westside pump station reliability improvements project

35
[1] Westside Pump Station Reliability Improvements Project Public Art Project Plan For approval at the December 21, 2016 Visual Arts Committee meeting BACKGROUND The San Francisco Public Utilities Commission (SFPUC) is making improvements to the Westside Pump Station, located at the corner of the Great Highway and Sloat Boulevard. The Westside Pump Station is the SFPUC’s main wastewater pump station servicing the west side of the City of San Francisco. The public art plan for this improvement project includes both the relocation of existing artwork as well as the commissioning of new artwork. RELOCATION OF EXISTING ARTWORK The existing artwork “Earth Air Sea,” by Mary Fuller, commissioned in 1986, will be removed from its current location at the corner of the Great Highway and Sloat Blvd., and relocated to a planting area in front of the building facing Sloat Blvd. The new location is adjacent to the San Francisco Zoo, and visible from residences across the street. The funds for the removal and relocation of the sculptures will be paid for from the capital improvement budget, and not from art enrichment funds. Below is an image of the concrete sculptures in their current location (on the left), and an image of the proposed location of the three sculptures (on the right). Existing Sculptures Proposed new building with relocated artwork facing Sloat Blvd.

Upload: others

Post on 04-Apr-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

[1]

Westside Pump Station Reliability Improvements Project Public Art Project Plan For approval at the December 21, 2016 Visual Arts Committee meeting

BACKGROUND The San Francisco Public Utilities Commission (SFPUC) is making improvements to the Westside Pump Station, located at the corner of the Great Highway and Sloat Boulevard. The Westside Pump Station is the SFPUC’s main wastewater pump station servicing the west side of the City of San Francisco. The public art plan for this improvement project includes both the relocation of existing artwork as well as the commissioning of new artwork. RELOCATION OF EXISTING ARTWORK The existing artwork “Earth Air Sea,” by Mary Fuller, commissioned in 1986, will be removed from its current location at the corner of the Great Highway and Sloat Blvd., and relocated to a planting area in front of the building facing Sloat Blvd. The new location is adjacent to the San Francisco Zoo, and visible from residences across the street. The funds for the removal and relocation of the sculptures will be paid for from the capital improvement budget, and not from art enrichment funds. Below is an image of the concrete sculptures in their current location (on the left), and an image of the proposed location of the three sculptures (on the right).

Existing Sculptures Proposed new building with relocated artwork facing Sloat Blvd.

[2]

COMMISSION OF NEW ARTWORK ART OPPORTUNITY The art opportunity is the facility’s West side concrete façade facing the Great Highway, distinct from the new location of the Mary Fuller sculptures along the facility’s North façade facing Sloat Blvd. The preferred location for the new work is the three sides of the upper portion of the tower structure that sits just south of the signage wall. The west facing side of the upper portion of the tower is approximately 15 feet high by 20 feet wide. Due to the harsh marine environment, the material for the artwork should be of the most durable materials, for example, stone or mosaic. PROJECT GOAL The goal of this new project is to create an artwork that will beautify and complement the architecture of the building; enhance the building’s connection to the site by reflecting SFPUC’s mission of providing high quality, efficient and reliable water, wastewater and power services to the City in a manner inclusive of environmental and community interests; and have visibility and presence from a distance. PROJECT BUDGET Administration Fee $46,308 Artist selection, signage and documentation $9,520 Artwork Budget $136,000 Contingency $16,559 Conservation $23,154 Total Budget $231,542

ARTIST RECRUITMENT APPROACH AND ELIGIBILITY The Arts Commission will select a short list of artists from the 2015/16 Prequalified Pool. ARTIST SELECTION PROCESS The list of qualified artists will be presented to the Westside Pump Station Reliability Improvements Public Art Selection Panel consisting of one representative of the client agency (PUC), one Arts Commissioner, two arts professionals, and one community member. The panel will identify three finalists who will be invited to develop conceptual site specific proposals after attending an orientation session with the project team and key stakeholders. These finalists will be paid an honorarium of $1,250 plus travel reimbursement for development of a proposal.

