1 Wembley Area Action Plan Sustainability Appraisal Proposed Submission Report May 2014

Upload: others

Post on 29-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

1

Wembley Area Action Plan

Sustainability Appraisal

Proposed Submission Report

May 2014

Page 2: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

2

Page 3: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

3

Contents

1 Introduction and timetable

Page 3

2 Wembley Area Action Plan Context

Page 4

3 Sustainability Appraisal Approach

Page 14

4 Sustainability Appraisal Methodology

Page 17

5 Analysis of the Preferred Options

Page 18

6 Mitigation, Implementation & Monitoring

Page 27

7 Summary of Effects & Conclusions

Page 28

Appendix 1 Review of Plans & Programmes

Page 30

Appendix 2 Baseline Information

Page 73

Appendix 3 Monitoring Data Page 77

Appendix 4 Key Issues by Theme

Page 82

Appendix 5 Sustainability Appraisal of Policy Options

Page 88

Appendix 6 Sustainability Appraisal of New Preferred Options

Page 152

Appendix 7 Sustainability Appraisal of Site Proposals

Page 156

Appendix 8

Sustainability Appraisal of Revisions at Proposed Submission Stage

Page 180

Appendix 9 Changes to Policy Numbers

Page197

Appendix 10 Main Modifications

Page199

Page 4: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

4

1. Introduction

Requirement for Sustainability Appraisal

The Planning and Compulsory Purchase Act 2004 introduced a requirement to carry out a sustainability appraisal (SA) as an integral part of preparing local development documents. The purpose of sustainability appraisal is to promote sustainable development by ensuring that the potential social, environmental and economic effects of a plan are fully considered during plan preparation.

European Directive 2001/42/EC requires a Strategic Environmental Assessment (SEA) which applies to local development documents (amongst others.) The SEA focuses on the assessment of the environmental effects of plans and strategies.

To avoid duplication both processes can be carried out together. The SA is broader than SEA as it considers social and economic issues as well as environmental issues. Therefore reference to SA throughout this document incorporates the requirements of the SEA Directive.

Sustainability Appraisal Scoping Report December 2011

The council published a Sustainability Appraisal Scoping Report for the Wembley Area Action Plan in early summer 2011. The scoping report identified the main national and local policies which affect the preparation of the Wembley Area Action Plan (AAP) and gives a picture of the current baseline state of the Wembley area. It was prepared and reviewed by a number of officers across the council and in consultation with stakeholders and statutory consultees. The Scoping Report identified the objectives against which the AAP will be tested and covered Stage A of the SA process.

The sustainability appraisal process has 5 key stages:

Stage A: Setting the context and objectives, establishing the baseline and deciding on the scope

Stage B: Developing and refining plan options

Stage C: Appraising the effects of the plan

Stage D: Consulting on the plan and the SA report

Stage E: Monitoring the implementation of the plan

Wembley Area Action Plan Interim Sustainability Appraisal Issues and Options 2011

This report assessed the APP issues and options against the SA framework and formed part of stage B in the SA process. The appraisal was carried out by a number of officers in the council, taking into account the information gathered in the Scoping Report and the background information set out in the draft Issues and Options Report for the WembleyAAP. The impacts of the options on each objective was scored in a matrix and a summary was included for each set of options to highlight which had the most sustainable/least adverse impact and those which had an impact which was mixed or unknown. The report set out the key findings from the assessment of each option within separate themes which were as follows:

Urban design and place shaping

Business, industry and waste

Transport

Housing

Town centres, shopping, leisure and tourism

Social infrastructure

Climate change

Open space, sports and wildlife In addition, single options were given for:

A vision for the area

Objectives

The public consultation on this report was carried out from 27th September to 7th November 2011 and no responses were received from the statutory consultees or members of the public.

Wembley Area Action Plan Interim Sustainability Appraisal Preferred Options 2012

The consultation and SA informed the preferred options for planning the Wembley area. The Wembley AAP Preferred Options and revised SA report underwent public consultation between 13 August and 8 October 2012. No responses were received from the statutory consultees or members of the public on the SA report. Next Steps The next stage involves consulting on the Proposed Submission Wembley AAP and SA report. During the preparation of the Proposed Submission AAP revisions to policies were considered in light of public consultation responses, and are consequently also the subject of this SA report. An assessment of revisions to these policies is included in appendix 8. Following consultation the SA Report, along with any revisions, will be submitted to the Secretary of State as part of the evidence base for the Wembley AAP. The details of the timetable for the production of all documents are:

Page 5: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

5

Wembley Area Action Plan

Timetable for production

Stage Milestone date

Consultation on the Wembley Area

Action Plan Preferred Options and

Sustainability Appraisal Report

August-October 2012

Consultation on Proposed Submission

DPD (Publication)

March 2013

Submission June 2013

Examination of the Wembley Area

Action Plan

October 2013

Adoption of the Wembley Area

Action Plan

Late 2014

SA Sustainability Monitoring On-going

2. Wembley Area Action Plan Context

2.1 Local policy context The regeneration of the Wembley area has been ongoing for over ten years, and in 2004, the council adopted its Unitary Development Plan (UDP) which allocated large opportunity sites for regeneration in the Wembley area. Whilst some of the regeneration aspirations have been achieved, i.e. the delivery of the new Wembley Stadium, there is still substantially more regenerative development to be delivered. The council adopted its Core Strategy in summer 2010. This identifies Wembley as its principal Growth Area. The Core Strategy is part of Brent’s Local Development Framework (LDF), consisting of a series of planning documents which will collectively guide the planning of the borough up to and beyond 2026. The Core Strategy sets out the proposed level of growth up to 2026 across the borough, focusing on five key growth areas, including the overall level of change proposed in Wembley and the infrastructure to support it. It is within this policy context, and that of the UDP, that the Wembley AAP will emerge. The Plan will provide further detail about how this growth will be delivered. Once adopted, the Wembley AAP will form part of the council’s LDF. The following Development Plan Documents (DPDs) have also been/ will be produced as part of the council’s LDF:

Core Strategy, adopted 27th July 2010.

Site Specific Allocations, adopted 11th July 2011.

West London joint waste DPD, to be adopted 2013.

Development Management Policies DPD, draft for consultation August 2013. The AAP will set out the policies and proposals to deliver growth, stimulate regeneration and protect and enhance Wembley’s assets. It will allow the council to recognise and promote the extensive opportunities in Wembley for further housing, provision of community services, green infrastructure and ecology, retail and leisure development and the promotion of culture in accordance with the priorities set out in the London Plan and Brent’s Core Strategy. It will also review and update the Wembley Regeneration Area chapter of the UDP which currently provides the statutory development plan basis, along with other saved policies and the Core Strategy of the LDF, for planning decisions in Wembley. The council has also produced a number of supplementary planning documents (SPDs) which provide more detailed planning guidance in a number of specific locations. One of the aims of the Wembley AAP is to bring all of these documents together to provide a cohesive Plan for the Wembley Growth Area. The AAP will establish a statutory basis upon which planning decisions can be made and will build on the extensive work that the Council and its partners have undertaken in preparing the Wembley Masterplan SPD, the Wembley Link SPD, Wembley West End (South) SPD and the Wembley Cafe Quarter Design Guide. The policy context for the Wembley AAP is set out in the diagram below, and the policy context is highlighted in more detail in the next section.

Page 6: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

6

Figure 1: Wembley Area Action Plan policy context

Brent’s Core Strategy The council’s Core Strategy identifies the level of growth proposed for the Wembley Area within Core Policy 7, which includes 10,000 new jobs across a range of sectors including retail, office, conference facilities, hotels, sports, leisure, tourism and visitor attractions, creative and cultural industries and education facilities, with around 70 hectares of land at the Wembley National Stadium and Wembley town centre will be redeveloped for at least 11,500 new homes to 2026. Core Strategy policy 7 also sets out the anticipated infrastructure for the proposed level of growth as follows:

New road connections

Junction improvements

Two new 2 form of entry primary schools

A new combined primary (2 form of entry ) and secondary school (6 form of entry) on the

Wembley Park site

Extensions to existing local schools

Nursery places

At least 2.4 hectares of new public open space comprising of a new park (1.2ha min) and 3 pocket parks/squares (0.4ha each)

Improvements to the quality and accessibility of existing open spaces

New community swimming pool

Indoor and outdoor sports facilities

Play areas

A minimum of 1,000 trees

New health facilities with space for 14 GPs and 11 new dentists

Combined Heat and Power plant, if financially viable

New multi use community facilities

As identified on the Proposals Map, Wembley town centre will be extended eastwards to facilitate a further 30,000sqm net of new retail floor space in addition to that already granted planning consent.

The Core Strategy is the key parent document containing an extensive range of information relating to the Wembley Growth Area, and establishes the vision for the overarching physical and economic framework for Wembley. The SA for the Wembley AAP will therefore cover a level of detail for the Growth Area which is not covered within the strategic Core Strategy policies. Brent’s Site Specific Allocations DPD The council’s Site Specific Allocations DPD was adopted on 11th July 2011 following examination in late 2010. There are ten site allocations in Wembley for a range of uses including:

Core Strategy DPD**

Joint West London Waste

DPD

Site Specific Allocations

DPD

Wembley Area Action Plan

DPD

Review

Annual Monitoring

Report

SPDs*

Sustainability Appraisal

Local Development Framework

The London Plan

(SDS***)

Brent’s Sustainable Community Strategy

National

Planning policy

***Spatial Development Strategy

**Development Plan Document *Supplemantary Planning

Document

Page 7: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

7

- W1 Wembley West End – mixed use development including retail and residential - W3 Brent Town Hall – offices, local needs retail, residential, hotel and community facilities - W4 Shubette House/ Karma House/ Apex House – hotel, retail, office, managed affordable workspace and public space - W5 Wembley Eastern Lands - leisure, hotels, offices, amenity/open space, and residential development - W6 Amex House - residential and workspace for creative industries - W7 Chesterfield House - hotel and ground floor retail, food and drink to create an active frontage - W8 Brent House and Elizabeth House - residential, retail, office and amenity space - W9 Wembley High Road - residential, retail, and amenity space and returning a proportion of space for offices to help support the physical

and economic regeneration of the High Road - W10 Wembley Chiltern Embankments - Town centre uses shall be sought along the southern section while the land north of the tracks will

be considered for residential development - W11 Former Wembley Mini Market - residential and commercial uses, or car parking, to support the regeneration of Wembley town centre. Wembley Link SPD (adopted 11th July 2011) The Wembley Link SPD provides land use guidance for land in the south west of the growth area, and includes both sides of the Wembley High Road from Wembley Triangle to Chesterfield House, including the Brent House and Copland School sites. The document identifies the uses that would be appropriate in this area of Wembley, and outlines the council’s vision for the eastern edge of the town centre. Wembley Masterplan SPD (adopted 2009) The Wembley Masterplan SPD, which covers the central core of the Growth Area, includes a number of exemplary design elements for the area and also sets out land use elements for the following:

Movement Infrastructure

Public Transport

Public Realm, Streetscape & Public Art

Scale, Height & Massing

Design Quality & Ambition

Safety & Security

Flood Risk Strategy

Sustainability & Climate Change

North West District

Olympic Way

North East District

First Way

Eastern Lands The Wembley Area Action Plan proposes to build on the elements in each of the planning documents and will provide clarity on land use aspects and design considerations for the whole Growth Area. Wembley West End (South) The Wembley West End (South) SPD promotes the strengthening of the existing Wembley town centre through a viable mixed use scheme and comprehensive redevelopment, with the objective of providing a gateway in the town centre linking to the redevelopment of Wembley Central Square where there is access from the station. The Wembley AAP will consider in more detail how Wembley’s retail offer can be supported to increase vitality and viability within the existing town centre. Wembley Cafe Quarter Design Guide (2003) The Wembley Cafe Quarter design guide promotes the eastern end of the Wembley town centre for cafe uses where the pavement is wider and capable of accommodating food and drink uses which provide active leisure uses, with excellent pedestrian links to the stadium from Wembley Central Station. The document sets out a design for the area and seeks to promote further leisure uses within the town centre, retaining visitors within the town centre and increasing expenditure. The Wembley Area Action Plan will review the objectives within the Wembley Cafe Quarter guide, and will provide further detail about proposals for use within the existing Wembley town centre. A coherent vision for Wembley – The Area Action Plan As shown above there is a variety of guidance adopted for Wembley. However, no one detailed strategy pulls these details together. It is proposed that the Wembley AAP will coordinate these plans, providing further detail and context for the growth proposed within the Core Strategy.

Regional policy context The London Plan (adopted July 2011) provides policy context for the Wembley AAP and forms part of the council’s statutory plan. The Mayor is also preparing an Opportunity Area Planning Framework (OAPF) for Wembley. Wembley as an Opportunity Area The London Plan identifies Wembley as an Opportunity Area under Policy 2.13; notably for leisure and tourism, for which it is a “strategic function of more than local importance”. The policy promotes 239 hectares of land for redevelopment, with an indicative employment capacity of 11,000 jobs and a minimum of 11,500 new homes. The London Plan highlights the importance of adopting policies within Opportunity Areas which should be in conformity with any higher level Mayoral policy. London Plan Policy 2.13 also seeks to optimise residential and non residential densities; provide necessary social and other infrastructure to sustain growth; and where appropriate containing a mix of uses (including contributing to meeting the minimum guidelines for housing). The Wembley Opportunity Area seeks to: “(provide) new housing and leisure-related development should be integrated with the iconic and world-class stadium and other facilities, including the Arena and Conference Centre. Supported by upgrades to the three stations, improved public transport will play a key role in managing heavy demand for mass movement, links between the stations and the strategic leisure facilities should be improved. Development

Page 8: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

8

should contribute to the regeneration, vitality and viability of Wembley as a town centre, including its expansion eastwards. Proposals should enhance permeability and connectivity to the wider hinterland and the potential to locate a civic facility including a school adjacent to Olympic Way should be explored”.

Wembley as a Strategic Cultural Area The London Plan (2011) allocates Wembley as a Strategic Cultural Area. Policies 4.6 and 4.7 provides the framework for these allocations, which seeks a town centre based sequential approach for allocating arts, cultural and entertainment enterprises in areas of high public transport accessibility and areas where there are currently deficiencies of cultural facilities. New cultural allocations should provide accessibility for all, including disabled and older people. Policies 4.6 and 4.7 encourage local authorities in their plan making to seek enhancement and protection of creative work and performance spaces and related facilities; allow for the temporary use of vacant buildings for performance and creative work; and provide further designation and development of Cultural Quarters to accommodate new arts, cultural and leisure activities, enabling them to contribute more effectively to regeneration. Wembley as a Preferred Industrial Location Part of Wembley is designated as a Preferred Industrial Location (PIL) in the London Plan under Strategic Industrial Location policy 2.17, and forms part of the wider term for industrial areas, “Strategic Industrial Locations”. PILs are locations which that are defined as “particularly suitable for general industrial, light industrial, storage and distribution, waste management, recycling, some transport related functions, utilities, wholesale markets and other industrial related activities” in the London Plan. SILs are protected by London Plan policy 2.17 which states that “the Mayor will, and boroughs and other stakeholders should promote, manage and, protect the Strategic Industrial Locations (SILs) where appropriate. The policy resists development in SILs unless it falls within the broad industrial allocation, promotes related uses, provide small scale ancillary accommodation (such as crèches or cafes) or unless a review of the land is taken forward and consolidated in a Development Plan Document (DPD) or Opportunity Area Planning Framework (OAPF).

Local authorities, in making their plans, are required by the London Plan to identify SILs on Proposal Maps and develop local policies to protect their function, enhance their attractiveness and competitiveness for industrial type activities and seek to improve accessibility. Wembley’s town centres The Wembley growth area contains two town centres; Wembley and Wembley Park. Wembley is allocated as a Major Centre with high potential for growth in the London Plan town centre hierarchy, and Wembley Park is allocated as a District centre with medium potential for growth within the London Plan. The London Plan town centre allocations are underpinned by Health Checks, which record a number of different indicators on the health of London’s town centres – further detail on this is provided in Section 3.

Characterisation of the Wembley Area This section aims to provide a commentary on the key areas, features and land uses that make up the Wembley area. It is supported by the baseline data and indicators provided in Appendix 2, 3 and 4. The spatial area to be covered by the Wembley AAP is shown in Figure 2, and includes both the regeneration area within the council’s Unitary Development Plan (2004) with the omission of the Neasden sidings, and the Wembley Growth Area as set out in the council’s Core Strategy in Figure 3. The Wembley regeneration and growth area encompasses Wembley National Stadium, Wembley Arena, Wembley and Wembley Park town centres, Brent Park, Chiltern Railway lands and the Wembley and Neasden industrial estates. Figure 2: Boundaries of the Wembley Area Action Plan

Page 9: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

9

Figure 3: Wembley Growth Area Key Diagram from Core Strategy

Growth Area context Wembley Growth Area is located within the London Borough of Brent, within North West London, and is highly accessible from three stations - Wembley Central, Wembley Park and Wembley Stadium. Wembley is the borough’s principle area for growth, and the redevelopment and completion of the Wembley Stadium in 2007 has helped to promote the stadium as the centrepiece for regeneration. The strategy for the Wembley area is to develop it further as a major attraction on a regional, national and international scale. The growth area is made up of a variety of different uses, including residential, industrial, leisure, office and also contains two town centres – Wembley to the south west which is a Major Centre in the council’s Core Strategy and the adopted and emerging London Plan (2010), and Wembley Park which is a District town centre. The stadium is roughly located centrally to the two town centres, and the surrounding area contains land which is ripe for redevelopment. This land has been designated largely for uses which complement Wembley’s role as a town centre and a location for the National Stadium, and is promoted in the council’s Core Strategy for new homes, jobs, leisure and other uses that reflect its designation as an Opportunity Area and a Cultural Priority Area within the adopted London Plan (2011). Land to the east of the stadium is largely protected employment land, identified as a Strategic Industrial Location in the London Plan and the Core Strategy. Wembley currently suffers from a poor quality environment; it is within an Air Quality Management Area, and lacks open spaces as well as suffering from a poor quality environment. The Wealdstone Brook runs through Wembley and, consequently, some sites are within higher flood risk zones 2 and 3a. The Wembley growth area lies within two wards, the Tokyngton Ward and the Wembley Central Ward with a population of 14,256 and 13,114 respectively, totalling 27,370 (GLA, 2011 Round SHLAA Ward Population Projections); a steady increase since 2001 when the population was estimated to be 11,836 and 11,002 for the wards.

Figure 4: Wembley Location Map

Transport and access Public Transport

Page 10: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

10

Wembley is generally well connected with close proximity to public transport services, interchange and accessibility, and scores highly on

Public Transport Accessibility Levels (PTAL). The three rail and Underground stations at Wembley Central, Wembley Park and Wembley

Stadium provide convenient and frequent services to and from Central and Outer London. However, certain journeys are not well provided for,

including orbital connections to major employment and retail centres such as Park Royal and Brent Cross.

Vehicular Transport

Travel by private car is the preferred choice of mode for private journeys with 37% of all trips made by this method. The road network is

generally very busy during peak periods with congestion prevalent at key intersections and certain locations demonstrate a higher than

acceptable level of road accidents. In particular, the A404 Harrow Road/ Wembley High Road route has to accommodate frequent bus

services and a high level of pedestrian activity, which has to compete with a high volume of general traffic.

Transport links to areas of employment in Wembley

The main employment area of Wembley industrial estate has a historic industrial road layout which is used by general traffic to bypass the main

road network. The estate’s roads are well connected to the main orbital route, the A406 North Circular Road, although congestion does occur

at peak times along this route and at junctions connecting with it. Access to the west is poor and estate traffic has to compete with general

traffic on the congested western highway corridors.

Pedestrians and Cycling

The pedestrian environment is less than satisfactory with busy roads, and narrow and often congested footways. Cycling provision is limited

with few dedicated cycle routes and less than satisfactory cycle parking facilities.

Event day activity at Wembley Stadium poses its own transport issues with local restrictive traffic management required and crowd

management of substantial pedestrian numbers, particularly from the three rail and Underground stations. Recent access improvements within

the Estate have helped to ease access problems for premises on event days.

Parking

Parking for new development is increasingly becoming more restrictive with residential parking standards in the new major development areas

generally being applied at 0.5 spaces per unit. Public off-street parking is currently limited to ground level parking at the Stadium and one

multi-storey car park. On-street parking controls are widespread supplemented by special event day parking controls operating.

Design and conservation

In design and conservation terms, Wembley is typical of an outer London Borough, developing from the late 19th Century through the early part

of the 20th Century to the 1960’s. Therefore, overall the area has a relatively few historic assets, and there are no Conservation Areas and no

Registered Parks or Gardens. There are, however, three listed buildings in the vicinity of the Growth Area including:

- Brent Town Hall (Grade II Statutory listed)

- The Wembley Arena (Grade II Statutory listed)

- Ealing Road Mosque (Grade II Statutory listed)

Although there have been many significant improvements in the Wembley area over recent years, the general pattern of development over the

last 80 years has removed any clear sense of urban form across the area. The Stadium area is currently functionally disconnected from the

High Road and surrounding residential development by two railway lines at the north and south that converge in the east.

The Wembley Industrial Estate, located to the east of the stadium, consists of a number of smaller industrial estates of differing ages and

forms. The dominance of heavy industrial uses and the presence of ‘bad neighbour’ activities means that the area has never been well

integrated with the residential, retail and leisure uses that surround it. The area has a poor quality environment with many underused sites and

premises that turn their back on the stadium.

Wembley Town Centre, at its height in the 1960’s is now the product of years of decline, and the gradual loss of major retailers has created a

limited shopping environment. However, recent improvements to the public realm and the approval and build out of a series of large scale

planning applications have added to the climate of change in Wembley. The town centre is now experiencing higher development pressures but

this is often occurring on a piecemeal, ad hoc basis.

Although there are only three major buildings in the area, it is the significance of these buildings at a local, regional and national level, and their

role in the townscape, that has a real impact on the character and future development of the area.

Open space, sports and the natural environment

There is currently a lack of public open space in Wembley; much of the Area Action Plan Area is more than 400m walking distance from its

local open spaces including King Edward VII Park, Sherrens Farm and Brent River Park, whilst nearby Chalkhill open space is separated from

Wembley by the Metropolitan and Jubilee railway lines. Wembley is therefore considered to be deficient in public open space provision.

Sports and Play Facilities

Play facilities are available at King Edward VII and Brent River Park, and the area south of the High Road and Harrow Road is a priority area

for new play provision. Outdoor sports facilities are available at King Edward VII park (tennis, football and bowls) and community use of a new

sports hall, synthetic turf pitch, netball, basketball and tennis courts is available at the Ark Academy school. New Power League 7 a-side and

5-aside football pitches have opened next to Wembley Arena.

Central areas of the borough, including Wembley, lack access to public swimming pool provision. Residents within Wembley live more than 20

minutes’ walk from any type of swimming pool provision. The nearest public indoor sports facility is Bridge Park Community Leisure Centre

which provides sports hall and health and fitness facilities. There are also a couple of private gyms within the Wembley area. A number of

schools make available their sports facilities for community use.

Page 11: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

11

Wildlife Habitats

There is limited wildlife and habitat area within Wembley, which reflects its built-up character. However, the most substantial area of habitat is

the Chiltern railway line embankments which provide a continuous strip of established woodland, and is designated for its nature conservation

value. The embankments are not accessible to the public and much of Wembley is defined as an area of wildlife deficiency. The Wealdstone

Brook and River Brent flow through the AAP area and are part of the London Blue Ribbon Network, which the London Plan seeks to restore

and enhance.

Allotments

In the Wembley area there are allotments available at Cecil Avenue, Lyon Park Avenue and Bovington Avenue, and all waiting lists for the plots

are currently full. Brent’s Open Space Report PPG17 Assessment identifies a standard of one new allotment plot per 200 people. The report

recognises the constraints in providing new allotment plots and that food growing opportunities can be incorporated into new housing

development by providing growing space at roof level.

Social infrastructure

There are currently some vacant community spaces within Wembley, which have arisen because of the recent economic climate. Crescent

House, part of the North West College of London campus, was vacated for redevelopment but funding for the project is no longer available.

Space for a health facility was provided in Quadrant Court. However, there is no longer the NHS funding to take up this space. There are also

smaller community halls within the area which lack sufficient revenue funding to run the facilities, although the redevelopment of the new Civic

Centre will provide a new Library for the area. It is important that any new housing in Wembley meets its social infrastructure requirements.

There are 12 primary schools in the wider Wembley catchment area, including a new primary school in the grounds of Preston Manor High School which opened in September 2011. Population growth with housing development will invariably require further primary school provision. New secondary school places will also be needed, although this has been addressed in part recently by the opening of the new Ark Academy on Bridge Road. With regard to health provision, the borough is well served by two large hospitals, but local treatment centres will be needed in Wembley as the population grows. In recent years the Primary Care Trust have developed expanded health facilities at Chalkhill and Monks Park Clinics, so there is not an immediate need for additional provision. Space for a 1469sqm health facility was provided as part of the development of Quadrant House on Empire way, but this remains vacant. Town centres, shopping, leisure and tourism Wembley Growth Area encompasses two town centres; Wembley town centre to the south western edge of the area and Wembley Park to the

northern end. Wembley and Wembley Park town centres are designated as a Major Centre and a District centre respectively within the adopted

London Plan (2011) and the council’s Core Strategy (2010).

Wembley has seen an increase in convenience stores and a loss in service and comparison stores in recent years. Wembley Park, however,

has a higher level of service uses which reflects its closer proximity to the stadium. Wembley’s increase in convenience stores highlights its role

as fulfilling a local shopping need.

Wembley Town Centre Context

Wembley has approximately 55,300 sq m of retail floorspace, and is the 58th largest centre in London. Its neighbouring town centres of Ealing (128,800 sq m), Harrow (115,800 sq m) Brent Cross (80,400 sq m) are larger in size, with Brent Cross being the closest spatially and most similar in comparative size. Whilst Kilburn is larger than Wembley in terms of its total retail floorspace, at 66,800 sq m, Wembley has a large amount of land available for development, and in the 2009 GLA Town Centre Health Check survey, unimplemented planning permissions accounted for 2.88 hectares – the ninth largest amount of land in London, and only behind Ealing in West London.

Town Centre Health and Hierarchy

In 2003-04, data from the index of the rank of shopping centres in the UK showed that Wembley was a declining centre and has been falling down the UK shopping centre index ranking. In 2003-04 Wembley was ranked in 491st place in the UK shopping index, which represents a fall of more than 200 places from its position in 1995-96. However, since 2005, Wembley’s vacancy rate has been falling; in 2005 Wembley’s vacancy rate was 18.4%, but by 2007 the rate had decreased to 4.7%. Despite the recession, the vacancy rate has marginally decreased from 4.7 % in 2007 to 4.3% in 2009. The council’s adopted Core Strategy seeks to continue reversing its decline, improve its position in the UK shopping index and to increase the amount of floorspace in the centre in line with capacity and growth forecasts. Since 1999, rents have more than doubled in Wembley, up to £70 per sq m in 2009, and there has been a steady increase in rents per sq m despite a slight reduction in 2009.

Convenience and Comparison Floorspace

In a 2009, 17,700 sq m of Wembley town centre's floorspace was for comparison goods, accounting for 26% of total floorspace. Convenience floorspace accounted for only 6,670 sq m (9.8%) whilst 17,430 sq m (25%) was service floorspace.

Catchment Area and Use

Shoppers’ surveys of households in the borough, undertaken in 2003 and 2008, fed into the evidence base for the council’s Retail Need and Capacity Studies. The surveys indicated that shopping was the main reason why people visited Wembley (65%), although Wembley also has the lowest proportion of visitors who do their main food shopping in the centre (34%) compared to other centres within the borough, and only 8% of visitors come to Wembley for eating and drinking. Comparatively, a high proportion of Wembley’s visitors used the centre for their non-food shopping (50%). Most of Wembley’s visitors used supermarkets outside its town centre, including Asda at Wembley Park and Sainsbury’s in Alperton, indicating that Wembley currently lacks a main food store. Indeed, since the survey was taken, two medium sized food stores have opened within the town centre, which includes Tesco (445 sq m) on the north side of Wembley High Road near Wembley Central Station, and the Coop (925 sq m), at Central Square. However, no large “anchor” store is yet provided in the town centre. Drinking uses have remained largely unchanged within Wembley since 2003, with A4 uses remaining at around 3%, although there has been a steady increase in A3 (currently 14%) and A5 uses (currently 5%).

Page 12: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

12

The majority of visitors to Wembley travelled to the centre by bus (38%), the highest proportion using this mode of transport of all Brent centres. Wembley had the highest proportion of visitors travelling to the centre by car in the borough (24%) whilst in comparison, Harlesden and Willesden Green had only 17% and 19% respectively. The most consistent response for how Wembley could be improved related to providing a better quality environment and public realm, and increasing the amount of car parking provided in the centre.

Entertainment, Service and Leisure Facilities

The shopping survey showed that Wembley is not currently meeting the needs of visitors to the area for entertainment, service and leisure facilities. Over half of visitors never visited for cafes and bars, and 42% never visited Wembley to eat out.

Potential for Retail Growth in Wembley

Brent Retail Needs and Capacity Study (2008) reviewed the level of growth that could be accommodated borough-wide across Brent town centres for comparison and convenience goods.

For the comparison goods allocation, it was recommended that 27,000 sq m would be required across Brent town centres up to 2026, to be located in Brent’s two major town centres. However, given that there are no sites available in Kilburn, it is likely that Wembley will be the main area for this growth.

For the convenience goods allocation, the total requirement of 12,500 sq m up to 2026 was considered to be sufficient for at least two new medium sized food stores within the borough as a whole.

Wembley Park Town Centre Context

Wembley Park is a District centre, encompassing units both north and south of Wembley Park underground station. The centre as currently defined does not include the Asda superstore to the north of the centre however now incorporates the Stadium Retail Park in the middle of the centre and the office, educational, and hotel buildings with the adoption of the Core Strategy in 2010 as suggested in the Retail Needs and Capacity Study in 2008.

Comparison and Convenience Floorspace

Wembley Park contains almost 16,400sqm of floorspace, of which 95% (15,600sqm) was in retail (A class) use in 2008. The presence of Asda, Lidl and other smaller grocery stores means that Wembley Park is dominated by convenience goods retail, with over 60% of the total floorspace in the centre used for the sale of convenience goods, amounting to approximately 10,000sqm. The proportion of comparison goods floorspace is small and is boosted by the presence of Curry’s and JD Sports at Stadium Retail Park. In 2008 the centre contained a high proportion of food and drink uses, mostly restaurants, cafes and takeaways (10% of total floorspace) for its size. The council’s UDP seeks to encourage these types of uses in the southern part of Wembley Park centre to serve visitors to events at Wembley Stadium.

There are no development opportunities designated within Wembley Park centre itself, and currently approved applications lie outside the town centre. However, on the edge of the town centre, the Wembley Masterplan 2009 detailed an indicative layout of a new retail street which linked the proposed Wembley Boulevard within the Quintain Stage 1 application and Wembley Park town centre. This also represents a further extension of Wembley town centre as the new boulevard, alongside which consent has been granted for shops and leisure uses, will extend from close to Wembley Stadium station eastwards to engineers Way.

Wembley Park, a District Centre within the council’s Core Strategy and a smaller town centre than, has seen a rise in vacancy rates of around

2.2% between 2003 and 2007, but vacancies have stayed at the same level up to 2009.

Civic, Leisure, Hotel and Conferencing Uses

Brent council’s new Civic Centre is to be located within the heart of the new Wembley, which is to provide some conferencing, civic and leisure

facilities. Other developments will contribute to this offer in Wembley including two schemes which are currently being built, including the new

5* Hilton Hotel, and Shubette House, and new pool has also been approved as part of an application for a mixed use scheme at Dexion House.

The Wembley Stadium also provides conferencing accommodation on non event days.

Whilst conferencing facilities have been a key part of the council’s vision for Wembley, conferencing facilities have been scaled back in recent

years following the loss of the Wembley Conference Centre and associated exhibition space, and the council’s vision for Wembley is to re-

provide these uses in the form of a Convention Centre. Whilst many of the land owners within Wembley do not consider these uses to be overly

profitable, there is some appetite to provide these on a smaller scale, creating an agglomeration of these uses which could collectively meet the

council’s vision for the area.

Residential Accommodation

The area currently has a low level of housing relative to the size of the area, with the main established residential areas confined to Danes

Court and Empire Court in North End Road, flats on the western side of Empire Way, flats in Wembley town centre at Central Square, the

estate south of Montrose crescent and the terraced housing north of Wembley High Road. However, a lot of new housing has been proposed

for Wembley, (some recently completed) which will more than double the level of housing in the area. Over 5,000 residential units have already

been granted planning consent in the Stadium area, and there is scope to accommodate more than double this number. Major schemes have

been built out in the last 3 years at Elm Road, Central Square and close to the Stadium at Forum House, Quadrant Court and Ada Lewis House

providing over 1,000 new residential properties.

Brent Council’s Housing Needs Survey 2005 and the West London Strategic Housing Market Assessment 2010 show a requirement for

affordable homes that outstrips the total housing supply. The high demand for affordable housing is unlikely to change over the lifetime of the

area action plan.

In order to meet current and future demand for housing, the council expects that a significant amount of residential provision will be met within

the Wembley area. The Core Strategy sets minimum targets for the provision of new homes in Wembley at 5,000 from 2007-2016 and 6,500

for 2017 to 2026.

Student Accommodation

The provision of student accommodation is a key issue in Wembley; over the past few years, a number of major planning applications in

Wembley have involved student accommodation and by 2012, 1,095 new student rooms will be completed. Further student accommodation

proposals are in the pipeline and there is a clear demand for student accommodation in the area.

Page 13: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

13

Quintain Estates and Development plc, has recently submitted a planning application for a mixed use development comprising an element of

student accommodation (i.e. some 880 rooms). Dexion House revised application for 661 student bed spaces has been approved. If all the

student accommodation proposals for Wembley are completed, 2,600 student rooms would be available which will be almost 10% of the new

population. Whilst there is some economic impact from this, there could be potential impacts on other resources, such as community facilities.

Energy and Climate Change Adaptation

Within the council’s Core Strategy, residential proposals are required to achieve a minimum rating of Code for Sustainable Homes Level 4,

subject to scheme feasibility. A rating of BREEAM “Excellent” is expected for major non-residential developments. Proposals will be expected

to connect to, provide or contribute towards Combined Heat and Power plant, unless it can be demonstrated that such provision is not

financially feasible as set out in the Core Strategy. Currently schemes coming forward are proposing site-wide CHP solutions. However,

greater efficiencies could be achieved if a wider Wembley network was established. This would need to overcome barriers of connecting

different sites to one another and finding a site for a single energy centre.

Apart from looking at the opportunity of having a decentralised energy network to provide heat to residential, commercial and community units

in Wembley AAP area, there is potential of introducing waste fuel for reducing or eliminating the cost of waste disposal and making Wembley

self-sufficient. Many fuels can be derived from waste, and minimising waste is a key sustainability issue for Wembley.

Climate Change Adaptation

Increasingly it is acknowledged that a certain level of climate change is inevitable and development will need to be built to cope with a changing

climate. Specific issues for Wembley include the legacy of industrial use in the area which led to a lack of green and ‘cool’ spaces. Much of

Wembley is deficient in open space and there are few mature trees.

Business and Industry There have been substantial changes in the nature of businesses operating in Wembley over the last 20 or more years, with a significant

decline in the amount of office space available as office buildings have converted to other uses together with a decline in manufacturing and

other industrial activity. There has been a consequent reduction in office and industrial employment. The retail sector and other services have

not experienced the jobs growth that many other parts of London have so overall employment levels have fallen.

The opening of the new Stadium in 2007 gave a major boost to the local economy, although most new jobs will be delivered by the

regeneration of the area around the Stadium where Quintain Estates and Development’s stage 1 scheme is well underway and is expected to

deliver over 6,000 jobs. More recently permission for further major, mixed use residential and commercial development on the north west lands

at Wembley will provide a further 2,300 jobs.

It is not possible to separately estimate the changes in employment across the industrial area (SIL). However, this is likely to have declined

over the past 20 years or so as industrial activity has reduced and sites have increasingly been given over to open storage and similar uses.

The level of waste management undertaken in the industrial area has also increased and may be reaching a level where it is impacting upon

Wembley’s regeneration prospects; the quality of its environment both visually and in terms of Wembley’s air quality are key concerns.

Access to the industrial area has improved with the opening of the estate access corridor so that businesses in most of the area can benefit from a minimum of interference from events at the Stadium and Arena. However, there remains problems for those operations which are located adjacent to the Stadium or which have direct access from the one way system along Fourth and Fifth Way. Waste & Aggregates There are a number of long-established waste management sites in the Wembley and Neasden industrial estates, and there is substantial

pressure for expansion and intensification of this activity, particularly for the storage and processing of construction waste. The availability of

industrial land, including a high proportion of cleared sites, together with the designation of a Strategic Industrial Location with good access to

the NCR and the rail network, means that the area is attractive to waste and aggregate operators. Permission was granted in 2010 for a major

new transfer and processing facility with rail sidings at Hannah Close, which will have the capacity to deal with up to 1 million tons of a variety

of waste types. There are is also a major aggregate depot at the former coal depot close to the North Circular Road at Great Central Way and

a concrete batching plant adjacent to Wembley Stadium.

Stage 1 of Quintain Estates & Development’s scheme for the redevelopment of its land close to the Stadium includes Envac, an automated

waste collection and disposal system, which is now operational for the first two large residential schemes. It is anticipated that this will be

extended as the area develops.

Issues for the Wembley Area

Sustainability problems and issues for Brent as a whole were identified in the SA Scoping Report for the Development Plan Documents of

Brent’s LDF in June 2005. Most of these remain relevant today, and where they are also relevant to the Wembley Area they are referred to

once again below. These have been supplemented by further issues identified in the period since or those which specifically relate to

Wembley. A list of the more detailed issues and the indicators supporting these is available in Appendix 2, 3 and 4.

Table 1: Key Sustainability Issues for Wembley

Key Issue Explanation

Social

1. Health inequalities and access to health

facilities

Although the PCT may be satisfied that

health facilities are sufficient to meet current

needs, the Plan should ensure that the

needs of the future population are met and

Page 14: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

14

that opportunities for a healthy lifestyle, such

as open space and active recreation facilities

are provided alongside housing development

2. Access to schools Across the wider area a shortfall of school

places has been identified. There is a clear

need to address current shortages as well as

the needs of the new population.

3. Meeting housing need Achieving an appropriate balance of housing

provision is a major issue. The provision of

affordable housing, at 50% of the total new

housing, to meet identified need has been

established. However, the rate of provision

in Wembley has been low to date. There is

also a need for extra care provision in the

borough. An overprovision of student

housing could result in impacts on the

character of the area.

4. High incidence of crime and fear of crime. Wembley Central is identified as a hotspot

for crime within the borough.

Environmental

5. Quality of the built environment Parts of the Wembley area suffer very poor

townscape quality, especially some of the

key gateways and the industrial estate.

6. Pressure on biodiversity and habitats and

lack of green space.

There is limited wildlife and habitat area, and

space for growing food, within Wembley,

reflecting its built-up character. Much of

Wembley is defined as an area of wildlife

deficiency.

7. Provision of facilities for waste

management in the right locations and

promoting recycling

There are a large number of waste operators

in the area which are having an increasingly

harmful impact on the environment. There is

a need to ensure sufficient land is provided

for waste management whilst minimising and

mitigating harmful effects. New development

needs to provide facilities to promote

recycling.

8. Water quality and potential pollution of the

River Brent and Wealdstone Brook

The water quality of the river and brook

should be improved and that new

development or operations do not make

matters worse. The River Brent is classified

as having poor ecological potential and

currently fails chemical quality, whilst the

Wealdstone Brook is classified as having

moderate ecological potential.

9. Flooding and flood risk There is localised flood risk from the

Wealdstone Brook and the River Brent.

Much of Wembley is prone to surface water

flooding, and there is an increased risk of

flooding because of climate change both now

and in the future. This is exacerbated with

pressure from development both close to

and within the floodplain. Thus, increasing

proximity of sensitive uses to watercourses.

The Environment Agency recommends that:

- Development should be restricted within

8 metres of the River Brent and

Wealdstone Brook and Wembley Brook

and within 5 metres of any ordinary

watercourses. This includes both open

and culverted watercourses.

- Development should be strictly limited in

floodplain areas and specifically in the

functional floodplain. Functional

floodplain should be protected and new

Page 15: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

15

areas of floodplain should be created.

10. Quality of and access to public open

spaces, parks and sports facilities

There is a lack of public open space in

Wembley with much of the area more than

400m walking distance from local open

spaces. There is also poor access to sports

facilities, particularly swimming pools. There

is also a need to improve the river corridor –

this will also improve the local environment

and help to improve the quality and access

to open public space.

11. The need to preserve and enhance built

heritage and the historic and

archaeological environment

Although there are only three listed buildings

remain in the area (Wembley Arena, Brent

Town Hall & Ealing Rd. Mosque), their

setting should not be adversely affected by

development. The new Stadium also has an

impact on the character of the area.

12. Energy use, energy efficiency and

climate change adaptation

There is a need to minimise carbon

emissions from new development. Greater

efficiencies in energy use could be achieved

through a Wembley CHP network.

Development will also have to cope with a

changing climate.

13. Poor air quality, particularly along major

roads and close to some

aggregates/waste management sites

Poor air quality is a major problem

associated with the North Circular Road and

the use of some waste management and

aggregate sites. New development should

not worsen air quality locally.

14. Noise and/or vibration from major roads,

railways and the Stadium/Arena

There is a need to have regard to the noise

or vibration generated by activities in the

Wembley area when deciding upon the

spatial distribution of sensitive receptors.

Economic

15. Unemployment and job opportunities for

local people

The reduction in manufacturing and

distribution jobs locally, together with a

declining office sector, means that other

opportunities will have to be promoted if

sufficient, appropriate jobs are to be provided

in Wembley.

16. The need to improve transport

infrastructure in a sustainable way

There is a need for improved access to the

area if the level of development envisaged is

to be brought forward. Improvements to

transport infrastructure should promote

sustainable modes of travel.

17. Reconciling the conflict between uses

such as demand for housing and the

need to protect and expand employment

opportunities

Pressures on land for housing and

associated infrastructure may mean that

there is a need to reconsider established

land use patterns and de-designation of

some protected employment land.

18. The need to manage redevelopment

impacts

In bringing forward much needed

regeneration in Wembley, and realising the

regeneration objectives, it will be important to

ensure the adverse impacts are avoided or

at least mitigated.

19. The need to ensure the vitality and

viability of the town-centres

Wembley in particular has declined as a

town centre over many years and it is

important that regenerative development is

promoted which meets the needs of local

people in a sustainable way by ensuring

good access for the whole community.

Page 16: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

16

3. Sustainability Appraisal Approach Strategic Environmental Assessment European Directive 2001/42/EC requires that a SEA is undertaken on certain plans and programmes which are likely to have significant effects on the environment. Strategic Environmental Assessment is a tool for improving the consideration of the environment in the preparation of plans and programmes and aids in minimising negative impacts whilst optimising positive ones. This report addresses the requirements of SEA, as required under the European Union Directive 2001/42/EC and Sustainability Appraisal and Section 39 of the Planning and Compulsory Purchase Act (2008). Focus of the Sustainability Appraisal The purpose of SA is to promote sustainable development through the plan making process. It is a key tool used to appraise the environmental, economic and social effects of plans, strategies and policies. Section 19 (5a and 5b) of the Planning and Compulsory Act (2004) states that local planning authorities must carry out a sustainability appraisal on all local development documents and prepare a report on the findings of the appraisal. Sustainability appraisal has been designed to incorporate the requirements of the European Directive 2001/42/EC. Whilst SEA purely focuses on environmental issues, sustainability appraisal considers the social, environmental and economic effects of a plan. Guidance on how to undertake sustainability appraisals has been produced by the Planning Advisory Service and the ODPM (now Communities and Local Government) so as to accommodate the requirements of the SEA directive. The published ODPM guidance states that Sustainability Appraisals should:

Take a long-term view of whether and how the area covered by the plan is expected to develop, taking into account of the social, environmental, and economic effects of the proposed plan;

Provide a mechanism for ensuring that sustainability objectives are translated into suitable planning policies;

Reflect global, national, regional and local concerns;

Provide an audit trail of how the plan has been revised to take into account the findings of the sustainability appraisal;

Form an integral part of all stages of plan preparation; and

Incorporate the requirements of the SEA directive. Sustainability Appraisal Process There are five main stages to the SA of a plan. All stages of the sustainability appraisal are outlined in Table 1 alongside how the sustainability process is linked with the process for developing a DPD. Typically, a DPD will take around two years to prepare. This process is split into four stages which are known as pre-production, production, examination and adoption. Table 1 demonstrates that plan preparation and production are directly linked to the sustainability appraisal process. It further shows that sustainability appraisal is an iterative process which ensures that sustainability issues are considered in plan preparation and overall is a useful tool for identifying issues to inform the need for action, revision or replacement in a development plan document. Table 2: The stages, aims and tasks of sustainability appraisal and links with the Development Plan Document process STAGES OF SUSTAINABILITY APPRAISAL LINKS TO THE PROCESS OFCING AE STAGES OF SUSTAINABILITY APPRAISAL LINKS TO THE PROCESS OF

PRODUCING A

DEVELOPMENT PLAN

DOCUMENT

STAGE A: SETTING THE CONTEXT AND SCOPING

Aims to set the context of

the plan area.

Tasks include:

Identifying relevant plans,

programmes and policies

Collecting baseline information

Identifying sustainability issues

Developing the sustainability

framework

Consulting with stakeholders

Stage A of the SA is prepared

alongside the Pre-production

stage of the DPD. Preproduction

of a DPD involves collecting

baseline information about a plan

area.

STAGE B: DEVELOPING AND REFINING OPTIONS AND

ASSESSING EFFECTS

Aims to ensure that the plan

objectives are in accordance

with sustainability principles

and assists in refining plan

options by identifying and

predicting sustainability

affects objectives.

Tasks include:

Testing the plan objectives

against the SA Framework

Carrying out an appraisal of

emerging issues and options

Predicting and mitigating the

effects of the plan.

Proposing measures to monitor

the effects of the DPD

Stage B of the SA is prepared

alongside the Production stage of

the DPD. Stage B of the SA is

undertaken in the early stages of

plan production when issues and

options for the development plan

are prepared.

STAGE C: PREPARING THE SA REPORT

Aims to provide a detailed

account of the SA process

including the findings of SA

and how it influenced the

development of the plan

Tasks include:

Preparing the SA report

Stage C of the SA is prepared

alongside the Production stage of

the DPD.

Page 17: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

17

STAGE D: CONSULTATION ON THE SA REPORT AND

PREFERRED OPTIONS

Aims to provide all

stakeholders with an

opportunity to express views

on the SA report. The

purpose of this stage also

allows more information to

be gathered from

stakeholders and ensures

that significant changes to

the plan are assessed for

their sustainability

implications

Tasks include:

Consulting on the SA report

alongside the plan -D1

Appraising significant changes

to the plan - D2(i)

Appraising significant changes

resulting from representations –

D2(ii)

Making decisions and providing

information – D3

Stage D, tasks D1 and D2(i) of

the SA are prepared alongside

the Production stage of the

DPD. Task D2(ii) is undertaken

alongside the Examination of the

DPD and Task D3 is undertaken

along the ‘adoption and

monitoring’ stage of DPD

production.

STAGE E: ADOPTION AND MONITORING THE EFFECTS OF

THE PLAN

The purpose of this stage is

to measure the sustainability

performance of the plan and

identify adverse affects in

order to inform future

revisions to the plan.

Tasks include:

Finalising aims and methods for

monitoring

Responding to adverse effects

Stage E of the SA is undertaken

alongside the adoption and

monitoring stage of the DPD

process.

The first stage of the SA has been carried out, and Wembley Area Action Plan Scoping Report is available on the council’s LDF pages at www.brent.gov.uk/ldf. A consultation on the document was held for five weeks from 21st July 2011 – 29th August 2011, and the council’s response to all representations is in Appendix 5 of the Scoping Report.

The Wembley Area Action Plan Interim Sustainability Appraisal Issues and Options Report represents stage B of the SA process and provides the reporting framework for the analysis of the Wembley Area Action Plan at the Draft Plan stage alongside the submission stage of the DPD. This document is available on the council’s LDF pages, www.brent.gov.uk/ldf. The Wembley Area Action Plan Interim Sustainability Appraisal Preferred Options represents stage C of the SA process. Stage D the consultation on this report and Wembley Area Action Plan Preferred Options was undertaken between 13 August and 8 October 2012. The table below highlights the requirements of the SA Report, and provides commentary on the location of each requirement within this SA

report.

