western india erectors llp
TRANSCRIPT
www.wiellp.com
CORPORATE OFFICE
WESTERN INDIA
ERECTORS LLP
An Engineering Construction
and
Industrial Infrastructure Company
14, BHAGYADARSHAN APARTMENTS,
2nd FLOOR,268 NEW SADASHIV PETH,
PUNE 411 030
MAHARASHTRA, INDIA
REGISTERED OFFICE
3/20, KILACHAND BLDG
298 PRINCESS STREET, MARINE LINES,
MUMBAI 400 002
MAHARASHTRA, INDIA
Vision Statement…
Nurture a winning network of
customers and provide unsurpassed
& premium services to
their satisfaction.
Be a highly effective, lean and
fast moving organization
To be business partners
to our valued customers.
We aim to uphold the 4 important ethics
Be a great place to work where
people are inspired to be the
best that they can be.
Mission Statement …
To be the best service provider to our
customers by offering time bound
premium services at the best prices with
consistent quality, value and commitment.
Our HSE Policy…
Statutory Compliances…
STATUTORY
COMPLIANCES
• We are compliant with all statutory requirements as required
under the prevalent company laws of the Government.
• For details please visit our website under the following link:
www.wiellp.com
About our Organization….
The founders as well as most of the Staff of WIE have been associated with UB Engineering
for 4 decades who are pioneers in all types constructions in India & Overseas.
WIE was re-born on 1st April 2016 transferring all resources and work references under general
arrangement.
Through specific legal agreement and arrangement it has been accepted by UB Engineering
Ltd to transfer all its past work references and resources vis-à-vis plant, Equipment and
resources.
WIE continues to execute construction and engineering projects and deals in on-site
Fabrication
Installation
Testing and commissioning of all electrical and mechanical equipment
Piping & Heavy Equipment Installation
Overhauling, Revamping & Maintenance of the Plants especially Power Plants
Services provided by WIE…
Other services such as material
management Supply of all
type of manpower, all type of pipe
line.
Operation and Maintenance of Industrial
Plants
Renovation and
Modernization of Plants
Heavy Fabrication and installations of structural steel,
piping and heavy
Equipment.
Key Team Profile
Mr. Mulraj Mody
Over 35 years of experience in handling various businesses related to
Construction Projects.
Mr. A. K. Ghosh
Over 37 years of experience in MNCs and UBEL in the erection of Power Plants, Steel and Cement Plants.
Mr. V. M. Sastry
Over 35 years of experience in erection and commissioning related to Power Plants, Oil & Gas, and Steel Plants.
Mr. M. K. Chatterjee
Over 30 years hands on experience in various Electrical Projects.
Mr. Ketan Zadgaonkar
Over 15 years of experience in Electrical and Mechanical Projects and hands on
experience in HSE.
Mr. Y. M. Thukral
Over 35 years of experience in MIS and Project Coordination of Projects.
Key Team Profile
Mr. Mukesh Sharma
Over 20 years field experience in various Electrical Projects.
Mr Harish Kawatkar
Over 25 years of experience in Administrative affairs of Project
sites
Mr Gautam Kundu
Over 20 years of experience in various Mechanical Projects as
Project Manager in various Mechanical Projects.
Mr. S. K. Dutta
Over 25 years of experience as Project Manager in various
Power and Oil & Gas projects in India and abroad
Mr. Pradip S. Tikale
Over 33 years of experience in Mechanical/Electrical
Executions & Business Developments.
Mr. Rakesh Tembare
Having hands on experience of more than 10 years of
developing, monitoring and managing network solutions in both Hardware and Software.
Mr. Sadanand Raut
Over 20 years of experience in Material Management.
Mr. Pradip Chauhan
Over 10 years of experience in Systems Managements
A.K. Ghosh
WIE Organization
S.D. Padayar
Mulraj Mody
S. B. Pingulkar
ACCOUNTS
K. M. Zadgaonkar HSE
S. S. Gawade
SITE COORDINATOR
H. V. Kawatkar
ADMINISTRATION
R.M Tembare
IT ADMIN
Y. M. Thukral
SYSTEMS/MIS
S. T. Raut
MATERIAL MANAGEMENT
M. Sharma
ELECTRICAL EXECUTION
P. S. Tikale
V. M. Sastry
TECHNO COMMERCIAL
M. K. Chatterjee
S. B.Srinivasan
ACCOUNTANT
ELECTRICAL BUSINESS DEVELOPMENT
LEGAL
H.R. Mody
BUSINESS DEVELOPMENT
D. S. Shevade
ADVISOR- (TECHNO COMMERCIAL)
BUSINESS DEVELOPMENT
DIRECTOR
PROJECTS / TECHNO COMMERCIAL
S.G. Patankar
P.S. Chauhan
SYSTEMS
• We have adequate Financial strength to acquire additional Plant Resources depending on the job requirement.
