cntr 1 BIG CREEK CONSTRUCTION, LTD............. 872,432.50

2 LINDSEY CONTRACTORS, INC................ 993,866.50 121,434.00 13.9

3 KNIFE RIVER CORPORATION - SOUTH......... 1,182,204.12 309,771.62 35.5

MCLENNAN Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

BIG CREE

Cntr 2

LINDSEYItems

Cntr 3

KNIFE RI

03412064 D-GR HMA(QCQA) TY-C SAC-B PG76-22 TON 4,143.00 1 62.00 61.00 69.00 81.50

03412136 D-GR HMA(QCQA) TY-D SAC-B PG76-22 TON 2,258.00 2 65.00 64.00 65.00 81.00

03412176 D-GR HMA(QCQA) TY-F SAC-B PG64-22 TON 1,424.00 3 71.00 72.00 86.00 91.00

03422002 PFC (ASPHALT) PG76-22 TON 52.00 4 82.00 120.00 900.00 135.00

03422006 PFC (AGGREGATE)(PG76 MIX) SAC-A TON 712.00 5 80.00 120.00 65.00 135.00

03512004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 1,833.00 6 36.00 33.00 44.50 49.00

03512013 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") SY 5,750.00 7 25.00 21.00 31.40 23.00

03542045 PLANE ASPH CONC PAV (2") SY 52,667.00 8 1.25 1.50 1.00 1.86

05002001 MOBILIZATION LS 1.00 9 20000.00 10000.00 8500.00 74000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.00 10 4000.00 1250.00 6300.00 10000.00

06622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 2,000.00 11 0.75 1.00 0.50 0.70

06622114 WK ZN PAV MRK SHT TERM (TAB) TY Y EA 1,000.00 12 0.75 1.00 0.50 0.70

06622115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 4,000.00 13 0.75 1.00 0.50 0.70

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 82: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: MCLENNAN

95 W

ESTIMATED COST: $371,500.00

PROJECT NUMBER: RMC - 622483001

ENGINEER: JASEK, JOHN- WACO TX 76712 (254)772-2890

DESCRIPTION: CONCRETE PAVEMENT & PAVEMENT SPALL REP

CHECK: 7,000

LOW BIDDER: LEGENDS LANDSCAPES LLC

DATE: 05/03/2011

HWY.NO.: US0084

LENGTH: 0.000 ORDER READ: 4004

Eng. Estimate -> $ 371,500.00 Amount Left %Left

Cntr 1 LEGENDS LANDSCAPES LLC.................. 346,250.00

2 VANN/ELLI, INC.......................... 396,925.00 50,675.00 14.6

3 TEXAS TREE & LANDSCAPE, LTD............. 435,125.00 88,875.00 25.7

4 CPAVE, INC.............................. 477,200.00 130,950.00 37.8

5 SILVER CREEK CONSTRUCTION, INC.......... 660,000.00 313,750.00 90.6

6 SCR CONSTRUCTION CO., INC............... 682,125.00 335,875.00 97.0

7 O. TREVINO CONSTRUCTION, LLC............ 886,475.00 540,225.00 156.0

MCLENNAN Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

LEGENDS

Cntr 2

VANN/ELLItems

Cntr 3

TEXAS TR

Cntr 4

CPAVE,

Cntr 5

SILVER

Cntr 6

SCR CONS

Cntr 7

O. TREVI

03612003 FULL-DEPTH REPAIR CRCP (10") SY 600.00 1 168.00 125.00 185.00 200.00 170.00 225.00 240.00 319.00

03612009 FULL-DEPTH REPAIR CPCD (8") SY 100.00 2 193.00 125.00 177.00 200.00 160.00 325.00 250.00 260.00

03612020 FULL-DEPTH REPAIR CPJR (9") SY 50.00 3 168.00 125.00 193.00 200.00 150.00 325.00 400.00 344.00

03612028 FULL-DEPTH REPAIR CRCP (6") SY 100.00 4 150.00 100.00 160.00 200.00 145.00 325.00 260.00 215.00

07202003 SPALLING REPAIR (POLYMERIC)(SEMIRIGID) GAL 7,250.00 5 28.00 30.00 25.10 34.50 38.00 35.00 46.50 75.50

44912001 TYPE CAC CONCRETE CY 50.00 6 500.00 500.00 1212.00 300.00 1234.00 3800.00 2600.00 1660.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 83: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: ORANGE

163 W

ESTIMATED COST: $1,375,000.00

PROJECT NUMBER: RMC - 622094001

ENGINEER: CARON, CHRIS- BEAUMONT TX 77708 (409)924-6523

DESCRIPTION: REMOVE LEAD PAINT

CHECK: 28,000

LOW BIDDER: 1 PRIORITY ENVIRONMENTAL SERVICES, INC.

DATE: 05/03/2011

HWY.NO.: IH0010

LENGTH: 0.000 ORDER READ: 4014

Eng. Estimate -> $ 1,375,000.00 Amount Left %Left

Cntr 1 1 PRIORITY ENVIRONMENTAL SERVICES, INC.. 749,440.00

2 PCTK PAINTING CO........................ 824,000.00 74,560.00 9.9

3 S & S BRIDGE PAINTING, INC.............. 892,770.00 143,330.00 19.1

4 HAMES CONTRACTING, INC.................. 928,000.00 178,560.00 23.8

5 TEXAS BRIDGE, INC....................... 1,235,000.00 485,560.00 64.8

6 INTECH CONTRACTING LLC.................. 1,348,710.00 599,270.00 80.0

ORANGE Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

1 PRIORI

Cntr 2

PCTK PAIItems

Cntr 3

S & S BR

Cntr 4

HAMES CO

Cntr 5

TEXAS BR

Cntr 6

INTECH

05002001 MOBILIZATION LS 1.00 1 120000 45000.00 25000.00 45441.00 75000.00 80000.00 122610

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 11.00 2 5000.00 3500.00 4000.00 2000.00 3000.00 5000.00 100.00

75872001 PAINT REMOVAL(STEEL BRIDGE ELEMENTS) LS 1.00 3 1200000 665940 755000 825329 820000 1100000 1225000

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 84: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: PALO PINTO

132 WORKING DAYS

ESTIMATED COST: $2,127,648.00

PROJECT NUMBER: STP 1102(128)

ENGINEER: CORDARY, JOHN- WEATHERFORD TX 76086 (682)229-2800

DESCRIPTION: GR, BS AND PAVEMENT

CHECK: 43,000

LOW BIDDER: PRATER EQUIPMENT CO., INC.

DATE: 05/03/2011

HWY.NO.: SH 254

LENGTH: 6.437 ORDER READ: 3031

Eng. Estimate -> $ 2,127,648.00 Amount Left %Left

Cntr 1 PRATER EQUIPMENT CO., INC............... 2,015,924.66

2 JAY MILLS CONTRACTING, INCORPORATED..... 2,020,781.19 4,856.53 0.2

3 THE LANE CONSTRUCTION CORPORATION....... 2,267,042.55 251,117.89 12.5

4 JAGOE-PUBLIC COMPANY.................... 2,393,846.85 377,922.19 18.7

5 ED BELL CONSTRUCTION COMPANY............ 2,463,968.42 448,043.76 22.2

6 STEPHENS MARTIN PAVING, L.P............. 2,466,580.05 450,655.39 22.4

7 APAC-TEXAS, INC......................... 2,750,113.68 734,189.02 36.4

PALO PINTO Page 1 of 4

Quantity No

Eng.

Est.

Cntr 1

PRATER

Cntr 2

JAY MILLItems

Cntr 3

THE LANE

Cntr 4

JAGOE-PU

Cntr 5

ED BELL

Cntr 6

STEPHENS

Cntr 7

APAC-TEX

01102001 EXCAVATION (ROADWAY) CY 13,688.00 1 9.25 5.00 7.00 8.00 9.00 10.00 13.62 14.00

01342002 BACKFILL (TY B) STA 154.70 2 115.00 125.00 75.00 110.00 170.00 255.00 125.00 290.00

02162001 PROOF ROLLING HR 80.00 3 80.00 50.00 70.00 100.00 80.00 120.00 50.00 100.00

02472238 FL BS (CMP IN PLC)(TY A GR 4)(12") SY 59,333.00 4 8.90 10.54 7.65 11.00 10.50 10.75 12.00 13.00

02602016 LIME (HYD, COM, OR QK(SLURRY)) TON 813.00 5 135.00 145.00 148.00 140.00 155.00 167.00 120.00 145.00

02602027 LIME TRT (EXST MATL)(8") SY 48,733.00 6 1.48 1.20 2.00 2.45 1.85 3.00 1.80 2.20

02752001 CEMENT TON 509.00 7 108.00 100.00 102.00 95.00 100.00 100.00 100.00 100.00

02752011 CEMENT TREAT(EXIST MATL)(8") SY 36,605.00 8 1.60 0.75 2.00 1.90 1.65 1.50 1.72 2.80

03102005 PRIME COAT (MC-30 OR AE-P) GAL 11,467.00 9 3.75 3.77 3.10 3.00 3.50 4.25 3.48 3.30

03162174 AGGR(TY-B GR-4 SAC-B) CY 680.00 10 75.00 40.75 50.00 75.00 70.00 65.00 45.60 77.00

03162409 ASPH(AC-5 OR AC-10)W/2%SBR OR CRS-1P/2P GAL 23,882.00 11 6.00 4.00 4.50 3.75 3.80 4.37 3.00 3.45

03412120 D-GR HMA(QCQA) TY-D SAC-B PG70-22 TON 9,155.00 12 60.00 64.15 64.00 63.50 67.00 66.00 61.35 72.00

03542045 PLANE ASPH CONC PAV (2") SY 28,005.00 13 0.88 0.84 0.87 0.70 0.70 0.95 1.12 1.00

03542049 PLANE ASPH CONC PAV (6") SY 57,333.00 14 1.00 0.40 1.91 1.20 1.30 1.30 1.85 1.30

05002001 MOBILIZATION LS 1.00 15 118395.1 130000 100000 170000 238000 210000 275000 221500

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 9.00 16 4000.00 1800.00 1250.00 1000.00 7500.00 4400.00 2000.00 8900.00

05062022 EARTHWORK (ERSN & SEDM CONT, IN VEH) CY 20.00 17 50.00 20.00 20.00 50.00 40.00 20.00 40.00 90.00

06622004 WK ZN PAV MRK NON-REMOV (W) 4" (SLD) LF 20,326.00 18 0.36 0.25 0.31 0.32 0.28 0.28 0.28 0.26

06622032 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 20,604.00 19 0.36 0.25 0.31 0.33 0.28 0.28 0.28 0.26

06622067 WK ZN PAV MRK REMOV (W) 4" (SLD) LF 20,211.00 20 0.60 0.55 0.47 0.45 0.43 0.43 0.43 0.58

06622099 WK ZN PAV MRK REMOV (Y) 4" (SLD) LF 20,840.00 21 0.64 0.55 0.47 0.46 0.43 0.43 0.43 0.58

06662003 REFL PAV MRK TY I (W) 4" (BRK)(100MIL) LF 4,370.00 22 0.80 0.42 0.50 0.50 0.47 0.45 0.45 0.44

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 30,940.00 23 0.50 0.38 0.47 0.48 0.43 0.43 0.43 0.40

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 563.00 24 0.26 0.42 0.50 0.51 0.45 0.45 0.45 0.44

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 85: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: PALO PINTO

132 WORKING DAYS

ESTIMATED COST: $2,127,648.00

PROJECT NUMBER: STP 1102(128)

ENGINEER: CORDARY, JOHN- WEATHERFORD TX 76086 (682)229-2800

DESCRIPTION: GR, BS AND PAVEMENT

CHECK: 43,000

LOW BIDDER: PRATER EQUIPMENT CO., INC.

DATE: 05/03/2011

HWY.NO.: SH 254

LENGTH: 6.437 ORDER READ: 3031

Eng. Estimate -> $ 2,127,648.00 Amount Left %Left

Cntr 1 PRATER EQUIPMENT CO., INC............... 2,015,924.66

2 JAY MILLS CONTRACTING, INCORPORATED..... 2,020,781.19 4,856.53 0.2

3 THE LANE CONSTRUCTION CORPORATION....... 2,267,042.55 251,117.89 12.5

4 JAGOE-PUBLIC COMPANY.................... 2,393,846.85 377,922.19 18.7

5 ED BELL CONSTRUCTION COMPANY............ 2,463,968.42 448,043.76 22.2

6 STEPHENS MARTIN PAVING, L.P............. 2,466,580.05 450,655.39 22.4

7 APAC-TEXAS, INC......................... 2,750,113.68 734,189.02 36.4

PALO PINTO Page 2 of 4

Quantity No

Eng.

Est.

Cntr 1

PRATER

Cntr 2

JAY MILLItems

Cntr 3

THE LANE

Cntr 4

JAGOE-PU

Cntr 5

ED BELL

Cntr 6

STEPHENS

Cntr 7

APAC-TEX

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 29,695.00 25 0.50 0.38 0.47 0.50 0.43 0.43 0.43 0.40

06722012 REFL PAV MRKR TY I-C EA 109.00 26 5.00 2.85 3.58 4.00 5.00 3.25 3.25 3.00

06722015 REFL PAV MRKR TY II-A-A EA 289.00 27 5.00 2.85 3.58 4.00 5.00 3.25 3.25 3.00

06772001 ELIM EXT PAV MRK & MRKS ( 4") LF 11,818.00 28 1.00 0.25 0.39 0.40 0.37 0.35 0.35 0.26

06782001 PAV SURF PREP FOR MRK ( 4") LF 11,818.00 29 0.07 0.18 0.06 0.06 0.07 0.05 0.05 0.20

50492003 BIODGRD EROSION CONTROL LOGS (12" DIA) LF 100.00 30 1.00 7.00 4.00 4.50 8.00 7.00 9.00 20.00

68342001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 540.00 31 75.00 60.00 60.00 60.00 55.00 66.00 85.00 90.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 86: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: PALO PINTO

132 WORKING DAYS

ESTIMATED COST: $2,127,648.00

PROJECT NUMBER: STP 1102(128)

ENGINEER: CORDARY, JOHN- WEATHERFORD TX 76086 (682)229-2800

DESCRIPTION: GR, BS AND PAVEMENT

CHECK: 43,000

LOW BIDDER: PRATER EQUIPMENT CO., INC.

DATE: 05/03/2011

HWY.NO.: SH 254

LENGTH: 6.437 ORDER READ: 3031

Eng. Estimate -> $ 2,127,648.00 Amount Left %Left

Cntr 8 DUININCK, INC........................... 2,799,987.30 784,062.64 38.9

9 ZACK BURKETT CO......................... 2,870,956.58 855,031.92 42.4

PALO PINTO Page 3 of 4

Quantity No

Eng.

Est.

Cntr 8

DUININCK

Cntr 9

ZACK BURItems

01102001 EXCAVATION (ROADWAY) CY 13,688.00 1 9.25 11.00 7.00

01342002 BACKFILL (TY B) STA 154.70 2 115.00 94.50 150.00

02162001 PROOF ROLLING HR 80.00 3 80.00 125.00 88.50

02472238 FL BS (CMP IN PLC)(TY A GR 4)(12") SY 59,333.00 4 8.90 14.25 16.00

02602016 LIME (HYD, COM, OR QK(SLURRY)) TON 813.00 5 135.00 145.00 166.00

02602027 LIME TRT (EXST MATL)(8") SY 48,733.00 6 1.48 2.95 7.00

02752001 CEMENT TON 509.00 7 108.00 93.50 115.00

02752011 CEMENT TREAT(EXIST MATL)(8") SY 36,605.00 8 1.60 2.65 4.15

03102005 PRIME COAT (MC-30 OR AE-P) GAL 11,467.00 9 3.75 3.50 4.10

03162174 AGGR(TY-B GR-4 SAC-B) CY 680.00 10 75.00 77.50 62.00

03162409 ASPH(AC-5 OR AC-10)W/2%SBR OR CRS-1P/2P GAL 23,882.00 11 6.00 3.80 3.99

03412120 D-GR HMA(QCQA) TY-D SAC-B PG70-22 TON 9,155.00 12 60.00 68.00 62.10

03542045 PLANE ASPH CONC PAV (2") SY 28,005.00 13 0.88 0.89 0.53

03542049 PLANE ASPH CONC PAV (6") SY 57,333.00 14 1.00 1.45 1.35

05002001 MOBILIZATION LS 1.00 15 118395.1 235000 150000

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 9.00 16 4000.00 9500.00 1500.00

05062022 EARTHWORK (ERSN & SEDM CONT, IN VEH) CY 20.00 17 50.00 125.00 354.00

06622004 WK ZN PAV MRK NON-REMOV (W) 4" (SLD) LF 20,326.00 18 0.36 0.29 0.33

06622032 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 20,604.00 19 0.36 0.29 0.33

06622067 WK ZN PAV MRK REMOV (W) 4" (SLD) LF 20,211.00 20 0.60 0.44 0.50

06622099 WK ZN PAV MRK REMOV (Y) 4" (SLD) LF 20,840.00 21 0.64 0.44 0.50

06662003 REFL PAV MRK TY I (W) 4" (BRK)(100MIL) LF 4,370.00 22 0.80 0.46 0.53

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 30,940.00 23 0.50 0.44 0.50

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 563.00 24 0.26 0.46 0.53

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 87: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: PALO PINTO

132 WORKING DAYS

ESTIMATED COST: $2,127,648.00

PROJECT NUMBER: STP 1102(128)

ENGINEER: CORDARY, JOHN- WEATHERFORD TX 76086 (682)229-2800

DESCRIPTION: GR, BS AND PAVEMENT

CHECK: 43,000

LOW BIDDER: PRATER EQUIPMENT CO., INC.

DATE: 05/03/2011

HWY.NO.: SH 254

LENGTH: 6.437 ORDER READ: 3031

Eng. Estimate -> $ 2,127,648.00 Amount Left %Left

Cntr 8 DUININCK, INC........................... 2,799,987.30 784,062.64 38.9

9 ZACK BURKETT CO......................... 2,870,956.58 855,031.92 42.4

PALO PINTO Page 4 of 4

Quantity No

Eng.

Est.

Cntr 8

DUININCK

Cntr 9

ZACK BURItems

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 29,695.00 25 0.50 0.44 0.50

06722012 REFL PAV MRKR TY I-C EA 109.00 26 5.00 3.35 3.80

06722015 REFL PAV MRKR TY II-A-A EA 289.00 27 5.00 3.35 3.80

06772001 ELIM EXT PAV MRK & MRKS ( 4") LF 11,818.00 28 1.00 0.36 0.41

06782001 PAV SURF PREP FOR MRK ( 4") LF 11,818.00 29 0.07 0.05 0.06

50492003 BIODGRD EROSION CONTROL LOGS (12" DIA) LF 100.00 30 1.00 6.20 29.50

68342001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 540.00 31 75.00 130.00 30.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 88: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: RUSK

24 W

ESTIMATED COST: $510,284.45

PROJECT NUMBER: RMC - 622474001

ENGINEER: HODGES, BRYAN- TYLER TX 75702 (903)510-9583

DESCRIPTION: RESTORATION OF EXISTING ROAD

CHECK: 10,000

LOW BIDDER: PINTO CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: FM1251

LENGTH: 0.000 ORDER READ: 4006

Eng. Estimate -> $ 510,284.45 Amount Left %Left

Cntr 1 PINTO CONSTRUCTION CO., INC............. 569,003.20

2 REYNOLDS & KAY, LTD..................... 590,910.26 21,907.06 3.9

3 A. L. HELMCAMP, INC..................... 664,377.28 95,374.08 16.8

4 LONGVIEW BRIDGE AND ROAD, LTD........... 681,158.65 112,155.45 19.7

5 EAST TEXAS BRIDGE, INC.................. 728,677.20 159,674.00 28.1

RUSK Page 1 of 3

Quantity No

Eng.

Est.

