What Is SMED?
Single Minute Exchange of Dies:
SMED is a problem solving tool used to
decrease the amount of set-up time
required from the last Good piece
produced to the first Good piece
produced
Precursor: 5s - completed and
standardized weeks in advanced
2
WHY IMPLEMENT SMED
•Reduces the need for inventory,
•Provides more flexibility and capacity,
•Done correctly, improves safety
•Enables us to better serve our customer
•Standard processes provide for better and
more consistent Quality.
3
Set-up Reduction – Gross adjustment Go
tools before fine alignment
Before
After
4
Set-up Reduction – Pick vs. Calculate Gears
Before
After
5
Set-up Reduction – Gross adjustment tools
before fine alignment
COLLAR SETTINGS
LAP
5 5 1/2 6 7
13 33 5/8 33 1/8 32 5/8 31 5/8
13 1/2 33 3/8 32 7/8 32 3/8 31 3/8
14 33 1/8 32 5/8 32 1/8 31 1/8
14 1/2 32 7/8 32 3/8 31 7/8 30 7/8
15 32 5/8 32 1/8 31 5/8 30 5/8
15 1/2 32 3/8 31 7/8 31 3/8 30 3/8
FA
CE
16 32 1/8 31 5/8 31 1/8 30 1/8
16 1/2 31 7/8 31 3/8 30 7/8 29 7/8
17 31 5/8 31 1/8 30 5/8 29 5/8
17 1/2 31 3/8 30 7/8 30 3/8 29 3/8
18 31 1/8 30 5/8 30 1/8 29 1/8
18 1/2 30 7/8 30 3/8 29 7/8 28 7/8
19 30 5/8 30 1/8 29 5/8 28 5/8
19 1/2 30 3/8 29 7/8 29 3/8 28 3/8
20 30 1/8 29 5/8 29 1/8 28 1/8
20 1/2 29 7/8 29 3/8 28 7/8 27 7/8
21 29 5/8 29 1/8 28 5/8 27 5/8
21 1/2 29 3/8 28 7/8 28 3/8 27 3/8
22 29 1/8 28 5/8 28 1/8 27 1/8
22 1/2 28 7/8 28 3/8 27 7/8 26 7/8
23 28 5/8 28 1/8 27 5/8 26 5/8
23 1/2 28 3/8 27 7/8 27 3/8 26 3/8
24 28 1/8 27 5/8 27 1/8 26 1/8 6
Set-up Reduction – Measurement Reference Matrix
Set-up Reduction – Organized & Accessible Tools
Order Step Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
Operator
1 release snatcher 1
2 Set Table & Former 7
3 Lockout 1
4 change bars 15
5 change spots 6
6 change Perf rollers 5
7 change glue pans 5
8 pull paper 5
9 Lineout 5
10 set donuts 3
11 set eye registration 3
12 set cutoff 2
13 set selector drum 2
Utility
1 finish pallet 5
2 Lockout 1
3 change gear 5
4 set spot and bar dials (length) 5
5 change bars 8
6 change spots 5
7 change perf rollers 5
8 change glue 5
9 pull paper 5
10 set knife dials 5
11 take slack out 3
12 position/set spots 2
13 takeaway scrap 2
Asst
1 Disengage Perf rollers 1
2 replace paper 20
3 prep inline(cylinders, ink,) 15
4 pull paper 5
5 take slack out 3
6 set edge aligners 2
7 strike inline 2
8 move seam wheels & position eye sens. 2
9 engage perf rollers 1
10 set bite 1
Kaizen Results Set-up Reduction – Distribute Labor Supporting Common Tasks
Kaizen Results
• Pre-event set-up reduction = 2.5 Hours o 2 ply - 2 ply change with tail printing
• Post-event set-up reduction = 45 minutes. o 2 ply - 2 ply change with tail printing
• Pre-event set-up reduction > 2.5 Hours o 3 ply - 3 ply change with tail printing (50lb to 40lb)
• Post-event set-up reduction = 1.5 Hours
o 3 ply - 3 ply change with tail printing (50lb to 40lb)