Table 3: SEA Directive requirements checklist

Environmental Report requirements Section of this

report

a) An outline of the contents, main objectives of the plan or programme and relationship with other relevant plans and programmes; Section 1

b) the relevant aspects of the current state of the environment and the likely evolution thereof without implementation of the plan

or programme;

Section 2;

Appendix 4

c) the environmental characteristics of areas likely to be significantly affected; Section 2;

Appendix 4

d) any existing environmental problems which are relevant to the plan or programme including, in particular, those relating to any

areas of a particular environmental importance, such as areas designated pursuant to Directives 79/409/EEC and 92/43/EEC;

Section 5;

Appendix 1;

Appendix 4

e) the environmental protection objectives, established at international, Community or Member State level, which are relevant to

the plan or programme and the way those objectives and any environmental considerations have been taken into account during

its preparation;

Appendix 1

f) the likely significant effects on the environment, including on issues such as biodiversity, population, human health, fauna, flora,

soil, water, air, climatic factors, material assets, cultural heritage including architectural and archaeological heritage, landscape

and the interrelationship between the above factors;

Sections 5 and 6

g) the measures envisaged to prevent, reduce and as fully as possible offset any significant adverse effects on the environment of

implementing the plan or programme;

Sections 5 and 6

h) an outline of the reasons for selecting the alternatives dealt with, and a description of how the assessment was undertaken

including any difficulties (such as technical deficiencies or lack of know-how) encountered in compiling the required information;

Sections 4 and 5;

Appendix 6

i) a description of the measures envisaged concerning monitoring in accordance with Article 10; Section 7 and

Appendix 3

j) a non-technical summary of the information provided under the above headings. Non-Technical

Summary section

Page 18: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

18

4. Sustainability Appraisal Methodology Stage B Tasks There are several tasks that need to be carried out within Stage B of the process and which are detailed below.

Compatibility of the Sustainability Appraisal Objectives It is also worth noting that the Core Strategy and Site Specific Allocations Sustainability Appraisal assessed the compatibility of the Sustainability Objectives with one another; therefore, it is considered that this is not required for the Wembley Area Action Plan Sustainability Appraisal. For further information, please see the Sustainability Appraisal web page for the Core Strategy and Site Specific Allocations Development Plan documents: http://www.brent.gov.uk/tps.nsf/Planning%20policy/LBB-121 (N.B. Although an extra criteria has been added to the Environmental Criteria (EN10) on Flood Risk, this builds upon existing criteria therefore is not considered to be contrary to any existing Sustainability Appraisal Objective). Assessing Options This stage of the SA process involves assessing the options against the SA framework – essentially the SA objectives (see Table 5). This reflects the Guidance which states that “the options need to be compared with each other and with the current social, environmental and economic characteristics of the area which is subject to the DPD and the likely future situation without a DPD. In doing so they need to be tested against the SA framework”. This was carried out using the following framework: Table 4: Appraisal Scoring System

Score Potential Impact

++ Significant positive impact

+ Positive impact

0 Neutral impact

- Negative impact

-- Significant negative impact

? No significant effect / no clear link

The impacts of the options on each objective were defined as having a significant positive impact; moderate positive impact; moderate negative impact; significant negative impact; uncertain or not significant / no clear link (see Table 4 above). A summary was included for each set of options, which highlighted which options caused the most sustainable/least adverse impact, and those which the impact was mixed or unknown, see Chapter 5 - Analysis of the Options in the Wembley Area Action Plan Draft Version Report (September 2011). The full assessments for the issues and options are in Appendix 1, along with a discussion of the policy options and any particular issues that arose through the assessment process. Assessment of the Preferred Options The policies in the Wembley Area Acton Plan Preferred Options have been appraised and the SA matrices are available in Appendix 5. Table 6 indicates what options have been taken forward and the options chosen at the Preferred Options stage are highlighted in blue in the options column of the SA matrix. Options which were not included at the Issues and Options stage and were therefore not appraised, have been subjected to the full SA appraisal and the matrices for these options are contained in Appendix 6 The Wembley Area Action Plan Preferred Options includes site proposals which have not been previously appraised, these are located in Appendix 7 where they have been appraised against the sustainability objectives, using the same scoring system used to appraise the policies to ensure consistency. A commentary on the appraisal of the sites has been included in this report in section 5 below.

Mitigation and Implementation of the Policies The preferred policies, throughout the assessment process, will have mitigation proposed against any impacts if deemed necessary. A monitoring framework has already been established, see Appendix 3 of the Wembley Area Action Plan Interim Sustainability Appraisal Issues & Options Draft Version Report (September 2011). The monitoring framework set out in Appendix 3 includes appropriate indicators for the effective monitoring of the plan to ensure that policies are being adequately used within the borough as well as ensuring that the policies are driving the area towards sustainable development.

Page 19: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

19

5. Analysis of the Preferred Options In Chapter 5: Analysis of the Wembley Area Action Plan Interim Sustainability Appraisal Issues & Options Draft Version Report (September 2011) the different options were considered and appraised against the SA objectives set out below: Table 5: The Sustainability Appraisal Objectives

Objective Criteria

Social

Prosperity and Social Inclusion

S1. To reduce poverty and social exclusion

Will it reduce poverty and social exclusion locally?

Will it improve affordability of essential services?

Will it contribute to promoting a low carbon and energy efficient

economy?

Health

S2. To improve the health and wellbeing of the population

Will it improve access to high quality health facilities?

Will it encourage healthy lifestyles and provide opportunities for sport and

recreation?

Will it reduce health inequalities?

Will it reduce death rates?

Education and Skills

S3. To improve the education and skills of the population

Will it improve qualifications and skills of the population?

Will it improve access to high quality educational facilities?

Will it help fill key skill gaps?

Housing

S4. To provide everybody with the opportunity to live in a decent home

Will it increase access to good quality and affordable housing?

Will it encourage mixed use and range of housing tenure?

Will it reduce the number of unfit homes?

Will it reduce homelessness?

Quality of surroundings

S5. To provide everybody with good quality surroundings

Will it improve the satisfaction of people with their neighbourhoods as

places to live; encouraging ‘ownership’?

Will it improve residential amenity and sense of place?

Will it reduce actual noise levels?

Will it reduce noise concerns?

Crime Prevention and & Community Safety

S6. To reduce crime and anti-social activity

Will it reduce actual levels of crime?

Will it reduce the fear of crime?

Community Identity

S7. To encourage a sense of community; identity and welfare

Will it encourage engagement in community activities?

Will it foster a sense of pride in area?

Will it increase the ability of people to influence decisions?

Will it improve ethnic relations?

Will it encourage communications between different communities in order

to improve understanding of different needs and concerns?

Will it encourage people to respect and value their contribution to society?

Will it increase the cultural and artistic offering in Wembley?

Accessibility

S8. To improve accessibility to key services especially for those most in need

Will it improve accessibility to key local services?

Will it improve the level of investment in key community services?

Will it make access easier for those without access to a car?

Environmental

Traffic

EN1. To reduce the effect of traffic on the environment

Will it reduce traffic volumes?

Will it increase the proportion of journeys using modes other than the car?

Will it encourage walking or cycling?

Water Quality & Resources Will it improve the quality of inland water?

Page 20: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

20

Objective Criteria

EN2. To improve water quality; conserve water resources and provide for sustainable sources of water supply

Will it reduce water consumption?

Air Quality

EN3. To improve air quality

Will it improve air quality?

Will it help achieve the objectives of the Air Quality Management Plan?

Will it reduce emissions of key pollutants?

Biodiversity

EN4. To conserve and enhance biodiversity

Will it conserve and enhance habitats of borough or local importance and

create habitats in areas of deficiency?

Will it conserve and enhance species diversity; and in particular avoid harm

to protected species?

Will it maintain and enhance sites designated for their nature conservation

interest?

Will it maintain and enhance woodland cover and management?

Will it encourage protection of, and increase the number of, trees?

Landscape & Townscape

EN5. To maintain and enhance the character and quality of landscapes and townscapes

Will it improve the landscape and ecological quality and character of open

spaces?

Will it enhance the quality of areas in need of townscape and public realm

enhancements?

Will it minimise visual intrusion and protect views?

Historic Environment & Cultural Assets

EN6. To conserve and where appropriate enhance the historic environment and cultural assets

Will it protect and enhance Conservation Areas and other sites; features

and areas of historical and cultural value?

Will it protect listed buildings?

Will it help preserve and record archaeological features?

Climate Change

EN7. To reduce contributions to climate change and reduce vulnerability to climate change

Will it reduce emissions of greenhouse gases by reducing energy

consumption?

Will it lead to an increased proportion of energy needs being met from

renewable sources?

Will it adapt to future changes in the climate?

Waste Management

EN8. To minimise the production of waste and promote its use as a resource

Will it lead to reduced consumption of materials and resources?

Will it reduce household waste?

Will it increase waste recovery and recycling?

Will it reduce waste in the construction industry?

Land and Soil

EN9. To conserve and enhance land quality and soil resources

Will it minimise development on greenfield sites?

Will it ensure that, where possible; new development occurs on derelict;

vacant and underused previously developed land and buildings?

Will it ensure land is remediated as appropriate?

Flood Risk

EN10. To reduce the likelihood and impact of flood risk from development and climate change

Will it reduce the risk of damage to property from storm events?

Will it minimise the risk of flooding from rivers and watercourses to people

and property?

Will it reduce the risk of flooding from all sources flooding to people and

property?

Will it encourage restoration and/ or deculverting of a watercourse?

Will it encourage the creation of new functional floodplain or set back of

development from the watercourse?

Will it encourage the use of Sustainable Urban Drainage Systems (SUDS)

which offer flood risk, water quality and aesthetic benefits in line with the

drainage hierarchy set out in the Mayor’s London Plan?

Will the redevelopment of sites/ retrofits mitigate the urban heat island

effect and reduce surface water flooding through the inclusion of SUDS/

soft landscaping/ open space?

Page 21: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

21

Objective Criteria

Growth

EC1. To encourage sustainable economic growth

Will it encourage new business start-ups and opportunities for local

people?

Will it improve business development and enhance productivity?

Will it improve the resilience of business and the local economy?

Will it promote growth in key sectors?

Will it promote growth in key clusters?

Will it enhance the image of the area as a business location?

Will it contribute to the creation of a low carbon economy?

Employment

EC2. To offer everybody the opportunity for rewarding and satisfying employment

Will it reduce short and long-term local unemployment?

Will it provide job opportunities for those most in need of employment?

Will it help to improve earnings?

Regeneration

EC3. To reduce disparities in economic performance and promote sustainable regeneration

Will it promote regeneration; reducing disparity with surrounding areas?

Investment

EC4. To encourage and accommodate both indigenous and inward investment

Will it encourage indigenous business?

Will it encourage inward investment?

Will it make land and property available for business development?

Efficient Movement

EC5. To encourage efficient patterns of movement in support of economic growth

Will it reduce commuting?

Will it improve accessibility to work by public transport; walking and

cycling?

Will it reduce journey times between key employment areas and key

transport interchanges?

Will it facilitate efficiency in freight distribution?

The preferred options have been subject to further assessment and the site proposals have been appraised against each SA objective; see Appendix 7 for the full site appraisals. The appraisal was a qualitative exercise based on professional judgement on the part of the Planning Policy staff within Brent council, with an independent review by two of Brent’s Environmental Policy Team, taking into account the information gathered in the Scoping Report and the background information set out in the draft Issues and Options Report for the Wembley Area Action Plan. The completed appraisal matrices for the Issues and Options are set out in Appendix 5 and the options chosen at the Preferred Options stage are highlighted in blue in the options column of the SA matrix. The options taken forward into the Preferred Policies is set out in Table 6 and comments have been provided where more than one option has been taken forward. In addition, more information about why the alternative options haven’t been taken forward is in the Wembley Area Action Plan Preferred Options document, and this information is detailed in the green box which contains information as to why alternative options have not been chosen. The table below shows which options have been carried forward into the preferred policy for Wembley AAP and comments have been included where more than one option has been taken forward. The following preferred policies; WEM 6, WEM 15, WEM 35 and WEM 40 were not appraised in the previous SA report and have been fully appraised, in Appendix 6. Table 6: Options Taken Forward into the Preferred Options Document

Theme Preferred Policy Issues & Options Taken Forward

Comments/Justification

Urb

an

De

sig

n &

Pla

ce M

akin

g

WEM 1 Character and Urban Form

UD1.2

WEM 2 Gateways to Wembley

UD2.1 UD2.2

The justification for using both of the options from the I & O paper was that they were not considered to be mutually exclusive. Therefore in order to have the maximum possible benefit to the Wembley area it was considered preferable to remain focussed on the three stations as key gateways, whilst also seeking to enhance a number of other gateways/nodes.

WEM 3 Public Realm UD6.2

WEM 4 Public Art UD5.2

WEM 5 Tall Buildings UD3.1

WEM 6 Protection of Stadium Views

N/A Part of the evidence base for this document was the production of a Strategy for Tall Buildings. A key element of this study identified the protection of a number of key views of the Stadium, therefore it was considered necessary to include this in addition to other policy on tall buildings. Further details setting out the context of these preferred options is contained in paragraphs 4.63 to 4.67 in the Wembley AAP. The policy has been appraised in Appendix 6.

WEM 7 Character of Olympic Way

UD4.2

Page 22: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

22

WEM 8 Securing Design Quality

UD7.1 B

usin

es

s, In

du

str

y &

Wa

ste

Proposals Map BIW1.3 De-designation of SIL adjacent to key sites will be reduced slightly and this is shown in the extract of the Proposals Map.

WEM 9 Wembley Stadium Business Park

BIW3.2

WEM 10 Offices BIW4.2

WEM 11 Low-cost Business Start-up Space

BIW4.1

WEM 12 Protected Rail Sidings

N/A Need for policy designating protected sidings is a strategic requirement flagged up in the Core Strategy.

Tra

ns

po

rt

WEM 13 Road and Junction Improvements to Stadium Access Corridor and Western Access Corridor

TS2.2 TS2.3 TS2.4 TS2.6

The preferred policy for highways for the area seeks to balance provision for different users along different routes; this follows government guidance, NPPF and is supported by the outcomes of further highway studies undertaken by the Council

WEM 14 Western Highway Corridor

TS2.5 TS2.7

This builds on the findings of the Strategic Corridor Study for Brent Cross – Wembley, and the series of junction improvements along Wembley Hill Road corridor.

WEM 15 Car Parking Strategy

N/A This preferred policy… Further details setting out the context of this preferred policy is contained in paragraphs 6.18 to 6.23 in the Wembley AAP. The policy has been appraised in Appendix 6.

WEM 16 Car Parking Standards

TS3.3 TS3.4

The current parking standards within the UDP (2004) have been updated using evidence from an independent consultant’s study, which suggested changes to balance development viability with a need to achieve a modal shift away from the car in Wembley.

WEM 17 Walking and Cycling

TS5.1 TS5.2 TS5.4 TS5.5 TS5.6

This policy has been developed using evidence drawn from additional consultants study work examining pedestrian and cycle links across the railway.

WEM 18 Event Related Transport

TS6.1 TS6.2 TS6.3 TS6.4

Rather than specify particular locations, this policy specified criteria for proposing coach parking locations using guidance from a consultants study.

Ho

us

ing

WEM 19 Affordable Rent H1.2 H1.3

Introducing new Affordable Rent as part of the housing mix in Wembley will help maintain a new supply of affordable housing in Wembley in the short to medium term. At the same time the Council will require that affordable rented housing meet the needs of households eligible for social housing at a cost low enough for them to afford determined with regard to local incomes and local house prices.

WEM 20 Housing Mix H2.1 H2.3

The current Wembley housing mix is considered appropriate to meet the wide range of household needs in the borough. At the same time flexibility has been allowed to introduce different and less affordable housing tenures such as discounted market sales products, as well as opportunities to deliver new private rented sector accommodation.

WEM 21 Family Housing H3.1 H3.2

In order to deliver 25% larger family homes in the Wembley area some sites more suitable for larger family housing will need to deliver a higher proportion of family housing, and be designated as such, to counterbalance denser town centre developments less suitable for larger family housing.

WEM 22 Extra Care Housing

H4.2

WEM 23 Supported Housing

H5.1 H5.2 H5.3

Together these policies seek to encourage the development of supported housing and wheelchair housing in the Wembley area.

WEM 24 Private Rented Sector

H6.2

WEM 25 Student Accommodation

H7.2 H7.3

*H8 not selected

To

wn

Cen

tre

s, S

ho

pp

ing

Leis

ure

& T

ou

rism

WEM 26 New Retail, leisure and office development

TC1.2 TC2.1 TC3.2

Appropriate to define the town centre for the continuous area where existing town centre and planning consents for town centre uses granted. At the same time a restriction on the location of large foodstores has also been applied to promote regeneration of the existing town centre.

WEM 27 Leisure, Tourism and Cultural Uses

TC4.1 Important to promote major leisure, tourism and cultural uses which, east of the stadium, can act as a buffer to between the new regeneration area and the industrial estate.

WEM 28 Hot Food Takeaways (A5 Uses)

TC5.3 Public consultation has identified substantial support for controlling fast food takeaways because of health impacts.

WEM 29 Conferencing Facilities

TC6.2 Policy to promote conferencing in Wembley in line with the Council’s adopted vision.

WEM 30 Temporary Creative Uses

TC7.2 Policy required because of a need to make the best use of existing vacant land / property.

Page 23: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

23

So

cia

l In

fra

str

uc

ture

WEM 31 Community Facilities

SI1.1&2 SI3.1a & SI3.1b SI4.1

It is now considered that a more pragmatic approach to the provision of health facilities in the area is needed rather than the options proposed and that the best option for meeting demand late in the plan period will be assessed closer to that time.

Re

sp

on

se

to

Clim

ate

Ch

an

ge

WEM 32 Decentralised Energy

CC2.1 CC2.4

It is undesirable to build on, and expand, capacity of the Civic Centre

CHP where the plant room is too small. However the Civic Centre is

future proofed that can be connected to a decentralised energy system.

WEM 33 Energy from Waste

CC3.3 CC4.2

Without policy intervention, residual waste would be transported outside

the area to landfill, which is not sustainable. There would be no joint

action between heat suppliers and heat users either. The Brent Energy

from Waste study suggests other energy from waste technologies should

be considered in Wembley apart from anaerobic digestion. The new

policy could encourage investments in suitable locations for waste fuel

industries subject to the scale and constraints.

WEM 34 Urban Greening CC6.4

WEM 35 Flood Risk CC6.3

Op

en

Sp

ace,

Sp

ort

s &

Wild

life

WEM 36 Open Space Provision

OS1.2

WEM 37 Open Space Improvements

OS2.1 OS2.2 OS2.3 OS2.4

These options for open space improvements are considered to be deliverable and have been taken forward into the preferred option.

WEM 38 Food Growing OS3.1 OS3.4

These options have been taken forward due to their deliverability by providing growing space next to demand and using vacant spaces for temporary food growing.

WEM 39 Sports Facilities OS4.1 OS4.2

Both options have been taken forward as they are considered deliverable by using development contributions for sports facilities improvements and making school sports facilities available to use out of school hours.

WEM 40 Play Provision N/A Neither options in OS5 Issues and Options document have been taken forward, due to accessibility and deliverability issues for more detail see paragraphs 11.13 to 11.14 in the Wembley AAP. Instead the standards set out in the policy are in line with the Mayor of London’s Providing for Children and Young People’s Play & Informal Recreation SPG Plan. The policy has been appraised in Appendix 6.

WEM 41 Access to Nature OS6.1 OS6.5

These options have been taken forward as creating access to the northern side of the Chiltern railway line could be achieved as part of a development scheme and development proposals can be required to provide wildlife enhancements.

WEM 42 Wealdstone Brook and River Brent

OS6.2

The purpose of this assessment is to ensure that there are no significant cumulative effects on the SA objectives from the preferred option

policies in the Wembley APP.

Objective S1 (to reduce poverty and social exclusion) has a mixed neutral positive impact on the preferred options with some positive impacts

on the town centres, shopping, leisure & tourism policies and open space, sports & wildlife policies. The majority of the positive impacts occur

against the housing policies, for example, policies WEM 19 Affordable Rent, WEM 20 Housing Mix, WEM 21 Family Housing, WEM 22 Extra

Care Housing, WEM 23 Supported Housing and the social infrastructure policy, WEM 31 Community Facilities. However there is a negative

impact on policy WEM 25 Student Accommodation which allows for student accommodation to be where major mixed use development occurs.

The policy includes a cap stating that student accommodation developments will not be allowed once the total number of approved student

bedrooms exceeds 20% of the projected increase in population in the Wembley Growth Area.

Objective S2 (to improve health and wellbeing of the population) has no negative impacts upon the policies and has a mixed neutral and

positive impact. There are positive impacts for housing policies WEM 19, WEM 20, WEM 21, WEM 22 and WEM 23, transport policies WEM 16

Car Parking Standards, WEM 17 Walking and Cycling and WEM 18 Event Related Transport. Objective S2 has a positive impact on all of the

open space, sports & wildlife policies. There is a significant positive effect on policy WEM 40 Play Facilities which requires major housing

development to provide children’s play space in line with London Plan standards. It has a significant positive impact on policy WEM 38 Food

Growing. This policy will have significant health benefits by increasing access to fresh fruit and vegetables and WEM 39 Sports Facilities, by

increasing the provision of sports facilities it will have health and social benefits and wider regeneration benefits.

Objective S3 (to improve the education and skills of the population) has a both neutral and positive impact, with a positive impact on policies

WEM 11 Low Cost Business Start Up Space, WEM 10 Offices, WEM 30 Temporary Creative Uses and policy WEM 38 in Open space, sports

& wildlife. There is a significant positive impact on social infrastructure policies WEM 31 Community Facilities which will secure at least four

forms of entry at primary level to be secured on development sites within the Wembley area. Objective S3 has no negative impacts on any of

the policies in Wembley AAP.

Page 24: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

24

Objective S4 (to provide everybody with the opportunity to live in a decent home) does not have a negative impact on any of the policies in

Wembley AAP. It does have a positive impact on policies WEM 1 Character and Urban Form which seeks to reinforce and emphasise the

distinctive character of each locality and WEM 2 Gateways to Wembley to focus on the three stations as the principle gateways and the

enhancement of nodes around the key junctions. Objective S4 has a positive impact on all of the housing policies and policies WEM 10 and

WEM 11 in the Business, Industry & Waster chapter.

Objective S5 (to provide everybody with good quality surroundings) has no negative impacts on the policies in Wembley AAP. Although there is

mixed positive and negative impact on policy WEM 13 Road and Junction Improvements to Stadium Access Corridor and Western Access

Corridor as improved road access is likely to generate more traffic in the area. Objective S5 has a mixed impact on WEM 42 River Brent and

Wealdstone Brook because the impact depends on the extent of development and mitigation measures proposed. However, policy WEM 42

states that development proposals which are adjacent to the Wealdstone Brook and the River Brent should undertake opportunities to provide

amenity space, provide public access and have regards to its natural setting. Objective S5 has a very positive impact upon the Urban design

and place shaping policies, in particular WEM 3 Public Realm because a public realm strategy will improve the quality of Wembley and help

foster a sense of pride and policy WEM 8 Securing Design Quality as higher quality design will improve the quality of the Wembley area.

Objective S5 has a potential positive impact on policy WEM 5 Tall Buildings because a tall buildings strategy could be considered to be

restrictive however it’s felt that having a tall buildings strategy in place will provide greater certainty on the appropriate scale of development

within Wembley. There is also a potential positive impact on policy WEM 7 Character of Olympic Way which requires proposed development to

be carefully designed and scaled to respect the predominance of Wembley Stadium and its arch. It continues to use the Masterplan as

guidance for development because if planning permissions are not implemented then its detailed guidance is still relevant. Policy WEM 4 Public

Art has a negative impact because it was considered that without a pro-active public art strategy that improvements might not happen. However

this option has been chosen because it is considered that there is sufficient detail contained within the Wembley Masterplan.

Overall Objective S6 (to reduce crime and anti-social activity) has a neutral impact on the majority of the policies. It does have a positive impact

on policy WEM 3 Public Realm as improvements will be sought that reflect the local character as an integral element of proposals for new

development. A public realm strategy will help foster a sense of pride in the Wembley area. However objective S6 has a negative impact upon

policy WEM 4 Public Art impact because it was considered that without a pro-active public art strategy that improvements might not happen.

However this option has been chosen because it is considered that there is sufficient detail contained within the Wembley Masterplan.

Objective S6 has a potential negative impact on WEM 37 Open Space Improvements which supports the provision of a new pedestrian bridge

across the Metropolitan, Jubilee and Chiltern railway lines to link to Chalkhill Open Space at St David’s Close. A new pedestrian bridge will

have significant positive benefits as it will improve accessibility by linking the Green Chain to Chalkhill open space, enabling walking and

cycling with the associated health benefits and these multiple positive benefits outweigh the potential negative impact of fear of crime.

Objective S7 (to encourage a sense of community; identity and welfare) has a neutral impact on all of the housing policies and it has a positive

impact on a range policies in the Urban design and place shaping, Business, Industry and Waste and Transport chapters. Objective S7 has a

negative impact upon policy WEM 4 Public Art which seeks contributions towards public art from development because it was considered that

without a pro-active public art strategy that improvements might not happen. However this option has been chosen because it is considered

that there is sufficient detail contained within the Wembley Masterplan to bring forward public art. However there are significant positives for

policy WEM 31 Community Facilities on community engagement and identity as the policy supports the provision of community facilities in the

Wembley area for religious and cultural uses. Objective S7 has a positive impact on all of the open space, sports and wildlife policies.

Objective S8 (to improve accessibility to key services especially for those most in need) does not have any negative impacts on the policies in

Wembley AAP. The SA objective S8 has a neutral impact on all of the housing policies in Wembley AAP. Objective S8 has a neutral and

unknown impact on policy WEM 2 Gateways to Wembley as the policy seeks the enhancement of nodes around key junctions however S8 also

has a positive impact on the policy because it focuses on the three stations which encourages a modal shift away from reliance on the car.

Objective S8 has positive impact on policy WEM 10 which allows reuse of redundant offices for appropriate alternative uses. Positive impacts

for transport policy WEM 17 which provide better provision for pedestrian and cycle bridges and policy WEM 30 Temporary Creative Uses in

the town centres, leisure and tourism. There is a significant positive impact on policy WEM 31 Community Facilities due to the provision of a

new school and community facilities. Objective S8 has significant positive impacts on policies WEM 37 Open Space Improvements and WEM

39 Sports Facilities.

Objective EN1 (to reduce the effect of traffic on the environment) has a negative impact on policy WEM 1 Character and Urban Form, WEM 9

Wembley Stadium Business Park. It has a negative impact on policy WEM 13 Road and Junction Improvements to Stadium Access Corridor

and Western Access Corridor as improved road access is likely to generate more traffic with consequential effects on the environment. Policy

WEM 14 Western Highway Corridor is likely to lead to increased traffic levels and policy WEM 31 Community Facilities may have a similar

effect. Objective EN1 has a positive impact on policies WEM 2 Gateways to Wembley, WEM 16 Car Parking Standards as any car free

development will have very positive effect in terms of environmental impacts, WEM 17 Walking and Cycling seeks to implement pedestrian only

streets which would provide an environment free of traffic. There are positive impacts on the open space, sports and wildlife policies WEM 37

Open Space Improvements, WEM 38 Food Growing, WEM 42 River Brent and Wealdstone Brook. Objective EN1 has a neutral impact on all of

the housing and climate change policies.

Objective EN2 (to improve water quality; conserve water resources and provide for sustainable sources of water supply) has a neutral effect on

the majority of the policies in Wembley AAP. Objective EN2 has a negative impact on policy WEM 34 Urban Greening because no local target

for increasing green cover has been taken forward however this is because setting a local target would be too prescriptive and development

proposals do need to include measures to tackle overheating and flood risk. On the other hand objective EN2 has a significant positive effect

on policy WEM 35 Flood Risk as it includes the requirement for major proposals to apply SUDS and this will help improve water quality and

sustainable sources of water supply.

Objective EN3 (to improve air quality) has a positive effect on the following policies; WEM 3, WEM 9, WEM 35, WEM 36, WEM 37, WEM 38,

and WEM 42. Objective EN3 has a negative impact on policies WEM 13 Road and Junction Improvements to Stadium Access Corridor and

Western Access Corridor as improved road access to the area is likely to generate more traffic with knock on effects on the environment and a

new road connection from North End Road to Bridge Road is likely to lead to more traffic levels. Objective EN3 has a negative impact upon

policy WEM 14 Western Highway Corridor but on the other hand these junction improvements will improve access to public transport,

pedestrians and cyclists. Objective EN3 has a positive impact on transport policies; WEM 15 Car Parking Strategy and WEM 17 Walking and

Cycling and WEM 18 Event Related Transport. Objective EN3 has an mixed positive and negative unknown impact on WEM 16 Car Parking

Page 25: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

25

Standards as the council seeks a balance between the London Plan standards, the existing Borough standards and the need to ensure new

development is served adequately in keeping with the regeneration initiatives for the Wembley Growth Area. Policy WEM 16 also has a positive

effect because the council will promote car free development. Objective EN3 has a negative impact on policies WEM 32 Decentralised Energy

as a large combined heat and power plant is likely to have a negative impact upon air quality and it has a significant negative on climate

change policy WEM 33 Energy from Waste as there would be a cumulative impact on air quality related to energy from waste and associated

waste management. Yet at a global scale there will be positive impact on air quality as waste used to close to its source will reduce emissions

associated with transportation.

Objective EN4 (to conserve and enhance biodiversity) has a mainly neutral impact on the policies in the Wembley AAP. It does have a positive

impact on policy WEM 35 Flood Risk and the majority of the policies in Open space, sports and wildlife chapter. Objective EN4 has a negative

impact on policy WEM 34 Urban Greening because not including a local target for increasing green cover would lead to an increase in green

cover not being achieved. However this is the preferred option because setting a local target would be too prescriptive and development

proposals are required to include measures to tackle overheating and flood risk. There is a significant positive impact on policy WEM 41

Access to Nature as the council will require new development proposals to include wildlife enhancements.

Objective EN5 (to maintain and enhance the character and quality of landscapes and townscapes) has a positive impact on a number of

policies contained in Urban design and place making, Town centres, shopping, leisure and tourism and Open space, sports and wildlife

chapters. Apart from Urban design and place shaping policy WEM 4 Public Art where there is a negative impact because it is considered that

without a pro-active public art strategy that improvements are less likely to happen. However this option has been chosen because it is

considered that there is sufficient detail contained within the Wembley Masterplan to bring forward public art.

Objective EN6 (to conserve and where appropriate enhance the historic environment and cultural assets) has neutral impact on the majority of

the policies in Wembley AAP. Objective EN6 has a positive impact on the policies in the Urban design and place shaping chapter but a

negative impact upon policy WEM 4 Public Art impact because it was considered that without a pro-active public art strategy that improvements

are less likely to happen. However this option has been chosen because it is considered that there is sufficient detail contained within the

Wembley Masterplan to bring forward public art.

Objective EN7 (to reduce contributions to climate change and reduce vulnerability to climate change) has a negative impact on the de-

designation of SIL, the reduction in land for industry, warehousing and closely related uses but this will bring forward sites for mixed use

development or sensitive uses. It is worth noting that this option has been taken forward and is shown on the Proposals Map extract in the

Wembley APP rather than in a policy in the Business, industry and waste chapter. Objective EN7 also has negative impacts on transport

policies WEM 13 Road and Junction Improvements to Stadium Access Corridor and Western Access Corridor and WEM 14 Western Highway

Corridor as better road access will have a negative impact on the environment and is likely to lead to an increase in traffic levels. However it

has a positive impact on transport policies WEM 15 Car Parking Strategy and WEM 17 Walking and Cycling. Objective EN7 has mainly positive

impacts on the policies in the Open space, sports and wildlife chapter. Although there is a significant negative impact on policy WEM 34 Urban

Greening and this is due to a local target for increasing green cover would lead to an increase in green cover. However this is the preferred

option because setting a local target would be too prescriptive and development proposals do need to include measures to tackle overheating

and flood risk.

Objective EN8 (to minimise the production of waste and promote its use as a resource) has neutral impact on the majority of the policies in

Wembley AAP. It does have a significant positive impact on the climate change policy WEM 33 Energy from Waste as this will reuse waste and

use it as a resource and a positive impact on open space, sports and wildlife policy WEM 38 Food Growing.

Objective EN9 (to conserve and enhance land quality and soil resources) has a neutral impact on most of the policies in the Wembley AAP.

Objective EN9 has a positive impacts in the Open space, sports and wildlife chapter on policy WEM 38 Food Growing which promotes local

food growing and the use of vacant spaces temporarily for food growing which will make use of underused land.

Objective EN10 (to reduce the likelihood and impact of flood risk from development and climate change) has a neutral impact on the majority of

the policies in the Wembley AAP and there are no negative impacts on any of the policies. Objective EN10 has a positive impact on climate

change policies WEM 37 Open Space Improvements, WEM 38 Food Growing, WEM 41 Access to Nature and significant positive impact on

policy WEM 42 River Brent and Wealdstone Brook as enhancements to Wealdstone Brook will aid flood protection and reduce flood risk.

Objective EC1 (to encourage sustainable economic growth) has a neutral impact on Urban design and place shaping and a positive impact on

housing policy WEM 25 Student Accommodation, social infrastructure, open space, sports and wildlife policies. Overall objective EC1 has no

negative impact on the majority of the policies in Wembley AAP. Objective EC1 has a positive impact on the Business, industry and waste

policies; WEM 9 Wembley Stadium Business Park, WEM 10 Offices and WEM 11 Low Cost Business Start-up Space. Objective EC1 has both

a positive and negative impact on climate change policy WEM 32 Decentralised Energy on the promotion of economic growth and a significant

positive impact on policy WEM 33 Energy from Waste in promoting a green sustainable economy

Objective EC2 (to offer everybody the opportunity for rewarding and satisfying employment) has a positive impact on most of the policies in the

Business, industry and waste chapter, for example policy WEM 11 Low Cost Business Start-up Space due to the provision of affordable

workspace and on policies in the Town Centres, Shopping, Leisure and Tourism chapter. Objective EC2 has a neutral impact for the rest of the

policies within the Wembley AAP. There are no negative impacts identified for any of the policies within Wembley AAP.

Objective EC3 (to reduce disparities in economic performance and promote sustainable regeneration) has a mainly positive impact most of the

policies in the Wembley AAP with a neutral impact on the housing policies. Objective EC3 has a significant positive impact on policy WEM 27

Leisure, Tourism and Cultural Uses which encourages leisure, tourism and cultural uses within the area and significant improvements to public

transport will be required. Overall, objective EC3 has no negative impacts on any of the policies in Wembley AAP.

Objective EC4 (to encourage and accommodate both indigenous and inward investment) has mainly a positive impact on the Urban design and

place shaping policies with a mixed neutral and positive impact on the housing policies. Objective EC4 has some significant positive impacts on

the Town Centres, Shopping, Leisure and Tourism policies; WEM 26 New Retail, leisure and office development and WEM 30 Temporary

Creative Uses will encourage investment as the use of vacant sites or buildings will be promoted for occupation by temporary creative uses.

Objective EC4 has both a positive and negative impact on the climate change policy WEM 32 Decentralised Energy on investment, as using

financial contributions for a decentralised energy network will reduce the level of contributions for other infrastructure. Objective EC4 has both a

Page 26: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

26

positive and negative impact on the following policies in the open space, sports and wildlife chapter; WEM 36 Open Space Provision, WEM 37

Open Space Improvements and WEM 42 River Brent and Wealdstone Brook, as substantial funding is needed for carrying out improvements

and these could have a negative impact on investment, although if the improvements are made it would greatly increase the attractiveness of

the area for investment.

Objective EC5 (to encourage efficient patterns of movement in support of economic growth) mainly positive impact on the Urban design and

place shaping policies, Transport policies and Town Centres, Shopping, Leisure and Tourism policies. In particular, Objective EC5 has a

significant positive impact on policy WEM 2 Gateways to Wembley as focusing on the three stations and improving the attractiveness of these

main gateways will support economic growth and encourage efficient patterns of movement. Objective EC5 has a mainly neutral impact on

Business, industry and waste policies with the exception of policy WEM 12 Protected Rail Sidings which, and a neutral impact housing and

climate change policies. Overall, objective EC5 has no negative impact on any of the policies in Wembley AAP.

Site Proposals An appraisal of each site proposal has been carried out by the Planning Policy, Regeneration and Transport staff at Brent Council. These appraisals were then independently reviewed by the Environmental Policy team. The purpose of this assessment is to ensure that there are no significant cumulative effects on the SA objectives from all of the site proposals in Wembley AAP. There are a total of 31 site proposals for the Wembley AAP and the full sustainability appraisals are located in Appendix 7. Each score against the SA objective is accompanied by a comment. The Wembley AAP Preferred Options site proposals are divided into 5 different areas due to their location and character. Wembley High Road Site Proposals: W1 Wembley West End W2 London Road W3 Chiltern Line Cutting North W4 Wembley High Road/Chiltern Line Cutting South W5 Copland Community School and Brent House The site proposals in the Wembley High Road area have an overall positive effect on SA objectives such as S1 (to reduce poverty and social exclusion), S7 (to encourage a sense of community), and S8 (to improve accessibility to key services especially for those most in need). However none of the site proposals in the Wembley High Road area had any significant effect on SA objective S2 (to improve health and wellbeing of the population) and SA objective S3 (to improve the education and skills of the population). Whereas SA objective S4 (to provide everybody with opportunity to live in a decent home) has scored a significant positive impact against all of the site proposals in the Wembley High Road area. In relation to the environmental SA objectives, all of the site proposals were identified as having a mixed impact of no significant effect and a neutral impact on EN3 (to improve air quality) as redevelopment of the sites would have a varying degree of impact on Wembley’s air quality. This mixed impact is due to location of the site, as town centre locations is likely to reduce the need for car use and on the size of new development proposed, as small scale developments will have a less significant impact on emissions levels. The majority of the sites in this area have scored positively against SA objective EN1 (to reduce the effect of traffic on the environment) due to their town centre location and excellent public transport accessibility. Site proposal W5 Copland Community School and Brent House has a neutral impact against SA objective EN1 because this site has been identified as being suitable for a medium sized food store which would require car parking. In particular, there is a negative impact on SA objective EN4 (to conserve and enhance biodiversity) on the site proposal W3 Chiltern Line Cutting North because it is a site of Metropolitan and Borough Grade 1 Nature Conversation Importance and therefore development on this site would require the mitigation of the effects of the development of the site upon the nature conservation. All of the site proposals were identified as having a mixed impact of no significant effect and a neutral impact on SA objective EN8 (to minimise the production of waste and promote its use as a resource). Redevelopment of the sites will result in the generation of waste and consumption of materials and resources. However redevelopment of sites may improve waste and recycling rates, this is dependant upon the location of the site and if new residential or mixed use development is proposed. All of the site proposals in the Wembley High Road area scored positively against EN10 (to reduce the likelihood and impact of flood risk from development and climate change) as redevelopment of the sites provides an opportunity to minimise the risk of flooding from surface water flooding by incorporating sustainable urban drainage systems during the rebuild. Positive impacts were identified against all of the economic SA objectives; EC1 (to encourage sustainable economic growth), EC2 (to offer everybody the opportunity for rewarding and satisfying employment), EC3 (to reduce disparities in economic performance and promote sustainable regeneration), EC4 (to encourage and accommodate both indigenous and inward investment) and EC5 (to encourage efficient patterns of movement in support of economic growth) in terms of growth, employment, regeneration and efficient movement, in particular significant positive impacts were scored for site proposals W1 Wembley West End, W4 Wembley High Road/Chiltern Line Cutting South, W5 Copland Community School and Brent House. Overall no significant negative impacts have been identified for any of the site proposals located within the Wembley High Road area for any of the SA objectives. Comprehensive Development Area Site Proposals: W6 South Way Site adjacent to Wembley Stadium Station W7 Mahatma Gandhi House W8 Land West of Wembley Stadium W9 York House W10 Dexion House W11 Malcolm House W12 North West Lands W13 Stadium Retail Park W14 Arena House and Crescent House W15 Apex House & Karma House W16 1 Olympic Way W17 Olympic Way Office Site W18 Wembley Retail Park W19 Wembley Stadium Car Park

Page 27: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

27

The site proposals in the Comprehensive Development Area all score positively against SA objective S1 (to reduce poverty and social exclusion) and the majority of the sites score positively against S4 (to provide everybody with opportunity to live in a decent home), significant positive impacts have been scored for the following sites; W6 South Way Site adjacent to Wembley Stadium Station, W8 Land West of Wembley Stadium, W10 Dexion House, W11 Malcolm House, W12 North West Lands, W13 Stadium Retail Park and W18 Wembley Retail Park against SA objective S4. Site proposal W6 South Way Site adjacent to Wembley Stadium Station scores significantly positive against SA objective S5 (to provide everybody with good quality surroundings) as the site is currently vacant so new development would improve a sense of place and SA objective S8 (to improve accessibility to key services especially for those most in need) as an improved public transport interchange will improve the level of investment. Site proposal W8 Land West of Wembley Stadium has significant positive impact against SA objectives S5 (to provide everybody with good quality surroundings) as development on this large site will improve the quality of the surroundings with new development integrating with boulevard acting as a key component and providing a sense of place to this area. It also has a significant positive impact against SA objective S7 (to encourage a sense of community) due to the proposed mixed use and integration of new and existing developments enabling easy access. W8 Land West of Wembley Stadium scores significantly positively against SA objective S8 (to improve accessibility to key services) because a new bus route will greatly increase accessibility. Only Site proposal W10 Dexion House scores significantly positive against SA objective S2 (to improve the health and wellbeing of the population) because of the requirement for the provision of a community pool on site. Site proposal W12 North West Lands scores significantly positive against SA objective S5 (to provide everybody with good quality surroundings) because of the opportunity of redevelopment of this site to greatly improve the quality of surroundings in this area with a new public space being provided in the middle of the site. Site proposal W18 Wembley Retail Park scores significantly positive against SA objective S3 (to improve the education and skills of the population) as it includes the provision of a new primary school on this site and site proposal W10 Dexion House as it includes student accommodation and a new community swimming pool. In general, none of the site proposals in the Comprehensive Development Area scored negatively against the social SA objectives. In relation to the environmental SA objectives, some of the site proposals scored negatively against EN1 (to reduce the effect of traffic on environment) site proposals W18 Wembley Retail Park and W19 Wembley Stadium Car Park due to their location in a PTAL area of 2-3. Some sites score positively due to their good PTAL rating and proximity to public transport. Whilst site proposal W9 York House scored significantly positive because of the opportunity to build on the existing car park and therefore reduce the number of parking spaces. All of the site proposals were identified as having either neutral or negative impacts on EN3 (to improve air quality) as redevelopment of the sites would have a varying degree of impact on Wembley’s air quality. The site proposals in this area all scored positively against SA objective EN5 (to maintain and enhance the character and quality of landscapes and townscapes. The majority of the sites scored positively against EN7 (to reduce contributions to climate change and reduce vulnerability to climate change) due to various reasons including reuse of land, sustainable location, use of sustainable design and construction methods and opportunity to improve energy efficiency of buildings. The site proposals in the Comprehensive Development Area were either identified as having negative impacts on SA objective EN8 (to minimise the production of waste and promote its use as a resource) as redevelopment of the sites will result in the generation of waste and consumption of materials and resources. Or it had a mixed impact of no significant effect and a neutral impact as the redevelopment of sites may improve waste and recycling rates and this is dependant upon the location of the site and if new residential or mixed use development is proposed. Positive and significant positive impacts were identified against the economic SA objectives in terms of growth, employment, regeneration and efficient movement. However site proposal W18 Wembley Retail Park scored negatively against SA objective EC4 (to encourage and accommodate bother indigenous and inward investment) but this is because of this site’s proposed use as a new residential district and against EC5 (to encourage efficient patterns of movement in support of economic growth) as the site is located within a PTAL area of 2 to 3. Site proposal W19 Wembley Stadium Car Park scored negatively against EC5 (to encourage efficient patterns of movement in support of economic growth) as the site is located within a PTAL area of 2 to 3. Overall no significant negative impacts have been identified for any of the site proposals located within the Comprehensive Development Area for any of the SA objectives. Wembley Park/Empire Way Corridor Site Proposals: W20 Cottrell House & Norman House W21 21-31 Brook Avenue W22 Wembley Park Station Car Park W23 The Torch/Kwik Fit W24 Town Hall The site proposals in the Wembley Park/Empire Way Corridor all score positively against SA objective S1 (to reduce poverty and social exclusion) and the majority of the sites score positively against S4 (to provide everybody with opportunity to live in a decent home), significant positive impacts have been scored for the following sites; W21 21-31 Brook Avenue, W22 Wembley Park Station Car Park and W23 The Torch/Kwik Fit. For the environmental SA objectives, the majority of the site proposals were identified as having a negative impacts on EN3 (to improve air quality) as redevelopment of the sites would have a varying degree of impact on Wembley’s air quality but for other sites there was a positive impact due to the site’s town centre location and excellent public transport links. The majority of the sites scored positively against EN7 (to reduce contributions to climate change and reduce vulnerability to climate change) due to various reasons including reuse of land, sustainable location, use of sustainable design and construction methods and opportunity to improve energy efficiency of buildings. For SA objective EN8 (to minimise the production of waste and promote its use as a resource) a negative impact is scored as redevelopment of the sites will result in the generation of waste and consumption of materials and resources. Or it had a mixed impact of no significant effect and a neutral impact as the redevelopment of sites may improve waste and recycling rates and this is dependant upon the location of the site and if new residential or mixed use development is proposed. . Apart from site proposal W24 Town Hall which scored neutral against SA objectives EN3 and EN8 the potential for new development is much smaller on this site compared to the others because the listed building needs to be retained as part of the redevelopment of this site. All of the site proposals in the Wembley Park/Empire Way Corridor area scored positively against EN10 (to reduce the likelihood and impact of flood risk from development and climate change) as redevelopment of the sites provides an opportunity to minimise the risk of flooding from surface water flooding by incorporating sustainable urban drainage systems during the rebuild, in particular site W21 21-31 Brook Avenue as redevelopment of this site provides an opportunity for semi-naturalise the book which would provide flood risk and water quality benefits. Positive and significant positive impacts were identified against the economic SA objectives; EC1, EC2, EC3, EC4 and EC5 in terms of growth, employment, regeneration and efficient movement for all of the site proposals in the Wembley Park/Empire Way Corridor. Overall no significant negative impacts have been identified for any of the site proposals located within the Wembley Park/Empire Way Corridor area for any of the SA objectives.

Page 28: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

28

Wembley Eastern Lands Site Proposals: W25 Amex House W26 Watkin Road W27 Euro Car Parts W28 First Way The site proposals in the Wembley Eastern Lands; W25 Amex House, W26 Watkin Road, W27 Euro Car Parts and W28 First Way have all scored positively against the social SA objectives S1 (to reduce poverty and social exclusion), S2 (to improve the health and wellbeing of the population) and S5 (to provide everybody with the opportunity to live in a decent home) this is because the provision for a publicly accessible brook side park will have multiple benefits in that it will encourage social cohesion, provide recreational opportunities for walking and cycling and will improve the area by providing amenity and creating a sense of place. All of the sites scored significantly positive against social SA objectives S4 (to provide everybody with the opportunity to live in a decent home) and S7 (to encourage a sense of community, identity and welfare) as these sites have the potential to provide new affordable housing in Wembley and the restoration and improvements to the Wealdstone Brook will foster a sense of pride in the area. Whilst site proposal W28 First Way scored positive effects on the social SA objectives S1 (to reduce poverty and social exclusion), S4 (to provide everybody with the opportunity to live in a decent home), S5 (to provide everybody with good quality surroundings), S7 (to encourage a sense of community) and S8 (to improve accessibility to key services especially for those most in need). This site proposal has the potential to provide new affordable housing, improvements to public transport accessibility by providing new pedestrian routes from east to west through the site are required. Its location adjacent to Wembley Stadium requires new development on this site to be of the highest design quality and contribute towards a sense of pride in the area. All of the sites scored negatively against SA objective EN3 (to improve air quality) as redevelopment of the sites would have an adverse impact on air quality by increasing traffic. However all of the sites scored significantly positive against environmental SA objectives EN4 (to conserve and enhance biodiversity), EN5 (to maintain and enhance the character and quality of landscapes and townscapes) and EN7 (to reduce contributions to climate change and reduce vulnerability to climate change). For SA objective EN8 (to minimise the production of waste and promote its use as a resource) has a mixed impact of no significant effect and a neutral impact as the redevelopment of sites will result in the generation of waste and consumption of materials and resources. However it may improve waste and recycling rates and this is dependant upon the location of the site and if new residential or mixed use development is proposed. The restoration works on the Wealdstone Brook will improve biodiversity, the planting of trees will provide habitats for biodiversity and mitigate the effects of climate change, a new brookside park would greatly improve the public realm as well as the existing landscape. All of the site proposals in the Wembley Eastern Lands area scored positively against EN10 (to reduce the likelihood and impact of flood risk from development and climate change) as redevelopment of the sites provides an opportunity to minimise the risk of flooding from surface water flooding by incorporating sustainable urban drainage systems during the rebuild. Positive and significant positive impacts were identified against the economic SA objectives; EC1, EC2, EC3, EC4 and EC5 in terms of growth, employment, regeneration and efficient movement for all of the site proposals in the Wembley Eastern Lands. Overall no significant negative impacts have been identified for any of the site proposals located within the Wembley Eastern Lands area for any of the SA objectives. Wembley Industrial Estates Site Proposals: W29 Second Way W30 Drury Way W31 Great Central Way For the social SA objectives, apart from the site proposal W29 Second Way, the rest of the site proposals in the Wembley Industrial Estates area scored no significant effect/ no clear link because of their proposed use for industrial and employment uses. Site proposal W29 Second Way scored positively against S5 (to provide everybody with good quality surroundings) as redevelopment provides an opportunity to improve the quality of surroundings. For the environment SA objective EN1 (to reduce the effect of traffic on the environment), site proposals W30 Drury Way and W31 Great Central Way have a neutral score and this is because site W30 is currently used for open storage whilst site W31 is vacant. All of the site proposals were identified as having a negative impact on the environmental SA objective EN3 (to improve air quality) as redevelopment of the sites would have an adverse impact on the air quality by increasing traffic. In particular Site proposal W31 Great Central Way scores negatively against EN4 (to conserve and enhance biodiversity) and this is because part of the site is located on a Site of Borough Nature Conservation Importance (Grade II). SA objective EN8 (to minimise the production of waste and promote its use as a resource) a neutral impact for the sites W29 Second Way and no significant effect for site W30 and W31. This is because redevelopment of the sites will result in the generation of waste and consumption of materials and resources that would counterbalance the waste currently generated on site from business uses. All of the site proposals in the Wembley Industrial Estates area score either positively or significantly positive for the economic SA objectives EC1 EC2, EC3 and EC4 in terms of growth, employment, regeneration and efficient movement as developments on these sites will provide employment opportunities, regenerative development, improve business development and encourage inward investment. Overall no significant negative impacts have been identified for any of the site proposals located within the Wembley Industrial Estates area against any of the SA objectives. Revisions at Proposed Submission Stage In light of consultation responses the following policies were revised at Proposed Submission stage:- WEM1 Local Character WEM 2 Gateways to Wembley WEM 3 Public Realm WEM 4 Public Art WEM 5 Tall Buildings WEM 7: Character of Olympic Way WEM 8 Securing Design Quality WEM 14 Western Highway Corridor

Page 29: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

29

WEM 17 Walking and Cycling WEM 20 Housing Mix WEM 26 New retail development WEM 27 Leisure, tourism and cultural uses WEM 31 Community Facilities WEM 34 Urban Greening WEM 35 Flood Risk WEM 42 River Brent and Wealdstone Brook W3 Chiltern Line Cutting North W4 High Road/ Chiltern Line Cutting South W6 South Way Site adjacent to Wembley Stadium Station W8 Land West of Wembley W10 Dexion House W11 Malcolm House W13 Stadium Retail Park W14 Arena House and Crescent House W15 Apex House & Karma House W16 1 Olympic Way W17 Olympic Way Office Site W19 Wembley Stadium Car Park W21 21-31 Brook Avenue W25 Amex House W26 Watkin Road W27 Euro Car Parts W28 First Way W29 Second Way Policies WEM9 (Wembley Stadium Business Park) and WEM19 (Affordable Rent) are to be removed from the AAP. WEM19: A policy on affordable rent is, in part, reliant on decisions made at a strategic regional level. It is therefore not considered appropriate to draft a policy in advance of key recommendations from the Inspector’s report on revised early minor alterations to the London Plan (2011). Additionally, affordable rent is a borough-wide issue and is more appropriately dealt with through a policy in the emerging Development Management Development Plan Document. WEM9: The Business Park was originally designated for the area east of the Stadium in the UDP. It was subsequently brought forward into

the WAAP. Since that time planning permissions have been granted for mixed use development in the area, and the London Plan has

designated Wembley as a ‘Strategic Cultural Area’, including part of the Business Park area. This means there is more than one land-use

policy for the same area which is not desirable. In addition, the council intends to seek a re-designation to part of the Business Park that is in

the SIL (Site Proposal W29). The re-designation will be from Preferred Industrial Location (PIL) to Industrial Business Park (IBP) through the

London Plan review process. The reason for this re-designation is to keep the site as part of the SIL but to improve the urban environment and

create more of a buffer between non-industrial uses proposed for the Comprehensive Development Area and the PIL. This replaces the need

for a separate Business Park designation for the same area. The proposed changes to Site Proposal W29 incorporate the land use principles

for an Industrial Business Park therefore policy WEM9 is not required.