The Westside Pump Station Reliability Improvements Public Art Selection Panel will reconvene to consider the finalists’ proposals in an interview format and will select one artist and an alternate for the project for recommendation to the Art Commission. COMMUNITY INVOLVEMENT

• A community representative will serve on the Selection Panel and will participate in the Artist Orientation. • The finalists’ proposals will be on display for public comment near the project site and on the SFAC

website for two weeks prior to the final selection panel meeting. • All selection panels, Visual Arts Committee (VAC) and Commission meetings are open to the public.

[3]

TIMELINE (Subject to change) Project Outline Approval (VAC) Wednesday, December 21, 2016 First Selection Panel week of January 30, 2017 VAC approval of finalists Wednesday, February 15, 2017 Artist Finalist Orientation week of February 20, 2017 Final Proposal Due week of April 18, 2017 Public Display end of April - beginning of May 2017 Final Selection Panel mid-May 2017 VAC Approval of Finalist Wednesday, May 17, 2017 Arts Commission Approval Monday, June 05, 2017 Artist under Contract end of June 2017

FURTHER INFORMATION Contact Mary Chou, Public Art Project Manager at (415) 252-2233 or by email at [email protected].

RELIABILITY IMPROVEMENTSPUBLIC UTILITIES COMMISSIONCIVIC DESIGN REVIEW - PHASE 1 - OCTOBER 17, 2016

WESTSIDE PUMP STATIONCITY & COUNTY OF SAN FRANCISCO

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 2

Project Background and Objective

PROJECT BACKGROUND AND OBJECTIVE

The Westside Pump Station has been in service for over 30 years since 1985. It is the SFPUC’s main wastewater pump station servicing the west side of the City of San Francisco therefore its continued service and reliability is critical. The objective of the Westside Pump Station Reliability Improvements Project is to increase reliability of its operations to comply with the current maximum permitted level of Combined Sewage Discharges.

SCOPE OF WORK

• Construction of a below-grade channel and a vertical shaft with connection to existing facility• Renovation/reconstruction of a portion of the existing pump station to accommodate construction of new

channel/shaft and installation of new mechanical equipment• Construction of a new electrical building to provide a redundant power feed and increase the power

capacity• Providing a new driveway for improved access and other site improvements

VICENTE STREET

LINCOLN WAY

RICHMOND WATERSHED

SUNSET WATERSHED

LAKE MERCED WATERSHED

PACIFIC OCEAN

RICHMOND TRANSPORT

TUNNEL

LAKE MERCED

TRANSPORT TUNNEL

WESTSIDE PUMP STATION

WES

TSID

E T/

S

OSP

LAKE MERCED OUTFALL

VICENTEOUTFALL

LINCOLNOUTFALL

PUMP STATION

COMBINED SEWER DISCHARGE (CSD)

WATERSHED INPUT

FORCE MAIN / PRESSURIZED FLOW

TUNNEL

TRANSPORT / STORAGE STRUCTURE

OCEANSIDE WATER POLLUTION CONTROL PLANT

SOUTHWEST OCEAN OUTFALL

SWOO

SWOO

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 3

Project Location

SLOAT BOULEVARD

GREAT H

IGH

WAY

SAN FRANCISCO ZOO

WAWONA STREET

VICENTE STREET

OC

EAN

BEACH

SKYL

INE B

OUL

EVAR

D

SOUTH SUNSET PLAYGROUND

ULLOAELEMENTARYSCHOOL

PROJECT SITE

PROJECT LOCATION

O 150’ 300’ 600’

SUN

SET BOU

LEVARD

n

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 4

Street Views

SLOAT BOULEVARD LOOKING WEST

SLOAT BOULEVARD LOOKING EAST

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 5

Street Views

GREAT HIGHWAY LOOKING SOUTH

GREAT HIGHWAY LOOKING NORTH

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 6

Existing Site Plan

GREAT HIGHWAY

SAN FRANCISCO ZOO PARKING LOT

SLOAT BO

ULEVARD

OCEAN BEACH

ACCESS DRIVE

SOUTHYARD

NORTHYARD

WESTSIDE PUMP STATION MAIN BUILDING

CONCRETE RETAINING WALL

FENCE

FENCE

SCULPTURESPLANTER, TYP.

