westgate access drive - oshtemo township, michigan · 2019. 3. 1. · westgate access drive...
TRANSCRIPT
-
7275 W. Main St.
Kalamazoo, MI 49009 (269) 375-4260
www.oshtemo.org
June 7, 2018 Mtg Date: June 14, 2018 To: Planning Commission From: Julie Johnston, AICP Planning Director Applicant/Owner: Two Squared Development, LLC Property: Approximately 2 acres of an 86.55-acre PUD Zoning: C: Local Business District / Commercial Planned Unit Development Request: Special Exception and Site Plan Approval Section(s): Section 60.420 – Commercial Planned Unit Development Project Name: Westgate PUD Access Drive PROJECT OVERVIEW The applicant requests the approval of an access drive within the Westgate Planned Unit Development (PUD). Per the requirements of Section 60.450: Approval Process that were a part of the PUD ordinance when Westgate was approved in 2016, each individual site plan requires special exception use and site plan approval by the Planning Commission. The request access drive will begin at West Main Street and move north along the western boundary of the PUD, connecting with the existing east/west drive which connects to Maple Hill Drive. This east/west drive is just south of the Holiday Inn and Holiday Inn Express hotels currently under construction. GENERAL ZONING AND CONCEPT PLAN COMPLIANCE In general, the proposed access drive complies with the concept plan approved by the Planning Commission in 2016. One item noted by staff is that the site plan indicates the sidewalk planned along the east side of the road right-of-way is intended to be built when the individual building sites are constructed. Staff would recommend that the sidewalk, in its entirety, be developed as part of the first building site to be constructed in this area. At that point, this section of the PUD will be activated and connectivity to both the existing hotels and to Maple Hill Drive will be important. The site plan meets all other requirements of the Site Plan Review Ordinance.
http://www.ocba.com/
-
Oshtemo Township Planning Commission Westgate Access Drive 06/07/2018 ∙ Page 2
ENGINEERING The Public Works Department has had an opportunity to review the most recent site plan for the access drive provided by the applicant. There are still a handful of engineering concerns that must be addressed, for example soil borings, hydrologic sub-basins illustrated, a stage volume table for storm water, etc. Many of these items can be handled administratively between the Township’s engineer and the applicant. Outside of conditioning any construction on resolving these issues to the satisfaction of the Township Engineer, there are concerns of note that require specific attention, as follows:
Asphalt Placement – the applicant intends to place the asphalt for the drive to the far west of the 66-foot right-of-way easement. This locates the paved portion of the drive very close to the western property line of the PUD. The applicant will need a grading easement from Consumers Energy who owns the utility corridor west of the project. In addition, the Township has concerns regarding maintenance and snow removal in this area. With the paved portion of the road so close to the property line, future snow removal and possibly maintenance of the road will occur on the adjacent property, not owned by the applicant. Staff sees two possible alternatives to this concern – either enter into some type of cross access agreement or maintenance easement with Consumers Energy or move the paved portion of the road 15 feet from the western boundary of the 66-foot easement. Storm Water Management Basins – the Township has been working towards requiring all storm water management basins to be free-form, and organic in shape and appearance. The storm water basins shown on the site plan are intended to be temporary in nature. As can be seen on the PUD concept plan, restaurants are planned to the east of the proposed road. When those buildings develop, storm water will likely be managed with underground facilities. In the interim, the applicant will need to manage runoff from the new access drive. Staff recommends the Planning Commission place a time restriction on these temporary basins for a period not to exceed 10-years. If restaurants or other uses are not constructed in this area within this time period, then the basins will be required to come in to compliance with Ordinance standards related to shape and appearance.
FIRE DEPARTMENT No concerns at this time. SPECIAL EXCEPTION USE CONSIDERATIONS Section 60.100 of the Zoning Ordinance provides additional review criteria for consideration when deliberating a Special Exception Use request. A. Is the proposed use compatible with the other uses expressly permitted within the C: Local
Business zoning district? Special exception use permission is required to include this project within the Westgate PUD.
Since the request is specifically for a segment of the road network of the PUD and not a use expressly permitted with the District, the question of compatibility with other uses is moot.
-
Oshtemo Township Planning Commission Westgate Access Drive 06/07/2018 ∙ Page 3
B. Will the proposed use be detrimental or injurious to the use or development of adjacent
properties or to the general public? The largest concern with this access drive is the curb cut onto West Main Street. As the major
commercial corridor in the Township, access management and public safety are critical issues. According to the Kalamazoo Area Transportation Study (KATS), the annual average daily traffic counts in this area exceed 35,000 vehicles. In addition, the Michigan Department of Transportation (MDOT) reports 35 crashes between Maple Hill Drive and the Kohls area in the last three years.
The applicant has provided a traffic study to MDOT for the PUD and this access point on West
Main Street. That study is still under review by MDOT. Therefore, any approvals will need to be conditioned on MDOT’s final decision regarding the configuration of this curb cut.
C. Will the proposed use promote the public health, safety, and welfare of the community? With a satisfactory outcome regarding the curb cut onto West Main Street by MDOT, concerns
for the public’s health, safety, and welfare should be adequately managed. D. Will the proposed use encourage the use of the land in accordance with its character and
adaptability? Intended to be incorporated and integrated into the larger vision of the Westgate PUD, the
proposed access drive is in accordance with its character and adaptability. RECOMMENDATION Staff recommends the Planning Commission grant Special Exception Use and site plan approval for the proposed access drive within the Westgate PUD, with the following suggested conditions:
1. Construction of the access drive will not begin until all approvals have been received by MDOT.
2. Relocate the paved portion of the access road 15 feet from the western easement boundary or provide the Township with agreements from Consumers Energy to allow maintenance of the road on their property.
