Page 1: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

1Photo credit: http://www.flickr.com/photos/flik/2533996623/

What Is New In Visual Jobs Scheduler for Microsoft Dynamics NAV Webinar, 20 May 2015Dr. Martin Karlowitsch, NETRONIC Software GmbH

Page 2: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

Content of Session

Why: NETRONIC – The Gantt Company – 5 min

What: Visual scheduling add-ins for Microsoft Dynamics NAV – 5 min

What is new: Overview of new VJS features – 10 min

How: The new Visual Jobs Scheduler features in action – 30 min

Page 3: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

NETRONIC – The Gantt Company

• Founded in 1975: specialized in interactive planning diagrams since decades

• Focus on Gantt charts (network and tree charts additionally)

• Innovation leader

• 24 employees

• Global reach: 60% of revenue from outside Germany

• >1,000 active customers globally;serving millions of users

NETRONIC is a worldwide leading supplier of software to visualize complex enterprise, planning and production data with powerful interactive Gantt, tree and network charts.

Page 4: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

Our Offering For Dynamics NAV- Three Plus Two Things To Remember

NETRONIC offers fully integrated visual scheduling add-ins for NAV.

3

The add-ins do not require any changes to the NAV standard.

+1

+1 We have dedicated products to support standard scheduling processes for production orders/ capacities, jobs/resources and service orders/ resources.

Page 5: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

5

Our Visual Scheduling Offering For Microsoft Dynamics NAV

NETRONIC Visual Scheduling Suite for Microsoft Dynamics NAV

Visual Production Scheduler

Visualize, schedule and optimize production orders & capacities

Visual Jobs Scheduler

Visualize, schedule and control jobs, job tasks, job planning lines & resources

Visual Service Scheduler

Visualize, dispatch and schedule service orders, allocations & resources

Page 6: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

6

Focus Of Today’s Webcast

NETRONIC Visual Scheduling Suite for Microsoft Dynamics NAV

Visual Production Scheduler

Visualize, schedule and optimize production orders & capacities

Visual Jobs Scheduler

Visualize, schedule and control jobs, job tasks, job planning lines & resources

Visual Service Scheduler

Visualize, dispatch and schedule service orders, allocations & resources

Page 7: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

7

New VJS Features - Overview

• Major Features– Assign job planning lines to resource groups– Work with ‚true length‘ of job planning lines– Restrict the reallocation of job planning lines– Create a resource load report

• Minor Features– Split job planning lines– Freeze histograms– Hide job planning lines with quantity = zero– Hide job planning lines with type = item

Page 8: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

8

Assign Job Planning LinesTo Resource Groups• Why

– Enable customers to differentiate between short-term detailed, and mid-term rough planning

• How– Define dedicated

resource called „unassigned task“ and use prefix $VJSRG$

– See capacity load forentire resource group

Page 9: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

9

Work With ‘True Length’ Of Job Planning Lines• Why

– Help customers to reducenumber of jobplanning lines

• How– Use quantities >8 hours,

and reflect this in longerjob planning line bars

– Mirror this ‘true allocation’in capacity load curve andshow ‘true’ utilization

• Please note– Needs one change to the C/AL code

Page 10: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

10

Required C/AL Code Change

Page 11: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

11

Restrict The Allocation Of Job Planning Lines• Why

– Make sure that customersallocate job planning linesto adequate resources only.

• How– Prevent to move a job

planning line from oneresource to another resource which belongs to a different resourcegroup

Page 12: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

12

Create A Resource Load Report

• Why– Provide comprehensive overview of the respective resource load

• How– Introduction of third view: histogram view

Page 13: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

13

Demo Time!

Page 14: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

14

What’s Next

• InPlace editing (“on bar”) of job planning line quantity

• Use resource skills when scheduling jobs• Introduce all four link types• Base user interactions on resource capacities, and

make intelligent ‘suggestions’• Customizable tooltip

Page 15: What is new in Visual Jobs Scheduler for Microsoft Dynamics NAV

Thank You Very Much For Your Kind Attention.

Dr. Martin KarlowitschManaging Director

NETRONIC Software GmbHPascalstrasse 1552076 Aachen, GermanyPhone: +49 2408 141-0Fax: +49 2408 [email protected]