These three factors of existing mixed-use planning permissions, the Strategic Cultural Area designation, and the proposed Industrial Business

Park designation combine to render the Business Park designation obsolete. As both policies will be covered elsewhere their removal from the

AAP has no significant impacts.

A full sustainability appraisal of the revisions to each policy and the removed policies is included in appendix 8. Positive and neutral impacts were identified against social SA objectives in terms of improved sense of place, fostering a sense of pride and improving connections to local services. Revisions to policy W29 have positive impacts on residential amenity by ensuring residential development is not in proximity to waste management facilities. Revisions to policy W31 have positive impacts in terms of improving accessibility to health and education facilities. For the environment SA objectives positive impacts were found in reducing traffic volumes, improving air quality, increasing the number of trees, enhancing townscape and public realm, protecting views and enhancing areas of historical value. Neutral impacts were identified against employment SA objectives. In summary overall no negative impacts have been identified as a result of revisions to policies at pre-submission stage. Minor amendments were also made to the wording of policies WEM31, W14, W15, W16, W17, W19 and W28 to add clarification. Due to the minor nature of these changes they did not have a significant impact and a more detailed sustainability appraisal was not required. N.B. It is important to note also that policy numbers have changed between the Preferred Options and Proposed Submission versions because of the deletion of policies. The policy numbers referred to in this Sustainability Appraisal are those in the Preferred Options DPD. A table showing the corresponding new policy numbers is included as appendix 9 to this report. Sustainability Appraisal of Main Modifications Hearing sessions on the WAAP took place between 3 March and 5 March 2014. Having taken account of representations, both in writing and at the Hearing, the Inspector considered a number of Main Modifications likely to be necessary. Of the Proposed Main Modification (PMM) the Inspector identified PMM 2, and PMM 19 -22 as requiring further Sustainability Appraisal. The full appraisal of sustainability impacts of these PMM is set out in appendix 10. A summary of the conclusions is set out below. PMM2: Tall Buildings On Map 4.4 it is proposed the area covered by Site Proposal W18 is to be shown as a Site Appropriate for Tall Buildings rather than a Site

Sensitive to Tall Buildings.

The SA of PMM2 identified no negative impacts against social, environmental or economic objectives. Policy WEM5 requires planning

applications for tall buildings on Site W18 to demonstrate highest architectural quality and assess impact on views, therefore amendment to

Map 4.4 will have no negative impacts in terms of effect on landscape, townscape and cultural assets.

Page 30: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

30

PMM19 and PMM20: Site W3 Chiltern Line Cutting North

Insertion of additional text at the end of the first paragraph of site Proposal W3, Chiltern Line Cutting North, as shown: The council will support limited development of the north cutting where it connects from the south (Site Proposal W4) and supports commercial development which benefits the town centre. As the whole of the cutting on the north side is identified as an Area of Nature Conservation Importance as well as a Wildlife corridor, then more significant development would be appropriate only if there were substantial benefits in terms of the regeneration of the town centre as well as major compensatory provision for the loss of habitat. The existing residential areas to the north are predominantly two storey which limits also the scale of development that would be appropriate. Consequently, only a limited development can be accommodated. Positive impacts were identified for SA social objectives due to the potential for the site to provide an element of affordable housing, and promote access to services. A potential negative SA environmental impact was identified in terms of biodiversity (EN4) as the site is of Metropolitan (and Borough Grade 1) Nature Conservation importance and forms part of a Wildlife Corridor. However, the policy states development will be subject to mitigation and compensation measures to ensure no net loss to biodiversity value, and that a continuous wildlife link is still provided through the site. Positive impacts were identified for all economic SA objectives. Limited development on the site has potential to support sustainable economic growth and create employment opportunities. PMM21: Site W 4 High Road/ Chiltern Line Cutting South

It is proposed to amend paragraph 2 of the Site Proposal, as shown: The council's objective is to transform the Wembley Link area into a sustainable mixed use community. This would be best delivered through developing the concept for cafés, restaurants and bars and appropriate retail, including potentially a food store. along the frontage. , potentially with Office Residential development should form part of any mixed use scheme. above these, and residential above this, where appropriate. Offices, student accommodation or hotel would also be appropriate within this site. Development proposals should include active frontages.

Positive impacts were identified for social SA objectives S1, S4 and S8, due to the potential for the site to provide new affordable housing, and

promote access to services. In terms of environmental impacts the development of a foodstore and offices has potential to generate traffic, and

therefore could reduce air quality, however, as this is a town centre location which is highly accessible by public transport this is the most

sustainable location for these uses. Due to the sustainability of the location and reuse of brownfield land, positive impacts were identified in

terms of reducing the need to travel by car (EN1) and climate change (EN7). In terms of flood risk, although the site is partly within a Local

Flood Risk Zone the introduction of SuDS and other mitigation measures set out in the Surface Water Management Plan, will be an

improvement on the existing situation, which will mitigate flood risk. Significant positive impacts were identified for economic SA objectives,

particularly EC1, EC2 and EC3. The redevelopment of the site for a mixed-use scheme will encourage sustainable economic growth.

PMM22: Site W: Copland School and Brent House

Amend Site Proposal W5, as shown: The ground floor on the High Road frontage should be commercial retail development, potentially including a medium sized food store (approximately 6000m²) with associated car parking. Residential development either above or adjacent to the retail should include a high proportion of family housing. Significant positive impacts were identified as a result of the potential to deliver affordable housing on the site. This has potential to promote

social inclusion, whilst an element of retail will help improve access to services. In terms of environmental impact the modified policy scored

positively against SA objectives EN1, EN3, EN5, EN7, EN9 and EN10. The new development makes use of brownfield land and is in a

sustainable location, therefore will have positive impacts in terms of air quality, by reducing the need to travel by car. Positive benefits are

identified for all economic SA objectives, particularly EC1, EC2 and EC3, due to the potential for the development to promote sustainable

economic growth on this section of the town centre.

6. Mitigation, Implementation and Monitoring Mitigation Preferred Options There seems to be no irresolvable conflicts between the policies and these have been discussed in the previous section. There is a significant negative impact identified for climate change policy WEM 33 Energy from Waste. Although it is considered that there are major positive global impacts because it is generally a sustainable approach to dealing with waste as it will not be transported large distances to landfill and heat and energy will be recovered, it is possible that there will be some local impacts on air quality and townscape. It is important that these impacts are mitigated at the planning application stage by ensuring that any facility is in an acceptable location, that appropriate standards of emission controls are enforced and through the quality of design of any new facility. Generally, it is considered that most of the impacts identified for policies can be mitigated via the consistent application of the other policies in the plan. In addition regional planning policies in the London Plan and policies in the National Planning Policy Framework may cover some of these areas of conflict. Certain transport policies, such as policy WEM13 promoting road improvements, have negative impacts relating to traffic generation because implementation is likely to lead to higher levels of traffic locally. In promoting inward investment into the area, including new shopping and leisure facilities, it is accepted that there may be some impacts because of increased traffic levels. However, the overall strategy for transport locally is to promote modes other than the car and it is a key objective for the area that there should be a modal shift of travel away from the car from 37% of trips down towards 27%. There is also a potential negative impact on prosperity and social inclusion from policy WEM25 on student accommodation because the accommodation will not be meeting a local need. However, there are positive benefits on the local economy and policy has been framed so that there will be a cap on the overall level of provision. Although a policy of expanding existing schools (WEM31) will inevitably lead to higher traffic levels in the vicinity, it is an option that will have to be followed if the predicted growth in the school age population is to be accommodated. It is important that the overall strategy of promoting improvements to modes of travel other than the car is reflected in planning decisions on school expansion.

Page 31: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

31

Site Proposals The impacts of the site proposals have been discussed in detail in the previous section. There are no significant negative impacts identified for any of the site proposals in Wembley AAP against the SA objectives. Transport impacts of proposed developments should be assessed including the cumulative effect of a number of sites in the same area. Relevant transport improvements should be incorporated into the next Transport Strategy. Where intensification of development of sites in lower PTAL areas are proposed, e.g. site W19 Wembley Stadium Car Park, improvements promoting access by non-car modes, especially improvements to public transport, will be required on development. The forthcoming Development Management Policies DPD should include a requirement to avoid adverse impact to sites of nature conservation importance. There are potential impacts on nature conservation at sites W3 and W4 on the Chiltern Line Cutting. The Council should seek compensatory provision for planning applications that involve any loss of habitat on these sites. All development in the borough should draw upon the information and guidance contained within Brent’s Strategic Flood Risk Assessment (SFRA). The Council should update its level 1 SFRA in light of the new sites added. Development proposals for any site within an AQMA should incorporate adaptation measures to protect the indoor environment from poor external air quality and demonstrate that it includes adequate mitigation measures so as to not exacerbate existing poor air quality. Adaptation measures will be important for sensitive uses such as health, education and housing. This requirement should be included in the site proposal text in Wembley AAP for all sites which are in AQMAs. The forthcoming Development Management DPD should set out conditions and guidance relating to development within AQMAs. The use and design of sites should take care not to expose additional residents to existing high levels of noise pollution in order to avoid health and social implications. Please note that some of the recommendations for mitigation could be dealt with by including requirements in planning briefs and other guidance documents that the council has prepared, or is preparing, for some of the sites. A list of sites that have accompanying guidance documents is included in the Table 7 below: Table 7: Relevant Guidance for Wembley Area Action Plan Site Proposals

Planning Document Relevant Wembley Area Action Plan Site Proposals

Wembley West End SPD Wembley High Road W1

Wembley Link SPD Wembley High Road W3, W4 & W5

Wembley Masterplan Comprehensive Area Development W10, W11, W12, W13, W14, W15, W16, W17, W18 Wembley Eastern Lands W25, W26, W28 Wembley Industrial Estates W29

Revisions at Proposed Submission Stage The impacts of the revisions at Proposed Submission stage are set out in the previous section and appendix 8. There are no significant negative impacts identified for any of the revisions against the SA objectives, therefore changes have not resulted in the need for any further mitigation. Sustainability Appraisal of Proposed Main Modifications Overall, no significant negative impacts were identified as a result of the PMM. One negative impact was identified in relation to proposed

modification to policy W3, in terms of biodiversity (EN4) as the site is of Metropolitan (and Borough Grade 1) Nature Conservation importance

and forms part of a Wildlife Corridor. However, the policy states only limited development will be acceptable subject to mitigation and

compensation measures to ensure no net loss to biodiversity value, and that a continuous wildlife link is still provided through the site.

Mitigation will therefore be required on site W3 for limited development to be considered acceptable.

Implementation The Wembley AAP is part of a broader hierarchy of plans, which will not be developed nor implemented in isolation. Wembley AAP has been developed with reference to a number of regional planning policies contained in the London Plan (July 2011) and in line with the National Planning Policy Framework (March 2012). Once adopted the Wembley AAP will form part of the borough’s development plan which already consists of the Core Strategy and the Site Specific Allocations DPD. Wembley AAP will replace chapter 14 of Brent’s UDP (2004) ‘Wembley Regeneration Area’ and its policies, as well as superseding some of the sites contained in the Site Specific Allocations DPD (July 2011), further details are contained in Appendix A in the Wembley AAP Preferred Options document. The Proposals Map will also be updated in line with the policy designations in Wembley AAP. The Wembley Masterplan will continue to provide detailed planning guidance on certain issues. Whilst the Wembley Link SPD will continue to provide similar guidance for the development of the eastern end of the High Road and the Wembley West End SPD will guide development on the Curtis Lane Car Park site behind the High Road. The council’s Sustainable Design, Construction and Pollution Control SPG 19 will continue to provide detailed guidance to developers. SPG19 is a material consideration in determining planning applications for all proposals meeting or exceeding the following thresholds: 100sqm floorspace or 10 residential units, or tall buildings (25m); sensitive uses i.e. housing, health, education in Air Quality Management Areas and/or schemes involving demolition of the above. The council’s Sustainable Development Checklist TP6 is required for developments meeting the thresholds mentioned previously. The Sustainable Development Checklist indicates the sustainability level of the development proposal and it also integrates environmental aspects in SPG19 with social and economic aspects of sustainability. In addition, an

Page 32: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

32

updated Design Guide for New Developments SPD will be produced later on this year which will provide further guidance for developers and applicants. If these preferred policies and site proposals contained in the Wembley AAP are to be considered effective at delivering sustainable development within the Wembley area, and seek to better people’s lives and their environment, they need to be applied in a consistent manner with the appropriate linkages made to national and regional guidance and specialist plans. Monitoring Monitoring the significant sustainability effects of implementation of the Wembley AAP is an important part of the SA process. It will be used to monitor the performance of the Wembley AAP against the sustainability appraisal objectives. Currently in Brent, an Annual Monitoring Report (AMR) is produced which reviews the situation in Brent each year against a series of indicators. This monitoring is conducted to establish how effective policies have been in enabling sustainable development and protecting the environment. As the Wembley AAP is developed, the monitoring of policies will be addressed through updates to the AMR and will provide commentary on any potential adverse effects that are noted within the Sustainability Appraisal. Further details of the appropriate indicators for the effective monitoring of the plan are provided in Appendix 3.

7. Conclusions

The following is a summary of the effects of the preferred policies and site proposals on the SA objectives. Overall there are no significant negative impacts for any of the site proposals in Wembley AAP however there are for just two of the preferred policies. The following preferred options were considered to have the most negative impacts: climate change policies WEM 33 Energy from Waste and WEM 34 Urban Greening. Whilst the following site proposals in the Comprehensive Development Area are considered to have the most negative impacts: W18 Wembley Retail Park and W19 Wembley Stadium Car Park. It is the environmental objectives that bear the burden of the potential negative impacts arising from the preferred options, in particular SA objectives EN1 (to reduce the effect of traffic on the environment) and EN3 (to improve air quality). This is also where there is the greatest potential for cumulative impacts to occur. There tends to be a slightly higher degree of uncertainty within the environmental than the economic objectives for example in relation to SA objective EN8 (to minimise the production of waste and promote its use as a resource). The economic objectives tend to have less negative and more positive impacts across the preferred options and the site proposals than the social and environmental objectives. There is a degree of trade off especially between environmental and economic objectives of the SA.

Page 33: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

33

Appendix 1: Review of Plans and Programmes

NB This appendix has not been updated since September 2011. Since then there has been a significant change in national planning policy with the publication of the new National Planning Policy Framework in March 2012. This appendix will be updated when the SA report is revised and made available at Publication & Submission stage. Document Objectives Key Targets Implications for the

Sustainability Appraisal

Implications for the DPD

International

Kyoto Protocol Aims to minimise the

adverse affects of climate

change by limiting and

reducing the emission of

greenhouse gases.

Reduce emission of

greenhouse gases by

at least 5 percent below

1990 levels.

Sustainability appraisal

objectives should aim to

reduce greenhouse gas

emissions.

The AAP needs to consider impact

of new development on climate

change and plans for its impact.

The

Johannesburg

Declaration on

sustainable

Development

2002

Aims to build a

humane, equitable and

caring global society. Key

objectives include the

sustainable use of

resources, energy

efficiency and biodiversity

and to promote more

sustainable production

and consumption

patterns.

No explicit targets and

indicators

SA framework will need

to consider the protection

and management of

natural

resources and

biodiversity.

The Wembley AAP will need to

ensure that it encourages the aims

set out in the Declaration.

Page 34: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

34

Bern

Convention on

the

Conservation of

European

Wildlife and

Natural Habitats

(1979).

Aims to ensure

conservation of wild flora

and fauna species and

their habitats. Special

attention is given to

endangered and

vulnerable species,

including endangered and

vulnerable migratory

species specified in

appendices. The Parties

undertake to take all

appropriate measures to

ensure the conservation

of the habitats of the

wild flora and fauna

species.

No specific targets or

indicators for the AAP

The SA Framework

should consider the

impact of development

on pollution control and

impact on wild flora and

fauna including habitats,

particularly any

endangered species

The Wembley AAP must have

regard for the conservation of

vulnerable species and habitats in

the area. It should ensure that its

policies are not in conflict with the

protection and conservation of

these species.

Ramsar

Convention on

Wetlands of

International

Importance

(1971).

The Convention on

Wetlands, signed in

Ramsar, Iran, in 1971, is

an

intergovernmental treaty

which provides the

framework for national

No specific indicators or

targets for the AAP.

SA framework will need

to consider the impacts

of development on

natural resources.

There are no RAMSAR sites within

the

London Borough of Brent.

However, the

core practices and objectives of the

Convention can be integrated into

Page 35: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

35

action and international

co-operation for the

conservation and wise

use of wetlands and their

resources.

the

Wembley Area Action Plan,

including the water courses running

through the area.

Bonn

Convention on

the

Conservation of

Migratory

Species of Wild

Animals 1979

To conserve migratory

species (specific species

defined in Convention)

and agree to take action

to ensure this happens,

paying particular attention

to migratory species and

their habitats.

No explicit targets or

indicators

The Sustainability

Appraisal framework

should measure impacts

on migratory species and

their habitats.

The AAP should ensure that there

is no impact on specific species,

especially around areas of wildlife

conservation.

Draft Document

A/C.2/62/L.40:

“Implementation

of Agenda 21,

the Programme

for the Further

Implementation

of Agenda 21,

and the

Outcomes of the

World Summit

on Sustainable

Effective implementation

of the commitments,

programmes and

time-bound targets

adopted at the World

Summit on Sustainable

Development for

stakeholders and as

contained in the

Johannesburg Plan of

No explicit targets/

indicators

The Sustainability

Appraisal framework

needs to ensure its

indicators reflect the

objective of Agenda 21.

The Wembley Area Action plan

should encourage the sustainable

use of resources, encourage

energy efficiency, enhance

biodiversity and consider the

economic needs of the Wembley

area.

Page 36: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

36

Development.”,

November 2007

Implementation.

European

European

Spatial

Development

Perspective

97/150/EC

EU aim of achieving a

balanced and sustainable

development, in particular

by strengthening

economic and social

cohesion

No specific targets for

consideration of the

Wembley Area Action

plan.

The Sustainability

Appraisal Framework

should take a balanced

approach to

development.

The Wembley Area Action plan

should achieve balanced and

sustainable development in the

context of Brent and the region,

and should provide fair

opportunities for poorer and

disadvantaged people.

European

Directive on the

Conservation of

Wild Birds

79/409/EEC

Aims to sustain

populations of naturally

occurring wild birds by

sustaining areas of

habitats to maintain

populations at ecologically

and scientifically sound

levels. This applies to

birds, their eggs, nests

and habitats.

No explicit targets or

indicators.

The SA framework will

need to consider the

impacts of the AAP’s

proposals on wild bird

populations and

incorporate appropriate

objectives/ indicators to

maintain and improve

habitats.

The Area Action Plan should

support and sustain wild bird

populations, their habitats, nests

and eggs and development should

not impact adversely on this by

ensuring habitats are maintained

and improved.

European

Directive

Nitrates

91/676/EEC

The Directive aims to

reduce and prevent water

pollution caused

or induced by nitrates

from

No explicit targets or

indicators.

The SA framework will

need to incorporate

objectives concerning

reducing pollution.

The AAP should support the overall

objectives and requirements of the

Directive.

Page 37: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

37

agricultural sources.

European

Directive Water

Framework

2000/60/EC

Aims to enhance

waterways and wetlands,

to ensure water is used in

a sustainable way, to

reduce groundwater

pollution, to lessen the

effects of floods and

droughts and to protect

and restore aquatic

ecosystems.

Requires all inland

waters to reach “good

status” by 2015

SA to include objectives/

indicators for improving

water quality its use, the

ecological status of

inland water bodies

(biodiversity) and

lessening the impacts of

flooding.

The Wembley Area Action Plan

should support the overall

objectives and requirements of the

Directive.

European

Directive Waste

Framework

75/442/EEC

Promotes the

improvement of the

energy performance of

buildings

within the community,

taking into

account outdoor climatic

and local conditions, as

well as indoor

climate requirements and

cost

effectiveness

No explicit targets or

indicators.

The SA framework

should include

objectives/ indicators

which consider energy

efficiency.

The Wembley Area Action plan

should support the overall

objectives and requirements of the

Directive.

European

Directive

To monitor noise

exposure, its effects and

No explicit targets for The SA framework

should consider any

The Wembley Area Action Plan will

have to reflect the outcomes as set

Page 38: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

38

Assessment and

Management of

Environmental

Noise

2002/49/EC

to implement measures to

address noise pollution

and to maintain

environmental noise.

the AAP. adverse noise impacts. out within Brent’s Noise Action

Plan.

European

Directive

Ambient Air

Quality and

Management

1996/62/EC

Establishes mandatory

standards for air quality

Sets limit values and

alert thresholds for S02,

NO2, Fine Particle

Matter, Suspended

Particle Matter, Pb, O3,

Other Air Establishes

mandatory standards

for air

Quality Pollutants,

Benzene, CO, Poly-

aromatic hydrocarbons,

Cadmium, Arsenic.

Nickel and Mercury

The SA framework

should consider any

adverse impacts with

regard to air pollution.

The AAP should consider the

contribution that spatial

development may have on air

pollution and try to minimise its

impact where possible by

promoting more sustainable

transportation.

Conservation of

Natural Habitats

and Wild Fauna

& Flora

(Directive

92/43/EC) (The

Habitats

Directive)

Protects European

biodiversity through the

adoption of wide ranging

conservation measures

which protect rare,

threatened or endemic

species. Also provides the

legal framework for

Natura 2000.

Protect some 220

habitats and

approximately 1,000

species listed in the

directive's Annexes.

Sustainability appraisal

objectives should aim to

protect biodiversity.

Need to consider impact of

development on biodiversity and

wildlife habitats.

Page 39: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

39

National policy

The Localism

Act 2011

Aims to further promote

sustainable development,

promotes community “right

to buy”, provides further

clarification on the

Community Infrastructure

Levy and promotes

empowerment to allow

local community groups to

produce neighbourhood

plans.

No targets Sustainability appraisal

Framework should seek

to reflect the

sustainability objectives

in the Bill.

The Area Action Plan needs to

reflect the needs and

representations of the Wembley

community, and should promote

sustainable development.

The Community

Infrastructure

Levy, January

2008

Aims to implement a

standard charge to

partially meet strategic

infrastructure costs

associated with growth

from development.

No targets Sustainability appraisal

Framework should

consider social

infrastructure

requirements needed to

be provided in line with

growth.

The Area Action Plan needs to

reflect the requirements for

infrastructure and balance this with

growth.

Flood and

Water

Management

Act 2010

Introduced in response to

the floods of 2007, aims to

overhaul the management

of water resources and

infrastructure. Includes

measures to encourage

the uptake of SUDs

No targets SA should consider flood

risk and sustainable

urban drainage.

The AAP should support the aims

of the F&W Management Act to

encourage the uptake of SUDs.

National

Planning Policy

The National Planning

Policy Framework sets out

No specific targets. SA should consider the

three dimensions to

The AAP needs to consider how it

can contribute to the delivery of

Page 40: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

40

Framework

(2012)

national planning policy

and provides general

guidance on a wide range

of planning matters. Of

general importance is the

introduction of a

presumption in favour of

sustainable development.

sustainable

development: economic,

social and

environmental.

sustainable development through:

- an economic role – contributing to building a strong, responsive and competitive economy, by ensuring that sufficient land of the right type is available in the right places to support growth and innovation; and by identifying and coordinating development requirements, including the provision of infrastructure;

- a social role – supporting strong, vibrant and healthy communities, by providing the supply of housing required to meet the needs of present and future generations; and by creating a high quality built environment, with accessible local services that reflect the community’s needs and support its health, social and cultural well-being; and

- an environmental role – contributing to protecting and enhancing our natural, built and historic environment; and, as part of this, helping to improve biodiversity, use natural resources prudently, minimise waste and pollution, and mitigate and adapt to climate change including moving to a

Page 41: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

41

low carbon economy.

- -

- - -

- - -

- -

-

-

London

Housing

Strategy (Feb

2010)

The strategy promotes

excellence in design

quality and sustainability in

general. It specifically

promotes a vibrant and

attractive private rented

sector to support London’s

economic vitality.

No targets Sustainability Framework

toconsider:

- Impacts of housing

provision on climate

change and flood risk

- Whether additional

housing is matched

by increase in health/

education facilities

- Whether it will reduce

homelessness and

improve access to

quality affordable

homes

The AAP needs to consider:

- Delivering a balanced housing

supply.

- Ensuring appropriate number of

new homes will be delivered.

- A range of types and tenures is

provided.

- The needs of the vulnerable are

met.

- New homes will be delivered in

a sustainable way.

Page 42: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

42

.

Code of

Practice for the

Management of

Student

Housing

managed by

Higher

Education

Establishments

(Revised

August 2010)

The National Code is

compulsory and aimed at

higher education

establishments for their

commitment to providing

students with a first-class

housing service.

Increasing the supply of

housing

Apart from complying

with statutory

requirements, suppliers

need to meet specific

requirements such as

environmental policy on

promoting energy and

water efficiency,

recycling, using public

transport, cycling and

walking.

The DPD should build upon the

requirements in the Code and try to

make the environmental policy

apply to private providers of

student accommodation.

The National

Code of

Standards for

Larger

Developments

for student

accommodation

not managed

and controlled

by HEEs (Feb

2010)

The National Code is

voluntary and aimed at

private sector suppliers.

Those who join do so as

part of their commitment to

providing students with a

first-class housing service.

Adhere to statutory

requirement

Apart from complying

with statutory

requirements, suppliers

need to meet specific

requirements. However,

the one related to

sustainability is “where

the local authority

operates a recycling

scheme, the waste

disposal plan will

conform to the relevant

standards for recycling

refuse. “

To require student accommodation

to sign up to the Code is not

sufficient. Consideration should be

given to travel plan, energy and

water efficiency, recycling apart

from BREEAM Excellent.

The climate and

energy package

Aims to combat climate

change and increase the

- A reduction in EU

greenhouse gas

Sustainability appraisal

objectives should aim to

The AAP should provide

appropriate policies to help to

Page 43: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

43

(June 2009) EU’s energy security while

strengthening its

competitiveness and

transforming itself into a

highly energy-efficient, low

carbon economy.

emissions of at

least 20% below

1990 levels

- 20% of EU energy

consumption to

come from

renewable

resources

- A 20% reduction in

primary energy use

compared with

projected levels, to

be achieved by

improving energy

efficiency

reduce greenhouse gas

emissions, enable

energy generated from

renewable resources and

improve energy

efficiency.

reduce greenhouse gases and

energy consumption.

The UK Climate

Change Act

(Nov 2008)

The Act aims to enable the

United Kingdom to

become a low-carbon

economy and gives

ministers powers to

introduce the measures

necessary to achieve a

range of greenhouse gas

reduction targets.

- An 80 per cent

reduction target of

greenhouse gas

emissions by 2050,

compared to 1990

emission levels

(equal to 77 per

cent below 2005

levels).

- Carbon reduction of

34% by 2020, 50%

by 2027 and 80%

by 2050

Sustainability appraisal

objectives should aim to

reduce greenhouse gas

emissions.

The AAP needs to consider the

impact of new development on

climate change.

Page 44: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

44

PPS10

Planning for

Sustainable

Waste

Management

To protect human health

and the environment by

producing

less waste and by using it

as a resource wherever

possible.

No specific targets. SA to consider:

- Whether policies

minimise waste

generation and

provide for efficient

handling of waste.

The DPD should:

- recognise the positive

contribution that waste

management can make to the

development of sustainable

communities

- help deliver sustainable

development through driving

waste management up the

waste hierarchy, addressing

waste as a resource

-

Regional/ London Policy

The London

Plan (2011)

The plan seeks to:

- Promote Brent as an

Opportunity Area

- Ensure future open

space needs planned

for in areas of

substantial change

- Increase biodiversity

and access to nature

- Protect trees and

woodland

- Protect existing

allotments & identify

There are a number of

generic targets for

boroughs within the

London Plan, but the

vision for Wembley is to

deliver:

- Leisure, tourism

and cultural

facilities

- 11,000 jobs

- 11,500 new homes

Sustainability Framework

to consider:

- Impact on open

space provision

- Impact on

biodiversity and

wildlife habitats

- Provision of

allotments and space

for community

gardens

- Impact on Blue

Ribbon Network

AAP to consider:

- Local standards for open space

and sport – these have been

set and requirements within

Wembley growth area have

been established in the IIF.

The Wembley AAP should

demonstrate how these will be

delivered.

- Wembley AAP should consider

potential enhancements to

Wealdstone Brook and River

Brent.

Page 45: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

45

other potential spaces

for community

gardening

- Enhance the Blue

Ribbon Network

(polices 7.24-30)

- Protect and extend

sports facilities

- Ensure adequate

social infrastructure for

new development

- Make provision for

facilities that meet

needs of local

communities and

groups

- Identify and address

local health issues and

secure sites for future

health provision

- Assess need for pre-

school, school, higher

& further education

- Promotes Wembley’s

role as a Major/

DistrictCentre

(Wembley and

Wembley Park

respectively)

- Designation of

- Provision of housing

- Provision of social

infrastructure

- Needs of local

communities and

groups

- Local health issues

and facilities needs

- Local education

needs Provision of

sports facilities

- Improving

accessibility

- Introducing Smarter

Travel choices

- Promoting Wembley

for a range of uses

with the appropriate

mix of public

transport, cycling,

walking and Smart

Travel initiatives

- Promoting and

influencing

opportunities for

improved orbital

connections

- Consider the design

of the historic

environment on the

- Potential to provide additional

food growing space.

- The Area Action Plan needs to

have proper regard to the

requirements for social

infrastructure in relation to

proposed growth.

- Providing necessary inclusive

infrastructure.

- Ensuring that new development

is accessible to all.

- Designating appropriate

development types and

locations commensurate with

accessibility requirements.

- Reviewing parking standards to

ensure they reflect the need to

accommodate levels of parking

consistent with sustaining

appropriate development types

relative to public transport

accessibility.

- Promotion of improved orbital

connections and influencing

providers of orbital public

transport services.

- The AAP needs to consider

housing needs and

requirements.

- The AAP should consider the

Page 46: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

46

Wembley as an

Opportunity Area and

a strategic Cultural

Area

- Promotes orbital

connectivity

- Promotes reducing the

need for travel,

particularly by private

car

- Promotion of public

transport, cycling and

walking

- Locating major new

development with high

trip generating

characteristics to

areas with high public

transport accessibility

- To promote a range of

housing which meets

people’s needs -

Policy 3.8

acknowledges that

London’s universities

make a significant

contribution to its

economy and labour

market, aims to ensure

that London’s

viability of

development

- Consider how

development helps to

minimise and recycle

waste

- Promote Sustainable

drainage, restore the

Blue Ribbon Network

and manage flood

risk.

impact of development on

buildings of high aesthetic

value.

- Need to consider size, scale,

type and location of new town

centre units.

- Safeguard existing waste

management sites and only

permit their loss if equivalent

replacement capacity provided

- Promote Sustainable drainage,

restore the Blue Ribbon

Network and manage flood risk.

Page 47: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

47

universities

attractiveness and

potential growth are

not compromised by

inadequate provision

for new student

accommodation.

- Ensure an adequate

supply of quality new

homes for all

Londoners - minimum

new homes targets set

for Opportunity areas

- Provides a policy

structure that ensures

the protection of local

character and

distinctiveness to

ensure the protection

of place

- Provides a town centre

hierarchy across

London which seeks to

meet London’s needs

alongside providing

economic growth.

- Developing a low

carbon economy and

consuming fewer

resources and using

Page 48: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

48

them more effectively.

- Dealing with waste

sustainably and

effectively, and

reducing landfill.

- Restore the Blue

Ribbon Network

(policy 7.28)

- Manage flood risk

(policy 5.12)

- Promote the use of

sustainable drainage

(policy 5.13).

Mayor of

London’s draft

Climate Change

Mitigation and

Energy Strategy

The strategy aims to:

reduce carbon

dioxide emissions

to mitigate climate

change

maximise

economic

opportunities from

the transition to a

low carbon capital

ensure a secure

and reliable energy

supply for London

meet, and where

Reduce London CO2

emissions on 1990

levels by:

20% by 2015

38% by 2020

60% by 2025

At least 80% by 2050

SA should take in

account Mayor’s

ambitious CO2 reduction

targets

AAP should contribute towards

achieving London-wide targets

Page 49: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

49

possible exceed,

national climate

change and energy

objectives

The Mayor of

London’s

Climate Change

Adaptation

Strategy

Strategy aims to:

Improve understanding

and management of

surface water flood risk

Promote urban greening to

increase the quality and

quantity of greenspace

and vegetation in London

Retro-fit up to 1.2m homes

by 2015 to improve the

water and energy

efficiency of London

homes

Targets include:

enhance 1,000 ha of

green space by 2012

Increase green cover in

central London by 5%

by 2030 and a further

5% by 2050

Increase tree cover

across London by 5%

SA should take into

consideration need to

address flood risk,

drought and overheating.

AAP should take into account

climate change impacts and

contribute towards achieving Mayor

adaptation targets.

Page 50: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

50

(from 20 to 25%)

enable the delivery of

100,000m2 of new

green roofs by 2012

Retro-fit up to 1.2m

homes by 2015 to

improve the water and

energy efficiency of

London homes.

Connecting with

London’s

Nature. The

Mayor’s

Biodiversity

Action Plan.

The document seeks to:

- Protect and conserve

London's natural open

spaces.

- Ensure no lose,

overall, of wildlife

habitats in London.

- Create more open

spaces that are

accessible so that all

Londoners are within

walking distance of a

quality natural space.

- No net loss of Sites

of Importance for

Nature

Conservation

- Reduce Areas of

Deficiency in

accessible wildlife

sites

Sustainability Framework

to consider:

- Potential impact of

proposals on

biodiversity and

wildlife habitats

- Potentials to reduce

areas of deficiency.

AAP to consider:

- Impact of development on

Chiltern Embankments and loss

of wildlife habitat. Potential

mitigation and compensation

measures should be

considered.

Page 51: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

51

London Tree

and Woodland

Framework

The document seeks to:

- Ensure trees and

woodlands contribute

to a high quality

natural environment.

- To help shape the built

environment and new

development in a way

that strengthens the

positive character and

diversity of London.

- Through people’s

contact with trees and

woodlands to help

foster community and

individual people’s

well-being and social

inclusion.

- To support the

capital’s economy.

Support biodiversity

action plan targets

(above)

Sustainability Framework

to consider –

- Potentials for trees to

help shape the built

environment and new

development

- Wembley AAP should consider

the potential to increase tree

cover taking into account the

impacts of climate change.

Thames

Catchment

Flood

Management

Plan

The flood plans give an

overview of the flood risk

across each river

catchment and

recommend ways of

managing those risks now

and over the next 50-100

No specific targets Sustainability Framework

to consider the impact of

development on flood

risk and the

implementation of SUDs

Wembley AAP should consider

how policy can incorporate the

requirements of the Management

Plan as well as creating a new,

viable community.

Page 52: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

52

years.

It includes measures to:

- Remove culverts and

other structures that

cause

- significant conveyance

problems Continue to

maintain existing flood

defences and when

redevelopment takes

place, replace and

improve them

- Making residents and

local people aware of

flood risk and ensuring

appropriate

emergency planning

measures are in place

- Manage and reduce

flood risk by reducing

culverts and

engineered rivers

(these will become

increasingly

ineffective against

storms which are

expected to be more

Page 53: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

53

frequent and intense in

the future)

- Reduce flooding from

the overflow of surface

drains, the inundation

of sewers, and large

areas of impermeable

surfaces.

- Increase the use of

SUDs to prevent flood

risk, and to try to

reduce its over

engineered water

courses as much as

possible.

- Opening up culverts

and re-creating river

corridors through

redevelopment

resulting in more

space for the river to

flow, more floodplain

where water can be

stored and reduced

flood risk.

- Maintain existing flood

defences and provide

a balance between

creating sustainable

communities and

Page 54: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

54

ensuring flood risk is

reduced, and where

development occurs

replace existing flood

defences.

It includes specific policy

for particular areas across

Brent and Wembley

including the following:

Areas of low, moderate or

high flood risk where we

are already managing the

flood risk effectively but

where we may need to

take further actions to

keep pace with climate

change - The most

sustainable approach to

managing future flood risk

will be to bring about

adaptation of the urban

environment. There are

some major opportunities

to reduce flood risk

through the appropriate

location, layout and design

Page 55: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

55

of redevelopment. This will

make properties more

resilient or resistant to

flood water, therefore

reducing the

consequences of flooding.

Draft West

London Waste

Plan

The document seeks to

implement the provision

for enough waste

management facilities in

the right locations to

provide for the sustainable

management of waste,

whilst protecting the

environment, stimulating

the economy and

balancing the needs of

west London’s

communities.

-

56 hectares of land for

waste management in

west London by 2026

Sustainability Framework

to consider whether

policies and allocation of

sites contribute towards

the provision of sufficient

land for waste

management

The AAP should not impact

adversely on the site proposals

included in the Joint west London

Waste Plan.

Thames River

Basin

Management

Plan

The document seeks the

protection, improvement

and sustainable use of the

water environment.

There are three river

basin management

cycles: 2009-2015,

2015-2021 and 2021-

2027. The overall target

Sustainability Framework

to consider the impact of

development and

industry on water

The AAP should seek to implement

the priorities of the plan across the

Wembley AAP area and ensure

that all development and industry

Page 56: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

56

The plan is prepared

under the Water

Framework Directive,

which requires all

countries throughout the

European Union to

manage the water

environment to consistent

standards. Each country

has to:

- prevent deterioration in

the status of aquatic

ecosystems, protect

them and improve the

ecological condition of

waters;

- aim to achieve at least

good status for all

water bodies by 2015.

Where this is not

possible and subject to

the criteria set out in

the Directive, aim to

achieve good status by

2021 or 2027;

- meet the requirements

of Water Framework

is to achieve good

status in all water

bodies by 2027.

courses and quality.

positively supports the plan.

Page 57: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

57

Directive Protected

Areas

- promote sustainable

use of water as a

natural resource;

- conserve habitats and

species that depend

directly on water;

- progressively reduce

or phase out the

release of individual

pollutants or groups of

pollutants that present

a significant threat to

the aquatic

environment;

- progressively reduce

the pollution of

groundwater and

prevent or limit the

entry of pollutants;

contribute to mitigating the

effects of floods and

droughts.

A Sustainable

Development

Framework for

London. London

Sustainable

The document seeks to

achieve environmental,

social and economic

development

No targets, 20 quality of

life indicators

SA should consider

Quality of Life Indicators,

including:

- primary education

The Area Action Plan needs to

have proper regard to the

requirements for social

infrastructure in relation to

Page 58: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

58

Development

Commission;

June 2003.

simultaneously - secondary education

- life expectancy

- physical activity

- neighbourhood

satisfaction

- volunteering

- crime rates

proposed growth.

Borough wide policy

Brent UDP 2004

Wembley

Regeneration

Area

The UDP seeks to:-

- Promote Wembley as

a regeneration area

- Protect and improve

Wembley’s cultural,

leisure, tourism,

economic and

environmental assets

- Improve the town

centres in Wembley

- Protect existing

employment land

within the SIL

- Improve public

transport accessibility

and integration

improvements

- Reduce the need to

travel, especially by

private car to new

No targets SA to consider:

- Impact of growth on

Wembley’s

environment

including its cultural,

leisure, tourism,

economic and

environmental assets

- Promotion of public

transport

infrastructure and

facilities

- Promotion of cycling

and walking facilities

- Review of parking

standards

- Promotion of

improved access to

reduce traffic

congestion and

AAP to include:

- Providing necessary

infrastructure which provides

for all users including social,

cultural, leisure, tourism,

economic and environmental

assets

- Ensuring that new development

is accessible to all.

- Designating appropriate

development types and

locations commensurate with

accessibility requirements.

- Reviewing parking standards to

ensure they reflect the need to

accommodate levels of parking

consistent with sustaining

appropriate development types

relative to public transport

accessibility

Page 59: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

59

development

- Travel demand

management

introduced as part of

new development

- Improvements to

cycling and walking

- Maximum parking

standards set for new

development with 1/3

exception for

regeneration areas

- Wembley

Regeneration Area

Transport Strategy

- Maintain existing

employment

generating activities

- Sustain a wide range

of employment

opportunities

- Tackle persistent

unemployment by

increasing skills

training for local

people

- Reducing the need to

travel and improved

transport choices

- Provide a balanced

smooth traffic flow to

new developments

- Introducing Smarter

Travel choices

- Promoting Wembley

for a range of uses

with the appropriate

mix of public

transport, cycling,

walking and Smart

Travel initiatives

- Improved public

transport interchange

e.g. 3 stations

strategy

- Implications of new

access road

infrastructure

(Stadium Access

Corridor

- Event management

strategy

- Review requirements for

access road improvements

- Review requirements for event

day management of traffic

impact

Page 60: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

60

provision of housing

Core Strategy

(July 2010)

Core Strategy policy CP7

designates Wembley as

the principal Growth Area

in the borough. Other

relevant policies include:

- CP21 a Balanced

Housing Stock

- CP14 public transport

improvements

- CP15 Infrastructure

requirements

- CP19 Brent Strategic

Climate Mitigation and

Adaptation Measures

- Build two district

wide CHP plants by

2017.

- To Achieve

Sustainable

Development,

Mitigate & Adapt to

Climate

- 10,000 new jobs in

the Wembley

Growth Area to

2026

- Compliance with

Council’s car

parking standards

- Reducing

proportion of car

trips below 37% by

a minimum of 10%

- Pooling of

development

contributions to

mitigate the

cumulative impacts

of development

- Secure

contributions to

The Sustainability

Framework needs to

consider:

- Housing mix and

provision

- adaptation and

mitigation to climate

change and efficient

use of energy

- Sustainable use of

transport

- Sustainable growth

across retail and

shopping sector

- Impact on social

infrastructure

- Impact of growth on

Wembley’s

environment

including its cultural,

leisure, tourism,

economic and

environmental assets

The DPD should reflect the

sustainability objectives as follows:

- Achieve a “balanced housing

stock”

- Provide necessary

infrastructure which provides

for all users

- Ensure that new development

is accessible to all.

- Designate appropriate

development types and

locations commensurate with

accessibility requirements.

- Promote regeneration and

economic development

- Review parking standards to

ensure they reflect the need to

accommodate levels of parking

consistent with sustaining

appropriate development types

relative to public transport

accessibility

- Consider size, scale, type and

location of new town centre

units.

Page 61: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

61

interchange

improvements

- Net increase in

town centre related

uses within

Wembley

- CSH level 4 in

growth areas and

schemes within

Wembley to

connect to, provide

for or contribute

towards CHP,

unless

demonstrated to be

financially

unfeasible

- Provision of 5,000

new homes from

2007-2016 and

6,500 from 2017 to

2026.

Wembley Link

SPD

The Wembley link SPD

seeks to provide

regeneration in Wembley

which improves and

extends the town centre,

improves the public realm

and delivers a range of

visitors’ uses in a high

No targets SA to consider:

- Implications of new

development access

requirements

- Enhancement of

public realm

AAP to include:

- Implications of new

development access

requirements

- Enhancement of public realm

Page 62: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

62

quality environment.

Brent Parks

Strategy 2010-

15

The strategy seeks to:

- Improve existing parks

and open spaces

- Provide new parks

and open spaces

- Achieve greater

community

involvement

- Maintain and improve

biodiversity in parks

- Mitigate climate

change impacts

- Reducing the adult

mortality rate

through measures

such as exercise

referral including

health walks in

parks

- Reducing obesity

among primary age

children

- Increasing

participation in sport

- Increasing

volunteering

- Reducing CO2

emissions

Sustainability Framework

to consider –

- Potential to improve

parks and open

spaces

- Potential to provide

new parks and open

spaces

Wembley AAP should consider

potential improve and extend parks

and open space provision in the

area.

Planning for

Sport and Active

Recreation

Facilities

Strategy 2008-

2021

The document seeks to

provide attractive,

sustainable, accessible,

quality sports facilities that

increase opportunities for

participation in sport and

active recreation.

- Third swimming

pool to serve north

of the borough.

- Redevelopment of

Vale farm sports

centre.

- Provision of a forth

pool.

Sustainability Framework

to consider –

- Potential to improve

sports facilities

Facilities Strategy identifies a

number of facilities improvements

within the Wembley area which

should be considered in the AAP.

Corporate

Strategy 2010-

14

The Corporate Strategy

seeks:

- A sustainable built

No targets SA to consider:

- Potential impact on

objectives of

Consider how the AAP can

contribute to the objectives of the

Corporate Strategy.

Page 63: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

63

environment which

drives economic

regeneration

- Reduce poverty,

inequality and

exclusion

corporate strategy to

promote a

sustainable built

environment,

economic

regeneration and

reduce poverty.

A Regeneration

Strategy for

Brent 2001-

2021.

The regeneration strategy

seeks to:

- Reduce gaps between

Brent deprived

communities and rest

of London

- Increase income

levels

- Landmark

development at

Wembley

- Reduce

unemployment

- High quality of life

Series of targets,

including by 2021 –

- none of Brent’s

wards will be within

the most 10%

deprived in the

country.

- standard mortality

rates within the

‘priority

neighbourhoods’

will be at or below

the Borough

average.

SA to consider:

- Potential impact on

Regeneration

Strategy objectives.

Further consideration needed on

how AAP can contribute to

objectives of the Regeneration

Strategy.

Schools

Organisation

Plan 2005-2010

The SOP seeks to

provide:

- Extra primary school

capacity required over

next 10 years

- Increasing pressure

on secondary schools

5% surplus capacity

target

SA to consider:

- Potential to meet

identified education

needs

Need to consider how AAP can

provide for educational facilities to

meet needs of new population.

Page 64: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

64

needs to be met

- There is 14% surplus

capacity in nursery

places, although this

is not evenly

distributed across the

borough and is

concentrated in the

south of the borough

Brent Housing

Strategy 2009-

14

The Housing Strategy

seeks to meet the

borough’s housing need

for both affordable and

market housing

To meet the borough’s

housing need

SA to consider:

- Delivering a balanced

housing stock that

meets the needs of

the borough

AAP to include:

- Meeting the housing needs of

the borough

Wembley

Masterplan SPD

The Wembley Masterplan

promotes:

- Travel demand

management

- Improvements to

walking and cycling

- New access road

connections and

modifications to

exiting estate roads

- Junction

improvements

- Target parking

standards in line with

0.5 parking spaces

overall per residential

unit within Masterplan

area

SA to consider:

- Promotion of public

transport

infrastructure and

facilities

- Promotion of cycling

and walking facilities

- Review of parking

standards

- Promotion of

improved access to

reduce traffic

congestion and

smooth traffic flow to

AAP to consider:

- Providing necessary

infrastructure which provides

for all users

- Ensuring that new development

is accessible to all.