3. Provide the Township documentation of a grading easement from Consumers Energy.
4. Limit the temporary storm water management basins to a 10-year period. If the basins are still in use at the end of the 10-year period, they will come into compliance will all Zoning Ordinance requirements.
5. Provide a revised site plan that satisfies the requirements of the Township Engineer, which will also include clear dimensions of the 66-foot easement.
-
Oshtemo Township Planning Commission Westgate Access Drive 06/07/2018 ∙ Page 4
6. Sidewalk connections along the access drive from West Main Street to the east/west connector
to Maple Hill Drive will be installed, in its entirety, with the construction of the first site plan in this area of the Westgate PUD.
7. A reciprocal easement agreement or other such device will be recorded to ensure access to and maintenance of all shared facilities planned within the PUD. A copy of this agreement will need to be provided to the Township prior to certificates of occupancy.
Respectfully Submitted,
Julie Johnston, AICP Planning Director Attachments: Application Aerial Site Plans
Westgate Concept Plan
-
\'.)\u/2,,-'..-\,) choite.p xot )nsbtE,
-1 0sLtterY)olng\-
72'75 W. Main Street, Kalamazoo, Michigan 49009-9334Phone:269-216-5223 F ax: 269-37 5-7 180
PLEASE PRINT
*qo N l4Arr.J sr:PROJECT NAME & ADDRESSPLANNING & ZONING APPLICATION
Applicant Name , -i \N J SAvtaaPgDwwo?
' ,ir i-r ll:,,ir,..-., fis.lii .: r
,dAl00, ilI 49009Jne :269-315-4260
,sHIEt't0r0t4trsHIP. oRc
Received From: IHt] SoUARED DEVEt0pl,tEtlIDate:04112/?018 Time:2109:52pi,,tReceipt: 141203Cashier: LPoToK
IIEM REFERENCE AIlOUNT
111"/gi-,iT. U,UCompany
Address 4ZOO WPO6-*;G?, Mt 4"1 oz,q
E-mail L *a.-.A< nn a- O rlw b |.1 Labq - j23_ zoz
c c,4
Telephone axInterest in Properfy , V.J Np12-
OWNER*:
Name
Address
Email
Phone & Fax
NATURE OF THE REQUEST: (Please check the appropriate ite
X Plannins Escrow-1042X-site PtrI Review-1088 &li_Administrative Site Plan Review- 1086A, Special Exception Use-lA85 l&Jon:rgYaiance-1092
_Site Condominium- 1 084_Accessory Building Review-l 083
BRIEFLY DESCRIBE YOUR R.EQUDST (Jse Attachments if Necessary):
PLd\-1e,
-
LEGAL DESCRIPTION OF PROPERTY (Use Attuchments if Necessaty)z
?LeA
-
Two Squared Development, LLC
11 April 2018
Julie Johnston, AICPPlanning DirectorOshtemo Charter Township7275 W. Main StreetKalamazoo, Ml 49009
RE: Westgate Development
Dear Ms. iohnston:
As depicted on the attached drawings, the next phase of the project is the reconstruction of the accessdrive from West Maln Street. This access drive will utilize an existing curb cut on West Main Street, asintended and depicted in the approved PUD Concept Plan. At this time, the road will only connect to thepreviously approved and under constructlon hotel buildings. No additional buildings are proposed at thewritlng of this application.
Our intent is to construct the access drive as the weather improves and our contractor transitions fromthe site infrastructure near the hotels. Once constructed, this new drive will enhance access to the siteand increase the possibility of new development in the township.
Please feel free to contact me with any questions.
Thanks,
Curt Aardema269-323-2022
We are excited to continue the development of our Westgate project at US-131 and West Main Street inOshtemo Township. As you may recall, the project started several years ago with the creation of aPlanned Unit Development (PUD) that now encompasses the entire site. The first phase of construction,however, started last year as work commenced on new buildings for Holiday lnn and Holiday lnnExpress. Those buildings, along with the associated site improvements, received site plan approval in2017 .