Cntr 1

PINTO CO

Cntr 2

REYNOLDSItems

Cntr 3

A. L. HE

Cntr 4

LONGVIEW

Cntr 5

EAST TEX

01002001 PREPARING ROW AC 0.04 1 5000.00 5000.00 10000.00 27000.00 12500.00 165000

01122001 SUBGRADE WIDENING (ORD COMP) STA 8.21 2 200.00 105.00 407.00 250.00 135.00 450.00

01322019 EMBANKMENT (VEHICLE)(ORD COMP)(TY B) CY 20.00 3 15.00 16.00 17.00 22.00 20.00 25.00

01342001 BACKFILL (TY A) STA 8.21 4 115.00 95.00 325.00 250.00 125.00 300.00

01642009 BROADCAST SEED (TEMP) (WARM) SY 2,845.00 5 0.10 0.31 0.32 0.10 0.32 0.35

01642011 BROADCAST SEED (TEMP) (COOL) SY 2,845.00 6 0.10 0.22 0.25 0.18 0.21 0.25

01642013 STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY) SY 5,690.00 7 0.25 0.33 0.35 0.28 0.34 0.40

01682001 VEGETATIVE WATERING MG 125.00 8 11.00 4.00 14.00 16.00 4.00 18.00

02472386 FL BS(RD DEL)(TY E GR 4)(RAP)(IN VEH) CY 2,921.00 9 7.50 5.33 10.50 9.00 11.50 20.00

02752001 CEMENT TON 205.00 10 100.00 112.00 117.00 125.00 120.00 115.00

02752003 CEMENT TREAT (NEW BASE) (6") SY 17,461.00 11 1.50 1.25 1.83 2.10 1.75 2.50

03162513 AGGR (TY-PD GR-3 OR TYL-PL GR-3) CY 240.00 12 100.00 82.17 92.00 95.00 95.00 145.00

03162532 ASPH(AC-20-5TR OR AC-20XP) GAL 9,066.00 13 3.00 3.75 3.30 3.90 4.25 4.50

03402034 D-GR HMA(METH) TY-C PG64-22 TON 223.00 14 70.00 119.44 96.00 110.00 95.00 155.00

03542057 PLANE ASPH CONC PAV (4") SY 17,033.00 15 5.00 1.05 1.70 2.60 2.75 2.55

04202016 CL C CONC (COLLAR) EA 2.00 16 500.00 890.00 350.00 800.00 1000.00 1200.00

04322001 RIPRAP (CONC)(4 IN) CY 130.00 17 250.00 386.00 307.00 360.00 380.00 350.00

04382002 CLEAN AND SEAL EXIST JOINTS LF 181.25 18 10.00 15.00 12.00 24.00 25.00 22.00

04522006 REMOV RAIL (TY T1) LF 480.00 19 6.50 5.00 5.30 9.00 6.00 5.00

04642003 RC PIPE (CL III)(18 IN) LF 8.00 20 30.00 69.00 132.00 180.00 125.00 50.00

04672209 SET (TY II)(18 IN)(RCP)(3:1)(C) EA 2.00 21 750.00 675.00 487.00 850.00 425.00 600.00

04672211 SET (TY II)(24 IN)(RCP)(3:1)(C) EA 2.00 22 750.00 733.00 564.00 1000.00 485.00 700.00

05002001 MOBILIZATION LS 1.00 23 24500.00 15000.00 32400.00 63000.00 50000.00 70000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.00 24 3500.00 1260.00 575.00 5000.00 2000.00 3000.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 89: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: RUSK

24 W

ESTIMATED COST: $510,284.45

PROJECT NUMBER: RMC - 622474001

ENGINEER: HODGES, BRYAN- TYLER TX 75702 (903)510-9583

DESCRIPTION: RESTORATION OF EXISTING ROAD

CHECK: 10,000

LOW BIDDER: PINTO CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: FM1251

LENGTH: 0.000 ORDER READ: 4006

Eng. Estimate -> $ 510,284.45 Amount Left %Left

Cntr 1 PINTO CONSTRUCTION CO., INC............. 569,003.20

2 REYNOLDS & KAY, LTD..................... 590,910.26 21,907.06 3.9

3 A. L. HELMCAMP, INC..................... 664,377.28 95,374.08 16.8

4 LONGVIEW BRIDGE AND ROAD, LTD........... 681,158.65 112,155.45 19.7

5 EAST TEXAS BRIDGE, INC.................. 728,677.20 159,674.00 28.1

RUSK Page 2 of 3

Quantity No

Eng.

Est.

Cntr 1

PINTO CO

Cntr 2

REYNOLDSItems

Cntr 3

A. L. HE

Cntr 4

LONGVIEW

Cntr 5

EAST TEX

05062001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 160.00 25 15.00 19.50 20.00 33.00 20.50 22.00

05062009 ROCK FILTER DAMS (REMOVE) LF 160.00 26 5.00 6.00 6.00 8.00 6.00 6.00

05062024 BACKHOE WORK (EROSION & SEDM CONT) HR 20.00 27 60.00 75.00 51.00 48.00 65.00 125.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 9,800.00 28 2.00 2.00 2.30 1.00 2.00 2.15

05142015 PERM CONC TRF BARR (F-SHAPE)(TY 1) LF 1,870.00 29 40.00 71.78 78.00 55.00 75.00 70.00

05142039 PERM CONC TRF BARR(F-SHAPE)(SPL) LF 493.00 30 60.00 159.08 117.00 170.00 175.00 90.00

05402001 MTL W-BEAM GD FEN (TIM POST) LF 2,425.00 31 15.00 16.80 14.00 18.00 15.00 17.50

05402011 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.00 32 1200.00 1700.00 1280.00 1500.00 1375.00 1250.00

05422001 REMOVING METAL BEAM GUARD FENCE LF 4,425.00 33 2.00 1.58 0.80 2.00 1.60 1.65

05422002 REMOVING TERMINAL ANCHOR SECTION EA 3.00 34 100.00 210.00 160.00 250.00 135.00 220.00

05442001 GUARDRAIL END TREATMENT (INSTALL) EA 4.00 35 2000.00 2010.00 1815.00 2300.00 2000.00 2100.00

05442003 GUARDRAIL END TREATMENT (REMOVE) EA 1.00 36 250.00 157.00 320.00 160.00 215.00 165.00

05602011 MAILBOX INSTALL-S (TWG-POST) TY 2 FND EA 2.00 37 160.00 250.00 154.00 280.00 265.00 160.00

06442001 INS SM RD SN SUP&AM TY 10BWG(1) SA(P) EA 4.00 38 450.00 450.00 425.00 450.00 480.00 440.00

06442004 INS SM RD SN SUP&AM TY 10BWG(1) SA(T) EA 1.00 39 450.00 400.00 450.00 650.00 425.00 470.00

06442060 REMOVE SM RD SN SUP & AM EA 5.00 40 75.00 65.00 64.00 85.00 70.00 65.00

06582258 INSTL DEL ASSM (D-SW)SZ (TYC)CTB EA 25.00 41 20.00 27.30 30.00 40.00 11.00 32.00

06582260 INSTL DEL ASSM (D-SW)SZ (TYC)GF1 EA 27.00 42 20.00 26.25 30.00 50.00 11.00 32.00

06582316 INSTL OM ASSM (OM-2Z)(FLX)GND EA 4.00 43 60.00 52.50 48.00 60.00 70.00 50.00

06622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 5.00 44 1.00 1.00 1.00 1.00 2.00 3.00

06622115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 256.00 45 1.00 1.00 1.00 0.70 2.00 2.25

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 10,722.00 46 0.50 0.50 0.54 0.52 0.75 0.55

06662036 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 100.00 47 0.75 1.00 1.10 1.10 0.75 1.10

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 117.00 48 5.00 6.00 6.40 6.50 4.80 6.60

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 90: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: RUSK

24 W

ESTIMATED COST: $510,284.45

PROJECT NUMBER: RMC - 622474001

ENGINEER: HODGES, BRYAN- TYLER TX 75702 (903)510-9583

DESCRIPTION: RESTORATION OF EXISTING ROAD

CHECK: 10,000

LOW BIDDER: PINTO CONSTRUCTION CO., INC.

DATE: 05/03/2011

HWY.NO.: FM1251

LENGTH: 0.000 ORDER READ: 4006

Eng. Estimate -> $ 510,284.45 Amount Left %Left

Cntr 1 PINTO CONSTRUCTION CO., INC............. 569,003.20

2 REYNOLDS & KAY, LTD..................... 590,910.26 21,907.06 3.9

3 A. L. HELMCAMP, INC..................... 664,377.28 95,374.08 16.8

4 LONGVIEW BRIDGE AND ROAD, LTD........... 681,158.65 112,155.45 19.7

5 EAST TEXAS BRIDGE, INC.................. 728,677.20 159,674.00 28.1

RUSK Page 3 of 3

Quantity No

Eng.

Est.

Cntr 1

PINTO CO

Cntr 2

REYNOLDSItems

Cntr 3

A. L. HE

Cntr 4

LONGVIEW

Cntr 5

EAST TEX

06662054 REFL PAV MRK TY I (W) (ARROW) (100MIL) EA 1.00 49 100.00 100.00 106.00 110.00 160.00 110.00

06662096 REFL PAV MRK TY I (W) (WORD) (100MIL) EA 1.00 50 150.00 125.00 133.00 130.00 265.00 140.00

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 94.00 51 0.30 0.54 0.60 0.60 0.75 0.60

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 13,282.00 52 0.30 0.50 0.54 0.52 0.75 0.55

06662132 REFL PAV MRK TY I (Y) 24"(SLD)(100MIL) LF 700.00 53 5.00 6.00 6.40 6.20 4.25 6.60

06662189 PAVEMENT SEALER 4" LF 960.00 54 0.15 0.15 0.16 0.15 0.55 0.20

06722010 REFL PAV MRKR TY I-A EA 133.00 55 3.00 4.50 4.80 4.60 4.25 5.00

06722012 REFL PAV MRKR TY I-C EA 5.00 56 4.00 4.50 4.80 4.60 4.25 5.00

06722015 REFL PAV MRKR TY II-A-A EA 201.00 57 3.50 4.50 4.80 4.60 4.25 5.00

06782001 PAV SURF PREP FOR MRK ( 4") LF 960.00 58 0.10 0.11 0.12 0.11 0.55 0.15

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 91: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: SAN PATRICIO

65 WORKING DAYS

ESTIMATED COST: $445,150.00

PROJECT NUMBER: STP 2011(960)HES

ENGINEER: BILL REITMANN- SINTON TX 78387 (361)364-6402

DESCRIPTION: INSTALL SAFETY LIGHTING

CHECK: 9,000

LOW BIDDER: AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P.

DATE: 05/03/2011

HWY.NO.: US 77

LENGTH: 4.242 ORDER READ: 3023

Eng. Estimate -> $ 445,150.00 Amount Left %Left

Cntr 1 AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., 365,316.00

2 THIRD COAST SERVICES, LLC............... 382,242.50 16,926.50 4.6

3 TRAF-TEX, INC........................... 385,647.85 20,331.85 5.6

4 STAR OPERATIONS, INC.................... 387,514.75 22,198.75 6.1

5 MICA CORPORATION........................ 426,575.50 61,259.50 16.8

6 HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, COR 433,379.56 68,063.56 18.6

7 THE LEVY COMPANY, L.P................... 443,117.84 77,801.84 21.3

SAN PATRICIO Page 1 of 2

Quantity No

Eng.

Est.

Cntr 1

AUSTIN

Cntr 2

THIRD COItems

Cntr 3

TRAF-TEX

Cntr 4

STAR OPE

Cntr 5

MICA COR

Cntr 6

HIGHWAY

Cntr 7

THE LEVY

04162029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 438.00 1 110.00 125.00 135.00 138.00 82.50 101.10 108.32 99.47

05002001 MOBILIZATION LS 1.00 2 32000.00 12500.00 35000.00 4030.00 8800.00 30435.00 34211.42 44311.78

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.00 3 3500.00 1500.00 500.00 1604.00 850.00 7315.00 2168.36 3372.37

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 1,300.00 4 2.50 2.10 5.00 1.95 2.50 3.30 4.89 2.73

06102025 INS RD IL AM (TY SA) 40T-8 (.25 KW)S EA 51.00 5 2500.00 2100.00 2260.00 2500.00 2360.00 2280.00 2271.53 2216.52

06102043 INS RD IL AM (TY SA) 50T-8-8 (.4 KW)S EA 3.00 6 3000.00 3100.00 2700.00 3784.00 3280.00 3345.00 3159.10 3087.33

06102072 REMOVE RDWY ILL ASSEM EA 2.00 7 500.00 500.00 500.00 165.00 430.00 177.00 394.68 388.79

06182018 CONDT (PVC) (SCHD 40) ( 2") LF 3,940.00 8 5.00 3.50 4.00 3.95 6.35 6.05 5.96 5.00

06182019 CONDT (PVC) (SCHD 40) (2") (BORE) LF 9,440.00 9 12.00 10.00 8.00 7.90 11.35 9.30 12.20 14.06

06182022 CONDT (PVC) (SCHD 40) (3") LF 15.00 10 10.00 25.00 6.00 7.75 7.25 13.30 12.98 7.51

06182053 CONDT (RM) (2") (BORE) LF 220.00 11 25.00 21.00 12.00 13.15 20.45 19.00 25.05 22.26

06202007 ELEC CONDR (NO. 4) BARE LF 5,870.00 12 1.00 1.10 1.20 1.65 1.35 1.42 1.21 1.32

06202008 ELEC CONDR (NO. 4) INSULATED LF 11,770.00 13 1.50 1.20 1.30 1.98 1.60 1.54 1.37 1.26

06202009 ELEC CONDR (NO. 6) BARE LF 6,550.00 14 1.00 0.90 0.85 1.15 0.95 1.12 0.91 0.91

06202010 ELEC CONDR (NO. 6) INSULATED LF 13,100.00 15 1.00 1.00 1.00 1.35 1.15 1.19 1.02 0.88

06242008 GROUND BOX TY A (122311) W/APRON EA 11.00 16 600.00 475.00 550.00 460.00 555.00 703.00 661.51 398.93

06242014 GROUND BOX TY D (162922) W/APRON EA 3.00 17 800.00 650.00 580.00 635.00 675.00 750.00 711.91 518.84

06282014 ELC SRV TY A 240/480 060 (NS)SS(E)GC(O) EA 2.00 18 6300.00 4100.00 3800.00 4840.00 4000.00 5270.00 4648.19 4046.99

06282015 ELC SRV TY A 240/480 060 (NS)SS(E)GC(U) EA 1.00 19 6500.00 3500.00 4800.00 4595.00 3600.00 5545.00 4648.19 3365.48

06282158 REMOVE ELECTRICAL SERVICES EA 1.00 20 315.00 300.00 40.00 445.00 325.00 177.00 315.74 210.07

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 92: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: SAN PATRICIO

65 WORKING DAYS

ESTIMATED COST: $445,150.00

PROJECT NUMBER: STP 2011(960)HES

ENGINEER: BILL REITMANN- SINTON TX 78387 (361)364-6402

DESCRIPTION: INSTALL SAFETY LIGHTING

CHECK: 9,000

LOW BIDDER: AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P.

DATE: 05/03/2011

HWY.NO.: US 77

LENGTH: 4.242 ORDER READ: 3023

Eng. Estimate -> $ 445,150.00 Amount Left %Left

Cntr 8 F & W ELECTRICAL CONTRACTORS, INC....... 453,282.50 87,966.50 24.1

SAN PATRICIO Page 2 of 2

Quantity No

Eng.

Est.

Cntr 8

F & W ELItems

04162029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 438.00 1 110.00 110.00

05002001 MOBILIZATION LS 1.00 2 32000.00 23300.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.00 3 3500.00 1312.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 1,300.00 4 2.50 5.25

06102025 INS RD IL AM (TY SA) 40T-8 (.25 KW)S EA 51.00 5 2500.00 2310.00

06102043 INS RD IL AM (TY SA) 50T-8-8 (.4 KW)S EA 3.00 6 3000.00 2835.00

06102072 REMOVE RDWY ILL ASSEM EA 2.00 7 500.00 525.00

06182018 CONDT (PVC) (SCHD 40) ( 2") LF 3,940.00 8 5.00 5.25

06182019 CONDT (PVC) (SCHD 40) (2") (BORE) LF 9,440.00 9 12.00 15.00

06182022 CONDT (PVC) (SCHD 40) (3") LF 15.00 10 10.00 10.00

06182053 CONDT (RM) (2") (BORE) LF 220.00 11 25.00 20.00

06202007 ELEC CONDR (NO. 4) BARE LF 5,870.00 12 1.00 1.50

06202008 ELEC CONDR (NO. 4) INSULATED LF 11,770.00 13 1.50 1.60

06202009 ELEC CONDR (NO. 6) BARE LF 6,550.00 14 1.00 1.05

06202010 ELEC CONDR (NO. 6) INSULATED LF 13,100.00 15 1.00 1.25

06242008 GROUND BOX TY A (122311) W/APRON EA 11.00 16 600.00 470.00

06242014 GROUND BOX TY D (162922) W/APRON EA 3.00 17 800.00 575.00

06282014 ELC SRV TY A 240/480 060 (NS)SS(E)GC(O) EA 2.00 18 6300.00 5775.00

06282015 ELC SRV TY A 240/480 060 (NS)SS(E)GC(U) EA 1.00 19 6500.00 5775.00

06282158 REMOVE ELECTRICAL SERVICES EA 1.00 20 315.00 420.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 93: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: SAN PATRICIO

40 W

ESTIMATED COST: $775,984.00

PROJECT NUMBER: BPM - 622008001

ENGINEER: REITMANN, BILL- SINTON TX 78387 (361)364-6402

DESCRIPTION: REPLACE BRIDGE JOINTS

CHECK: 16,000

LOW BIDDER: SILVER CREEK CONSTRUCTION, INC.

DATE: 05/03/2011

HWY.NO.: IH0037

LENGTH: 0.000 ORDER READ: 4010

Eng. Estimate -> $ 775,984.00 Amount Left %Left

Cntr 1 SILVER CREEK CONSTRUCTION, INC.......... 655,440.00

2 O. TREVINO CONSTRUCTION, LLC............ 690,100.80 34,660.80 5.3

3 CPAVE, INC.............................. 699,960.80 44,520.80 6.8

4 PRIMATE CONSTRUCTION, INC............... 895,892.80 240,452.80 36.7

5 SCR CONSTRUCTION CO., INC............... 997,520.00 342,080.00 52.2

6 FLASHER EQUIPMENT COMPANY............... 1,050,560.00 395,120.00 60.3

7 CCC GROUP, INC.......................... 1,052,885.00 397,445.00 60.6

SAN PATRICIO Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

SILVER

Cntr 2

O. TREVIItems

Cntr 3

CPAVE,

Cntr 4

PRIMATE

Cntr 5

SCR CONS

Cntr 6

FLASHER

Cntr 7

CCC GROU

04542006 HEADER TYPE EXPANSION JOINT LF 9,520.00 1 72.00 59.50 61.04 72.79 90.64 101.00 103.00 97.45

05002001 MOBILIZATION LS 1.00 2 70544.00 65000.00 69000.00 5000.00 25000.00 20000.00 57000.00 110601

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.00 3 10000.00 12000.00 20000.00 1000.00 4000.00 8000.00 6500.00 7280.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 94: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: SHELBY

263 WORKING DAYS

ESTIMATED COST: $1,655,721.98

PROJECT NUMBER: BR 2011(970)

ENGINEER: LEE, C. MICHAEL- NACOGDOCHES TX 75961 (936)564-7782

DESCRIPTION: REPLACE BRIDGES AND APPROACHES

CHECK: 33,000

LOW BIDDER: LONGVIEW BRIDGE AND ROAD, LTD.

DATE: 05/03/2011

HWY.NO.: FM 139

LENGTH: 0.972 ORDER READ: 3024

Eng. Estimate -> $ 1,655,721.98 Amount Left %Left

Cntr 1 LONGVIEW BRIDGE AND ROAD, LTD........... 1,630,133.08

2 J-W PAYNE CONSTRUCTION COMPANY, LTD..... 1,727,122.71 96,989.63 5.9

3 HODGES AND SON CONSTRUCTION COMPANY, INC 1,923,155.00 293,021.92 18.0

4 EAST TEXAS BRIDGE, INC.................. 2,065,488.55 435,355.47 26.7

5 SPRING EQUIPMENT CO., INC............... 2,493,168.00 863,034.92 52.9

SHELBY Page 1 of 4

Quantity No

Eng.

Est.