Resource Strength
Plant and Machinery Description Capacity Unit Qty
Mobile Cranes 70 T Nos 3
Mobile Cranes 35T Nos 1
Hydra F15 Nos 2
Hydra F12 Nos 2
Welding Rectifiers 400A Nos 40
DG Sets 125KVA Nos 2
Electrical Winch 10T Nos 2
Electrical Winch 5T Nos 4
Electrical Winch 3T Nos 4
Electrical Winch 2T Nos 2
Hydraulic Testing Pump 400PSI Nos 1
Chain Pulley Block 10T Nos 25
Chain Pulley Block 5T Nos 50
Chain Pulley Block 3T Nos 50
Chain Pulley Block 2T Nos 25
Power Tools ----- Lot 50
Measuring Instruments (assorted ) ----- Set 20
Small Tools ----- Lot 25
Lifting Tackles ----- Lot 30
Resource Strength Manpower
Management Staff Engineers & Supervisors Admin. & Support Staff
30 56 16 180
Workers
Depending upon the job requirement we have capacity and resources to augment required manpower
Some of our prestigious International Client
SAUDI, DAMMAM
Abu Dhabi
Some of our prestigious Clientele
Karnataka Rural
Infrastructure
Development Limited
POWERGEN
INFRASTRUCTURE
(L.L.C.)
Jindal Steel Work
Some of our prestigious Clientele
INDIA
Some of our Achievements
• 40,000 MT Structural Steel Fabrication in a year (1999) at Reliance Refinery Project
Jamnagar.
• Special award winner on safety performance Recognition from Bechtel India for 4.5 million
man-hours without loss time injury in the year 1999 at Dhabhol Power Project-Phase 2.
• Successfully Completed Boiler Hydro test of 600 MW Unit No.3 in 285 Days from boiler Drum
lifting at Jindal Power Project, Raigarh. This is a new bench mark in the history of BHEL .
• EEPC award winner in engineering services export category for 16 years consecutively.
• Successful execution of EPC contract of Acoustic Suppression System for ISRO at Sriharikota.
This system was second of its kind after NASA.
Projects’ Executed Summary…. (Overseas)
Sr. No.
Brief Description Of Work
Name of the Client
Location Total Job Value
1 8 x 300 MW boilers at Sabiya Power Station, Kuwait Mitsubishi Heavy
Industries Ltd. Kuwait 6 M. KD
2
Electro - Mechanical Installation works of 750MW,Combines Cycle
Power Project (GTG, STG, HRSG, Piping & E&I) at Jabel Ali Power
Project, UAE
Toshiba Japan U.A.E 66 M. DHS
3
Completion of erection, testing and commissioning for Electrical
and Mechanical works related to Generators and Balance of Plant
for 10x 140MVA at
Merowe Dam Hydro Electric Project ,Sudan ( Africa)
Alstom (Switzerland) Limited Sudan 13 M. Euro
4 Structural erection of 8 x 300 MW Sabiya Power Station, Kuwait. Hyundai Engineering Ltd.,
Korea. Kuwait 1.503 M. KD
5 Mechanical maintenance of boilers, pumps motors, valves,
( 8 x 300 MW Power station ) Az-zour south power station, Kuwait
Ministry of Electricity & Water,
Kuwait. Kuwait 1.262 M. KD
6 Electro - Mechanical Installation works of 2 Nos.550 T/ Hr Cap.
Auxiliary Boilers at Jabel Ali Power Project Phase I at U.A.E. IHI Japan U.A.E 12 M.DHS
7 Electro - Mechanical Installation of 8 x 125 MW Gas Turbine
Generating sets and auxiliaries at Az-zour Power Project, Kuwait Siemens Kuwait 1.346 M. DHS
Projects’ Executed Summary…. (Domestic)
Sr. No.
Brief Description Of Work
Name of the Client
Awarded Date
Completed
Date
Total Job Amount Rs - Lakhs
1
Erection & Associated works of Boiler & Aux. And TG Aux. of Unit
No.2,4 & 5 of 5 x 660 MW For M/s Adani Power Maharashtra Ltd.,
Tiroda STPP At Tiroda, Dist. Gondia, Maharashtra.
