WES PROGRAMME UPDATE Elva Bannon – Senior Research Engineer Supergen ORE Hub Annual Assembly 6 November 2019

Upload: others

Post on 09-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

WES PROGRAMME UPDATE Elva Bannon – Senior Research Engineer

Supergen ORE Hub Annual Assembly 6 November 2019

Page 2: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

WES in brief

Page 3: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

WES in brief

£39.6M committed

expenditure

Established in November 2014 as

a subsidiary of Highlands and Islands Enterprise

Developingcost competitive wave technology

Delivering objectives through Research, Development

& Innovation Programmes13 Countries

5 competitive programmes• Power Take-Offs

• Wave Devices• Structural Materials

• Controls Systems• Quick connection Systems

200 Organisations88 Projects

Funded by theScottish Government

£

Page 4: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Technology Development Programmes

Page 5: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

WES Technology Programmes

Power Take-Off Call

Novel Wave Energy Converter Call

Materials CallControl Systems Call

PTO 1 SG PTO 2 SG PTO 3 SG PTO 4

NWEC 1 SG NWEC 2 SG NWEC 3

Mat 1 SG Mat 2 SG Mat 3

C1 SG CS 2 SG CS 3

Power Take-Off

Novel Wave Device

Structural Materials and Manufacturing

Advanced Control Systems

Integration

Integration

Today

2015 2016 2017 2018 2019 2020 2021

PTO 2 SG

PTO 3

PTO 3

Page 6: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Power Take-Off Programme

PTO 1 SG PTO 2 SG PTO 3 SG PTO 4

Today

2015 2016 2017 2018 2019 2020 2021

PTO 2 SG PTO 3

PTO 31

4

10

6

Page 7: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

CorPower Ocean AB

HiDrive

Direct drive PTO for resonant Wave Energy Converter

(Cascade gearbox)

Power Take-Off Programme

Milestones:

• Stage 3 –complete

• Extensive PTO characterisation tests

• Sea trials at EMEC

• Lessons Learned presentation at WES Conference 2018

• Completed: September 2018

Page 8: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

UmbraGroup

Electro-Mechanical Reciprocating Generator (EMERGE)

Reciprocating linear drive recirculating ball screw technology

Power Take-Off Programme

Milestones:

• Stage 2 – complete

• Stage 3 – current • PTO testing

complete in Scotland (Doosan)

• Sea trials in Orkney summer 2019

• Expected completion: end 2019 https://marineenergy.biz/2019/10/24/emerge-

project-wraps-up-sea-trials/

Page 9: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Artemis Intelligent Power Ltd

Quantor

Hybrid Digital Displacement Hydraulic PTO

Power Take-Off Programme

Milestones:

• Stage 2 – complete

• Stage 3 – current • Bespoke test rig

which emulates device inertia

• Extensive testing over 3 months

• Expected completion: end 2019

Page 10: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

University of Edinburgh

Project Neptune

C-GEN Direct Drive

Power Take-Off Programme

Milestones:

• Stage 2 – complete

• Stage 3 – current• FAT completed in

Rugby (Quartzelec)

• Dry & wet testing in Leith

• Partnering with Mocean for WEC testing

• Expected completion: end 2019

Page 11: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Oceaneering International Services

Ltd

PECMAG

Power Electronic Controlled Magnet Gear

Power Take-Off Programme

Milestones:

• Stage 1 – complete

• Stage 2 – complete• Stage 3 – current

• Dry testing at factory

• Planned sea tests integrated with point absorber WEC

• Expected completion: March 2020

Page 12: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Struct. Materials Programme

Today

2015 2016 2017 2018 2019 2020 2021

Mat 1 SG Mat 2 SG Mat 3

10 Mat 13

Page 13: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Tension Technology International Ltd

NetBuoy II

Inflatable buoy with load carrying net

Struct. Materials Programme

Milestones:

• Stage 1 – complete • Stage 2 – current • Hydrostatic tests of

¼ scale buoy• Proof of concept

testing• Abrasion tests on

material itself

• Expected completion: end 2019

Page 14: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Ove Arup & Partners Ltd

CREATE

Concrete as a Technology Enabler

Struct. Materials Programme

Milestones:

• Stage 1 – complete • Stage 2 – current • Pre-fabricated

panel design developed

• Lab tests on full-scale panel joint

• Carnegie CETO as test case

• Expected completion: end 2019

Page 15: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

CorPower Ocean AB

HydroComp

Fibre Reinforced Polymer

Struct. Materials Programme

Milestones:• Stage 1 – complete • Stage 2 – current • Composite structure

using E-glass fibres • Panelised design for

ease of mass manufacture

• Thorough material tests including fatigue, bending, environmental aging

• Expected completion: end 2019

Page 16: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Control Systems Programme