Cntr 1

LONGVIEW

Cntr 2

J-W PAYNItems

Cntr 3

HODGES

Cntr 4

EAST TEX

Cntr 5

SPRING

01002002 PREPARING ROW STA 31.93 1 1000.00 1500.00 566.00 1200.00 3000.00 750.00

01102001 EXCAVATION (ROADWAY) CY 4,292.00 2 5.00 4.00 5.91 6.00 6.00 8.00

01322004 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 12,329.00 3 8.00 6.50 7.19 8.00 8.00 17.00

01612002 COMPOST MANUF TOPSOIL (BOS) (4") SY 37,117.00 4 0.70 1.50 0.95 2.00 1.75 4.00

01642021 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 37,117.00 5 0.18 0.18 0.175 0.20 0.20 0.30

01642029 CELL FBR MLCH SEED(TEMP)(WARM) SY 37,117.00 6 0.18 0.13 0.12 0.20 0.15 0.20

01642031 CELL FBR MLCH SEED(TEMP)(COOL) SY 37,117.00 7 0.18 0.13 0.12 0.20 0.15 0.20

01682001 VEGETATIVE WATERING MG 296.90 8 10.00 15.00 4.00 20.00 12.00 14.00

02472054 FL BS (CMP IN PLC)(TY D GR 2)(FNAL POS) CY 2,979.00 9 65.00 70.00 61.56 50.00 65.00 45.00

02512252 REWORK BS MAT (TY C) (6") (ORIG POS) SY 6,861.00 10 2.00 1.40 1.22 3.00 5.00 5.00

02602004 LIME (QUICKLIME (DRY)) TON 88.00 11 150.00 150.00 162.00 200.00 175.00 140.00

02602009 LIME TRT (EXST MATL)(10") SY 3,889.00 12 2.30 2.00 3.22 3.00 4.00 3.00

03162015 ASPH (RC-250) GAL 2,406.00 13 5.00 4.50 4.91 6.00 8.00 5.00

03162425 AGGR (TY-E GR-3 OR TY-L GR-3) CY 109.00 14 90.00 100.00 80.62 200.00 200.00 146.00

03162427 AGGR (TY-E GR-5 OR TY-L GR-5) CY 78.00 15 90.00 95.00 77.78 200.00 200.00 146.00

03162566 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 8,456.00 16 3.50 4.00 3.88 6.00 5.50 5.00

03162644 AGGR (TY PE, PL, E, OR L GR-4 SAC-B) CY 83.00 17 90.00 100.00 100.00 200.00 200.00 146.00

04002005 CEM STABIL BKFL CY 190.00 18 100.00 91.00 143.92 160.00 150.00 35.00

1 04162003 DRILL SHAFT (30 IN) LF 1,002.00 19 120.00 0.00 121.79 110.00 150.00 180.00

04202003 CL C CONC (ABUT) CY 59.20 20 700.00 700.00 747.96 700.00 765.00 820.00

1 04202004 CL C CONC (BENT) CY 62.80 21 725.00 0.00 908.14 700.00 900.00 980.00

04202029 CL S CONC (SLAB) CY 193.20 22 600.00 600.00 585.10 700.00 640.00 1100.00

04202031 CL S CONC (SHEAR KEY) CY 55.30 23 300.00 300.00 344.23 500.00 310.00 510.00

04202033 CL S CONC (APPR SLAB) CY 103.60 24 400.00 400.00 443.61 400.00 430.00 580.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 95: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: SHELBY

263 WORKING DAYS

ESTIMATED COST: $1,655,721.98

PROJECT NUMBER: BR 2011(970)

ENGINEER: LEE, C. MICHAEL- NACOGDOCHES TX 75961 (936)564-7782

DESCRIPTION: REPLACE BRIDGES AND APPROACHES

CHECK: 33,000

LOW BIDDER: LONGVIEW BRIDGE AND ROAD, LTD.

DATE: 05/03/2011

HWY.NO.: FM 139

LENGTH: 0.972 ORDER READ: 3024

Eng. Estimate -> $ 1,655,721.98 Amount Left %Left

Cntr 1 LONGVIEW BRIDGE AND ROAD, LTD........... 1,630,133.08

2 J-W PAYNE CONSTRUCTION COMPANY, LTD..... 1,727,122.71 96,989.63 5.9

3 HODGES AND SON CONSTRUCTION COMPANY, INC 1,923,155.00 293,021.92 18.0

4 EAST TEXAS BRIDGE, INC.................. 2,065,488.55 435,355.47 26.7

5 SPRING EQUIPMENT CO., INC............... 2,493,168.00 863,034.92 52.9

SHELBY Page 2 of 4

Quantity No

Eng.

Est.

Cntr 1

LONGVIEW

Cntr 2

J-W PAYNItems

Cntr 3

HODGES

Cntr 4

EAST TEX

Cntr 5

SPRING

04252006 PRESTR CONC BOX BEAM (4B20) LF 1,039.50 25 120.00 135.00 160.00 170.00 175.00 250.00

04252007 PRESTR CONC BOX BEAM (5B20) LF 1,386.00 26 140.00 135.00 160.00 170.00 175.00 242.00

04282002 CONC SURF TREAT (CLASS II) SY 1,179.00 27 2.00 3.00 3.30 3.00 4.00 5.00

2 04322021 RIPRAP (STONE PROTECTION)(18 IN) CY 376.00 28 105.00 110.00 0.00 110.00 115.00 0.00

04502161 RAIL (TY T223) LF 764.00 29 75.00 75.00 71.79 80.00 60.00 170.00

04542005 ARMOR JOINT (WITH SEAL) LF 113.40 30 60.00 70.00 77.17 100.00 90.00 90.00

04642003 RC PIPE (CL III)(18 IN) LF 48.00 31 40.00 41.00 33.00 40.00 35.00 87.00

04642005 RC PIPE (CL III)(24 IN) LF 112.00 32 65.00 50.00 44.00 45.00 45.00 100.00

04672286 SET (TY II)(18 IN)(RCP)(6:1)(P) EA 4.00 33 500.00 500.00 445.00 500.00 600.00 1600.00

04672288 SET (TY II)(24 IN)(RCP)(6:1)(P) EA 4.00 34 750.00 630.00 660.00 700.00 800.00 1900.00

04962009 REMOV STR (BRIDGE 0-99 FT LENGTH) EA 1.00 35 15000.00 13000.00 24519.90 15000.00 16000.00 15000.00

04962010 REMOV STR (BRIDGE 100-499 FT LENGTH) EA 1.00 36 30000.00 17000.00 32693.20 20000.00 26000.00 15000.00

04962016 REMOV STR (PIPE) EA 3.00 37 125.00 400.00 150.00 500.00 600.00 1700.00

05002001 MOBILIZATION LS 1.00 38 127000 100000 137500 175000 160000 4200.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 13.00 39 1500.00 800.00 700.00 1000.00 1500.00 5500.00

05062002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 150.00 40 30.00 21.00 28.70 40.00 32.00 40.00

05062009 ROCK FILTER DAMS (REMOVE) LF 150.00 41 10.00 6.00 5.40 20.00 6.00 10.00

05062016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 488.00 42 13.00 10.00 14.80 40.00 16.00 39.00

05062019 CONSTRUCTION EXITS (REMOVE) SY 488.00 43 5.25 2.00 4.00 20.00 5.00 3.00

05062024 BACKHOE WORK (EROSION & SEDM CONT) HR 100.00 44 58.00 55.00 75.00 30.00 135.00 110.00

05062027 BLADING WORK (EROSION & SEDM CONT) HR 50.00 45 75.00 45.00 85.00 30.00 135.00 95.00

05062030 CONSTRUCTION PERIMETER FENCE LF 634.00 46 2.75 1.30 1.80 4.00 6.00 2.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 3,980.00 47 3.00 2.60 1.95 3.00 3.00 3.00

05302011 DRIVEWAYS (ACP) SY 157.00 48 50.00 28.00 21.42 40.00 35.00 22.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 96: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: SHELBY

263 WORKING DAYS

ESTIMATED COST: $1,655,721.98

PROJECT NUMBER: BR 2011(970)

ENGINEER: LEE, C. MICHAEL- NACOGDOCHES TX 75961 (936)564-7782

DESCRIPTION: REPLACE BRIDGES AND APPROACHES

CHECK: 33,000

LOW BIDDER: LONGVIEW BRIDGE AND ROAD, LTD.

DATE: 05/03/2011

HWY.NO.: FM 139

LENGTH: 0.972 ORDER READ: 3024

Eng. Estimate -> $ 1,655,721.98 Amount Left %Left

Cntr 1 LONGVIEW BRIDGE AND ROAD, LTD........... 1,630,133.08

2 J-W PAYNE CONSTRUCTION COMPANY, LTD..... 1,727,122.71 96,989.63 5.9

3 HODGES AND SON CONSTRUCTION COMPANY, INC 1,923,155.00 293,021.92 18.0

4 EAST TEXAS BRIDGE, INC.................. 2,065,488.55 435,355.47 26.7

5 SPRING EQUIPMENT CO., INC............... 2,493,168.00 863,034.92 52.9

SHELBY Page 3 of 4

Quantity No

Eng.

Est.

Cntr 1

LONGVIEW

Cntr 2

J-W PAYNItems

Cntr 3

HODGES

Cntr 4

EAST TEX

Cntr 5

SPRING

05302012 DRIVEWAYS (SURF TREAT) SY 439.00 49 50.00 29.00 18.31 30.00 35.00 22.00

05302018 TURNOUTS (SURF TREAT) SY 12.00 50 60.00 40.00 18.31 40.00 35.00 22.00

05402001 MTL W-BEAM GD FEN (TIM POST) LF 400.00 51 20.00 23.00 19.00 18.00 22.00 49.00

05402011 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 8.00 52 2000.00 2300.00 1475.00 1400.00 1600.00 2000.00

05422001 REMOVING METAL BEAM GUARD FENCE LF 1,600.00 53 2.50 3.00 2.00 2.00 3.00 3.00

05422002 REMOVING TERMINAL ANCHOR SECTION EA 8.00 54 200.00 100.00 100.00 200.00 125.00 4.00

05442006 GDRAIL END TRT(INST)(WOOD POST)(TY III) EA 8.00 55 2200.00 2300.00 2200.00 2200.00 2600.00 4500.00

05602004 MAILBOX INSTALL-S (WC-POST) TY 3 FND EA 1.00 56 150.00 185.00 140.00 250.00 165.00 215.00

06442012 INS SM RD SN SUP&AM TY 10BWG(1) SB(U) EA 2.00 57 340.00 520.00 525.00 800.00 600.00 1500.00

06442060 REMOVE SM RD SN SUP & AM EA 8.00 58 50.00 45.00 75.00 100.00 100.00 70.00

06442081 INS SM RD SN SUP&AM TY TWT(1) WS(P) EA 2.00 59 280.00 305.00 325.00 500.00 400.00 430.00

06582241 INSTL DEL ASSM (D-SW)SZ 1(FLX)GF2(BI) EA 24.00 60 20.00 24.00 35.00 50.00 40.00 50.00

06582259 INSTL DEL ASSM (D-SW)SZ (TYC)CTB(BI) EA 12.00 61 18.00 10.00 20.00 50.00 25.00 50.00

06622032 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 6,386.00 62 0.20 0.80 1.60 0.80 1.00 2.00

06622115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 240.00 63 1.00 1.35 1.00 4.00 2.00 3.00

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 6,386.00 64 0.50 0.80 1.10 0.75 1.00 2.00

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 6,386.00 65 0.50 0.80 1.10 0.75 1.00 2.00

06662189 PAVEMENT SEALER 4" LF 350.00 66 0.20 0.35 1.00 1.00 1.00 2.00

06722015 REFL PAV MRKR TY II-A-A EA 80.00 67 5.00 4.20 4.00 12.00 5.00 15.00

06782001 PAV SURF PREP FOR MRK ( 4") LF 350.00 68 0.05 1.05 1.00 0.50 1.00 2.00

50492001 BIODGRD EROSION CONTROL LOGS (8" DIA) LF 634.00 69 2.50 2.90 3.70 5.00 5.00 7.00

1A 04092001 PRESTR CONC PIL (16 IN SQ) LF 852.00 70 63.00 55.00 0.00 0.00 0.00 0.00

1A 04092002 PRESTR CONC PIL (18 IN SQ) LF 1,045.00 71 69.48 65.00 0.00 0.00 0.00 0.00

1A 04202019 CL C CONC (CAP) CY 53.50 72 725.00 750.00 0.00 0.00 0.00 0.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 97: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: SHELBY

263 WORKING DAYS

ESTIMATED COST: $1,655,721.98

PROJECT NUMBER: BR 2011(970)

ENGINEER: LEE, C. MICHAEL- NACOGDOCHES TX 75961 (936)564-7782

DESCRIPTION: REPLACE BRIDGES AND APPROACHES

CHECK: 33,000

LOW BIDDER: LONGVIEW BRIDGE AND ROAD, LTD.

DATE: 05/03/2011

HWY.NO.: FM 139

LENGTH: 0.972 ORDER READ: 3024

Eng. Estimate -> $ 1,655,721.98 Amount Left %Left

Cntr 1 LONGVIEW BRIDGE AND ROAD, LTD........... 1,630,133.08

2 J-W PAYNE CONSTRUCTION COMPANY, LTD..... 1,727,122.71 96,989.63 5.9

3 HODGES AND SON CONSTRUCTION COMPANY, INC 1,923,155.00 293,021.92 18.0

4 EAST TEXAS BRIDGE, INC.................. 2,065,488.55 435,355.47 26.7

5 SPRING EQUIPMENT CO., INC............... 2,493,168.00 863,034.92 52.9

SHELBY Page 4 of 4

Quantity No

Eng.

Est.

Cntr 1

LONGVIEW

Cntr 2

J-W PAYNItems

Cntr 3

HODGES

Cntr 4

EAST TEX

Cntr 5

SPRING

2A 40222001 INTRLOCK ARTICULATING CONC BLKS(4" MIN) SF 10,248.00 73 3.66 0.00 3.75 0.00 0.00 8.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 98: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: SHELBY

271 WORKING DAYS

ESTIMATED COST: $863,937.20

PROJECT NUMBER: BR 2011(974)

ENGINEER: LEE, C MICHAEL- NACOGDOCHES TX 75961 (936)564-7782

DESCRIPTION: REPLACE BRIDGE AND APPROACHES

CHECK: 17,000

LOW BIDDER: LONGVIEW BRIDGE AND ROAD, LTD.

DATE: 05/03/2011

HWY.NO.: FM 2026

LENGTH: 0.443 ORDER READ: 3025

Eng. Estimate -> $ 863,937.20 Amount Left %Left

Cntr 1 LONGVIEW BRIDGE AND ROAD, LTD........... 892,525.95

2 J-W PAYNE CONSTRUCTION COMPANY, LTD..... 952,660.98 60,135.03 6.7

3 HODGES AND SON CONSTRUCTION COMPANY, INC 1,012,341.30 119,815.35 13.4

4 EAST TEXAS BRIDGE, INC.................. 1,288,390.30 395,864.35 44.4

SHELBY Page 1 of 3

Quantity No

Eng.

Est.

Cntr 1

LONGVIEW

Cntr 2

J-W PAYNItems

Cntr 3

HODGES

Cntr 4

EAST TEX

01002002 PREPARING ROW STA 14.57 1 1500.00 1000.00 1027.00 1600.00 3000.00

01102001 EXCAVATION (ROADWAY) CY 804.00 2 5.00 6.00 4.20 8.00 6.00

01322003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 1,523.00 3 8.00 8.00 6.06 8.00 8.00

01612002 COMPOST MANUF TOPSOIL (BOS) (4") SY 8,540.00 4 1.50 1.50 1.35 2.00 2.00

01642009 BROADCAST SEED (TEMP) (WARM) SY 12,604.00 5 0.10 0.05 0.05 0.10 0.10

01642011 BROADCAST SEED (TEMP) (COOL) SY 12,604.00 6 0.10 0.05 0.05 0.10 0.10

01642021 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 8,540.00 7 0.25 0.19 0.185 0.20 0.20

01682001 VEGETATIVE WATERING MG 337.50 8 10.00 10.00 0.01 20.00 12.00

01692002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 1,455.00 9 2.50 1.05 1.00 1.50 2.00

02472054 FL BS (CMP IN PLC)(TY D GR 2)(FNAL POS) CY 452.00 10 70.00 75.00 83.96 80.00 65.00

02512317 REWRK BS MTL (TY C)(7")(OC)(ORG POS) CY 279.00 11 6.00 8.00 11.14 4.00 15.00

02752001 CEMENT TON 28.00 12 150.00 150.00 115.00 200.00 160.00

02752006 CEMENT TREAT (EXIST MATL) (10") SY 2,069.00 13 3.00 1.60 2.38 4.00 5.00

03102001 PRIME COAT (MC-30) GAL 398.00 14 4.50 5.00 7.00 6.00 15.00

03162432 AGGR(TY-PE OR TY-PL GR-4 SAC-B) CY 33.00 15 120.00 150.00 106.00 250.00 215.00

03162469 AGGR (TY-E GR-4 OR TY-L GR-4) CY 18.00 16 120.00 150.00 145.00 250.00 265.00

03162566 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 874.00 17 4.00 5.00 4.78 6.00 11.00

03162655 ASPH (AC 10-2TR, AC-15P, OR AC-15XP) GAL 1,283.00 18 4.00 5.00 5.19 6.00 11.00

03402106 D-GR HMA(METH) TY-D PG64-22 TON 4.00 19 150.00 200.00 150.00 200.00 300.00

04002005 CEM STABIL BKFL CY 126.00 20 100.00 88.00 149.51 180.00 165.00

04032001 TEMPORARY SPL SHORING SF 620.00 21 15.00 10.00 8.00 25.00 25.00

04162003 DRILL SHAFT (30 IN) LF 150.00 22 120.00 150.00 149.45 110.00 200.00

04202003 CL C CONC (ABUT) CY 36.80 23 700.00 645.00 803.98 700.00 800.00

04202029 CL S CONC (SLAB) CY 57.90 24 600.00 540.00 618.62 700.00 800.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 99: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: SHELBY

271 WORKING DAYS

ESTIMATED COST: $863,937.20

PROJECT NUMBER: BR 2011(974)

ENGINEER: LEE, C MICHAEL- NACOGDOCHES TX 75961 (936)564-7782

DESCRIPTION: REPLACE BRIDGE AND APPROACHES

CHECK: 17,000

LOW BIDDER: LONGVIEW BRIDGE AND ROAD, LTD.

DATE: 05/03/2011

HWY.NO.: FM 2026

LENGTH: 0.443 ORDER READ: 3025

Eng. Estimate -> $ 863,937.20 Amount Left %Left

Cntr 1 LONGVIEW BRIDGE AND ROAD, LTD........... 892,525.95

2 J-W PAYNE CONSTRUCTION COMPANY, LTD..... 952,660.98 60,135.03 6.7

3 HODGES AND SON CONSTRUCTION COMPANY, INC 1,012,341.30 119,815.35 13.4

4 EAST TEXAS BRIDGE, INC.................. 1,288,390.30 395,864.35 44.4

SHELBY Page 2 of 3

Quantity No

Eng.

Est.

Cntr 1

LONGVIEW

Cntr 2

J-W PAYNItems

Cntr 3

HODGES

Cntr 4

EAST TEX

04202031 CL S CONC (SHEAR KEY) CY 32.10 25 300.00 250.00 357.60 500.00 350.00

04202033 CL S CONC (APPR SLAB) CY 48.00 26 400.00 400.00 460.84 400.00 450.00

04252010 PRESTR CONC BOX BEAM (4B34) LF 298.50 27 160.00 215.00 208.25 220.00 230.00

04252011 PRESTR CONC BOX BEAM (5B34) LF 398.00 28 160.00 215.00 208.25 220.00 230.00

04282002 CONC SURF TREAT (CLASS II) SY 483.00 29 3.00 3.00 3.30 4.00 5.00

1 04322021 RIPRAP (STONE PROTECTION)(18 IN) CY 610.00 30 105.00 105.00 0.00 110.00 115.00

04322033 RIPRAP (STONE COMMON)(DRY)(12 IN) CY 5.00 31 120.00 105.00 178.35 150.00 115.00

04502161 RAIL (TY T223) LF 244.00 32 75.00 80.00 74.58 85.00 60.00

04542005 ARMOR JOINT (WITH SEAL) LF 57.00 33 55.00 70.00 97.40 60.00 90.00

04642005 RC PIPE (CL III)(24 IN) LF 30.00 34 70.00 53.00 55.00 45.00 45.00

04672288 SET (TY II)(24 IN)(RCP)(6:1)(P) EA 2.00 35 700.00 650.00 700.00 800.00 900.00

04962009 REMOV STR (BRIDGE 0-99 FT LENGTH) EA 1.00 36 15000.00 9000.00 16980.62 20000.00 21000.00

04962016 REMOV STR (PIPE) EA 1.00 37 250.00 240.00 150.00 500.00 600.00

05002001 MOBILIZATION LS 1.00 38 64000.00 80000.00 89500.00 80000.00 125000

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 14.00 39 1000.00 800.00 700.00 1000.00 2000.00

05062002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 75.00 40 25.00 28.00 29.00 40.00 35.00

05062009 ROCK FILTER DAMS (REMOVE) LF 75.00 41 7.00 6.00 6.00 20.00 7.00

05062024 BACKHOE WORK (EROSION & SEDM CONT) HR 69.00 42 70.00 55.00 75.00 30.00 125.00

05062030 CONSTRUCTION PERIMETER FENCE LF 90.00 43 2.00 1.30 3.00 5.00 5.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 2,140.00 44 3.00 2.65 2.20 3.00 3.00

05082001 CONSTRUCTING DETOURS STA 14.70 45 16600.00 17000.00 20229.00 18000.00 29000.00

05302012 DRIVEWAYS (SURF TREAT) SY 289.00 46 25.00 23.00 20.00 30.00 35.00

05402001 MTL W-BEAM GD FEN (TIM POST) LF 113.00 47 22.00 26.00 20.50 22.00 25.00

05402011 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.00 48 2000.00 2600.00 1425.00 1500.00 1800.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 100: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: SHELBY

271 WORKING DAYS

ESTIMATED COST: $863,937.20

PROJECT NUMBER: BR 2011(974)

ENGINEER: LEE, C MICHAEL- NACOGDOCHES TX 75961 (936)564-7782

DESCRIPTION: REPLACE BRIDGE AND APPROACHES

CHECK: 17,000

LOW BIDDER: LONGVIEW BRIDGE AND ROAD, LTD.

DATE: 05/03/2011

HWY.NO.: FM 2026

LENGTH: 0.443 ORDER READ: 3025

Eng. Estimate -> $ 863,937.20 Amount Left %Left

Cntr 1 LONGVIEW BRIDGE AND ROAD, LTD........... 892,525.95

2 J-W PAYNE CONSTRUCTION COMPANY, LTD..... 952,660.98 60,135.03 6.7

3 HODGES AND SON CONSTRUCTION COMPANY, INC 1,012,341.30 119,815.35 13.4

4 EAST TEXAS BRIDGE, INC.................. 1,288,390.30 395,864.35 44.4

SHELBY Page 3 of 3

Quantity No

Eng.