SFPUCFACILITY

SFPUC FACILITY

O 20’ 40’ 80’ n

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 7

Photos of Existing Site

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 8

Proposed Site Plan

GREAT HIGHWAY

SAN FRANCISCO ZOO PARKING LOT

SLOAT BO

ULEVARD

OCEAN BEACH

(E) DRIVEWAY

(E) SOUTHYARD

(E) NORTHYARD

(E) PUMP STATION SCULPTURES

(P) ELECTRICALBUILDING

(P) LOW PLANTING

(P) BAR SCREEN SHAFT

SFPUCFACILITY

SFPUC FACILITY

O 20’ 40’ 80’ n

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 9

Program Area / Equipment Layout

BAR SCREEN SHAFT

SWITCHGEAR ROOM

VARIABLE FREQUENCY DRIVE ROOM

BATTERY ROOM

10’ MIN

.5’ M

IN.

8’ MIN. 8’ MIN.

ELECTRICAL ROOM W/ AIR HANDLING UNIT ABOVE

OPENING ABOVE FOR DISCHARGE POINT

EXISTING TO REMAINEXISTING TO BE MODIFIED / RECONSTRUCTED

PROPOSED ADDITIONS

O 8’ 16’ 32’ n

10’ MIN

.

SOUTHYARD

NORTH YARD

(E) PUMP STATION

8’ MIN

.

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 10

Proposed Program

WEST PUMP CHAMBER EXPANSION

NEW BAR SCREEN SHAFT

NEW ELECTRICAL BUILDING

EXISTING TO REMAINEXISTING TO BE MODIFIED / RECONSTRUCTED*

PROPOSED ADDITIONS

NEW REDUNDANT CHANNEL

* RECONSTRUCTION NECESSITATED MAINLY BY EXCAVATION FOR WORK BELOW GRADE

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 11

Program Location and Form

NEW REDUNDANT CHANNEL

WEST PUMP CHAMBER EXPANSION

(E) STAIR TO REMAINNEW OPENING IN (E) WALL FOR DISCHARGE POINT NEW BAR SCREEN SHAFT

AND HYDRAULIC POWER UNITELECTRICAL ROOM W/ AIR HANDLING UNIT ABOVE

SWITCHGEAR ROOM

VARIABLE FREQUENCY DRIVE ROOM

BATTERY ROOM

EXISTING TO REMAINEXISTING TO BE MODIFIED / RECONSTRUCTED

PROPOSED ADDITIONS

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 12

Concept Site Plan - Planting

Building Design & Construction Westside Pump Station| Team Progress Review | 09.01.2016

Concept Site Plan - Planting

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 13

Planting Palette

Building Design & Construction Westside Pump Station| Team Progress Review | 09.01.2016

Planting Palette

new zealand flaxPhormium ‘margaret Jones’infrequent

lion’s earLeonotis Leonurus

spring-fall

angelina stonecropsedum ruPestre ‘angeLina’summer

blue chalk stickssenecio mandraLiscae

summer

rock purslanecaLindrinia grandifLora

summer

blue oat grassheLictotrichon semPervirens

summer

little sur manzanitaarctostaPhyLos edmundsii

winter-spring

sea lavenderLimonium caLifornicum

late summer-early winter

coral aloeaLoe striata

winter-spring

WES

T PL

AN

TIN

G

NO

RTH

PLA

NTI

NGtaller (aBOVe 2ft)

miD (1 tO 2ft)

lOw (BelOw 1ft) lOw (BelOw 1ft)

miD (1 tO 2ft)

taller (aBOVe 2ft)