Powergen Infrastructure (L.L.C)
Bandra (East), Mumbai, India. Sep-10 Jan-13 20500
2 EPC contract of Turbine Auxiliaries ,BOP, Electrical and
Instrumentation for 250 MW Navelley Power Project, Tamilnadu. Ansaldo STS India
Jan-98
Feb-01
17200
3 Erection of Unit 1 & 2 BTG Packages of 4x350 MW Coal Based
Thermal Power Project of GMR at Kamalanga, Angul, Orissa
SEPCO Electric Power
Construction. Corporation, China Oct-10 Jul-13 7629
4
Erection, Testing & Commissioning of Boiler & Its Auxiliaries
including ESP, Air Pre Heaters , Ducts , Dampers, Fans, Fuel
Piping, Boiler Integral Piping, Power Cycle Piping, Chemical
Dozing System, Lining & Insulation, Final Painting, etc., of Unit
No.3 at 4 x 600 MW JPL ( Jindal Power Ltd ) Project Near Tamnar
Village, Dist. Raigarh, Chhattisgarh
Bharat Heavy Electricals Ltd,
Power Sector – Western Region,
Nagpur
Jan-12 Oct-16 7616.7
5
Erection, Testing & Commissioning of Boiler & Its Auxiliaries
including ESP, Air Pre Heaters , Ducts , Dampers, Fans, Fuel
Piping, Boiler Integral Piping, Power Cycle Piping, Chemical
Dozing System, Lining & Insulation, Final Painting, etc., of Unit
No.2 & 4 at 4 x 250 MW Nabinagar Thermal Power Project at
BRBCL Nabinagar, Distt Aurangabad, Bihar.
Bharat Heavy Electricals Ltd,
Power Sector – Western Region,
Nagpur
Sep-11 Oct-17 7118.5
Projects’ Executed Summary…. (Domestic)
Sr. No.
Brief Description Of Work
Name of the Client
Awarded Date
Completed
Date
Total Job Amount Rs - Lakhs
6
Erection, Testing ,Commissioning of Boiler Structure, Pressure
Parts, Non Pr. Parts, Rotating Equipment's And Boiler Aux. ESP,
Cooling water piping, Power Cycle Piping, for Unit No.2 of 2x600
MW Set at North Chennai Thermal Power Station, Stage – II,
Athipattu, Chennai, Tamilnadu.
Bharat Heavy Electricals Ltd,
Power Sector – Southern Region,
Chennai, Tamilnadu.
Sep-09 Mar-13 5643
7
Erection, Testing ,Commissioning of Boiler Structure, Pressure
Parts, Non Pr. Parts, Rotating Machines of Main Boiler and Power
Cycle Piping, Steam Generator and Auxiliaries for Unit No.2 of
2x600 MW Thermal Power Plant For Jindal India Thermal Power
at village Derang, Angul, Orissa
Bharat Heavy Electricals Ltd,
Power Sector – Southern Region,
Chennai, Tamilnadu.
Nov-10 Jan-17 4036
8
Erection, Testing ,Commissioning of Boiler Structure, Pressure
Parts, Non Pr. Parts, Air Pre Heaters, Ducts, Its Auxiliaries and
Rotating Machines of Main Boiler and Power Cycle Piping, Steam
Generator and Auxiliaries for Unit No.1 of 2x600 MW
at Shree Singaji Thermal Power Project (Malwa),Mundi Village,
Khandwa Dist. Madhya Pradesh.
Bharat Heavy Electricals Ltd,
Power Sector – Southern Region,
Chennai, Tamilnadu.
Sep-10 Sep-16 3873
9
Mechanical -GT and STG Set ,HRSG ,Mechanical Piping and
Electrical Works for 370 MW Combine Cycle Power Plant at
Utaran, near Surat in Gujarat (India)
Alstom Projects India Limited Mar-08 Oct-10 2200
10
Erection, Testing & Commissioning of Turbine And Generator Set
And Its Auxiliaries, HP/LP Heaters, Insulation Hanger &
Supports,& Final Painting, etc., of Unit No.2 at 4 x 600 MW JPL
( Jindal Power Ltd ) Project Near Tamnar Village, Dist. Raigarh
,Chhattisgarh
Bharat Heavy Electricals Ltd,
Power Sector – Western Region,
Nagpur
Jul-12 Mar-14 8290
Projects’ Executed Summary…. (Domestic)
Sr. No.