4200 W. Centre Ave., Portage, Ml | 269-323-2022
-
Lesal Descriotions
05-13-180-029
o sEc t 3-2-12 BEG 5W COR E1l2 E1l2 NW1/4 TH S 88DEG02MIN39SEC W ALG E & W1/4 U 49.2sFTTH N ].7DEG1OMINsOSEC W 638.11FT TH N 28DEG38MIN1OSEC W 401.94FT TH N
88DEGO2MIN39SEC E PAR WITH E & W1/4 U TO W U E7/2 EA2 NW/4 IH S THEREON 4O3FT TH N88DEGOOMIN33SEC E 66.MFT TH S OODEGO1MIN5SSEC E 572FT TO E & W 1/4 U TH W 66.O4FT TO
BEG *..12-97 1997 COMBTNATTON OF 13-180-025, 13-180-028 & 13-180-034
05-13-130-021
O SEC 13-2.12 S 66FT E1l2 NE1/4 NWL/4 ALSO W3/4 NW1/4 L\1NG E OF FOLL DESCFIIBED U BEG INE &.Wt/4 U 704.L7F1 WLY OF C1l4 POST TH N 17DEG19SEC50 MtN W 638.LLFT TH N
28DEG38MIN1OSEC W 819.22FT TH N OODEGs9MIN W 135OFT TO N SEC U AND PT OF ENDING
EXC 5 975FT 4L50 EXCEPT BEG NE COR W1/2 NE1/4 NW1/4 TH S OODEGO1MIN5OSEC E ALG E U
THEREOF 1250.51FT TH S 87DEG56MINO5EC W PAR N1/8 U 13O.O8FT TH N OODEGOIMIN5OSEC W
I25O.77FT TO N SEC UTH N SSDEGO2MINsOSEC E 13O.O7FT TO BEG * +*12-97 1997 SPLII FROM
13-180-023 & 13-130-019 Split on LLll4/20L7 into 05-13-130-022,0s-13-130-030.05-13-130-M0;
-
W MAIN ST
VINTAGE LNUS 1
31 TOM
AINRA
MP
MAIN TO NUS131RAMP
W MAIN ST
CROYDEN AVEBEECH AVE
N DRA
KE RD
MAPLE
HILL
DR
N US 1
31[
Other Property LineSubject Property
0 250 500125 Feet
WESTGATE PUDAerial Map
-
DESCRIPTIONSHT #DRAWING INDEX
SITE LOCATION MAP
PROJECTLOCATION
C-0 - TITLE SHEETC-1 - EXISTING CONDITIONS & DEMO PLANC-2 - WATERSHED MAP AND DETAILSR-1 - DRIVEWAY PLAN & PROFILER-2 - MDOT DRIVEWAY LAYOUT
SITE PLAN RESUBMITTAL5/31/18
UTILITY CONTACTS:
hurley & stewart
hurley & stewart, llc2800 s 11th streetkalamazoo, michigan 49009269.552.4960 fax 552.4961www.hurleystewart.com
PLANS PREPARED BY:
AVB4200 W. CENTRE AVENUEPORTAGE, MI 49024269.323.2022
LEGEND
ISSUED FOR:
OSHTEMO TOWNSHIPKALAMAZOO COUNTY, MI
5/31/18
WESTGATE SOUTH ACCESS DRIVEWAYCIVIL PLAN SET
OWNER
PROJECT DESCRIPTION
AutoCAD SHX TextSCALE: 1" = 500'
AutoCAD SHX TextCONSUMERS ENERGY CO. JESSE BURNS 2500 E. CORK STREET KALAMAZOO, MI 49001 269.337.2311 CONSUMERS ENERGY CO. TERRY FIELDS 2500 E. CORK STREET KALAMAZOO, MI 49001 269.337.2270 CITY OF KALAMAZOO STEVE SKALSKI/MATT JOHNSON 415 STOCKBRIDGE AVENUE KALAMAZOO, MI 49001 269.337.8002 CHARTER JEFF LAKE 2919 MILLCORK ST. KALAMAZOO, MI 49001 269.625.7403 COMCAST 1(800)391-3000 OSHTEMO TOWNSHIP GREG MILLIKEN 7275 W. MAIN ST KALAMAZOO, MI 49009
AutoCAD SHX TextELECTRIC
AutoCAD SHX TextTELEPHONE/CABLE
AutoCAD SHX TextCABLE TV
AutoCAD SHX TextTOWNSHIP
AutoCAD SHX TextWATER/SANITARY
AutoCAD SHX TextEXISTING CATV
AutoCAD SHX TextEXISTING CONTOUR HIGHLIGHTED
AutoCAD SHX Text720
AutoCAD SHX TextEXIST ELEC (OVERHEAD)
AutoCAD SHX TextEXIST ELEC (UNDERGROUND)
AutoCAD SHX TextEXISTING FIBEROPTIC CABLE
AutoCAD SHX TextEXISTING GAS
AutoCAD SHX TextEXISTING SANITARY SEWER
AutoCAD SHX TextEXISTING STORM SEWER
AutoCAD SHX TextEXISTING TELEPHONE
AutoCAD SHX TextPROPOSED CATV
AutoCAD SHX TextPROPOSED CONTOUR HIGHLIGHTED
AutoCAD SHX Text720
AutoCAD SHX TextPROP ELEC (OVERHEAD)
AutoCAD SHX TextPROP ELEC (UNDERGROUND)
AutoCAD SHX TextPROPOSED FIBEROPTIC CABLE
AutoCAD SHX TextPROPOSED GAS
AutoCAD SHX TextPROPOSED SANITARY SEWER
AutoCAD SHX TextPROPOSED STORM SEWER
AutoCAD SHX TextPROPOSED TELEPHONE
AutoCAD SHX Text719
AutoCAD SHX TextEXISTING CONTOUR NORMAL
AutoCAD SHX TextPROPOSED CONTOUR NORMAL
AutoCAD SHX Text719
AutoCAD SHX TextBENCH MARK
AutoCAD SHX TextCURB CATCH BASIN
AutoCAD SHX TextELECTRIC MANHOLE
AutoCAD SHX TextELECTRIC METER
AutoCAD SHX TextEXISTING SPOT GRADE
AutoCAD SHX Text865.25
AutoCAD SHX TextGAS METER
AutoCAD SHX TextGUY WIRE
AutoCAD SHX TextLIGHT POLE
AutoCAD SHX TextMANHOLE SANITARY
AutoCAD SHX TextMANHOLE STORM
AutoCAD SHX TextMONITOR WELL
AutoCAD SHX TextPOST/BOLLARD
AutoCAD SHX TextPOWER POLE
AutoCAD SHX TextPROPOSED SPOT GRADE
AutoCAD SHX Text896.32
AutoCAD SHX TextSANITARY CLEANOUT
AutoCAD SHX TextSIGN
AutoCAD SHX TextSOIL BORING
AutoCAD SHX TextTELEPHONE MANHOLE
AutoCAD SHX TextTELEPHONE PEDESTAL
AutoCAD SHX TextTELEPHONE POLE
AutoCAD SHX TextWATER METER
AutoCAD SHX TextWATER VALVE
AutoCAD SHX TextWATER REDUCER
AutoCAD SHX TextEXISTING TREELINE
AutoCAD SHX TextEXISTING FENCE
AutoCAD SHX TextEXISTING WATER MAIN
AutoCAD SHX TextPROPOSED WATER MAIN
AutoCAD SHX TextNOTE: ALL SYMBOLS IN THIS LEGEND ARE SHOWN AS EXISTING. PROPOSED SYMBOLS WILL USE THE CORRESPONDING SYMBOL WITH A THICKER LINE.
