TERRAMIN AUSTRALIA LIMITED What's happening at Angas Zinc? Safety - In March achieved 12 months without a Lost Time Injury (LTI) Emergency Response Training - new team members Hazard reporting continued to increase Increased core safety training Highest recorded RL (72.34m)

Upload: others

Post on 12-Jun-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

What's happening at Angas Zinc?

Safety - In March achieved

12 months without a Lost

Time Injury (LTI)

Emergency Response

Training - new team

members

Hazard reporting continued

to increase

Increased core safety

training

Highest recorded RL (72.34m)

Page 2: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Mining and Processing

(Quarter 1, 2013)

Underground development has advanced to over

11km

Development progressing on the 360 metre level

A total 93,989 tonnes of ore was processed

10,827 tonnes of zinc concentrate

4,730 tonnes of lead copper concentrate

Exploration result from underground has resulted in

approval of development of the 380mL

Page 3: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume
Page 4: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume
Page 5: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Near Mine Exploration

Page 6: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Regional Exploration

Results in March

confirmed presence

of a large copper-gold

mineralisation at

Pipeline

Ongoing geochemical

sampling continues

over regional

prospects

Regional exploration commenced in January

Page 7: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Angas Zinc Mine

Quarterly Environment Report Quarter 1: January -March 2013

M. Daniel

Page 8: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Environmental and Community

Activities

Annual Compliance Report

(formally MARCR) submitted at

requested date

Waste Management Plan -

implemented, waste bays,

recycling

Installation of noise curtains

TSF Rehabilitation trial (soil

moisture probe vandalised,

repaired in April)

Seed Collection - 9 species

throughout the quarter

Rabbit fumigation

Woody Weeds eradication program

Community Interaction - Site tours

CSIRO Double helix club

SACOME Mining for non-miners

SCCC and government regulators

DMITRE Industry and Manufacturing

tour

Green Triangle Activity Group

TAFE SA Indigenous Students

studying mining – presentation and

surface tour

Sponsorships

CLASS

Page 9: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Noise March Monitoring - West results

(Boxcut side)

Page 10: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Noise March Monitoring -East results

(Mill side)

Possible sledge hammer

Wind

Wind

Page 11: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Noise

Noise/vibrations concerns from one resident.

Ongoing regular discussions attempting to identify and resolve

these issue

Analysis of noise and vibration data

Consultant from a noise mitigation strategies company

(Flexshield) came to site in December 2012 measuring noise

around and off-site to determine the main source of noise

Page 12: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

Flexshield Noise Monitoring Locations

a

Mine side of

Grain Mill

Paddock

Residence

Neighbour’s

Home

Boundary towards

Neighbour

1st Level Ball Mill –

3000mm from Mill

Page 13: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Noise - Flexshield Monitoring Data

Page 14: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Noise/ Vibration

14

PPVmax- 0.10 mm/s

7/5/13 00:00 7/5/13 06:00

PPVmax- 0.12 mm/s

Vibration Levels at time of Noise/vibration concern received on the 7th of

May

AS2187.2 Vibration limit - 5mm/s

Walking - 1mm/s

Jumping - 7mm/s

Average vibration for a stope blast - 1.5mm/s

Max during time (00:00 - 06:00) of concern - 0.12mm/s

Noise data has been forwarded to the EPA

Velo

city

(m

m/s

)

Page 15: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Hi-volume samplers

Exceedance on the 4th of January over the PEPR criteria

SA Environmental Pollution Monitoring Services investigated the

exceedance;

Dust contained

low lead levels

Wind speed 5-10

m/s

Wind direction

(north to west)

High levels not

recorded at

western unit

Non-mine related

dust

Page 16: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Blasting

No complaints regarding blasting during the quarter

Monitors were calibrated during the quarter and replaced by the

roving monitor

All monitors are now operational

No data was recorded during the 25th and 28th of February and

the 5th to the 13th of March due to issues with the solar panel

resulting in battery failure (roving monitor)

Problem with the sensor at the Glover paddock monitor resulted

in invalid data from 31st of January till the 14th of March

SAROS are currently installing an alarm system to raise an alert

when unusual data inputs occur

Page 17: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Acid Mine Drainage - TSF Decant

Pond RL

2010

2011

2012

2013

RL - 67.39 at 16th May

Page 18: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Acid Mine Drainage - TSF Decant

Pond Surface Area

Surface area- now measuring weekly through visual

inspection (photo and GPS points)

Current surface area - 11,807m2 at 67.45RL on the 15th of May

Below 15,000m2 and 68RL

7th

March 2013 TSF Western Wall 15th

2013 May TSF Western Wall

Page 19: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Acid Mine Drainage - Surface Area

Page 20: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Acid Mine Drainage - TSF Decant Pond

Beach survey undertaken on the 4th of May 2013

Volume of water in the decant pond has reduced by 219,727m3

since November 2011

RL of the tails has increased by 1 meter - at the decant chute

Water depth at decant chute reduced from 8.94m on 28th

November 2011 to 2.12m on the 4th of May 2013

Date RL of Tails (m)

Volume of Decant Pond Water (m3)

Total Volume of tailings (m3)

Nov-11 -36.79 239,367 569,000

May-12 -35.85 149,587 606,000

Oct-12 -35.60 159,786 639,830

May-13 -34.64 19,640 677,100

Page 21: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Acid Mine Drainage - Modeled

Surface Area

Page 22: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Acid Mine Drainage - Management

of the TSF Decant Pond

Raw water management

350m3/day sent underground for use in the underground drill rigs

Re-injection of filtered water

Increased feed capacity of the filtration plant (replaced the

Osmoflo UF) which can treat 100m3/hr compared to 40m3/hr

Dust suppression- sprinklers and water trucks

RO plants - treating small amounts for internal use

TSF water management

Currently an average of 445m3/day of water is used within the

process plant

Enhanced evaporation - sprinklers

Paste fill

V2 - contingency for high rainfall events

Page 23: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Community feedback & environmental

incidents

3 registered community complaints

Two from one resident regarding noise at night-

– noise curtains installed

– house visit

– noise monitoring conducted at the house

Local resident complained about work conducted on Good Friday- did

not leave details

2 internal environmental events recorded

Turtle found in process pond

Oil spill identified on road verge adjacent to the eastern paddock

fenceline

Page 24: What's happening at Angas Zinc? - Terramin Australia Limited · TERRAMIN AUSTRALIA LIMITED Acid Mine Drainage - TSF Decant Pond Beach survey undertaken on the 4th of May 2013 Volume

TERRAMIN AUSTRALIA LIMITED

Upcoming Activities for Q2 2013

Further weed and pest management

Vegetation maintenance and

enhancement

TAFE group using Angas as a

training site for rehabilitation

Drainage and sediment drain upgrades

Continued removal of historic waste

Seeding of native plants on 6ha of the eastern

paddock for SEB requirements

Rehabilitation of the historic landfill