- Designating appropriate

development types and

locations commensurate with

accessibility requirements.

- Reviewing parking standards to

ensure they reflect the need to

accommodate levels of parking

consistent with sustaining

Page 65: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

65

UDP and London Plan

- Improve public

transport interchange

and services and seek

improvements to

orbital connectivity

- Provide training for

local people

- Enable businesses to

co-exist harmoniously

with Stadium and

Arena provide a

flexible development

framework that is able

to respond to change

over time;

- Promote the

redevelopment of the

Wembley Masterplan

area whilst ensuring

innovative, high

quality and

sustainable design,

construction and

operation;

- To offer guidance on

appropriate land uses

and scale of

development;

- To set out a strategy

new developments

- Introducing Smarter

Travel choices

- Promoting Wembley

for a range of uses

with the appropriate

mix of public

transport, cycling,

walking and Smart

Travel initiatives

- Improved public

transport interchange

e.g. 3 stations

strategy

- Implications of new/

modified access road

and junction

infrastructure (e.g.

Stadium Access

Corridor and North

End Road

Connection)

- Event management

strategy

- Delivering job

opportunities and

promoting economic

growth in a

sustainable way

- To provide a

appropriate development types

relative to public transport

accessibility

- Justification of new/ modified

access road connections and

junction improvements

- Review requirements for public

transport interchange

improvements

- Review approach to seeking

orbital connectivity

improvements

- Review requirements for event

day management of traffic

impact

- Policies and proposals should

seek to promote regeneration

and economic growth providing

at least 10,000 new jobs

- Provide a balanced housing

stock

Page 66: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

66

for the provision of

open space;

- To produce a strategy

for the future

transportation

infrastructure of the

area and encourage

sustainable modes of

travel including public

transport, walking and

cycling;

- To establish the

impact of potential

future development

and set out future

community

infrastructure

requirements

balanced housing

stock

Brent

Supplementary

Planning

Guidance

(SPG19):

Sustainable

Design &

Construction,

2004

Aims to ensure that

resources used for

development are

minimised and promotes

the use of sustainable

materials. Development

should mitigate and adapt

to climate change.

Strategic developments

are required to achieve

50% on the council’s

sustainability checklist.

The Sustainability

Appraisal Framework

should assess the AAP’s

adaptation and mitigation

to climate change and

efficient use of energy.

The Area Action Plan should reflect

the objectives of SPG19.

Level 2

Strategic Flood

Level 2 SFRA has been

undertaken for 3 sites in

No targets SA should take into

consideration the

The AAP should implement the

recommendations of the Level 2

Page 67: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

67

Risk

Assessment

(SFRA) for 3

sites and

Wembley

Masterplan area

the borough and the

Wembley Masterplan

area, identifying the

planning constraints

posed as a result of flood

risk

planning constraints

identified in the Level 2

SFRA for the Wembley

Masterplan area.

SFRA.

Surface Water

Management

Plan

SWMP outlines the

preferred surface water

management strategy for

the borough.

No targets SA should consider the

impact of development

on surface drainage.

AAP should take into account

Critical drainage Areas identified in

the SWMP which are within the

Wembley area.

Brent climate

change strategy,

(Dec 2009)

The climate change

strategy seeks to:

- To cut emissions

produced by the

borough

- To enable Brent to cope

with and adapt to

climate change

To ensure that

members of the public

and employees cut their

emissions and to

ensure that the council

and residents mitigate

and adapt to climate

change.

SA Framework needs to

consider the impact of

development on climate

change.

The Area Action plan should

actively promote efficient use of

resources and development should

adapt to and mitigate against

climate change impacts.

Brent Strategic

Flood Risk

Assessment

The SFRA seeks to

ensure that growth does

not increase risk of

flooding, and to ensure

that uses are placed in

appropriate locations to

ensure that risk of

flooding is minimised.

To ensure that

development is located

away from areas of

high flood risk.

No. properties at risk

from flooding in

Wembley.

SA needs to consider the

locations of growth and

uses based on flood risk.

The Area Action Plan needs to

ensure that vulnerable uses are

away from areas of the highest risk

of flooding.

Page 68: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

68

Brent’s Cultural

Strategy, 2010-

2015

The vision for the Brent

Cultural Strategy is to

deliver a place that is a

place that is confident in

its belief in culture as a

catalyst for improving the

quality of life of everyone

who lives or works in the

borough regardless of

their individual

circumstances.

Brent’s culture will be the

direct product of people’s

sense of pride, identity

and connectedness. A

relevant and exciting offer

of cultural activities will be

available and will provide

a route for harnessing and

developing the local

distinctiveness of the

borough.

The creation of an

accessible and vibrant

local culture and shared

community activities will

prove to be an integral

part of a sustainable and

No targets. SA needs to consider the

implications of growth

and how it can deliver

cultural activities that add

to the quality of life of

residents.

The Area Action Plan needs to

carefully consider how cultural

activities are promoted and

balanced with other activities. The

Civic Centre and other related uses

should be used as a starting point

to galvanising an approach.

Page 69: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

69

successful community.

Eight headline principles

have been identified as

being key to the

successful delivery of this

vision:

Enhancing cultural

vibrancy; Increasing

participation; Raising the

profile of culture;

Encouraging young

people to take part;

Developing public space;

Making the most of

London 2012

and other major events;

Supporting the cultural

economy; Promoting

health and well-being.

Brent Air Quality

Action Plan

The objectives are to

pursue the air quality

objectives in the National

Air Quality

Strategy whilst:

- improving the quality

Targets include:

- Securing car clubs

and car free

agreements

- Improvements to

cycle and

SA needs to consider

how Brent’s air quality

can be improved

holistically through the

implementation of each

policy within the Area

The AAP needs to consider how

the AAP’s settlement strategy can

lend itself to improving air quality

across Wembley and promote

sustainable transport more

strategically across the borough

Page 70: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

70

of life and health of

the residents and

workers in Brent;

- acting in a cost-

effective manner,

through careful

selection options

-

with other Council

strategies and the

activities of the

Council, regional

bodies, outside

agencies and other

interested parties;

- taking account of the

needs and views of

local people; and

- acting where possible,

to stimulate local

employment and the

local economy.

pedestrian routes

- Improvements to

bus services

- Improvements to

rail and tube routes

Action Plan. and beyond.

Brent health and

wellbeing

strategy

The Strategy aims to

design local programmes

that:

- Enable people to live

healthier lives and

Strategic Targets

Reduce gap in life

expectancy at birth

between the top 5 and

bottom

5neighbourhoods in

Brent : by 25% in2013

SA needs to consider

how the Wembley AAP

can contribute to

improving health through

promoting sport, healthy

living and encouraging

this through the built

The AAP needs to ensure that it

contributes to promoting increased

activity in physical exercise through

attractive places to walk, cycle,

play games and to ensure that

there is the necessary health

facilities to do so.

Page 71: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

71

take greater control

over the services they

receive

- Provide greater choice

and information to

support their choices

- Move towards a model

of prevention and

promotion of healthy

lifestyles

- Focus on tackling

inequalities in health

- Provide high quality,

personalised and

responsive services

that are convenient

and easy to access

- Develop community-

based provision

- Are delivered in

partnership to provide

joined-up services

Provide value for

money

and 50% by

2018

Reduce rate of

coronary heart disease

in neighbourhoods with

rates above the Brent

average

Reduce rates of

smoking in

neighbourhoods with

rates above the Brent

average

Increase number of

people participating in

physical activity.

Increase the average

income in Brent

Reduce unemployment

rate in Brent

Reduce the level of

Brent’s housing needs

index to below the

London average

environment.

Page 72: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

72

Appendix 2: Baseline Information

Population

Males Females Total

Tokyngton Ward 5918 5918 11836

Wembley Central Ward 5501 5501 11002

Total Wembley Area 11419 11419 22838

Total Brent borough 127806 135658 263464 Source: Census, 2001

Age Age Wembley

Central Ward Tokyngton Ward Total

Wembley Growth Area Ave. Borough Ave.

0 - 4 671 631 1302 5.7 6.1

5 - 7 429 444 873 3.9 3.7

8 - 9 271 277 548 2.4 2.4

10 – 14 746 705 1451 6.5 6.2

15 155 154 309 1.4 1.3

16 - 17 368 401 769 3.4 2.7

18 - 19 304 328 632 2.8 2.4

20 - 24 857 1012 1869 8.2 8.4

25 - 29 998 1069 2067 9.1 10.1

30 - 44 2777 2825 5602 24.6 25.4

45 - 59 1753 1836 3589 15.7 15.5

60 - 64 463 606 1069 4.7 4.3

65 - 74 811 929 1740 7.6 6.7

75 - 84 333 459 792 3.5 3.5

85 - 89 50 106 156 0.7 0.9

90+ 16 54 70 0.3 0.4 Source: Census, 2001

Ethnicity

Ethnic Group Wembley Central Ward

Tokyngton Ward

Wembley Growth Area total

Wembley Growth Area Ave.

Borough Ave.

White

British 1475 2169 3644 15.9 29.2

Irish 338 678 1016 4.4 6.9

Other White 529 765 1294 5.6 9.1

Mixed

White & Black Caribbean 78 114 192 0.9 1

White & Black African 47 58 105 0.5 0.7

White & Asian 90 82 172 0.8 1

Other Mixed 100 98 198 0.9 1.1

Asian or Asian British

Indian 4361 3236 7597 33.5 18.8

Pakistani 665 693 1358 6 4.1

Bangladeshi 79 61 140 0.6 0.4

Other Asian 934 597 1531 6.8 4.8

Black or Black British

Caribbean 1220 1952 3172 13.8 10.4

African 750 844 1594 7 7.6

Other Black 147 174 321 1.4 1.5

Chinese or other

Chinese 46 74 120 0.5 1.1

Other 143 241 384 1.7 2.3

Source: Census, 2001

Page 73: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

73

Religion

Wembley Central Ward

Tokyngton Ward

Wembley Growth Area total

Wembley Growth Area Ave. Borough Ave.

All People 11002 11836 22838 100 11983

Christian 3477 5308 8785 38.3 47.7

Buddhist 79 86 165 0.7 0.9

Hindu 4275 3102 7377 32.6 17.2

Jewish 51 113 164 0.8 2.5

Muslim 1647 1464 3111 13.7 12.3

Sikh 129 80 209 1 0.7

Other 178 106 284 1.3 1.1

No religion 489 625 1114 4.9 10

Religion not stated 677 952 1629 7.1 7.7

Source: Census, 2001

Health

Wembley Central Ward

Tokyngton Ward

Wembley Growth Area total

Wembley Growth Area Ave.

Borough Ave.

Good 7647 8258 15905 69.7 70.1

Fairly Good 2350 2552 4902 22 21.3

Not Good 1005 1026 2031 8.9 8.6

Person with Limiting long-term illness

1807 1911 3718 16.3 15.6

Provided unpaid care

1168 1010 2178 9.6 8.7

Source: Census, 2001

Labour market

Residents aged 16+

Wembley Central Ward

Tokyngton Ward

Wembley Growth Area total

Wembley Growth Area Ave.

Borough Ave.

Total residents aged 16 and over 8331 9006 17337 100 9462

Total Economically Active 4445 5078 9523 54.9 56.9

Students full time 385 368 753 4.4 4.9

Self-employed 269 356 625 3.6 3.6

Unemployed 840 1055 1895 10.1 9.6

Total Economically Inactive 775 797 1572 9.1 8.3

Students 637 509 1146 6.7 6.8

Permanently sick 471 409 880 5.1 4.7 Retired 509 434 943 5.5 5.1

Source: Census, 2001

Index of local deprivation The Index of Multiple Deprivation (IMD) combines a range of different indicators including economic, social and housing issues and combines them into a single deprivation score for small “Super Output Areas” in England. There are then ranked relative to one another, and placed in order. The Wembley Growth Area, which includes the Tokyngton and Wembley Central wards, shows a mixed picture with regard to deprivation. Whilst in the Tokyngton Ward deprivation is mostly low or very low, a small of Wembley Central suffers from high deprivation with the rest of the ward suffering from medium or low deprivation. It should be noted that the higher deprivation is generally centred close to the Wembley Town Centre.

Page 74: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

74

Index of Multiple Deprivation, 2010

Flood Risk

Flood Zones in Wembley

Index of Multiple Deprivation 2010

Legend

Page 75: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

75

Surface Water Flooding

Page 76: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

76

Appendix 3 – Monitoring Points and Supporting Data

STRATEGIC OBJECTIVE 1 Promoting Economic Performance & Regeneration - by creating five main growth areas of mixed use, mixed tenure development, the largest being Wembley which will be the main focus of new retail and town centre uses (expanding the town centre eastwards into the Stadium area).

Delivery Agencies: Developers, Brent Council

Performance Measure Target Monitoring Point Specific Policies to be monitored

Local Indicators:

Local employment change. 10,000 new jobs within Wembley to 2026. Net increase of 500 jobs p.a. in Wembley area. When: Annually

Policies CP1, CP3 and CP7

Amount of new retail floorspace developed by type in Wembley.

30,000 m2 increase in the new retail floorspace in Wembley, on that currently existing or consented, by 2026.

Percentage and amount of completed gross retail floorspace by type in Wembley. When: Annually

Policies CP1, CP7 and CP16

STRATEGIC OBJECTIVE 8 Reducing the Need to Travel and Improved Transport Choices – by completing first class retail and other facilities in Wembley that reduces the need to travel to other centres. Improving key transport interchanges of Wembley, Alperton, First Central and Queen’s Park. Promoting access by public transport, bicycle or on foot and reducing car parking standards for growth areas because of their relative accessibility. Reducing modal share of car trips to Wembley from 37% towards 25%. Completing at least 5 car- free schemes per annum in the Plan period.

Delivery Agencies: Brent Council, Greater London Authority (GLA), Highways Agency & Transport for London (TfL)

Performance Measure Target Monitoring Point

Specific Policies to be Monitored

Local Output Indicators:

Proportion of trips made by public transport.

Reducing proportion of car trips as a result of Wembley development from a baseline (currently estimated at 37%), by a minimum of 10% over the life of the development.

MVA model currently calculates modal share if no intervention of 37% car use. Re-run model to refine estimates as land uses become more certain. Monitor targets through the travel plan process When: every 3-5 years

CP7

Secure interchange improvements. Secure major improvements at Wembley Stadium and Wembley Central stations by 2017.

Record Planning Obligations and direct works that secure improvements. When: Annually

CP14 and CP15

STRATEGIC OBJECTIVE 9 Protecting and Enhancing Brent's Environment - by preserving the borough's open spaces for recreation and biodiversity and creating new and enhanced open spaces to address deficiencies where possible, but particularly to meet the needs of additional population commensurate with current levels of provision. To increase the amount of public open space in the borough (and at least 2.4ha within Wembley) and the amount of land with enhanced ecological value. Enhance the borough’s green and blue infrastructure by tree planting, returning rivers to their more natural courses and mitigating the pollution effects of development. To protect the borough’s built heritage.

Delivery Agencies: Brent Council, Greater London Authority (GLA), Environment Agency, Developers.

Performance Measure Target Monitoring Point Specific Policies to be Monitored

Local Output Indicators:

Provision for new or extended public open space.

To meet open space targets in growth areas Wembley - 2.4ha.

Measure new open spaces created and laid out as a result of development. When: Annually

CP7, CP8, CP9, CP11, CP12 and CP18

New Tree Planting for new neighbourhoods. To meet tree planting targets in growth area set out in IIF, by 2017 Wembley 1,000.

Count of new trees planted in growth areas. When: Annually

CP7, CP8, CP9, CP10, CP11 and CP12

STRATEGIC OBJECTIVE 10

Achieving Sustainable Development including mitigating and adapting to climate change - By promoting mixed use, mixed tenure

Page 77: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

77

development in growth areas integrating infrastructure and housing provision, reducing energy demand in the growth areas from current building regulation standards and by achieving exemplar low carbon schemes and CHP plants.

Delivery Agencies: Brent Council, Greater London Authority (GLA), PCT

Performance Measure Target Monitoring Point

Specific Policies to be Monitored

Local Output Indicators

Secure district wide CHP in Wembley Area. Complete one CHP plant. To meet GLA energy hierarchy on very large regeneration schemes. When: Annually

CP7

In addition, the council will monitor the following indicators which relate to policy / proposals which are specific to the Wembley AAP which are not covered by indicators set out in the Core Strategy.

OBJECTIVE

Promoting Wembley as a global and distinctive tourist destination -To provide a world class setting for a world class Stadium by creating a distinctive place with high quality building design and a positive sense of identity that is sustainable and enables progress to a low carbon future.

Promoting new public art to support regeneration.

Delivery Agencies: Brent Council, Greater London Authority (GLA)

Performance Measure Target Monitoring Point

Specific Policies to be Monitored

Output Indicators

Tall buildings None in areas deemed inappropriate.

Measure number of consents When: Annually

WEM5

OBJECTIVE

Promoting improved access and reducing the need to travel by car - To create a well connected and accessible location where sustainable modes of travel are prioritised and modal share of car trips to Wembley is reduced from 37% towards 25%.

To ensure that the infrastructure of Wembley is upgraded so that it supports new development and meets the needs of the local community.

To complete first class retail and other facilities in Wembley that reduces the need to travel to other centres and improving key transport interchanges.

To promote access by public transport, bicycle or on foot and reduce car parking standards because of Wembley’s relative accessibility.

Delivery Agencies: Brent Council, Greater London Authority (GLA), TfL

Performance Measure Target Monitoring Point

Specific Policies to be Monitored

Output Indicators

Road / Junction Improvements All those proposed implemented in lifetime of the Plan.

Number of schemes completed. When: Annually

WEM13 & 14

Roads pedestrianised or with shared surface Provided with redevelopment in Comprehensive Development Area.

Length of street pedestrianised or with shared surface

When: Annually

WEM17

OBJECTIVE

Housing Needs - To achieve housing growth and meet local housing needs by promoting development that is mixed in use, size and tenure.

To achieve 50% (approx.) of new housing as affordable.

Delivery Agencies: Brent Council, Greater London Authority (GLA)

Performance Measure Target Monitoring Point

Specific Policies to be Monitored

Output Indicators

Family-sized units Achieve at least 25% of total new units in Wembley.

Number of units consented When: Annually

WEM21

Page 78: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

78

Extra care housing At least 1 scheme delivered in Wembley by 2017.

Number of units consented When: Annually

WEM22

Student accommodation No more than 5,000 student bedspaces by 2026.

Number of beds consented When: Annually

WEM25

OBJECTIVE

People’s needs and associated infrastructure - To meet social infrastructure requirements by securing provision for needs arising from new housing development, especially the provision of new education, health and community facilities.

To provide community facilities to meet the needs of Brent's diverse community.

To promote sports and other recreational activities by placing particular emphasis on the provision of new facilities to address existing deficiencies and to meet the needs of new population.

To promote healthy living and create a safe and secure environment.

Delivery Agencies: Brent Council, Greater London Authority (GLA)

Performance Measure Target Monitoring Point

Specific Policies to be Monitored

Output Indicators

Hot food take-aways No more than 7% in any length of frontage.

Shop unit survey When: Annually

WEM28

OBJECTIVE

Protecting and enhancing the environment - To preserve open spaces for recreation and biodiversity and create new and enhanced open spaces to address deficiencies where possible, but particularly to meet the needs of additional population commensurate with current levels of provision.

To increase the amount of public open space (at least 2.4ha within Wembley) and the amount of land with enhanced ecological value.

To enhance green and blue infrastructure by tree planting, returning rivers to their more natural courses and mitigating the pollution effects of development.

To achieve sustainable development, mitigate & adapt to climate change.

To reduce energy demand from current building regulation standards and achieve exemplar low carbon schemes and a combined heat and power plants.

Delivery Agencies: Brent Council, Greater London Authority (GLA), West London Waste Authority, Environment Agency

Performance Measure Target Monitoring Point

Specific Policies to be Monitored

Output Indicators

Energy from waste 1 energy from waste plant in Wembley in the plan period.

Planning permission When: Annually

WEM33

Improvements to access to open space Various proposals implemented in the plan period.

Completed schemes

When: Annually

WEM36

Food growing At least 1 scheme established as part of new development by 2017.

Completed schemes

When: Annually

WEM38

Semi-naturalisation of Wealdstone Brook 150 metres semi-naturalised by 2022.

Completed schemes

When: Annually

WEM42

Appendix 4 – key issues by theme Key issues - Transportation

Key Issue Information Source

Sustaining appropriate new

development

Ensuring that parking

requirements for new

development reflect the need

to reduce travel by private car

NPPF, MTS, LP, UDP, LDF,

WMSPD, WLSPD

Access to and within the area Ensuring existing and new

development is well served by

public transport, cycling and

MTS, LP, UDP, LDF, WMSPD,

WLSPD

Page 79: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

79

pedestrian provision

Reducing the need to travel by

private car

Travel demand management

measures

MTS, LP, WMSPD, Consultants

Studies

Improved connectivity with

other centres

Securing improved orbital

linkages

MTS, LP, LDF, WMSPD, SRTPW

Environmental and social

infrastructure

Removing congestion,

improving road safety, reducing

severance, enhancing the

public realm and smoothing

traffic flow

MTS, LP, WMSPD, Brent LIP,

Consultants Studies

Encouraging inward investment Providing adequate access to

existing and new developments

NPPF, MTS, LP, WMSPD, WLSPD

Sustaining event related activity Managing event day access

activity effectively to ensure

that existing and new

development is not

compromised

WMSPD

Key issues – Open space, sports and biodiversity

Key Issue Information Source

Increase open space provision

to meet demand of growing

population

Increase in all forms of open

space provision (park, play,

outdoor sports, allotments,

areas of wildlife) required to

meet demand of population

growth.

Core Strategy

Infrastructure and Investment

Framework

Planning for Sport and Active

Recreation Facilities 2008-2021

Brent Open Space Report –

PPG17 Assessment

Improve quality and

accessibility of open space

provision

The quality and accessibility of

all open space types could be

improved.

Brent Parks Strategy

Brent Open Space Report –

PPG17 Assessment

Improve access to nature Areas of deficiency in access to

nature are defined as localities

more than 1km from publicly

accessible green space, which

offers an experience of the

natural environment and

wildlife. Parts of Wembley are

more than 1km from Brent

River Park, the nearest publicly

accessible wildlife area.

London Plan Implementation

Report: Improving Londoners’

Access to Nature

Brent Open Space Report –

PPG17 Assessment

Increase swimming pool

provision in the centre of the

borough

Residents in central areas of

the borough live more than

20min walk from a swimming

pool.

Planning for Sport and Active

Recreation Facilities 2008-2021

Increase community access, in

particular to sports facilities on

education sites

Sports facilities at schools sites

should be made available for

community use outside of

school hours and during

holidays. School facilities

should have a clear

management plan and be

designed to maximise use

outside of school hours.

Planning for Sport and Active

Recreation Facilities 2008-2021

Sports and Physical Activity

Strategy 2010-2015

Page 80: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

80

Increase community gardening

space

Existing allotments in area are

full and new population will

increase demand for

community gardening space.

Brent Open Space Report –

PPG17 Assessment, Emerging

London Plan.

Key issues – Design and Conservation

Key Issue Information Source

Design quality management

and ensuring delivery

Difficulty in ensuring the deliver

of policy requirements through

the tendering, procurement

and construction processes

Post application negotiations

Protection of Listed Buildings Development pressure will

ensue from proposal in close

proximity to the listed Buildings

None

Key issues – Social Infrastructure

Key Issue Information Source

Provision of new education

infrastructure

2 new primary schools

required, a site for one has

been proposed in the NE

district.

Core Strategy policy CP7

Provision of health facilities to

support population growth

2,800sqm healthcare space was

secured in Quintain Phase 1

permission; space provided in

Quadrant Court is currently

vacant with no prospect of the

NHS being able to take it on.

Alternative temporary uses

such as space for creative

industries and start-up

businesses are being

considered.

CP7

Provision of multi-use

community space

Population growth and diverse

population profile will need

range of community facilities.

New Brent civic centre will

provide library, community hall

and performance space.

Further community space will

be needed. There are also

existing community facilities

which lack revenue funding.

CP7 and CP15

Key issues – Town Centres and Shopping

Key Issue Information Source

Access to and within the town

centre

Providing for the needs of all

users including pedestrians,

cyclists, vehicles and public

transport, and reducing the

number of traffic incidents within

the town centre

NPPF

Mayor of London town centre

health check, 2008

Brent Infrastructure Investment

Framework

Size, type and location of retail

units

Subdivision of units and lack of

larger units within Wembley

retail mix

Brent Retail Frontage Surveys

Page 81: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

81

Wembley and Wembley Park

town centre boundary changes

Re-visit the town centre

boundaries within the UDP.

Brent Core Strategy

Level of parking within the

town centre

Implications of increasing or

reducing parking numbers

within the town centre

Brent UDP, the London Plan

Key issues – Residential

Key Issue Information Source

How can the delivery of

affordable housing, to meet

identified need, be maximised?

Reduction in capital funding for

affordable housing is

significantly curtailing the

delivery of traditional new build

social rented housing in the

short to medium term.

NPPF

London Plan

Can a higher proportion of

family housing be provided in

the Wembley growth area and

is it appropriate to specify a

target level?

Most of the development sites

are to be brought forward as

mixed use developments at

relatively high densities and are

not always appropriate for

significant numbers of family

units.

Wembley Masterplan

Is the area appropriate for the

provision of supported or extra

care housing and, if so, how

much and where are the

appropriate locations?

The Wembley area is to provide

half of the new housing in the

borough so should be providing

a full range of housing types.

However, the vision for the

area is to develop Wembley as

a visitor destination and many

of the sites will be mixed use

where supported housing may

be inappropriate.

London Plan

Brent Extra Care Housing

Strategy 2010-15

Key Issues – Student Accommodation

Key Issue Information Source

No planning policy for student

accommodation

- Evidence for an adequate

student accommodation

policy

- Student accommodation

policy in similar councils

- London Plan

- Student accommodation

policies of

boroughs/districts with large

student populations, such as

Camden, Islington,

Southwark and Canterbury.

Growth of the student

accommodation sector in

Wembley

The supply and demand of

student accommodation, both

in Wembley and throughout

London

Student survey conducted at

current purpose built student

accommodation

- Interviews with student

accommodation developers

- Relevant student

accommodation studies

Community balance - can

Wembley cope with more

student housing

Advantages and disadvantages

of a large student population in

a community.

Case studies

Impacts on the surrounding

community - pressure on types

of services and facilities such as

health facilities and open space

- The facilities that will be

strained by students that

investment and growth is

required

- Mitigation of strain

- Student survey conducted at

current purpose built

student accommodation

- National student

expenditure report

- Experience of other

Page 82: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

82

boroughs

Over-concentration of student

housing in Wembley – should a

cap be applied

Methodology to recognise an

over concentration of student

accommodation

Comparison to similar

boroughs

Key issues – Energy and Sustainability

Key Issue Information Source

Reducing carbon emissions

from new development

Standards for carbon emission

reduction are enshrined within

CSH and BREEAM requirements

set by the Core Strategy. WAAP

could set specific fabric

performance levels. Core

Strategy supports District

Energy; WAAP could ensure

developments are DE ready.

London Plan, Kyoto Protocol,

NPPF, Brent’s Core Strategy.

Overheating, urban heat island

effect and lack of green and

‘cool’ spaces

London Plan (2009) London Climate Change

Partnership

Flood risk Localised flood risk from

Wealdstone Brook and River

Brent. Much of Wembley

prone to surface water

flooding.

Flood risk needs to be positively

reduced to minimise the risk of

flooding posed to existing

properties within the Borough.

Developers should be

encouraged to

demonstrate that their

proposal will deliver a positive

reduction in flood risk to the

Borough, whether that be by

reducing the frequency or

severity of flooding

or by reducing the impact that

flooding may have on the

community (for example,

through a reduction in the

number of people within the

site that may be at risk).

- Brent Level 2 Strategic

Flood Risk Assessment

- Wembley Masterplan Level

2 Flood Risk Assessment

- Environment Agency Areas

Prone to Surface Water

Flooding

- Surface Water

Management Plan

- Thames River Basin

Management Plan

- NPPF

- Flood and Water

Management Act 2010

- London Plan (2011) policies

7.28 Restoration of the

Blue Ribbon Network; 5.12

Flood Risk Management;

5.13 Sustainable Drainage.

- Thames Catchment Flood

Management Plan

-

Minimum energy efficiency

standards

London Plan (adopted 2011) - Brent AMR

- Brent S106

CHP/District energy network &

energy plant locations

Suitable location and

mechanism for implementation

- Brent Heat Mapping Study

- Infrastructure and

Investment Framework

Climate adaptation London Plan (2009) and

emerging London Plan

- Brent AMR

- Brent S106

Decentralised energy fuel type

– source and suitability

Potential sources:

- Biomass

- Biogas: gas produced by the

anaerobic digestion

- The existing land uses,

factories and plants where

their waste has the

potential to provide energy

Page 83: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

83

(biological materials such as

sewage gas, food

processing waste,

pharmaceutical waste and

municipal waste),

- Liquid Biofuels such as

biodiesel, and by-product

of biomass such as

bioethanol, biomethanol

and biodimethylether

- Liquid Waste (such as animal

fats)

fuel.

- Alternative fuel types for

Wembley that will support

regeneration will be

suitable for the area.

- Potential sites for locating

the waste fuel industries.

- Air quality and other

environmental impacts of

different fuel types.

Synergies with industrial area Potential to link energy centre

with industrial uses to the NE of

the growth area.

London Plan, Core Strategy

Setting min renewables

requirement counter

productive to DE and CSH policy

Electric car charging

infrastructure

- Further investigation to the

charging time and charging

management

- Feasibility for having on

street charging points

which will not result in

losing Council parking

revenues

- Mechanism for

implementation

An Electric Vehicle Delivery

Plan for London

Key issues – Industry and Employment

Key Issue Information Source

Strategic Industrial Location

(SIL) designation

Some land currently designated

as SIL could be de-designated,

and released for other uses to

further regeneration and job

creation.

Brent Employment Land

Demand Study 2009

Brent Employment land survey

2010

GLA Employment land study

Conflict between business

operation and events

Development options adjacent

to SIL

Should development proposals

adjacent to SILs have regard to

the potential effectiveness of

these locations?

London Plan

Proportion of land in SIL given

over to certain uses such as

waste management and similar

activities

General view that too much

land for open storage,

aggregate depots and waste

management could have a

negative impact upon

regeneration potential

Brent Employment Land survey

2010

Office Development Accepted that there will be

little demand for new purpose-

built offices for the foreseeable

future. Other types of

development are likely to drive

job creation in Wembley

London office Policy Review

2009

Brent Employment Land

Demand Study 2009

Business Parks Whether land should be

designated for Business Park in

Wembley

London office Policy Review

2009

Brent Employment Land

Demand Study 2009

Page 84: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

84

Start-up business units There are few sites or premises

where low-cost space for new

business start-ups is available.

Brent Employment land survey

2010

Brent Employment Land

Demand Study 2009

Key issues – Waste and Aggregates

Key Issue Information Source

Impact of waste management

activity on the environment

and regeneration.

There is a need to reduce and

minimise the impact of facilities

whilst accommodating waste

management uses which can

take advantage of the industrial

estate’s locational advantages.

PPS10 Planning for Sustainable

Waste management

Draft Joint West London Waste

DPD, Feb 2011

Energy from waste Can energy from waste be

established at Wembley given

the proximity of major waste

processing facilities to major

new housing and commercial

development?

London Plan

Page 85: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

85

Appendix 5: Sustainability Appraisal of Issues and Options

Review of the Vision for the Wembley Area Action Plan

Wembley’s vision - review against the full sustainability criteria Social Environmental Economic Commentary

S1 S2 S3 S4 S5 S6 S7 S8 EN1 EN2 EN3 EN4 EN5 EN6 EN7 EN8 EN9 EN10 EC1 EC2 EC3 EC4 EC5 Main sustainability concerns:-

- Traffic impacts; water quality and resources; air quality; biodiversity; climate change;

waste management; flooding; efficient movement. +

++ + ++

+

+ +

+

+/?

-/?

-/?

-/?

+

0 +/?

+/?

+

-/? +

+

++ + +/?

Vision

Brent (Core Strategy, 2010)

In 2026, Brent will :

be a dynamic London Borough, with a new and iconic Wembley at its core providing new jobs, homes, retail & major leisure attractions.

retain its industrial and manufacturing sectors by providing modern, upgraded premises in a quality environment.

be a borough of opportunity, maximising the potential of its youthful population through new and improved education and training facilities.

provide a range of homes that are affordable and meet the needs of its diverse communities.

be a healthy & safe place to live, benefiting from high quality urban design, attractive open spaces, first class sports facilities, and green and safe walking and cycling routes.

host inclusive community and cultural facilities which enable the full participation of it diverse communities.

retain its smaller centres which provide important local services to their immediate area.

be fully integrated into the city with excellent public transport interchanges and connections to other strategic centres in London.

use energy and resources in an efficient & sustainable manner, playing its role in addressing the global challenge of climate change.

Wembley (Vision to Reality, 2007)

“a new place, a new home and a new destination - modern, urban and exciting. At its core will be a comprehensive range of leisure and commercial facilities, exploiting excellent public transport connections to the rest of London and the United Kingdom, all in a

contemporary, lively and distinctive setting. Wembley will have a modern, service based economy. Hotels, restaurants, offices, shops, leisure uses and an array of other businesses will provide thousands of new jobs and meet the needs of both visitors and local

residents”.

Background: The Wembley Area Action Plan Vision is taken from the Core Strategy, adopted in 2009, and the council’s Corporate Strategy for Wembley, “Vision to reality” (2007).

Assumptions: The Vision for the Wembley Area Action Plan builds on those already provided through policy guidance. It is the aim of the Wembley Area Action Plan to provide further context as to how the Spatial

Vision for Wembley will be delivered; it is not, however, the role of the Wembley Area Action Plan to define the level of growth and change, as this is set out within the council’s Core Strategy

Monitoring points: Appendix 3, Wembley AAP Scoping Report (all monitoring points)

Page 86: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

86

Sustainability

Analysis:

Economic – The vision provides a generally positive economic outcome, as the vision seeks to provide new jobs in a variety of sectors which will help to attract investment into the area by providing a better quality

environment, new conferencing facilities, cultural facilities, homes, leisure and tourism. As the plan is at Issues and Options stage, it is not currently known how the Area Action Plan will seek to address efficient

movement; this is dependent on the options chosen within the Transportation theme of the plan.

Social – The vision provides moderate to significant positive impacts for the Wembley Area Action Plan area in that it seeks to provide new education facilities; improvements to health; reduction in crime; training

facilities; cultural improvements; service improvements; open space and sports facilities improvements.

Environmental – The vision provides largely mixed and unknown environmental impacts, although some neutral and positive impacts are expected on the historic environment and the landscape and townscape

respectively. This is because there are no historic buildings of interest, and because the regeneration of Wembley is expected to improve the townscape of the existing Wembley area as it is very low quality in many

places. Further positive impacts are expected with regard to land and soil, as the redevelopment of the Wembley area is likely to reduce decontamination of some industrial land. Mixed/ negative outcomes are

expected for the issue of air quality, climate change, water quality and resources, biodiversity and flood risk - currently the air quality across Wembley is particularly poor, and although the shift to more sustainable

modes of transport may in theory help to improve air quality, it is not clear yet how this will be implemented through the Area Action Plan in the context of the intensive use of the area. It should be noted, however,

that these problems are balanced against the very positive social and economic objectives; which will see the improvement of new housing, social infrastructure and economic growth amongst other issues. Similarly,

the issue of flood risk and water quality and resources is balanced against these economic and social benefits; the main reason for the negative outcome is because it is not yet clear how the AAP will help to reduce

the risk of flooding and manage climate change related impacts (both mitigation and adaptation), and the Wembley AAP is in a location which is susceptible to flood risk and climate change. The Wembley AAP seeks

to develop part of a wildlife corridor, therefore this could potentially impact on biodiversity within this location (Chiltern Banks); however, this could potentially be offset through the provision of new open spaces and

improvements to the Wildlife Corridor. Waste management, transportation and efficient movement have been given positive/ unknown scorings as although the Wembley AAP Vision provides priorities for these

issues, it is not clear how these improvements will be achieved at this stage of the plan.

Significant, cumulative, synergistic and indirect impacts – There is potential for cumulative impacts for transportation, climate change, air quality and flooding, and significant impacts on biodiversity.

Mitigation

measures:

Flooding, climate change and water resources – implementation of Sustainable Urban Drainage systems in new and existing development; locating vulnerable uses away from areas more susceptible to flood risk.

Air quality/ transportation/ efficient movement – implementation of Travel Plans; transportation improvements (orbital and radial including bus/ rail); sustainable design to minimise impact of pollutants; promotion

and provision of walking and cycling including bike stores, cycle routes, safe walking environments.

Biodiversity – habitat protection and improvements at existing wildlife corridors where development occurs; provision of new wildlife and habitats.

Wembley’s Objectives - review against the full sustainability criteria

Ob

ject

ives

Sustainability Objectives

Social Environmental Economic Overall sustainability commentary

S1 S2 S3 S4 S5 S6 S7 S8 EN1 EN2 EN3 EN4 EN5 EN6 EN7 EN8 EN9 EN

10

EC1 EC2 EC3 EC4 EC5

Page 87: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

87

OJ.

1

+ 0 0 + 0 0 0 0 - - - -/? + 0 - - 0 -/? + + + + +/- OJ.1 Regeneration through leisure, sport and mixed

use development

Main sustainability issues:

- Flood risk, efficient movements. Traffic; water

quality and resources; air quality; climate

change; waste management biodiversity.

OJ.

2

+ 0 0 0 + 0 + -/+/? -/? -

/+/?

-

/+/?

0 + 0 +/-

/?

+/-

/?

+ +/? ++ + + + +/-/? OJ.2 Town centres, shopping and existing and new

uses

Main sustainability issues:

- Impact on transportation, efficient movement,

air quality.

OJ.

3

++ + + 0 + + ++ -/+/? -/? -

/+/?

-

/+/?

0 + 0 +/-

/?

+/-

/?

+/-

/?

+/-

/?

++ ++ ++ ++ +/-/? OJ.3 Modern, service based economy

Main sustainability issues:

- Impact on transportation, efficient movement,

air quality, use of water, waste and other

resources.

OJ.

4

+ 0 0 0 + 0 + + +/-

/?

-

/+/?

-

/+/?

0 + 0 +/-

/?

+/-

/?

+

+/-

/?

++ ++ ++ ++ +/-/? OJ.4 Promoting Wembley as a global and distinctive

tourist destination

Main sustainability issues:

OJ.

5

+ + + ++ + ++ + + +/? +/? ? 0 0 0 0 0 0 0 + 0 ++ + 0 OJ.5 People’s needs and associated infrastructure

Main sustainability issues:

- Impact on traffic, water quality and resources, air

quality.

Page 88: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

88

OJ.

6

+ + 0 ++ + + ++ + +/-

/?

-/? -/? 0 + 0 +/-

/?

+/-

/?

+/? ? + ++ ++ + -/+/? OJ.6 Housing Needs

Main sustainability issues:

- Transportation and accessibility, climate change,

waste management, provision of related

infrastructure.

OJ.

7

+/? 0 0 0 0 0 +/? +/? +/? 0 +/? 0 +/? 0 0 0 0 0 ? -/? -/? -/? +/? OJ.7 Promoting improved access and reducing the

need to travel by car

Main sustainability issues:

- Uncertainty about impacts across many of the

options, but likely to have a positive environmental

impact with more negative economic impacts.

OJ.

8

+ + 0 +

+

0 + +

+ +

+ +

+ +

+ + +

++ +

+

+ + + OJ.8 Protecting and enhancing the environment

Main sustainability issues:

- No sustainability issues, although further detail will

need to be considered and appraised at Draft Plan

stage.

Objective 1: Regeneration through leisure, sport and mixed use development

- To promote the regeneration of the area for sporting, leisure, tourism and mixed-use development, including the provision of at least 11,500 new homes between 2010 and 2026, so that Wembley is developed as

a major visitor destination as well as a major new community.

- To complete three large scale hotels in the Wembley area and one large regional visitor attraction.

- To increase newly approved retail floorspace in Wembley by 25%

- To ensure that the local community benefits from development, including training and access to 10,000 additional full-time jobs created by 2031

Background: Wembley town centre has been weakened by new retail growth in the past and Wembley now serves local convenience and comparison need with Wembley Park serving more of a service role; it is

important any growth considers the impact of new retail on the role of these centres.

Assumptions: The Core Strategy identifies Wembley and Kilburn as the town centres where retail growth is to be located and a retail street has already been approved around the stadium area.

Monitoring points: Appendix 3, Wembley AAP Scoping Report

Sustainability

Analysis:

The increase in development and intensive use of the area will create more journeys thus will have knock on effects on accessibility, transport and air quality which will need to be managed. There

are also potential problems around adapting and mitigating to climate change and managing water quality and dealing with waste with such growth. There are potential negative impacts if

land is lost at the Chiltern Railway banks wildlife corridor.

Page 89: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

89

Objective 2: Town centres, shopping and existing and new uses

- To ensure that the development around the National Stadium is compatible and co-ordinated with regeneration proposals in the surrounding area, and that Wembley town centre, the main focus for new retail

and town centre uses in the borough, is expanded eastwards into the Stadium area.

- To enhance the vitality and viability of Wembley’s town centres by maintaining their position in the retail hierarchy and maintaining a range of local services.

Background: Wembley town centre has been weakened by new retail growth in the past and Wembley now serves local convenience and comparison need with Wembley Park serving more of a service role (i.e.

shops under 1000sqm); it is important any growth considers the impact of new retail on the role of these centres. It was expected that a new retail element close to the stadium would be for niche

retail and would not impact on the two centres.

Assumptions: The Core Strategy identifies Wembley and Kilburn as the town centres where retail growth is to be located and a retail street has already been approved around the stadium area.

Monitoring points: Appendix 3, Wembley AAP Scoping Report

Sustainability

Analysis:

Locating new town centre uses which will attract visitors to Wembley from elsewhere may increase trips, but improving retail offer including convenience within Wembley may promote shorter,

more sustainable trips and therefore may impact positively or negatively on issues such as air quality, climate change etc. A reduction in industrial uses may have a positive impact on land and

water quality.

Economic – Positive/ mixed/ unknown

Social – Positive/ neutral

Environmental – mixed/ neutral/ positive

Significant, cumulative, synergistic and indirect impacts –None, but many uncertainties.

Mitigation

measures:

The impacts depend on how and where the retail is located and the type of retail, and how this impacts on patterns of movement. It could well be reduced through mitigating measures such as improving cycle routes,

public transport, sustainable urban drainage and systems that encourage recycling such as Envac. Impact on the Chiltern Wildlife Corridors could be reduced by improving habitats and providing other alternate spaces.

Economic – positive/ mixed

Social – neutral/ positive

Environmental – mixed

Significant, cumulative, synergistic and indirect impacts – There may be some cumulative impacts with regard to climate change, waste, transport, accessibility and also some significant impacts on wildlife at the

Chiltern Banks.

Mitigation

measures:

The impacts could well be reduced through mitigating measures such as improving cycle routes, public transport, sustainable urban drainage and systems that encourage recycling such as Envac. Impact on the Chiltern

Wildlife Corridors could be reduced by improving habitats and providing other alternate spaces.

Page 90: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

90

Objective 3: Modern, service based economy

- Generate 10,000 jobs across a range of sectors including retail, leisure, office and other businesses.

- Increase the supply of modern subsidised workplace developments for the arts and creative industries.

- Ensure sufficient sites and premises are available for commercial activity and that industrial/ warehousing floorspace is renewed.

Background: The Wembley Growth Area has over 70 hectares of land around the new stadium available for redevelopment alongside the potential to create further jobs through flexibility across the existing

poorly used industrial land in the east of the Growth Area.

Assumptions: Brent’s Core Strategy (adopted 2009) seeks to provide 10,000 new jobs across Wembley in a range of retail, office, conferencing, sports, creative, civic and other sectors.

Monitoring points: Appendix 3, Wembley AAP Scoping Report

Sustainability

Analysis:

The most positive outcomes of this objective relate to social and economic objectives. It is clear that the growth in jobs will have an impact on use of resources such as water, traffic, efficient

movement, water quality and waste management but the impacts are dependent on how this is dealt with in the Area Action Plan, and the nature of the employment post recession.

Economic – very positive/ mixed

Social – positive/ very positive

Environmental – mixed

Significant, cumulative, synergistic and indirect impacts – there are potential impacts around the creation of new industries with regard to water resources, waste etc, although whether these are likely to be

significant is unknown without further policy detail. There are likely to be impacts on air quality, transport and movement although this depends on how these issues are dealt with at Issues and Options stage.

Mitigation

measures:

The impacts could well be reduced through mitigating measures such as improving cycle routes, public transport, sustainable urban drainage and systems that encourage recycling such as Envac. Impact of industry

could be mitigated through the encouragement of sustainable industry.

Objective 4: Promoting Wembley as a global and distinctive tourist destination

- To provide a world class setting for a world class Stadium by creating a distinctive place with high quality building design and a positive sense of identity that is sustainable and enables progress to a low carbon

future.

- Promoting new public art to support regeneration.

Background: Wembley is the location of the National Stadium, the Wembley Arena and before demolition was the location for internationally known conferencing facilities.

Assumptions: Brent’s Core Strategy (2009) promotes Wembley as a tourist destination for retail, leisure and culture. It is an Opportunity Area in the London Plan and a Strategic Cultural Area.

Monitoring points: Appendix 3, Wembley AAP Scoping Report

Sustainability

Analysis:

The promotion of Wembley as a tourist destination will help to promote its image and pride in the area, however with more visitors means more pressure on transportation, movement, water,

impact on air quality and more pressure for sensitive uses such as hotels.

Page 91: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

91

Economic – very positive/ mixed

Social – positive/ neutral

Environmental – mixed

Significant, cumulative, synergistic and indirect impacts –There may be impacts associated with more visits such as impact on transport and movement, air quality.

Mitigation

measures:

The impacts could well be reduced through mitigating measures such as improving cycle routes, public transport, walking routes, open spaces.

Objective 5: People’s needs and associated infrastructure

- To meet social infrastructure requirements by securing provision for needs arising from new housing development, especially the provision of new education, health and community facilities.

- To provide community facilities to meet the needs of Brent's diverse community.

- To promote sports and other recreational activities by placing particular emphasis on the provision of new facilities to address existing deficiencies and to meet the needs of new population.

- To promote healthy living and create a safe and secure environment.

Background: The council has to enable the delivery to support infrastructure with housing growth including community, sports, education, health facilities, transportation facilities etc.

Assumptions: The council’s Core Strategy policy CP7 sets out the requirements for Wembley’s growth, which is supported by the Infrastructure Investment Framework.

Monitoring points: Appendix 3, Wembley AAP Scoping Report, Town Centre Monitoring points

Sustainability

Analysis:

The main positive outcomes will relate to the social objectives and economic objectives, as improved social and transportation infrastructure will make Wembley a more desirable place to live and

visit. Although within this infrastructure there could be the potential for transport improvements, it is not yet clear how facilities will be improved therefore an “unknown” score has been given.

Economic – mixed/ positive

Social – positive/ very positive

Environmental – mixed

Significant, cumulative, synergistic and indirect impacts – none

Mitigation

Measures:

None required.

Objective 6: Housing Needs

- To achieve housing growth and meet local housing needs by promoting development that is mixed in use, size and tenure

- To achieve 50% (approx.) of new housing as affordable

Page 92: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

92

Background: Core Strategy policy CP21 seeks to provide a mix of housing stock, including affordable and family housing.

Assumptions: The Core Strategy assumes a growth of at least 11,500 new homes up to 2026 in Wembley. The council suffers from a severe lack of homes, particularly affordable and family units.

Monitoring points: Appendix 3, Wembley AAP Scoping Report, Town Centre Monitoring points

Sustainability

Analysis:

The construction of housing will use water and energy and will put pressure on existing transport facilities, however it will also have very positive social and economic impacts. The impact of flood

risk is unknown as there is no specific settlement strategy in the Area Action Plan as yet. Waste management and climate change adaptation and mitigation will be important considerations for the

provision of new housing.

Economic – mixed/ positive

Social – positive/ very positive

Environmental – mixed

Significant, cumulative, synergistic and indirect impacts – potential cumulative impacts on transportation, air quality, climate change, flood risk.

Mitigation

measures:

The impacts could be reduced by promoting sustainable patterns of growth, adapting/ mitigating climate change through design, ensuring sensitive uses are located away from areas of higher flood risk.

Objective 7: Promoting improved access and reducing the need to travel by car

- To create a well connected and accessible location where sustainable modes of travel are prioritised and modal share of car trips to Wembley is reduced from 37% towards 25%.

- To ensure that the infrastructure of Wembley is upgraded so that it supports new development and meets the needs of the local community.

- To complete first class retail and other facilities in Wembley that reduces the need to travel to other centres and improving key transport interchanges.

- To promote access by public transport, bicycle or on foot and reduce car parking standards because of Wembley’s relative accessibility.

Background: Wembley is within an Air Quality Management Area and is affected by poor quality air because of vehicle movement and industry.