AutoCAD SHX TextFIRE HYDRANT
AutoCAD SHX TextH
AutoCAD SHX TextY
AutoCAD SHX TextD
AutoCAD SHX TextPROPOSED TREELINE
AutoCAD SHX TextSQUARE CATCH BASIN
AutoCAD SHX TextROUND CATCH BASIN
AutoCAD SHX TextWATER VALVE IN VAULT
AutoCAD SHX TextMAILBOX
AutoCAD SHX TextPROPOSED FENCE
AutoCAD SHX TextGAS
AutoCAD SHX TextEXISTING TOPOGRAPHY PROVIDED BY CARR AND ASSOCIATES LAND SURVEYING. ALL UTILITIES AS SHOWN ARE APPROXIMATE LOCATIONS DERIVED FROM ACTUAL MEASUREMENTS AND AVAILABLE RECORDS. THEY SHOULD NOT BE INTERPRETED TO BE EXACT LOCATION NOR SHOULD IT BE ASSUMED THAT THEY ARE THE ONLY UTILITIES IN THE AREA.
AutoCAD SHX TextWESTGATE SOUTH ACCESS DRIVEWAY, ISSUED FOR SITE PLAN RESUBMITTAL, 5/31/18, ISSUED FOR SITE PLAN RESUBMITTAL, 5/31/18SITE PLAN RESUBMITTAL, 5/31/18, 5/31/185/31/18
AutoCAD SHX Text DRAWING LOCATION: H:\16-061D (Holiday Inn-Westgate)\__FINAL DRAWINGS\South Access Drive\C-0 Title Sheet.dwg LAST SAVED BY: APHELAN ON 5/31/2018H:\16-061D (Holiday Inn-Westgate)\__FINAL DRAWINGS\South Access Drive\C-0 Title Sheet.dwg LAST SAVED BY: APHELAN ON 5/31/2018 LAST SAVED BY: APHELAN ON 5/31/2018APHELAN ON 5/31/2018 ON 5/31/20185/31/2018
AutoCAD SHX TextUNDER THE SUPERVISION OF TODD D. HURLEY, P.E. MI. LICENSE #43221
AutoCAD SHX TextTHIS PROJECT INVOLVES THE CONSTRUCTION OF A COMMERCIAL ACCESS DRIVE FROM THE NORTH SIDE OF WEST MAIN ST (M-43) TO SERVE THE WESTGATE DEVELOPMENT PROJECT. THIS PROJECT INCLUDES SITE GRADING, INSTALLATION OF UNDERGROUND UTILITIES, AND CONSTRUCTION OF CONCRETE AND ASPHALT PAVEMENT.
-
hu
rle
y &
ste
wa
rt
C-1
EXIS
TIN
G C
ON
DIT
ION
S &
DE
MO
PLA
NW
ES
TG
ATE
SO
UTH
AC
CE
SS
DR
IVE
WA
YA
VB
, IN
C
REMOVAL NOTES
REMOVALS LEGEND
WEST M
AIN ST
(M-43)
AutoCAD SHX Text1 inch = ft.
AutoCAD SHX Text0
AutoCAD SHX Text60
AutoCAD SHX Text30
AutoCAD SHX Text60
AutoCAD SHX Text120
AutoCAD SHX TextSheet
AutoCAD SHX TextSheet Title:
AutoCAD SHX TextProject:
AutoCAD SHX TextClient:
http://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMAutoCAD SHX TextQA/QC:
AutoCAD SHX TextJob No.:
AutoCAD SHX TextISSUED FOR/REVISIONS:
AutoCAD SHX TextP.M.:
AutoCAD SHX TextDrft:
AutoCAD SHX TextCOPYRIGHT C of Hurley & Stewart, LLC
AutoCAD SHX TextFIELD WORK PERFORMED BY: LANDTECH PROFESSIONAL SURVEYING
AutoCAD SHX TextALL UTILITIES AS SHOWN ARE APPROXIMATE LOCATIONS DERIVED FROM ACTUAL MEASUREMENTS AND AVAILABLE RECORDS. THEY SHOULD NOT BE INTERPRETED TO BE EXACT LOCATION NOR SHOULD IT BE ASSUMED THAT THEY ARE THE ONLY UTILITIES IN THE AREA.