Est.

Cntr 1

LONGVIEW

Cntr 2

J-W PAYNItems

Cntr 3

HODGES

Cntr 4

EAST TEX

05422001 REMOVING METAL BEAM GUARD FENCE LF 300.00 49 2.50 2.40 2.00 3.00 3.00

05422002 REMOVING TERMINAL ANCHOR SECTION EA 4.00 50 180.00 90.00 100.00 200.00 200.00

05442006 GDRAIL END TRT(INST)(WOOD POST)(TY III) EA 4.00 51 2200.00 2700.00 2350.00 2400.00 2500.00

05522001 WIRE FENCE (TY A) LF 1,278.00 52 16.00 3.70 6.60 10.00 8.00

05602004 MAILBOX INSTALL-S (WC-POST) TY 3 FND EA 1.00 53 150.00 180.00 140.00 250.00 200.00

06442001 INS SM RD SN SUP&AM TY 10BWG(1) SA(P) EA 1.00 54 400.00 515.00 400.00 500.00 500.00

06442059 RELOCATE SM RD SN SUP & AM TY TWT EA 2.00 55 200.00 195.00 350.00 300.00 500.00

06442060 REMOVE SM RD SN SUP & AM EA 3.00 56 80.00 120.00 75.00 200.00 90.00

06442081 INS SM RD SN SUP&AM TY TWT(1) WS(P) EA 4.00 57 300.00 315.00 375.00 400.00 500.00

06582241 INSTL DEL ASSM (D-SW)SZ 1(FLX)GF2(BI) EA 6.00 58 45.00 21.00 35.00 50.00 55.00

06582259 INSTL DEL ASSM (D-SW)SZ (TYC)CTB(BI) EA 2.00 59 20.00 17.00 20.00 50.00 35.00

06622032 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 2,948.00 60 1.00 1.20 2.40 2.00 1.50

06622054 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 74.00 61 2.40 4.80 5.00 10.00 6.00

06622115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 141.00 62 1.00 1.90 1.00 2.00 2.00

06662105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 50.00 63 0.60 1.40 2.40 2.00 1.50

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 2,728.00 64 0.60 1.35 2.40 2.00 1.50

06662178 REF PAV MRK TY II (Y) 4" (SLD) LF 280.00 65 1.00 1.20 2.00 2.00 1.50

06722015 REFL PAV MRKR TY II-A-A EA 37.00 66 3.50 4.30 5.00 10.00 6.00

06772001 ELIM EXT PAV MRK & MRKS ( 4") LF 597.00 67 2.00 1.30 1.00 4.00 1.50

06782001 PAV SURF PREP FOR MRK ( 4") LF 280.00 68 0.25 0.65 1.00 1.00 1.00

1A 40222001 INTRLOCK ARTICULATING CONC BLKS(4" MIN) SF 11,169.00 69 5.73 0.00 3.75 0.00 0.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 101: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: SMITH

45 WORKING DAYS

ESTIMATED COST: $245,357.25

PROJECT NUMBER: STP 2011(979)HES

ENGINEER: SCHNEIDER, MICHAEL- TYLER TX 75702 (903)510-9100

DESCRIPTION: UPGRD TRF SGNL,VIVDS,PED SGNL,INTRCNCT TRF SGNL

CHECK: 5,000

LOW BIDDER: TEXAS TRAFFIC CONTROL SYSTEMS, INC.

DATE: 05/03/2011

HWY.NO.: US 69

LENGTH: 0.767 ORDER READ: 3026

Eng. Estimate -> $ 245,357.25 Amount Left %Left

Cntr 1 TEXAS TRAFFIC CONTROL SYSTEMS, INC...... 239,805.50

2 ALLSTATE SIGNAL & CONSTRUCTION, LLC..... 245,428.05 5,622.55 2.3

3 STRIPING TECHNOLOGY, L.P................ 246,236.00 6,430.50 2.7

4 HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, COR 250,162.55 10,357.05 4.3

5 DURABLE SPECIALTIES, INC................ 259,900.00 20,094.50 8.4

SMITH Page 1 of 2

Quantity No

Eng.

Est.

Cntr 1

TEXAS TR

Cntr 2

ALLSTATEItems

Cntr 3

STRIPING

Cntr 4

HIGHWAY

Cntr 5

DURABLE

04162030 DRILL SHAFT (TRF SIG POLE) (24 IN) LF 96.00 1 120.00 90.00 100.00 85.00 97.98 125.00

04162031 DRILL SHAFT (TRF SIG POLE) (30 IN) LF 11.00 2 125.00 135.00 165.00 175.00 130.72 165.00

04162032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF 39.00 3 170.00 155.00 185.00 185.00 159.05 180.00

05002001 MOBILIZATION LS 1.00 4 11500.00 14000.00 13000.00 2500.00 17251.91 4000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.00 5 1000.00 1000.00 500.00 1500.00 1504.36 1200.00

06182018 CONDT (PVC) (SCHD 40) ( 2") LF 1,775.00 6 5.15 4.50 5.55 5.00 5.95 6.00

06182035 CONDT (PVC) (SCHD 80) (2") (BORE) LF 1,600.00 7 14.75 16.00 13.75 16.00 13.51 12.00

06182052 CONDT (RM) (2") LF 300.00 8 14.00 16.00 13.25 18.00 16.69 12.00

06202007 ELEC CONDR (NO. 4) BARE LF 15.00 9 0.90 1.75 2.00 2.55 1.55 2.00

06202008 ELEC CONDR (NO. 4) INSULATED LF 45.00 10 1.05 2.00 2.10 2.55 1.71 2.00

06202011 ELEC CONDR (NO. 8) BARE LF 3,695.00 11 0.65 0.60 0.84 1.45 0.75 1.00

06212004 TRAY CABLE (4 CONDR) (12 AWG) LF 860.00 12 1.75 1.50 1.65 1.40 1.28 1.50

06242008 GROUND BOX TY A (122311) W/APRON EA 12.00 13 460.00 425.00 450.00 515.00 657.45 620.00

06242014 GROUND BOX TY D (162922) W/APRON EA 3.00 14 475.00 550.00 525.00 575.00 706.95 640.00

06282235 ELC SRV TY D 120/240 070 (NS)AL(N)PS(U) EA 1.00 15 3750.00 2400.00 4250.00 3800.00 3367.53 4500.00

06442058 RELOCATE SM RD SN SUP & AM TY S80 EA 1.00 16 430.00 150.00 400.00 200.00 371.84 300.00

06802003 INSTALL HWY TRF SIG (SYSTEM) EA 1.00 17 18000.00 18000.00 12500.00 15200.00 16031.60 18000.00

06822001 BACK PLATE (12 IN) (3 SEC) EA 15.00 18 65.00 60.00 62.00 65.00 56.03 110.00

06822002 BACK PLATE (12 IN) (4 SEC) EA 2.00 19 90.00 70.00 68.00 75.00 63.73 120.00

06822022 VEH SIG SEC (12 IN) LED (GRN ARW) EA 6.00 20 200.00 175.00 185.00 190.00 191.20 255.00

06822023 VEH SIG SEC (12 IN) LED (GRN) EA 13.00 21 210.00 185.00 191.00 205.00 202.20 270.00

06822024 VEH SIG SEC (12 IN) LED (YEL ARW) EA 4.00 22 212.00 170.00 201.00 185.00 180.20 255.00

06822025 VEH SIG SEC (12 IN) LED (YEL) EA 13.00 23 225.00 190.00 191.00 205.00 202.20 275.00

06822027 VEH SIG SEC (12 IN) LED (RED) EA 17.00 24 200.00 165.00 180.00 185.00 180.20 250.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 102: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: SMITH

45 WORKING DAYS

ESTIMATED COST: $245,357.25

PROJECT NUMBER: STP 2011(979)HES

ENGINEER: SCHNEIDER, MICHAEL- TYLER TX 75702 (903)510-9100

DESCRIPTION: UPGRD TRF SGNL,VIVDS,PED SGNL,INTRCNCT TRF SGNL

CHECK: 5,000

LOW BIDDER: TEXAS TRAFFIC CONTROL SYSTEMS, INC.

DATE: 05/03/2011

HWY.NO.: US 69

LENGTH: 0.767 ORDER READ: 3026

Eng. Estimate -> $ 245,357.25 Amount Left %Left

Cntr 1 TEXAS TRAFFIC CONTROL SYSTEMS, INC...... 239,805.50

2 ALLSTATE SIGNAL & CONSTRUCTION, LLC..... 245,428.05 5,622.55 2.3

3 STRIPING TECHNOLOGY, L.P................ 246,236.00 6,430.50 2.7

4 HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, COR 250,162.55 10,357.05 4.3

5 DURABLE SPECIALTIES, INC................ 259,900.00 20,094.50 8.4

SMITH Page 2 of 2

Quantity No

Eng.

Est.

Cntr 1

TEXAS TR

Cntr 2

ALLSTATEItems

Cntr 3

STRIPING

Cntr 4

HIGHWAY

Cntr 5

DURABLE

06842009 TRF SIG CBL (TY A) (12 AWG) ( 4 CONDR) LF 550.00 25 1.60 1.30 1.40 1.75 1.48 2.00

06842012 TRF SIG CBL (TY A) (12 AWG) ( 7 CONDR) LF 1,765.00 26 2.00 2.25 2.00 1.75 2.11 2.00

06842028 TRF SIG CBL (TY A) (14 AWG) ( 2 CONDR) LF 3,795.00 27 1.00 1.30 0.95 1.25 0.80 1.00

06842029 TRF SIG CBL (TY A) (14 AWG) ( 3 CONDR) LF 3,875.00 28 1.30 1.30 1.00 1.25 0.95 1.00

06862034 INS TRF SIG PL AM(S) 1 ARM(32')LUM&ILSN EA 1.00 29 4594.00 5300.00 6466.00 7550.00 6885.51 6900.00

06862041 INS TRF SIG PL AM(S) 1 ARM (40') LUM EA 1.00 30 5000.00 6000.00 7031.00 6850.00 7774.58 6900.00

06862121 INS TRF SIG PL AM(S) 2 ARM (36-32')LUM EA 1.00 31 5930.00 7450.00 8783.00 8750.00 8660.65 8000.00

06862141 INS TRF SIG PL AM(S) 2 ARM (40-32')LUM EA 1.00 32 5785.00 8150.00 9273.00 9100.00 9145.75 9070.00

06872001 PED POLE ASSEMBLY EA 16.00 33 850.00 750.00 900.00 550.00 816.24 750.00

60062002 COAXIAL CABLE LF 2,675.00 34 2.00 2.50 1.55 3.10 2.65 3.00

60062004 ANTENNA (OMNI-DIRECTIONAL) EA 1.00 35 500.00 350.00 350.00 500.00 354.90 450.00

60062005 ANTENNA (UNI-DIRECTIONAL) EA 2.00 36 500.00 350.00 300.00 650.00 283.40 475.00

60072001 REMOVING TRAFFIC SIGNALS EA 1.00 37 2100.00 2000.00 5000.00 3000.00 1973.39 2500.00

62662001 VIVDS PROCESSOR SYSTEM EA 1.00 38 5500.00 8500.00 8250.00 8200.00 8407.87 11000.00

62662002 VIVDS CAMERA ASSEMBLY EA 6.00 39 1350.00 1400.00 1260.00 1200.00 1103.87 1600.00

62662003 VIVDS SET-UP SYSTEM EA 1.00 40 485.00 1000.00 500.00 1000.00 544.81 2000.00

62662005 VIVDS COMMUNICATION CABLE (COAXIAL) LF 1,740.00 41 2.10 2.00 2.10 2.00 2.33 2.00

86722001 ACCESSIBLE PEDESTRIAN SIGNAL UNIT EA 16.00 42 900.00 875.00 1125.00 1000.00 889.70 950.00

86832001 LED COUNTDOWN PEDESTRIAN SIGNAL MODULE EA 16.00 43 500.00 450.00 525.00 475.00 472.70 600.00

87272001 RADAR ADVANCE DETECTION DEVICE EA 3.00 44 10600.00 7000.00 7500.00 8500.00 7020.77 9000.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 103: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: SMITH

30 W

ESTIMATED COST: $643,157.00

PROJECT NUMBER: RMC - 622346001

ENGINEER: STURROCK, MARK- TYLER TX 75702 (903)510-5297

DESCRIPTION: OVERLAY

CHECK: 13,000

LOW BIDDER: APAC-TEXAS, INC.

DATE: 05/03/2011

HWY.NO.: SH0110

LENGTH: 0.000 ORDER READ: 4005

Eng. Estimate -> $ 643,157.00 Amount Left %Left

Cntr 1 APAC-TEXAS, INC......................... 691,710.83

2 B&H CONTRACTING, L.P.................... 702,209.21 10,498.38 1.5

3 REYNOLDS & KAY, LTD..................... 732,203.79 40,492.96 5.9

4 LONGVIEW BRIDGE AND ROAD, LTD........... 786,197.91 94,487.08 13.7

5 CLARK CONSTRUCTION OF TEXAS, INC........ 872,733.11 181,022.28 26.2

SMITH Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

APAC-TEX

Cntr 2

B&H CONTItems

Cntr 3

REYNOLDS

Cntr 4

LONGVIEW

Cntr 5

CLARK CO

03412047 D-GR HMA(QCQA) TY-C SAC-A PG70-22 TON 653.00 1 80.00 96.00 120.00 94.00 95.00 258.67

03512002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 300.00 2 35.00 56.00 67.75 49.00 55.00 117.76

03542045 PLANE ASPH CONC PAV (2") SY 5,933.00 3 1.25 1.72 3.31 2.95 3.25 3.50

05002001 MOBILIZATION LS 1.00 4 35000.00 66000.00 25000.00 35600.00 45000.00 69000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.00 5 3500.00 2300.00 866.25 2540.00 2200.00 1600.00

06622116 WK ZN PAV MRK SHT TERM RMV(W)(4") LF 3,795.00 6 1.50 1.00 1.35 1.12 1.25 1.50

06622117 WK ZN PAV MRK SHT TERM RMV(Y)(4") LF 2,378.00 7 1.50 1.00 1.35 1.12 1.25 1.50

06662002 REFL PAV MRK TY I (W) 4" (BRK)(090MIL) LF 4,966.00 8 0.30 0.42 0.44 0.54 0.53 0.40

06662011 REFL PAV MRK TY I (W) 4" (SLD)(090MIL) LF 16,137.00 9 0.30 0.38 0.40 0.50 0.50 0.40

06662035 REFL PAV MRK TY I (W) 8" (SLD)(090MIL) LF 2,990.00 10 0.80 0.80 0.84 1.06 1.05 0.86

06662041 REFL PAV MRK TY I (W) 12"(SLD)(090MIL) LF 740.00 11 5.00 3.00 3.15 2.90 2.95 3.16

06662047 REFL PAV MRK TY I (W) 24"(SLD)(090MIL) LF 672.00 12 5.00 6.05 6.30 3.45 3.50 6.61

06662104 REFL PAV MRK TY I (Y) 4" (BRK)(090MIL) LF 3,231.00 13 0.30 0.43 0.44 0.54 0.53 0.40

06662110 REFL PAV MRK TY I (Y) 4" (SLD)(090MIL) LF 20,236.00 14 0.30 0.38 0.40 0.50 0.50 0.40

06682106 PREFAB PAV MRK TY C (W) (ARROW) EA 15.00 15 105.00 226.00 236.25 155.00 155.00 143.75

06682112 PREFAB PAV MRK TY C (W) (RR XING) EA 6.00 16 120.00 453.00 472.50 425.00 425.00 230.00

06682116 PREFAB PAV MRK TY C (W) (WORD) EA 15.00 17 300.00 252.00 262.50 207.00 205.00 143.75

06722012 REFL PAV MRKR TY I-C EA 389.00 18 3.50 3.27 3.41 4.00 4.00 3.45

06722015 REFL PAV MRKR TY II-A-A EA 585.00 19 3.50 3.27 3.41 4.00 4.00 3.45

31422001 UTBHMWC (MEMBRANE) GAL 16,771.00 20 2.75 4.70 3.31 3.00 3.00 3.00

31422003 UTBHMWC (ASPHALT)(PG 76-22) TON 178.00 21 645.00 114.00 123.00 137.50 150.00 132.47

31422010 UTBHMWC (AGGREGATE)(TY B) TON 3,386.00 22 94.00 112.00 123.00 137.50 150.00 132.47

68342001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 60.00 23 100.00 92.50 220.00 100.00 35.00 100.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 104: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TARRANT

81 WORKING DAYS

ESTIMATED COST: $663,335.51

PROJECT NUMBER: BR 2011(971)

ENGINEER: CEDILLO, GREG- FORT WORTH TX 76115 (817)370-6640

DESCRIPTION: REPLACE BRIDGE

CHECK: 13,000

LOW BIDDER: IOWA BRIDGE & CULVERT, LC

DATE: 05/03/2011

HWY.NO.: BF1187C

LENGTH: 0.161 ORDER READ: 3027

Eng. Estimate -> $ 663,335.51 Amount Left %Left

Cntr 1 IOWA BRIDGE & CULVERT, LC............... 766,144.60

2 REBCON, INC............................. 775,998.95 9,854.35 1.3

3 REECE CONSTRUCTION CO., INC............. 787,736.17 21,591.57 2.8

4 ED BELL CONSTRUCTION COMPANY............ 795,159.94 29,015.34 3.8

5 STRILAND CONSTRUCTION, INC.............. 807,381.93 41,237.33 5.4

6 EARTH BUILDERS, L.P..................... 810,534.70 44,390.10 5.8

7 MASSANA CONSTRUCTION, INC............... 904,805.80 138,661.20 18.1

TARRANT Page 1 of 4

Quantity No

Eng.

Est.

Cntr 1

IOWA BRI

Cntr 2

REBCON,Items

Cntr 3

REECE CO

Cntr 4

ED BELL

Cntr 5

STRILAND

Cntr 6

EARTH BU

Cntr 7

MASSANA

01002002 PREPARING ROW STA 6.00 1 2000.00 3000.00 5000.00 755.00 13500.00 2313.00 1500.00 2648.00

01102004 EXCAVATION (ROADWAY AND CHANNEL) CY 810.00 2 2.50 12.00 20.00 16.00 8.00 24.00 20.00 10.30

01322008 EMBANKMENT (FINAL)(DENS CONT)(TY D) CY 410.00 3 2.50 9.00 16.00 14.00 15.00 12.30 20.00 14.80

01612005 COMPOST MANUF TOPSOIL (PB) (4") SY 2,245.00 4 2.20 3.82 4.50 3.82 4.00 4.24 4.00 3.90

01642027 CELL FBR MLCH SEED(PERM)(URBAN)(CLAY) SY 2,245.00 5 0.50 0.65 0.75 0.65 0.99 0.54 0.70 0.50

01642029 CELL FBR MLCH SEED(TEMP)(WARM) SY 1,123.00 6 0.50 0.75 1.00 0.75 0.75 0.73 1.30 1.20

01642031 CELL FBR MLCH SEED(TEMP)(COOL) SY 1,123.00 7 0.50 0.75 1.00 0.75 0.75 0.73 1.30 1.20

01682001 VEGETATIVE WATERING MG 0.08 8 50.00 250.00 115.00 100.00 3165.00 2662.00 100.00 100.00

02472225 FL BS (RDWY DEL)(TY E GR 4)(FNAL POS) CY 569.00 9 16.00 55.00 36.00 48.50 40.00 32.37 60.00 49.00

02602016 LIME (HYD, COM, OR QK(SLURRY)) TON 28.00 10 130.00 160.00 153.00 180.00 145.00 177.00 150.00 169.00

02602027 LIME TRT (EXST MATL)(8") SY 1,668.00 11 1.85 6.00 4.00 13.00 4.00 7.26 6.00 6.50

02752001 CEMENT TON 21.50 12 100.00 150.00 94.00 210.00 100.00 242.00 170.00 195.00

02752018 CEMENT TREAT (NEW BASE)(36") SY 462.00 13 10.00 18.00 3.50 32.50 12.50 25.40 40.00 16.00

03052002 SALV, HAUL & STKPL RCL APH PV (0 TO 2") SY 1,671.00 14 1.26 4.00 4.00 3.68 4.00 4.76 4.00 8.00

03102002 PRIME COAT (AE-P) GAL 296.00 15 3.00 5.00 5.60 4.85 5.00 4.22 6.00 5.00

03412011 D-GR HMA(QCQA) TY-B PG64-22 TON 704.00 16 53.00 61.00 65.20 56.75 60.00 71.40 70.00 60.00

03412138 D-GR HMA(QCQA) TY-D PG76-22 TON 188.00 17 55.00 72.00 82.30 71.65 75.00 90.75 80.00 72.00

04162004 DRILL SHAFT (36 IN) LF 325.00 18 90.00 150.00 140.00 118.00 150.00 163.00 150.00 177.00

04202003 CL C CONC (ABUT) CY 63.20 19 475.00 700.00 700.00 661.00 600.00 572.00 750.00 739.00

04202004 CL C CONC (BENT) CY 80.20 20 470.00 700.00 600.00 659.00 600.00 509.00 750.00 805.00

04202033 CL S CONC (APPR SLAB) CY 132.90 21 340.00 300.00 400.00 465.00 295.00 368.00 430.00 449.00

04222003 REINF CONC SLAB (HPC)(CL S) SF 6,900.00 22 12.00 14.00 13.00 18.40 16.00 13.85 17.00 29.00

04252064 PRESTR CONC GIRDER (TX28) LF 959.54 23 120.00 130.00 123.00 151.00 115.00 163.35 125.00 145.00

04282002 CONC SURF TREAT (CLASS II) SY 1,100.00 24 5.00 5.00 3.39 6.30 3.50 3.95 4.00 4.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 105: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TARRANT

81 WORKING DAYS

ESTIMATED COST: $663,335.51

PROJECT NUMBER: BR 2011(971)

ENGINEER: CEDILLO, GREG- FORT WORTH TX 76115 (817)370-6640

DESCRIPTION: REPLACE BRIDGE

CHECK: 13,000

LOW BIDDER: IOWA BRIDGE & CULVERT, LC

DATE: 05/03/2011

HWY.NO.: BF1187C

LENGTH: 0.161 ORDER READ: 3027

Eng. Estimate -> $ 663,335.51 Amount Left %Left

Cntr 1 IOWA BRIDGE & CULVERT, LC............... 766,144.60

2 REBCON, INC............................. 775,998.95 9,854.35 1.3

3 REECE CONSTRUCTION CO., INC............. 787,736.17 21,591.57 2.8

4 ED BELL CONSTRUCTION COMPANY............ 795,159.94 29,015.34 3.8

5 STRILAND CONSTRUCTION, INC.............. 807,381.93 41,237.33 5.4

6 EARTH BUILDERS, L.P..................... 810,534.70 44,390.10 5.8

7 MASSANA CONSTRUCTION, INC............... 904,805.80 138,661.20 18.1

TARRANT Page 2 of 4

Quantity No

Eng.