Assumptions: The Core Strategy encourages a modal shift from the car within the Wembley Area.

Monitoring points: Appendix 3, Wembley AAP Scoping Report, Town Centre Monitoring points

Sustainability

Analysis:

There could potentially be a number of positive impacts with regard to this option on the environmental theme, however it is still unclear how far the Area Action Plan (and funding raised) will go to promoting

sustainable travel. Furthermore, there may be negative impacts on economic objectives.

Page 93: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

93

Economic – mixed/ unknown

Social – mixed/ unknown

Environmental – positive/ unknown

Significant, cumulative, synergistic and indirect impacts – none; not enough detail in the plan to consider the impacts.

Mitigation

measures:

An appropriate balance will need to be struck in promoting improved access and reducing the need to travel by car, and the requirements of new and existing businesses and tourists.

Objective 8: Protecting and enhancing the environment

- To preserve open spaces for recreation and biodiversity and create new and enhanced open spaces to address deficiencies where possible, but particularly to meet the needs of additional population

commensurate with current levels of provision.

- To increase the amount of public open space (at least 2.4ha within Wembley) and the amount of land with enhanced ecological value.

- To enhance green and blue infrastructure by tree planting, returning rivers to their more natural courses and mitigating the pollution effects of development.

- To achieve sustainable development, mitigate & adapt to climate change.

- To reduce energy demand from current building regulation standards and achieve exemplar low carbon schemes and a combined heat and power plants.

Background: The council has to enable the delivery to support infrastructure with housing growth including community, sports, education, health facilities, transportation facilities etc.

Assumptions: The council’s Core Strategy policy CP7 sets out the requirements on open space, sports and climate change for Wembley’s growth, which is supported by the Infrastructure Investment Framework.

Wembley’s CP17 policy protects open space.

Monitoring points: Appendix 3, Wembley AAP Scoping Report, Town Centre Monitoring points

Sustainability

Analysis:

There are potential improvements with regard to flood risk and water resources, biodiversity and climate change. The objective will also help to promote social and economic improvements as

Wembley will become a more attractive place to live, work and visit.

Economic – positive

Social – positive/ neutral

Environmental – positive

Significant, cumulative, synergistic and indirect impacts –none

Mitigation

measures:

More detailed information on mitigation measures will be required at Draft Plan stage when further details are known.

Page 94: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

94

Urban design and place shaping Options Analysis - review against the full sustainability criteria Options chosen at Preferred Options stage highlighted in blue

Them

e

Issu

es

Op

tio

ns

Sustainability Objectives

Social Environmental Economic Overall sustainability commentary

S1 S2 S3 S4 S5 S6 S7 S8 EN1 EN2 EN3 EN4 EN5 EN6 EN7 EN8 EN9 EN10 EC1 EC2 EC3 EC4 EC5

UR

BA

N D

ESIG

N A

ND

PLA

CE

MA

KIN

G

ISSU

E 1

UD

1.1

- 0 0 - 0 0 0 0 - 0 0 0 0 0 0 0 + 0 0 + + 0 0 The market provides for need to some extent;

however this will be profit led rather than focusing on

mixed and sustainable community.

UD

1.2

0 0 0 + 0 0 0 0 - 0 0 0 0 0 0 0 + 0 0 0 0 0 0 A stricter approach to providing a mix of housing will

help to address the borough’s wider housing need as

well as ensuring profits for developers. *

UD

1.3

0 0 0 + 0 0 0 0 - 0 0 0 0 0 0 0 + 0 0 0 - 0 0 An overly explicit approach to the provision and mix of

housing will address the borough’s wider housing

need, although may impact on deliverability and

profits.

ISSU

E 2

UD

2.1

0 0 0 + + 0 + + + 0 + 0 + + +/? + 0 0 0 0 + + ++ The strategy for Wembley regeneration area is to

encourage a modal shift away from reliance on the car

and promote more sustainable journeys. This option

builds upon this vision and would help to encourage

this modal shift, depending on how pro-active the

options are (hence +/?)*

UD

2.2

0 0 0 + 0 0 + 0/? +/? 0 + 0 + + +/? 0/? 0 0 0 0 + + +/

?

The option assumes that better entrances would only

improve the area for those travelling by car and bus,

but not walking or cycling. This option would be more

positive if it also included these issues (hence +/?).

This option also helps to improve the economic

benefits for businesses to the east of the area.

ISSU

E 3

UD

3.1

0 0 0 0 +/? 0 +/? 0/? 0 0 0 0 +/? 0 0 0 + 0 0 0 + + + This option will provide a comprehensive strategy on

the location of tall buildings within the Wembley area

and will help to improve the public realm, however it

may be overly restrictive on development.*

UD

3.2

0 0 0 0 +/? 0 0/? 0/? 0 0 0 0 ++/

?

0 0 0 + 0 0 0 + + + This option will provide more flexibility on building

heights, will improve viability for land owners and will

ensure efficient use of land. However it may also

result in over-development and could have an impact

on the public realm.*

Page 95: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

95

ISSU

E 4

UD

4.1

0 0 0 0 ++ + + 0 0 0 0 ++ ++ 0 0 0 ++ 0 0 0 ++ ++ 0 A more up to date design guide will ensure better

design integration and improve the potential for

regeneration, investment and the promotion of

Wembley as a destination and quality place to live.

EN4 and 5 would need to be specified in the design

guide if they are to be ++

UD

4.2

0

0 0 0 +/? 0 0 0 0 0 0 0 +/? 0 0 0 0 0 0 0 +/

?

+/? 0 The masterplan is out of date and will largely have a

neutral impact on Olympic Way. However, there is a

chance that permissions may not be implemented; in

which case the masterplan would still be relevant. *

ISSU

E 5

UD

5.1

0 0 0 0 + + ++ 0 0 0 0 0 ++ + 0 0 0 0 + 0 + + 0 A public art strategy could help to foster a sense of

pride in the area thus improving economic investment

and promoting Wembley as a tourist destination. *

UD

5.2

0 0 0 0 - - - 0 0 0 0 0 - - 0 0 0 0 0 0 0 0 0 Without a pro-active strategy for investment in public

art, Wembley may not see the improvements and

benefits that might be found with a more proactive

policy.*

ISSU

E 6

UD

6.1

0 0 0 0 ++ + + +/? 0 0 0 0 ++ + 0 0/? 0 0 0 0 ++ + +/

?

A public realm strategy will help to improve the

quality of Wembley and help to foster a sense of pride

in the area, and attract other economic benefits. *

UD

6.2

0 0 0 0 ++ + ++ +/? 0 0 0 0 ++ + 0 0/? 0 0 0 0 ++ + +/

?

A public realm strategy will help to improve the

quality of Wembley and help to foster a sense of pride

in the area, and attract other economic benefits. A

unique set of materials within each area could help to

promote local distinctiveness. *

ISSU

E 7

UD

7.1

0 0 0 0 ++ 0 + 0 0 0 0 +/? ++ + + +/? 0 0 0 0 +/

?

0 0 Higher quality design will improve the quality of the

Wembley area and will also ensure that more

sustainable materials are used. There could

potentially be an impact on developer profit and

viability, however this could generally promote a

better quality environment and therefore increase

revenue.*

UD

7.2

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 The continuation of the current system will have

neither positive nor negative impacts on the AAP

area.*

Page 96: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

96

Urban design and place shaping - detailed review of each option

Issue 1 - What is the appropriate character & urban form for Wembley?

1. Continue to allow the market to dictate form

2. Allocate some general areas for different types of development i.e. family houses in the north east stadium area or

around the High Road.

3. Be prescriptive about specific locations and a range of building typologies that would be acceptable in such

locations

Background: Development already undertaken or granted planning consent has, in the main, been of a

similar scale and typology

Assumptions: That urban form would benefit from greater variety being introduced

Options Social, economic and environmental impacts

Option UD1.1:

The market provides for need to some extent; however this will be profit led rather than focusing

on mixed and sustainable community.

Economic – positive

Social – negative

Environmental – positive/negative

Significant, cumulative, synergistic and indirect impacts –none

Option UD1.2: A stricter approach to providing a mix of housing will help to address the borough’s wider housing

need as well as ensuring profits for developers.

Economic – neutral

Social – positive

Environmental – positive/negative

Significant, cumulative, synergistic and indirect impacts – none

Option UD1.3: An overly explicit approach to the provision and mix of housing will address the borough’s wider

housing need, although may impact on deliverability and profits

Economic – positive

Social – positive

Environmental – positive/negative

Significant, cumulative, synergistic and indirect impacts –none

Issue 2 – How can the approaches/gateways to Wembley be made more attractive to visitors?

1. Continue to focus on the three stations

2. Produce a strategy to enhance other entrance points into the area

Background: Despite improvements in recent years, some of the main gateways into Wembley,

particularly by road, do not present a good aspect to visitors

Assumptions: That improvements to the attractiveness of the main gateways will have a positive effect

on inward investment.

Options Social, economic and environmental impacts

Option UD2.1:

The strategy for Wembley regeneration area is to encourage a modal shift away from reliance on

the car and promote more sustainable journeys. This option builds upon this vision and would

help to encourage this modal shift, depending on how pro-active the options are (hence +/?)

Economic – positive

Social – positive

Environmental – positive

Page 97: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

97

Significant, cumulative, synergistic and indirect impacts – very positive

Option UD2.2: The option assumes that better entrances would only improve the area for those travelling by car

and bus, but not walking or cycling. This option would be more positive if it also included these

issues (hence +/?). This option also helps to improve the economic benefits for businesses to the

east of the area

Economic – positive

Social – positive

Environmental – positive

Significant, cumulative, synergistic and indirect impacts – very positive

Issue 3 - Where in Wembley are tall buildings appropriately located and what should the maximum height

be?

1. Produce a comprehensive tall buildings strategy for the entire AAP area.

2. Continue with the indicative images and loose guidelines set out in SPDs.

Background: Guidance on the appropriate height of buildings is currently largely included in SPDs

rather than in a development plan.

Assumptions:

Options Social, economic and environmental impacts

Option UD3.1:

This option will provide a comprehensive strategy on the location of tall buildings within the

Wembley area and will help to improve the public realm, however it may be overly restrictive

on development

Economic – positive

Social – neutral

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts –none

Option UD3.2:

This option will provide more flexibility on building heights, will improve viability for land

owners and will ensure efficient use of land. However it may also result in over-development

and could have an impact on the public realm

Economic – positive

Social – neutral

Environmental – positive

Significant, cumulative, synergistic and indirect impacts –none

Issue 4 - Is there a need to review the design code for Olympic Way?

1. Review and strengthen the design code for Olympic Way.

2. Continue to use the Masterplan as guidance for development in this location

Background: Determination of a recent major proposal adjacent to Olympic way has raised

questions as to whether the current guidance is appropriate and whether more weight

is needed for guidance by including it in a statutory development plan.

Assumptions:

Options Social, economic and environmental impacts

Option UD4.1:

A more up to date design guide will ensure better design integration and improve the potential

for regeneration, investment and the promotion of Wembley as a destination and quality place

to live. EN4 and 5 would need to be specified in the design guide if they are to be ++

Page 98: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

98

Economic – positive

Social – positive

Environmental – positive

Significant, cumulative, synergistic and indirect impacts – very positive

Option UD4.2: The masterplan is out of date and will largely have a neutral impact on Olympic Way. However,

there is a chance that permissions may not be implemented; in which case the masterplan

would still be relevant. *

Economic – neutral

Social – neutral

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts –none

Issue 5 - Should the Plan include a public art strategy and what should this comprise?

1. Produce a public art strategy

2. Do not produce a public art strategy

Background: There is currently no statutory policy for public art in Wembley in the development

plan for the borough.

Assumptions:

Options Social, economic and environmental impacts

Option UD5.1:

A public art strategy could help to foster a sense of pride in the area thus improving economic

investment and promoting Wembley as a tourist destination.

Economic – positive

Social – positive

Environmental – positive

Significant, cumulative, synergistic and indirect impacts –very positive

Option UD5.2: Without a pro-active strategy for investment in public art, Wembley may not see the

improvements and benefits that might be found with a more proactive policy.*

Economic – neutral

Social – negative

Environmental – negative

Significant, cumulative, synergistic and indirect impacts –none

Issue 6 - Should the Plan include a public realm strategy, and what should this comprise?

1. Seek to use a palette of materials (lighting, furniture etc.) for all localities across the area.

2. Seek to reinforce the differences of each locality by using different materials.

Background: There is currently no statutory policy for the design of the public realm in Wembley in

the development plan for the borough

Assumptions: That particular guidance is needed for the Wembley area.

Options Social, economic and environmental impacts

Option UD6.1:

A public realm strategy will help to improve the quality of Wembley and help to foster a sense

of pride in the area, and attract other economic benefits.

Economic – positive

Page 99: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

99

Social – positive

Environmental – positive

Significant, cumulative, synergistic and indirect impacts – very positive

Option UD6.2: A public realm strategy will help to improve the quality of Wembley and help to foster a sense

of pride in the area, and attract other economic benefits. A unique set of materials within each

area could help to promote local distinctiveness.

Economic – neutral

Social – positive

Environmental – positive

Significant, cumulative, synergistic and indirect impacts –none

Issue 7 - Should the Plan seek to secure the quality of materials and detailing of development at an early

stage?

1. Secure detailed design specifications at planning stage.

2. Continue to work under the current system.

Background: The quality of materials used in the final build-out of development is often reduced in

quality

Assumptions: That a policy requirement relating to the quality of materials can be included in the

development plan

Options Social, economic and environmental impacts

Option UD7.1:

Higher quality design will improve the quality of the Wembley area and will also ensure that

more sustainable materials are used. There could potentially be an impact on developer profit

and viability, however this could generally promote a better quality environment and therefore

increase revenue.*

Economic – neutral

Social – positive

Environmental – positive

Significant, cumulative, synergistic and indirect impacts – none

Option UD7.2: The continuation of the current system will have neither positive nor negative impacts on the

AAP area.

Economic – neutral

Social – neutral

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts –none

Page 100: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

100

Business, Industry & Waste Options Analysis – review against the full sustainability criteria Options chosen at Preferred Options stage highlighted in blue

Them

e Is

sues

Op

tio

ns

Sustainability Objectives

Social Environmental Economic Overall sustainability commentary

S1 S2 S3 S4 S5 S6 S7 S8 EN1

EN2 EN3 EN4 EN5 EN6 EN7 EN8 EN9 EN10 EC1 EC2 EC3 EC4 EC5

BU

SIN

ESS,

IND

UST

RY

& W

AST

E

bag

IS

SUE

1 –

SI

L re

leas

e

BIW

1.1

0 - 0 0 - 0 0 0 - - - - -- - -- 0 0 0 0 - - 0 0 Negative significant environmental impacts as there is no proactive change to improve a poor quality area. Generally poorly performing with regard to the economic and social impacts as the option does not pro-actively make use of under-used land.

BIW

1.2

0 0 0 0 + 0 0 0/? - - - - -- - -- 0 0 0 - - -- - 0 This would impact upon regeneration of sites close to the SIL,with a consequent stagnation of the local economy and fewer job opportunities. No improvements to environmental conditions.

BIW

1.

3

0 0 0 0 + 0 0 0 - 0 - 0 0 0 - 0 + 0 + + ++ + 0 Option to de-designate SIL immediately adjacent to key sites identified for regeneration which will include residential or other sensitive uses:

BIW

1.4

+ 0 0 + + 0 + 0 0 + + + ++ + + 0 + 0 -- -- + -/+ 0 Potential for significant employment to be lost if too much industrial land de-designated as sites may be occupied by uses incompatible with business & industry

BIW

1.

5

0 0 0 0 + 0 0 0 0 0 + 0 + 0 - 0 0 0 +/- 0 + + 0 Generally positive

ISSU

E 2

Bad

nei

ghb

ou

rs

BIW

2.

1

0 - 0 - -- 0 - - - - -- - -- 0 + + 0 0 + + -- -- 0 Significant environmental impacts and negative effects on regeneration and inward investment of too many waste and other bad neighbour uses

BIW

2.

2

0 + 0 + + 0 0 0 0 0 0 0 0 0 - - 0 0 +/- +/- ++ ++ 0 Generally positive effects on regeneration and inward investment but negative on dealing with waste and climate change

BIW

2.

3

0 - 0 ? 0 0 0 0 0 0 - 0 - 0 + + 0 0 +/- +/- +/- - 0 Less harmful potential effect on inward investment and air quality and townscape

BIW

2.

4

0 + 0 + + 0 + 0 + 0 0 0 ++ 0 0 0 0 0 + + ++ ++ 0 Re locating existing waste facilities would have all round positive effects

ISSU

E 3

Bu

sin

ess

Par

k p

rovi

sio

n

BIW

3.1

+ 0 0 0 0 0 0 0 - 0 + 0 + 0 0 0 0 0 + + + + 0 The development of a business park would generally have positive impacts. Some impact of traffic because area currently has relatively poor public transport accessibility

Page 101: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

101

BIW

3.

2

+ 0 0 0 0 0 0 0 - 0 + 0 + 0 0 0 0 0 + + + + 0 As above

BIW

3.

3

- 0 0 0 0 0 0 0 0 0 - 0 - 0 0 0 0 0 0 0 0 0 0 Negative impacts based upon area remaining much as it is now.

ISSU

E 4

– O

ffic

e &

oth

er

use

s

BIW

4.

1

+ 0 + + 0 0 + 0 0 0 0 0 0 0 0 0 0 0 ++ ++ + + 0 Generally positive effects of new offices and affordable workspace, especially in terms of regeneration and economic well being

BIW

4.

2

+ + + + + 0 + + 0 0 0 0 0 0 0 0 0 0 ++ 0 + + 0 Housing as alternative to offices would still provide regeneration benefits but few employment opportunities. Social benefits from new housing

BIW

4.

3

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 + + + 0 Retains positive effects of offices on inward investment but few other benefits

Page 102: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

102

Business, Industry & Waste Options - Detailed review of each option

Issue 1 - Should some land currently designated as SIL be de-designated, and released for other uses, and if so, how much?

1. Leave the extent of the SIL as currently defined. 2. Introduce policy whereby development proposals adjacent to SIL should have regard to the potential

effectiveness of these locations 3. De-designate SIL immediately adjacent to key sites identified for regeneration which will include residential or

other sensitive uses. 4. De-designate a substantial part of the SIL to facilitate wider regeneration and environmental improvement. 5. Limit the range of acceptable uses, for example to B1, adjacent to key regeneration sites.

Background: The level of manufacturing and distribution activity has been declining with the introduction of more waste and open storage uses.

Assumptions: That the current economic downturn is temporary and that growth will return in the future

Options

Option BIW1.1:

Negative significant environmental impacts as there is no proactive change to improve a poor quality area. Generally poorly performing with regard to the economic and social impacts as the option does not pro-actively make use of under-used land Economic – negative Social – neutral/ negative Environmental – significant negative . Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option BIW1.2:

This would impact upon regeneration of sites close to the SIL, with a consequent stagnation of the local economy and fewer job opportunities. No improvements to environmental conditions. Economic – negative Social – neutral/ negative Environmental – significant negative . Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option BIW1.3:

Option to de-designate SIL immediately adjacent to key sites identified for regeneration which will include residential or other sensitive uses: Economic – mainly neutral Social –negative Environmental – negative. Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option BIW1.4:

Potential for significant employment to be lost if too much industrial land de-designated as sites may be occupied by uses incompatible with business & industry Economic – mainly neutral Social –negative Environmental – significant negative . Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option BIW1.5:

Generally positive Economic – positive Social – mainly neutral

Environmental – mainly positive. Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Issue 2 – What proportion of land in the SIL should be given over to bad-neighbour uses such as waste management?

1. No limit on the proportion of the SIL devoted to waste uses or open storage. 2. Allow no further waste management or open storage uses in the SIL. 3. Consider individual proposals on their merits and only restrict such uses if evidence of detrimental impact. 4. Actively promote the re-location of existing, badly located waste management sites.

Background: Increasing proportion of SIL in waste, aggregate or open storage use

Assumptions: Continuing demand for bad-neighbour use

Options

Option BIW2.1:

Significant environmental impacts and negative effects on regeneration and inward investment of too many waste and other bad neighbour uses Economic – mainly negative Social – significant negative

Environmental – significant negative Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option BIW2.2:

Generally positive effects on regeneration and inward investment but negative on dealing with waste and climate change

Page 103: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

103

Economic – significant positive Social – mainly positive

Environmental – some negative Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option BIW2.3:

Less harmful potential effect on inward investment and air quality and townscape Economic – minor negative Social – minor negative

Environmental –.positive/negative Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option BIW2.4:

Re locating existing waste facilities would have all round positive effects Economic – positive Social – positive

Environmental –positive. Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Issue 3 - Is it unrealistic to expect the area to be developed as a business park?

1. Retain business park designation as currently in the UDP. 2. Reduce the extent of business park designation. 3. Completely remove business park designation.

Background: No Business Park development to date despite 10 year old policy

Assumptions: : Continuing lack of demand for Business Park

Options

Option BIW3.1:

The development of a business park would generally have positive impacts. Some impact of traffic Economic – positive Social – positive/negative

Environmental –.positive Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option BIW3.2:

The development of a business park would generally have positive impacts. Some impact of traffic Economic – positive Social – positive/negative

Environmental –.positive Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option BIW3.3:

Negative impacts based upon area remaining much as it is now Economic – neutral Social – negative

Environmental –negative Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Issue 4 - Should the AAP be promoting other job generating development together with offices, including promoting change of use from that already granted permission?

1. Promote the development of more low-cost, affordable workspace. 2. Allow purpose-built office development to be converted to residential or other non-commercial uses. 3. Do not allow offices to be converted to other uses until it is clear that there will be no demand in the medium term.

Background: Existing outline consent for about 100,000 sq. m office development

Assumptions: That continuing low demand for office space in Wembley

Options

Option BIW4.1:

Generally positive effects of new offices and affordable workspace, especially in terms of regeneration and economic well being Economic – very positive Social – positive

Environmental –neutral Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option BIW4.2:

Generally positive Economic – very positive Social – positive

Environmental –neutral. Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option BIW4.3:

Generally positive Economic – positive

Page 104: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

104

Social – positive

Environmental –neutral Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Page 105: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

105

Transport Options Analysis – review against the full sustainability criteria Options chosen at Preferred Options stage highlighted in blue

Them

e O

pti

on

s

Sustainability Objectives

Social Environmental Economic Overall sustainability commentary

S1 S2 S3 S4 S5 S6 S7 S8 EN1 EN2 EN3 EN4 EN5 EN6 EN7 EN8 EN9 EN10 EC1 EC2 EC3 EC4 EC5

Tran

spo

rt

bag

IS

SUE

1 –

C

AR

USE

TS1

.1 0 + 0 0 + 0 0 + ++ 0 + 0 0 0 + 0 0 0 +/- 0 0 0 + Generally positive effects in terms social and environmental

objectives but less positive for economic growth, including inward investment.

TS1

.2 +/- - 0 0 - 0 0 +/-

-- 0 - 0 0 0 -- 0 0 0 + + + + - Some significant environmental impacts in terms of impacts of

traffic, including on air quality although generally positive for economy

TS1

.3 0 +/- 0 0 +/- 0 0 + + 0 +/- 0 0 0 - 0 0 0 + + + + + A balance between some road enhancements and other modes

will generally have all round positive effects

ISSU

E 2

– R

OA

D S

CH

EMES

TS2

.1 0 0 0 0 +/- 0 0 0 - 0 - 0 0 0 - 0 0 0 + 0

+ + + Improved road access to the area will inevitably generate more

traffic with consequential effects on environment but will also enhance regeneration and inward investment prospects

TS2

.2 0 0 0 0 +/- 0 0 0 - 0 - 0 0 0 - 0 0 0 + 0

+ + + As above

TS2

.3 0 0 0 0 0 0 0 0 ?

0 ?

0 0 0 ?

0 0 0 + 0 +

+ +

Assessed as an alternative to TS2.1 &2.2 i.e., less road space for access / egress to and from the regeneration area. Therefore, generally a more positive environmental effect.

TS2

.4 0 0 0 0 0 0 0 0 ?

0 ?

0 0 0 ?

0 0 0 + 0 +

+ +

As with TS2.3, it will have a positive effect in terms of the attraction of the area to inward investors, etc. but not as positive as an option with more significant road improvements.

TS2

.5 0 0 0 0 0 0 0 0 - 0 - 0 0 0 - 0 0 0 + 0 + + +

Positive in terms of attraction to the area but likely to lead to increased traffic levels.

TS2

.6 0 0 0 0 0 0 0 0 - 0 - 0 0 0 - 0 0 0 + 0

+ + +/- As above

TS2

.7 0 0 0 0 0 0 0 0 - 0 - 0 0 0 - 0 0 0 + 0

+ + +/- As above

ISSU

E 3

CA

R

PA

RK

I

NG

TS3

.1 0 - 0 0 0 0 0 0

-- 0 - 0 0 0 - 0 0 0 + + + + - Current car parking standards are generally fairly generous with

consequent potential negative impacts of traffic but generally positive for local economic growth and regeneration

Page 106: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

106

TS3

.2 0 + 0 0 0 0 0 0 ++ 0 + 0 0 0 + 0 0 0 - - - - + Generally opposite effects to above.

TS3

.3 0 +/- 0 0 0 0 0 0 +/- 0 +/- 0 0 0 +/- 0 0 0 +/- +/- +/- +/- +/- Provides a balance between the impacts on the environment

and the need to promote the local economy. TS

3.4

0 + 0 0 0 0 0 0 ++ 0 + 0 0 0 + 0 0 0 0 0 0 0 0 Car-free residential development very positive in terms of environmental impacts

ISSU

E 4

– P

UB

LIC

TR

AN

SPO

RT TS

4.1

0 0 0 0 0 0 0 + + 0 + 0 0 0 0 0 0 0 + + + + + Orbital public transport improvements have the benefit of potentially reducing orbital car trips whilst promoting the economy and inward investment

TS4

.2 0 0 0 0 0 0 0 + + 0 + 0 0 0 0 0 0 0 + + + + + Similar benefits to above for bus service improvements,

particularly enhanced interchange.

TS4

.3 0 0 0 0 - 0 0 + + 0 0 0 - 0 0 0 0 0 0 0 0 0 + Some benefits from increased bus penetration but impacts on

quality of immediate surroundings

TS4

.4 0 0 0 0 + 0 0 + + 0 + 0 0 0 + 0 0 0 + + + 0 + Generally positive effects of extending bus services to east of

the area

ISSU

E 5

- W

ALK

ING

& C

YC

LIN

G

TS5

.1 0 + 0 0 + 0 0 + + 0 + 0 + 0 + 0 0 0 0 0 0 0 0 Generally positive environmental effects with no negative

impacts

TS5

.2 0 + 0 0 + 0 0 + ++ 0 + 0 + 0 + 0 0 0 0 0 0 0 0 Pedestrian only streets offer a number of environmental

benefits, particularly an environment free of traffic.

TS5

.3 0 0 0 0 0 0 0 0 0 0 0 0 + 0 0 0 0 0 0 0 ? 0 0 Largely neutral effects of replacing ramp to stadium

TS5

.4 0 + 0 0 0 0 0 + + 0 + 0 0 0 + 0 0 0 0 0 0 0 + New pedestrian and cycle bridges would promote walking and

cycling with generally positive benefits

TS5

.5 0 + 0 0 0 0 0 + + 0 + 0 0 0 + 0 0 0 0 0 0 0 0 Better provision for walking and cycling at junctions would be

generally positive

TS5

.6

0 + 0 0 0 0 0 + + 0 + 0 0 0 + 0 0 0 0 0 0 0 0 Better provision for walking and cycling would be generally positive

ISSU

E 6

– S

TAD

IUM

EV

ENTS

TS6

.1

0 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 0 0 0 0 0 0 0 Adequate coach parking for events at the stadium is essential if the environmental impacts from coaches parking in inappropriate locations, or people travelling by car instead, is to be avoided.

TS6

.2 0 0 0 0 + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 + No negative impacts from more effective signage

TS6

.3 0 + 0 0 + 0 + 0 + 0 + 0 0 0 0 0 0 0 0 0 + + + Only positive effects from better pedestrian environment and

public realm improvements

Page 107: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

107

TS6

.4 0 0 0 0 0 0 0 0 + 0 0 0 0 0 + 0 0 0 0 0 + 0 + Improved pedestrian crossing facilities would provide some

benefits

TS6

.5 0 0 0 0 + 0 + 0 0 0 0 0 0 0 0 0 0 0 0 0 + + 0 Gateway enhancements would benefit regeneration and

townscape

ISSU

E 7

– P

RIO

RIT

IES

FOR

FU

ND

ING

TS7

.1 0 + 0 0 0 0 0 + +

0 + 0 0 0 + 0 0 0 0 0 0 - + Prioritising public transport walking & cycling over road

investment will benefit the environment generally but will be less attractive to inward investors

TS7

.2 0 - 0 0 0 0 0 0 - 0 - 0 0 0 - 0 0 0 + + +

+ +

Although positive for economic criteria, would have some harmful environmental impacts

TS7

.3 0 +/- 0 0 0 0 0 0 +/- 0 +/- 0 0 0 +/- 0 0 0 + + + + + A balance between some road enhancements and other modes

will generally have all round positive effects

Page 108: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

108

Transportation - detailed review of each option

Issue 1 – How much emphasis should be placed on meeting the needs of those who wish to use the car both within, and to access, the area?

5. Minimum road improvements necessary to prevent unacceptable levels of traffic congestion taking into account predicted development traffic growth

6. More significant road and junction improvements to accommodate additional car trips generated by development and improving general network capacity

7. A balance between minimising car use and ensuring that the area is also attractive to those who wish to come by car

Background: There is a need to encourage regeneration and growth whilst ensuring that this is sustainable and is acceptable in terms of traffic congestion.

Assumptions: That people will make use of alternative modes of travel if car access/parking is limited

Options

Option TS1.1:

Generally positive effects in terms social and environmental objectives but less positive for economic growth, including inward investment. Economic – positive Social – positive Environmental – positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS1.2:

Economic – mainly positive Social – negative Environmental – negative Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS1.3:

Economic – positive Social – positive/negative Environmental – positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Issue 2 – Which specific road schemes are considered necessary to facilitate the level of growth proposed in the Core Strategy?

1. Complete the Stadium Access Corridor by altering the alignment of South Way to provide a direct connection to the Stadium

2. Complete the Stadium Access Corridor by widening South Way as far as the Stadium including the potential removal of the Adam’s Bridge

3. Return South Way to two-way traffic subject to local improvements including the potential removal of the Adam’s Bridge 4. Remove the one-way gyratory system in part or in whole through the industrial estate 5. Implement junction improvements along the Western Highway Corridor between and Including Wembley Triangle and

Forty Lane 6. Provide a new access connection from North End Road to Bridge Road 7. Implement junction improvements at the High Road / Park Lane junction 8. Implement only those road schemes, such as junction widening and new access formation, required by development

Background: Studies show that there is a need for some junction and vehicular access improvements if the level of desirable development is to be accommodated.

Assumptions: That funding is available to implement the needed schemes at least.

Options

Option TS2.1:

Improved road access to the area will inevitably generate more traffic with consequential effects on environment but will also enhance regeneration and inward investment prospects Economic – positive Social – neutral Environmental – negative Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS2.2:

As above Economic – positive Social – neutral Environmental – negative Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS2.3:

Assessed as an alternative to TS2.1 &2.2 i.e., less road space for access / egress to and from the regeneration area. Therefore, generally a more positive environmental effect Economic – positive Social – neutral Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS2.4:

As with TS2.3, it will have a positive effect in terms of the attraction of the area to inward investors, etc. but not as positive as an option with more significant road improvements. Economic – positive Social – neutral

Page 109: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

109

Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS2.5:

Positive in terms of attraction to the area but likely to lead to increased traffic levels Economic – positive Social – neutral Environmental – negative Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS2.6:

As above Economic – positive Social – neutral Environmental – negative Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS2.7:

As above Economic – positive Social – neutral Environmental – negative Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS2.8:

Generally positive effects in terms social and environmental objectives but less positive for economic growth, including inward investment Economic – positive Social – neutral Environmental – positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Issue 3 - What level of car parking provision is appropriate for the Wembley Regeneration Area?

4. Apply parking standards as currently established in the UDP, i.e. allow for extra parking to promote inward investment because it is a regeneration area

5. Restrain car use by applying low maximum standards and direct resources towards improving public transport and walking and cycling routes

6. Seek a balance between the draft London Plan standards, the existing Borough standards and the need to ensure new development is served adequately in keeping with the regeneration initiatives for the Wembley Growth Area

7. Promote the implementation of car-free development where it can be associated with good public transport accessibility

Background: There is a need to achieve a balance between the promotion of alternative modes of travel to the car whilst ensuring that successful regeneration is promoted.

Assumptions: That lower levels of car parking availability will act as a restraint on car travel.

Option TS3.1 Current car parking standards are generally fairly generous with consequent potential negative impacts of traffic but generally positive for local economic growth and regeneration Economic – mainly positive Social – negative Environmental – negative Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS3.2

Generally opposite effects to above Economic – negative Social – positive Environmental – positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS3.3 Provides a balance between the impacts on the environment and the need to promote the local economy. Economic – positive/negative Social – positive/negative Environmental – positive/negative Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS3.4 Car-free residential development very positive in terms of environmental impacts Economic – neutral Social – positive Environmental – positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Issue 4 - What should the priority be in further improving public transport access to the area? 4. Focus on significant bus service improvements to improve orbital access, including reducing journey times. 5. Implement more bus priority schemes and improve interchange facilities between bus and rail. 6. Route buses into the heart of the new urban quarter along the proposed new Boulevard and shopping street 7. Seek further bus service enhancements in the east of the area

Background: A particular need to improve orbital public transport access has been identified in the Core Strategy and is confirmed by the West London Sub-regional Transport Strategy.

Page 110: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

110

Assumptions: That completed and committed improvements to rail stations are sufficient.

Options

Option TS4.1:

Orbital public transport improvements have the benefit of potentially reducing orbital car trips whilst promoting the economy and inward investment Economic – positive Social – neutral Environmental – positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS4.2: Similar benefits to above for bus service improvements, particularly enhanced interchange Economic – positive Social – neutral Environmental – positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS4.3: Some benefits from increased bus penetration but impacts on quality of immediate surroundings Economic – positive Social – negative Environmental – positive/ negative Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS4.4: Generally positive effects of extending bus services to east of the area Economic – positive Social – positive Environmental – positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Issue 5 How can enhancements to pedestrian and cycle routes contribute to achieving a modal shift away from the car in Wembley?

1. Provide shared surfaces throughout the new urban quarter close to the Stadium 2. Provide exclusively pedestrian streets in locations with the heaviest footfall, and restrict servicing to early morning only. 3. Replace the pedestrian ramp to the Stadium with steps 4. Provide new pedestrian and cycle bridges over the Metropolitan/Jubilee/ Chiltern lines 5. Ensure that any junction/ highway improvements take due account of pedestrian/ cycle access and convenience and the

need to ensure a high quality public realm is established 6. Enhance existing secure cycle parking and introduce a cycle hire ‘hub’ scheme within the area

Background: There are benefits other than in terms of modal shift if more trips are made on foot or by bicycle, e.g. health benefits.

Assumptions: That enhancements to the pedestrian environment and to cycle provision will help achieve a modal shift away from the car

Options

Option TS5.1

Generally positive environmental effects with no negative impacts Economic – neutral Social – positive Environmental – positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS5.2 Pedestrian only streets offer a number of environmental benefits, particularly an environment free of traffic Economic – neutral Social – positive Environmental – very positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS5.3 Largely neutral effects of replacing ramp to stadium Economic – neutral Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS5.4 New pedestrian and cycle bridges would promote walking and cycling with generally positive benefits Economic – positive Social – positive Environmental – positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS5.5 Better provision for walking and cycling at junctions would be generally positive Economic – neutral Social – positive Environmental – positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS5.6 Better provision for walking and cycling at junctions would be generally positive Economic – neutral Social – positive Environmental – positive

Page 111: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

111

Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Issue 6 - To what degree should event related activity dictate the transport characteristics of the Wembley area? 1. Identify suitable coach parking facilities and sites that ensure future requirements can be met post development 2. Introduce more effective signage for pedestrian and vehicular travel 3. Provide an enhanced pedestrian environment and introduce high quality public realm improvements without detriment to

residents and visitors alike 4. Provide new crossing facilities, primarily for spectators walking to the stadium, across Wembley Hill Road. 5. Provide ‘Gateway’ enhancements to reflect the strategic importance of Wembley and Wembley Stadium within a major

growth area

Background: Events at the Stadium and Arena have particular transport requirements and significant impact on the Wembley area..

Assumptions: That further improvements are necessary to ensure more efficient movement of crowds with a reduced impact on the area.

Options

Option TS6.1

Adequate coach parking for events at the stadium is essential if the environmental impacts from coaches parking in inappropriate locations, or people travelling by car instead, is to be avoided Economic – neutral Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS6.2 No negative impacts from more effective signage Economic – positive Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS6.3 Only positive effects from better pedestrian environment and public realm improvements Economic – positive Social – positive Environmental – positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS6.4 Improved pedestrian crossing facilities would provide some benefits Economic – positive Social – neutral Environmental – positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS6.5 Gateway enhancements would benefit regeneration and townscape Economic – positive Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Issue 7 - What priorities should the Council establish for funding of transport schemes?

1. Priorities for investment should be directed towards public transport, cycling and pedestrian facilities with only limited improvements to key road junctions to ease congestion and improve operational effectiveness

2. Priorities for investment must recognise that key infrastructure improvements are required to the road network in order to ensure that inward investment and regeneration occurs.

3. A balance needs to be struck between providing major infrastructure improvements and the more local needs of pedestrians, cyclists and public transport users.

Background: There is a declining level of funding that will be available for transport schemes.

Assumptions: That prioritisation of investment in transport improvements is necessary.

Options Social impacts Economic impacts Environmental impacts

Option TS7.1

Prioritising public transport walking & cycling over road investment will benefit the environment generally but will be less attractive to inward investors Economic – positive/ negative Social – positive Environmental – positive Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS7.2 Although positive for economic criteria, would have some harmful environmental impacts Economic – positive Social – negative Environmental – negative Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option TS7.3 A balance between some road enhancements and other modes will generally have all round positive effects Economic – positive Social – positive/ negative Environmental – positive/ negative

Page 112: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

112

Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Page 113: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

113

Housing Options Analysis – review against the full sustainability criteria Options chosen at Preferred Options stage highlighted in blue

Them

e Is

sues

Op

tio

ns

Sustainability Objectives

Social Environmental Economic Overall sustainability commentary

S1 S2 S3 S4 S5 S6 S7 S8 EN1 EN2 EN3 EN4 EN5 EN6 EN7 EN8 EN9 EN10 EC1 EC2 EC3 EC4 EC5

0

ISSU

E 1

Aff

ord

able

Ho

usi

ng H

1.1

+ 0 0 + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts. Generally positive for social indicators

H1

.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts.

H1

.3 + 0 0 + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts. Generally positive for social indicators

ISSU

E 2

Ho

usi

ng

Mix

H2

.1 + 0 + + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts. Generally positive for social indicators.

H2

.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts

H2

.3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts

ISSU

E 3

–Fa

mily

H

ou

sin

g

H3

.1 + + 0 ++ + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Positive for social indicators, especially housing supply

H3

.2 + + 0 ++ + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Positive for social indicators, especially housing supply

ISSU

E 4

– E

xtra

Car

e H

ou

sin

g

H4

.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts

H4

.2 + + 0 + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts. Generally positive for social indicators

H4

.3 + + 0 + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts. Generally positive for social indicators

Page 114: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

114

ISSU

E 5

– H

ou

sin

g fo

r D

isab

led

Pe

op

le

H5

.1 + + 0 + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts

H5

.2 + + 0 + + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts. Generally positive for social indicators

H

5.3

+ + 0 + + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts. Generally positive for social indicators

ISSU

E 6

Pri

vate

Re

nt

H6

.1 0 0 0 + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts

H6

.2 0 0 0 + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts

ISSU

E 7

– S

tud

en

t H

ou

sin

g

H7

.1 0 0 + + 0 0 0 - 0 0 0 0 0 0 0 0 0 0 + 0 + 0 0 Generally positive for housing and education and the local

economy but negative in terms of community and sense of ‘ownership’

H7

.2 0 0 0 + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No significant impacts.

H7

.3 - 0 0 + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 + 0 + 0 0 Mixed impact for social indicators and benefits for the local

economy

H7

.4 + 0 0 + + 0 0 0 0 0 0 0 0 0 0 0 0 0 + 0 + 0 0 Generally positive for social indicators and benefits for the

local economy

No

mad

ic

Pe

op

le

H8

.1

0 0 0 + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 + 0 + 0 0 This will provide more people with an opportunity to live in a decent home and positive for regeneration

ISSU

E 8

-

H8

.2

0 0 0 + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 + 0 + 0 0 This will provide more people with an opportunity to live in a decent home and positive for regeneration.

Page 115: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

115

Housing - detailed review of each option

Issue 1 - How should affordable housing supply be maintained to meet housing need?

6. Reaffirm the current tenure mix guidance in terms of social rented and intermediate housing. 7. Accept Affordable Rent as part of the tenure mix in Wembley 8. Consider where rent levels on new affordable rent housing might need to be capped for affordability reasons, for

example larger family housing or supported housing.

Background: Affordable housing is not being delivered on the ground in the proportions needed and sought by the Wembley Masterplan

Assumptions: That a specific Wembley based policy which deviates from national planning policy would be acceptable.

Options

Option H1.1:

No significant impacts. Generally positive for social indicators Economic – neutral Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option H1.2: No significant impacts Economic – neutral Social – neutral Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option H1.3: No significant impacts. Generally positive for social indicators Economic – neutral Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Issue 2 – What should the housing mix (tenure and unit size) in Wembley be?

8. Retain current Wembley Masterplan housing mix guidance. 9. Revise the Wembley Masterplan housing mix guidance to more closely reflect the pattern of actual delivery on the ground. 10. Allow the flexibility to introduce different, and less affordable housing tenures, e.g. discounted market rent into the

housing.

Background: The Wembley Masterplan provides specific guidance on unit size mix.

Assumptions:

Options

Option H2.1:

No significant impacts. Generally positive for social indicators Economic – neutral Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option H2.2: No significant impacts Economic – neutral Social – neutral Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option H2.3: No significant impacts Economic – neutral Social – neutral Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Issue 3 - What proportion of new housing should be family housing?

8. Leave at Core Strategy target of 25% 3 or more bedrooms. 9. Designate sites suitable for more family housing in Wembley.

Background: There is a limited supply of family housing and a high level of overcrowding in the borough

Assumptions: That there are sites in Wembley where family housing is appropriate.

Options

Option H3.1:

Positive for social indicators, especially housing supply Economic – neutral Social – very positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option H3.2: Positive for social indicators, especially housing supply Economic – neutral

Page 116: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

116

Social – very positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Issue 4 - Should Extra Care Housing be provided in Wembley?

8. Do not require provision of Extra Care housing. 9. Designate suitable locations for Extra Care Housing in Wembley. 10. Set quota or target for Extra Care housing in Wembley.

Background: There is a need for additional Extra Care housing in the borough

Assumptions: That Wembley can be an appropriate location for providing extra care housing

Options

Option H4.1:

No significant impacts. Economic – neutral Social – neutral Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option H4.2: No significant impacts. Generally positive for social indicators Economic – neutral Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option H4.3: No significant impacts. Generally positive for social indicators Economic – neutral Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Issue 5 - How should the housing needs of disabled people be met?

7. Providing fully wheelchair accessible housing for physically disabled people 8. Remodelling of supported housing facilities, as well as adaptations to homes, to ensure that existing supply is able to meet

the housing requirements of disabled people 9. Increasing the supply of small supported housing schemes that provide self contained accommodation and communal

facilities and which are sufficiently flexible to accommodate a range of support and care services so they can be adapted to meet different needs as priorities change over time.

Background: In 2001 15.6% of Brent’s population had a limiting long-term illness or disability.

Assumptions: That the market will not meet identified need.

Options

Option H5.1:

No significant impacts Economic – neutral Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option H5.2: No significant impacts. Generally positive for social indicators Economic – neutral Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option H5.3: No significant impacts. Generally positive for social indicators Economic – neutral Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Issue 6 - Should private rent sector housing be encouraged?

1. Allow the market to deliver private rented accommodation in response to demand. 2. Seek to encourage the delivery of private rented sector accommodation, including measures such that delivery would have

a financially neutral impact upon developers when compared to the delivery of market sale accommodation.

Background: The private rented sector meets a substantial need for affordable homes in the borough

Assumptions: That the market will not meet future needs.

Options

Option H6.1:

No significant impacts Economic – neutral Social – positive Environmental – neutral

Page 117: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

117

Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option H6.2: No significant impacts Economic – neutral Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Issue 7 - What level of student accommodation is appropriate for Wembley?

1. Allow the market to decide the appropriate level of student housing 2. Set a cap on the number of student rooms that would be allowed in total, e.g. 20% of the new population. 3. Designate suitable locations for student accommodation in Wembley, and not allow it elsewhere 4. Introduce a new policy to require that student accommodation proposals demonstrate how the benefits could outweigh

the possible negative impacts, or how potential impacts would be mitigated.

Background: 2,636 student homes have been granted consent in the Wembley area in recent years

Assumptions: That an oversupply of student housing could have an impact upon the character of the area.

Options

Option H7.1:

Generally positive for housing and education and the local economy but negative in terms of community and sense of ‘ownership’. Economic – positive Social – positive/negative Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option H7.2: No significant impacts. Economic – neutral Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option H7.3: Mixed impact for social indicators and benefits for the local economy Economic – positive Social – positive/negative Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option H7.4: Generally positive for social indicators and benefits for the local economy Economic – positive Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Issue 8 - How should the housing needs of nomadic people be met?

1. 1. Seek to deliver landscaping improvements such as tree planting to, as well as potential layout reconfiguration of, the existing Lynton Close travellers site to mitigate any impacts from adjacent sites and improve conditions for those living on the site.

2. Consider opportunities to find a new travellers site within Wembley able to cater for GTANA identified need for between 7 and 13 additional pitches in Brent over the period 2007 to 2013.

Background: According to the GTANA there is a need for 7 – 13 additional pitches in the borough up to 2013.

Assumptions: That the number of pitches at Linton Close cannot be increased.

Options

Option H8.1:

This will provide more people with an opportunity to live in a decent home and positive for regeneration Economic – positive Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Option H8.2: This will provide more people with an opportunity to live in a decent home and positive for regeneration Economic – positive Social – positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts – n/a Mitigation measures N/A

Page 118: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

118

Town centres, shopping, leisure and tourism Options Analysis - review against the full sustainability criteria Options chosen at Preferred Options stage highlighted in blue

Them

e

Op

tio

ns

Sustainability Objectives

Social Environmental Economic Overall sustainability commentary

S1 S2 S3 S4 S5 S6 S7 S8 EN1 EN2 EN3 EN4 EN5 EN6 EN7 EN8 EN9 EN10 EC1 EC2 EC3 EC4 EC5

ISSU

E 1

– P

RO

TEC

TIN

G R

ETA

IL

TC1

.1

+ 0 0 0 + 0 + + 0 0 0 0 + 0 0 0 0 0 + + ++ + + TC1.1 Policy that identifies key roles, including type of

retail offer, to be promoted for particular parts of the

area

TC1

.2

+ 0 0 0 + 0 + + 0 0 0 0 + 0 0 0 0 0 - - + + + TC1.2 Policy to protect against local impact on the retail

offer allocated. Encouraging sustainable growth;

employment

TC1

.3

-/? 0 0 0 0 0 - - - 0 - 0 - 0 0 0 0 0 ? + -/? ++ 0 TC1.3 No policy identifying roles or retail offer for parts of

the area. Community identity accessibility; air quality;

landscape/ townscape; growth; regeneration.

ISSU

E 2

– D

EFIN

ING

SIZ

E &

TYP

E O

F U

NIT

S

TC2

.1 + 0 0 0 0 0 + + 0 0 0 0 + 0 0 0 0 0 + + + + + TC2.1 Policy to control size and type of units in line with

indicative town centre uses across Wembley:

TC2

.2

-/? 0 0 0 0 0 - - - 0 - 0 - 0 0 0 0 0 ? + -/? ++ 0 TC2.2 No policy controlling unit sizes or type in particular

locations: Community identity; accessibility; traffic; air

quality; landscape and townscape; regeneration.

ISSU

E 3

– D

EFII

NIN

G T

HE

TOW

N

CEN

TRES

TC

3.1

0 0 0 0 0 0 ? ? -/? 0 ? 0 ? 0 0 0 0 0 -/? ? -/? -/? -/? TC3.1 Leave the town centres as defined by the Core

Strategy. Review town centre boundaries as the area is

developed: Unknown/ potential negative impacts for

investment; efficient movement; accessibility; traffic;

community identity; regeneration; employment; growth;

landscape and townscape; air quality;

TC3

.2

? 0 0 0 0 0 ? ? + 0 0 0 + 0 0 0 0 0 + + + ++ + TC3.2 Define a single town centre from Ealing Road to

Bridge Road: Potential unknown impacts relating to some

of the social objectives.

Page 119: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

119

TC3

.3

0

0 0 0

+

0 0

0

0

0

?

0

0

0

0

0

0

0 +

+

++ + -

TC3.3 Re-consider town centre boundaries by defining

tighter boundary around the existing town centres and

identify a separate general Wembley Stadium retail area

which links the two centres. Retain existing primary and

secondary frontages within the town centres: No

sustainability concerns, although there is uncertainty

relating to air quality.