http://WWW.HURLEYSTEWART.COMAutoCAD SHX Texthurley & stewart, llc 2800 south 11th street Kalamazoo, michigan 49009 269.552.4960 fax 269.552.4961 www.hurleystewart.com
AutoCAD SHX Text5/31/18
AutoCAD SHX TextTDH
AutoCAD SHX Text15-063D
AutoCAD SHX TextJJU
AutoCAD SHX Text5/31/18
AutoCAD SHX Text1
AutoCAD SHX TextADMINISTRATIVE REVIEW
AutoCAD SHX Text3/20/18
AutoCAD SHX Text2
AutoCAD SHX TextSITE PLAN RESUBMITTAL
AutoCAD SHX Text5/31/18
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text1. REVIEW ALL THE REMOVALS AND PROTECTION WITH OWNER PRIOR TO REVIEW ALL THE REMOVALS AND PROTECTION WITH OWNER PRIOR TO COMMENCING CONSTRUCTION. INSTALL TEMPORARY SNOW FENCE AROUND ALL TREES REQUIRING PROTECTION. SNOW FENCE SHALL BE PLACED AT EDGE OF DRIP LINE. 2. ALL DEMOLITION WORK SHALL CONFORM TO ALL LOCAL CODES AND ALL DEMOLITION WORK SHALL CONFORM TO ALL LOCAL CODES AND ORDINANCES. ALL DEMOLITION OPERATIONS SHALL COMPLY WITH OSHA REGULATIONS INSOFAR AS THEY APPLY TO THE REQUIRED WORK. SOIL EROSION AND SEDIMENTATION CONTROL ITEMS SHALL BE IN PLACE PRIOR TO DEMOLITION. 3. THE CONTRACTOR SHALL REMOVE AND CLEAR ALL TREES, BRUSH, FENCES, THE CONTRACTOR SHALL REMOVE AND CLEAR ALL TREES, BRUSH, FENCES, CURB, AND ASPHALT AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 4. ALL DEMOLITION MATERIAL SHALL BE PROPERLY REMOVED FROM THE SITE AND ALL DEMOLITION MATERIAL SHALL BE PROPERLY REMOVED FROM THE SITE AND DISPOSED OF IN A LEGALLY DESIGNATED DISPOSAL AREA. PERMITS AND FEES FOR DISPOSAL OF DEMOLITION MATERIAL SHALL BE OBTAINED AND PAID FOR BY THE CONTRACTOR. 5. UTILITY LEAD WORK SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY UTILITY LEAD WORK SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY COMPANY. 6. BACKFILL EXCAVATED AREAS WITH CLEAN GRANULAR FILL COMPACTED TO 95% BACKFILL EXCAVATED AREAS WITH CLEAN GRANULAR FILL COMPACTED TO 95% OF THE MATERIAL UNIT WEIGHT BY MODIFIED PROCTOR. 7. COMPLY WITH ALL ASPECTS OF THE SOIL EROSION CONTROL PERMIT AS ISSUED COMPLY WITH ALL ASPECTS OF THE SOIL EROSION CONTROL PERMIT AS ISSUED BY KALAMAZOO COUNTY. ALL TEMPORARY CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING CONSTRUCTION. 8. ALL REMOVALS SHALL BE TO THE LIMITS INDICATED ABOVE UNLESS OTHERWISE ALL REMOVALS SHALL BE TO THE LIMITS INDICATED ABOVE UNLESS OTHERWISE DIRECTED BY THE ENGINEER/OWNER. UNAUTHORIZED REMOVALS AND SUBSEQUENT REPLACEMENT SHALL BE AT THE CONTRACTOR'S COST. 9. IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS BECOME APPARENT PRIOR TO IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS BECOME APPARENT PRIOR TO OR DURING CONSTRUCTION, THEY SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER SO THAT CLARIFICATION OR REDESIGN MAY OCCUR. 10. ALL WORK REQUIRING PERSONS OR VEHICLES WITHIN MDOT AND CITY OF ALL WORK REQUIRING PERSONS OR VEHICLES WITHIN MDOT AND CITY OF KALAMAZOO R/W AND TRAFFIC CONTROL DEVICES AND PROCEDURES SHALL BE IN ACCORDANCE WITH THE MICHIGAN MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES AND ITEM 812 (MAINTAINING TRAFFIC) OF THE CONSTRUCTION MATERIALS AND SPECIFICATIONS, CURRENT EDITIONS. 11. FOR PROTECTION OF UNDERGROUND UTILITIES, THE CONTRACTOR SHALL CALL FOR PROTECTION OF UNDERGROUND UTILITIES, THE CONTRACTOR SHALL CALL 1-800-482-7171 A MINIMUM OF THREE FULL WORKING DAYS EXCLUDING SATURDAYS, SUNDAYS AND HOLIDAYS PRIOR TO BEGINNING EACH EXCAVATION IN AREAS WHERE PUBLIC UTILITIES HAVE NOT BEEN PREVIOUSLY LOCATED. MEMBERS WILL THUS BE ROUTINELY NOTIFIED. THIS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF NOTIFYING OWNERS WHO MAY NOT BE A PART OF THE "MISS DIG" ALERT SYSTEM.
AutoCAD SHX TextP
AutoCAD SHX TextR
AutoCAD SHX TextREMOVE
AutoCAD SHX TextPROTECT
AutoCAD SHX TextPAVEMENT/SIDEWALK REMOVAL
AutoCAD SHX TextCURB REMOVAL
AutoCAD SHX TextSAWCUT
AutoCAD SHX TextR
AutoCAD SHX TextR
AutoCAD SHX TextR
AutoCAD SHX TextR
AutoCAD SHX TextREMOVE EXISTING ASPHALT DRIVE
AutoCAD SHX TextSAWCUT AND REMOVE EXISTING PAVEMENT
AutoCAD SHX TextSAWCUT AND REMOVE EXISTING CONCRETE SIDEWALK
AutoCAD SHX TextSAWCUT AND REMOVE EXISTING CONCRETE SIDEWALK
AutoCAD SHX TextP
AutoCAD SHX TextPROTECT EXISTING STORM STRUCTURE
AutoCAD SHX TextREMOVE EXISTING CURB (TYP)
AutoCAD SHX Text(PUBLIC) (ROW WIDTH VARIES)
-
LINEMATCHMATCH
LINE
HOLIDAY INNF.F. = 972.25
hu
rle
y &
ste
wa
rt
C-2
WA
TE
RS
HE
D M
AP
AN
D D
ETA
ILS
WE
STG
ATE
SO
UTH
AC
CE
SS
DR
IVE
WA
YA
VB
, IN
C
C-4 CURB DETAIL
CATCH BASIN DETAIL
TRENCH DETAILS
UNDER PAVED AREA NOT UNDER PAVED AREA
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextH
AutoCAD SHX TextY
AutoCAD SHX TextD
AutoCAD SHX Text#15
AutoCAD SHX Text#14
AutoCAD SHX Text#11
AutoCAD SHX Text#10
AutoCAD SHX Text#13
AutoCAD SHX Text#12
AutoCAD SHX Text#16
AutoCAD SHX Text#9
AutoCAD SHX Text#8
AutoCAD SHX Text#20
AutoCAD SHX Text#21
AutoCAD SHX Text#22
AutoCAD SHX TextSheet
AutoCAD SHX TextSheet Title:
AutoCAD SHX TextProject:
AutoCAD SHX TextClient:
http://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMAutoCAD SHX TextQA/QC:
AutoCAD SHX TextJob No.:
AutoCAD SHX TextISSUED FOR/REVISIONS:
AutoCAD SHX TextP.M.:
AutoCAD SHX TextDrft:
AutoCAD SHX TextCOPYRIGHT C of Hurley & Stewart, LLC
AutoCAD SHX Text1 inch = ft.