blue oat grassheLictotrichon semPervirens

summer

angelina stonecropsedum ruPestre ‘angeLina’summer

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 14

Floor Plan

AA

B B

A

A

GREAT HIGHWAY

SLOAT BO

ULEVARD

SOUTHYARD

NORTHYARD

(E) PUMP STATION

SCULPTURES

SWITCHGEARROOM

V.F.D. ROOM

BATTERY ROOMBAR SCREEN / HPU ROOM

CONTROL ROOM

ELECTRICALROOM

O 10’ 20’ 40’ n

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 15

Scheme A - Imagery

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 16

Scheme A - Great Highway - Southbound

Building Design & Construction

Westside Pump Station Reliability Improvements

CDR Views | 10.17.2016 | Page 6

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 17

Scheme A - Great Highway - Northbound

Building Design & Construction

Westside Pump Station Reliability Improvements

CDR Views | 10.17.2016 | Page 7

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 18

Scheme A - Sloat Boulevard - Eastbound

Building Design & Construction

Westside Pump Station Reliability Improvements

CDR Views | 10.17.2016 | Page 8

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 19

Scheme A - Sloat Boulevard - Westbound

Building Design & Construction

Westside Pump Station Reliability Improvements

CDR Views | 10.17.2016 | Page 9

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 20Building Design & Construction

Westside Pump Station Reliability Improvements

CDR Views | 10.17.2016 | Page 10

Scheme A - Overall Perspectival Elevation

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 21

Scheme A - Electrical Building Elevations

O 8’ 16’ 32’

EAST ELEVATION NORTH ELEVATION

SOUTH ELEVATION WEST ELEVATION

ROOF20’-2”

LEVEL 10’-0”

+10’-6”

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 22

Scheme A - Main Building Elevations

WEST ELEVATION

SOUTH ELEVATION NORTH ELEVATION

LEVEL 10’-0”

+9’-0”+10’-6”

+12’-0”

+18’-6”

+31’-0”

+12’-0”+10’-6”

O 8’ 16’ 32’

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 23

Scheme A - Building Sections

O 8’ 16’ 32’

MAIN BUILDING SECTION A-A

ELECTRICAL BUILDING SECTION B-B ELECTRICAL BUILDING SECTION A-A

ELECTRICAL ROOM

AIR HANDLING UNIT

VFD ROOM ELECTRICAL ROOM

AIR HANDLING UNIT SWITCHGEAR ROOM

BATTERY ROOM

CORRIDOR

BAR SCREEN / HPU ROOM

STORAGE

CONTROL ROOM

STORAGE

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 24

Scheme B - Imagery

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 25

Scheme B - Great Highway - Southbound

Building Design & Construction

Westside Pump Station Reliability Improvements

CDR Views | 10.17.2016 | Page 11

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 26

Scheme B - Great Highway - Northbound

Building Design & Construction

Westside Pump Station Reliability Improvements

CDR Views | 10.17.2016 | Page 12

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 27

Scheme B - Sloat Boulevard - Eastbound

Building Design & Construction

Westside Pump Station Reliability Improvements

CDR Views | 10.17.2016 | Page 13

Scheme D - Perspective View

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 28

Scheme B - Sloat Boulevard - Westbound

Building Design & Construction

Westside Pump Station Reliability Improvements

CDR Views | 10.17.2016 | Page 14

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 29

Scheme B - Overall Perspectival Elevation

Building Design & Construction

Westside Pump Station Reliability Improvements

CDR Views | 10.17.2016 | Page 15

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 30

Scheme B - Exterior Elevations

EAST ELEVATION NORTH ELEVATION

SOUTH ELEVATION WEST ELEVATION

O 8’ 16’ 32’

ROOF20’-2”

LEVEL 10’-0”

+10’-6”

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 31

Scheme B - Exterior Elevations

WEST ELEVATION

SOUTH ELEVATION NORTH ELEVATION

LEVEL 10’-0”

+9’-0”+10’-6”

+12’-0”

+18’-6”

+31’-0”

+12’-0”+10’-6”

O 8’ 16’ 32’

Building Design & Construction

Westside Pump Station - Reliability Improvements

Civic Design Review - Phase 1 | 10.17.2016 | Page 32

Scheme B - Building Sections

O 8’ 16’ 32’

MAIN BUILDING SECTION A-A

ELECTRICAL BUILDING SECTION B-B ELECTRICAL BUILDING SECTION A-A

ELECTRICAL ROOM

AIR HANDLING UNIT

VFD ROOM ELECTRICAL ROOM

AIR HANDLING UNIT SWITCHGEAR ROOM

BATTERY ROOM

CORRIDOR

BAR SCREEN / HPU ROOM

STORAGE

CONTROL ROOM

STORAGE