western wisconsin natural gas/dairy basin project developer: agri-waste energy, inc
TRANSCRIPT
![Page 1: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/1.jpg)
Western Wisconsin Natural Gas/Dairy Basin
Project Developer:Agri-Waste Energy, Inc.
![Page 2: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/2.jpg)
Western Wisconsin Natural Gas/Dairy Basin
- Phase 1: Emerald Dairy
![Page 3: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/3.jpg)
Biogas Refinery and Anaerobic Digester at Emerald Dairy
Methane (biogas) from digester processed into Compressed Natural Gas (CNG)
![Page 4: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/4.jpg)
CNG transported in DOT approved CNG transport trailers
![Page 5: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/5.jpg)
CNG delivered to Northern Natural Gas (NNG) pipeline injection site; CNG from
Emerald Dairy transferred to NNG pipeline for sale to 3M company
![Page 6: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/6.jpg)
Natural Gas Basins in the Northern Natural Gas System
WesternCanadian Basin
Rocky MountainBasins
HugotonBasin
AnadarkoBasin
AnadarkoBasin
Market Area
Field Area
Storage0.8 Bcf/d
Field1.6 Bcf/d
0.5 Bcf/d
2.0 Bcf/d0.4 Bcf/d
GulfCoast
Ventura
Demarc
Carlton
Northern Natural
Receipt PointsStorage LocationsLNG Locations
Texas
Montana
Iowa
Kansas
Wyoming
New Mexico
Illinois
Nebraska
Minnesota
Missouri
South Dakota
Wisconsin
North Dakota
Michigan
Northern Natural Gas accesses supply from the Mid-Continent, Permian, Rocky Mountain, and
Western Canadian basins.
16,600 miles of pipeline
![Page 7: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/7.jpg)
- Phase 2: Baldwin Dairy/ Jon-De Dairy digester(s) / biogas pipeline(s) / Biogas Refining project
![Page 8: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/8.jpg)
Baldwin Dairy
![Page 9: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/9.jpg)
Jon-De Dairy
![Page 10: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/10.jpg)
Pipeline for Methane (biogas) transfer
8 miles of pipeline to be placed in township road right-of-way to move methane (biogas) from Baldwin & Jon-De Dairies to Phase 2 Biogas Refinery
![Page 11: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/11.jpg)
Phase 2 Biogas Refinery to be located adjacent to NNG pipeline
injection point
![Page 12: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/12.jpg)
Phase 2 Biogas Refinery will process “digester-produced methane”
(biogas) from 4000 cows at Baldwin and Jon-De Dairies
![Page 13: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/13.jpg)
Western Wisconsin Natural Gas / Dairy Basin: Natural Gas will be
injected into the NNG pipeline from:
• 4000 cows at Emerald Dairy
• 1300 cows at Baldwin Dairy
• 2700 cows at Jon-De Dairy
![Page 14: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/14.jpg)
Major Natural Gas Pipelines in Wisconsin
![Page 15: Western Wisconsin Natural Gas/Dairy Basin Project Developer: Agri-Waste Energy, Inc](https://reader035.vdocuments.site/reader035/viewer/2022062417/551a3562550346cb358b51cf/html5/thumbnails/15.jpg)
Wisconsin has…
• An existing network of major natural gas pipelines
• An expanding “large scale” dairy industry
• The potential for several natural gas/ dairy basins