Brief Description Of Work
Name of the Client
Awarded Date
Completed
Date
Total Job Amount Rs - Lakhs
11 Construction of Flood-Lighting along with Indo-Bangladesh
Border in the State of Tripura
National Projects Constn.
Corpn. Ltd., New Delhi Sep-10 On going 8086
12
Design, Engineering, Supply, Erection, Testing& Inspection of
equipment & material of sub station, transmission line and
associated system at Singrauli / Rihand / Vindhyachal STPS.
NTPC Electric supply Co. Ltd.,
Noida Mar-12 Jan-16 4578
13
Supply, Erection, Testing & Commissioning and Civil Work of all
the Equipments of 220 / 132 KV Grid Substation, Construction of
Overhead 33 KV Double Circuit Line from old campus of 132 / 33
KV Grid Substation to new campus of 220 / 132 KV Grid
Substation at Hajipur
Bihar State Electricity Board
BSEB, Patna May-10 Apr-16 3265
14 Supply and Construction Electrical Equipments of 132/33 KV
Substation at Kaithi and Garwara
U.P. Power Transmission
Corporation Ltd., Lucknow Oct-10 Sep-17 2234.4
15
Design, Supply & Erection of equipment & material for
construction and civil work of 132 / 33 KV sub station at
Pimpalgaon (Khadki), Dist. Pune, Maharashtra.
Maharashtra State Electricity
Transmission Co. Ltd,(MSETCL)
Mumbai
Jan-12 Mar-17 1723
16 Electrical & Instrumentataion Erection work of 4x135 MW Thermal
Power Plant at Wardha,Maharashtra
Wardha Power Co. Ltd,
Hyderabad Sep-09 Aug-11 1588
17 Supply, Erection, Testing & Commissioning and Civil Work of all
the Equipments of 132/33 KV Grid Substation,at Betai,Bihar
Bihar State Electricity Board
BSEB, Patna May-10 Aug-15 501.6
Projects’ Executed Summary….(Domestic)
Sr. No.
Brief Description Of Work
Name of the Client
Awarded Date
Completed
Date
Total Job Amount Rs - Lakhs
18 Erection, Testing & Commissioning of Plant and Equipment
including Refractory of BOF & CCP at Burnpur
SAIL, IISCO,
Burnpur Mar-09 Nov-10 4456
19 Structural Construction and Equipment Erection & Electrical
Work for Expansion Project at Jamshedpur, Jharkhand
Usha Martin Limited,
Jamshedpur Dec-10 Feb-15 2600
20 Fabrication, Erection, Alignment, and Commissioning of Various
Equipments for CRM # 2 at JSW Bellary
JSW Steel Limited,
Bellary Apr-12 Oct-16 2050
21 Erection & Commissioning of 850 TPD Oxygen Plant at Bokaro,
Jharkhand
Electrosteel Steels Limited,
Bokaro Dec-10 Dec-12 1650
22 Structural and Equipment Erection work at Bokaro, Jharkhand Electrosteel Steels Limited,
Bokaro Jun-11 May-13 1517
23 Erection, Alignment, and Commissioning of Various Equipments
for Billet Caster for SMS # 3 at JSW Bellary
JSW Steel Limited,
Bellary Aug-13 Aug-16 1005.5
Projects Currently Under Execution……
Sr. No. Brief Description Of Work
Location Name of the Client
Total Job Balance Amount Rs-Lakh
1 Erection and Painting of Transfer Tower Structures, Gallery and
Trestles at Toshiba JSW Power Systems Pvt. Ltd Aligarh, UP Aligarh, UP FLSmidth (Chennai ) 251
2 ETC of 250 MW Boiler at Nabinagar Thermal Power Project at
Nabinagar, Bihar Nabinagar, Bihar BHEL 1200
3 MISC. Plumbing Works of Jawaharpur Power Project for DOOSAN
at Jawaharpur ETAHA, UP ETAHA, UP DOOSAN 878
4 ETC of 250 MW Lignite based CFBC Boiler and Electrical Work for
Bhavnagar Energy Company Ltd. At Bhavnagar, Gujarat Bhavnagar, Gujarat BHEL 175
5 Supply & Erection of Electrical work of 132/33 KV Substation at
Pimpalgaon (Khadki),Pune Pune, Maharashtra MSEDCL 150
6 Electrical and Civil balance works with supply of required
workforce, mechanical, electrical and civil work at NPCC Tripura. Agartala ,Tripura NPCC 150
7 ETC of 125 MW Boiler at Power Plant for SINTEX INFRA at Shirpur
Power Project at Dhule, Maharashtra Dhule, Maharashtra BHEL 110
8 Provide onsite support for smooth working of cranes at Reliance
Jamnagar-Gujarat. Jamnagar, Gujarat RELIANCE 101
9 Design, Manufacture, Supply, Installation of 1000 LPH RO Plants at
Karwar, Karnataka Karwar, Karnataka KRIDL 75
10
Supply of suitable manpower for execution of work HPPTA Static
Equipment, Pnumatic Conveying line, Installation of Load
cell,Fabrication and Installation of pipe and MS scaffolding inside
vessel for MCPT Pvt.Ltd. HP PSDM job.