AutoCAD SHX Text0
AutoCAD SHX Text60
AutoCAD SHX Text30
AutoCAD SHX Text60
AutoCAD SHX Text120
AutoCAD SHX TextFIELD WORK PERFORMED BY: LANDTECH PROFESSIONAL SURVEYING
AutoCAD SHX TextALL UTILITIES AS SHOWN ARE APPROXIMATE LOCATIONS DERIVED FROM ACTUAL MEASUREMENTS AND AVAILABLE RECORDS. THEY SHOULD NOT BE INTERPRETED TO BE EXACT LOCATION NOR SHOULD IT BE ASSUMED THAT THEY ARE THE ONLY UTILITIES IN THE AREA.
http://WWW.HURLEYSTEWART.COMAutoCAD SHX Texthurley & stewart, llc 2800 south 11th street Kalamazoo, michigan 49009 269.552.4960 fax 269.552.4961 www.hurleystewart.com
AutoCAD SHX Text DRAWING LOCATION: H:\16-061D (Holiday Inn-Westgate)\__FINAL DRAWINGS\South Access Drive\C-2 Watershed Map and Details.dwg LAST SAVED BY: JUITVLUGT ON 3/19/2018H:\16-061D (Holiday Inn-Westgate)\__FINAL DRAWINGS\South Access Drive\C-2 Watershed Map and Details.dwg LAST SAVED BY: JUITVLUGT ON 3/19/2018 LAST SAVED BY: JUITVLUGT ON 3/19/2018JUITVLUGT ON 3/19/2018 ON 3/19/20183/19/2018
AutoCAD SHX Text5/31/18
AutoCAD SHX TextTDH
AutoCAD SHX Text15-063D
AutoCAD SHX TextJJU
AutoCAD SHX Text5/31/18
AutoCAD SHX Text1
AutoCAD SHX TextADMINISTRATIVE REVIEW
AutoCAD SHX Text3/20/18
AutoCAD SHX Text2
AutoCAD SHX TextSITE PLAN RESUBMITTAL
AutoCAD SHX Text5/31/18
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX TextEXISTING STORM BASIN TO FILLED IN
AutoCAD SHX TextREMOVE EXISTING STORM PIPE LEADING TO BASIN AND CAP AT MANHOLE
AutoCAD SHX TextPROPOSED STORMWATER RETENTION BASIN 949.00 TO 960.00
AutoCAD SHX TextWATERSHED BOUNDARY FOR WESTGATE HOLIDAY INN (NOT PART OF THIS PROJECT)
AutoCAD SHX TextWATERSHED BOUNDARY FOR SOUTH ACCESS ROAD 148,474 SFT 3.408 ACRES
AutoCAD SHX Text5 "12"
AutoCAD SHX Text2"
AutoCAD SHX Text2'
AutoCAD SHX Text1 "38"
AutoCAD SHX Text9"
AutoCAD SHX Text7"
AutoCAD SHX Text4"
AutoCAD SHX Text4"
AutoCAD SHX Text10"
AutoCAD SHX Text1'-3"
AutoCAD SHX TextR2"
AutoCAD SHX TextR3"
AutoCAD SHX TextNOT TO SCALE
AutoCAD SHX TextMANHOLE STEPS
AutoCAD SHX TextNO SCALE
AutoCAD SHX TextSAND LEVELING
AutoCAD SHX TextINVERT ELEVATIONS AS INDICATED ON PLANS
AutoCAD SHX TextCONCRETE RINGS (12" MAX) PLASTER INSIDE AND OUT
AutoCAD SHX TextINLET PIPE IF REQUIRED
AutoCAD SHX TextCONCRETE MANHOLE PRECAST SECTION PER ASTM C-478. SIZE PER PLAN. BASE SECTION TO HAVE INTEGRAL FLOOR.
AutoCAD SHX TextPRECAST ECCENTRIC CONE. USE FLAT TOP FOR LOW DEPTH OF COVER.
AutoCAD SHX TextKOR-N-SEAL GASKET, OR EQUAL (TYP). SEAL W/ MORTAR.
AutoCAD SHX TextOUTLET PIPE
AutoCAD SHX TextASTM C-443 GASKETED JOINTS, TYP.
AutoCAD SHX TextCASTING AS SPECIFIED. SET IN MORTAR.
AutoCAD SHX TextFINISHED GRADE SLOPE TOWARD CB
AutoCAD SHX TextNO SCALE
AutoCAD SHX TextBITUMINOUS PAVEMENT AND BASE COURSE. SEE DETAIL FOR THICKNESSES.
AutoCAD SHX TextALL TRENCH SLOPES TO COMPLY WITH APPLICABLE STATE AND FEDERAL REGULATIONS.