Est.

Cntr 1

IOWA BRI

Cntr 2

REBCON,Items

Cntr 3

REECE CO

Cntr 4

ED BELL

Cntr 5

STRILAND

Cntr 6

EARTH BU

Cntr 7

MASSANA

04322021 RIPRAP (STONE PROTECTION)(18 IN) CY 160.00 25 95.00 80.00 93.00 55.00 85.00 84.13 80.00 80.00

04502161 RAIL (TY T223) LF 348.00 26 63.00 55.00 70.00 77.00 75.00 66.55 65.00 123.00

04542005 ARMOR JOINT (WITH SEAL) LF 110.00 27 63.00 65.00 105.00 80.00 75.00 44.09 55.00 50.00

04962010 REMOV STR (BRIDGE 100-499 FT LENGTH) EA 1.00 28 40000.00 25000.00 33700.00 19100.00 25000.00 32820.00 25000.00 27000.00

05002001 MOBILIZATION LS 1.00 29 66035.00 65000.00 70000.00 40000.00 78000.00 75000.00 55000.00 10000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.00 30 6000.00 1200.00 701.00 315.00 315.00 591.67 900.00 3159.00

05062001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 10.00 31 20.00 35.00 40.20 35.00 18.00 18.00 25.00 20.00

05062003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 100.00 32 32.00 45.00 52.00 45.00 22.00 39.30 30.00 26.00

05062009 ROCK FILTER DAMS (REMOVE) LF 100.00 33 6.00 6.50 7.50 6.50 6.00 9.10 7.00 6.00

05062016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 100.00 34 16.00 14.50 16.70 14.50 11.00 11.80 14.00 20.00

05062019 CONSTRUCTION EXITS (REMOVE) SY 156.00 35 6.00 5.50 6.30 5.50 3.50 5.45 4.00 8.00

05062043 ROCK FILTER DAMS (REMOVE & REPLACE) LF 100.00 36 30.00 45.00 51.60 45.00 25.00 48.40 28.00 35.00

05402016 MTL BM GD FN TRANS(THRIE)(RND TIM POST) EA 4.00 37 1370.00 1211.00 1607.00 1485.00 1400.00 1465.00 1600.00 1687.00

05402017 MTL W-BEAM GD FEN (ROUND TIMBER POST) LF 575.00 38 20.00 16.60 19.00 19.00 16.30 20.10 21.00 26.00

05442004 GDRAIL END TRT(INST)(WOOD POST)(TY I) EA 2.00 39 2000.00 2010.00 2238.00 1825.00 2000.00 2430.00 2100.00 2336.00

06582241 INSTL DEL ASSM (D-SW)SZ 1(FLX)GF2(BI) EA 12.00 40 30.00 50.00 52.00 35.00 28.45 34.17 38.00 39.00

06662001 REFL PAV MRK TY I (W) 4" (BRK)(060MIL) LF 1,160.00 41 1.00 5.00 1.15 1.00 1.00 1.21 1.20 2.50

06662103 REFL PAV MRK TY I (Y) 4" (BRK)(060MIL) LF 580.00 42 1.00 5.00 1.15 1.00 1.00 1.21 1.20 2.50

50492002 BIODGRD EROSION CONTROL LOGS (18" DIA) LF 888.00 43 4.00 10.00 5.20 4.50 3.22 2.77 5.00 6.50

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 106: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TARRANT

81 WORKING DAYS

ESTIMATED COST: $663,335.51

PROJECT NUMBER: BR 2011(971)

ENGINEER: CEDILLO, GREG- FORT WORTH TX 76115 (817)370-6640

DESCRIPTION: REPLACE BRIDGE

CHECK: 13,000

LOW BIDDER: IOWA BRIDGE & CULVERT, LC

DATE: 05/03/2011

HWY.NO.: BF1187C

LENGTH: 0.161 ORDER READ: 3027

Eng. Estimate -> $ 663,335.51 Amount Left %Left

Cntr 8 LINDER CONSTRUCTION CO., INC............ 921,931.81 155,787.21 20.3

9 SCR CONSTRUCTION CO., INC............... 924,523.59 158,378.99 20.7

TARRANT Page 3 of 4

Quantity No

Eng.

Est.

Cntr 8

LINDER

Cntr 9

SCR CONSItems

01002002 PREPARING ROW STA 6.00 1 2000.00 14430.76 2650.00

01102004 EXCAVATION (ROADWAY AND CHANNEL) CY 810.00 2 2.50 13.14 20.00

01322008 EMBANKMENT (FINAL)(DENS CONT)(TY D) CY 410.00 3 2.50 16.91 34.00

01612005 COMPOST MANUF TOPSOIL (PB) (4") SY 2,245.00 4 2.20 4.89 3.05

01642027 CELL FBR MLCH SEED(PERM)(URBAN)(CLAY) SY 2,245.00 5 0.50 0.83 0.54

01642029 CELL FBR MLCH SEED(TEMP)(WARM) SY 1,123.00 6 0.50 0.83 0.64

01642031 CELL FBR MLCH SEED(TEMP)(COOL) SY 1,123.00 7 0.50 0.83 0.64

01682001 VEGETATIVE WATERING MG 0.08 8 50.00 767.34 31.00

02472225 FL BS (RDWY DEL)(TY E GR 4)(FNAL POS) CY 569.00 9 16.00 53.36 45.00

02602016 LIME (HYD, COM, OR QK(SLURRY)) TON 28.00 10 130.00 204.62 220.00

02602027 LIME TRT (EXST MATL)(8") SY 1,668.00 11 1.85 5.05 13.25

02752001 CEMENT TON 21.50 12 100.00 217.41 200.00

02752018 CEMENT TREAT (NEW BASE)(36") SY 462.00 13 10.00 7.50 45.00

03052002 SALV, HAUL & STKPL RCL APH PV (0 TO 2") SY 1,671.00 14 1.26 4.71 5.00

03102002 PRIME COAT (AE-P) GAL 296.00 15 3.00 6.39 5.00

03412011 D-GR HMA(QCQA) TY-B PG64-22 TON 704.00 16 53.00 76.73 60.00

03412138 D-GR HMA(QCQA) TY-D PG76-22 TON 188.00 17 55.00 117.66 76.00

04162004 DRILL SHAFT (36 IN) LF 325.00 18 90.00 138.64 157.00

04202003 CL C CONC (ABUT) CY 63.20 19 475.00 723.32 700.00

04202004 CL C CONC (BENT) CY 80.20 20 470.00 875.35 950.00

04202033 CL S CONC (APPR SLAB) CY 132.90 21 340.00 326.89 400.00

04222003 REINF CONC SLAB (HPC)(CL S) SF 6,900.00 22 12.00 21.87 21.00

04252064 PRESTR CONC GIRDER (TX28) LF 959.54 23 120.00 152.76 129.00

04282002 CONC SURF TREAT (CLASS II) SY 1,100.00 24 5.00 2.85 3.50

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 107: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TARRANT

81 WORKING DAYS

ESTIMATED COST: $663,335.51

PROJECT NUMBER: BR 2011(971)

ENGINEER: CEDILLO, GREG- FORT WORTH TX 76115 (817)370-6640

DESCRIPTION: REPLACE BRIDGE

CHECK: 13,000

LOW BIDDER: IOWA BRIDGE & CULVERT, LC

DATE: 05/03/2011

HWY.NO.: BF1187C

LENGTH: 0.161 ORDER READ: 3027

Eng. Estimate -> $ 663,335.51 Amount Left %Left

Cntr 8 LINDER CONSTRUCTION CO., INC............ 921,931.81 155,787.21 20.3

9 SCR CONSTRUCTION CO., INC............... 924,523.59 158,378.99 20.7

TARRANT Page 4 of 4

Quantity No

Eng.

Est.

Cntr 8

LINDER

Cntr 9

SCR CONSItems

04322021 RIPRAP (STONE PROTECTION)(18 IN) CY 160.00 25 95.00 83.95 74.00

04502161 RAIL (TY T223) LF 348.00 26 63.00 131.51 90.00

04542005 ARMOR JOINT (WITH SEAL) LF 110.00 27 63.00 58.82 60.00

04962010 REMOV STR (BRIDGE 100-499 FT LENGTH) EA 1.00 28 40000.00 25555.42 50000.00

05002001 MOBILIZATION LS 1.00 29 66035.00 16299.19 92000.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.00 30 6000.00 874.61 500.00

05062001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 10.00 31 20.00 27.79 28.50

05062003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 100.00 32 32.00 27.79 30.50

05062009 ROCK FILTER DAMS (REMOVE) LF 100.00 33 6.00 21.40 6.50

05062016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 100.00 34 16.00 27.79 10.50

05062019 CONSTRUCTION EXITS (REMOVE) SY 156.00 35 6.00 13.90 5.50

05062043 ROCK FILTER DAMS (REMOVE & REPLACE) LF 100.00 36 30.00 49.19 20.50

05402016 MTL BM GD FN TRANS(THRIE)(RND TIM POST) EA 4.00 37 1370.00 1548.75 1400.00

05402017 MTL W-BEAM GD FEN (ROUND TIMBER POST) LF 575.00 38 20.00 21.23 16.30

05442004 GDRAIL END TRT(INST)(WOOD POST)(TY I) EA 2.00 39 2000.00 2570.59 1950.00

06582241 INSTL DEL ASSM (D-SW)SZ 1(FLX)GF2(BI) EA 12.00 40 30.00 35.81 45.00

06662001 REFL PAV MRK TY I (W) 4" (BRK)(060MIL) LF 1,160.00 41 1.00 1.28 1.00

06662103 REFL PAV MRK TY I (Y) 4" (BRK)(060MIL) LF 580.00 42 1.00 1.28 1.00

50492002 BIODGRD EROSION CONTROL LOGS (18" DIA) LF 888.00 43 4.00 6.06 3.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 108: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TARRANT

730 CALENDAR DAYS

ESTIMATED COST: $642,650.10

PROJECT NUMBER: RMC - 622151001

ENGINEER: PHILLIPS, GARY- SAGINAW, TEXAS TX 76179 (817)232-1304

DESCRIPTION: GUARDRAIL INSTALLATION AND REPAIR

CHECK: 13,000

LOW BIDDER: LONE STAR BARRIER SERVICES, LLC

DATE: 05/03/2011

HWY.NO.: IH0820

LENGTH: 0.000 ORDER READ: 4002

Eng. Estimate -> $ 642,650.10 Amount Left %Left

Cntr 1 LONE STAR BARRIER SERVICES, LLC......... 361,644.75

2 CKORP, LLC.............................. 368,078.00 6,433.25 1.8

3 VANN/ELLI, INC.......................... 412,240.00 50,595.25 14.0

4 T & L CLEANING SERVICES................. 521,882.00 160,237.25 44.3

TARRANT Page 1 of 3

Quantity No

Eng.

Est.

Cntr 1

LONE STA

Cntr 2

CKORP,Items

Cntr 3

VANN/ELL

Cntr 4

T & L CL

05402001 MTL W-BEAM GD FEN (TIM POST) LF 1,000.00 1 5.93 5.50 5.00 5.00 8.00

05402005 TERMINAL ANCHOR SECTION EA 25.00 2 181.04 200.00 40.00 50.00 1.00

05402007 MTL W-BEAM GD FEN ADJUSTMENT LF 50.00 3 2.74 3.00 10.00 5.00 1.00

05402011 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 5.00 4 415.54 425.00 200.00 400.00 200.00

05402015 MTL W-BEAM GD FEN(TIM POST)RADIUS RAIL LF 75.00 5 5.58 6.65 10.00 5.00 8.00

05422001 REMOVING METAL BEAM GUARD FENCE LF 500.00 6 1.35 1.50 2.00 1.00 1.00

05422002 REMOVING TERMINAL ANCHOR SECTION EA 3.00 7 72.65 75.00 1.00 30.00 1.00

05442009 GDRAIL END TRT(MOV&RST)(WOOD PST)TY III EA 1.00 8 739.76 650.00 800.00 500.00 1.00

05442012 GDRAIL END TRT(REMOV)(WOOD POST)TY III EA 1.00 9 260.00 125.00 100.00 100.00 1.00

05452003 CRASH CUSH ATTEN (REMOVE) EA 1.00 10 483.33 500.00 400.00 500.00 200.00

05452007 CRASH CUSH ATTEN (INSTL)(TRACC) EA 1.00 11 875.00 1250.00 1000.00 500.00 1000.00

05452009 CRASH CUSH ATTEN (REMOVE)(TRACC) EA 1.00 12 625.00 500.00 400.00 500.00 100.00

05452010 CRASH CUSH ATTEN (INSTL)(SHORTRACC) EA 1.00 13 750.00 1250.00 1000.00 500.00 1000.00

05452012 CRASH CUSH ATTEN (REMOVE)(SHORTRACC) EA 1.00 14 422.00 500.00 400.00 500.00 100.00

05452019 CRASH CUSH ATTEN (INSTL)(TRACC)(W) EA 1.00 15 705.22 1250.00 1000.00 500.00 1000.00

05452021 CRASH CUSH ATTEN (REMOVE)(TRACC)(W) EA 1.00 16 416.67 500.00 500.00 500.00 100.00

05452022 CRASH CUSH ATTEN (INSTL)(REACT)(N) EA 1.00 17 1208.33 1500.00 1400.00 500.00 1000.00

05452024 CRASH CUSH ATTEN (REMOVE)(REACT)(N) EA 1.00 18 372.00 500.00 500.00 500.00 100.00

05452025 CRASH CUSH ATTEN (INSTL)(REACT)(W) EA 1.00 19 750.00 1250.00 1500.00 500.00 1000.00

05452027 CRASH CUSH ATTEN (REMOVE)(REACT)(W) EA 1.00 20 425.06 500.00 500.00 500.00 100.00

05502012 CHAIN LINK FENCE (REPAIR) (4') LF 150.00 21 11.00 8.00 5.00 7.00 2.00

07702001 REPAIR RAIL ELEMENT (W-BEAM) LF 28,000.00 22 5.62 4.44 4.50 4.00 10.00

07702002 REPAIR RAIL ELEMENT (THRIE-BEAM) LF 25.00 23 8.04 6.00 5.00 4.00 1.00

07702003 REP RAIL ELMNT(THRIE-BM TRANS TO W-BM) LF 25.00 24 8.03 3.25 5.00 4.00 1.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 109: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TARRANT

730 CALENDAR DAYS

ESTIMATED COST: $642,650.10

PROJECT NUMBER: RMC - 622151001

ENGINEER: PHILLIPS, GARY- SAGINAW, TEXAS TX 76179 (817)232-1304

DESCRIPTION: GUARDRAIL INSTALLATION AND REPAIR

CHECK: 13,000

LOW BIDDER: LONE STAR BARRIER SERVICES, LLC

DATE: 05/03/2011

HWY.NO.: IH0820

LENGTH: 0.000 ORDER READ: 4002

Eng. Estimate -> $ 642,650.10 Amount Left %Left

Cntr 1 LONE STAR BARRIER SERVICES, LLC......... 361,644.75

2 CKORP, LLC.............................. 368,078.00 6,433.25 1.8

3 VANN/ELLI, INC.......................... 412,240.00 50,595.25 14.0

4 T & L CLEANING SERVICES................. 521,882.00 160,237.25 44.3

TARRANT Page 2 of 3

Quantity No

Eng.

Est.

Cntr 1

LONE STA

Cntr 2

CKORP,Items

Cntr 3

VANN/ELL

Cntr 4

T & L CL

07702004 REM/REPL TIMBER/STL POST W/O CONC FND EA 2,500.00 25 23.32 15.00 20.00 12.00 2.00

07702005 REM/REPL TIMBER/STL POST W/ CONC FND EA 50.00 26 30.83 40.00 20.00 15.00 10.00

07702009 REMOVE GDRAIL END TRT/ REPL WITH SGT EA 30.00 27 517.60 500.00 400.00 500.00 500.00

07702010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 30.00 28 313.75 100.00 150.00 100.00 10.00

07702011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 10,000.00 29 13.33 4.00 4.50 8.00 12.00

07702012 REPLACE SINGLE GDRAIL TERMINAL POST EA 800.00 30 50.24 15.00 20.00 50.00 5.00

07702013 REPLACE STL BLOCKOUTS W/WOOD BLOCKOUTS EA 5.00 31 26.31 5.00 50.00 5.00 1.00

07702014 REPAIR STEEL POST WITH BASE PLATE EA 75.00 32 18.11 50.00 50.00 20.00 10.00

07702017 REPAIR RAIL ELEMENT (T4S) LF 150.00 33 10.80 4.00 5.00 5.00 10.00

07702022 REM & RESET SGT IMPACT HEAD EA 300.00 34 117.92 75.00 75.00 100.00 10.00

07702023 REPLACE SGT OBJECT MARKER EA 100.00 35 21.46 10.00 20.00 15.00 1.00

07702024 REPLACE SGT CABLE ANCHOR EA 300.00 36 42.35 1.00 20.00 25.00 1.00

07702025 REPLACE SGT CABLE ASSEMBLY EA 300.00 37 42.17 1.00 20.00 25.00 1.00

07702026 REPLACE SGT STRUT EA 100.00 38 33.95 1.00 20.00 10.00 1.00

07702027 REMOVE & REPLACE BLOCKOUT EA 600.00 39 6.39 5.00 5.00 5.00 1.00

07702035 REPAIR RAIL ELEMENT (CURVED RAIL) LF 7,000.00 40 13.72 5.00 2.00 4.00 8.00

07702040 RAISE RAIL ELEMENT LF 100.00 41 2.00 3.00 1.00 5.00 2.00

07722001 POST AND CABLE FENCE(REMOVAL) LF 25.00 42 1.17 2.99 5.00 1.00 1.00

07722002 POST AND CABLE FENCE(REMV CONC ANCHOR) EA 1.00 43 71.20 20.00 50.00 30.00 1.00

07722003 POST AND CABLE FENCE(NEW INSTALLATION) LF 50.00 44 3.70 3.00 5.00 3.00 4.00

07722004 POST AND CABLE FENCE(NEW CONC ANCHOR) EA 1.00 45 112.10 45.00 50.00 50.00 20.00

07722005 POST AND CABLE FENCE(REMV/REPL POSTS) EA 40.00 46 27.37 15.00 20.00 20.00 5.00

07722006 POST AND CABLE FENCE(RMV/REPL CNC ANCH) EA 1.00 47 55.00 30.00 50.00 50.00 10.00

07722007 POST AND CABLE FENCE(REMV/REPL CABLE) LF 1,800.00 48 4.55 1.25 2.00 2.00 3.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 110: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TARRANT

730 CALENDAR DAYS

ESTIMATED COST: $642,650.10

PROJECT NUMBER: RMC - 622151001

ENGINEER: PHILLIPS, GARY- SAGINAW, TEXAS TX 76179 (817)232-1304

DESCRIPTION: GUARDRAIL INSTALLATION AND REPAIR

CHECK: 13,000

LOW BIDDER: LONE STAR BARRIER SERVICES, LLC

DATE: 05/03/2011

HWY.NO.: IH0820

LENGTH: 0.000 ORDER READ: 4002

Eng. Estimate -> $ 642,650.10 Amount Left %Left

Cntr 1 LONE STAR BARRIER SERVICES, LLC......... 361,644.75

2 CKORP, LLC.............................. 368,078.00 6,433.25 1.8

3 VANN/ELLI, INC.......................... 412,240.00 50,595.25 14.0

4 T & L CLEANING SERVICES................. 521,882.00 160,237.25 44.3

TARRANT Page 3 of 3

Quantity No

Eng.