ISSU

E 4

– L

EISU

RE/

TO

UIS

M/

OTH

ER U

SES

TC4

.1

+ + 0 0 ++ 0 ++ + + 0 + + + 0 0 0 + 0 + + ++ + + Creative and light industrial to be promoted on de-

designated industrial land to the east of the stadium to

create a "buffer zone" between the commercial, leisure,

tourism and cultural uses in the Wembley Stadium area

and the industrial land to the east. General policy to

encourage leisure, tourism, commercial and cultural uses

within the stadium area.

TC4

.2

+ + 0 0 ++ 0 ++ + + 0 + + + 0 0 0 + 0 + + ++ + + Creation of a "buffer zone" as in option 1 alongside the

promotion of leisure, tourism, commercial and cultural

uses within the stadium area, but also promote one

major leisure attraction with a site allocation:

TC4

.3

0 0 0 0 - 0 - - - 0 - 0 - 0 0 0 0 0 - - 0 0 0 No policy to encourage leisure, tourism, creative and

cultural uses across the Wembley area: Moderate

potential negative impacts relating to quality of

surroundings, accessibility, traffic, water quality and

resources, air quality, landscape and townscape,

sustainable economic growth, employment.

ISSU

E 5

- T

AK

E A

WA

YS/

FA

ST

FOO

D

TC5

.1

0 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0/? 0 No change to policy to further control takeaway/ fast

food outlets across the centres: Potential minor impact on

health.

TC5

.2

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0/? 0 Policy which allows for take aways and fast food outlets

to be located close to the stadium by zoning locations

where they are acceptable:

TC5

.3

0 + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0/? 0 Restrictive policy for take aways and fast food outlets

close (within 800 metres) to “sensitive uses” such as

schools, including maximum % thresholds:

ISSU

E 6

CO

NFE

REN

CN

G

FAC

ILIT

IES

TC6

.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No policy that builds on the Core Strategy to promote

conferencing uses:

TC6

.2

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 + + + + 0 General policy to encourage conferencing within

Wembley:

Page 120: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

120

TC6

.3

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 + + + +/? 0 Policy designating a mix of conferencing facilities

including hotels, exhibition/ conferencing and other

services with sites specified: IS

SUE

7 –

TEM

PO

RA

RY

CR

EATI

VE

USE

S

TC7

.1 - 0 0 0 - - - - 0 0 0 0 0 -- 0 0 0 0 0 -- - - - 0 No policy or promoted locations to encourage or allow for

flexible temporary uses: TC

7.2

+ 0 + 0 + + + + 0 0 0 +/? + 0 0/? 0 + 0 + + + ++ 0 General policy encouraging landowners to allow for

temporary creative uses:

TC7

.3 + 0 + 0 ++ + + + 0 0 0 +/? ++ 0 0/? 0 + 0 + + ++ ++ 0 Policy specifying locations for temporary creative uses:

Page 121: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

121

Town centres, shopping, leisure, tourism and temporary uses - detailed review of each

option

Issue 1 – Should the council explicitly protect the existing retail offer in Wembley and Wembley Park town centres?

1. Policy that identifies key roles, including type of retail offer, to be promoted for particular parts of the area.

2. Policy to protect against local impact on the retail offer allocated.

3. No policy identifying roles or retail offer for parts of the area.

Background: Wembley town centre has been weakened by new retail growth in the past and Wembley now serves

local convenience and comparison need with Wembley Park serving more of a service role; it is

important any growth considers the impact of new retail on the role of these centres.

Assumptions: The Core Strategy identifies Wembley and Kilburn as the town centres where retail growth is to be

located and a retail street has already been approved around the stadium area.

Monitoring points: Appendix 3, Wembley AAP Scoping Report, Town Centre Monitoring points

Options Potential impacts

TC1.1

This option could help to pro-actively promote development and provide certainty to developers

alongside consolidating uses and promoting sustainable travel. It could help to promote local

distinctiveness and pride in the area, and help to reduce crime.

Economic – positive/ very positive

Social – neutral/ positive

Environmental – neutral/ positive – the option could help to consolidate uses and alleviate transportation

problems.

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures – n/a

TC1.2

The control of the size and type of units across Wembley will help to promote local distinctiveness and will

ensure that existing uses are protected, however an “impact test” could provide uncertainty for developers and

may be restrictive.

Economic – mixed

Social – positive/ neutral

Environmental – positive/ neutral

Significant, cumulative, synergistic and indirect impacts – some economic impacts, but not considered to be

“significant” or any of the above.

Mitigation measures –more certainty for applicants specifying locations for particular uses; this will also help to

protect existing businesses.

Option TC1.3

Economic – mixed - this option could help to bring in new businesses, however it could also displace retailers

already located in Wembley to the detriment of particular areas, such as Wembley Central Square. It could also

promote unsustainable patterns of growth with regard to accessibility.

Social – negative/ neutral

Environmental – negative/ neutral

Significant, cumulative, synergistic and indirect impacts – some negative impacts but not considered to be

significant, cumulative or synergistic.

Mitigation measures – more control for town centre uses.

Issue 2 – Should the council specify the size and type of units within Wembley’s town centres?

1. Policy to control size and type of units in line with indicative town centre uses across Wembley.

2. No policy controlling unit sizes or type in particular locations.

Page 122: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

122

Background: Wembley town centre has been weakened by new retail growth in the past and Wembley now serves local

convenience and comparison need with Wembley Park serving more of a service role (i.e. shops under

1000sqm); it is important any growth considers the impact of new retail on the role of these centres. It

was expected that a new retail element close to the stadium would be for niche retail and would not

impact on the two centres.

Assumptions: The Core Strategy identifies Wembley and Kilburn as the town centres where retail growth is to be located

and a retail street has already been approved around the stadium area.

Monitoring

points:

Appendix 3, Wembley AAP Scoping Report, Town Centre Monitoring points

Options Social, economic and environmental impacts

Option TC2.1:

The control of the size and type of units across Wembley will help to promote local distinctiveness and will ensure

that existing uses are protected.

Economic – very positive/ positive

Social – positive/ neutral

Environmental – positive/ neutral

Significant, cumulative, synergistic and indirect impacts –n/a

Mitigation measures – n/a

Option TC2.2: This option could help to bring in new businesses, however it could also displace retailers already located in

Wembley to the detriment of particular areas, such as Wembley Central Square. It could also promote

unsustainable patterns of growth with regard to accessibility.

Economic – mixed

Social – neutral/ mixed

Environmental –negative/ neutral

Significant, cumulative, synergistic and indirect impacts –n/a

Mitigation measures – Better control would help to negate negative impacts associated with competitions and

unsustainable patterns of growth.

Issue 3 – How should the council define the boundaries of Wembley and Wembley Park town centres?

1. Leave the town centres as defined by the Core Strategy. Review town centre boundaries as the area is developed.

2. Define a single town centre from Ealing Road to Bridge Road.

3. Re-consider town centre boundaries by defining tighter boundary around the existing town centres and identify a

separate general Wembley Stadium retail area which links the two centres. Retain existing primary and secondary

frontages within the town centres.

Background: Wembley town centre has been weakened by new retail growth in the past and Wembley now serves local

convenience and comparison need with Wembley Park serving more of a service role (i.e. shops under

1000sqm); it is important any growth considers the impact of new retail on the role of these centres. It

was expected that a new retail element close to the stadium would be for niche retail and would not

impact on the two centres. Reconsidering town centre boundaries will either seek to control these specific

uses, or allow for development to be located more freely.

Assumptions: The Core Strategy identifies Wembley and Kilburn as the town centres where retail growth is to be located

and a retail street has already been approved around the stadium area.

Monitoring

points:

Appendix 3, Wembley AAP Scoping Report, Town Centre Monitoring points

Options Social, economic and environmental impacts

Page 123: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

123

Option TC3.1:

This option could potentially have adverse traffic, townscape and retail impact issues if it is not managed pro-

actively, and may also reduce certainty for developers.

Economic – mixed/ negative

Social – neutral

Environmental – mixed/ unknown

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures – Plan more pro-actively to help shape Wembley’s town centre.

Option TC3.2: This option could impact on the existing town centre unless it goes hand in hand with some additional controls on

the type of retail permitted in parts of the town centre. It is also considered, however, that when a clear and

positive link is provided between new development to the east and the High Road, there will be a positive ‘spin-off’

benefit to the established town centre from the increase in visitors, and shoppers in particular, in the area.

Economic – positive

Social – neutral/unknown

Environmental – mixed positive/neutral

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures - ensure that the town centre’s role in meeting local needs is preserved

Option TC3.3 This option would retain town centre specialisms and promote growth within the Wembley Stadium area without

impacting on existing town centre uses and specialisms. Although it may have an impact on attracting investment

into the area, it would support the overall balance of the economy in Wembley.

Economic – positive/ very positive

Social – positive/ neutral

Environmental – positive/ very positive

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures –n/a

Issue 4 – Where should leisure, tourism, creative and cultural uses be placed in Wembley?

1. Creative and light industrial to be promoted on de-designated industrial land to the east of the stadium to create a

"buffer zone" between the commercial, leisure, tourism and cultural uses in the Wembley Stadium area and the

industrial land to the east. General policy to encourage leisure, tourism, commercial and cultural uses within the

stadium area.

2. Creation of a "buffer zone" as in option 1 alongside the promotion of leisure, tourism, commercial and cultural uses

within the stadium area, but also promote one major leisure attraction with a site allocation.

3. No policy to encourage leisure, tourism, creative and cultural uses across the Wembley area.

Background: The council’s adopted Core Strategy seeks to promote Wembley as a creative and cultural area to build on

its reputation as a visitor centre in consideration of its visitor attractions at the stadium and arena.

Wembley is also a Strategic Cultural Area in the London Plan.

Assumptions: The Core Strategy aims for one major leisure attractor in the Core Strategy.

Monitoring

points:

Appendix 3, Wembley AAP Scoping Report, Town Centre Monitoring points

Options Social, economic and environmental impacts

Option TC4.1:

This option provides flexibility on the type of leisure uses to be provided in Wembley, and could potentially help to

improve the health of residents if sports and other community facilities are provided. The buffer zone will improve

the quality of the area and will also help to improve the air quality which is currently very poor in Wembley because

of industrial uses.

Economic – positive/very positive

Page 124: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

124

Social – positive/ very positive/ neutral

Environmental – positive/ neutral

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures –n/a

Option TC4.2: This option promotes one main leisure attraction which could help to promote Wembley as a world class tourist

destination, although may be impractical in the current financial climate. The promotion of leisure uses could

potentially help to improve the health of residents if sports and other community facilities are provided. The buffer

zone will improve the quality of the area and will also help to improve the air quality which is currently very poor in

Wembley because of industrial uses.

Economic – positive/ very positive

Social – positive/ neutral

Environmental – positive/ neutral

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures - n/a

Option TC4.3 This option does not seek to pro-actively improve the relationship between the industrial and stadium area, and

may cause adverse impacts on the economy. There will also be few improvements with regard to townscape and air

quality, and there may be fewer community, sport and leisure facilities provided.

Economic – negative/ neutral

Social – negative/ neutral

Environmental – negative/ neutral

Significant, cumulative, synergistic and indirect impacts – no significant, cumulative, synergistic or indirect

impacts specifically, but the policy would not pro-actively seek to improve Wembley.

Mitigation measures –Pro-active policy to encourage improvement, regeneration and growth in terms of visitor

facilities and those for the existing and new population.

Issue 5 – Should the council introduce stricter controls on fast food outlets/ take-aways within parts of Wembley?

1. No change to policy to further control takeaway/ fast food outlets across the centres.

2. Policy which allows for take aways and fast food outlets to be located close to the stadium by zoning locations where

they are acceptable.

3. Restrictive policy for take aways and fast food outlets close (within 800 metres) to “sensitive uses” such as schools,

including maximum % thresholds.

Background: The council has seen an increase in the number of planning applications for fast food outlets in Wembley,

and the area already contains a large number of these uses which sit very close to sensitive uses such as

schools.

Assumptions: There has been an increase in queries and planning applications for fast food outlets in recent years which

is likely to continue.

Monitoring

points:

Appendix 3, Wembley AAP Scoping Report, Town Centre Monitoring points

Options Social, economic and environmental impacts

Option TC5.1:

The number of fast food takeaways in Wembley has been steadily increasing, and this option of “do nothing” could

harm the health of the existing and new population.

Economic – mixed

Social – negative

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts – the “do nothing” approach will not help to improve

Page 125: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

125

health across Wembley, and an increase in fast food outlets could harm health in some locations.

Mitigation measures –attempt to control uses in sensitive areas.

Option TC5.2: The location of take aways and fast food outlets, if located close to the stadium where they could serve the visiting

population, would impact less on the health of existing residents.

Economic – neutral/ mixed

Social – neutral

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts –n/a

Mitigation measures –n/a

Option TC5.3 Restrictive policy for take aways and fast food outlets close (within 800 metres) to “sensitive uses” such as schools

will help to improve the health of nearby residents.

Economic – neutral/ mixed

Social – positive/ neutral

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts –n/a

Mitigation measures –n/a

Issue 6 – How can Wembley properly cater for a conference offer as sought in the council's vision for Wembley?

1. No policy that builds on the Core Strategy to promote conferencing uses.

2. General policy to encourage conferencing within Wembley.

3. Policy designating a mix of conferencing facilities including hotels, exhibition/ conferencing and other services with sites

specified

Background: Before its demolition, Wembley’s conferencing centre was a world renowned visitor and exhibition centre

that attracted a large number of businesses and individuals to the area before its demolition.

Assumptions: The council and landowners are now seeking to pursue the idea of a shared conference and exhibition hub

in Wembley across a number of hotels, civic buildings and other uses which can operate in a cohesive way.

Monitoring

points:

Appendix 3, Wembley AAP Scoping Report, Town Centre Monitoring points

Options Social, economic and environmental impacts

Option TC6.1:

Without a pro-active policy to promote conferencing uses, it may be harder to promote these uses in Wembley.

Economic – positive/ neutral

Social – neutral

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures – n/a

Option TC6.2: A general policy to encourage conferencing within Wembley will provide a flexible but pro-active approach to

encouraging these uses within the area thus promoting investment and regeneration.

Economic – positive/ neutral

Social – neutral

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts –n/a

Page 126: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

126

Mitigation measures –n/a

Option TC6.3 A policy designating a mix of conferencing facilities including hotels, exhibition/ conferencing and other services

with sites specified could promote investment and regeneration in the area, although may not be overly flexible.

Economic – positive/ mixed

Social – neutral

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures –n/a

Issue 7 – Where should the council promote temporary creative uses across the Wembley area, and to what scale?

1. No policy or promoted locations to encourage or allow for flexible temporary uses.

2. General policy encouraging landowners to allow for temporary creative uses using

vacant brownfield sites or floor space, with reference to creative industries that will benefit Wembley’s retail, leisure, tourism and

creative offer.

3. Policy specifying locations for temporary creative uses.

Background: In the 2009 GLA Town Centre Health Check survey, unimplemented planning permissions accounted for 2.88

hectares in Wembley – the ninth largest amount of land in London. There are vacant pockets of land

surrounding the Wembley Stadium.

Assumptions: A number of sites for development will remain vacant within Wembley because of the economic downturn;

this option considers how the sites should be dealt with in the short to medium term.

Monitoring points: Appendix 3, Wembley AAP Scoping Report, Town Centre Monitoring points

Options Social, economic and environmental impacts

Option TC7.1:

Unused, vacant land will detract from the area and will maintain a poor townscape in Wembley, detract from

the area and may impact negatively on regeneration efforts.

Economic – negative/ very negative

Social – negative/ very negative

Environmental – negative/ neutral

Significant, cumulative, synergistic and indirect impacts – there will be no significant, cumulative,

synergistic or direct impacts from this option, however the policy is not pro-active to be able to generate a

positive outcome.

Mitigation measures –pro-active policy to use vacant land to a positive regenerative purpose.

Option TC7.2: A general policy encouraging landowners to allow for temporary creative uses would make use of vacant

brownfield sites and promote creative industries that will benefit Wembley’s retail, leisure, tourism and

creative offer. There could also be an opportunity to provide training for local residents and would support an

improved townscape and further regeneration. There may also be an opportunity to provide uses which could

reduce carbon and improve biodiversity in the area, depending on the temporary uses that are proposed.

Economic – positive/ very positive

Social – positive/ neutral

Environmental – mixed

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures – n/a

Option TC7.3 A specific policy encouraging landowners to allow for temporary creative uses would make use of vacant

brownfield sites and promote creative industries that will benefit Wembley’s retail, leisure, tourism and

creative offer. This policy would help to provide more encouragement for temporary uses than option 2.

There could also be an opportunity to provide training for local residents and would support an improved

townscape and further regeneration. There may also be an opportunity to provide uses which could reduce

Page 127: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

127

carbon and improve biodiversity in the area, depending on the temporary uses that are proposed.

Economic – positive/ very positive

Social – positive/ very positive/ neutral

Environmental – mixed

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures –n/a

Page 128: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

128

Social infrastructure Options Analysis - review against the full sustainability criteria Options chosen at Preferred Options stage highlighted in blue

Them

e

Issu

e

Op

tio

ns

Sustainability Objectives

Social Environmental Economic Overall sustainability comments

S1 S2 S3 S4 S5 S6 S7 S8 EN1 EN2 EN3 EN4 EN5 EN6 EN7 EN8 EN9 EN10 EC1 EC2 EC3 EC4 EC5

ISSU

E 1

Edu

cati

on

SI1

.1

+ 0 ++ 0 0 0 0 + - 0 0 0 - 0 0 0 0 0 0 0 0 0 0

Social benefits of providing new school places, however there may be

environmental impacts associated with the expansion of existing

schools through traffic pressure on roads and loss of existing playing

fields.

SI1

.2

+ 0 ++ 0 + 0 + ++ +/- 0 0 0 + 0 + 0 0 0 0 0 + + 0

Social benefits of providing a new school, however the proposed site is

adjacent to existing industrial uses which could lead to noise, traffic

and amenity impacts. A new school is considered to improve the

existing townscape which is currently a warehouse unit.

ISSU

E 2

– H

ealt

h

SI2

.1 0 ++ 0 0 + 0 0 ++ + 0 0 0 + 0 + 0 0 0 0 0 + + 0

Significant social benefits by providing a central health facility in

Wembley which provides a wide range of services. Such a facility could

have wider regeneration benefits.

SI2

.2 0 + 0 0 0 0 0 ++ +/- 0 0 0 0 0 0 0 0 0 0 0 0 0 0

New smaller GP facilities across the Wembley area would provide

health benefits, with local health facilities although they won’t provide

as many services.

SI2

.3 0 + 0 0 0 0 0 ++ +/- 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Expanding existing GPs will provide additional health benefits but are

unlikely to be located close to the increase in demand. This could lead

to additional trips made by car.

ISSU

E 3

– C

om

mu

nit

y Fa

cilit

ies

SI3

.1a + 0 0 0 + + ++ ++ +/- 0 0 0 + 0 + 0 0 0 0 0 +? 0 0

Social benefits, in particular social inclusion, community engagement

and accessible local services. Neutral on environmental criteria. A

large community facility could have wider regeneration benefits.

SI3

.1b

+ 0 0 0 + + ++ ++ +/- 0 0 0 + 0 + 0 0 0 0 0 + 0 0 Benefits social inclusion, community identity and accessible local

services. Neutral on environmental and economic criteria.

SI3

.2a + 0 0 0 0 0 ++ ++ 0 0 0 0 0 0 0 0 0 0 0 0 + + 0

Community and cultural facilities at a market rate may attract

investment and wider regeneration, although may not be as affordable

for local residents.

SI3

.2b

+ 0 0 0 0 0 ++ ++ 0 0 0 0 0 0 0 0 0 0 0 0 + + 0 Less community space but will be more affordable and accessible for

local residents. Also provides a level of new investment.

Page 129: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

129

SI3

.2c + 0 0 0 0 0 ++ ++ 0 0 0 0 0 0 0 0 0 0 0 0 + + 0

Social benefits of supporting existing community facilities. Also

provides a level of new investment.

ISSU

E 4

– P

lace

s o

f w

ors

hip

SI4

.1 0 0 0 0 0 0 ++ + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Neutral on environmental and economic criteria but will provide social

benefits by promoting community activity within a shared space.

SI4

.2

0 0 0 0 0 0 + +/- - 0 0 0 0 0 0 0 0 0 0 0 0 - 0 Although providing a community resource PoW in industrial areas will

not be easily accessible by public transport and could adversely impact

existing operations in the industrial area e.g through increased traffic

movement at particular times of day or days of the week.

SI4

.3 0 0 0 0 0 0 + + +/- 0 0 0 0 0 0 0 0 0 0 0 0 - 0 Town centre locations will accessible by public transport, however PoW

in these locations could adversely impact the vitality of town centre.

Page 130: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

130

Community facilities - detailed review of each option

Issue 1 – How and where should new primary school places be provided?

1. Expanding existing schools in the vicinity of Wembley AAP

2. Providing a new primary school in the AAP area

Background: The regeneration of Wembley gives rise to the need for new school provision.

Assumptions: That school have to be provided close to where they are needed.

Options

Option SI1.1:

Social benefits of providing new school places, however there may be environmental impacts associated with the

expansion of existing schools through traffic pressure on roads and loss of existing playing fields.

Economic – neutral

Social – positive

Environmental – negative

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option SI1.2: Social benefits of providing a new school, however the proposed site is adjacent to existing industrial uses which

could lead to noise, traffic and amenity impacts. A new school is considered to improve the existing townscape.

Economic – positive

Social – positive

Environmental – positive

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Issue 2 – How should the health needs of a growing population be met?

11. 1. A new central health centre could be provided towards the end of the development period once there is sufficient

demand for new provision.

12. Space for additional GPs could be provided at a number of smaller health centres across Wembley.

13. Space for additional GPs could be provided by expanding existing GP practices in the Wembley area.

Background: Additional space for new primary health facilities are needed to accompany regeneration

Assumptions: That there will be funding for a new health facility in Wembley

Options

Option SI2.1:

Significant social benefits by providing a central health facility in Wembley which provides a wide range of services.

Such a facility could have wider regeneration benefits.

Economic – positive

Social – positive

Environmental – positive

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option SI2.2: New smaller GP facilities across the Wembley area would provide health benefits, with local health facilities

although they won’t provide as many services.

Economic – neutral

Social – positive

Environmental – neutral

Page 131: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

131

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option SI2.3: Expanding existing GPs will provide additional health benefits but are unlikely to be located close to the increase in

demand. This could lead to additional trips made by car.

Economic – neutral

Social – positive

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Issue 3 - How should the needs of Wembley’s diverse communities be met?

1. Type of community/cultural facility:

a) Single, large, multi-use community facility

b) Smaller, specialised community facilities

2) Mechanisms to fund community facilities:

a) Substantial community and cultural space could be provided at current market value, on the basis that the space will be

filled as Wembley is a regional attraction.

b) Provide less new community space but at a subsidised rate to increase affordability.

c) Funding from development such as S106 and New Homes Bonus could be used to support and expand existing community

facilities in Wembley

Background: Significant population increase gives rise to a need for space for community use.

Assumptions: That individual groups or organisations within the community will want to take space to meet the needs

of their communities

Options

Options

SI3.1a

Social benefits, in particular social inclusion, community engagement and accessible local services. Neutral on

environmental criteria. A large community facility could have wider regeneration benefits.

Economic – positive

Social – very positive

Environmental – positive

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option

SI3.1b:

Benefits social inclusion, community identity and accessible local services. Neutral on environmental and economic

criteria.

Economic – positive

Social – very positive

Environmental – positive

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option

SI3.2a:

Community and cultural facilities at a market rate may attract investment and wider regeneration, although may

not be as affordable for local residents.

Economic – positive

Social – very positive

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Page 132: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

132

Option

SI3.2b:

Less community space but will be more affordable and accessible for local residents. Also provides a level of new

investment

Economic – positive

Social – very positive

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option

SI3.2c:

Social benefits of supporting existing community facilities. Also provides a level of new investment

Economic – positive

Social – very positive

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Issue 4 - How can demand for places of worship in Wembley be met?

11. Shared space and multi-faith facilities could be encouraged.

12. Religious uses could be allowed in some vacant employment areas where land values are cheaper.

13. Religious uses could be allowed in some vacant town centre locations.

Background: There will be demand from different faiths for additional space.

Assumptions: That faith groups will wish to take up space

Options

Option SI4.1:

Neutral on environmental and economic criteria but will provide social benefits by promoting community activity

within a shared space.

Economic – neutral

Social – positive

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option SI4.2: Although providing a community resource PoW in industrial areas will not be easily accessible by public transport

and could adversely impact existing operations in the industrial area e.g through increased traffic movement at

particular times of day or days of the week

Economic – negative

Social – positive

Environmental – negative

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Option SI4.3: Town centre locations will accessible by public transport, however PoW in these locations could adversely impact

the vitality of town centre.

Economic – negative

Social – positive

Environmental – neutral

Significant, cumulative, synergistic and indirect impacts – n/a

Mitigation measures N/A

Page 133: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

133

Climate Change Options Analysis - review against the full sustainability criteria Options chosen at Preferred Options stage highlighted in blue

Them

e Is

sue

Op

tio

ns

Sustainability Objectives

Social Environmental Economic Overall sustainability comments

S1 S2 S3 S4 S5 S6 S7 S8 EN1 EN2 EN3 EN4 EN5 EN6 EN7 EN8 EN9 EN10 EC1 EC2 EC3 EC4 EC5

Re

spo

nse

to

Clim

ate

Ch

ange

Bag

ISSU

E 1

Re

du

cin

g ca

rbo

n e

mis

sio

ns

CC

1.1

+ + 0 0 + 0 0 0 0 0 + + 0 0 ++ + 0 0 -/+ 0 0 +/- 0 Could have both positive and negative impacts on economic growth and investment.

CC

1.2

+ + 0 0 0 0 0 0 0 0 +/- 0 0 0 ++ 0 0 0 -/+ 0 0 +/- 0

Could have both positive and negative impacts on air quality, economic growth and investment.

CC

1.3

+ + 0 0 + 0 0 0 0 0 +/- 0 0 0 ++ 0 0 0 -/+ 0 0 +/- 0

Could have both positive and negative impacts on air quality, economic growth and investment.

CC

1.4

+ + 0 0 + 0 0 0 0 0 ++ 0 0 0 ++ 0 0 0 -/+ 0 + +/- 0

Could have both positive and negative impacts on economic growth and investment.

ISSU

E 2

– W

emb

ley

Dis

tric

t En

erg

y N

etw

ork

CC

2.1

+ 0 0 0 0 0 0 0 0 0 0 0 0 0 + 0 0 0 -/+ 0 0 0 0 Could have both positive and negative impacts on economic growth.

CC

2.2

+ 0 0 0 0 0 0 0 0 0 0 0 0 0 ++ 0 0 0 -/+ 0 0 +/- 0

Could have both positive and negative impacts on economic growth and investment.

CC

2.3

+ 0 0 0 0 0 0 0 0 0 - 0 0 0 ++ 0 0 0 -/+ 0 0 +/- 0

Large CHP system could have negative air quality impact. Could have both positive and negative impacts on economic growth and investment.

CC

2.4

+ 0 0 0 0 0 0 0 0 0 - 0 0 0 ++ 0 0 0 -/+ 0 0 +/- 0

Large CHP system could have negative air quality impact. Could have both positive and negative impacts on economic growth and investment.

CC

2.5

+ 0 0 0 0 0 0 0 0 0 - 0 0 0 ++ + 0 0 -/+ 0 0 +/- 0

Large CHP system could have negative air quality impact. Could have both positive and negative impacts on economic growth and investment.

ISSU

E 3

– E

ner

gy

fro

m W

aste

CC

3.1

0 0 0 0 0 0 0 0 0 0 0 0 0 0 - - 0 0 - 0 0 0 0

Negative environmental impacts on reducing climate change emissions and waste management. Negative impact on sustainable economic growth.

CC

3.2

+ 0 0 0 0 0 0 0 0 0 - 0 0 0 ++ ++ + 0 + + + + 0 Could have negative impact on air quality.

Page 134: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

134

CC

3.3

+ 0 0 0 0 0 0 0 0 0 -- 0 -? 0 ++ ++ + 0 ++ + + + + Cumulative impact on air quality, could have negative impact on townscape if predominantly energy from waste and associated waste management.

ISSU

E 4

– S

yner

gies

w

ith

in

du

stri

al a

reas

CC

4.1

0 0 0 0 0 0 0 0 0 0 - 0 0 0 - - - 0 - 0 0 0 0 Negative environmental impacts on carbon emissions, waste management and land & soil as waste continues to go to landfill. Negative impact on economic growth as opportunity for new green enterprise is not promoted.

CC

4.2

+ 0 0 0 0 0 0 0 0 0 +/- 0 0 0 + + + 0 + 0 + 0 0 Impact on air quality could be both positive negative. At a local level there could be negative impacts associated with the use of waste to generate energy. At a global scale there will be positive air quality impacts as waste is used close to its source reducing emissions associated with transportation.

ISSU

E 5

Ele

ctri

c ve

hic

les

CC

5.1

+ + 0 0 0 0 0 0 0 0 ++ 0 0 0 - 0 0 0 0 0 0 0 0 Negative air quality impacts without proactive policy.

CC

5.2

+ + 0 0 0 0 0 0 0 0 ++ 0 0 0 + 0 0 0 + 0 0 0 0 Primarily air quality benefits (and associated health benefits) as well as promoting low carbon energy use.

CC

5.3

+ + 0 0 0 0 0 0 0 0 ++ 0 0 0 + 0 0 0 + 0 0 0 0 Primarily air quality benefits (and associated health benefits) as well as promoting low carbon energy use.

ISSU

E 6

– C

limat

e ch

ange

ad

apta

tio

n

CC

6.1

0 + 0 0 + 0 0 0 0 + ++ ++ + + ++ 0 0 + + 0 + + 0 No negative impacts

CC

6.2

0 ++ 0 0 + 0 0 0 0 + + + + + ++ 0 0 0 + 0 + + 0 No negative impacts

CC

6.3

0 + 0 0 + 0 0 0 0 ++ + + + + ++ 0 0 ++ + 0 0 - 0 Potential negative impact on investment.

CC

6.4

0 0 0 0 0 0 0 0 0 - - - - 0 -- 0 0 0 0 0 - 0 0 Negative impacts of no action include worsening water quality, air quality, biodiversity, landscape and importantly not reducing vulnerability to climate change impacts with associated negative impact on regeneration.

Page 135: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

135

Climate change - detailed review of each option

Issue 1 – How can carbon emissions from buildings in Wembley be minimised?

1. Set minimum building fabric performance standards for new development in line with the government's recommended fabric specification to meet Zero Carbon standard in 2016.

2. Promote use of combined heat and power (see issue CC2) 3. Set a target for renewable energy generation in the area & examine sources of renewable energy which could be located in

Wembley 4. Reduce energy demand from existing buildings by promoting retrofit energy efficiency measures.

Background: National, regional and local targets have been set to substantially reduce carbon emissions. Buildings are a significant contributor to overall carbon emissions and it is crucial that new development minimises carbon emissions to mitigate climate change.

Assumptions: London Plan and Core Strategy set requirements for new development to minimise carbon emissions beyond minimum standards set by building regulations.

Monitoring points

Appendix 3, Wembley Scoping Report, Energy and Sustainability

Options Potential impacts

Option CC.1.1:

As well as reducing energy demand, well insulated homes will have associated health benefits by tackling fuel poverty and reducing noise transmission. Green roofs – a possible way of improving building insulation to meet higher requirements – also encourage biodiversity. Higher performance standards will cost more to meet and could effect investment. Economic – positive/negative Social - positive Environmental – strong positive Significant, cumulative, synergistic and indirect impacts – significant benefit in reducing carbon emissions

Option CC1.2

Natural gas CHP engines emit more NOx emissions than gas boilers providing equivalent thermal output. NOx reduction technology needs to be applied to protect air quality. Economic – positive/negative Social – slight positive Environmental - positive Significant, cumulative, synergistic and indirect impacts – significant benefit in reducing carbon emissions

Option CC1.3

Promoting renewables will have significant benefits in reducing green house gases and possibly other air pollutants depending on the renewable technology. Economic – positive/negative Social – slight positive Environmental - positive Significant, cumulative, synergistic and indirect impacts – significant benefit in reducing carbon emissions

Option CC1.4

Opportunity to tackle fuel poverty and noise impacts which will lead to health benefits as well as reducing energy demand in existing buildings. However, the additional cost could deter investment. Economic – positive/negative Social - positive Environmental – strong positive Significant, cumulative, synergistic and indirect impacts - significant benefit in reducing carbon emissions

Issue 2 – Is a Wembley District Energy Network (DEN) desirable and how can it be implemented? 14. Future proofing e.g providing space for heat interchange units 15. Establish a hierarchy of compatible renewables with DEN 16. Compel adjacent sites to connect to one another where feasible 17. Collect financial contribution towards establishing the network 18. Build on and expand capacity of Civic Centre CHP

Background: High level feasibility assessment shows Wembley is suitable for a decentralised energy network.

Assumptions: London Plan policy will continue to promote decentralised energy networks as a means of meeting carbon emission reduction targets.

Monitoring Points:

Appendix 3, Wembley Scoping Report, Energy and Sustainability

Option CC2.1

While future proofing developments for DEN facilitates a potential network, it does not necessarily secure its delivery and the associated reduction in carbon emissions. Economic – positive/negative Social – slight positive Environmental – slight positive Significant, cumulative, synergistic and indirect impacts – future proofing buildings will improve the feasibility and viability of any future district energy network

Option CC2.2

Any future DEN will provide heat for heating and hot water. Renewable systems should be sought in Wembley which are compatible i.e providing electricity or cooling Economic – positive/negative Social – slight positive Environmental - positive Significant, cumulative, synergistic and indirect impacts - significant benefit in reducing carbon emissions

Option CC2.3

Cost of connecting sites, in particular the cost of connecting pipe work could be prohibitive. Slight negative also associated to the air quality impacts of district-wide CHP. Economic – positive/negative Social – slight positive

Page 136: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

136

Environmental – positive/negative Significant, cumulative, synergistic and indirect impacts - significant benefit in reducing carbon emissions. Local air quality impact.

Option CC2.4

Financial contributions towards a district energy network will affect the viability of development proposals. Economic – positive/negative Social – slight positive Environmental – positive/negative Significant, cumulative, synergistic and indirect impacts - significant benefit in reducing carbon emissions. Local air quality impact.

Option CC2.5

As well reducing carbon emissions, this option will also have benefits in terms of waste reuse as the Civic Centre CHP is proposed to be run on waste fish oil. Economic – positive/negative Social – slight positive Environmental – positive/negative Significant, cumulative, synergistic and indirect impacts - significant benefit in reducing carbon emissions. Local air quality impact.

Issue 3 - Could energy from waste be used in Wembley? 10. Do nothing and leave the market to decide how energy is produced locally 11. Identify sites which would be appropriate for locating anaerobic digestion plants 12. Introduce a new policy to encourage relocation of renewable energy industries in the

Wembley AAP area

Background: Number of waste management uses currently operating within Wembley and future occupiers also will generate significant waste which could be used to generate energy locally.

Assumptions: Suitable technology can be used to generate energy from waste. Energy from waste generation will reduce carbon emissions. Only waste that cannot be reused or recycled will be used to generate energy. Waste will be sourced from a local catchment area.

Monitoring points:

Appendix 3, Wembley Scoping Report, Energy and Sustainability

Option CC3.1

Option is neutral on social criteria but has some negative impacts in terms of green house gas emissions and waste which will worsen without active intervention. Also option misses opportunity to promote new business ventures in energy from waste. Economic – slight negative Social - neutral Environmental - negative Significant, cumulative, synergistic and indirect impacts – n/a

Option CC3.2

Slight negative in environment criteria as anaerobic digestion could lead to localised air pollution (smells). Positives in reducing green house gases and sustainable use of waste. Also this option has economic benefits by promoting the green economy. Economic - positive Social – slight positive Environmental - positive Significant, cumulative, synergistic and indirect impacts – n/a

Option CC3.3

Significant positives in reducing carbon emissions, reuse of waste and promoting the green economy. Some energy from waste processing could have a negative townscape impact. Economic – strong positive Social – slight positive Environmental – positive/negative Significant, cumulative, synergistic and indirect impacts – local impacts on air quality

Issue 4 - Can synergies with the industrial area be made to supply Wembley with energy? 14. No policy dealing with energy from waste 15. Introduce a new policy to require developers proposing new waste processing facilities to carry out a feasibility study to

investigate if heat could be provided to Wembley from biomass or biomass by-products and anaerobic digestion from municipal waste or other sources.

Background: Number of waste management uses currently operating within Wembley and future occupiers also will generate significant waste which could be used to generate energy locally.

Assumptions: Suitable technology can be used to generate energy from waste. Energy from waste generation will reduce carbon emissions. Only waste that cannot be reused or recycled will be used to generate energy.

Monitoring points

Appendix 3, Wembley Scoping Report, Energy and Sustainability

Option CC4.1

Carbon emissions, waste and landfill impacts will worsen without a proactive policy. Economic – slight negative Social - neutral Environmental – strong negative Significant, cumulative, synergistic and indirect impacts n/a

Option CC4.2

Environmental and economic benefits of identifying potential uses of waste heat. Economic - positive Social – slight positive Environmental – strong positive Significant, cumulative, synergistic and indirect impacts – synergistic benefits of making use of waste near to its generation

Page 137: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

137

Issue 5 - How can electric car charging infrastructure be introduced in Wembley? 10. Leave to market forces so that developers add charging points when there is demand. 11. Include a standard for electric car charging points in private car parks e.g. one for every 30 cars. 12. Identify the locations for electric car recharging units in Wembley AAP

Background: Road transport is responsible for 20% of green house gas emissions in the borough. Electric vehicles can significantly reduce local ghg emissions.

Assumptions: Demand for electrical vehicles will increase. Cost of electric vehicles will reduce making them an increasingly attractive option for car users.

Monitoring points

Appendix 3, Wembley Scoping Report, Energy and Sustainability

Option CC5.1

Air quality will not improve without positive policy. Economic - neutral Social - positive Environmental – positive/negative Significant, cumulative, synergistic and indirect impacts

Option CC5.2

Primarily air quality benefits (and associated health benefits) as well as promoting low carbon energy use. Economic – slight positive Social - positive Environmental - positive Significant, cumulative, synergistic and indirect impacts

Option CC5.3

Primarily air quality benefits (and associated health benefits) as well as promoting low carbon energy use. Economic – slight positive Social - positive Environmental - positive Significant, cumulative, synergistic and indirect impacts

Issue 6 - How can Wembley prepare for a changing climate with more severe weather events and more frequent heatwaves?

1. Set a target to increase the proportion of green cover in Wembley (using green space, green roofs & tree planting) 2. Set criteria for tackling overheating in buildings & the public realm (see example below) 3. Set Wembley specific flood risk response and sustainable urban drainage requirements (see example below) 4. No local targets for green cover.

Background: New development will need to prepare for a changing climate with hotter summers and wetter winters.

Assumptions: UK Climate Projections

Monitoring points

Appendix 3, Wembley Scoping Report, Energy and Sustainability

Option CC6.1

Environmental benefits particularly for air and water quality as well as reducing flood risk. This option would also improve the setting of historical and cultural assets (e.g. the arena and the stadium). Economic - neutral Social - positive Environmental – strong positive Significant, cumulative, synergistic and indirect impacts

Option CC6.2

Multiple environmental benefits as well as economic benefits by ensuring a comfortable and healthy work/visitor environment. Economic - positive Social - positive Environmental – strong positive Significant, cumulative, synergistic and indirect impacts

Option CC6.3

Reducing flood risk will have health benefits and will have a positive impact for local businesses currently at risk of flooding. SUDs measures will require investment which could deter development. Economic – positive/negative Social - positive Environmental - positive Significant, cumulative, synergistic and indirect impacts n/a

Option CC6.4

By not setting any targets to increase green cover it is likely that biodiversity, water quality and air quality problems are likely to get worse. Economic – slight negative Social - neutral Environmental – strong negative Significant, cumulative, synergistic and indirect impacts – significant impact by not adapting to climate change

Page 138: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

138

Open Space, Sports and Wildlife Options Analysis - review against the full sustainability criteria

Options chosen at Preferred Options stage highlighted in blue

Them

e Is

sue

Op

tio

ns

Sustainability Objectives

Social Environmental Economic Overall sustainability comments

S1 S2 S3 S4 S5 S6 S7 S8 EN1 EN2 EN3 EN4 EN5 EN6 EN7 EN8 EN9 EN9 EN 10

EC1 EC2 EC3 EC4 EC5

Op

en s

pac

e, w

ildlif

e an

d s

po

rts

Bag

ISSU

E 1

Ne

w W

emb

ley

Par

k

OS1

.1

0 + 0 0 + 0 + + 0 0 + + + 0 + 0 0 0

0 0 + 0 0

No negative impacts

OS1

.2

0 + 0 0 + 0 + + 0 0 + + + 0 + 0 0 +

0 0 + +/- 0

Possible negative impact on investment

OS1

.3

0 ++ 0 0 + + + + 0 0

+ ++ ++ 0 + 0 0 0

0 0 + +/- 0

Possible negative impact on investment

ISSU

E 2

– O

pen

sp

ace

imp

rove

me

nts

OS2

.1

0 + 0 0 0 - + ++ + 0 +? 0 0 0 + 0 0 0

0 0 0 + 0 + Possible negative impact on fear of crime

OS2

.2

0 + 0 0 + 0 + ++ +? 0 +? 0 + 0 + 0 0 0

0 0 0 0 0 0

No negative impacts

OS2

.3

0 + 0 0 +/- 0 + + + 0 0 +/- +/- 0 0 0 0 0

+ 0 0 0 0 0

Could have both positive and negative impacts on biodiversity and landscape.

OS2

.4

0 + 0 0 + 0 + + 0 ++ 0 ++ ++ 0 ++ 0 0 ++

++

0 0 +/- +/- +

Substantial funding required for these improvements could have a negative impact on investment. However, if the improvements are made they will greatly increase the attractiveness of the area for investment.

OS2

.5

0 + 0 0 + + 0 0 0 0 0 0 + + 0 0 0 0

0 0 0 + 0 0

No negative impacts

OS2

.6

0 + 0 0 +/- 0 + + 0 0 0 +/- + +/- 0 0 0 0

0 0 0 0 0 0

Could have either positive or negative impacts on amenity, the historic environment and biodiversity.

OS2

.7

0 + 0 0 + 0 + 0 + + + ++ + 0 + 0 0 0

0 0 0 0 0 + No negative impacts

ISSU

E 3

-

Foo

d

gro

win

g O

S3.1

0 ++ + 0 0 0 + + +? 0 + + + 0 ++ + + +

+ 0 0 + 0 0

No negative impacts

Page 139: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

139

OS3

.2 0 ++ + 0 0 0 + + -? 0 + + + 0 ++ + + + + 0 0 + 0 0 Uncertain negative impact on traffic

OS3

.3 0 ++ + 0 0 0 + + 0 0 + + + 0 ++ + + + + 0 0 + 0 0 No negative impacts

OS3

.4 0 ++ + 0 + 0 + + 0 0 + + + 0 ++ + + + + 0 0 + + 0 No negative impacts

ISSU

E 4

– S

po

rts

faci

litie

s

OS4

.1 + ++ 0 0 0 0 + ++ 0 0 0 0 0 0 0 0 0 0 0 0 0 + 0 0 No negative impacts

OS4

.2

+ ++ 0 0 0 0 + ++ 0 0 0 0 0 0 0 0 0 0 0 0 0 + 0 0 No negative impacts

ISSU

E 5

Pla

y

faci

litie

s

OS5

.1 + + 0 0 + 0 + + 0 0 0 0 + 0 0 0 0 0 0 0 0 + 0 0 No negative impacts

OS5

.2 + + 0 0 + 0 + + 0 0 0 0 + 0 0 0 0 0 0 0 0 + 0 0 No negative impacts

ISSU

E 6

– W

ildlif

e

OS6

.1 0 + 0 0 +/- 0 0 + + 0 ? +/- +/- 0 0 0 0 0 + 0 0 + 0 0 Impacts on the environment are uncertain depending on the

extent of development and mitigation measures to protect trees and biodiversity.

OS6

.2

0 + 0 0 + 0 0 + 0 ++ 0 ++ ++ 0 ++ 0 0 + ++ 0 0 + -/+ + Substantial funding required for these improvements could have a negative impact on investment. However, if the improvements are made they will greatly increase the attractiveness of the area for investment.

OS6

.3

0 + 0 0 + 0 0 + 0 ++ 0 ++ ++ 0 ++ 0 0 ++ ++ 0 0 + -/+ 0 Substantial funding required for these improvements could have a negative impact on investment. However, if the improvements are made they will greatly increase the attractiveness of the area for investment.

OS6

.4 0 + 0 0 +/- 0 0 + 0 0 0 +/- + +/- 0 0 0 0 0 0 0 0 0 0 Could have either positive or negative impacts on amenity,

the historic environment and biodiversity.

OS6

.5 0 + 0 0 + 0 0 + 0 + + ++ + 0 + 0 0 + 0 0 0 + 0 0 No negative impacts

Page 140: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

140

Open space, sports and wildlife - detailed review of each option

Issue 1 – Should the plan include detail about the location and size of a new park in Wembley? 1. Set no further requirements regarding the new park other than repeating the quantum of open space required by the Core Strategy 2. Specify that the new park be located adjacent to Engineers Way, orientated East to West 3. Set a series of additional criteria for the new park including; function and use, character & design, provision of substantial play facilities, natural surveillance, distinction between public and private space, reducing flood risk and management

Background: Core Strategy identifies need for a new park in Wembley to meet the needs of new population.

Assumptions: Funding will be available to lay out a new park (S106/CIL)

Monitoring points:

Appendix 3, Wembley Scoping Report, Open space, sports and nature conservation

Options Potential Impacts

Option OS1.1:

Health, townscape & community benefits of new public open space. Expected to have wider regeneration benefits by promoting sustainable communities. Economic – slight positive Social – strong positive Environmental – strong positive Significant, cumulative, synergistic and indirect impacts- n/a

Option OS1.2:

East / west orientation provides better walking and cycling connections to Eastern district. However, specifying park orientation could restrict land availability for investment or enhance it by creating an attractive local environment. Economic – positive/negative Social – strong positive Environmental – strong positive

Page 141: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

141

Significant, cumulative, synergistic and indirect impacts-n/a

Option OS1.3:

Detailed design criteria for the new park will ensure social and environmental benefits but could hinder delivery or could enhance it by creating an attractive local environment. Economic – positive/negative Social – strong positive Environmental – strong positive Significant, cumulative, synergistic and indirect impacts-n/a

Issue 2 – What other open space improvements should there be? 19. New pedestrian bridge links to/ connect to open spaces:

a. Pedestrian link across Metropolitan & Jubilee lines linking to Chalkhill Open Space at St David’s Close. b. Pedestrian link across Chiltern railway to Sherran’s Farm Open Space c. Pedestrian link across Metropolitan & Jubilee lines linking to Chalkhill Park at Chalkhill Road

20. Create public access to Copland playing fields 21. Create a new woodland walk along Chiltern Embankments 22. Semi-naturalise the Wealdstone Brook and create a linear open space for informal recreation 23. Prescriptive criteria could be set for Olympic Way to ensure its role as a public space with

dedicated space for performance, public art and seating. 24. Create a new public space at St John’s Churchyard 25. The plan could include a Green Grid policy to coordinate these improvements and create a network of

interlinked, multi-purpose open spaces.

Background: Parts of Wembley are deficient in public open space provision. The Core Strategy identifies need for open space improvements.