AutoCAD SHX TextTRENCH BACKFILL
AutoCAD SHX TextUTILITY PIPE PER PLAN
AutoCAD SHX TextPIPE BEDDING. 4" BELOW AND 12" ABOVE PIPE.
AutoCAD SHX TextNOTE: SEE SPECIFICATIONS AND GEOTECHNICAL REPORT FOR MATERIALS REQUIRED AND AVAILABLE FOR THIS PROJECT.
AutoCAD SHX TextTRENCH BACKFILL
AutoCAD SHX Text1 ON 1 FROM PAVEMENT EDGE
AutoCAD SHX TextFINISHED GRADE. SEE SPECIFICATIONS FOR TREATMENT
AutoCAD SHX TextSUITABLE MATERIAL AS DETERMINED BY ENGINEER
-
hu
rle
y &
ste
wa
rt
R-1
DR
IVE
WA
Y P
LA
N &
PR
OFIL
EW
ES
TG
ATE
SO
UTH
AC
CE
SS
DR
IVE
WA
YA
VB
, IN
C
WEST ACCESS DRIVE PROFILESTA: 00+00 (START OF PROJECT) TO 12+00
WEST ACCESS DRIVEWAY CROSS SECTION
SUPERELEVATION TABLE
STATIONLEFT LANE
SLOPE
RIGHTLANE
SLOPE
AutoCAD SHX TextPROPOSED GRADE
AutoCAD SHX TextEXISTING GRADE
AutoCAD SHX TextEXISTING ELEVATION
AutoCAD SHX TextPROPOSED ELEVATION
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextX
AutoCAD SHX TextC
AutoCAD SHX Text#20
AutoCAD SHX TextSheet
AutoCAD SHX TextSheet Title:
AutoCAD SHX TextProject:
AutoCAD SHX TextClient:
http://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMAutoCAD SHX TextQA/QC:
AutoCAD SHX TextJob No.:
AutoCAD SHX TextISSUED FOR/REVISIONS:
AutoCAD SHX TextP.M.:
AutoCAD SHX TextDrft:
AutoCAD SHX TextCOPYRIGHT C of Hurley & Stewart, LLC
http://WWW.HURLEYSTEWART.COMAutoCAD SHX Texthurley & stewart, llc 2800 south 11th street Kalamazoo, michigan 49009 269.552.4960 fax 269.552.4961 www.hurleystewart.com
AutoCAD SHX Text DRAWING LOCATION: H:\16-061D (Holiday Inn-Westgate)\__FINAL DRAWINGS\South Access Drive\R-1 Driveway Plan & Profile.dwg LAST SAVED BY: APHELAN ON 5/31/2018H:\16-061D (Holiday Inn-Westgate)\__FINAL DRAWINGS\South Access Drive\R-1 Driveway Plan & Profile.dwg LAST SAVED BY: APHELAN ON 5/31/2018 LAST SAVED BY: APHELAN ON 5/31/2018APHELAN ON 5/31/2018 ON 5/31/20185/31/2018
AutoCAD SHX Text5/31/18
AutoCAD SHX TextTDH
AutoCAD SHX Text15-063D
AutoCAD SHX TextJJU
AutoCAD SHX Text5/31/18
AutoCAD SHX Text1
AutoCAD SHX TextADMINISTRATIVE REVIEW
AutoCAD SHX Text3/20/18
AutoCAD SHX Text2
AutoCAD SHX TextSITE PLAN RESUBMITTAL
AutoCAD SHX Text5/31/18
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX TextSCALE HORZ: 1" = 50' 1" = 50' VERT: 1" = 5' 1" = 5'
AutoCAD SHX Text1 inch = ft.
AutoCAD SHX Text0
AutoCAD SHX Text50
AutoCAD SHX Text25
AutoCAD SHX Text50
AutoCAD SHX Text100
AutoCAD SHX TextNOT TO SCALE
AutoCAD SHX Text18'
AutoCAD SHX Text2'
AutoCAD SHX Text18'
AutoCAD SHX Text2'
AutoCAD SHX Text8 INCHES CIP MDOT 22A AGGREGATE BASE
AutoCAD SHX Text220 LBS / SYD (2 INCHES) RCKC HMA 13A MOD
AutoCAD SHX Text2.00%
AutoCAD SHX Text2.00%
AutoCAD SHX TextC-4 CURB (SEE DETAIL)
AutoCAD SHX Text24 INCHES CIP MDOT GRANULAR MATERIAL CLASS III SUBBASE
AutoCAD SHX Text220 LBS / SYD (2 INCHES) RCKC HMA 13A MOD. LEVELING COURSE
AutoCAD SHX Text220 LBS / SYD (2 INCHES) RCKC HMA 13A MOD. BASE COURSE
AutoCAD SHX TextEXISTING ELECTRICAL TOWER
AutoCAD SHX TextPROPOSED TEMPORARY STORMWATER RETENTION BASIN 949.00 TO 960.00. BASIN TO BE REDESIGNED PER OSHTEMO TOWNSHIP VISUAL DESIGN REGULATIONS IF BASIN BECOMES PERMANENT.