Est.

Cntr 1

LONE STA

Cntr 2

CKORP,Items

Cntr 3

VANN/ELL

Cntr 4

T & L CL

07742001 REMOVE AND REPLACE (TRACC) EA 1.00 49 1258.33 1500.00 1200.00 600.00 1000.00

07742002 REMOVE AND REPLACE (WIDE TRACC) EA 1.00 50 816.67 1500.00 1200.00 600.00 1000.00

07742003 REMOVE AND REPLACE (NARROW REACT 350) EA 1.00 51 475.00 1500.00 1200.00 1000.00 1000.00

07742004 REMOVE AND REPLACE (WIDE REACT 350) EA 1.00 52 875.00 2000.00 1200.00 1000.00 1000.00

07742006 REPAIR (TRACC) EA 1.00 53 1305.40 1000.00 1000.00 500.00 400.00

07742008 REPAIR (WIDE TRACC) EA 1.00 54 1116.67 500.00 1000.00 500.00 400.00

07742010 REPAIR (REACT) EA 5.00 55 850.00 1000.00 1400.00 500.00 400.00

07742023 REPAIR REACT(N)(MISC HARDWARE) EA 1.00 56 328.25 600.00 1000.00 500.00 200.00

07742024 REPAIR REACT(N)(REAR SEC "S") EA 1.00 57 328.25 500.00 500.00 300.00 200.00

07742025 REPAIR REACT(N)(REAR SEC "B") EA 1.00 58 100.00 500.00 500.00 300.00 200.00

07742026 REPAIR REACT(N)(FRONT SECTION) EA 1.00 59 100.00 750.00 500.00 300.00 200.00

07742027 REPAIR REACT(N)(CYLINDERS) EA 1.00 60 150.00 750.00 500.00 500.00 1.00

68342002 PORTABLE CHANGEABLE MESSAGE SIGN EA 15.00 61 100.00 600.00 100.00 200.00 100.00

72242001 REPLACE POSTS (TL-3) EA 300.00 62 34.75 20.00 30.00 50.00 10.00

72242003 CABLE SPLICE / TURNBUCKLE (TL-3) EA 1.00 63 106.06 50.00 150.00 50.00 10.00

72242005 REPAIR CONCRETE FOUNDATION (TL-3) EA 1.00 64 214.15 275.00 450.00 25.00 10.00

72242007 REPR OR REPLC CABLE BARR TERM SEC(TL-3) EA 1.00 65 250.00 350.00 450.00 2000.00 10.00

72242009 REPLACE CABLE (TL-3) LF 10.00 66 15.69 5.00 20.00 2.00 1.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 111: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TRAVIS

26 WORKING DAYS

ESTIMATED COST: $480,088.90

PROJECT NUMBER: IM 0353(281)

ENGINEER: MCCOY, TERRY- AUSTIN TX 78753 (512)832-9599

DESCRIPTION: PLANING, SEAL COAT, ACP OVERLAY AND MBGF

CHECK: 10,000

LOW BIDDER: J.D. RAMMING PAVING CO., LTD.

DATE: 05/03/2011

HWY.NO.: IH 35

LENGTH: 1.220 ORDER READ: 3019

Eng. Estimate -> $ 480,088.90 Amount Left %Left

Cntr 1 J.D. RAMMING PAVING CO., LTD............ 550,418.75

2 ANGEL BROTHERS ENTERPRISES, LTD......... 635,686.10 85,267.35 15.5

3 BIG CREEK CONSTRUCTION, LTD............. 652,905.50 102,486.75 18.6

4 APAC-TEXAS, INC......................... 655,820.50 105,401.75 19.1

5 HUNTER INDUSTRIES, LTD.................. 860,812.27 310,393.52 56.4

TRAVIS Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

J.D. RAM

Cntr 2

ANGEL BRItems

Cntr 3

BIG CREE

Cntr 4

APAC-TEX

Cntr 5

HUNTER

01342002 BACKFILL (TY B) STA 37.00 1 65.00 100.00 200.00 200.00 200.00 390.00

03162707 ASPH (TIER III) GAL 9,915.00 2 2.00 3.75 3.75 4.00 4.10 4.18

03162719 AGGR (TIER III) CY 253.00 3 35.00 75.00 145.00 150.00 95.00 96.34

03462002 STONE-MTRX-ASPH SMA-C SAC-A PG76-22 TON 3,895.00 4 70.00 100.00 115.00 99.00 104.00 139.44

03542115 PLANE ASPH CONC PAV (2" TO 2.5") SY 35,410.00 5 1.00 1.00 0.50 2.00 1.85 2.67

05002001 MOBILIZATION LS 1.00 6 100000 15000.00 30000.00 60000.00 60000.00 89813.65

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.00 7 2500.00 3500.00 5000.00 1500.00 2337.50 2094.45

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 100.00 8 5.00 3.00 3.25 5.00 5.00 3.00

05402001 MTL W-BEAM GD FEN (TIM POST) LF 275.00 9 15.00 17.60 19.50 17.60 17.60 17.60

05402005 TERMINAL ANCHOR SECTION EA 2.00 10 450.00 430.00 475.00 430.00 430.00 430.00

05422001 REMOVING METAL BEAM GUARD FENCE LF 275.00 11 1.50 1.50 1.65 1.50 1.50 1.50

05422002 REMOVING TERMINAL ANCHOR SECTION EA 2.00 12 100.00 125.00 140.00 125.00 125.00 125.00

05442001 GUARDRAIL END TREATMENT (INSTALL) EA 2.00 13 1850.00 1835.00 2000.00 1835.00 1835.00 1835.00

05442003 GUARDRAIL END TREATMENT (REMOVE) EA 2.00 14 200.00 250.00 280.00 250.00 250.00 250.00

06622005 WK ZN PAV MRK NON-REMOV (W) 6" (BRK) LF 2,900.00 15 0.30 0.70 0.30 0.27 0.27 0.27

06622008 WK ZN PAV MRK NON-REMOV (W) 6" (SLD) LF 5,760.00 16 0.30 0.50 0.28 0.25 0.25 0.25

06622035 WK ZN PAV MRK NON-REMOV (Y) 6" (SLD) LF 5,760.00 17 0.30 0.50 0.28 0.25 0.25 0.25

06662015 REFL PAV MRK TY I (W) 6" (BRK)(100MIL) LF 2,900.00 18 0.40 1.00 1.10 1.00 1.00 1.00

06722017 REFL PAV MRKR TY II-C-R EA 146.00 19 2.90 5.00 10.50 9.50 9.50 9.50

68342002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.00 20 5000.00 3500.00 2500.00 3800.00 3800.00 4113.50

80202005 REF PROF PAV MRK TY I(W)6"(SLD)(100MIL) LF 5,760.00 21 0.85 1.25 2.00 1.90 1.90 1.90

80202009 REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL) LF 5,760.00 22 0.85 1.25 2.00 1.90 1.90 1.90

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 112: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TRAVIS

56 WORKING DAYS

ESTIMATED COST: $1,008,312.15

PROJECT NUMBER: STP 1102(132)HES

ENGINEER: WAGNER, JOHN- GEORGETOWN TX 78626 (512)930-5402

DESCRIPTION: INSTALL ADVANCED WARNING, SAFETY LIGHTING, ETC.

CHECK: 20,000

LOW BIDDER: HUNTER INDUSTRIES, LTD.

DATE: 05/03/2011

HWY.NO.: RM 620

LENGTH: 2.427 ORDER READ: 3034

Eng. Estimate -> $ 1,008,312.15 Amount Left %Left

Cntr 1 HUNTER INDUSTRIES, LTD.................. 1,391,103.86

2 CAPITAL EXCAVATION COMPANY.............. 1,404,945.09 13,841.23 1.0

3 RGM CONSTRUCTORS OF TEXAS LLC........... 1,485,656.86 94,553.00 6.8

4 AUSTIN ENGINEERING CO., INC............. 1,588,854.45 197,750.59 14.2

5 AARON CONCRETE CONTRACTORS, L.P......... 1,603,894.36 212,790.50 15.3

TRAVIS Page 1 of 6

Quantity No

Eng.

Est.

Cntr 1

HUNTER

Cntr 2

CAPITALItems

Cntr 3

RGM CONS

Cntr 4

AUSTIN

Cntr 5

AARON CO

01002002 PREPARING ROW STA 37.20 1 850.00 2310.00 1000.00 2000.00 1360.00 2200.00

01042037 REMOVE CONC (RAIL) LF 198.00 2 6.50 7.74 55.00 65.00 16.75 35.00

01062001 OBLITERATING ABANDONED ROAD STA 1.60 3 242.00 1083.00 1000.00 4000.00 7150.00 5600.00

01102001 EXCAVATION (ROADWAY) CY 6,080.00 4 4.50 16.83 18.00 20.00 21.00 17.00

01322005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 2,045.00 5 4.70 11.22 18.00 19.50 30.00 8.00

01602003 FURNISHING AND PLACING TOPSOIL (4") SY 9,858.00 6 0.70 2.22 3.75 1.30 4.00 2.15

01642003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 9,858.00 7 0.14 0.15 0.06 0.10 0.15 0.07

01642009 BROADCAST SEED (TEMP) (WARM) SY 2,465.00 8 0.08 0.15 0.05 0.10 0.15 0.06

01642011 BROADCAST SEED (TEMP) (COOL) SY 2,465.00 9 0.08 0.15 0.05 0.32 0.15 0.06

01662001 FERTILIZER AC 0.01 10 500.00 1000.00 2500.00 800.00 1000.00 595.00

01682001 VEGETATIVE WATERING MG 246.10 11 20.00 17.80 20.00 25.00 26.00 52.00

02472044 FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS) CY 2,029.00 12 29.50 48.07 45.00 38.00 60.00 50.00

03102005 PRIME COAT (MC-30 OR AE-P) GAL 1,089.00 13 3.18 5.39 4.25 5.25 4.10 5.00

03162190 AGGR(TY-D GR-4 SAC-B) CY 300.00 14 43.10 108.81 68.00 55.00 66.05 62.00

03162707 ASPH (TIER III) GAL 14,413.00 15 2.90 4.88 4.00 3.90 3.85 4.00

03412050 D-GR HMA(QCQA) TY-C PG70-22 TON 1,291.00 16 55.00 76.86 68.00 80.00 66.05 85.00

03442291 PRF-DSGN-MX CMHB-F SAC-B PG70-22 TON 1,885.00 17 80.00 102.06 105.00 103.00 101.60 113.00

03512002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 100.00 18 27.00 94.68 85.00 125.00 81.30 113.00

03542020 PLANE ASPH CONC PAV(0" TO 1") SY 822.00 19 0.85 13.51 11.00 12.00 10.25 11.00

04162029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 10.00 20 150.00 217.35 210.15 235.00 224.00 265.00

04162031 DRILL SHAFT (TRF SIG POLE) (30 IN) LF 33.30 21 145.00 234.15 226.40 235.00 230.00 270.00

04162032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF 39.20 22 160.00 267.75 258.88 285.00 280.00 330.00

04162034 DRILL SHAFT (TRF SIG POLE) (48 IN) LF 22.00 23 260.00 304.50 294.42 345.00 326.00 385.00

04322001 RIPRAP (CONC)(4 IN) CY 40.00 24 300.00 325.01 500.00 500.00 366.00 500.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 113: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TRAVIS

56 WORKING DAYS

ESTIMATED COST: $1,008,312.15

PROJECT NUMBER: STP 1102(132)HES

ENGINEER: WAGNER, JOHN- GEORGETOWN TX 78626 (512)930-5402

DESCRIPTION: INSTALL ADVANCED WARNING, SAFETY LIGHTING, ETC.

CHECK: 20,000

LOW BIDDER: HUNTER INDUSTRIES, LTD.

DATE: 05/03/2011

HWY.NO.: RM 620

LENGTH: 2.427 ORDER READ: 3034

Eng. Estimate -> $ 1,008,312.15 Amount Left %Left

Cntr 1 HUNTER INDUSTRIES, LTD.................. 1,391,103.86

2 CAPITAL EXCAVATION COMPANY.............. 1,404,945.09 13,841.23 1.0

3 RGM CONSTRUCTORS OF TEXAS LLC........... 1,485,656.86 94,553.00 6.8

4 AUSTIN ENGINEERING CO., INC............. 1,588,854.45 197,750.59 14.2

5 AARON CONCRETE CONTRACTORS, L.P......... 1,603,894.36 212,790.50 15.3

TRAVIS Page 2 of 6

Quantity No

Eng.

Est.

Cntr 1

HUNTER

Cntr 2

CAPITALItems

Cntr 3

RGM CONS

Cntr 4

AUSTIN

Cntr 5

AARON CO

04592009 GABION MATTRESSES (GALV)(6 IN) SY 1,167.00 25 45.00 22.50 45.00 52.00 25.00 55.00

04602109 CMP AR (GAL STL DES 1) LF 38.00 26 185.00 48.52 110.00 80.00 180.00 51.00

04642003 RC PIPE (CL III)(18 IN) LF 178.00 27 36.00 45.12 85.00 75.00 115.00 52.00

04672286 SET (TY II)(18 IN)(RCP)(6:1)(P) EA 2.00 28 789.00 1554.93 1000.00 2500.00 925.00 1300.00

04672335 SET (TY II)(DES 1)(CMP)(6:1)(P) EA 2.00 29 750.00 1037.90 950.00 3000.00 1500.00 1020.00

04962004 REMOV STR (SET) EA 4.00 30 300.00 309.54 300.00 600.00 1210.00 310.00

04962016 REMOV STR (PIPE) EA 3.00 31 145.00 309.54 300.00 2000.00 8000.00 820.00

05002001 MOBILIZATION LS 1.00 32 72000.00 115804.6 136000 135000 160000 160000

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.00 33 2500.00 1630.86 2500.00 2000.00 15900.00 910.00

05062002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 150.00 34 17.00 14.50 25.00 19.00 15.00 22.00

05062009 ROCK FILTER DAMS (REMOVE) LF 150.00 35 4.80 4.50 15.00 8.50 4.60 8.00

05062016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 20.00 36 8.40 10.00 50.00 19.00 10.20 10.00

05062019 CONSTRUCTION EXITS (REMOVE) SY 20.00 37 4.20 5.00 10.00 9.00 5.00 7.00

05062024 BACKHOE WORK (EROSION & SEDM CONT) HR 20.00 38 70.00 102.60 64.17 80.00 150.00 53.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 1,814.00 39 2.50 1.28 3.00 2.00 2.00 2.30

05292004 CONC CURB & GUTTER (TY II) LF 552.00 40 12.80 26.07 18.00 12.00 15.00 16.00

05312003 CONC SIDEWALKS (5') (6") LF 60.00 41 19.00 36.78 25.00 75.00 24.40 32.00

05312005 CURB RAMPS (TY 1) EA 5.00 42 1400.00 1547.87 1000.00 1800.00 855.00 900.00

05312010 CURB RAMPS (TY 7) EA 1.00 43 1150.00 1139.81 1000.00 2000.00 700.00 900.00

05402001 MTL W-BEAM GD FEN (TIM POST) LF 75.00 44 14.00 17.50 16.25 25.00 18.00 20.00

05402005 TERMINAL ANCHOR SECTION EA 1.00 45 465.00 450.00 430.00 450.00 460.00 520.00

05402007 MTL W-BEAM GD FEN ADJUSTMENT LF 275.00 46 8.75 6.50 3.50 10.00 6.60 4.20

05422001 REMOVING METAL BEAM GUARD FENCE LF 75.00 47 1.30 2.50 2.00 3.75 2.60 2.40

05422002 REMOVING TERMINAL ANCHOR SECTION EA 1.00 48 80.00 125.00 150.00 120.00 160.00 180.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 114: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TRAVIS

56 WORKING DAYS

ESTIMATED COST: $1,008,312.15

PROJECT NUMBER: STP 1102(132)HES

ENGINEER: WAGNER, JOHN- GEORGETOWN TX 78626 (512)930-5402

DESCRIPTION: INSTALL ADVANCED WARNING, SAFETY LIGHTING, ETC.

CHECK: 20,000

LOW BIDDER: HUNTER INDUSTRIES, LTD.

DATE: 05/03/2011

HWY.NO.: RM 620

LENGTH: 2.427 ORDER READ: 3034

Eng. Estimate -> $ 1,008,312.15 Amount Left %Left

Cntr 1 HUNTER INDUSTRIES, LTD.................. 1,391,103.86

2 CAPITAL EXCAVATION COMPANY.............. 1,404,945.09 13,841.23 1.0

3 RGM CONSTRUCTORS OF TEXAS LLC........... 1,485,656.86 94,553.00 6.8

4 AUSTIN ENGINEERING CO., INC............. 1,588,854.45 197,750.59 14.2

5 AARON CONCRETE CONTRACTORS, L.P......... 1,603,894.36 212,790.50 15.3

TRAVIS Page 3 of 6

Quantity No

Eng.

Est.

Cntr 1

HUNTER

Cntr 2

CAPITALItems

Cntr 3

RGM CONS

Cntr 4

AUSTIN

Cntr 5

AARON CO

06102042 INS RD IL AM (TY SA) 50T-8 (.4 KW)S EA 1.00 49 2400.00 2800.00 2842.64 3000.00 2540.00 3000.00

06182018 CONDT (PVC) (SCHD 40) ( 2") LF 549.00 50 4.00 10.00 10.15 6.00 11.20 14.00

06182019 CONDT (PVC) (SCHD 40) (2") (BORE) LF 1,033.00 51 13.00 21.00 21.32 18.00 18.30 22.00

06182022 CONDT (PVC) (SCHD 40) (3") LF 2,298.00 52 7.00 12.00 12.18 8.00 12.20 15.00

06182023 CONDT (PVC) (SCHD 40) (3") (BORE) LF 386.00 53 18.00 22.00 22.34 21.00 19.50 23.00

06182024 CONDT (PVC) (SCHD 40) (4") LF 45.00 54 7.00 24.00 24.37 13.00 25.50 30.00

06182025 CONDT (PVC) (SCHD 40) (4") (BORE) LF 420.00 55 18.20 30.00 30.46 23.00 21.00 24.00

06202009 ELEC CONDR (NO. 6) BARE LF 835.00 56 1.00 1.30 1.32 1.30 1.15 1.20

06202010 ELEC CONDR (NO. 6) INSULATED LF 1,670.00 57 1.80 1.35 1.37 1.40 1.25 1.50

06202011 ELEC CONDR (NO. 8) BARE LF 3,971.00 58 0.70 0.95 0.96 1.00 0.75 0.90

06202012 ELEC CONDR (NO. 8) INSULATED LF 5,292.00 59 0.75 0.95 0.96 1.10 1.00 1.10

06242012 GROUND BOX TY C (162911) W/APRON EA 3.00 60 555.00 770.00 781.73 800.00 970.00 1150.00

06242014 GROUND BOX TY D (162922) W/APRON EA 9.00 61 700.00 830.00 842.64 810.00 1020.00 1200.00

06282122 ELC SRV TY D 120/240 100 (NS)SS(E)SP(O) EA 1.00 62 3500.00 3400.00 3451.78 4000.00 3760.00 4500.00

06362001 ALUMINUM SIGNS (TY A) SF 115.00 63 17.40 26.00 26.40 15.00 25.00 29.00

06442001 INS SM RD SN SUP&AM TY 10BWG(1) SA(P) EA 6.00 64 320.00 325.00 315.00 350.00 331.00 380.00

06442004 INS SM RD SN SUP&AM TY 10BWG(1) SA(T) EA 10.00 65 430.00 400.00 445.00 500.00 407.00 535.00

06582240 INSTL DEL ASSM (D-SW)SZ 1(FLX)GF2 EA 2.00 66 23.00 30.00 35.50 40.00 36.10 43.00

06582315 INSTL OM ASSM (OM-2Y)(WC) GND EA 5.00 67 37.00 30.00 42.50 50.00 44.00 51.00

06622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 158.00 68 0.67 1.15 1.00 2.20 2.00 1.20

06622115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 158.00 69 0.76 1.15 1.00 2.20 2.00 1.80

06662002 REFL PAV MRK TY I (W) 4" (BRK)(090MIL) LF 1,584.00 70 0.33 0.44 0.44 0.50 0.50 0.60

06662011 REFL PAV MRK TY I (W) 4" (SLD)(090MIL) LF 8,526.00 71 0.30 0.40 0.40 0.45 0.45 0.50

06662035 REFL PAV MRK TY I (W) 8" (SLD)(090MIL) LF 2,952.00 72 0.63 0.78 0.78 0.90 0.80 1.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 115: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TRAVIS

56 WORKING DAYS

ESTIMATED COST: $1,008,312.15

PROJECT NUMBER: STP 1102(132)HES

ENGINEER: WAGNER, JOHN- GEORGETOWN TX 78626 (512)930-5402

DESCRIPTION: INSTALL ADVANCED WARNING, SAFETY LIGHTING, ETC.

