what's new in primavera p6 8.1

42
1 The following presentation is from the Oracle Webcast “What’s New in P6 EPPM Release 8.1.” As a partner, you may not use the Oracle Power Point template, rather you must format the presentation slides according to your own template and branding. NOTE:

Upload: eduardenache

Post on 20-Feb-2016

225 views

Category:

Documents


0 download

DESCRIPTION

What'S New in Primavera P6 8.1

TRANSCRIPT

Page 1: What'S New in Primavera P6 8.1

1

The following presentation is from the Oracle Webcast “What’s New in P6 EPPM Release 8.1.”

As a partner, you may not use the Oracle Power Point template, rather you must format the presentation slides according to your own template and branding.

NOTE:

Page 2: What'S New in Primavera P6 8.1

<Insert Picture Here>

What’s New in Primavera P6 EPPM Release 8.1 May 19, 2011

Brian Saldutti Oracle Primavera Product Strategy

Page 3: What'S New in Primavera P6 8.1

3

Agenda

• Refreshed User Interface• Resource Management • Project Management • Risk Management• Portfolio Management• Administration• Technologies• P6 Professional• Mobile• Reporting

Page 4: What'S New in Primavera P6 8.1

4

Refreshed User Interface

Page 5: What'S New in Primavera P6 8.1

5

Refreshed User Interface

Icons replaced with text for easier readability

Main navigation moved to tabs to easily

identify where you are

Page 6: What'S New in Primavera P6 8.1

6

Refreshed User Interface

Detailed pages modernized and simplified

Page 7: What'S New in Primavera P6 8.1

7

Refreshed User Interface

• Control Center Performance• UI Scalability

Buttons always appear when page scrolls to

improve usability

Page 8: What'S New in Primavera P6 8.1

8

Resource Management

Page 9: What'S New in Primavera P6 8.1

9

Resource Management

Dates and duration fields available for viewing and updating in Resource Assignments tab

Page 10: What'S New in Primavera P6 8.1

10

Resource Management

Filter options available when assigning resources including

currently opened projects

Page 11: What'S New in Primavera P6 8.1

11

Resource Management

Assign resources to multiple assignments at once and

search for best fit

Page 12: What'S New in Primavera P6 8.1

12

Resource Management

Run Check Resource Overallocation to identify

resource constraints that may impact the project

Page 13: What'S New in Primavera P6 8.1

13

Resource Management

Automatic notification appears when service is completed

Page 14: What'S New in Primavera P6 8.1

14

Resource Management

See resource overallocation in week increments

Take action to fix the overallocation

Page 15: What'S New in Primavera P6 8.1

15

Project Management

Page 16: What'S New in Primavera P6 8.1

16

Project Management

New fields available in EPS View –

Last Scheduled DateLast Leveled Date

Last Apply Actuals Date

Page 17: What'S New in Primavera P6 8.1

17

Project Management

Define Gantt bars based on User Defined

Fields (UDFs)

Page 18: What'S New in Primavera P6 8.1

18

Project Management

Risk adjusted schedule views to

reflect Risk Analysis data

Page 19: What'S New in Primavera P6 8.1

19

Risk Management

Page 20: What'S New in Primavera P6 8.1

20

Risk Management

• x

Organize categories in a hierarchy for risk

breakdown structure

Page 21: What'S New in Primavera P6 8.1

21

Risk Management

• x

Copy and paste risks within a single

project or across multiple projects

Page 22: What'S New in Primavera P6 8.1

22

Risk Management

• x

Relative thresholds support for use across multiple projects

Page 23: What'S New in Primavera P6 8.1

23

Risk Management

Additional fields to better track and analyze risks

Page 24: What'S New in Primavera P6 8.1

24

Risk Management

Risk exposure and score available at the project

level for analysis

Page 25: What'S New in Primavera P6 8.1

25

Portfolio Management

Page 26: What'S New in Primavera P6 8.1

26

Portfolio Management

• Drill into WBS UDFs

Drill down to view and edit WBS UDF’s via the Dashboard

and Portfolios

Page 27: What'S New in Primavera P6 8.1

27

Administration

Page 28: What'S New in Primavera P6 8.1

28

Project Scheduled Services

Specify a rolling date when configuring project services

Page 29: What'S New in Primavera P6 8.1

29

Scheduled Services Status

Standardized log files for all services including translation support

Page 30: What'S New in Primavera P6 8.1

30

User Sessions

Administrators can reset sessions for users who have been locked out.

Page 31: What'S New in Primavera P6 8.1

31

Technologies

Page 32: What'S New in Primavera P6 8.1

32

New platforms• Google Chrome 9 Browser • Server platform – HP-UX Itanium• Administration – Oracle Enterprise Manager 11g• JRE 1.6.0_24+• BI Publisher 11g• UCM 11g• Brazilian Portuguese language support

Additional Tools• Project integrity checker• Jackrabbit to UCM migration tool

Technologies

Page 33: What'S New in Primavera P6 8.1

33

P6 Professional

Page 34: What'S New in Primavera P6 8.1

34

P6 Professional – Supports: stand alone and work groups

P6 EPPM – Includes: P6 Web and Optional

Client

P6 PMDB

End Users using P6 Optional Client

End Users using P6 Web client

P6 PMDB

End Users using P6 Professional

End Users using P6 Professional

End Users using P6 Professional

Import/Export

Stand alone or Offline mode for P6 EPPM

End Users using P6

Professional with local database

Local P6 PMDB

P6 EPPM Optional Client & P6 Professional 8.1

Page 35: What'S New in Primavera P6 8.1

35

Mobile

Page 36: What'S New in Primavera P6 8.1

3636

Mobile – iPhone App

Email comments and photos related to a task

View assigned tasks by project

Update time spent , time left & dates

Graphical indicator of health/status

Star favorite tasks

Page 37: What'S New in Primavera P6 8.1

3737

Mobile – Email Updates

Filter list of tasks

Send email to request tasks

View assigned tasks by project

Update time spent , time left & dates

Easily mark a task complete

Email changes to update P6 project

Receive confirmation message for updates

Page 38: What'S New in Primavera P6 8.1

38

Reporting

Page 39: What'S New in Primavera P6 8.1

39

Reporting Changes• P6 Schema increased to store calculated fields• Incremental update of projects via trickle process

– Project filter, Manual or Automatic publication • Global Publishing Services • BI Publisher 11g support

– Web based report layout editor– Create reports that combine P6 data with other data sources

• P6 Analytics– Unlimited number of codes supported

Benefits• Improved performance• Near real-time reporting• ODS an optional component for BI Reporting• SQL Server support

39

Reporting

Page 40: What'S New in Primavera P6 8.1

4040

P6 Reporting Database 2.xP6 Data Warehouse

P6 Analytics 1.xP6 EPPM 8.1

P6 PMDB

Resource Utilization Star

Resource Assignment Star

Project History Star

Project Activity Star

OBIEE+/SE-1

Oracle BI Answers

P6 Metadata

Oracle BI Interactive Dashboards

P6 CatalogOracle BI Publisher

Near Real-Time Operational Reporting

Transactional Reporting

StaticOperational Reporting

Analytical Reporting

ODSETLPeriodic Extract,

Transform & Load Process

Extension Tables and Views

Reporting

Page 41: What'S New in Primavera P6 8.1

41

Reporting

Project options to enable publication

and set priority

Page 42: What'S New in Primavera P6 8.1

For more information please visit:

www.oracle.com/primavera