AutoCAD SHX TextPROPOSED ACCESS AND UTILITY EASEMENT
AutoCAD SHX Text6" HDPE PERFORATED CORRUGATED PIPE. WRAP PIPE WITH GEOTEXTILE. CORE INTO PROPOSED CATCH BASIN STRUCTURES BELOW BOTTOM OF PROPOSED SUBBASE. (TYP)
AutoCAD SHX TextPROPOSED 2' STOP BAR AND STOP SIGN
AutoCAD SHX Text2" MIN
AutoCAD SHX Text12"
AutoCAD SHX TextEND NORMAL CROWN
AutoCAD SHX Text5+33.76
AutoCAD SHX Text-2.00%
AutoCAD SHX Text-2.00%
AutoCAD SHX TextCROWN RUNOUT
AutoCAD SHX Text5+95.83
AutoCAD SHX Text-2.00%
AutoCAD SHX Text0.00%
AutoCAD SHX TextBEGIN FULL SUPER
AutoCAD SHX Text6+57.90
AutoCAD SHX Text-2.00%
AutoCAD SHX Text2.00%
AutoCAD SHX TextEND FULL SUPER
AutoCAD SHX Text6+97.02
AutoCAD SHX Text-2.00%
AutoCAD SHX Text2.00%
AutoCAD SHX TextCROWN RUNOUT
AutoCAD SHX Text7+59.09
AutoCAD SHX Text-2.00%
AutoCAD SHX Text0.00%
AutoCAD SHX TextBEGIN NORMAL CROWN
AutoCAD SHX Text8+21.16
AutoCAD SHX Text-2.00%
AutoCAD SHX Text-2.00%
AutoCAD SHX TextPROPOSED WALKING PATH. TO BE CONSTRUCTED AS FUTURE LOTS ARE DEVELOPED.
-
hu
rle
y &
ste
wa
rt
R-2
MD
OT D
RIV
EW
AY L
AYO
UT
WE
STG
ATE
SO
UTH
AC
CE
SS
DR
IVE
WA
YA
VB
, IN
C
LEGEND
AutoCAD SHX TextSheet
AutoCAD SHX TextSheet Title:
AutoCAD SHX TextProject:
AutoCAD SHX TextClient:
http://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMhttp://WWW.HURLEYSTEWART.COMAutoCAD SHX TextQA/QC:
AutoCAD SHX TextJob No.:
AutoCAD SHX TextISSUED FOR/REVISIONS:
AutoCAD SHX TextP.M.:
AutoCAD SHX TextDrft:
AutoCAD SHX TextCOPYRIGHT C of Hurley & Stewart, LLC
AutoCAD SHX TextFIELD WORK PERFORMED BY: LANDTECH PROFESSIONAL SURVEYING
AutoCAD SHX TextALL UTILITIES AS SHOWN ARE APPROXIMATE LOCATIONS DERIVED FROM ACTUAL MEASUREMENTS AND AVAILABLE RECORDS. THEY SHOULD NOT BE INTERPRETED TO BE EXACT LOCATION NOR SHOULD IT BE ASSUMED THAT THEY ARE THE ONLY UTILITIES IN THE AREA.
http://WWW.HURLEYSTEWART.COMAutoCAD SHX Texthurley & stewart, llc 2800 south 11th street Kalamazoo, michigan 49009 269.552.4960 fax 269.552.4961 www.hurleystewart.com
AutoCAD SHX Text DRAWING LOCATION: H:\16-061D (Holiday Inn-Westgate)\__FINAL DRAWINGS\South Access Drive\R-2 MDOT Driveway Layout.dwg LAST SAVED BY: JUITVLUGT ON 5/30/2018H:\16-061D (Holiday Inn-Westgate)\__FINAL DRAWINGS\South Access Drive\R-2 MDOT Driveway Layout.dwg LAST SAVED BY: JUITVLUGT ON 5/30/2018 LAST SAVED BY: JUITVLUGT ON 5/30/2018JUITVLUGT ON 5/30/2018 ON 5/30/20185/30/2018
AutoCAD SHX Text5/31/18
AutoCAD SHX TextTDH
AutoCAD SHX Text15-063D
AutoCAD SHX TextJJU
AutoCAD SHX Text5/31/18
AutoCAD SHX TextCONCRETE CURB AND GUTTER TYPE C-4
AutoCAD SHX TextCONCRETE SIDEWALK
AutoCAD SHX TextHMA PAVEMENT
AutoCAD SHX Text1 inch = ft.
AutoCAD SHX Text0
AutoCAD SHX Text5
AutoCAD SHX Text2.5
AutoCAD SHX Text5
AutoCAD SHX Text10
AutoCAD SHX TextPROPOSED WATERSHED
AutoCAD SHX TextEXISTING WATERSHED
AutoCAD SHX TextEXISTING WATERSHED DRAINS TO EXISTING CATCH BASIN. AREA = 6,666 SFT PROPOSED WATERSHED DRAINS TO EXISTING CATCH BASIN. AREA = 7,324 SFT NO STORMWATER IN DRIVEWAY AREA DRAINS TO R.O.W.
AutoCAD SHX Text1
AutoCAD SHX TextADMINISTRATIVE REVIEW
AutoCAD SHX Text3/20/18
AutoCAD SHX Text2
AutoCAD SHX TextSITE PLAN RESUBMITTAL
AutoCAD SHX Text5/31/18
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX Text-
AutoCAD SHX TextEXISTING R.O.W. OF M-43 (WEST MAIN ST)
AutoCAD SHX TextEXISTING GUTTER LINE
AutoCAD SHX TextEXISTING CONCRETE SPILLWAY DIRECTS LOCAL STORMWATER TO CATCH BASIN
-
1 - Westgate Access Drive Staff Report2 - Application3 - Westgate PUD aerial map4 - 2018-05-31 Site Plan ResubmittalSheets and ViewsC-0 Title Sheet-C-0 Title SheetC-1 Existing Conditions & Demo Plan-C-1 Existing Conditions & Demo PlanC-2 Watershed Map and Details-C-2 Watershed Map and DetailsR-1 Driveway Plan & Profile-R-1 Driveway Plan & ProfileR-2 MDOT Driveway Layout-R-2 MDOT Driveway Layout