PRODECK FIXING LTD CASE STUDY WESTON SUPER MARE GRAND PIER PAVILION PROJECT DETAILS CLIENT: JOHN SISK & SONS MAIN CONTRACTOR: JOHN SISK & SONS STEELWORK CONTRACTOR: WILLIAM HALEY ENGINEERING DECKING TYPE: 4000m2 CORUS ComFlor 60 PROJECT VALUE: £250,000.00 Prodeck Fixing Ltd were chosen to supply and install approx 4000 square meters of Corus ComFlor 60 to the prestigious project of rebuilding the Grand Pier Pavilion at Weston Super Mare in early 2010. Included in our package was the placing of anticrack mesh, reenforcing bars and concrete. There were particular challenges to overcome, including the pumping of concrete from the sea front to the pavilion at a distance of over 300 meters in freezing conditions. Prodeck Fixing Ltd Whitehouse The Causeway Mark Somerset TA9 4QS Tel: 01278 780586 Fax: 01278 787762 www.prodeckfixing.co.uk

Upload: phamnguyet

Post on 05-Aug-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

PRODECK FIXING LTD CASE STUDY 

WESTON SUPER MARE GRAND PIER PAVILION 

PROJECT DETAILS   

CLIENT:  JOHN SISK & SONS 

MAIN CONTRACTOR:  JOHN SISK & SONS 

STEELWORK CONTRACTOR:  WILLIAM HALEY ENGINEERING 

DECKING TYPE:  4000m2 CORUS ComFlor 60 

PROJECT VALUE:  £250,000.00 

Prodeck Fixing Ltd were chosen to supply and install approx 4000 

square meters of Corus ComFlor 60 to the prestigious  project of  

rebuilding the Grand Pier Pavilion at Weston Super Mare in early 

2010. 

Included in our package was the placing of anti‐crack mesh,               

re‐enforcing bars and concrete.  

There were particular challenges to overcome, including the pumping 

of concrete from the sea front to the pavilion at a distance of over 

300 meters in freezing conditions. 