CHECK: 20,000

LOW BIDDER: HUNTER INDUSTRIES, LTD.

DATE: 05/03/2011

HWY.NO.: RM 620

LENGTH: 2.427 ORDER READ: 3034

Eng. Estimate -> $ 1,008,312.15 Amount Left %Left

Cntr 1 HUNTER INDUSTRIES, LTD.................. 1,391,103.86

2 CAPITAL EXCAVATION COMPANY.............. 1,404,945.09 13,841.23 1.0

3 RGM CONSTRUCTORS OF TEXAS LLC........... 1,485,656.86 94,553.00 6.8

4 AUSTIN ENGINEERING CO., INC............. 1,588,854.45 197,750.59 14.2

5 AARON CONCRETE CONTRACTORS, L.P......... 1,603,894.36 212,790.50 15.3

TRAVIS Page 4 of 6

Quantity No

Eng.

Est.

Cntr 1

HUNTER

Cntr 2

CAPITALItems

Cntr 3

RGM CONS

Cntr 4

AUSTIN

Cntr 5

AARON CO

06662042 REFL PAV MRK TY I (W) 12"(SLD)(100MIL) LF 172.00 73 2.55 3.15 3.15 3.50 3.25 3.80

06662047 REFL PAV MRK TY I (W) 24"(SLD)(090MIL) LF 150.00 74 5.50 6.10 6.10 6.60 6.25 7.40

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 80.00 75 6.38 6.10 6.10 6.60 6.25 7.40

06662053 REFL PAV MRK TY I (W) (ARROW) (090MIL) EA 18.00 76 76.00 75.00 75.00 85.00 76.20 90.00

06662056 REFL PAV MRK TY I (W)(BIKE ARW)(090MIL) EA 4.00 77 80.00 55.00 55.00 60.00 56.00 66.00

06662062 REFL PAV MRK TY I(W)(BIKE SYML)(090MIL) EA 4.00 78 130.00 195.00 195.00 210.00 200.00 235.00

06662065 REFL PAV MRK TY I(W)(BIKE WORD)(090MIL) EA 4.00 79 189.00 300.00 300.00 325.00 305.00 360.00

06662095 REFL PAV MRK TY I (W) (WORD) (090MIL) EA 18.00 80 106.00 100.00 100.00 110.00 102.00 120.00

06662104 REFL PAV MRK TY I (Y) 4" (BRK)(090MIL) LF 260.00 81 0.32 0.45 0.45 0.50 0.50 0.60

06662110 REFL PAV MRK TY I (Y) 4" (SLD)(090MIL) LF 6,857.00 82 0.29 0.40 0.40 0.45 0.45 0.50

06662125 REFL PAV MRK TY I (Y) 12"(SLD)(090MIL) LF 448.00 83 3.15 3.15 3.15 3.40 3.25 3.80

06662140 REFL PAV MRK TY I (Y)(MED NOSE)(090MIL) EA 1.00 84 276.00 335.00 335.00 360.00 345.00 402.00

06662142 REF PAV MRK TY II (W) 4" (BRK) LF 1,584.00 85 0.14 0.15 0.15 0.16 0.20 0.20

06662145 REF PAV MRK TY II (W) 4" (SLD) LF 8,526.00 86 0.11 0.12 0.12 0.13 0.15 0.15

06662153 REF PAV MRK TY II (W) 8" (SLD) LF 2,952.00 87 0.30 0.22 0.22 0.24 0.25 0.30

06662157 REF PAV MRK TY II (W) 24" (SLD) LF 150.00 88 2.11 1.60 1.60 1.75 1.65 2.00

06662160 REF PAV MRK TY II (W) (ARROW) EA 18.00 89 33.50 35.00 35.00 40.00 36.00 42.00

06662161 REF PAV MRK TY II (W) (BIKE ARROW) EA 4.00 90 37.50 35.00 35.00 38.00 36.00 42.00

06662163 REF PAV MRK TY II (W) (BIKE SYMBOL) EA 4.00 91 46.00 50.00 50.00 55.00 51.00 60.00

06662164 REF PAV MRK TY II (W) (BIKE WORD) EA 4.00 92 35.00 50.00 50.00 55.00 51.00 60.00

06662173 REF PAV MRK TY II (W) (WORD) EA 18.00 93 43.00 50.00 50.00 55.00 51.00 60.00

06662176 REF PAV MRK TY II (Y) 4" (BRK) LF 260.00 94 0.10 0.15 0.15 0.16 0.20 0.20

06662178 REF PAV MRK TY II (Y) 4" (SLD) LF 6,857.00 95 0.83 0.12 0.12 0.13 0.15 0.15

06662183 REF PAV MRK TY II (Y) 12" (SLD) LF 448.00 96 1.42 1.00 1.00 1.10 1.05 1.20

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 116: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TRAVIS

56 WORKING DAYS

ESTIMATED COST: $1,008,312.15

PROJECT NUMBER: STP 1102(132)HES

ENGINEER: WAGNER, JOHN- GEORGETOWN TX 78626 (512)930-5402

DESCRIPTION: INSTALL ADVANCED WARNING, SAFETY LIGHTING, ETC.

CHECK: 20,000

LOW BIDDER: HUNTER INDUSTRIES, LTD.

DATE: 05/03/2011

HWY.NO.: RM 620

LENGTH: 2.427 ORDER READ: 3034

Eng. Estimate -> $ 1,008,312.15 Amount Left %Left

Cntr 1 HUNTER INDUSTRIES, LTD.................. 1,391,103.86

2 CAPITAL EXCAVATION COMPANY.............. 1,404,945.09 13,841.23 1.0

3 RGM CONSTRUCTORS OF TEXAS LLC........... 1,485,656.86 94,553.00 6.8

4 AUSTIN ENGINEERING CO., INC............. 1,588,854.45 197,750.59 14.2

5 AARON CONCRETE CONTRACTORS, L.P......... 1,603,894.36 212,790.50 15.3

TRAVIS Page 5 of 6

Quantity No

Eng.

Est.

Cntr 1

HUNTER

Cntr 2

CAPITALItems

Cntr 3

RGM CONS

Cntr 4

AUSTIN

Cntr 5

AARON CO

06662188 REF PAV MRK TY II (Y) (MED NOSE) EA 1.00 97 68.83 80.00 80.00 90.00 82.00 96.00

06722012 REFL PAV MRKR TY I-C EA 211.00 98 2.86 3.60 3.60 4.00 3.70 4.40

06722015 REFL PAV MRKR TY II-A-A EA 331.00 99 2.86 3.60 3.60 4.00 3.70 4.40

06802002 INSTALL HWY TRF SIG (ISOLATED) EA 3.00 100 3500.00 4200.00 4263.96 6500.00 4065.00 4800.00

06802003 INSTALL HWY TRF SIG (SYSTEM) EA 1.00 101 4000.00 4200.00 4263.96 5500.00 4575.00 5400.00

06812001 TEMP TRAF SIGNALS EA 1.00 102 15350.00 6700.00 6802.03 12000.00 8640.00 10200.00

06822014 PED SIG SEC (12 IN) LED (2 INDICATIONS) EA 2.00 103 405.00 570.00 578.68 400.00 335.00 393.00

06822022 VEH SIG SEC (12 IN) LED (GRN ARW) EA 8.00 104 205.00 240.00 243.66 230.00 195.00 228.00

06822023 VEH SIG SEC (12 IN) LED (GRN) EA 21.00 105 248.00 250.00 253.81 230.00 205.00 240.00

06822024 VEH SIG SEC (12 IN) LED (YEL ARW) EA 8.00 106 200.00 260.00 263.96 230.00 216.00 255.00

06822025 VEH SIG SEC (12 IN) LED (YEL) EA 25.00 107 248.00 260.00 263.96 230.00 226.00 267.00

06822026 VEH SIG SEC (12 IN) LED (RED ARW) EA 5.00 108 205.00 230.00 233.50 230.00 181.00 215.00

06822027 VEH SIG SEC (12 IN) LED (RED) EA 21.00 109 221.00 240.00 243.65 200.00 196.00 230.00

06822043 PED SIG SEC (12")(2 IND)(HOUSING ONLY) EA 4.00 110 225.00 450.00 456.85 220.00 236.00 280.00

06822045 BACK PLATE (12 IN) (3 SEC) ALUM EA 19.00 111 60.00 39.00 39.59 140.00 41.00 48.00

06822047 BACK PLATE (12 IN) (5 SEC) ALUM EA 5.00 112 107.00 57.00 57.87 175.00 562.00 64.00

06842031 TRF SIG CBL (TY A) (14 AWG) ( 5 CONDR) LF 9,459.00 113 1.43 1.10 1.12 1.20 1.55 1.80

06842033 TRF SIG CBL (TY A) (14 AWG) ( 7 CONDR) LF 2,944.00 114 1.80 1.35 1.37 1.75 1.65 2.00

06842080 TRF SIG CBL (TY C) (14 AWG) ( 2 CONDR) LF 2,190.00 115 0.86 0.80 0.81 1.10 1.05 1.20

06852004 INSTL RDSD FLSH BEACON ASSM(SOLAR PWRD) EA 2.00 116 5000.00 4600.00 4670.05 5200.00 6100.00 7200.00

06862023 INS TRF SIG PL AM(S) 1 ARM (24') EA 2.00 117 2560.00 2800.00 2842.64 3000.00 2950.00 3500.00

06862033 INS TRF SIG PL AM(S) 1 ARM (32') LUM EA 1.00 118 4600.00 4300.00 4365.48 5000.00 4775.00 5700.00

06862039 INS TRF SIG PL AM(S) 1 ARM (40') EA 1.00 119 3828.00 4600.00 4670.05 5000.00 4880.00 5800.00

06862049 INS TRF SIG PL AM(S) 1 ARM (48') LUM EA 2.00 120 7000.00 6200.00 6294.42 7500.00 9855.00 12000.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 117: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TRAVIS

56 WORKING DAYS

ESTIMATED COST: $1,008,312.15

PROJECT NUMBER: STP 1102(132)HES

ENGINEER: WAGNER, JOHN- GEORGETOWN TX 78626 (512)930-5402

DESCRIPTION: INSTALL ADVANCED WARNING, SAFETY LIGHTING, ETC.

CHECK: 20,000

LOW BIDDER: HUNTER INDUSTRIES, LTD.

DATE: 05/03/2011

HWY.NO.: RM 620

LENGTH: 2.427 ORDER READ: 3034

Eng. Estimate -> $ 1,008,312.15 Amount Left %Left

Cntr 1 HUNTER INDUSTRIES, LTD.................. 1,391,103.86

2 CAPITAL EXCAVATION COMPANY.............. 1,404,945.09 13,841.23 1.0

3 RGM CONSTRUCTORS OF TEXAS LLC........... 1,485,656.86 94,553.00 6.8

4 AUSTIN ENGINEERING CO., INC............. 1,588,854.45 197,750.59 14.2

5 AARON CONCRETE CONTRACTORS, L.P......... 1,603,894.36 212,790.50 15.3

TRAVIS Page 6 of 6

Quantity No

Eng.

Est.

Cntr 1

HUNTER

Cntr 2

CAPITALItems

Cntr 3

RGM CONS

Cntr 4

AUSTIN

Cntr 5

AARON CO

06862057 INS TRF SIG PL AM(S) 1 ARM (55') LUM EA 1.00 121 13000.00 14000.00 14213.20 17000.00 16250.00 19200.00

06872001 PED POLE ASSEMBLY EA 3.00 122 1400.00 1600.00 1624.37 1600.00 1971.00 2300.00

06882001 PED DETECT (2 INCH PUSH BTN) EA 6.00 123 190.00 280.00 284.26 250.00 215.00 250.00

06902024 REMOVAL OF SIGNAL HEAD ASSM EA 1.00 124 60.00 110.00 111.68 175.00 255.00 300.00

06902025 REPLACE OF SIGNAL HEAD ASSM EA 2.00 125 500.00 390.00 395.94 130.00 508.00 600.00

06902027 REMOVAL OF SIGNAL RELATED SIGNS EA 1.00 126 54.00 33.00 33.50 110.00 51.00 60.00

60062001 SPREAD SPECTRUM RADIO EA 5.00 127 2000.00 1500.00 1522.84 1900.00 1486.00 1800.00

60062002 COAXIAL CABLE LF 130.00 128 3.12 1.50 1.52 3.50 4.10 5.00

60062003 HELIAX CABLE LF 50.00 129 3.00 3.35 3.40 5.00 5.10 6.00

60062004 ANTENNA (OMNI-DIRECTIONAL) EA 2.00 130 900.00 440.00 446.70 390.00 490.00 600.00

60062005 ANTENNA (UNI-DIRECTIONAL) EA 4.00 131 900.00 370.00 375.64 320.00 430.00 504.00

60072001 REMOVING TRAFFIC SIGNALS EA 1.00 132 2200.00 5000.00 5076.14 2200.00 1020.00 1200.00

68342002 PORTABLE CHANGEABLE MESSAGE SIGN EA 3.00 133 3000.00 4598.64 500.00 9000.00 8000.00 15000.00

86132001 AUDIBLE PEDESTRIAN SIGNAL UNITS EA 4.00 134 750.00 730.00 741.12 700.00 715.00 840.00

86142001 LED COUNTDOWN PEDESTRIAN MODULE EA 4.00 135 900.00 330.00 335.03 230.00 355.00 424.00

86152001 RADAR ADVANCE DETECTION DEVICE EA 12.00 136 8000.00 7500.00 8000.00 7500.00 7120.00 8400.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 118: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: TRAVIS

ESTIMATED COST: $313,056.00

PROJECT NUMBER: STP 1102(010)HES

ENGINEER: MCCOY, TERRY- AUSTIN TX 78753 (512)832-9599

DESCRIPTION: RESURFACING

CHECK:

LOW BIDDER:

DATE: 05/03/2011

HWY.NO.: FM 1327

LENGTH: ORDER READ: 3028

TRAVIS Page 1 of 1

Quantity No

Eng.

Est.Items

Job CANCELLED or No Bidders

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 119: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: UPSHUR

30 WORKING DAYS

ESTIMATED COST: $113,587.50

PROJECT NUMBER: STP 2011(946)

ENGINEER: LEDBETTER, ROGER- MT PLEASANT TX 75456 (903)572-8511

DESCRIPTION: IMPROVE INTERSECTION

CHECK: 2,000

LOW BIDDER: H. V. CAVER, INC.

DATE: 05/03/2011

HWY.NO.: FM 1404

LENGTH: 0.169 ORDER READ: 3029

Eng. Estimate -> $ 113,587.50 Amount Left %Left

Cntr 1 H. V. CAVER, INC........................ 136,996.55

2 REYNOLDS & KAY, LTD..................... 137,853.90 857.35 0.6

3 LONGVIEW BRIDGE AND ROAD, LTD........... 142,285.25 5,288.70 3.9

4 SAMMY GIST ENTERPRISES, INC............. 158,166.00 21,169.45 15.5

5 H. H. HOWARD & SONS, INC................ 158,344.00 21,347.45 15.6

6 B&H CONTRACTING, L.P.................... 165,015.09 28,018.54 20.5

7 EAST TEXAS BRIDGE, INC.................. 189,675.50 52,678.95 38.5

UPSHUR Page 1 of 2

Quantity No

Eng.

Est.

Cntr 1

H. V. CA

Cntr 2

REYNOLDSItems

Cntr 3

LONGVIEW

Cntr 4

SAMMY GI

Cntr 5

H. H. HO

Cntr 6

B&H CONT

Cntr 7

EAST TEX

01002002 PREPARING ROW STA 1.00 1 1000.00 2500.00 3000.00 2500.00 5000.00 2000.00 10000.00 15000.00

01042021 REMOVING CONC (CURB) LF 468.00 2 5.00 5.00 4.00 12.00 20.00 7.00 9.12 7.50

01102001 EXCAVATION (ROADWAY) CY 112.00 3 6.00 15.00 30.00 10.00 20.00 15.00 34.01 16.00

01322006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 275.00 4 8.00 20.00 30.00 10.00 30.00 12.00 13.85 16.00

01622005 MULCH SODDING CY 100.00 5 8.00 15.00 17.00 12.00 30.00 20.00 53.07 20.00

01642001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 500.00 6 0.14 1.00 1.06 1.10 1.00 5.00 1.05 1.10

01642009 BROADCAST SEED (TEMP) (WARM) SY 125.00 7 0.14 0.50 0.54 0.55 0.50 2.00 0.53 1.00

01682001 VEGETATIVE WATERING MG 25.00 8 8.00 0.01 17.50 8.00 1.00 5.00 15.75 30.00

01692002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 500.00 9 1.30 1.50 1.60 1.60 1.50 2.50 1.58 2.00

02472074 FL BS (CMP IN PLC)(TY D GR 2) (6") SY 1,091.00 10 10.00 9.80 9.00 13.00 12.50 15.00 22.77 16.00

02752001 CEMENT TON 9.00 11 110.00 250.00 162.00 140.00 152.00 400.00 294.51 200.00

02752010 CEMENT TREAT (SUBGRADE) (8") SY 677.00 12 2.10 4.00 6.90 3.50 8.00 8.00 8.53 7.00

03102008 PRIME COAT & BLOTTER (MC-30) GAL 442.00 13 3.95 6.00 5.00 5.00 5.00 7.00 5.40 14.00

03162074 AGGR(TY-B GR-3 SAC-A) CY 11.00 14 80.00 85.00 150.00 250.00 200.00 250.00 115.00 275.00

03162158 AGGR(TY-PL GR-4 SAC-A) CY 36.00 15 80.00 90.00 126.00 140.00 110.00 250.00 150.00 225.00

03162706 ASPH (TIER II) GAL 1,940.00 16 4.00 8.00 4.00 4.00 4.50 6.00 4.00 12.00

03402122 D-GR HMA(METH) TY-D PG70-22 TON 130.00 17 130.00 135.00 118.00 140.00 135.00 170.00 135.00 150.00

03402232 D-GR HMA(METH)TY-C OR D PG64-22 TON 158.00 18 130.00 120.00 108.00 140.00 120.00 170.00 120.00 135.00

05002001 MOBILIZATION LS 1.00 19 9288.10 10000.00 13000.00 10000.00 10000.00 3000.00 12000.00 17500.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.00 20 2500.00 2500.00 3000.00 1500.00 800.00 1500.00 1500.00 3000.00

05062003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 40.00 21 50.00 48.80 49.00 53.00 48.80 50.00 51.24 55.00

05062009 ROCK FILTER DAMS (REMOVE) LF 40.00 22 8.00 14.50 15.00 16.00 14.50 10.00 15.23 15.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 300.00 23 2.50 2.60 3.30 2.75 2.60 3.00 2.73 3.00

05292002 CONC CURB (TY II) LF 613.00 24 15.00 18.00 17.00 16.50 18.00 15.00 19.17 12.50

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 120: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: UPSHUR

30 WORKING DAYS

ESTIMATED COST: $113,587.50

PROJECT NUMBER: STP 2011(946)

ENGINEER: LEDBETTER, ROGER- MT PLEASANT TX 75456 (903)572-8511

DESCRIPTION: IMPROVE INTERSECTION

CHECK: 2,000

LOW BIDDER: H. V. CAVER, INC.

DATE: 05/03/2011

HWY.NO.: FM 1404

LENGTH: 0.169 ORDER READ: 3029

Eng. Estimate -> $ 113,587.50 Amount Left %Left

Cntr 1 H. V. CAVER, INC........................ 136,996.55

2 REYNOLDS & KAY, LTD..................... 137,853.90 857.35 0.6

3 LONGVIEW BRIDGE AND ROAD, LTD........... 142,285.25 5,288.70 3.9

4 SAMMY GIST ENTERPRISES, INC............. 158,166.00 21,169.45 15.5

5 H. H. HOWARD & SONS, INC................ 158,344.00 21,347.45 15.6

6 B&H CONTRACTING, L.P.................... 165,015.09 28,018.54 20.5

7 EAST TEXAS BRIDGE, INC.................. 189,675.50 52,678.95 38.5

UPSHUR Page 2 of 2

Quantity No

Eng.

Est.