Today

2015 2016 2017 2018 2019 2020 2021

C1 SG CS 2 SG CS 3

13 3 2

Page 17: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

MaxSim Ltd

CEORL

Cost of Energy Optimised Reinforcement Learning

Control Systems Programme

Milestones:

• Stage 1 – complete

• Stage 2 – complete • Stage 3 – current

• HIL and tank testing of reinforcement learning in scale WEC

• Expected completion: end 2020

Page 18: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Queen Mary University

Adaptive hierarchical model predictive control of wave energy converters

Control Systems Programme

Milestones:

• Stage 1 – complete• Stage 2 – complete • Stage 3 – current • Testing Mocean

device in FloWave

• Testing wave prediction technique along with controller

• Expected completion: end 2020

Page 19: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Wave Device Programme (NWEC)

Today

2015 2016 2017 2018 2019 2020 2021

NWEC 1 SG NWEC 2 SG NWEC 3

8 4 2

Page 20: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

AWS Ocean Energy Ltd

At sea demonstration of the Archimedes Waveswing

Wave Device Programme (NWEC)

Milestones

• Stage 1 – complete

• Stage 2 – complete • Stage 3 – current

• Orkney sea trials in Summer 2020

• ½ Scale device

• Expected completion date: end 2020

Page 21: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Mocean Energy Ltd

Mocean WEC: Blue Horizon

Wave Device Programme (NWEC)

Milestones:

• Stage 1 – complete• Stage 2 – complete • Stage 3 – current • Orkney sea trials in

Summer 2020• ½ Scale device• C-GEN PTO• QMU control

System

• Expected completion date: end 2020

Page 22: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

WES Technology Programmes

Power Take-Off Call

Novel Wave Energy Converter Call

Materials CallControl Systems Call

PTO 1 SG PTO 2 SG PTO 3 SG PTO 4

NWEC 1 SG NWEC 2 SG NWEC 3

Mat 1 SG Mat 2 SG Mat 3

C1 SG CS 2 SG CS 3

Power Take-Off

Novel Wave Device

Structural Materials and Manufacturing

Advanced Control Systems

Integration

Integration

Quick Connection Systems

QC 1 SG QC 2Quick Connection Systems

Today

2015 2016 2017 2018 2019 2020 2021

PTO 2 SG

PTO 3

PTO 3

Page 23: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Overall Competition Objectives• Reduce the duration, cost and risk of offshore operations for prototype

wave energy converters

by

• supporting projects to design and develop a quick connection and disconnection system between a device and its moorings and/or electrical system.

Page 24: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Quick Connection SystemsQuick Connection Systems for a wave energy converter which target the connection and disconnection of either the:• Mooring system,• Electrical system, • Mooring and electrical systems combined.

Successful projects announced in mid-December

Today

2015 2016 2017 2018 2019 2020 2021

QC 1 SG QC 2

7 ???

Page 25: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

International Collaboration

Page 26: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

IEA-OES Task 12

“International Technology Evaluation Framework for Ocean Energy”

• How to measure• Clear definitions• Evaluation methods• Links to existing standards• Wide review to gain

international consensus

Page 27: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Advanced Design Tools for Ocean Energy Systems Innovation, Development and Deployment

This project has received funding from the European Union’s Horizon 2020 research and innovation

programme under grant agreement No 785921

This project has received funding from the European Union’s Horizon 2020 research and innovation program under grant agreement Nº 840651

• 3-year project• €8m budget• 18 partners in 8 countries• WES leading Stage Gate design

tool work package• Defining metrics for technology

development process (TRL 1-9)

Page 28: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

OceanSET is supporting the ocean energy implementation plan of the European Strategic Energy Technology Plan (SET Plan)

3-year projectPartners: WES (UK), University of Edinburgh (UK), SEAI (Ireland), FEM (France), OEE (EU), PLOCAN (Canaries), ENEA (Italy), DGEG (Portugal), EVE (Basque Country)

This project has received funding from the European Union’s Horizon 2020 research and innovation

program under grant agreement Nº 840651

Page 29: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Knowledge Sharing

Page 30: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Home screenshot

library.waveenergyscotland.co.uk

Page 31: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Submit project details for chance to display poster on the dayhttps://www.surveymonkey.co.uk/r/WESAC19Poster

Register for conference through B2Match (case sensitive)

www.bit.ly/WESAC19

Page 32: WES PROGRAMME UPDATE...• Lessons Learned presentation at WES Conference 2018 • Completed: September 2018 UmbraGroup Electro-Mechanical Reciprocating Generator (EMERGE) Reciprocating

Twitter @WaveEnergyScotLinkedIn waveenergyscotland

THANK YOUElva Bannon