Assumptions: Funding will be available to make improvements (S106/CIL)

Monitoring points:

Appendix 3, Wembley Scoping Report, Open space, sports and nature conservation

Options Potential Impacts

Option OS2.1:

New pedestrian bridges significantly improve accessibility, promote walking and cycling with associated health benefits through passive recreation and could reduce the number of trips made by car. Economic – positive Social - positive Environmental – positive Significant, cumulative, synergistic and indirect impacts-n/a

Option OS2.2:

Providing public access to Copland school playing fields would have social benefits include health and accessibility by providing public open space in an area of deficiency. This in turn may reduce

Page 142: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

142

number of trips made by car with associated air quality benefits. Economic – neutral Social – strong positive Environmental – positive Significant, cumulative, synergistic and indirect impacts-n/a

Option OS2.3:

Public access and a green link along the north Chiltern Line rail embankment would provide opportunity for informal recreation and link to existing open space at King Edward VII Park. Impacts on the environment are uncertain depending on the extent of development and mitigation measures to protect trees and biodiversity. Economic – neutral Social - positive Environmental – positive/negative Significant, cumulative, synergistic and indirect impacts-

Option OS2.4:

Enhancements to the Wealdstone Brook would significantly improve water quality and biodiversity. Flood protection and alleviation measures would also meet objectives to adapt to climate change. Improving the Wealdstone Brook environment is considered to provide wider regeneration benefits by improving the quality of the environment, however river restoration measures would require significant investment which could deter development. Economic – positive/negative Social - positive Environmental – strong positive Significant, cumulative, synergistic and indirect impacts-n/a

Option OS2.5:

Social benefits include improved townscape and space for cultural activities, which will have wider regeneration benefits also. Economic – slight positive Social - positive Environmental – positive Significant, cumulative, synergistic and indirect impacts-n/a

Option OS2.6:

A new public space at St John’s Church yard would need to be sensitively designed to ensure wildlife is protected and enhanced and a quite, reflective environment is retained. Economic – neutral Social – positive/negative Environmental – positive/negative

Page 143: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

143

Issue 3 - Is there a need for new food growing space to be provided in the Wembley area? 13. New development could be required to provide space for food growing, either in

communal spaces or rooftop gardens. 14. Allotment space could be expanded on existing open spaces such as Vivian Avenue and Vale Farm. 15. School redevelopments could incorporate food growing space. 16. Using vacant spaces temporarily for food growing

Background: All allotments in Wembley are currently full with long waiting lists

Assumptions: Current trend of increasing demand for allotment and food growing space will continue

Monitoring points:

Appendix 3, Wembley Scoping Report, Open space, sports and nature conservation

Options Potential impacts

Options OS3.1

Opportunities for food growing provide significant health benefits by providing a gentle form of exercise and increasing access to fresh fruit and vegetables. Skills in food growing will also be developed. Local opportunities to grow food could also have economic benefits if local markets are also established. Providing growing space within development may reduce car trips to other potential spaces. Economic – slight positive Social – strong positive Environmental – strong positive

Significant, cumulative, synergistic and indirect impacts-n/a

Option OS2.7:

A green grid policy will provide several environmental benefits including wildlife, air quality and meeting objectives to adapt to climate change. This policy would also promote walking and cycling by improving the public realm and links between open spaces. Economic – slight positive Social – strong positive Environmental – strong positive Significant, cumulative, synergistic and indirect impacts-n/a

Page 144: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

144

Significant, cumulative, synergistic and indirect impacts-

Option OS3.2:

Several social and environmental benefits from expanding existing allotments, although these may increase car trips as they are not located near to increase in demand. Economic – slight positive Social – strong positive Environmental – strong positive/uncertain negative Significant, cumulative, synergistic and indirect impacts-

Option OS3.3:

Food growing within schools provides multiple social and environmental benefits. Economic – slight positive Social – strong positive Environmental – strong positive Significant, cumulative, synergistic and indirect impacts

Option OS3.4:

Active use of vacant land will improve appearance of area and potentially attract investment. Economic – slight positive Social – strong positive Environmental – strong positive Significant, cumulative, synergistic and indirect impacts

Issue 4 - How can improvements to sports facilities in the Wembley area be made? 16. Sports facilities improvements will be delivered by council capital spend and S106/CIL receipts from

development where additional demand in created 17. In addition to option 1 schools could be required to make new or upgraded sports

facilities available for community use out of school hours, e.g. Copland School.

Background: Infrastructure and Investment Framework indicates that improvements to spots facilities will be required to meet the needs of new population.

Assumptions: Funding will be available to improve sports facilities (S106/CIL)

Monitoring points:

Appendix 3, Wembley Scoping Report, Open space, sports and nature conservation

Options Potential impacts

Page 145: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

145

Option OS4.1:

Increasing provision of sports facilities will have health and social inclusion benefits. Greater sports provision will also have wider regeneration benefits. Economic – slight positive Social – strong positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts-n/a

Option OS4.2: Increasing provision of sports facilities will have health and social inclusion benefits. Greater sports provision will also have wider regeneration benefits. Economic – slight positive Social – strong positive Environmental – neutral Significant, cumulative, synergistic and indirect impacts-n/a

Issue 5 - How and where should play provision be increased? 13. Provide formal neighbourhood play areas in open spaces created by development

and at Sherrans Farm open space. 14. Require a more play friendly environment with child-friendly streets and public spaces

Background: There is a shortage of play provision within Wembley and new provision will be required to meet the needs of new population

Assumptions: Funding will be available to improve play facilities (S106/CIL)

Monitoring points:

Appendix 3, Wembley Scoping Report, Open space, sports and nature conservation

Options Potential impacts

Option OS5.1:

New play facilities will have social benefits including health and social inclusion. Providing play facilities with development will ensure they are accessible. Economic – slight positive Social – strong positive Environmental – slight positive

Page 146: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

146

Significant, cumulative, synergistic and indirect impacts-

Option OS5.2:

In addition to the health and social inclusion benefits of a more play friendly public realm, it is considered this option would improve the quality of surroundings and townscape which would have wider regeneration benefits. Economic – slight positive Social – strong positive Environmental – slight positive Significant, cumulative, synergistic and indirect impacts-

Issue 6 - How can people’s access to wildlife and nature conservation be improved?

6. The Chiltern railway line embankments provide a continuous strip of established woodland, and are designated for their nature conservation value. Site Specific Allocation W10 identifies the potential of development of the southern embankment to help contribute to the regeneration of Wembley town centre. Development of the northern bank will only be permitted as part of a comprehensive scheme that includes the southern section and contributes to the regeneration of the town centre. This could provide an opportunity to create a new public access and green link through the site, with measures to enhance wildlife value along the northern bank.

7. The Core Strategy commits to enhancing the Wealdstone Brook by providing amenity open space and improving biodiversity. The Plan could provide further detail as to how the brook can be semi-naturalised.

8. River Brent restoration phase 2 would remove the concrete channel and extend the riverside park and natural corridor.

9. St John’s churchyard could be converted into a public garden which provides a relatively tranquil open space and an opportunity to enjoy the sights and sounds of nature.

10. New development could be required to make wildlife enhancements as part of the built environment; measures could include biodiverse green roofs, living walls, tree planting and landscaping to encourage wildlife and the use of bat and bird boxes.

Background: Parts of Wembley are deficient in wildlife

Page 147: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

147

Assumptions: Funding will be available to improve wildlife

Monitoring points:

Appendix 3, Wembley Scoping Report, Open space, sports and nature conservation

Options Potential impacts

Option OS6.1:

Public access and a green link along the north Chiltern Line rail embankment would provide opportunity for informal recreation and link to existing open space at King Edward VII Park. Economic – slight positive Social – positive/negative Environmental – positive/negative Significant, cumulative, synergistic and indirect impacts-

Option OS6.2:

Enhancements to the Wealdstone Brook would significantly improve water quality and biodiversity. Flood protection and alleviation measures would also meet objectives to adapt to climate change. Improving the Wealdstone Brook environment is considered to provide wider regeneration benefits by improving the quality of the environment, however river restoration measures would require significant investment which could deter development. Economic – positive/negative Social – strong positive Environmental – strong positive Significant, cumulative, synergistic and indirect impacts-

Option OS6.3:

Enhancements to the River Brent would have similar benefits to enhancing the Wealdstone Brook (above). This option would provide river restoration measures within an existing public open space. Economic – positive/negative Social – strong positive Environmental – strong positive Significant, cumulative, synergistic and indirect impacts-

Option OS6.4:

A new public space at St John’s Church yard would need to be sensitively designed to ensure wildlife is protected and enhanced and a quite, reflective environment is retained. Economic – neutral Social – positive/negative Environmental – positive/negative Significant, cumulative, synergistic and indirect impacts-

Page 148: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

148

Option OS6.5:

Measures to increase biodiversity in the built environment will have environmental benefits as well as providing social benefits by improving quality of surroundings. Economic – slight positive Social - positive Environmental – strong positive Significant, cumulative, synergistic and indirect impacts-

Page 149: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

149

Appendix 6: Sustainability Appraisals of New Preferred Options

The tables below contain the full sustainability appraisals on the Wembley Area Action Plan Preferred Options: WEM6 Protection of Stadium Views, WEM

12 Protected Rail Sidings, WEM15 Car Parking Strategy and WEM 40 Play Provision that were not appraised in the previous SA report.

Urban Design and Place Shaping: WEM 6 Protection of Stadium Views

Them

e:U

rban

des

ign

&p

lace

shap

ing

Pre

ferr

ed O

pti

on

s

Sustainability Objectives

Social Environmental Economic Overall

sustainability

commentary S1 S2 S3 S4 S5 S6 S7 S8 EN

1

EN

2

EN

3

EN4 EN5 EN6 EN7 EN8 EN9 EN

10

EC1 EC2 EC3 EC4 EC5

WEM

6

0 0 0 0 + 0 0 0 0 0 0 0 ++ ++ 0 0 0 0 0 0 0 0 0 No negative

impacts

Page 150: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

150

Business, Industry and Waste: WEM 12 Protected Rail Sidings

Them

e:B

usi

nes

s,

Ind

ust

ry &

Was

te

Pre

ferr

ed O

pti

on

s

Sustainability Objectives

Social Environmental Economic Overall

sustainability

commentary S1 S2 S3 S4 S5 S6 S7 S8 EN

1

EN

2

EN

3

EN

4

EN

5

EN

6

EN

7

EN8 EN9 EN

10

EC1 EC2 EC3 EC4 EC5

WEM

12

0 0 0 0 0 0 0 0 + 0 - 0 0 0 0 0 0 0 0 + 0 + ++ Potential

negative

impact on air

quality

Page 151: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

151

Transport: WEM 15 Car Parking Strategy

Them

e: T

ran

spo

rt

Pre

ferr

ed O

pti

on

s Sustainability Objectives

Social Environmental Economic Overall

sustainability

commentary S1 S2 S3 S4 S5 S6 S7 S8 EN

1

EN

2

EN

3

EN

4

EN

5

EN

6

EN

7

EN

8

EN

9

EN

10

EC1 EC2 EC3 EC4 EC5

WEM

15

+ 0 0 0 + 0 0 0 +

+

0 +

+

0 0 +

+

0 0 0 0 + 0 0 0 + Potential

positive

impacts and

no negative

impacts

Page 152: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

152

Open Space, Sports and Wildlife: WEM 40 Play Provision

Them

e:

Op

en S

pac

e,

Spo

rts

& W

ildlif

e

Pre

ferr

ed O

pti

on

s Sustainability Objectives

Social Environmental Economic Overall

sustainability

commentary S1 S2 S3 S4 S5 S6 S7 S8 EN

1

EN

2

EN

3

EN

4

EN

5

EN

6

EN

7

EN

8

EN

9

EN

10

EC1 EC2 EC3 EC4 EC5

WEM

40

+ +

+

0 0 +

+

0 + 0 0 0 0 0 + 0 0 0 + + 0 0 0 0 0 Potential

negative

impact and

no negative

impacts

Page 153: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

153

Appendix 7: Sustainability Appraisals of the Site Proposals

Wembley High Road

Site Proposal: W1 Wembley West End Size: 0.8 ha This site is suitable for comprehensive mixed use development including retail or other town centre uses and residential. A replacement town centre car park and amenity/open space should be provided. The development should improve and diversify Wembley's retail offer and include active frontages to Wembley High Road and Ealing Road. Land for a bus lane and an improved footway is required along Wembley High Road to provide better pedestrian access along the High Road to Wembley Central Station. Provision for pedestrian access between the High Road and Ealing Road should either be provided along the alignment of the High Road or Ealing Road, or be incorporated within the ground floor design for any new development on this site. The provision of improved highway access by providing easier turning movement left from High Road into Ealing Road should be built into the development design, and potential use of the land behind the development to provide increased capacity at the Montrose Crescent car park, serving the western gateway to the town centre. Indicative Development Capacity - 250 units

Objective Scoring Comment

Soci

al S1. + Excellent public transport accessibility and potential to provide new

affordable housing.

S2. ?

S3. ?

S4. + Potential to provide new affordable housing.

S5. + Redevelopment of the site provides an opportunity to improve the area.

S6. 0

S7. + Town centre location fosters community cohesion.

S8. + Town centre location for easy access to key services.

Envi

ron

men

tal EN1. + Town centre location of the site and excellent public transport

accessibility.

EN2. ?

EN3. - Redevelopment of the site would have adverse impact on air quality by increasing traffic.

EN4. ?

EN5. + New development would enhance the public realm and improve the townscape.

EN6. ?

EN7. + Sustainable location in the town centre and reuse of land.

EN8. ?/0 Redevelopment of the site will result in generation of waste and consumption of materials and resources. . May improve waste and recycling rates of households.

EN9. + It is a brownfield site and remediation of the land would be dealt with appropriately.

EN10. + Redevelopment of the site would incorporate sustainable urban drainage systems (SUDS).

Eco

no

mic

EC1. ++ Proposed use of the site is for mixed used development including retail and other town centre uses and site is located in Wembley Growth area

EC2. ++ Redevelopment of the site and the end use will provide job opportunities for local population.

EC3. ++ Site is located in the Wembley growth area and would provide regenerative development.

EC4. + Site is suitable for mixed use development including retail and other town centre uses.

EC5. + Excellent public transport accessibility and town centre location.

Page 154: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

154

Site Proposal: W2 London Road Size: 0.19 ha Mixed use development. Appropriate uses include retail and other town centre uses on the ground floor and residential uses above. There should be active frontages to both the High Road and London Road. Indicative Development Capacity - 50 units Objective Scoring Comment

Soci

al S1. + Potential to reduce social exclusion through potential provision of

affordable housing and retail units

S2. ?

S3. ?

S4. + Potential to provide new mixed use

S5. + Active frontages improve the quality of surroundings

S6. ?

S7. + Town centre location fosters community cohesion

S8. + Town centre location for easy access to key services

Envi

ron

men

tal EN1. + Town centre location of the site and excellent public transport

accessibility

EN2. ?

EN3. ? Town centre location of the site reduces the need for car use and small development mean that emission levels will not be significant. This site is very small therefore will not make a significant improvement (if any) on the air quality.

EN4. 0 Whilst the site will not enhance habitats of borough or local importance, it does not damage existing nature conservation sites.

EN5. + New development would enhance the public realm and improve the townscape

EN6. 0

EN7. + Sustainable location in the town centre will contribute to increased proportion of energy needs being met from renewable sources

EN8. ?/0 Re-development of this site will result in generation of waste and consumption of materials and resources. However a mixed use development will waste and recycling rates to be improved.

EN9. + Sustainable location in the town centre and re-use of land.

EN10. + Re-development of the site would incorporate sustainable urban drainage systems (SUDS)

Eco

no

mic

EC1. + The proposed use of the site is for mixed use development including retail and other town centre uses and will encourage sustainable economic growth

EC2. + Site is not directly providing new employment but new shops will provide employment.

EC3. + The site will help support the regeneration of Wembley and help reduce disparity of the town centre with the new masterplan area

EC4. + Site is suitable for mixed use development including retail and other town centre uses

EC5. + Very good public transport accessibility and town centre location will assist with efficient patterns of movement to support economic growth

Page 155: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

155

Site Proposal: W3 Chiltern Line Cutting North Size: 2.3 ha This area would support only a very limited amount of new housing development. The scale of any new development should relate to, and respect the adjacent existing neighbourhoods to the north of this area. The council will seek to maintain and enhance the nature conservation value of the site and mitigation and compensation measures will need to be provided to ensure that there is no overall net loss to biodiversity value and a continuous wildlife link is provided through the site. Public access through part of the site will be sought on development. Indicative Development Capacity - 15 units Objective Scoring Comment

Soci

al S1. + Excellent public transport accessibility but limited potential to provide

new housing

S2. ?

S3. ?

S4. + Potential to provide new affordable housing

S5. ?

S6. ?

S7. + Town centre location fosters community cohesion

S8. + Town centre location for easy access to key services

Envi

ron

men

tal EN1. + Town centre location of the site and excellent public transport

accessibility

EN2. 0

EN3. ?

EN4. - It is a site of Metropolitan (and Borough Grade 1) Nature Conservation importance, and a Wildlife Corridor and therefore effects on biodiversity will need to be mitigated

EN5. + New development would enhance the public realm and improve the townscape

EN6. 0

EN7. + Sustainable location in the town centre and re-use of land

EN8. ?/0 Re-development of this site will result in generation of waste and consumption of materials and resources. However could increase waste and recycling rates.

EN9. ?/0 Sustainable location in the town centre and reuse of land but this this site is located on a Site of Metropolitan Nature Conservation Importance & Site of Borough (Grade 1) Nature Conservation Importance.

EN10. + Re-development of the site would incorporate sustainable urban drainage systems (SUDS).

Eco

no

mic

EC1. + The proposed use of the site is for mixed use development including retail and other town centre uses and the site is located in Wembley Growth Area

EC2. + The redevelopment of the site and the end use will provide job opportunities for local population

EC3. + The site is located in the Wembley growth area and would provide regenerative development

EC4. + Site is suitable for mixed use development including retail and other town centre uses

EC5. + Very good public transport accessibility and town centre location

Page 156: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

156

Site Proposal: W4 Wembley High Road / Chiltern Line Cutting South Size: 4 ha A key aspect of the development of the High Road area is maintaining viability and vitality of Wembley town centre. Development should support these objectives and will need to be in keeping with providing improved public realm and pedestrian access through this area. Development should also support the objective of creating a link to encourage movement to and from the new Wembley re-development via the White Horse Bridge and the forthcoming Wembley City Boulevard. The Council's objective is to transform the Wembley Link area into a sustainable mixed use community. This would be best delivered through developing the concept for cafes, restaurants and bars and appropriate retail along the frontage, potentially with office above these, and residential above this, where appropriate. Student accommodation or hotel would also be appropriate within this site. Development proposals should include active frontages. Land will be required for road widening on redevelopment of the site, as shown on the Proposals Map. Indicative Development Capacity - 890 units

Objective Scoring Comment

Soci

al S1. + Excellent public transport accessibility and with the combination of uses

(café culture and offices), will reduce social exclusion

S2. ?

S3. + It is likely to effect access to education if student accommodation is built here.

S4. ++ Significant positive impact – potential to provide new affordable housing

S5. ?

S6. ?

S7. + Town centre location fosters community cohesion

S8. + Town centre location for easy access to key services

Envi

ron

men

tal EN1. + Town centre location of the site and excellent public transport

accessibility

EN2. 0

EN3. ?/0 Potential to reduce the need for car use.

EN4. - Site is site of Metropolitan (and Borough Grade 1) Nature Conservation importance, and a Wildlife Corridor and therefore effects on biodiversity will need to be mitigated

EN5. + New development would enhance the public realm and improve the townscape

EN6. 0

EN7. + Sustainable location in the town centre and re-use of land

EN8. ?/0 Re-development of this site will result in generation of waste and consumption of materials and resources. However it may improve waste and recycling rates due to its location and use.

EN9. + Sustainable location in the town centre and reuse of land

EN10. + Re-development of the site would incorporate sustainable urban drainage systems (SUDS)

Eco

no

mic

EC1. ++ The density of residential development combined with offices above these will encourage sustainable economic growth

EC2. ++ The re-development of the site and the end use will provide job opportunities for local population

EC3. ++ The site will help facilitate regeneration within the town centre area, and retain the quality of the town centre environment compared to the masterplan area.

EC4. + Site is suitable for mixed use development and through the combination of retail, restaurants, bars and offices above and accessible location, will encourage indigenous business and inward investment

EC5. + Very good public transport accessibility and town centre location. With offices as part of the development, this will encourage efficient patterns of movement.

Site Proposal: W5 Copland Community School and Brent House

Page 157: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

157

Size: 4 ha Mixed use development on the High Road frontage with new / rebuilt school to the rear. The ground floor on the High Road frontage should be commercial retail development, potentially including a medium sized food store (approximately 6000m²) with associated car parking. Residential development either above or adjacent to the retail should include a high proportion of family housing. Development of the school to the rear of the site should accommodate, if possible, an additional form of entry on current capacity. The scale of new development near to Cecil Avenue should respect the adjacent suburban character. Car parking on the retail site should have shared use for town centre parking. There should be an active retail frontage with servicing off Wembley High Road. Access from Cecil Avenue will be limited to residential access only. In the event of the school not coming forward as part of a joint scheme, proposals may be brought forward for the Brent House site as a standalone development. Indicative Development Capacity - 370 units

Objective Scoring Comment

Soci

al S1. + Excellent public transport accessibility, the potential to provide

affordable housing will help promote social inclusion, and food store will help improve affordability of essential services

S2. + A food store on this site would introduce further price competition for essential foods, thereby improving affordability of essential goods.

S3. ?

S4. ++ Given the size of the development, there is good potential to provide new affordable housing

S5. ?

S6. 0 New uses will increase footfall in a currently quiet area but increased anti-social behaviour possible from bars/restaurants

S7. + Town centre location fosters community cohesion

S8. + Town centre location for easy access to key services

Envi

ron

men

tal EN1. 0 Town centre location of the site and excellent public transport

accessibility will encourage travel by modes other than the car, but food store on this site may attract additional car trips

EN2. ?

EN3. ?/0 Town centre location of the site reduces the need for car use, thereby reducing potential emissions however if there is a food store then this will increase traffic

EN4. ?

EN5. + With appropriate mitigation, new development would enhance the public realm and improve the townscape

EN6. ?

EN7. + Sustainable location in the town centre and re-use of land

EN8. ?/0 Re-development of this site will result in generation of waste and consumption of materials and resources. However it may increase waste and recycling rates.

EN9. + Sustainable location in the town centre and reuse of land

EN10. + Re-development of the site would incorporate sustainable urban drainage systems (SUDS)

Eco

no

mic

EC1. ++ The proposed use of the site is for mixed use development including the retail store will help support economic growth

EC2. ++ The re-development of the site and the end use will provide job opportunities for local population

EC3. ++ The site is located in the Wembley growth area and would provide regenerative development, and provide jobs for those in need of employment

EC4. + A food retail store on this site will help encourage supporting indigenous business and inward investment

EC5. + Very good public transport accessibility and town centre location will improve accessibility and reduce journey times

Comprehensive Development Area

Page 158: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

158

Site Proposal: W6 South Way Site adjacent to Wembley Stadium Station Size: 1.29 ha The location of this site means that it is ideally suited for major mixed use development, with a limited scale of development on the south side of White Horse Bridge. A retail component will be important in providing a link between the High Road and Wembley Park. Boulevard. Pubs, bars or cafes would also be appropriate along with other town centre uses such as residential and student accommodation. Residential uses would be best suited to areas away from the main pedestrian thoroughfare while an employment hub would be encouraged for the land to the east of the square. Consideration would need to be given to access arrangements to this part of the site on event days due to the need for the public square to act as a holding area for passengers boarding rail services from Wembley Stadium railway station. Active frontage should be provided at ground floor level on both the public square and the pedestrian link between The Triangle and Wembley Stadium. Car park access to the site should not conflict with pedestrian movements and the closure of South Way on event days. New station facilities, including ticket office, should be provided together with an improved bus interchange. The height of buildings should not block the view of the stadium from Wembley Triangle with a 6-7storeys maximum height on the south side of site. Land is required for bridge/road widening as shown on the Proposals Map. Indicative Development Capacity - 341 units

Objective Scoring Comment

Soci

al S1. + Provide affordable housing and low carbon environment

S2. ?

S3. ?

S4. ++ Potential to provide affordable homes

S5. + Site currently vacant, sense of place will be improved between existing town centre and new developments, development will provide buffer against railway noise.

S6. 0 New uses will increase footfall in a currently quiet area but increased anti-social behaviour possible from bars/restaurants

S7. + Potential to provide new community facilities and creation of an area of self with the built out square

S8. ++ Improved public transport interchange and flagship development will improve investment

Envi

ron

men

tal EN1. 0

EN2. ?

EN3. - Increased car usage associated with development likely to worsen air quality

EN4. 0 Site currently covered in vegetation but not of importance so neutral impact

EN5. ++ Development will protect and frame views of the stadium and enhance the local area

EN6. ?

EN7. 0 New development will be built to high energy standards but as existing site vacant there will be a very small net increase in emissions

EN8. ?/0 Re-development of this site will result in generation of waste and consumption of materials and resources. However it may increase waste and recycling rates.

EN9. + Development on current vacant, brownfield land

EN10. 0

Eco

no

mic

EC1. ++ New business opportunities and growth in a variety of employment sectors

EC2. ++ New jobs will provide opportunity and reduce local unemployment

EC3. ++ Will promote regeneration in the local area

EC4. ++ Substantial new land made available for development

EC5. ++ Provision of local jobs for nearby residents, improve public transport accessibility with new interchange facilities and station, new bus link will reduce journey times

Page 159: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

159

Site Proposal: W7 Mahatma Gandhi House Size: 0.29 ha Suitable for redevelopment or conversion for residential or office use. Any redevelopment should include an active ground floor onto South Way. This site is adjacent to the Ibis Hotel therefore a building of a similar scale is appropriate. Land is required to improve South Way/Wembley Hill Road junction, as shown on the Proposals Map. Indicative Development Capacity - 76 units (if residential)

Objective Scoring Comment

Soci

al S1. + Excellent public transport location and potential to provide affordable

housing

S2. ?

S3. ?

S4. + Potential for some affordable housing on the site

S5. ?

S6. ?

S7. ?

S8. ?

Envi

ron

men

tal EN1. 0

EN2. ?

EN3. 0

EN4. ?

EN5. + Small improvement to urban environment expected on redevelopment

EN6. ?

EN7. + New building likely to be more energy efficient

EN8. 0

EN9. ?

EN10. 0

Eco

no

mic

EC1. + Opportunity for business growth

EC2. 0 Impact dependent on whether development employment or residential

EC3. 0

EC4. + New development will promote inward investment

EC5. 0

Site Proposal: W8 Land West of Wembley Stadium Size: 8.4 ha A key component of this area is the Boulevard connection which runs from the north east to the south west through the development site. This is critical in ensuring a connection to, and therefore integration with, the High Road as well as to Wembley Park to the north. The Boulevard connection should enable the use of buses, taxis and cycles. To integrate the Boulevard with the rest of the development area and existing developments to the west, it is important that pedestrian links are provided east/west through the site to ensure permeability. Outstanding parcels of undeveloped land should provide a mix of uses appropriate to a town centre location such as retail, leisure, office, community and residential. At ground level there should be active frontages to the boulevard. Development of sites to the east of the boulevard should allow for easy pedestrian access to the stadium. The existing 5-a-side football centre should be relocated to a nearby site on development of its current site. Royal Route should provide an at-grade crossing with the boulevard to provide for public transport access. Indicative Development Capacity (remaining) - 1,500 units

Objective Scoring Comment

Page 160: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

160

Soci

al S1. ++ Substantial development and opportunity associated with development

S2. ?

S3. ?

S4. ++ Up to 1,500 additional homes, many of which affordable will reduce homelessness/usage of unfit homes

S5. ++ Substantial improvement to the quality of surroundings in this area

S6. 0 More people will reduce fear and risk of crime but bars may increase anti-social behaviour and increased risk during event days

S7. ++ Symbolises regeneration in Brent as a whole

S8. ++ New bus route through development area will increase accessibility, development will focus on non-car modes

Envi

ron

men

tal EN1. 0

EN2. ?

EN3. 0 Development will increase traffic volumes but these are mitigated by design of development which will create a boulevard of good air quality

EN4. ?

EN5. + Significant improvement to townscape of Wembley City, new open spaces around Boulevard, some threat from visual intrusion

EN6. ?

EN7. + Renewable sources used for energy needs, energy efficient homes will reduce emissions

EN8. - Major development will increase waste generation

EN9. ++ Major development on brownfield land

EN10. + Inclusion of SUDs will reduce flood risk, as will green roofs

Eco

no

mic

EC1. ++ Development will encourage economic growth through new businesses. Growth in key sectors and clusters and enhance image of the area

EC2. ++ New employment opportunities from major mixed use development

EC3. ++ Development promotes regeneration throughout the area

EC4. ++ Investment will help encourage local businesses and attract more investment

EC5. ++ Mixed use development will reduce commuting and the Boulevard and public transport improvements will reduce journey times and improve accessibility

Site Proposal: W9 York House Size: 0.76 ha It is unlikely that York House will be redeveloped in the timescale of this Action Plan. However, there may be an opportunity to build on the car park. Any proposed development on the car park should be relatively low rise, mixed use and include a substantial area of open space. It should integrate with public realm improvements in the vicinity. Indicative Development Capacity - 60 units

Objective Scoring Comment

Soci

al S1. + If mixed use contain employment may reduce poverty

S2. ?

S3. ?

S4. ?

S5. + New open space would be expected as part of development

S6. ?

S7. ?

S8. ?

E n v i r o n m e n t a l EN1. + Reduction in car parking would reduce impact of traffic

Page 161: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

161

EN2. + Reduction in car parking would reduce impact of surface run off

EN3. 0

EN4. ?

EN5. ++ New open space and new development on car park will improve townscape

EN6. ?

EN7. + Climate change impact from reduced car usage

EN8. 0

EN9. ?

EN10. ++ Potential to include new open space and incorporate SUDS on site

Eco

no

mic

EC1. + Mixed use development on site will encourage growth

EC2. + Mixed use development will provide employment opportunity

EC3. ?

EC4. ?

EC5. ?

Site Proposal: W10 Dexion House Size: 0.37 ha Mixed-use development. Appropriate uses include retail, office, leisure, residential, student accommodation and hotel. The provision of a community swimming pool is a requirement for the site. Active frontage should be provided at ground level onto Empire Way. Height should not exceed 18 stories. Public pedestrian access from Empire Way to the rear of the site should be provided on redevelopment.

Objective Scoring Comment

Soci

al S1. + This site lies in close proximity to Wembley Park Station, therefore

focussing mixed-use development is such a location and improving connectivity through the site is likely to reduce social exclusion.

S2. ++ The provision of a publicly accessible pool will encourage healthy lifestyles and help to reduce health inequalities in the area.

S3. + Student accommodation will affect access to education and the provision of a new community swimming pool will improve educational facilities.

S4. ++ Potential for a mix of uses, including a range of affordable housing

S5. + Redevelopment of the site provides an opportunity to improve the area.

S6. + Incorporation of a range of uses and a stronger, active frontage is likely to increase activity throughout the day, thus reducing the potential fear of crime.

S7. ++ The provision of a community swimming pool is likely to have significant benefits to the local community.

S8. + Site is in close proximity to public transport facilities and the existing local centre at Wembley Park.

Envi

ron

men

tal EN1. + Close proximity to Wembley Park Station and increased access for

pedestrians and cyclists across the site.

EN2. ?

EN3. - Redevelopment may increase emissions in the short term

EN4. ?

EN5. + Redevelopment is likely to result in an enhanced public realm

EN6. ?

EN7. + Redevelopment will necessitate a more energy efficient building than the existing

EN8. - Intensification of the site likely to increase consumption of materials and production of waste

EN9. + It is a brownfield site and remediation of the land would be dealt with appropriately.

EN10. + Redevelopment of the site will increase the provision of soft landscaping and the use of SUDS

Page 162: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

162

Eco

no

mic

EC1. ++ A range of uses are promoted as part of the development of this site which should support economic growth in the area.

EC2. ++ Redevelopment of the site and the end use will provide job opportunities for local population.

EC3. ++ Site is located in the Wembley growth area and would provide regenerative development likely to reduce disparities in surrounding areas

EC4. + Site has been identified for mixed-use development which will encourage inward investment

EC5. + The site lies in close proximity to a range of public transport facilities

Site Proposal: W11 Malcolm House Size: 0.21 ha Mixed use development. Appropriate uses include retail, office, leisure, residential, hotel and community use. Active frontage should be provided at ground level onto Empire Way. Land will be required on redevelopment of the site for the junction improvement as shown on the Proposals Map.

Objective Scoring Comment

Soci

al S1. + This site lies in close proximity to Wembley Park Station, therefore

focussing mixed-use development is such a location and improving connectivity through the site is likely to reduce social exclusion.

S2. ?

S3. ?

S4. ++ Potential for a mix of uses, including a range of affordable housing

S5. + Redevelopment of the site provides an opportunity to improve the area.

S6. + Incorporation of a range of uses and a stronger, active frontage is likely to increase activity throughout the day, thus reducing the potential fear of crime.

S7. + The provision of a community uses would have significant benefits to the local community.

S8. + Site is in close proximity to public transport facilities and the existing local centre at Wembley Park.

Envi

ron

men

tal EN1. + Near to Wembley Park Station and increased access for pedestrians and

cyclists across the site.

EN2. ?

EN3. - Redevelopment may increase emissions in the short term

EN4. ?

EN5. + Redevelopment is likely to result in an enhanced public realm

EN6. ?

EN7. + Redevelopment will be energy efficient and therefore reduce energy consumption

EN8. ?/0 Intensification of the site likely to increase consumption of materials and production of waste. Mixed use development might improve waste and recycling rates.

EN9. + It is a brownfield site and remediation of the land would be dealt with appropriately.

EN10. + Redevelopment of the site will increase the provision of soft landscaping and the use of SUDS

Eco

no

mic

EC1. ++ A range of uses are promoted as part of the development of this site which should support economic growth in the area.

EC2. ++ Redevelopment of the site and the end use will provide job opportunities for local population.

EC3. ++ Site is located in the Wembley growth area and would provide regenerative development likely to reduce disparities in surrounding areas

EC4. + Site has been identified for mixed-use development which will encourage inward investment

Page 163: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

163

EC5. + The site lies in close proximity to a range of public transport facilities

Site Proposal: W12 North West Lands Size: 5 ha Mixed-use development. Appropriate uses include retail, office, leisure, residential, student accommodation, hotel and community use. A key element of the development of the North West Lands is the provision of the shopping street parallel to Olympic Way to the east of the Civic Centre to ultimately extend north of Fulton Road. It is important also that pedestrian links are provided east / west through the site to provide permeability between areas and onto Olympic Way. Active frontages should be provided at ground level to Olympic Way. A public open space of at least 0.4 hectares should be provided in the centre of the area. Development should include a publicly accessible car park. Proposals should be accompanied by a flood risk assessment. Indicative Development Capacity - 815 units

Objective Scoring Comment

Soci

al

S1. ++ The amount and type of new development proposed for this site are likely to provide a range of services currently lacking in the area

S2. + A new open space and increase accessibility through the site will provide increased opportunities for sport and recreation

S3. + Student accommodation will improve access to education

S4. ++ Potential for a mix of uses, including a range of affordable housing

S5. ++ Redevelopment of the site provides an opportunity to significantly improve the area and create a genuine sense of place.

S6. ?

S7. + The provision of community and cultural uses would have significant benefits to the local community.

S8. ?

Envi

ron

men

tal

EN1. 0

EN2. ?

EN3. - The scale of development is likely to increase emissions in the area

EN4. ++ Development will significantly increase tree planting and soft landscaping in the area as well as green/brown roofs for biodiversity

EN5. ++ Redevelopment is likely to result in a significantly enhanced public realm and improved townscape character

EN6. + Development should preserve and enhance the character of the Listed Arena

EN7. + Redevelopment will be energy efficient and therefore reduce energy consumption.

EN8. ?/0 Intensification of the site likely to increase consumption of materials and production of waste however it could increase waste and recycling rates

EN9. + It is a brownfield site and remediation of the land would be dealt with appropriately.

EN10. ++ Redevelopment of the site will significantly increase the provision of soft landscaping and the use of SUDS

Eco

no

mic

EC1. ++ A range of uses are promoted as part of the development of this site which should support significant economic growth in the area.

EC2. ++ Redevelopment of the site and the end use will provide job opportunities for local population.

EC3. ++ Site is located in the Wembley growth area and would provide regenerative development likely to reduce disparities in surrounding areas

EC4. ++ Site has been identified for mixed-use development which will encourage inward investment

EC5. ++ The site lies in close proximity to a range of public transport facilities

Site Proposal: W13 Stadium Retail Park Size: 1.1 ha

Page 164: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

164

Mixed-use development with predominantly commercial uses. Appropriate uses include retail, office, leisure, student accommodation, hotel and community use with a limited amount of residential. It is important that redevelopment of the site should allow for the extension of the pedestrian route from the shopping street to be developed in the North West Lands site south of Fulton Road. Active frontages should be provided onto Olympic way Development should contribute towards environmental improvements, including road and junction adjustments on the gyratory at the junction of Wembley Park Drive, Empire Way and Bridge Road. Landscape improvements fronting onto Empire Way, and especially Olympic Way, should also be included. Indicative Development Capacity - 50 units

Objective Scoring Comment

Soci

al S1. + This site lies in close proximity to Wembley Park Station, therefore

focussing mixed-use development is such a location and improving connectivity through the site is likely to reduce social exclusion.

S2. ?

S3. ?

S4. + Potential for a mix of uses, including a range of affordable housing

S5. + Redevelopment of the site provides an opportunity to improve the area.

S6. 0

S7. ?

S8. + Site is in close proximity to public transport facilities and the existing local centre at Wembley Park.

Envi

ron

men

tal EN1. + Given the current use, it is likely that redevelopment of this site will

result in the reduction of traffic

EN2. ?

EN3. 0

EN4. + Development will increase tree planting and soft landscaping in the area

EN5. + Redevelopment is likely to result in an enhanced public realm

EN6. ?

EN7. + Redevelopment will necessitate a more energy efficient building than the existing

EN8. - Intensification of the site likely to increase consumption of materials and production of waste

EN9. + It is a brownfield site and remediation of the land would be dealt with appropriately.

EN10. + Redevelopment of the site will increase the provision of soft landscaping and the use of SUDS

Eco

no

mic

EC1. + Uses promoted as part of the development of this site should support economic growth in the area.

EC2. + Redevelopment of the site and the end use will provide job opportunities for local population.

EC3. + Site is located in the Wembley growth area and would provide regenerative development likely to reduce disparities in surrounding areas

EC4. + Site has been identified for mixed-use development which will encourage inward investment

EC5. ++ The site lies in close proximity to a range of public transport facilities

Site Proposal: W14 Arena House and Crescent House Size: Arena House - 0.29 ha, Crescent House - 0.37 ha At least one of the buildings should be retained in educational use. On redevelopment or conversion of either building appropriate uses include offices, education, student housing or hotel, providing active frontages on the ground floor. Arena House is a suitable location for a tall building subject to preserving views of Wembley Stadium from Barnhill. A small area of land on North End Road and Bridge Road is required, as shown on the Proposals Map, to allow North End Road to be re-opened. Any new development should create a main entrance on Bridge Road. Any redevelopment of Crescent House should have regard to flood risk and flood risk assessment will be required. Opportunities to semi-naturalise the Brook and provide for public access will be

Page 165: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

165

sought on redevelopment of the site.

Objective Scoring Comment

Soci

al S1. + Excellent public transport accessibility therefore contributing to low

carbon economy.

S2. ?

S3. + Ensures retention of education use

S4. ?

S5. ?

S6. 0

S7. ?

S8. + Education facility in very accessible location

Envi

ron

men

tal EN1. + Town centre location of the site and excellent public transport

accessibility.

EN2. + Semi-naturalising the brook will improve water quality

EN3. 0

EN4. ++ Semi-naturalising the brook will improve biodiversity

EN5. + New development would enhance the public realm and improve the townscape/ landscape.

EN6. ?

EN7. + Sustainable location in the town centre and reuse of land.

EN8. - Intensification of the site likely to increase consumption of materials and production of waste

EN9. + Brownfield sites that would be converted or redeveloped.

EN10. ++ Potential opportunity to semi naturalise the brook. Plus redevelopment proposals for the site would require a flood risk assessment to demonstrate how flood risk would be minimised.

Eco

no

mic

EC1. + Proposed uses for the sites would help maintain the local economy

EC2. ++ Development and the end uses will provide job opportunities for local population.

EC3. ++ Sites are located in the Wembley growth area and would provide regenerative development.

EC4. + Redevelopment or reoccupation of sites would regenerate inward investment

EC5. + Excellent public transport accessibility and town centre location.

Site Proposal: W15 Apex House and Karma House Size: 0.3 ha The Apex House and Karma House sites are suitable for hotel or residential development, providing commercial uses such as affordable work space on the ground floor. In spite of the extant permission on Karma House a courtyard type development, as illustrated in the Wembley Masterplan, is favoured for the site. Indicative Development Capacity: (If residential) 85

Objective Scoring Comment

Soci

al

S1. + Very good public transport accessibility therefore contributing to low carbon economy.

S2. ?

S3. ?

S4. + Potential for new affordable housing

S5. + Improved sense of place

S6. 0

S7. ?

S8. + Within a very accessible location therefore good access to services

E n v i r o n m e n t a l EN1. + Very good public transport accessibility.

Page 166: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

166

EN2. ?

EN3. 0

EN4. ?

EN5. + New development would enhance the public realm and improve the townscape/ landscape.

EN6. ?

EN7. + Sustainable location because of very good public transport access and reuse of land.

EN8. - Additional waste will be generated

EN9. + Brownfield sites that will be redeveloped.

EN10. + Redevelopment proposals for the site would require a flood risk assessment.

Eco

no

mic

EC1. + New office development would boost the local economy

EC2. + Development will maintain job opportunities for local population.

EC3. + Site would provide regenerative development.

EC4. + Redevelopment site would regenerate inward investment

EC5. + Very good public transport.

Site Proposal: W16 1 Olympic Way Size: 0.68 ha Any redevelopment of the existing offices is expected to follow the form set out in the masterplan in order to maintain Olympic Way as an internationally recognised processional route to the stadium. Redevelopment should re-provide office floor space. The council would wish to improve the setting of the Wealdstone Brook and the tree belt through the north of the site. Opportunities to semi-naturalise the Brook and provide for public access will be sought on any redevelopment of the site. Redevelopment proposals must be accompanied by a flood risk assessment. Development of this site should contribute to an upgrading of the northern part of Olympic Way including the underpass to Wembley Park underground station. A small area of land on North End Road is required, as shown on the Proposals Map, to allow the road to be re-opened at the junction with Bridge Road.

Objective Scoring Comment

Soci

al S1. + Very good public transport accessibility therefore contributing to low

carbon economy.

S2. ?

S3. ?

S4. ?

S5. ?

S6. 0

S7. ?

S8. ?

Envi

ron

men

tal EN1. ?

EN2. ?

EN3. 0

EN4. + Semi-naturalising the brook will improve biodiversity

EN5. + New development would enhance the public realm and improve the townscape/ landscape.

EN6. ?

EN7. +

EN8. - Additional waste generated

EN9. + Proposal to redevelop a Brownfield site.

EN10. ?

Eco

no

mic

EC1. + Proposed uses for the site would boost the local economy

EC2. ++ Development and the end uses will provide job opportunities for local

Page 167: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

167

population.

EC3. ++ Site located in the Wembley growth area and would provide regenerative development.

EC4. + Redevelopment site would regenerate inward investment

EC5. + Very Good public transport.

Site Proposal: W17 Olympic Way Office Site Size: 0.3 ha The redevelopment of this site should largely mirror the development pattern on the western side of Olympic Way in scale and form – these are detailed and illustrated in the Wembley Masterplan. This requires the

pulling back of taller elements to secure an 80m zone with maximum projections of 25m separated by ‘

outdoor rooms’. Office and hotel development would be acceptable throughout the development, while residential development should be confined to upper floors as set out in the Wembley Masterplan. The council will strongly encourage active ground floor uses such as cafes, restaurants and bars on the Olympic Way side. The building at the southern end should complement the park and the plot should provide a generous open space connecting to the new public open space on Engineers Way. Development of this plot should also ensure that buses can be accommodated on Rutherford Way, turning in and out of Engineers Way and Fulton Road. Indicative Development Capacity: 250

Objective Scoring Comment

Soci

al S1. + Very good public transport accessibility therefore contributing to low

carbon economy.

S2. ?

S3. ?

S4. + Provision of new affordable housing

S5. + Improved sense of place

S6. 0

S7. ?

S8. + Within a very accessible location therefore good access to services

Envi

ron

men

tal EN1. + Very good public transport accessibility.

EN2. ?

EN3. 0

EN4. + Site to include public green space

EN5. + New development would enhance the public realm and improve the townscape/ landscape.

EN6. ?

EN7. + Sustainable location because of very good public transport access and reuse of land. Redevelopment of the site is likely to increase energy efficiency of buildings.

EN8. ?/0 Additional waste generated but is likely to improve waste and recycling rates once the building is occupied.

EN9. + Brownfield sites that will be redeveloped.

EN10. ?

Eco

no

mic

EC1. ++ New mixed use development would boost the local economy

EC2. ++ Development will provide job opportunities for local population.

EC3. ++ Site would provide regenerative development.

EC4. ++ Redevelopment site would regenerate inward investment

EC5. + Very good public transport access.

Site Proposal: W18 Wembley Retail Park Size: 4.9 ha This site will provide a new residential district supplying a high proportion of family sized housing including

Page 168: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

168

dwellings at ground level. The Wembley Masterplan sets out general 4-6 storey heights with taller elements (8-12 stories) on identified corner plots on key junctions. Development should include a new public open space orientated east/west and facing onto Engineers Way. The emphasis is on a much more domestic scale and character than the regeneration area to the west of Olympic Way. A new primary school will be provided on the site of the Wembley Industrial Park. If the site is not required for a new school then it will provide affordable housing as an alternative. Indicative Development Capacity - 500

Objective Scoring Comment

Soci

al S1. ++ The site will provide high proportion of family housing. If a new primary

school is not delivered then affordable housing will be expected.

S2. ?

S3. ++ This site is identified for the provision of a new primary school.

S4. ++ The site will deliver a new housing district including a high proportion of family housing. Affordable housing will be expected to be provided if a new primary school is not delivered.

S5. + Redevelopment of the site will improve the area and provide a new residential district and a new public open space providing residential amenity.

S6. ?

S7. + Provision of new housing and a park will enable will encourage sustainable communities.

S8. 0

Envi

ron

men

tal EN1. 0 The site is located in a PTAL area of 2-3 but the provision of a school

would provide easy access without the need for a car. Additionally residential instead of retail is likely to be a lower trip generator (depending upon the density).

EN2. ?

EN3. 0

EN4. ++ A new public open space would enhance biodiversity and create habitats in an area of open space deficiency.

EN5. + Redevelopment by providing new housing, a school and public open space would significantly enhance the public realm.

EN6. ?

EN7. + Reuse of land and sustainable design and construction methods would be used for new housing and a school.

EN8. - Redevelopment of the site will result in a higher generation of waste and consumption of materials and resources.

EN9. + It is a brownfield site and remediation of the land would be dealt with appropriately.

EN10. ++ Redevelopment of the site would incorporate sustainable urban drainage systems (SUDS) and a new public open space would reduce surface water flooding.

Eco

no

mic

EC1. ?

EC2. + Redevelopment of the site will provide job opportunities for local population.

EC3. + A new primary school will help regenerate the area

EC4. - Focus is on creating a domestic character with the regeneration being focused to the west of Olympic Way.

EC5. - Located in PTAL area of 2-3 however new housing would be located within walking or cycling distance of new employment areas.

Site Proposal: W19 Wembley Stadium Car Park Size: 4.5 ha The Wembley Masterplan seeks the development of a major leisure attraction that will complement and add to Wembley’s offer on stadium non event days. It is likely that the site is large enough, and in such close proximity to the Stadium, that a multi use complex can be accommodated and serviced. The physical and

Page 169: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

169

operational relationship between any new development and the Stadium will require careful policy management and planning. Any development on the site which would result in the loss of coach and car parking would need to provide replacement coach and car parking elsewhere nearby (see policy WEM17).

Objective Scoring Comment So

cial

S1. ?

S2. ?

S3. ?

S4. ?

S5. ?

S6. ?

S7. ?

S8. ?

Envi

ron

men

tal EN1. - The site is located in a PTAL area of 2-3.

EN2. ?

EN3. - Redevelopment of the site would have adverse impact on air quality by increasing traffic.

EN4. ?

EN5. + The development of a major leisure attraction would improve the townscape and would be built to ensure that it does not impact upon the Stadium.

EN6. ?

EN7. + Reuse of land and sustainable design and construction methods would be used in the redevelopment.

EN8. - Redevelopment of the site will result in generation of waste and consumption of materials and resources. May improve waste and recycling rates of households.

EN9. + It is a brownfield site.

EN10. + Redevelopment of the site would incorporate sustainable urban drainage systems (SUDS).

Eco

no

mic

EC1. ++ Development of a major leisure attraction would enable economic growth.

EC2. ++ Development of a major leisure attraction would create new jobs.

EC3. + Redevelopment of the site from a car park to a new major leisure attraction would help regenerate the area.

EC4. + Development of a major leisure attraction would attract investment and visitors to Wembley.

EC5. - Located in PTAL area of 2-3.

Wembley Park/Empire Way Corridor

Site Proposal: W20 Cottrell House & Norman House Size: 0.2 ha Mixed use development. Appropriate uses include residential, retail, commercial and community facilities. Residential development should provide amenity space. The design of new development on this site could be integrated with Norman House. Indicative Development Capacity - 55 units

Objective Scoring Comment

Soci

al S1. + Excellent public transport accessibility and potential to provide new

affordable housing.

S2. ?

S3. ?

S4. + Potential to provide new affordable housing.

S5. + New housing on this site would have to provide amenity space.

Page 170: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

170

S6. ?

S7. + New community facilities on this site would encourage a sense of community.

S8. + Excellent public transport accessibility En

viro

nm

enta

l EN1. + Excellent public transport accessibility.

EN2. ?

EN3. - Redevelopment of the site would have adverse impact on air quality by increasing traffic.

EN4. ?

EN5. + Redevelopment of the site would improve the townscape and character of the area.

EN6. ?

EN7. + Sustainable location in the town centre and reuse of land. Redevelopment provides an opportunity for energy efficient buildings.

EN8. ?/0 Redevelopment of the site will result in generation of waste and consumption of materials and resources. However there will be improved waste and recycling rates with new development and there is the possibility of linking to Envac.

EN9. + Site is underused buildings and land.

EN10. + Redevelopment of the site would incorporate sustainable urban drainage systems (SUDS).

Eco

no

mic

EC1. + Proposed use of the site is for mixed used development including retail and other town centre uses and the site is located in Wembley Growth area

EC2. + Redevelopment of the site and the end use will provide job opportunities for local population.

EC3. + Site is located in the Wembley growth area and would provide regenerative development.

EC4. + Site is suitable for mixed use development including retail and other town centre uses.

EC5. + Excellent public transport accessibility and town centre location.