Haldia, West Bengal MITSUBISHI 63
Photo Summary of Projects Executed
Laminar Tank & Headers ( Header In Operation ) at
Hadeed Flat Products Facility Project, Jubail , Saudi Arabia
Photo Summary of Projects Executed
Off shore Platform Erection of Khuff Gas Development Project, Adhoc - Abu Dhabi
Photo Summary of Projects Executed
HRSG Bypass Stack Erection for DEWA at Jabel Ali, Dubai UAE
Photo Summary of Projects Executed
600 MW BOILER FOR BHEL IN CHENNAI
Photo Summary of Projects Executed
ESP DUCTING 600MW BOILER FOR BHEL IN CHENNAI
Photo Summary of Projects Executed
ACOUSTIC SUPPRESSION SYSTEM FOR SATTELITE LAUNCHING PAD
FOR ISRO SATISH DHAWAN SPACE CENTER, SHRIHARIKOTA
Photo Summary of Projects Executed
WATER LINE for ACOUSTIC SUPRESSION SYSTEM WITH VALVES FOR ISRO
SATISH DHAWAN SPACE CENTER, SHRIHARIKOTA
Photo Summary of Projects Executed
RELIANCE INDUSTRIES LTD JERP PLANT STRUCTURAL ASSEMBLY
1000 LPH Capacity RO Plant
Synopsis:
• 12 no. of 1000 LPH capacity reverse osmosis plants have
been designed, manufactured, assembled and installed at
Karawar, Karnataka for Karnataka Rural Infrastructure
Development (Government of Karnataka)
• Water output
Dissolved Solids < 50ppm
Hardness < 10 ppm
• An ATM is also installed at the Output for consumers to
access directly.
• The unit is designed such that it can be externally monitored,
and any action for plant operations can be taken accordingly.
TYPICAL FLOW CHART OF THE PLANT
Photo Summary of Projects Executed
1000 LPH CAPACITY RO PLANT at Karwar for KRIDL
Photo Summary of Projects Executed
ESSAR, HAZIRA STRUCTURAL ERECTION FOR REFINERY
Financial Status
Mr. Mulraj Mody: Managing Partner
Combined turnover of around Rs.15 cr
Solvency of Rs.15 cr
Mr. Mahindra Doshi: Partner
Combined turnover of around Rs.65 cr
Solvency of Rs.75 cr
Raunak Group: Financial Partner
Turnover of Rs.200 cr
Mr. Vijay Mody: Financial Partner
Partner in Unnati Developers
Turnover of Rs.125cr
Combined Turnover of Partners: Rs.90 cr.
Combined Turnover of Financial Partners: Rs.325 cr.
Auditor Details : N. J. Parekh & Associates ( Chartered Accountants )
Contact Us
3/20, KILACHAND BLDG,
298 PRINCESS STREET, MARINE LINES.
MUMBAI 400 002 MAHARASHTRA, INDIA
+91 22 22037498
+91 22 22095123
REGISTERED OFFICE
WEBSITE
www.wiellp.com
DIRECTOR | [email protected]
BD | [email protected]
MECHANICAL | [email protected]
COMMERCIAL | [email protected]
ELECTRICAL | [email protected]
O&M | [email protected]
THANK YOU
14, BHAGYADARSHAN APARTMENTS,
2nd FLOOR,268 NEW SADASHIV PETH.
PUNE 411 030
MAHARASHTRA, INDIA
+91 20 24444050
CORPORATE OFFICE
A-124 DDA SHEDS,
OKHLA INDUSTRIAL AREA PHASE II.
NEW DELHI 110020,
DELHI,INDIA
+91 9582895740
DELHI REGION