Cntr 1

H. V. CA

Cntr 2

REYNOLDSItems

Cntr 3

LONGVIEW

Cntr 4

SAMMY GI

Cntr 5

H. H. HO

Cntr 6

B&H CONT

Cntr 7

EAST TEX

06442006 INS SM RD SN SUP&AM TY 10BWG(1) SA(U) EA 2.00 25 360.00 400.00 425.00 425.00 400.00 450.00 420.00 440.00

06442025 INS SM RD SN SUP&AM TY S80(1) SA(T) EA 3.00 26 530.00 425.00 450.00 455.00 425.00 750.00 446.25 470.00

06442053 INS SM RD SN SUP&AM TY TWT(1) WA(P) EA 21.00 27 320.00 325.00 350.00 345.00 325.00 275.00 341.25 360.00

06442054 INS SM RD SN SUP&AM TY TWT(1) WA(T) EA 3.00 28 270.00 350.00 380.00 375.00 350.00 350.00 367.50 385.00

06442056 RELOCATE SM RD SN SUP & AM TY 10BWG EA 3.00 29 286.00 400.00 425.00 425.00 400.00 300.00 420.00 440.00

06442058 RELOCATE SM RD SN SUP & AM TY S80 EA 2.00 30 340.00 450.00 500.00 480.00 450.00 450.00 472.50 500.00

06442060 REMOVE SM RD SN SUP & AM EA 21.00 31 40.00 60.00 100.00 64.00 325.00 30.00 63.00 65.00

06622114 WK ZN PAV MRK SHT TERM (TAB) TY Y EA 56.00 32 0.95 1.50 1.10 2.00 1.00 3.00 1.50 2.00

06682105 PREFAB PAV MRK TY C (W) (24") (SLD) LF 41.00 33 11.00 11.50 12.20 16.00 15.00 15.00 12.08 13.00

06682106 PREFAB PAV MRK TY C (W) (ARROW) EA 2.00 34 155.00 225.00 240.00 215.00 200.00 200.00 236.25 250.00

06682128 PREFAB PAV MRK TY C (Y) (24") (SLD) LF 75.00 35 9.50 11.50 12.20 16.00 15.00 15.00 12.08 13.00

06722015 REFL PAV MRKR TY II-A-A EA 26.00 36 2.60 5.00 5.30 5.25 5.00 5.00 5.25 5.50

60452005 REF PAV MRK TY I (W)(4")(SLD)(90 MIL) LF 1,500.00 37 0.35 0.77 0.82 2.10 2.00 2.00 0.81 0.85

60452038 REF PAV MRK TY I (Y)(4")(SLD)(90 MIL) LF 2,400.00 38 0.30 0.77 0.82 2.10 2.00 2.00 0.81 0.85

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 121: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: VAL VERDE

60 WORKING DAYS

ESTIMATED COST: $154,198.55

PROJECT NUMBER: STP 1102(019)HES

ENGINEER: PEREA, ANTONIO- DEL RIO TX 78840 (830)703-1422

DESCRIPTION: INSTALL TRAFFIC SIGNAL

CHECK: 3,000

LOW BIDDER: STAR OPERATIONS, INC.

DATE: 05/03/2011

HWY.NO.: US 90

LENGTH: 0.877 ORDER READ: 3030

Eng. Estimate -> $ 154,198.55 Amount Left %Left

Cntr 1 STAR OPERATIONS, INC.................... 140,513.92

2 THE LEVY COMPANY, L.P................... 145,711.77 5,197.85 3.7

3 AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., 145,783.40 5,269.48 3.8

4 WILLIS ELECTRIC CO., LP................. 156,376.10 15,862.18 11.3

5 HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, COR 159,870.95 19,357.03 13.8

6 F & W ELECTRICAL CONTRACTORS, INC....... 195,605.75 55,091.83 39.2

7 MICA CORPORATION........................ 199,886.03 59,372.11 42.3

VAL VERDE Page 1 of 3

Quantity No

Eng.

Est.

Cntr 1

STAR OPE

Cntr 2

THE LEVYItems

Cntr 3

AUSTIN

Cntr 4

WILLIS

Cntr 5

HIGHWAY

Cntr 6

F & W EL

Cntr 7

MICA COR

01322001 EMBANKMENT (FINAL)(ORD COMP)(TY A) CY 17.00 1 18.50 36.50 110.91 88.00 93.40 40.58 208.00 93.50

04162030 DRILL SHAFT (TRF SIG POLE) (24 IN) LF 15.90 2 120.00 124.00 93.31 105.00 117.00 98.32 150.00 315.00

04162032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF 24.00 3 165.00 210.00 156.13 210.00 165.00 159.80 175.00 293.50

04602014 CMP AR (GAL STL DES 2) LF 26.50 4 40.00 90.00 87.99 70.00 74.10 133.97 118.00 74.25

04672336 SET (TY II)(DES 2)(CMP)(6:1)(P) EA 1.00 5 1500.00 2400.00 2017.66 1580.00 1700.00 1249.47 3204.00 1700.00

04802001 CLEAN EXIST CULVS EA 1.00 6 1200.00 3350.00 1409.14 1090.00 1200.00 1359.47 2604.00 1190.00

04962006 REMOV STR (HEADWALL) EA 1.00 7 700.00 2000.00 1042.29 850.00 875.00 1139.47 1764.00 878.00

05002001 MOBILIZATION LS 1.00 8 16000.00 10700.00 13665.84 14500.00 15000.00 16079.54 10000.00 15750.00

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.00 9 2500.00 1400.00 1405.35 2500.00 1400.00 1828.73 3600.00 8762.00

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 80.00 10 3.00 3.00 3.58 2.50 3.00 4.88 8.00 11.40

05292004 CONC CURB & GUTTER (TY II) LF 40.00 11 20.00 36.50 37.23 29.00 31.35 40.47 60.00 31.35

05292006 CONC CURB (MONO) (TY II) LF 67.00 12 8.00 36.50 26.64 21.00 22.45 23.97 55.00 22.45

05312015 CONC SIDEWALKS (4") SY 49.90 13 45.00 85.30 106.31 85.00 90.00 84.47 85.00 89.55

05312020 CURB RAMPS (TY 2)(MOD) EA 1.00 14 1600.00 2435.00 1589.83 1350.00 1340.00 2789.47 2600.00 1339.00

05312023 CURB RAMPS (TY 1)(SPL) EA 2.00 15 2200.00 1825.00 1483.05 1275.00 1250.00 2019.47 2200.00 1250.00

05312047 CURB RAMPS (TY 5)(MOD) EA 1.00 16 2200.00 1825.00 2472.23 2100.00 2082.00 3119.47 3500.00 2083.00

05312062 CURB RAMPS (TY 21)(MOD) EA 1.00 17 850.00 1825.00 1391.85 1285.00 1175.00 2789.47 3000.00 1173.00

06182018 CONDT (PVC) (SCHD 40) ( 2") LF 69.00 18 7.00 7.70 9.42 15.00 6.30 7.93 30.00 11.55

06182024 CONDT (PVC) (SCHD 40) (4") LF 155.00 19 15.00 8.00 10.98 20.00 6.50 9.94 30.00 10.70

06182035 CONDT (PVC) (SCHD 80) (2") (BORE) LF 369.00 20 18.00 13.50 17.48 15.00 5.50 16.76 40.00 22.00

06182041 CONDT (PVC) (SCHD 80) (4") (BORE) LF 249.00 21 25.00 17.50 24.96 20.00 30.00 21.56 50.00 24.00

06202009 ELEC CONDR (NO. 6) BARE LF 836.00 22 1.00 1.00 1.35 1.10 1.30 1.36 1.30 1.50

06202010 ELEC CONDR (NO. 6) INSULATED LF 36.00 23 1.20 1.00 1.53 1.40 1.50 1.44 1.45 1.50

06212002 TRAY CABLE (3 CONDR) (12 AWG) LF 223.00 24 2.30 1.20 1.41 1.50 2.80 1.65 1.45 1.65

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 122: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: VAL VERDE

60 WORKING DAYS

ESTIMATED COST: $154,198.55

PROJECT NUMBER: STP 1102(019)HES

ENGINEER: PEREA, ANTONIO- DEL RIO TX 78840 (830)703-1422

DESCRIPTION: INSTALL TRAFFIC SIGNAL

CHECK: 3,000

LOW BIDDER: STAR OPERATIONS, INC.

DATE: 05/03/2011

HWY.NO.: US 90

LENGTH: 0.877 ORDER READ: 3030

Eng. Estimate -> $ 154,198.55 Amount Left %Left

Cntr 1 STAR OPERATIONS, INC.................... 140,513.92

2 THE LEVY COMPANY, L.P................... 145,711.77 5,197.85 3.7

3 AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., 145,783.40 5,269.48 3.8

4 WILLIS ELECTRIC CO., LP................. 156,376.10 15,862.18 11.3

5 HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, COR 159,870.95 19,357.03 13.8

6 F & W ELECTRICAL CONTRACTORS, INC....... 195,605.75 55,091.83 39.2

7 MICA CORPORATION........................ 199,886.03 59,372.11 42.3

VAL VERDE Page 2 of 3

Quantity No

Eng.

Est.

Cntr 1

STAR OPE

Cntr 2

THE LEVYItems

Cntr 3

AUSTIN

Cntr 4

WILLIS

Cntr 5

HIGHWAY

Cntr 6

F & W EL

Cntr 7

MICA COR

06242012 GROUND BOX TY C (162911) W/APRON EA 7.00 25 650.00 750.00 598.96 750.00 825.00 706.10 400.00 1019.00

06282142 ELC SRV TY T 120/240 000 (NS)GS(L)SP(O) EA 1.00 26 2000.00 2450.00 1884.29 2575.00 2500.00 2779.11 2500.00 5690.00

06442001 INS SM RD SN SUP&AM TY 10BWG(1) SA(P) EA 2.00 27 430.00 540.00 602.53 650.00 600.00 434.32 500.00 966.00

06442060 REMOVE SM RD SN SUP & AM EA 3.00 28 75.00 38.00 181.59 85.00 40.00 157.87 50.00 277.00

06662003 REFL PAV MRK TY I (W) 4" (BRK)(100MIL) LF 160.00 29 1.50 2.25 0.91 1.30 0.95 4.11 1.00 0.95

06662012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 720.00 30 1.20 1.90 0.91 1.35 0.95 2.68 1.00 0.95

06662036 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 300.00 31 2.00 3.75 2.15 2.85 2.20 4.55 2.50 2.20

06662048 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 356.00 32 7.00 11.25 6.45 10.00 6.60 7.46 6.75 6.60

06662054 REFL PAV MRK TY I (W) (ARROW) (100MIL) EA 4.00 33 150.00 180.00 129.00 210.00 132.00 99.04 133.00 132.00

06662096 REFL PAV MRK TY I (W) (WORD) (100MIL) EA 4.00 34 150.00 230.00 129.00 215.00 132.00 132.04 133.00 132.00

06662111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 850.00 35 1.30 1.85 0.91 1.25 0.95 2.73 1.00 0.95

06662132 REFL PAV MRK TY I (Y) 24"(SLD)(100MIL) LF 92.00 36 7.50 11.30 6.45 10.00 6.60 6.53 6.75 6.60

06722015 REFL PAV MRKR TY II-A-A EA 20.00 37 5.00 11.55 21.50 5.00 22.00 5.04 22.50 22.00

06722017 REFL PAV MRKR TY II-C-R EA 32.00 38 5.00 11.45 21.50 6.00 22.00 5.04 22.50 22.00

06772001 ELIM EXT PAV MRK & MRKS ( 4") LF 310.00 39 1.20 1.50 1.08 1.45 1.10 1.58 1.25 1.10

06772007 ELIM EXT PAV MRK & MRKS (24") LF 70.00 40 2.50 9.00 3.23 6.10 3.30 2.73 3.50 3.30

06772008 ELIM EXT PAV MRK & MRKS (ARROW) EA 2.00 41 75.00 97.50 59.13 83.00 60.00 71.89 60.75 61.00

06772018 ELIM EXT PAV MRK & MRKS (WORD) EA 2.00 42 100.00 97.50 59.13 83.00 60.00 71.54 60.75 61.00

06782001 PAV SURF PREP FOR MRK ( 4") LF 1,730.00 43 0.50 0.25 0.43 0.10 0.45 1.08 0.60 0.44

06782003 PAV SURF PREP FOR MRK ( 8") LF 300.00 44 0.90 0.45 1.08 0.20 1.10 1.41 1.25 1.10

06782006 PAV SURF PREP FOR MRK (24") LF 448.00 45 1.60 1.35 2.15 1.05 2.20 2.29 2.50 2.20

06782007 PAV SURF PREP FOR MRK (ARROW) EA 4.00 46 30.00 22.00 23.65 10.50 24.00 44.04 25.00 25.00

06782018 PAV SURF PREP FOR MRK (WORD) EA 4.00 47 35.00 22.00 23.65 10.50 24.00 49.54 25.00 25.00

06802003 INSTALL HWY TRF SIG (SYSTEM) EA 1.00 48 20000.00 17850.00 15649.19 18000.00 20000.00 17736.79 20000.00 23570.00

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 123: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: VAL VERDE

60 WORKING DAYS

ESTIMATED COST: $154,198.55

PROJECT NUMBER: STP 1102(019)HES

ENGINEER: PEREA, ANTONIO- DEL RIO TX 78840 (830)703-1422

DESCRIPTION: INSTALL TRAFFIC SIGNAL

CHECK: 3,000

LOW BIDDER: STAR OPERATIONS, INC.

DATE: 05/03/2011

HWY.NO.: US 90

LENGTH: 0.877 ORDER READ: 3030

Eng. Estimate -> $ 154,198.55 Amount Left %Left

Cntr 1 STAR OPERATIONS, INC.................... 140,513.92

2 THE LEVY COMPANY, L.P................... 145,711.77 5,197.85 3.7

3 AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., 145,783.40 5,269.48 3.8

4 WILLIS ELECTRIC CO., LP................. 156,376.10 15,862.18 11.3

5 HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, COR 159,870.95 19,357.03 13.8

6 F & W ELECTRICAL CONTRACTORS, INC....... 195,605.75 55,091.83 39.2

7 MICA CORPORATION........................ 199,886.03 59,372.11 42.3

VAL VERDE Page 3 of 3

Quantity No

Eng.

Est.

Cntr 1

STAR OPE

Cntr 2

THE LEVYItems

Cntr 3

AUSTIN

Cntr 4

WILLIS

Cntr 5

HIGHWAY

Cntr 6

F & W EL

Cntr 7

MICA COR

06822001 BACK PLATE (12 IN) (3 SEC) EA 6.00 49 75.00 55.00 48.76 65.00 75.00 56.36 65.00 88.00

06822002 BACK PLATE (12 IN) (4 SEC) EA 2.00 50 100.00 65.00 56.52 75.00 80.00 64.13 71.00 95.00

06822014 PED SIG SEC (12 IN) LED (2 INDICATIONS) EA 6.00 51 430.00 375.00 494.04 375.00 485.00 372.59 325.00 537.00

06822021 VEH SIG SEC (12 IN) LED (HOUSING ONLY) EA 26.00 52 155.00 130.00 138.98 165.00 100.00 101.75 115.00 136.75

06822022 VEH SIG SEC (12 IN) LED (GRN ARW) EA 3.00 53 105.00 75.80 71.11 100.00 90.00 96.20 80.00 104.00

06822023 VEH SIG SEC (12 IN) LED (GRN) EA 5.00 54 115.00 85.00 71.12 110.00 100.00 96.20 86.00 201.00

06822024 VEH SIG SEC (12 IN) LED (YEL ARW) EA 2.00 55 100.00 95.00 55.71 115.00 112.00 80.66 98.00 368.00

06822025 VEH SIG SEC (12 IN) LED (YEL) EA 6.00 56 115.00 88.00 71.10 105.00 104.00 96.20 89.00 190.00

06822027 VEH SIG SEC (12 IN) LED (RED) EA 10.00 57 100.00 70.00 55.66 100.00 83.00 80.66 74.00 143.25

06842007 TRF SIG CBL (TY A) (12 AWG) ( 2 CONDR) LF 325.00 58 1.00 1.05 1.30 1.00 1.00 1.19 1.20 1.30

06842009 TRF SIG CBL (TY A) (12 AWG) ( 4 CONDR) LF 325.00 59 1.50 1.25 1.49 1.20 1.60 1.60 1.35 1.70

06842010 TRF SIG CBL (TY A) (12 AWG) ( 5 CONDR) LF 171.00 60 1.75 1.55 1.70 1.30 1.90 1.81 1.60 1.95

06842014 TRF SIG CBL (TY A) (12 AWG) ( 9 CONDR) LF 365.00 61 2.50 2.40 2.42 1.80 3.80 2.66 2.25 2.77

06842049 TRF SIG CBL (TY A) (16 AWG) ( 3 CONDR) LF 464.00 62 1.00 0.80 0.91 0.10 0.25 0.99 1.70 1.11

06862037 INS TRF SIG PL AM(S) 1 ARM (36') LUM EA 1.00 63 5580.00 6000.00 4855.76 5500.00 7800.00 5222.07 7250.00 5476.00

06862111 INS TRF SIG PL AM(S) 2 ARM (36-24') EA 1.00 64 4920.00 6160.00 5418.69 6100.00 9000.00 5215.53 7250.00 5950.00

06872001 PED POLE ASSEMBLY EA 3.00 65 1500.00 600.00 652.51 640.00 600.00 794.15 750.00 910.00

06882001 PED DETECT (2 INCH PUSH BTN) EA 6.00 66 195.00 100.00 152.67 115.00 110.00 98.05 98.00 266.00

62662001 VIVDS PROCESSOR SYSTEM EA 1.00 67 8400.00 5100.00 4535.52 5800.00 7000.00 4764.37 5500.00 4875.00

62662002 VIVDS CAMERA ASSEMBLY EA 3.00 68 1400.00 1350.00 1280.32 1500.00 1500.00 1118.02 1700.00 1625.00

62662003 VIVDS SET-UP SYSTEM EA 1.00 69 750.00 785.00 326.96 500.00 750.00 370.01 400.00 132.00

62662005 VIVDS COMMUNICATION CABLE (COAXIAL) LF 464.00 70 2.10 2.25 2.10 1.70 2.50 3.17 2.00 5.12

87142001 RAIS TRF SEP CRB GUID SYS(FURN&INSTL) EA 36.00 71 250.00 6.00 344.00 105.00 352.00 369.47 465.00 342.75

M = 1000

www.WhitleySiddons.com * (512)477-9491 * Fax:(512)481-1983

Page 124: Whitley & Siddons Bid Tabulations · 2011. 5. 3. · Whitley & Siddons Bid Tabulations TABULATIONS FOR MAY 3,2011 LETTING 3001 ANGELINA VA 0911-00-072 $453,290.00 3002 BASTROP PW

COUNTY: VICTORIA

16 W

ESTIMATED COST: $645,006.10

PROJECT NUMBER: RMC - 622521001

ENGINEER: VINKLAREK, JEFF- YOAKUM TX 77995 (361)293-4363

DESCRIPTION: ALPHALTIC CONCRETE PAVEMENT SURFACING

CHECK: 13,000

LOW BIDDER:

DATE: 05/03/2011

HWY.NO.: BU0077S

LENGTH: 0.000 ORDER READ: 4009

Eng. Estimate -> $ 645,006.10 Amount Left %Left

Cntr 1 HUNTER INDUSTRIES, LTD.................. 737,137.23

VICTORIA Page 1 of 1

Quantity No

Eng.

Est.

Cntr 1

HUNTERItems

03162576 ASPH (AC-10-2TR OR AC-15P) GAL 17,088.00 1 3.30 3.94

03162582 AGGR (TY-PB GR-4) CY 438.00 2 64.00 71.44

03412136 D-GR HMA(QCQA) TY-D SAC-B PG76-22 TON 6,266.00 3 65.00 70.29

03542146 PLANE ASPH CONC PAV (1.5'-2") SY 56,961.00 4 1.00 1.51

05002001 MOBILIZATION LS 1.00 5 50000.00 68367.61

05022001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1.00 6 4000.00 1661.45

05062022 EARTHWORK (ERSN & SEDM CONT, IN VEH) CY 2.00 7 50.00 196.59

05062034 TEMPORARY SEDIMENT CONTROL FENCE LF 50.00 8 3.00 4.00

06622001 WK ZN PAV MRK NON-REMOV (W) 4" (BRK) LF 5,983.00 9 0.24 0.30

06622030 WK ZN PAV MRK NON-REMOV (Y) 4" (BRK) LF 2,992.00 10 0.23 0.30

06622032 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 11,966.00 11 0.19 0.30

06622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 3,590.00 12 1.00 1.00

06622115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 2,992.00 13 1.00 1.00

06662005 REFL PAV MRK TY I (W) 4" (DOT)(090MIL) LF 48.00 14 0.40 1.00

06662029 REFL PAV MRK TY I (W) 8" (DOT)(090MIL) LF 24.00 15 1.20 2.00

06682103 PREFAB PAV MRK TY C (W) (12") (SLD) LF 602.00 16 7.35 4.00

06682105 PREFAB PAV MRK TY C (W) (24") (SLD) LF 528.00 17 11.60 8.00

06682106 PREFAB PAV MRK TY C (W) (ARROW) EA 2.00 18 165.00 140.00

06682128 PREFAB PAV MRK TY C (Y) (24") (SLD) LF 68.00 19 11.60 8.00

06722012 REFL PAV MRKR TY I-C EA 636.00 20 4.05 5.00

06722015 REFL PAV MRKR TY II-A-A EA 626.00 21 4.05 5.00

82512002 RE PM W/RET REQ TY I(W)4"(BRK)(090MIL) LF 12,683.00 22 0.36 0.32

82512014 RE PM W/RET REQ TY I(Y)4"(BRK)(090MIL) LF 6,000.00 23 0.35 0.34