Site Proposal: W21 21-31 Brook Avenue Size: 0.6 ha Redevelopment for residential use including at least as many family sized units as would be lost and associated amenity space. Development should provide a buffer to the brook of at least 8 metres and semi-naturalisation of the brook will be sought. Proposals in Flood Zones 2 and 3 must be accompanied by a flood risk assessment and the sequential test and exception test should be applied. Development should not impede flood water flows and should not increase surface water run-off or reduce water storage. Basement dwellings will not be allowed in flood Zone 3. Indicative Development Capacity - 160 units

Objective Scoring Comment

Soci

al S1. + Excellent public transport accessibility and potential to provide new

affordable housing.

S2. ?

S3. ?

S4. ++ New housing would have to provide family housing.

S5. 0

S6. ?

S7. + Redevelopment provides an opportunity to encourage a sense of pride.

S8. + Good location for easy access to key services.

Envi

ron

men

t al EN1. + Location of the site has excellent public transport accessibility.

EN2. + Semi –naturalisation of the brook would help improve water quality.

EN3. - Redevelopment of the site would have adverse impact on air quality by

Page 171: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

171

increasing traffic.

EN4. + Semi-naturalisation of the brook would enhance biodiversity.

EN5. + Semi-naturalisation of the brook would improve the ecological quality of the brook.

EN6. ?

EN7. + Reuse of land and redevelopment provides an opportunity for providing energy efficient buildings.

EN8. ?/0 Redevelopment of the site will result in generation of waste and consumption of materials and resources. However there will be improved waste and recycling rates with new development.

EN9. + Development would take place on underused developed land.

EN10. ++ Redevelopment of the site would be set back from the brook, incorporate SUDS and the opportunity to semi-naturalise the brook would provide flood risk and water quality benefits.

Eco

no

mic

EC1. ?

EC2. ?

EC3. ?

EC4. ?

EC5. + Excellent public transport accessibility.

Site Proposal: W22 Wembley Park Station Car Park Size: 0.92 ha The site is considered suitable for residential development including a significant proportion of family housing and appropriate amenity space. Mitigation for noise and vibration from the railway line to the north will be necessary. Indicative Development Capacity - 100 units Objective Scoring Comment

Soci

al S1. + Excellent public transport accessibility and potential to provide new

affordable housing.

S2. ?

S3. ?

S4. ++ New housing would include family housing.

S5. ++ New housing development would need to provide amenity space for residents.

S6. ?

S7. + Redevelopment provides an opportunity to encourage a sense of pride.

S8. + Good location for easy access to key services with excellent public transport links.

Envi

ron

men

tal EN1. + Location of the site has excellent public transport accessibility.

EN2. ?

EN3. - Redevelopment of the site would have adverse impact on air quality by increasing traffic.

EN4. + Amenity space could enhance biodiversity and include the planting of new trees on site

EN5. + The provision of new housing and amenity space on this site would improve the landscape quality and character.

EN6. ?

EN7. + Reuse of land and redevelopment provides an opportunity for providing energy efficient buildings.

EN8. ?/0 Redevelopment of the site will result in generation of waste and consumption of materials and resources. Redevelopment may improve waste and recycling rates.

EN9. + Development would take place on underused developed land.

EN10. + Redevelopment of the site would incorporate sustainable urban drainage

Page 172: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

172

systems (SUDS).

Eco

no

mic

EC1. ?

EC2. ?

EC3. ?

EC4. + Investment would be needed to build new housing.

EC5. ++ Excellent public transport accessibility.

Site Proposal: W23 The Torch/Kwik Fit Size: 0.37 ha Mixed use development. Appropriate uses include residential with retail at ground floor level. An active frontage should be provided at ground level on Bridge Road and Forty Lane. Any residential development should have regard to the neighbouring uses and provide amenity/open space. Proposals should take account of potential junction improvements. Indicative Development Capacity - 100 units

Objective Scoring Comment

Soci

al S1. + Excellent public transport accessibility and potential to provide new

affordable housing.

S2. ?

S3. ?

S4. ++ Potential to provide new affordable housing.

S5. + Redevelopment of the site provides an opportunity to improve the area.

S6. ?

S7. + Town centre location fosters community cohesion.

S8. + Town centre location for easy access to key services.

Envi

ron

men

tal EN1. + Town centre location of the site and excellent public transport

accessibility.

EN2. ?

EN3. - Redevelopment of the site would have adverse impact on air quality by increasing traffic.

EN4. ?

EN5. + New development would enhance the public realm and improve the townscape.

EN6. ?

EN7. + Sustainable location in the town centre and reuse of land. Redevelopment provides an opportunity for providing energy efficient buildings.

EN8. ?/0 Redevelopment of the site will result in generation of waste and consumption of materials and resources. It could improve waste and recycling rates

EN9. + New development would take place on under developed land and buildings.

EN10. + Redevelopment of the site would incorporate sustainable urban drainage systems (SUDS).

Eco

no

mic

EC1. ++ Proposed use of the site is for mixed used development including retail and other town centre uses

EC2. ++ Redevelopment of the site and the end use will provide job opportunities for local population.

EC3. ++ Site is located in the Wembley growth area and would provide regenerative development.

EC4. ++ Site is suitable for mixed use development including retail and other town centre uses.

EC5. ++ Excellent public transport accessibility and town centre location.

Page 173: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

173

Site Proposal: W24 Town Hall Size: 2.1 ha - 0.5 assumed developable area Mixed use development. Appropriate uses include offices, retail (for local needs only), residential, hotel and community facilities ensuring the retention of the Listed Building. Any change of use and/or development should enhance and not detract from the character and importance of the Town Hall, and have regard for existing traffic problems to surrounding residential areas and seek to improve these conditions. Due to the Listed Building status, the entire area has not been used to estimate the indicative development capacity. The area to the rear of the building could possibly be used for development. Height should not exceed the current height of the Town Hall of 5 storeys. A Flood Risk Assessment will be required as the site area is over 1 hectare. Indicative Development Capacity - 156 units

Objective Scoring Comment

Soci

al S1. + Potential to provide new affordable housing and in an area of excellent

public transport accessibility.

S2. ?

S3. ?

S4. + Potential to provide new affordable housing.

S5. + Development would need to retain the listed building and residential amenity would be expected if housing was to come forward on this site to provide a good quality surrounding.

S6. ?

S7. + The Town Hall is a listed building and is in a town centre location enabling better community relationships. Plus there is potential to provide community facilities on this site.

S8. + Town centre location for easy access to key services.

Envi

ron

men

tal EN1. + Town centre location of the site and excellent public transport

accessibility.

EN2. ?

EN3. 0

EN4. ?

EN5. + Any redevelopment would maintain the modern art deco design of the Town Hall.

EN6. + Any redevelopment on this site will need to retain the listed building.

EN7. + Sustainable location in the town centre and reuse of land and buildings. Opportunity for energy efficiency upgrades

EN8. ?/0 Redevelopment of the site will result in generation of waste and consumption of materials and resources. May increase waste and recycling rates.

EN9. + Development would be reusing an existing building and land.

EN10. + Redevelopment of the site would incorporate sustainable urban drainage systems (SUDS).

Eco

no

mic

EC1. + The site is suitable for mixed use development.

EC2. ++ Redevelopment of the site and the end use will provide job opportunities for local population.

EC3. + Reuse of the Town Hall would provide regeneration benefits.

EC4. ++ Site is suitable for mixed use development including retail, offices, hotel, residential and community facilities.

EC5. + Excellent public transport accessibility and town centre location.

Wembley Eastern Lands

Site Proposal: W25 Amex House Size: 0.5 ha

Page 174: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

174

Amex House site is appropriate for mixed use development, including residential, office and managed affordable workspace for creative industries, to support the wider regeneration of the Wembley Park area. Family housing should form part of the housing mix. Biodiversity improvements and flood risk adaptation measures will be sought when development proposals come forward. A buffer strip of at least 10 metres wide should be retained for a publicly accessible brookside park to allow for a cycle way/footpath, associated landscaping, tree planting and street furniture, as agreed in consultation with the Environment Agency and Brent Council. Development should allow for a nodal point on the brook where the buffer strip should be widened to about 20 metres. Removal of part of the canalised wall and regrading of the bank to provide a more natural setting will be sought. The site would be suitable for housing facing the brook providing the restoration work is carried out. Proposals in Flood Zones 2 and 3 must be accompanied by a flood risk assessment and the sequential test and exception test should be applied. Development should not impede flood water flows and should not increase surface water run-off or reduce water storage. Basement dwellings will not be allowed in flood Zone 3. Indicative Development Capacity - 150 units

Objective Scoring Comment

Soci

al S1. + The brookside park would encourage social cohesion.

S2. + The brookside walk would provide an opportunity for recreation and cycling.

S3. ?

S4. ++ Potential to provide new affordable housing

S5. + Redevelopment of the site provides an opportunity to improve the area.

S6. 0

S7. ++ The restored brook will foster a sense of pride in the area.

S8. ?

Envi

ron

men

tal EN1. + The introduction of the brookside walk will complement the improved

walking and cycling facilities in the area.

EN2. + River restoration work will improve water quality.

EN3. ?/0 Redevelopment of the site would have adverse impact on air quality by increasing traffic. However there will be an increase in walking and cycling.

EN4. ++ The river restoration work will improve biodiversity while planting new trees will provide habitats for wildlife.

EN5. ++ New development and the proposed brookside park would enhance the public realm and improve the townscape and landscape.

EN6. ?

EN7. ++ SUDs will be introduced along with tree planting. Provision of energy efficient buildings.

EN8. ?/0 Redevelopment of the site will result in generation of waste and consumption of materials and resources. May improve waste and recycling rates.

EN9. + It is a brownfield site and remediation of the land would be dealt with appropriately.

EN10. + Redevelopment of the site would incorporate sustainable urban drainage systems (SUDS).

Eco

no

mic

EC1. ++ Proposed use of the site is for mixed use development that including affordable workspace for creative industries.

EC2. ++ Redevelopment of the site and the end use will provide job opportunities for local population.

EC3. ++ Site is located in the Wembley growth area and would provide regenerative development.

EC4. + Local employment opportunities for creative industries.

EC5. + Excellent public transport location and employment opportunities on doorsteps for new residents.

Page 175: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

175

Site Proposal: W26 Watkin Road Size: 1.5 ha Watkin Road is appropriate for mixed use development including office, leisure, residential, managed affordable workspace (including for creative industries), and community use. Extra care housing or family housing could form part of any housing mix. Biodiversity improvements and flood risk adaptation measures will be sought when development proposals come forward. A buffer strip of at least 10 metres wide should be retained for a publicly accessible brook-side park to allow for a cycle way/footpath, associated landscaping, tree planting and street furniture, as agreed in consultation with the Environment Agency and Brent Council. Development should allow for two nodal points on the Brook where the buffer strip should be widened to about 20 metres. Removal of part of the canalised wall and regarding of the bank to provide a more natural setting will be sought. The site would be suitable for housing facing the brook providing the restoration work is carried out. Development of parts of the site outside of Flood Zone 3a will be required to contribute towards the restoration work. Proposals in Flood Zones 2 and 3 must be accompanied by a flood risk assessment and the sequential test should be applied. Development should not impede flood water flows and should not increase surface water run-off or reduce water storage. Basement dwellings will not be allowed in flood Zone 3. Indicative Development Capacity - 400 units

Objective Scoring Comment

Soci

al S1. + The brookside park would encourage social cohesion.

S2. + The brookside walk would provide an opportunity for recreation and cycling.

S3. ?

S4. ++ Potential to provide new affordable housing

S5. + Redevelopment of the site provides an opportunity to improve the area.

S6. 0

S7. ++ The restored brook will foster a sense of pride in the area.

S8. ?

Envi

ron

men

tal EN1. 0 The introduction of the brookside walk will complement the improved

walking and cycling facilities in the area.

EN2. + River restoration work will improve water quality.

EN3. ?/0 Redevelopment of the site would have adverse impact on air quality by increasing traffic. However it is mentioned that cycling will reduce traffic.

EN4. ++ The river restoration work will improve biodiversity while planting new trees will provide habitats for wildlife.

EN5. ++ New development and the proposed brookside park would enhance the public realm and improve the townscape and landscape.

EN6. ?

EN7. ++ SUDs will be introduced alongside with tree planting.

EN8. 0 Redevelopment of the site will result in generation of waste and consumption of materials and resources that would counterbalance the waste currently generated on site from businesses.

EN9. + It is a brownfield site and remediation of the land would be dealt with appropriately.

EN10. + Redevelopment of the site would incorporate sustainable urban drainage systems (SUDS).

Eco

no

mic

EC1. ++ Proposed use of the site is for mixed use development that including affordable workspace which would encourage business start-ups.

EC2. ++ Redevelopment of the site and the end use will provide job opportunities for local population.

EC3. ++ Site is located in the Wembley growth area and would provide regenerative development.

EC4. + Local employment opportunities and investment for office, leisure use and affordable workspace

EC5. + Excellent public transport location and employment opportunities on doorsteps for new residents.

Site Proposal: W27 Euro Car Parts

Page 176: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

176

Size: 1.35 ha The site is appropriate for mixed use development including office, leisure, residential, student accommodation, managed affordable workspace (including for creative industries), hotel and community use. The creation of an appropriate buffer between the existing industrial and new non-industrial uses will be required. Biodiversity improvements and flood risk adaptation measures will be sought when development proposals come forward. A buffer strip of at least 10 metres wide should be retained for a publicly accessible brookside park to allow for a cycle way/footpath, associated landscaping, tree planting and street furniture, as agreed in consultation with the Environment Agency and Brent Council. Development should allow for a nodal point on the brook where the buffer strip should be widened to about 20 metres. Removal of part of the canalised wall and regrading of the bank to provide a more natural setting will be sought. The site would be suitable for housing facing the river providing the river restoration work is carried out. Development will be required to contribute towards the restoration work. Proposals must be accompanied by a Flood Risk Assessment. Development should not impede flood water flows and should not increase surface water run-off or reduce water storage. Indicative Development Capacity - 360 units

Objective Scoring Comment

Soci

al S1. + The brookside park and community use would encourage social cohesion.

S2. + The brookside walk would provide an opportunity for recreation and cycling.

S3. ?

S4. ++ Potential to provide new affordable housing

S5. + Redevelopment of the site provides an opportunity to improve the area.

S6. 0

S7. ++ The restored brook will foster a sense of pride in the area.

S8. ?

Envi

ron

men

tal EN1. 0 The introduction of the brookside walk will complement the improved

walking and cycling facilities in the area.

EN2. + River restoration work will improve water quality.

EN3. - Redevelopment of the site would have adverse impact on air quality by increasing traffic.

EN4. ++ The river restoration work will improve biodiversity while planting new trees will provide habitats for wildlife.

EN5. ++ New development and the proposed brookside park would enhance the public realm and improve the townscape and landscape.

EN6. ?

EN7. ++ SUDs will be introduced alongside with tree planting.

EN8. 0 Redevelopment of the site will result in generation of waste and consumption of materials and resources that would counterbalance the waste currently generated on site from businesses.

EN9. + It is a brownfield site and remediation of the land would be dealt with appropriately.

EN10. + Redevelopment of the site would incorporate sustainable urban drainage systems (SUDS).

Eco

no

mic

EC1. ++ Proposed use of the site is for mixed use development that including affordable workspace which would encourage business start-ups.

EC2. ++ Redevelopment of the site and the end use will provide job opportunities for local population.

EC3. ++ Site is located in the Wembley growth area and would provide regenerative development.

EC4. + Local employment opportunities and investment for hotel, student accommodation, office, leisure use and affordable workspace.

EC5. + Excellent public transport location and employment opportunities on doorsteps for new residents.

Page 177: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

177

Site Proposal: W28 First Way Size: 9 ha The site is appropriate for mixed use development including leisure, hotels, offices, amenity/open space, residential development and student accommodation. The Council is seeking the delivery of complementary land use relationships across the site. Alternatively, the creation of an appropriate buffer between the existing industrial and new non-industrial uses will be sought. In particular, new development will be required to have careful regard for the relationship with, and impact of, the waste facility on Fifth Way and industrial units set along Second Way. Public transport accessibility improvements will be sought for development of this site. New streets/pedestrian routes are sought to create east-west links through the site. A small portion of land, as shown on the Proposals Map, will be required to enable the introduction of two way traffic on South Way/ First Way. A Transport Assessment will be required to assess the impact of trip generation on the local and wider road network. As the site is within easy walking distance of the Stadium, part of the site may be appropriate to meet the need for coach parking. Any new coach park should be used for non parking activities outside of event days to maximise job opportunities. Proposals must be accompanied by a Flood Risk Assessment as the site is over 1ha in size. Indicative Development Capacity - 1,500 units

Objective Scoring Comment

Soci

al S1. + New street/pedestrian routes and public transport accessibility

improvements would promote to a low carbon economy

S2. ?

S3. ?

S4. ++ Potential to provide new affordable housing

S5. + Redevelopment of the site provides an opportunity to improve the area.

S6. 0

S7. ++ The site is adjacent to the Stadium. High design quality required of new buildings would increase the artistic offering.

S8. + Public transport accessibility will be sought.

Envi

ron

men

tal EN1. - Redevelopment of the site would increase traffic volumes.

EN2. ?

EN3. - Redevelopment of the site would have adverse impact on air quality by increasing traffic.

EN4. ++ Pocket parks are proposed that would improve habitats for wildlife.

EN5. ++ New development would enhance the public realm and improve the townscape and landscape.

EN6. ?

EN7. ++ SUDs will be introduced alongside with tree planting.

EN8. 0 Redevelopment of the site will result in generation of waste and consumption of materials and resources that would counterbalance the waste currently generated on site from businesses.

EN9. + It is a brownfield site and remediation of the land would be dealt with appropriately.

EN10. + Redevelopment of the site would incorporate sustainable urban drainage systems (SUDS).

Eco

no

mic

EC1. ++ New developments will enhance the image of the area as a business location

EC2. ++ Redevelopment of the site and the end use will provide job opportunities for local population.

EC3. ++ Site is located in the Wembley growth area and would provide regenerative development.

EC4. + Local employment opportunities and investment for hotel, student accommodation, office and leisure use.

EC5. + New employment opportunities on doorsteps for new residents.

Page 178: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

178

Wembley Industrial Estates

Site Proposal: W29 Second Way Size: 10.21 ha The site is considered suitable for offices, light industry, storage and distribution, some transport related functions, utilities and wholesale markets. Given the proximity of potential residential uses on First Way, the site is not considered suitable for long term occupation by waste management uses. In view of the site being within walking distance of the Stadium, part of the site is maybe appropriate as a “satellite” coach park if replacement or additional coach parking is needed. Any new coach park should be used for non parking activities on non event days. If part of the site were to be used as a coach park then a dedicated, safe pedestrian route to the Stadium should be created. A small part of land (as shown on the Proposals Map) would be acquired to enable the introduction of two way traffic on South Way.

Objective Scoring Comment

Soci

al S1. ?

S2. ?

S3. ?

S4. ?

S5. + Redevelopment of the site provides an opportunity to improve the area.

S6. ?

S7. ?

S8. ?

Envi

ron

men

tal EN1. - Redevelopment of the site would increase traffic volumes.

EN2. ?

EN3. - Redevelopment of the site would have adverse impact on air quality by increasing traffic.

EN4. ?

EN5. ++ New development would enhance the public realm and improve the townscape and landscape.

EN6. + The area used to have the Never Stop Railway of the Empire Exhibition. The road layout of the area will remain the same to reflect the old setting.

EN7. ++ SUDs will be introduced alongside with tree planting.

EN8. 0 Redevelopment of the site will result in generation of waste and consumption of materials and resources that would counterbalance the waste currently generated on site from businesses.

EN9. + It is a brownfield site and remediation of the land would be dealt with appropriately.

EN10. + Redevelopment of the site would incorporate sustainable urban drainage systems (SUDS).

Eco

no

mic

EC1. ++ New developments will enhance the image of the area as a business location

EC2. ++ Redevelopment of the site and the end use will provide job opportunities for local population.

EC3. ++ Site is located in the Wembley Opportunity Area and would provide regenerative development.

EC4. + Local employment opportunities and investment for offices, light industry, storage and distribution, transport related functions, utilities and wholesale markets.

EC5. + New employment opportunities on doorsteps for new residents.

Page 179: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

179

Site Proposal: W30 Drury way Size: 1.21 ha Industrial and employment uses are suitable for this site. Waste management will not be acceptable in this location. This site is adjacent to protected railway sidings and proposals could make use of these railway sidings. The site is not within an identified flood zone however proposals must be accompanied by a Flood Risk Assessment as the site area is over 1ha.

Objective Scoring Comment

Soci

al S1. ?

S2. ?

S3. ?

S4. ?

S5. ?

S6. ?

S7. ?

S8. ?

Envi

ron

men

tal EN1. - Increase in traffic

EN2. ?

EN3. - Redevelopment of the site would have adverse impact on air quality by increasing traffic.

EN4. ?

EN5. ?

EN6. ?

EN7. ?

EN8. ?

EN9. + Development of a Brownfield site.

EN10. ?

Eco

no

mic

EC1. ++ Development of the site for employment use

EC2. ++ Development will provide additional job opportunities for local population.

EC3. ++ Will provide regenerative development.

EC4. ++ Redevelopment would promote inward investment

EC5. 0

Site Proposal: W31 Great Central Way Size: 1.21 ha The site is considered suitable for industrial, warehousing or other business uses, subject to a full ecological appraisal and appropriate mitigating measures. Given the proximity of residential uses on Lynton Close and Yeats Close to the south east of the development, the site is not considered suitable for waste management use.

Objective Scoring Comment

Soci

al S1. ?

S2. ?

S3. ?

S4. ?

S5. ?

S6. ?

S7. ?

S8. ?

Page 180: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

180

Envi

ron

men

tal EN1. 0

EN2. ?

EN3. - Redevelopment of the site would have adverse impact on air quality by increasing traffic.

EN4. - The site is located on a Site of Borough Nature Conservation Importance (Grade II) however an ecological appraisal and appropriate mitigation measures would be required.

EN5. ?

EN6. ?

EN7. ?

EN8. ?

EN9. + Development of a Brownfield site.

EN10. ?

Eco

no

mic

EC1. ++ Development of the site for employment use

EC2. ++ Development will provide additional job opportunities for local population.

EC3. ++ Will provide regenerative development.

EC4. ++ Redevelopment would promote inward investment

EC5. ?

Page 181: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

181

Appendix 8: Sustainability Appraisal of Revisions at Proposed Submission Stage The impacts of the revisions at Proposed Submission stage are set out in the tables below. The assessment found no significant negative impacts identified for any of the revisions against the SA objectives, therefore changes have not resulted in the need for any further mitigation. Amended policy WEM 1: Character and Urban Form Local Character

Development within each Wembley character area should seek to reinforce and emphasise

have regard to the broad development principles set out above for distinctive character of

each locality through well considered building and public realm design Development should

seek and exploit opportunities to whilst strengthen ing the connections between each of the

areas.

The council will require planning applications for development affecting buildings and areas

of architectural merit to demonstrate how proposals will conserve their significance and

setting.

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. + Wording of policy has been altered to improve clarity and strengthen role of buildings and areas of architectural merit in developing future local identity.

S6. 0

S7. + Conserving buildings and areas of architectural merit and their setting will contribute to a sense of local pride.

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. 0

EN5. + Policy will contribute to enhancements to townscape.

EN6. ++ Policy will ensure development conserves the setting of buildings and areas of architectural merit.

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Page 182: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

182

Amended policy WEM 2: Gateways to Wembley

The council will continue to focus on the three stations as the principle gateways into Wembley.

The enhancement of nodes around key junctions will be sought, particularly to the east of the AAP

area. Architecture and public realm design should seek to reinforce the role of these gateways and

nodes as important elements of the urban experience.

Any new development around the Triangle junction (High Road/Wembley Hill Road) must

demonstrate how the strengthening of connections through the area has been considered.

Development at principal gateways and key nodes will be expected to add to the sense of arrival and

legibility of Wembley. The quality of development along key routes will be given significant weight

when considering applications in these locations.

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. 0

S6. 0

S7. 0

S8. + Rewording of policy places greater onus on strengthening connections through the area.

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. 0

EN5. + Emphasises the need for development to enhance the quality of gateways.

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Amended policy WEM 3: Public Realm

Public realm improvements will be sought that reflect local character as an integral element of

proposals for new development.

Page 183: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

183

The council will seek a consistent approach to the public realm along the pedestrian route between

the three station gateways. New development will be expected to contribute to connectivity in the

area through public realm improvements at key nodes and junctions

The council will require development to contribute to new tree planting.

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. + Rewording of policy makes it more explicit that new development is to enhance public realm at key nodes and junctions, which will enhance the quality of surroundings.

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. + Tree planting has potential to enhance air quality.

EN4. ++ Increase in number of trees will improve ecological quality of public realm.

EN5. + Policy will ensure new development supports public realm enhancements at key nodes and junctions.

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Amended policy WEM 4: Public Art

Where appropriate, the design of public spaces should allow for event infrastructure.

The council will seek contributions towards public art from development within the AAP

area, particularly at key gateways or where new open spaces are proposed.

The design of new open space should include a place for public art.

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

Page 184: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

184

S4. 0

S5. + Artwork can make an important contribution to the creation of a sense of place.

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. 0

EN5. + Artwork will contribute to the quality of public realm.

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Amended policy WEM 5: Tall Buildings

Tall buildings will be acceptable in a limited number of locations within the AAP area, where they

can demonstrate the highest architectural quality. Where tall buildings are proposed in areas

designated as ‘appropriate’ and ‘sensitive’ the council will require the submission of a key views

assessment to accompany planning applications proposals must also fully demonstrate their impact

on key views of the Stadium. Any application for a tall building within Wembley will be required to

submit a three dimensional digital model in a format specified by the council.

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. 0

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. 0

EN5. ++ Rewording places greater protection on views by requiring a key views assessment to accompany planning applications for tall buildings.

EN6. 0

Page 185: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

185

EN7. 0

EN8. 0

EN9. 0

EN10. 0 Ec

on

om

ic EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Amended policy WEM 7: Character of Olympic Way

Proposed Development on Olympic Way must be carefully designed and scaled to respect the predominance of Wembley Stadium and its arch.

Proposals for tall buildings must demonstrate that they have no adverse visual impacts on views of the stadium from Olympic Way.

The council will seek active ground floor uses either side of Olympic Way that can be appropriately managed on Event Days.

Development flanking Olympic Way will be expected to pursue opportunities to incorporate pocket spaces.

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. 0

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. 0

EN5. + Incorporating pocket spaces along Olympic Way will enhance the quality of the public realm.

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Page 186: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

186

Amended policy WEM 8: Securing Design Quality

The Council will require expect details the submission of the primary materials suite detailed

specifications to be submitted as part of all major applications within the AAP area.

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. 0

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. 0

EN5. + Policy will help to ensure materials are of a high quality and will make a positive contribution to the enhancement of townscape and public realm.

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

In light of the council’s proposal to re-designate part of the Strategic Industrial Location (SIL) to an

Industrial Business Park, including the area currently designated as a Business Park in the UDP, and

the Strategic Cultural Area which is designated in the London Plan, it is felt that the Business Park

designation is no longer necessary.

The area covered by the current Business Park will therefore be divided into the eastern section

currently in the SIL and the western section adjacent to the Stadium.

The council will seek re-designation of the eastern section (which is Site Proposal W29) from

Preferred Industrial Location (PIL) to Industrial Business Park (IBP) through the London Plan review

process. The proposed changes to Site Proposal W29 incorporate the land use principles for an

Industrial Business Park. This reflects the site’s location and purpose to provide a buffer zone

between the non-industrial uses proposed for the Comprehensive Development Area and the PIL.

The western section will fall within the Strategic Cultural Area within which major leisure, tourism

and cultural uses are encouraged. Mixed use development is also appropriate in this area. This is

Page 187: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

187

addressed in policy WEM27 and in individual Site Proposals.

Removed policy WEM9: Wembley Stadium Business Park

Redevelopment for business use of the area east of the Stadium, as shown on the Proposals Map,

will be encouraged.

Development attracting large numbers of trips should contribute towards transport improvements

appropriate to the scale of the proposed development.

Development for waste management, and related uses such as aggregate storage and transfer, will not be appropriate in this area. The relocation of such uses from within the business park area will be encouraged.

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. 0

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. 0

EN5. 0

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0 As the proposed changes to Site Proposal W29 incorporate the land use principles for an Industrial Business Park the removal of this policy has no significant impacts on sustainable economic growth.

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Revised policy WEM 14 Western Highway Corridor

The council will develop improved access for public transport, pedestrians and cyclists, especially from Forty Lane to Ealing Road via Empire Way and Wembley High Road. Junction and highway improvements along this route are required to facilitate development and will be designed to favour these non car users as well as improve general highway performance, including for non-car users. Any improvements would need to be supported by modelling.

Land for improvements will be determined and secured when planning consent is granted for re-development of the site. This will ensure that on re-development, improvements for public

Page 188: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

188

transport users, pedestrians and cyclist will be secured.

Objective Scoring Comment So

cial

S1. 0

S2. 0

S3. 0

S4. 0

S5. 0

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. ++ Policy will reduce traffic volumes by encouraging the use of public

transport, walking and cycling.

EN2. 0

EN3. + Reducing traffic volumes will contribute to improved air quality.

EN4. 0

EN5. 0

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Amended policy WEM 17: Walking and Cycling

With supporting amendments to area based policies W3, W4, W6, W13, W14, W15, W16, W21,

W25, W26 and W27.

Measures The council will seek to implement to encourage walking and cycling by: are:

1. Allowing shared surfaces in low trafficked areas in the new urban quarter close to the Stadium.

2. Promote Prioritising space for pedestrians, cyclists and public transport users in Wembley the

traditional town centre and reducing the proportion of through traffic using routes through

Wembley the town centre in ways that maintain capacity for vehicles on the wider network

5. Ensuring e that any junction/ highway improvements and new streets are designed to prioritise

take due account of pedestrian/ cycle access, convenience and ease of movement and the need to

ensure a high quality public realm.

3. Provide exclusively pedestrian streets in locations with the heaviest footfall, and restrict servicing

to early morning only.

Ensuring that streets and spaces are designed so that conflict between road users is reduced and

Page 189: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

189

vulnerable users are protected.

Requiring appropriate cycling facilities, such as parking, showers and storage, as part of all major

new and retrofit developments.

Identifying new cycle routes and signage opportunities for commuting, leisure and local cycling trips.

Maximising cycling investment in Wembley from all sources.

4. Providing a new pedestrian and cycle bridge over the Metropolitan/Jubilee/Chiltern rail lines near

St David's Close.

6. Enhance existing Increasing the provision of secure cycle parking and introducing a Cycle Hub

within the area.

7. Continue to progress feasibility work on the Western Footbridge

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. 0

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. ++ Policy revised to improve facilities and routes for cyclist, which will

encourage cycling and reduce traffic volumes.

EN2. 0

EN3. + Reducing traffic volumes will improve air quality.

EN4. 0

EN5. 0

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

It is felt that a policy on affordable rent, which is a borough-wide issue, is more appropriately dealt

with in the council’s forthcoming development management development plan document (DMDPD),

rather than the Wembley Area Action Plan. This approach is also fitting given the timing of the

London Plan examination and Inspector’s report on the matter which would delay the submission of

the WAAP.

Page 190: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

190

Removed policy WEM 19: Affordable Rent

Affordable Rent subject to rent controls that require a rent of no more than 80% of the local market

rent, including service charges, are an appropriate part of the tenure mix in Wembley. Affordable

Rent will be required to meet the needs of households eligible for social housing at a cost low

enough for them to afford, determined with regard to local incomes and local house prices.

Amended policy WEM 20: Housing Mix

The housing mix guidance provided in table 7.12 will be applied in the relevant parts of Wembley. Additionally, new Affordable Rent that meets the needs of households eligible for social housing, with eligibility determined with regard to local incomes and local house prices, at a cost low enough for them to afford, will be accepted as part of the tenure mix. The council will encourage intermediate affordable housing tenures, such as discounted market sale products, where the council can secure future equity payments that can be recycled into new affordable housing.

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. 0 As affordable rent will be covered in the DMDPD removal of policy WEM19 will not impact on the provision of affordable rented housing.

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. 0

EN5. 0

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Page 191: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

191

Amended policy WEM 26: New retail, leisure and office development

New retail, leisure and office development will be directed to the town centre as defined on the Proposals Map. Edge of centre retail and leisure development will be considered appropriate only when existing town centre sites have been developed or where the proposed use, because of its size, is incapable of being accommodated on an existing town centre site.

Outside of the town centre, ancillary retail function as part of a major leisure, tourism or cultural use may be acceptable in the Strategic Cultural Area.

Large foodstores (over 2,000 sq m gross) will be directed to sites within or adjoining Wembley High Road.

Improvements to existing local retail uses in the SIL are supported.

Shops (Use class A1) will not generally be appropriate on the eastern side of Olympic Way.

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. 0

S6. + Policy will improve access to local retail.

S7. 0

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. 0

EN5. 0

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Page 192: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

192

Revised policy WEM31: Community Facilities

In considering the needs for Community Facilities provision the council will:

1. Secure at least four forms of entry at primary level to be secured on development sites within the Wembley area, noting provision of one site in site proposal W 18.

2. Secure contributions for secondary school provision through planning obligations and then through the use of the Community Infrastructure Levy.

3. Require new GP/dentists provision in the AAP where other local capacity (e.g. Chalkhill Health Centre) is used up in the longer term as population grows.

4. Seek the provision of multi-use community facilities at the rate set out in the Core Strategy accepting a lower provision when costs of provision or rents are substantially reduced;

5. Support the provision of community facilities social infrastructure including religious, community and cultural provision in locations accessible to all sections of the community and within easy reach by walking, cycling and public transport within the AAP area; and

6. Actively support the provision of meanwhile and temporary uses that will provide opportunities for social interaction.

Objective Scoring Comment

Soci

al S1. 0

S2. ++ Policy will ensure access to high quality health facilities.

S3. ++ Policy will improve access to educational facilities.

S4. 0

S5. 0

S6. 0

S7. 0

S8. ++ Will improve accessibility to key community facilities.

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. 0

EN5. 0

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Page 193: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

193

Revised policy WEM34: Urban Greening

Development proposals must incorporate urban greening measures such as green roofs, green walls, trees and soft landscaping. Wherever possible, opportunities to connect new green spaces to existing green spaces should be maximized to help create green infrastructure. Where site constraints limit the level of urban greening that can be provided on site, a financial contribution will be required. Local food growing facilities will be supported as stated in (see policy WEM 38 in the Open Space chapter).

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. 0

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. + Policy supports the creation of green infrastructure.

EN5. 0

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Revised policy WEM 42: River Brent and Wealdstone Brook

The council will work in partnership with the Environment Agency and use development contributions to aid the restoration of the River Brent and the Wealdstone Brook. The development of sites adjacent to the Wealdstone Brook should undertake the opportunities to provide amenity space, improve biodiversity, public access, and semi naturalisation. Development proposals adjacent to the River Brent and Wealdstone Brook should contribute to the naturalisation of the river have regards to its natural setting and enhance biodiversity.

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. 0

Page 194: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

194

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. ++ Policy will enhance biodiversity of River Brent and Wealdstone Brook.

EN5. 0

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Amended policy WEM35: Flood Risk

All proposed development in Flood Zones 2 and 3 will require a detailed Flood Risk Assessment

(FRA), in accordance with Section 6.7 of Brent’s Strategic Flood Risk Assessment.

Applications will be assessed against the site-specific flood risk mitigation requirements set out for

individual Site Proposals.

Development is not suitable in Flood Zone 3b.

Application of a site-level sequential approach will be expected to locate development towards

areas of lowest risk within the site. More vulnerable development will not usually be appropriate in

Flood Zone 3a. Where it is proposed in exceptional circumstances, an Exception Test will be

required.

Proposals within Flood Risk Zones 3a (High Probability and Climate Change) and 2 (Medium

Probability) will be required to pass the Sequential Test, and where a site is affected by Flood Zone

3a, the Exception Test must be applied. Proposals will need to demonstrate how flood risk is reduced

by sequential layout of the site and form of development. All proposals for development in Flood

Zones 2 and 3a&b will require a full Flood Risk Assessment (FRA). Proposals in Flood Zone 1 which

are over 1 hectare in size will also require a site specific FRA.

Development proposals in the area above must demonstrate that there will be no net loss in

floodplain storage nor an increase in maximum flood levels, within adjoining properties as

recommended by Brent's Strategic Flood Risk Assessment Report Level 1 (2007).

Developments will be required to implement SUDS to ensure that runoff from the site (post

redevelopment) does not exceed Greenfield runoff rates. In order to reduce surface water flood risk

in the area, all major proposals will be required to apply SUDS in accordance with Brent Surface

Water Management Plan.

Page 195: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

195

Developers will also be required to demonstrate whether there is sufficient capacity both on and off

site in the foul sewer network to support development. Where insufficient capacity exists

developers will be required to identify how any necessary upgrades will be delivered ahead of the

occupation of development.

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. 0

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. 0

EN5. 0

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. + Policy reduces the risk of flooding to people and property.

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Page 196: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

196

Revised policy W8: Land West of Wembley Stadium

(8.4 hectares)

A key component of this area is the Boulevard connection which runs from the north east to the south west through the development site. This is critical in ensuring a connection to, and therefore integration with, the High Road as well as to Wembley Park to the north. The Boulevard connection should enable the use of buses, taxis and cycles. To integrate the Boulevard with the rest of the development area and existing developments to the west, it is important that pedestrian links are provided east/west through the site to ensure permeability.

Outstanding parcels of undeveloped land should provide a mix of uses appropriate to a town centre location such as retail, leisure, office, community and residential. At ground level there should be active frontages to the boulevard. Development of sites to the east of the boulevard should allow for easy pedestrian access to the stadium.

The council will support proposals to relocate the existing 5-a-side football centre should be relocated to a nearby site on development of its current site.

Royal Route should provide an at-grade crossing with the boulevard to provide for public transport access.

The grade II listed Empire Pool (Wembley Arena) is one of the most significant historic buildings in Wembley. Any new development within close proximity of this building must provide a full and adequate assessment of potential impacts as part of a planning application.

Indicative Development Capacity (remaining) - 1,500 units

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. 0

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. 0

EN5. 0

EN6. ++ Policy amended to emphasise need to protect an important heritage asset.

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Page 197: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

197

Revised policy W29: Second Way

The site is considered suitable for uses in line with CP20 including offices, light industrial and higher value general industrial, utility and transport functions, wholesale markets, small scale distribution and sui generic uses that are closely related offices, light industry, storage and distribution, some transport related functions, utilities and wholesale markets. Given the proximity of potential residential uses on First Way, the site is not considered suitable for long term occupation by waste management uses, including aggregate storage and transfer. The relocation of such uses to the Preferred Industrial Location (PIL) north and east of Fourth Way will be encouraged.

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0

S5. + Will ensure potential residential development is not in proximity to waste management uses.

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. 0

EN5. 0

EN6. 0

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0 Wording of policy revised to clarify appropriate employment uses.

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Page 198: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

198

Appendix 9: Changes to Policy Numbers Preferred Options Proposed

Submission Policy Title

WEM 1 WEM 1 Urban Form

WEM 2 WEM 2 Gateways to Wembley

WEM 3 WEM 3 Public Realm

WEM 4 WEM 4 Public Art

WEM 5 WEM 5 Tall Buildings

WEM 6 WEM 6 Protection of Stadium Views

WEM 7 WEM 7 Character of Olympic Way

WEM 8 WEM 8 Securing Design Quality

WEM9 Wembley Stadium Business Park

WEM 10 WEM 9 Offices

WEM 11 WEM 10 Low-cost Business Start-up Space

WEM 12 WEM 11 Protected Rail Sidings

WEM 13 WEM 12 Road and Junction Improvements to Stadium Access Corridor and Western Access Corridor

WEM 14 WEM 13 Western Highway Corridor

WEM 15 WEM 14 Car Parking Strategy

WEM 16 WEM 15 Car parking standards

WEM 17 WEM 16 Walking and Cycling

WEM 18 WEM 17 Event Related Transport

WEM19 Affordable Rent

WEM 20 WEM 18 Housing Mix

WEM 21 WEM 19 Family Housing

WEM 22 WEM 20 Extra Care Housing

WEM 23 WEM 21 Wheelchair Housing and Supported Housing

WEM 24 WEM 22 Private Rented Sector

WEM 25 WEM 23 Student Accommodation

WEM 26 WEM 24 New retail development

WEM 27 WEM 25 Strategic Cultural Area

WEM 28 WEM 26 Hot Food Takeaways (A5 Uses)

WEM 29 WEM 27 Conferencing Facilities

WEM 30 WEM 28 Temporary Creative Uses

WEM 31 WEM 29 Community Facilities

WEM 32 WEM 30 Decentralised Energy

WEM 33 WEM 31 Energy from Waste

WEM 34 WEM 32 Urban Greening

WEM 35 WEM 33 Flood Risk

WEM 36 WEM 34 Open Space Provision

WEM 37 WEM 35 Open Space Improvements

WEM 38 WEM 36 Food Growing

WEM 39 WEM 37 Sports Facilities

WEM 40 WEM 38 Play Provision

WEM 41 WEM 39 Access to Nature

WEM 42 WEM 40 River Brent and Wealdstone Brook

Page 199: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

199

Appendix 10: Main Modifications The proposed main modifications (PMM) below are expressed either in the conventional form of strikethrough for deletions and underlining for additions of text, or by specifying the modification in words in italics.

Amended policy: Tall Buildings (PMM2)

Page 40 Map 4.4. The area covered by Site Proposal W18 is to be shown as a Site Appropriate for Tall Buildings rather than a Site Sensitive to Tall Buildings.

Objective Scoring Comment

Soci

al S1. 0

S2. 0

S3. 0

S4. 0/? Allowing taller buildings on site W18 has potential to increase site capacity, meaning potentially a higher quantum of residential development. However, development of tall buildings will still be subject to detailed design assessments including an assessment of impact on key views as set out in policy WEM 5.

S5. 0 Policy WEM 5 requires application for tall buildings on site W18 to demonstrate highest architectural quality, therefore amendment to Map 4.4 will have limited impact in terms of quality of surroundings.

S6. 0

S7. 0

S8. 0

Envi

ron

men

tal EN1. 0

EN2. 0

EN3. 0

EN4. 0

EN5. 0 Policy WEM 5 requires planning applications in this location to be accompanied by a key views assessment. This will be the mechanism to ensure views are protected and visual intrusion is minimised.

EN6. 0 Although site is now identified as appropriate for tall buildings planning applications will still be required to accord with WEM 5. An assessment of key views and 3D modelling will be used to assess impact on cultural assets, such as Wembley Stadium and arena.

EN7. 0

EN8. 0

EN9. 0

EN10. 0

Eco

no

mic

EC1. 0

EC2. 0

EC3. 0

EC4. 0

EC5. 0

Amended policy Site W3: Chiltern Line Cutting North (PMM19 and PMM20)

Insert additional text at the end of the first paragraph of site Proposal W3, Chiltern Line Cutting North, as shown: The council will support limited development of the north cutting where it connects from the

Page 200: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

200

south (Site Proposal W4) and supports commercial development which benefits the town centre. As the whole of the cutting on the north side is identified as an Area of Nature Conservation Importance as well as a Wildlife corridor, then more significant development would be appropriate only if there were substantial benefits in terms of the regeneration of the town centre as well as major compensatory provision for the loss of habitat. The existing residential areas to the north are predominantly two storey which limits also the scale of development that would be appropriate. Consequently, only a limited development can be accommodated.

Objective Scoring Comment

Soci

al S1. + Excellent public transport accessibility but limited potential to provide

new housing

S2. ?

S3. ?

S4. + Potential to provide new affordable housing

S5. ?

S6. ?

S7. 0

S8. + Town centre location for easy access to key services

Envi

ron

men

tal EN1. + Town centre location of the site and excellent public transport

accessibility, will reduce the need to travel for residents.

EN2. 0

EN3. 0

EN4. - It is a site of Metropolitan (and Borough Grade 1) Nature Conservation importance, and a Wildlife Corridor and therefore effects on biodiversity will need to be mitigated as set out in the policy.

EN5. + New development would enhance the public realm and improve the townscape

EN6. 0

EN7. + Sustainable location in the town centre and re-use of land

EN8. ?/0 Re-development of this site will result in generation of waste and consumption of materials and resources. However could increase waste and recycling rates.

EN9. ?/0 Sustainable location in the town centre and reuse of land but this this site is located on a Site of Metropolitan Nature Conservation Importance & Site of Borough (Grade 1) Nature Conservation Importance.

EN10. ?/0 Re-development of the site would incorporate sustainable urban drainage systems (SUDS). Mitigation will be required.

Eco

no

mic

EC1. + Development, albeit limited, will promote sustainable economic growth.

EC2. + The redevelopment of the site and the end use will provide job opportunities for local population

EC3. + The site is located in the Wembley growth area and would provide limited regenerative development.

EC4. + Site is suitable for limited development where this supports the delivery of site W4.

EC5. + Very good public transport accessibility and town centre location

Amended policy Site W4: High Road/Chiltern Line Cutting South (PMM21)

Amend paragraph 2 of the Site Proposal, as shown: The council's objective is to transform the Wembley Link area into a sustainable mixed use

Page 201: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

201

community. This would be best delivered through developing the concept for cafés, restaurants and bars and appropriate retail, including potentially a food store. along the frontage. , potentially with Office Residential development should form part of any mixed use scheme. above these, and residential above this, where appropriate. Offices, student accommodation or hotel would also be appropriate within this site. Development proposals should include active frontages.

Objective Scoring Comment

Soci

al S1. + Excellent public transport accessibility and with the combination of uses

(food store, café culture and offices), will reduce social exclusion

S2. + A food store on this site would introduce further price competition for essential foods, thereby improving affordability of essential goods.

S3. 0

S4. ++ Significant positive impact – potential to provide new affordable housing

S5. ?

S6. ?

S7. 0/+ Town centre location and mixed use scheme with facilities such as cafes and restaurants has potential to fosters community cohesion

S8. + Town centre location for easy access to key services

Envi

ron

men

tal EN1. + Town centre location of the site and excellent public transport

accessibility, will reduce the need to travel for residents. Accessible location for new facilities such as a foodstore and offices.

EN2. 0

EN3. ?/0 Potential to reduce the need for car use. Foodstore and offices have potential to generate traffic, however, as this is a town centre location which is highly accessible by public transport this is the most sustainable location for these uses.

EN4. 0

EN5. + New development would enhance the public realm and improve the townscape

EN6. 0

EN7. + Sustainable location in the town centre and re-use of land

EN8. ?/0 Re-development of this site will result in generation of waste and consumption of materials and resources. However it may improve waste and recycling rates due to its location and use.

EN9. + Sustainable location in the town centre and reuse of land

EN10. ?/0 Re-development of the site would incorporate sustainable urban drainage systems (SUDS). Mitigation will be required.

Eco

no

mic

EC1. ++ The density of residential development combined with offices above these will encourage sustainable economic growth

EC2. ++ The re-development of the site and the end use will provide job opportunities for local population

EC3. ++ The site will help facilitate regeneration within the town centre area, and retain the quality of the town centre environment compared to the masterplan area. A food store will make a positive contribution to the town centre offer.

EC4. + Site is suitable for mixed use development and through the combination of retail, restaurants, bars and offices above and accessible location, will encourage indigenous business and inward investment

EC5. + Very good public transport accessibility and town centre location. With offices as part of the development, this will encourage efficient patterns of movement.

Amended policy Site W5: Copland School and Brent House (PMM22)

Page 202: Wembley Area Action Plan Sustainability Appraisal Proposed … · 2014. 5. 16. · 6 Figure 1: Wembley Area Action Plan policy context Brent’s Core Strategy The council’s Core

202

Amend Site Proposal W5, as shown: The ground floor on the High Road frontage should be commercial retail development, potentially including a medium sized food store (approximately 6000m²) with associated car parking. Residential development either above or adjacent to the retail should include a high proportion of family housing.

Objective Scoring Comment

Soci

al S1. + Excellent public transport accessibility, the potential to provide

affordable housing will help promote social inclusion, and an element of retail development will help improve access to essential services

S2. 0

S3. 0

S4. ++ Given the size of the development, there is good potential to provide new affordable housing

S5. ?

S6. ?/0 New uses will increase footfall in a currently quiet area but increased anti-social behaviour possible from bars/restaurants

S7. 0

S8. + Town centre location for easy access to key services

Envi

ron

men

tal EN1. + Town centre location of the site and excellent public transport

accessibility will encourage travel by modes other than the car.

EN2. 0

EN3. + Town centre location of the site reduces the need for car use, thereby reducing potential emissions.

EN4. ?

EN5. + New development would enhance the public realm and improve the townscape.

EN6. 0

EN7. + Sustainable location in the town centre and re-use of land

EN8. ?/0 Re-development of this site will result in generation of waste and consumption of materials and resources. However it may increase waste and recycling rates.

EN9. + Sustainable location in the town centre and reuse of land

EN10. + Re-development of the site would incorporate sustainable urban drainage systems (SUDS)

Eco

no

mic

EC1. ++ The proposed use of the site is for mixed use development including an element of retail which will help support economic growth.

EC2. ++ The re-development of the site and the end use will provide job opportunities for local population.

EC3. ++ The site is located in the Wembley growth area and would provide regenerative development, and provide jobs for those in need of employment.

EC4. + Retail development on this site will help encourage supporting indigenous business and inward investment

EC5. + Very good public transport accessibility and town centre location will improve accessibility and reduce journey times